Loading...
HomeMy WebLinkAbout071 Plumbing WaterBFP T 1 1 2 2A A B B 4 4 5 5 6 6 7 7 8 8 9 9 10 10 C C D D E E F F 3 3 2A 2A 1 ROUTE DCW UP IN CHASE. 2 1/2" DCW2 1/2" DCW2" DCW2 WATER RISER ROOM FP RISER 2" WATER SERVICE UP IN WALL. 2" WATER METER W/ BY PASS 4" FP LAV-1 WC-1 ROUTE GAS PIPING UP FROM BELOW TO GAS METER BANK. SEE CIVIL DRAWINGS FOR UNDERGROUND GAS PIPING CONTINUTATION. GAS METER BANK 2" CITY WATER METER 2" WATER TO BUILDING PRV WITH STRAINER SET @ 70 PSI STRAINER FOR IRRIGATION CONNECTION 2-1/2" WATER SUPPLY TO BUILDING ANGLE STOP BALL VALVE (DOWNSTREAM SHUT OFF) 2-1/2" WATER SERVICE TO BUILDING 1-1/2" WATTS #009 RPBP-1 2-1/2" DOUBLE CHECK BACKFLOW PREVENTER WATTS LF007 DRAIN TO FLOOR DRAIN BIM FILE PATH: SHEET NO.: TITLE: COPYRIGHT 2021 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:THESE DRAWINGS ARE INTENDED TO BE PRINTED IN COLOR HELENA P: 406-442-4933 BOZEMAN P: 406-219-2216 www.sma.design C:\Users\mmelgar\Documents\BG MILL MEP CENTRAL v22_mmelgarKNS36.rvt 8/11/2022 4:23:15 PMP1.0 22-024 2022-08-11 PLUMBING DOMESTIC WATER Author Checker BG MILL CONDOMINIUMS 22-024 714 EAST MENDENHALL SREET BOZEMAN, MT 59715 SPR SUBMITTAL P1.0 SCALE: 1/8" = 1'-0" 1- MAIN FLOOR PLAN - DOM 1 KEYED NOTES 1 SEE CIVIL FOR CONTINUATION OF WATER SERVICE. COORDINATE WITH SITE CONTRACTOR TO PROVIDE 2-1/2" WATER SREVICE WITHIN 5 FT OF BUILDING. 2 3'-8" X 1'-8" FIRE RISER AREA. N No.Date Revision Description P1.0 SCALE: NTS WATER SERVICE DETAIL2