GENERAL ELECTRICAL NOTES:
A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH
OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS,
DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL
PLACEMENT OF MATERIALS.
B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS,
AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
C. 3rd FLOOR IS IDENTICAL TO 2nd FLOOR, POWER, LIGHTING, DATA, AND FIRE ALARM, DEVICE
AND FIXTURE LAYOUT AND CIRCUITING IS TO BE COPIED FROM 2nd FLOOR TO 3rd.
D. 5th FLOOR IS IDENTICAL TO 4th FLOOR, POWER, LIGHTING, DATA, AND FIRE ALARM, DEVICE
AND FIXTURE LAYOUT AND CIRCUITING IS TO BE COPIED FROM 4th FLOOR TO 5th.
E. PROVIDE ARC-FAULT PROTECTION AS REQUIRE IN NEC 210.12
F. RECEPTACLES INSTALLED UNDER A SINK OR BEHIND A WASHING MACHINE, AND NOT EASILY
REACHABLE FOR RESETTING, SHALL BE PROTECTED BY GFCI BREAKERS.
G. COORDINATE KITCHEN ISLAND RECEPTACLE LOCATIONS WITH ARCHITECT PRIOR TO ROUGH
IN. ENSURE INSTALLATION LOCATION COMPLIES WITH NEC 210.52.C.3.
E5
E5E5
E2
E2
E2 E2
BIM FILE PATH:
SHEET NO.:
TITLE:
COPYRIGHT 2021 SMA, P.C.
REVISIONS:
KEYMAP:
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:Plot Date:NOT FOR CONSTRUCTION
HELENA
P: 406-442-4933
BOZEMAN
P: 406-219-2216
www.sma.design
C:\Users\JBrianG\Documents\BG MILL MEP CENTRAL v22_bgoveia@energy-1.net.rvt
8/4/2022 4:53:11 PME1.3
22-024
2022-06-03
ELECTRICAL LIGHTING 3rd
FLOOR
Author
Checker
BG MILL CONDOMINIUMS
22-024
714 EAST MENDENHALL SREET
BOZEMAN, MT 59715
50% SCHEMATIC DESIGN
No.Date Revision Description
E1.3 SCALE: 1/8" = 1'-0"
3-THIRD FLOOR RCP1