HomeMy WebLinkAbout045 Arch Floor Plan-61
1
2
2A
A
B B
SD-A3.01
SD-A3.02
SD-A3.00
SD-A3.02
4
4
5
5
6
6
7
7
8
8
9
9
10
10
C C
D D
E E
F F
3
3
2A
2A
EXIT LOBBY
STAIR 1
1/2" / 12"
1/2" / 12"
1/2" / 12"
SPR-A3.00
1
SPR-A3.021
SPR-A3.01
1
SPR-A3.022
1
2
3
4
5
6
7
8
9
10
11
12
13
ELEVATOR
MAINT. CL.
STAIR 2
ROOF TOP DECK
& LOUNGE
ROOF TOP DECK
& LOUNGE
11
11
1
1
2
SPR-A2.06
2 2
2
3
3
4
4
4
5
5
5
5
6
6
12
13
13
13
1. SEE SHEET A1.00 FOR ROOF ASSEMBLIES.
2. ROOF DRAINS AND OVERFLOW DRAINS, WHEN NOT DIMENSIONED, ARE TO BE CENTERED OR EQUALLY SPACED WITHIN THE ROOF AREA AS
SHOWN. DIMENSIONS INDICATED FOR ROOF DRAINS AND OVERFLOW DRAINS ARE APPROXIMATE AND MAY BE ADJUSTED +/-1'-0" AS
REQUIRED.
3. CENTER OF ROOF DRAINS TO BE LOCATED 2'-0" MINIMUM FROM ADJACENT ROOF EDGE, PARAPET OR WALLS AS SHOWN UNLESS NOTED
OTHERWISE.
4. IN ADDITION TO MECHANICAL AND ELECTRICAL ITEMS SHOWN ON THIS DRAWING, SEE MECHANICAL AND ELECTRICAL DRAWINGS TO
VERIFY LOCATIONS, TYPES, SIZES AND QUANTITIES OF MECHANICAL AND ELECTRICAL ROOF PENETRATIONS/ITEMS.
5. TAPERED INSULATION SHALL BEGIN AT 0" THICKNESS AT TOP EDGE OF ROOF DRAIN SUMPS AND SLOPE UP AND AWAY AT 1/4" PER FOOT
AS SHOWN TO ACCOMPLISH POSITIVE DRAINAGE AT ALL LOCATIONS.
6. MECHANICAL CONTRACTOR TO FURNISH ALL CURBS REQUIRED FOR HVAC EQUIPMENT, SEE MECHANICAL.
7. ALL FLASHING, ROOFING TIE-INS AND ROOFING ACCESSORIES NECESSARY FOR ROOFING PENETRATIONS, CURBS AND MOUNTING
ASSEMBLIES SHALL BE PROVIDED BY THE ROOFING CONTRACTOR AND APPROVED BY THE ROOFING MANUFACTURER.
SHEET NOTES -ROOF PLAN
T.O. ROOF STRUCTURE
170'-0"
SPR-A2.06
3
1/4" / 12"1/4" / 12"
T.O. ROOF STRUCTURE
170'-0"
R-30 CONTINUOUS & TAPERED INSULATION
VAPOR BARRIER -BRING UP MIN. 8" TO
VERTICAL SURFACE
1/4" GLASS MATT SHEATHING
EPDM MEMBRANE -WRAP UP VERTICAL
SURFACE MIN. 8"
FLAT PROFILE TERM BAR CONTINUOUS W/
SEALANT BED BEHIND -FASTENERS AS
REQUIRED
CONTINUOUS SELF-ADHERED MEMBRANE
OVER EPDM MEMBRANE
STEEL STUD SPACED PER STRUCTURAL
REQUIREMENTS
PREFIN. MTL. PARAPET CAP
3/4" CORE-A-VENT DRAINAGE SPACER
5/8" FIBER CEMENT PANELS
LEVEL UNISTRUT ASSEMBLY -VERIFY W/
CONTRACTOR AND MECH. UNIT MFR.
FASTEN MECH. UNIT TO THE UNISTRUT -
PER MFR. VERIFICATION
BIM FILE PATH:
SHEET NO.:
TITLE:
COPYRIGHT 2022 SMA, P.C.
REVISIONS:
KEYMAP:
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:Plot Date:SITE PLAN REVIEW
HELENA
P: 406-442-4933
BOZEMAN
P: 406-219-2216
www.sma.design
C:\Users\JordanC\Documents\22-024 - BG Mill-R22_jordancL2SGC.rvt
8/11/2022 1:07:31 PMSPR-A2.06
22-024
2022-08-10
FLOOR PLAN -ROOF LEVEL
Author
Checker
BG MILL CONDOMINIUMS
22-024
714 EAST MENDENHALL SREET
BOZEMAN, MT 59715
SITE PLAN REVIEW SUBMITTAL
N
1/8" = 1'-0"SPR-A2.06
1 SPR - ROOF DECK
No.Date Revision Description
KEYNOTES - ROOF PLAN
1 PRIMARY AND SECONDARY OVERFLOW RAINS - SEE PLUMBING AND ARCH.
DETAILS/DRAWINGS
2 MECHANICAL EQUIPMENT - SEE MECH. DRAWINGS
3 24" X 24" MFR. STANDARD WALKWAY PADS
4 MECHANICAL SCREEN - SEE DETAILS
5 UNIT BALCONY BELOW
6 RAISED PLANTERS AROUND OCCUPYABLE ROOF TOP AREA - SEE LANDSCAPING PLANS
7 HOT TUB @ ROOF DECK AMMENITY SPACE
8 FIRE PIT AT ROOF DECK LOUNGE - SEE MECHANICAL PLANS
9 SEATING @ LOUNGE AREA - PER OWNER
10 BAR SEATING AND BBQ AREA
11 TRELLIS OVERHEAD - SUNSHADING FOR BBQ
12 LANDSCAPE AND ROOF TOP DECK LOUNGE LIGHTING - SEE LANDSCAPING AND ELECTRICAL
PLANS
13 SEDUM TRAYS - SEE LANDSCAPING
1/4" = 1'-0"SPR-A2.06
2 TYP. SECTION @ MECHANICAL SCREEN
3/4" = 1'-0"SPR-A2.06
3 TYP. DETAIL @ MECHANICAL SCREEN