Loading...
HomeMy WebLinkAbout042 Arch Floor Plan-3UP D D W W WDWD W D 1 1 2 2 A A B B 4 4 5 5 6 6 7 7 8 8 9 9 10 10 C C D D E E F F 3 3 2A 2A UNIT LEGEND CIRCULATION UNIT A UNIT B UNIT C UNIT D UNIT E STAIR 1 HALLWAY TRASH CHUTE HALLWAY SPR-A3.00 1 SPR-A3.021 SPR-A3.01 1 SPR-A3.022 UNIT 301 UNIT 302 UNIT 303 UNIT 304 UNIT 305 BIM FILE PATH: SHEET NO.: TITLE: COPYRIGHT 2022 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:SITE PLAN REVIEW HELENA P: 406-442-4933 BOZEMAN P: 406-219-2216 www.sma.design C:\Users\JordanC\Documents\22-024 - BG Mill-R22_jordancL2SGC.rvt 8/11/2022 1:07:21 PMSPR-A2.03 22-024 2022-08-10 FLOOR PLAN -LEVEL 3 Author Checker BG MILL CONDOMINIUMS 22-024 714 EAST MENDENHALL SREET BOZEMAN, MT 59715 SITE PLAN REVIEW SUBMITTALN 1/8" = 1'-0"SPR-A2.03 1 SPR - LEVEL 3 FLOOR PLAN No.Date Revision Description