Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
037 Civil Details-2
(28.0' THROAT WIDTH @ ALLEY)(4.0' @ ALLEY)BIM FILE PATH:SHEET NO.:TITLE:COPYRIGHT2022 SMA, P.C.REVISIONS:KEYMAP:ARCHITECT SEAL:PROJECT:PROJECT LOCATION:PREPARED FOR:LOGO:CONSULTANT:PROJECT NUMBER:DRAWN BY:CHECKED BY:TEAM:PHASE:DATE:PROJECT NUMBER:22-0242022-0-11File PathBG MILL CONDOMINIUMS22-02414 EAST MENDENHALL STREETBO=EMAN, MT 91OZQeUSPR SUBMITTALNR.DateReYiViRQ DeVFUiStiRQSPR SUBMITTALHELENAP: 406-442-4933BO=EMANP: 406-219-2216www.sma.design2150 Analysis Drive, Ste. BBozeman, MT 59718Phone: (406) 585-0590info@bridgerengineers.comBRIDGER ENGINEERS, INC.CIVIL and STRUCTURALENGINEERINGPROJECT MANAGEMENTBEIPROJECT NOTE:BLENDED TRANSITION RAMP STANDARDS TO BE USEDWHEN FIELD FORMING THE PEDESTRIAN RAMPS AT THERAILROAD CROSSING. SIMILAR RAMP CONSTRUCTION ASACROSS RIGHT-OF-WAY TO BE UTILIZED.C2.1SITE DETAILSMMDMMDPROJECT NOTE:CURB STOP TO BE LOCATED1.0' BEYOND PROPERTY LINE.