Loading...
HomeMy WebLinkAbout034 Civil Proposed SiteUPUP192021222311109854371614131218TRASHENTRYSTOR.STAIRMECHELECELEVLOBBYGYMUNDERGROUND STORM WATER RETENTIONG A S GA S GA S GA S GA S GAS GASGASGASGASGASGASGASGASGASGASOHPOHPOHPOHPOHPOHPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPGASGASGASGASGASGASGASGASGASGASGASUGPUGPUGPUGPUGPUGP2151716TV TV GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP WATWATWATWATWATWATWATWATWATWATWAT WAT WATWATSEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEW SEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSEWSSEWSEWGASGASTEL TELUG-FIBUG-FIBUG-FIBUG-FIBUG-FIBUG-FIBUG-FIBUG-FIBXXXXXXXXXXN. BROA D W A Y A V E .E. MENDENHALL ST.SSENTRYSTAIRWORK/SHAREMAILPARCELRMTRASHCHUTERRSTOR.17.0'R.R. EASE.5.8'60.0'ROW70'ROW16'ALLEYR-O-W20'(PER C-23-A11)40.0'TBC40'TBC54'TBC18.0'16.0'20.0'OHD2-WAY9.0'9.9'18.0'16.0' OHD1-WAYEXIT ONLY11.1'9.0'9.0'11.1'9.0'9.0'11.9'9.0'9.0'10.3'9.0'9.0'9.0'24.0'10.5'25.90' IDA AVE.(PER C-23-A11)28.0'8'EX.BLVD5'EX.SW40'120'16'(EXIT ONLY)40'7.0'42'TBC28.0'70'ROW29.91' IDA AVE.(PER C-23-A11)5.0'SIDESETBACKR50' COBSTREET EASE.SEE GENERALSITE NOTE #224.9'40.0'TBC40.0'TBC12.0'7.2'4.0'1.0'53.6'11.5'74.0'10.0'31.5'1.7'LT8.9'5.0'5.0'1.0'R25' TBCTO MATCHEASTCORNERSBIM FILE PATH:SHEET NO.:TITLE:COPYRIGHT2022 SMA, P.C.REVISIONS:KEYMAP:ARCHITECT SEAL:PROJECT:PROJECT LOCATION:PREPARED FOR:LOGO:CONSULTANT:PROJECT NUMBER:DRAWN BY:CHECKED BY:TEAM:PHASE:DATE:PROJECT NUMBER:22-0242022-08-11File PathBG MILL CONDOMINIUMS22-02414 EAST MENDENHALL STREETBO=EMAN, MT 91OZQeUSPR SUBMITTALNR.DateReYiViRQ DeVFUiStiRQSPR SUBMITTALHELENAP: 406-442-4933BO=EMANP: 406-219-2216www.sma.design2150 Analysis Drive, Ste. BBozeman, MT 59718Phone: (406) 585-0590info@bridgerengineers.comBRIDGER ENGINEERS, INC.CIVIL and STRUCTURALENGINEERINGPROJECT MANAGEMENTBEIPRELIM INARYNOT FORCONSTRUCTION C1.1CIVIL SITE PLANMMDMMD12023-08-22CORNER RADIUS & NOTE S