HomeMy WebLinkAbout020 WR-FormWR
WETLAND REVIEW CHECKLIST
GENERAL INFORMATION
This handout is for all activities proposed in or adjacent to regulated wetland areas. Section 38.610 BMC includes the wetland
regulations for the City of Bozeman. The regulations provide specific guidelines and methods to identify whether an area is a
wetland and to determine the boundary between wetlands and uplands. The City’s wetland regulations apply to both wetlands
with direct hydrologic connection to “waters of the U.S.” and to isolated wetlands with no direct connection to a water of the U.S.
and that exhibit positive wetlands indicators for all three wetland parameters.
WETLAND REVIEW CHECKLIST
1.Create and submit a Planning application using the ProjectDox portal;
a.After completing your Development Review Application, you will receive a Notification Letter (example)
via email. Please download this document and obtain owner’s signature. Upload as a PDF to the “Documents” folder
in ProjectDox.
2.The digital copies must be separated into two categories: Documents and Drawings.
a.The Documents folder should include items such as application forms, narrative, response to City comments,
supplemental documents, technical reports, easements, legal documents, etc.
b.The Drawings folder should include items such as site plans, civil plans, landscape plans, photometric plans,
elevations, etc. All drawing files must be drawn and formatted for a 24” x 36” sheet file or 11” x 17” sheet file. Plan
pages shall be properly oriented in landscape mode. Refer to our Quick Guide for additional information;
3.Naming protocol. All files should be numbered and named according to their order listed on your provided Submittal Checklist.
File names should start with a numeric value followed by the document name. The numeric value at the beginning of the file
name ensures the order in which they are displayed. Refer to our Quick Guide for additional information;
4.Project narrative providing a thorough description of the proposed activity.
5.A description of why aboidance and less damaging alternatives have been rejected, if applicable.
6.A Wetland Delineation Report complying with the requirements of Section 38.610.030 BMC.
7.A site plan which shows the delineated wetland boundary, the property boundary, all existing and proposed structures,
streets and hardscape including sidewalks and pathways, watercourse and drainage ways on and within 100 feet of the
property. Include date of preparation. Suggested scale 1:20 but not less than 1:100.
8.The wetland boundary must be keyed to a wetland delineation report.
9.The exact locations and specification for all proposed activities and the direct and indirect impact of such activities.
10.The source, type of method of transport and disposal of any fill materials to be used and certification that the placement
of fill material will not violate any applicable State or Federal Statues and Regulations.
11.Copies of any Section 404 wetland permits submitted or already obtained for the site.
12.Any historical information regarding wetland permitting or mitigation on the site.
CONTACT US
Alfred M. Stiff Professional Building
20 East Olive Street
Bozeman, MT 59715
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net/planning
Wetland Review Checklist Page 1 of 1 Revision Date: November 2021