HomeMy WebLinkAbout003 SP-ChecklistBG MILL||
SPR SUBMITTAL
BG MILL | NORTHERN PACIFIC ADD, S07, T02 S, R06 E, LOT 1, PLAT C-23-A11 | BOZEMAN, MT, 59715
003SP
SP - SITE PLAN CHECKLIST
APPLICATION SET
1. A PLANNING APPLICATION VIA PROJECTDOX PORTAL
HAS BEEN CREATED - SEE SECTION 001 FOR THE
DEVELOPMENT REVIEW APPLICATION / NOTIFICATION
LETTER
2. PROJECT NARRATIVE - SEE SECTION 004
3. FOR ALL OTHER REQUIRED FORM REFERENCES, SEE
SECTIONS 000 THROUGH 021
4. DEPARTURES - SEE SECTION 007
5. TRAFFIC STUDY - SEE SECTION 008
6. WATER RIGHTS - IN 2017, THE OWNER PAID $13,123
FOR THE CASH-IN-LIEU OF WATER RIGHTS
7. STORMWATER - SEE SECTIONS 009
8. CCON - SEE SECTIONS 012 & 013
9. CCOA & DEM - SEE SECTIONS 014 - 017
GENERAL PLAN REQUIREMENTS
1. SEE DRAWINGS FOR APPLICABLE STANDARDS &
INCLUSIONS FOR EACH PLAN SHEET
COVER SHEET REQUIREMENTS
1. SEE DRAWINGS FOR APPLICABLE STANDARDS &
INCLUSIONS FOR THE COVER SHEET
CIVIL, UTILITY, AND GRADING PLANS
1. SEE DRAWINGS FOR APPLICABLE STANDARDS &
INCLUSIONS FOR CIVIL, UTILITY, & GRADING PLANS.
SITE PLAN
1. SEE DRAWINGS - CIVIL, LANDSCAPE, &
ARCHITECTURAL FOR SITE PLANS.
BUILDING DESIGN AND SIGNAGE
1. SEE ARCHITECTURAL DRAWINGS
LANDSCAPE PLAN
1. SEE LANDCAPE DRAWINGS
LIGHTING PLAN AND DETAILS
1. SEE LANDSCAPE & ELECTRICAL DRAWINGS
DETAIL SHEET REQUIREMENTS
1. SEE CIVIL & ARCHITECTURAL DRAWINGS
PARKLAND REQUIREMENTS
1. SEE SECTION 022
REQUIRED FORMS
1. SEE SECTIONS 000 THROUGH 021 FOR REQUIRED
FORMS, REQUESTS, & CHECKLIST REFERENCES