Loading...
HomeMy WebLinkAbout638300223938700010) Z�-�Qd20_ZA V1T g Adwato m `Mods TO FINAL Pura ��as village powntowu fII'tivd_jCrosS. r The Iage vsetme Croup N O p ' N b N D 1 I i 1 Proieci Activity Loa bk� a City OT Bozeman DeaarTment or Planning and Community Deveicoment Proieci Name: File'Number: - T19 � at1►u�� DatE fi xy Activity o \ ( 1'em ES) ++,.taftiHours} K4Y f. a h - - gibers rs I i � i I i i I I I i i I I i I I l I I I i i i i i i I I I I i i I I I � i I ! i i I ! I I i i I i i l I ! I I I i I I i I i I ! ! Q Z-07198, Z-07025, Z-04202,Z-00100A, Z-00100,Z-03192, Z-03170, Z-02147, Z-02024, P-0041 CITY BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT u_D 1 Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406 582 2263 P.O. Box 1230 planning@bozeman.net Bozeman, Montana 59771-1230 www.bozemon.net MEMORANDUM To: Bozeman Building Division(2 copies with addresses) Bozeman Water and Sewer Department Bozeman Engineering Department From: Lanette Windemaker, AICP; Contract Planner Date: March 4, 2008 Re: Village Downtown PUD Minor Modification—Approved Final Plan (#Z-04202A) Attached is the copy of the approved PUD Minor Modification Final Plan for your records. If you have any questions, please give me a call at 586-5266. planning • zoning . subdivision review • annexation • historic preservation . housing • grant administration neighborhood coordination 4 -� CI00F BOZEMAN �+ . DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 P.O. Box 1230 planning@bozeman.net Bozeman, Montana 59771-1230 www.bozeman.net PLANNING DIRECTOR FINDINGS File Name: Village Downtown Minor Modification to Final PUD Plan File Number: # Z—04202A PURSUANT to Chapter 18.36, BMC, and other applicable sections of Title 18, BMC, a review of the minor modification to the final PUD plan described herein was conducted. The applicant presented to the City a proposed minor modification to the final PUD plan to allow Lots 119, 121, 123, 125, 127 and 129 in the Village Downtown PUD to be changed from attached, single-family lots to detached single- family lots. The applicant proposes to complete this minor modification with property boundary relocation to achieve the minimum five-foot side yard setbacks. The purposes of the minor modification to the final PUD plan review were to consider all relevant evidence relating to public health, safety, welfare, and the other purposes of Title 18, BMC; to evaluate the proposal against the criteria of Section 18.36.040.C.4, BMC, and the standards of Title 18, BMC; and to determine whether the minor modification to the final PUD plan should be approved, conditionally approved, or denied. Staff reviewed the proposal and concluded that the request appears to meet the criteria for a minor modification. The DRC reviewed the proposal on February 27, 2008, and recommended approval of the minor modification to the final PUD plan subject to the following condition(s): 1. Street cut permits and the associated fees will be required for the abandonment of the water service. The Planning Director has found that the proposed minor modification to the final PUD plan, would comply with the requirements of the Bozeman Municipal Code if certain conditions were imposed. Therefore, being fully advised of all matters having come before him regarding this application, the Planning Director makes the following decision. The minor modification to the final PUD plan has been found to meet the criteria of Title 18, BMC, and is therefore approved, subject to the conditions listed above and the correction of any elements not in conformance with the standards of the Title. The evidence contained in the submittal materials, advisory body review, and this finding, justify the condition(s) imposed on this development to ensure that the final PUD plan and subsequent construction complies with all applicable regulations, and all applicable criteria of Title 18, BMC. On this day of 2008, Andrew C. Epple, AICP; Planning Director, Approved this Minor Modification to the Final PUD Plan for and on behalf of the City of Bozeman as authori ed by Section 18.64.010, BMC. (I id Andrew C. Epple, AICP; PlanningbirlIector planning • zoning • subdivision review . annexation • historic preservation • housing • grant administration • neighborhood coordination This Planning Director project decision may be appealed filing a notice of appeal with the Clerk for the City of Bozeman, within 4 days after the date of approval as evidenced by the Planning Director's signature, by following the procedures of Section 18.66.030, BMC. Page 2 Proposed Buildable Areas FINAA ff FOO L A �y ti�% %�:'tom �� , " �,• I ,WNIR Y E V PNI y5 E " � SFr• `L O'' � ��9,�'�.• Y•�';: �_pp°,,�,,�1`,>�i. °k � '�� ��•�''k�..Yi �� \�a ° Fir � ✓ f � O:• `���¢f ,�(/ J�b��� of these Plano r e levation V, U; 10,11 prior v dfiaqLappfovaj- --- �_ from the Previously A,Q,Qroved Buildin s • PIT �o,'L' �`' .�' .••'. air,. •� � � 6t.. Scale In, Feet Scale In Meters SF, �`• r rsff. • F, '•\. fit''` 1 • Engineering and Surveying Inc. N SP_A-C-E E ' 1091 Stoneridge Drive•Bozeman, MT 59718 P __ Phone(406)587-1115•Fax(406)587-9768 www.chengineers.com•info@chengineers.com #08001 a EXHIBIT Proposed Buildable Areas .G1 / OO�o• ' r,rk� '• / x �o • OPEC P_A-CEO Prev'iouslv AmDroved Buildin s X. 9ti S 1 ` Scale In Feet l < , \ o > ;, _�,O Q \ •, c \\ 80 0 �6, ��so QQ \ 24 0 Scale In Meters ��5���� // �° O� ' f f r 1 • Engineering and Surveying Inc. `- - — 1091 Stoneridge Drive•Bozeman, MT 59718 PEN SP—AC—E Phone(406)587-1115•Fax(406)587-9768 www.chengineers.com•info@)chengineers.com #080U1 1302� • THE CITY OF BOZEMAN •, U�r� 9x 20 E. OLIVE- P.O. BOX 1230 * * BOZEMAN, MONTANA 59771.1230 9<< pp C ENGINEERING DEPARTMENT CO. 0 PHONE: (406) 582-2280 - FAX: (406) 582-2263 February 26, 2008 To: Development Review Committee From: Bob Murray, Project Engineer f*1 Re: The Village Downtown Villas Mods to PUD - #Z-04202A The following should be included as conditions for this PUD modification: 1. Street cut permits and the associated fees will be required for the abandonment of the water service. cc: ERF Project File HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK DALOPMENT REVIEW COMMITTO UPSTAIRS CONFERENCE ROOM, ALFRED STIFF PROFESSIONAL BUILDING, 20 EAST OLIVE STREET WEDNESDAY, FEBRUARY 27, 2008 10:00 A.M. ITEM 1. CALL TO ORDER ITEM 2. FINAL WEEK REVIEW 1. Fire Station #3/911 Center SP#Z-08013 (Krueger/Murray) Southwest of the intersection of Davis Lane &Vaquero Parkway * A Site Plan Application to allow the construction of a combined fire station (10,733 sq. ft.) and-911 dispatch center(4,579 sq. ft.) with related site improvements. ITEM 3. ONE WEEK REVIEW 1. Village Downtown Villas Mods to PUD #Z-04202A (Windemaker/Murray) . Village Downtown Blvd./Village Crossing Way * A request for modification to an approved Planned Unit Development Application to change six attached, single-family lots to six detached, single-family lots. ITEM 4. SECOND WEEK REVIEW 1. James Lindley Home SP/COA/DEV #Z-08016 (Kramer/Heaston) 406 East Story Street * A Certificate of Appropriateness Application to allow the restoration of the existing residence and the construction of two, two-car garages with apartments above, a common laundry/storage.area, and related site improvements. ITEM 5. INFORMAL REVIEW 1. . Meadow Creek Apartments Informal #I-08004 (Bristor/Johnson) Lot 1, Block 1, Meadow Creek Subdivision * An Informal Application for advice and comment on the construction of a —65,00 square foot, three story, 72 unit apartment building with related site improvements. ITEM 6. PUBLIC COMMENT—(15 —20 minutes) {Limited to any public matter, within the jurisdiction of the Development Review Committee, not on this agenda. Three-minute time limit per speaker.) ITEM 7. ADJOURNMENT **This meeting is open to all members of the public. If you have a disability that requires assistance,please contact— ADA Coordinator,Ron Brey,at 582-2306(voice)or 582-2301 (TDD). 1 BU2� • THE CITY OF BOZEMAN • * BOZEMAN, MONTANA 59771-1 230 788 a,�T� ENGINEERING DEPARTMENT z�fH Co.140 PHONE: (406) 582-2280 • FAX: (406) 582.2263 February 26, 2008 To: Development Review Committee From: Bob Murray, Project Engineer Re: The Village Downtown Villas Mods to PUD - #Z-04202A The following should be included as conditions for this PUD modification: 1. Street cut permits and the associated fees will be required for the abandonment of the water service. cc: ERF Project File HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK 13UZ�'`l1 THE CITY OF BOZEMAN , 9 20 E. OLIVE • P.O. BOX 1230 U x BOZEMAN, MONTANA 5977 1-1 230 9le 88� ��� ENGINEERING DEPARTMENT CO.1�0 PHONE: (406) 582-2280 • FAX: (406) 582-2263 February 26, 2008 To: Development Review Committee From: Bob Murray, Project Engineer Re: The Village Downtown Villas Mods to PUD -#Z-04202A The following should be included as conditions for this PUD modification: l. Street cut permits and the associated fees will be required for the abandonment of the water service. cc: ERF Project File HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK 0 • r r EIc ngineering and Surveying Inc. 1091 Stoneridge Drive•Bozeman,MT 59718 Phone(406)587-1115•Fax(406)587-9768 www.changineers.com•info@chengineers.com LETTER OF TRANSMITTAL DATE: February 7, 2008 `%17 TO: City of Bozeman Planning Department 1 �, ATTN: Lanette Windemaker FROM: Matt Cotterman RE: Village Villas - Minor PUD Amendment `' �Q�1 6A QTY. DESCRIPTION 7 Minor PUD Amendment Request - letter, application, plan, exhibit 1 $500 application fee PURPOSE: As You Requested For Design Revisions For Your Information/Records For Your Signature/return ✓ For Your Approval Other: (See Remarks) U.S. Mail Federal Express ✓ Hand Delivered For Pick Up REMARKS: a,14 Copies to: 1 THE VSLLIAGE INVESTMENT GROUP, INC. 9 619 C/O DELANEY&CO. THE VILLIAGE INVESTMENT GROUP, INC. 9 619 C/O DELANEY&CO. 0 o D 0 0 CW DEWXE BUSINESS FORMS 1+800-328-0304 w .delweformsxom 00 i [ITY OF BOZEMAN a *aa CUS70MER RECEIPT aaa I Oner: PROFCA.H Toe: EP Drawer: 1 I Date: 2/13,1B 02 Receint no: 119738 a Description Guantitv Aoount r ZE IPCD: PUD-FINAL PLAN 1.00 S500.00 THE VILLAGE INVESTMENT Tender detail CK CHECK 9619 $500.00 Total tendered $509.00 i Total naynent $508.03 Trans date: 2/14108 'fine: 8:47:05 1HONK YOU! -ub 3`'�s vn � Kc- 7�C O �� r i• y Engineering and Surveying, Inc. 1091 Stoneridge Drive • Bozeman, Montana 59718 • Phone (406) 587-1 1 15 Fax(406) 587-9768 www.chengineers.com • E-Mail: info@chengineers.com February 5, 2008 City of Bozeman Planning Office Attn: Lanette Windemaker 20 E. Olive Street P.O. Box 1230 -- Bozeman, MT 59771-0640 FEB RE: Village Villas,Minor PUD Amendment Request,Lot - 9-ThetiVtiill`a nto n PUD Subdivision(08001) AM- Dear Lanette, Attached please find an Amended PUD Final Plan and Exhibit showing proposed buildable areas for the above referenced project. We would like this change to be processed as a Minor PUD Amendment for the following reasons as per Section 18.36.040.C.4.a. of the UDO: a. The character of the development will not change. The previously approved townhomes will become detached residential homes with similar architectural character. b. This proposal will not increase the approved number of residential dwelling units. C. There will be no increase in the gross leasable floor areas of retail, service, office and/or industrial buildings. d. The proposed buildings and lot lines will be moving a maximum of 11% of the originally approved building width(4'maximum shift). Two lot lines will be moving 2 feet and two lot lines will be moving 4 feet. e. There will be no increase in the number of lots or density. f. The proposed plan does not contain any changes that would allow an increase in deviation/relaxation from the UDO. g. The Amended Plat will not create additional lots. Upon approval of this Minor PUD amendment we will move forward with submitting an Amended Plat , exempt from review as a subdivision,completing the boundary line adjustments specified on the attached drawings. Civil/Structural Engineering and Surveying If you have any questions or need anything additional to process this request please let me know. Sincerely, 4orma—n—,—PI-7 Mat ew Enc. G:Ic MOM0800/IOffice1A4inorPU1DAmendRgs1..ulpd CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fox 406-582-2263 P.O. Box 1230 planning@bozeman.net Bozeman, Montana 59771-1230 www.bozemon.net DEVELOPMENT REVIEW APPLICATION 1. Name of Project/Development. A11ended PUD Plan -The Village Downtown 2. Property Owner Information: Name: The Village Investment Group, Inc. E-mail Address: delaneynco@earthlunlc.com Mailing Address: 101 Last Main Street,Bozeman,MT 59715 Phone: 586-3132 FAX: 586-8692 3. Applicant Information: Name: same as above E-mail Address: Mailing Address: Phone: FAX: 4. Representative Information: Name: C&II Engineering and Surveying, Inc. E-mail Address: info@clnengineers.com Mailing Address: 1091 Stoneridge Drive,Bozeman,MT 59718 Phone: 587-1115 FAX: 587-9768 5. Legal Description: Lots 119, 121, 123, 125, 127 & 129,The Village Downtown PUD Subdivision 6. Street Address: Village Downtown Boulevard and Village Crossing Way 7. Project Description: Amended PUD Final Plan-changing 6 attached single family lots to detached single family lots. 8. Zoning Designation(s): R-O 9. Current Land Use(s): Vacant/Under Construction 10. Bozeman 2020 Community Plan Designation: Residential Page 1 Appropriate Review Fee Submitted ❑ f* 11. Gross Area: Acres: 0.7521 Square Feet: 32,760 12. Net Area: Acres: 0.7521 Square Feet: 32,760 13. Is the Subject Site Within an Overlay District? ❑ Yes, answer question 13a ✓❑ No,go to question 14 13a. Which Overlay District? ❑ Casino ❑ Neighborhood Conservation ❑ Entryway Corridor 14. Will this application require a deviation(s)? ❑ Yes ✓❑ No 15. Application Type (please check all that apply): ❑ O. Planned Unit Development—Concept Plan ❑A.Sketch Plan for Regulated Activities in Regulated Wetlands ❑ P.Planned Unit Development—Preliminary Plan ❑ B.Reuse,Change in Use, Further Development Pre-9/3/91 Site ✓❑ Q.Planned Unit Development—Final Plan ❑� C.Amendment/ndodification of]'Ian Approved On/After 9/3/91 ❑ R.Planned Unit Development—Master Plan ❑ D.Rcuse,Change in Use,f"urthcr Development,Amendment/COA ❑ S.Subdivision Pre-application ❑ L.Special Temporary Use Permit ❑✓ T.Subdivision Preliminary Plat ❑ F.Sketch Plan/COA ❑ U.Subdivision Final Plat ❑ G.Sketch Plan/COA with an Intensification of Use ❑ V.Subdivision Exemption ❑ H.Preliminary Site Plan/COA ❑W.Annexation ❑ I.Preliminary Site Plan ❑Z.Zoning Map Amendment ❑J.Preliminary Master Site Plan ❑Y. Unified Development Ordinance Text Amendment ❑ K.Conditional Use Permit ❑ Z. Zoning Variance ❑ L.Conditional Use Pernvt/COA ❑A.A.Growth Policy Map Amendment ❑ M.Administrative Project Decision Appeal ❑BB.Growth Policy Text Amendment ❑ N.Administrative Interpretation Appeal ❑ Other: This application must be accompatued by the appropriate checklist(s),number of plans or plats,adjoiner information and materials,and fee (see Development Review Application Requirements and Fees). The plans or plats must be drawn to scale on paper not smaller than 8/2- by 11-inches or larger than 24- by 36-inches folded into individual sets no larger than 8'/-by 14-inches. If 3-ring binders will be used, they must include a table of contents and tabbed dividers between sections. Application deadlines are 5:00 pm every Tuesday. This application must be signed by both the applicant(s)and the property owner(s) (if different)before the submittal will be accepted. As indicated by the signature(s) below, the applicant(s) and property owner's) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development,approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and an),special conditions established by the approval authority. Finally,I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. I (We)hereby certify that the above information is true and correct to the best of my(our)knowledge. Applicant's Signature: Date: 2- C! Applicant's Signature: Date: Property Owner's Signature: (� /� � Date: 'Z. ^� Property Owner's Signature: " Date: Property Owner's Signature: Date: Page 2 (Development Review Application—Prepared 11/25/03) C. ❑✓ Planned Unit Development— Final Plan. The following information and data shall be submitted: PUD Final Plan Information Yes No N/A 1. A list of names of all general and limited partners and/or officers and directors of ✓❑ ❑ ❑ the corporation involved as either applicants or owners of the planned unit development 2. A final plan site plan shall be submitted on a 24- by 36-inch sheet(s) at the same scale as the approved preliminary plan. If a different scale is requested or required,a copy of the approved prelinnary plan shall be submitted that has been enlarged or reduced to equal the scale of the final plan. However, only the scales perntted for the preliminary plans shall be permitted for final plans. The final plan site plan shall show the following information: a. Land use data (same information as required on the preliminary site plan) ❑ ❑ ❑ b. Lot lines,easements,public rights-of-way as per subdivision plat l ❑ ❑ C. Attorney's or owner's certification of ownership ❑ ❑ ✓❑ d. Planning Director certification of approval of the site plan and its ❑ ❑ ✓❑ conformance with the preliminary plan e. Owner's certification of acceptance of conditions and restrictions as set forth ❑ ❑ 0 on the site plan 3. A final landscape plan consistent with the conditions and restrictions of the ❑ ❑ ✓❑ approved preliminary plan shall be submitted. It shall also be consistent with the Chapter 18.48 (Landscaping), B\MC, except that any stated conditions and restrictions of the preliminary plan approval shall supersede the provisions of Chapter 18.48(Landscaping),BDMC `re?-4 ,Ue(i ]K rY< -tom -t ,w••s r •Xr. 4. An official final subdivision plat of the site must accompany the final planned unit ❑ ❑ ✓❑ development plan when applicable. City approval of the final subdivision plat shall be required before issuance of building permits kAe;c)ec1 -A4 „ll he.�,Jj� Ana. ore, 5. Prior to submission of the final plan to the DRC and ADR staff, eng_neering plans ,/❑ ❑ ❑ and specifications for sewer, water, street improvements and other public improvements, and an executed improvements agreement in proper form providing for the installation of such improvements,must be submitted to and approved by the City G. A plan for the maintenance of open space, meeting the requirements of Section ❑ Q ❑ 18.72.040(Common Area and Facility\Maintenance Plan and Guarantee),BAMC,shall be submitted with an application for final plan approval. Open space shown on the approved final plan shall not be used for the construction of any structures not shown on the final plan -'Q2roe,4 + -t o c31 es c, Page 5