Loading...
HomeMy WebLinkAbout638300223906108870) 2 040YSA• Wal�qri Homestea Moods�to P�JD LPa kang T ayout) w .7w - o Dursto•, 200,5 P N O . .P O Ul A i Fil.FoW— SP411-113 " � s y y r Project Activity Lod City of E)ozeman ® ® Department of Planning Fy Community Development Project Name: File No: 15 f\ Date Activity Staff Staff Cumulative Members Hours Hours CID s i i I i i I i 130 THE CITY OF BOZEMAN V9� 20 E: OLIVE • P.O. BOX 1230 * * BOZEMAN, MONTANA 5977 1-1 230 ENGINEERING DEPARTMENT CO. PHONE: (406) 582-2280 • FAX: (406) 582-2263 November 9, 2005 Ray H. Center, E.S. . Rocky Mountain Engineers 1700 W. Koch Street, Suite 7 Bozeman, MT 59715 Re: Walton Homestead Subdivision—Phase I, Lot 3, Block 3 Dear.Ray: The City of Bozeman has completed its review of the revised stormwater calculations on the above referenced project submitted on November 7°i and 9`I'and found them to be acceptable. My review was only of the hydraulic calculations since I reviewed the original stormwater plan for the entire subdivision. The project engineer and planner will review the plan in association with the final site plan review for the car wash. As we discussed, conversion of the earthen pond for basin 11 to a concrete walled pond may cause some concern, but I will leave that to their review. Also note that we have no standards for sizing of the oil sand separator, so we are leaving that to your engineering judgement. If you have any questions regarding these comments, please call me at 582-2280. Sincerely, Robert J. 16urray Jr., P.E. Project Engineer cc: Sue Stodola, Project Engineer 4Susan-.Kozub, Planner I ERF Project File HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK a - CI"J$DF BOZEMAN , DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 P:O. Box 1230 planning@bozemon.net Bozeman, Montana 59771-1230 www.bozemon.net November 15, 2005 Kevin Cook Oakway,LLC 2066 Stadium Drive, Suite 101 Bozeman MT 59715 Re: Walton Homestead PUD Parking Layout, #Z-04015A ! Dear Kevin, The proposed PUD clarification to allow a specific parking layout for Common Area B,Block 7 in the Walton Homestead PUD has been approved subject to the following conditions: 1. Approval is for the new parking layout only;building footprints shown on modified Final Site Plan are conceptual and will be evaluated for setbacks, coverage, etc. with site plan review; 2. The parking lot shall be constructed in accordance with Section 18.46.020 "Stall,Aisle, and Driveway Design." Please let me know if you have any questions. Thank you. Sincerely, Susan Kozub Planner I Enc: Original Signed Copy of FSP CC: Ray Center, Rocky Mountain Engineers, 1700 W. Koch St., Suite 7, Bozeman, MT 59715 Bob Murray,Project Engineer planning zoning subdivision review annexation historic preservation housing grant administration neighborhood coordination Rocky Mountain Engineers, PLI.C. Civil Engineering & Land Surveying 1700 W. Koch St., Suite 7, Bozeman, Montana 59715 (406) 586-4859 November 11, 2005 Ms. Susan Kozub ��7 Department of Planning& Community Developmentrapping-f6r-C— CQ V E 20 East Olive DBoz MT 59715 4 2005 T OF PLANNING PMENT Re: Parking Layout& Land — onNITV �Area Walton Homestead Subdivision, P.U.D. Dear Susan, Attached are two copies of our final revised Parking Plan and Landscape Plan for Common Area B, Block 7, Walton Homestead Subdivision P.U.D., Phase 2. I have made the minor revisions that you requested in our telephone conversation earlier this fall. The islands along the north side of the parking lot have been widened to 9 feet and the handicap space has been changed from 16 feet to 13 feet in width to allow the wider islands and to allow the east end of the parking to be at least 20 feet from the east property line. I have also added striping along the side of the 13 foot wide handicap spaces, and verified the number of parking spaces and the quantities in the plan table. Thanks for your help in review of this parking plan. Feel free to call if you have any questions concerning the final plan. Best Regards, tR� . Center, P.E., L.S. .5 4 m qx i7li M 03 �W m vs Rt'3A m,va 0 ff, 3.1;8 P, m St 0 u tq!V31�111g m M W,0 M i1a Z.j2 C3 r,L?M ZZ am&n Ra n D1 tlIt Q 0 W BZsaW 14 m 0=vire, wN=a 9 W T,t3 UO 0 m W 94 m q TR W_1V'4 M M M rg 26 M m m i5 0 n W m A a Wi ig+li_5 m U H, V�2.ff Z z .......... Z ......JL 4 --CATCH CURI1-- �� C> 60 9 wn . 0. i. 7",V Coi 13' Rock t Mulch .?0.?0 ', 401 _f, Mulch �_;qltllq P!_arb Rock Mulch --SPILL CURB­ of 18' 26' C: Lat 26' 18' 9.0 18' 43 22 26, 73 7 f 18' Rock 20 Mulch t 00 �R ockl. Rock), 'Mulch!ch. .3 , 17 multpi t 'A 23,345 s.f PILL CURB st cc) C"ri 9 ock ,v � \\ �. - --.:: v.. Mulch Lawn- Mulch \Rock Rock Mulch Mulch 13' w n 91 U wn Lawn SPILL CURB­ \C1 7L -m iawii areas snau Lx 5ociaoa wu iocaiiq ciravii 5oa, Al shrub beds shall be edged Ali Nack Kw*Vinyl eclgiq or compariuc, 1265icined bit, I (L 18' Cashman Nursery and Landscaping 2055 5priticihill PU Pozeman, molitato 59-11� 22 Pravii by. 26, 737 s.f Ckad,Pernpfer Rock Mulch1 a �ozeman UPO P\,equirement5 _j k -110 total parking 5ta115 provided(105 1&(,ular, 5 Haidicap) -1 large canopy We-,per 9 5paces _j . ..... -12 1,;arx canopy trees rer4meJ 'Ro e callopq treC5 installed Rock Mulch m 0) 0) 3: -SPILL CURB — 6 — 0 f I r L pj airs -ar)a/o*r.eie.v-at10V ills \ 9 ock Lawn �,�Gck Mulch k ithcQt pr'or vv,6R-.,-.. n. approval W Mulch Rock 11 Rock Mulch Off ice f ro(.1.1 v-i Mulch 0 13' 91 bo 91 L Lawn SPILL CURB 0A, Aj P LA� DEF"T C- D X" AN f D 14,413 s. z Scale: 1"= 30' 0 15 30 60 Rocky Mountain Engineers, P.L.L.c. Civil Engineering & Land Surveying 1700 W. Koch St., Suite 7, Bozeman, Montana 59715 (406) 586-4859 September 9, 2005 Ms. Susan Kozub Department of Planning & Community Development 20 East Olive Bozeman, MT 59715 Re: Parking Layout&Landscaping for Common Area B Walton Homestead Subdivision, P.U.D. Dear Susan, Attached are two copies of a Parking Plan and Landscape Plan for Common Area B, Block 7, Walton Homestead Subdivision P.U.D., Phase 2. The owner wishes to construct curb and gutter around the perimeter of the parking lot and interior landscape islands at this time. Kevin Cook has indicated that there will be a total of 52, 2-bedroom apartment units served by the parking lot. At 2 parking spaces per 2-bedroom apartment unit, a total of 104 parking spaces are required. A total of 5 handicap parking spaces are also required, with two of the spaces being van-accessible. We have added 4 parking spaces to the original parking layout, along the south side of Lot 22, to meet the required number of parking spaces. It is also our understanding that the office space to the north of the parking lot will share in the use of this parking lot. Kevin Cook has indicated that the office space will be allowed to share 52 parking spaces during regular business hours within this parking lot. Please review this plan at your earliest convenience. Feel free to call if you have any questions concerning the parking layout or landscaping. Best Regards, Ray . Center, P.E., L.S. K Parking Plan / Landscape Plan COMMON AREA "B", BLOCK 7, WALTON HOMESTEAD SUBDIVISION, PHASE 2 BOZEMAN, MONTANA 1 3 21 i 18 s s Plant fable 20 699 s.f. i ; i t 20,451 s.f. I F i I i W 5gmbol Flanb Name(5cientiflc) 51ze @ Mature 5ize Qtq Fallgold 131ack Ash(Fraxinus nigra) 1,5"-T 50-60' av,0 1 Norway Maple(Acer platenoides) 1.5"-2" 50-6 CaWn ) ----_-..______________ � � 3 x .; _ 5kgliwHoneglocu5t,(Ocditsiatriacardv5 a q� i I � amommmmmammon"aown fxwo�m 50-60' 3 �,:,. �t MnT J ) # ! a0 Noonan awoman=a on0noNBW Inermis) t ! l2warl Highbush Cranberry CViburnum 15-18" �}-5' �� trllobUm) # L---------- Lc R buffalo Juniper-C Juniperus Sabina) 5 g 1M�nbal 2-3' � I � \ _ � Line j � { i ( s - go I `` 9' �jv =y� �� �t1 � HS yy `t� `i2 �� '�v 3 �— 5 Plant TableRp-t � ,1 G;�,r' I G-OLA 1, +0 =.eAC h Rock . Rock f �3 t l(3 1r1 I�a -}v °y Mulch 58,r 0 s.� Mulch I F -All landscaped areas shall have underground irrigation installed to promote he'althq plant I # 64, i i L Rock 1 v and lawn ct-owUll, t i' .� �� € 14*� {'ia4 c� :. Mulch -All trees shall be staked with wooden tree stakes with 2 stakes per tree, t -All planting beds shall be covered with professional grade weed fabric and 2-3" of i t 5�18 t _ <, tF (�( rock mulch to be selected bq owner, y ; 26 i ~' ["- --- I y h t ` c y + t a Lot Line ` -All lawn areas shall be sodded with locallq orown sod, 26 ` rE', � i -All shrub beds shall be edged with 61ack Knight Vinql cooling or comparible, ty _ ,18+ I °' I, _42L I � q p q 21 Q d 2055 SNrin ill p� I.andsca in i J 6ozeman, Montana 59715 ty 22 Prawn b ti t a Zt, i i g. 26, 737 s.f. Lawn i 1 Chad Fcmpfer .. , �arrds'cape f7esigner '� � t, yt - t � ,:. Rock._. _ _ 7 ( ozeman Ub I?equirements Mulch -109 total parkinq stalls 104 . gular; 5 Handicap) i � ! � � 00 i O Z I 'I arge canopq trees per } 1 -12 arge canopq trees required \ \ :. ` , arge canopq trees installed "Rock;F,Roc \� Z 17 I Mulchy Mulch t 2 ! tip t I 23 345 s.f. t 41 t\ \ Lawn � �`Glr�� VVVVYI ✓G7 I�VVl�1`� ��x tit I f��(A9.3 �.I°X y i t � 1 I I t 0�S `° \`rr •� ? ! } '1," ".ter•. 1a..i t ly } t r �J� ! I 9+ 17 e kYfJyY.. AA t i t € Y � f V � KJV a i LfLi; 3t �a �� .11.. ... ..._. .. Rock Y �� � aC,o -��/lQil/1 ``� Lawn Mu Mulch Mulch ye `: O� 1 Q zRock Rock tt I ; (�} �-� I� '�� �� �� �� Rock Mulch IS � € \t ,,........ Mulch 4 i o 3, 91 .�• g+ ,., � Lt�wn I ! 05 f� ` S �y`.� Lawn1 1 'L 3 S 6 `� 110 I I IZ !,13 r \ �C �s� L��' Line k I I � ! j \ s i 1 # � � 15 I ` 16 k ` \\\ 14,413 Prepared By. Rocky Mountain Engineers, P.L.L.C. Civil Engineering & Land Surveying Scale: 1"= 30' 1700 West Koch Street, Suite 7 Bozeman, Montana 59715 (406)586-4859 0 15 30 60 Drawing File Name: WBase882-AmendPh2.dwg 09/09/2005 � � ��ts' . �cc i ;�nni ;viac t; /— '10--.7ccass sir,'o �;1P•:' r w1de :�c-accsss siriA (typ.)"� West Oak Street / -� � � 3 S 8903123"E 6 994.7-7 j N 89031'33"W 455.77 I CL IM I 12T.-,-' �� '.S.aO' 35.30' �� — — — — 4T5.76� — — — o'� 40.00' Found aluminum ----- ------------ ----� -------------------------------i---------- ----- ------- dcap oyM00T .03 7 1' M 10 ------ -------------= 86.72'r-------- --------- r-a---- -------- - -------------------- - - --'----------- I - - - --_-_ ---- drainage 199.43' N 89°31' " ' 10" i j I 33 W 196.38 � L ye Ease'ment-____ N� b j y I 15' wide uiil~� 40' �® I f05.00 I I , I I ni I N I Drainage Easement +' S C I � '� � i � � .••— ' o ' 20-A O l 0 19-A I O to u ! I 20,566 s.Ao h i a 19,904 s.f° N i 20,566 s.f° i ! 19,904 s.f. i N 90°00'00"W 199.42' I I .. N 90°00'00"W 196.52' i 0 , I � I D I ; I , IU � do ino Y I I^t v ... uck g` i v= �y I Q BpU vsn r I , S Q I��S I �•� Building footprints shown on this FSP arc I pR� w conceptual in terms of approval. Site specifics I %� > `:,•° I including setbacks, lot coverage, height, I I N � r I � ttttt I ttt N BO 0 ---- Z!I- m i 14 ! �� •,0jJS�0 -1parkmg,.detentton areas, etc. wtll be evaluated tT - _ _ f - 0.�0. . W 1.7Y _I_ - W - - ' Scale: 1"= 50' during site plan and/or building permit review. 30' UTlLTY EASEMENT tillilltt, I tttdlllllll , I �118 7 irn'Iu!ttIllrnitl tltltttr,lt II i7st1r 1:dddt1rt1ttt11ttt1r n11 ! � i •� 'YAL `G O Cq F I �0. 0 25 .50 J- 7 0 184 36 N I ttt I N T'I�Ixl Common Area A-1zN I l l 13 r l d l'1111 � ��r tdrttttt N •�:" ! ce lark�n lan c i � - A„ tr� andtttttttf P � Irfi+gttttl .trrdrtttttr II I lLiL tlnrtttt i ,ttdttttttr 5,7 I" V t:... '�,� p ►- .!.:+; ttttmtt,t I ;ttdrtttttt REVIEWED $ APPROVED I ;.t. DEPT OF lilt I ttt illllll I - i "l! PLANPdIN'' i t I I^V : !! M UNITY DEV , tt I':..� •� o II-..;.: .!, x I l i l l I t t t l -:, 1 ser4z:oe>:'w ., r.i � ,. ,, AND O 22.76 I I i I I �; tt,t I , ttlo I I I ;:_ ; �.- 4, , i.l'.; A IL.:.;i; .i• o I I IFSr-CTOROATE / I �' I tr] L:,..i..! Irk,I•r� I• � _ - � , i o i-irn I I i I N 90°00'00"W i sz m'i 22.50'I 416.27' I I i Sian 7t �a `nI I 1 I if I C, I i._ 1 �o 1, 14 c t i S 90900'00" E * I + ! �+ I I I \. pd 45' easement for j i , a0' easement ----- ---J----------T—' i �\OGey�� `L torm water ove ow I 1 1 for form ti Qr fI I I 00 ! �` ye 5etween parking ots I 1 , dra Wipe Vo mo d , ' ON I ti� �oQr" and pedestrian ac ess i j o 1 �O��J 1 rn l Prepared By. 0� 0� a• I Rocky Mountain Engineers. P.L.L C. 4J I I I 11• ----------. --� � P � C Ij ! Civil Engineering Y Land Surveying �` 1700West Koch Street, Suite 7I'M0 a Me�a wase882A8�end P4h5 g.dwgwgaDrnfie Nm !M,67gav C•semeni rnawmPor i ! 05 09 2005 t CI1W- BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 P.O. Box 1230 planning@bozeman.net Bozeman, Montana 59771-1230 vvww.bozeman.net June 24, 2005 Kevin Cook Oakway,LLC 2066 Stadium Drive, Suite 101 Bozeman MT 59715 Re: Minor Modifications to Walton Homestead PUD Parking Layout, #Z-04015A Dear Kevin, The proposed minor PUD modification to allow a different parking layout for Common Area A-1 in the Walton Homestead PUD has been approved subject to the following conditions: 1. Approval is for the new parldng layout only;building footprints shown on modified Final Site Plan are conceptual and will be evaluated for setbacks, coverage,etc. with site plan review; 2. Please submit a revised landscape plan for review and approval prior to landscape installation; 3. The parking lot shall be constructed in accordance with Section 18.46.020 "Stall,Aisle, and Driveway Design," 4. Regarding the stormwater calculations: a. The slot width for Basin 18A must be 1/2-inch; b. We typically do not allow stormwater ponds to discharge to the street,but in this case since it is a relatively small basin, and there is another inlet a little over 100-feet down the road that will intercept the flow,it will be acceptable. Please let me know if you have any questions. Thank you. Sincerely, san Kozub Planner I CC: Ray Center, Rocky Mountain Engineers, 1700 W. Koch St., Suite 7,Bozeman,MT 59715 Bob Murray,Project Engineer Dave Skelton, Senior Planner planning • zoning • subdivision review . annexation • historic preservation • housing • grant administration • neighborhood coordination ~� I a GOO N ' Z9'T s£ 4 � to 1 ---1--- C O 1 ----- A fir-i-- ----- •�" ------------- =o W---- i o - 1 --------- L --~ ------------ N00'00'00`E J o f60.0?' a S� Q bag* Eoiwnent j � , -i -a !' o 3 & I 1 [z7 c w c o v •�' °' v i.� 'to, I � E c� '� ` I .---------- -- --------_ 0S —< y .-------------------------- --- — J 97.79' - o 478.10' <, w R ° o CD C� 3 A� S CL .Si y U North 15th Avenue qo y so ��oo w o , 477.52' N 00000'00"E 353.23' ------- 8.84'----------- 1 ��� 219.28Llk� -103.95'- 30.00' -------- I --- IIIII I111111111 TRASH I TRASH I II111 I I I111111I I I 1 I1111 III1111111 I I I IIIII I111111111 I 1�1111 IIIIIII118 $'- Oc IJ1111 IIII WjIJ10 >`'� I I z o o �% IZ o o1"111 iiiiiiiiio I • 21111 1111111111 ro O r o hnll6 nnlnlll 111IF IIIIIIIIII f2-' O 1 ' °� IO I 111 Ilnnlidl V I� I nnI unnl�@I W Q O 0 � I uni nnun�I 3 ig am IN N 1 1 9 0 c I 1 p �o fi G 1 ^ IV I I I^1 T, p co I w I I �1 I i I 1 4 1 = 0 1 Ll I I I n ' Ijo ^yi 2- 2. N 00*00:03" ___Waqp I I . c _____-- --- N 00°00'00"E 102.30'----- I 1 " W I I 395.02' I S 00°00'00"W 98.84' I ° I I I ID I �1 _____�__ N 00°00'00 E 102 14 1 � I .n. ----J ------- — — ---------------V'iN 00'0003" ------- -=_t==== I 39236' y O • .l Ge I I j C ^ I I .O �2f j 0o coo `O1 I I CO IR �� � Q00 4 I I i 1� � � �O 1 � �• m `� I I p`Of co 0 1 I Q l SG CO O I Fo o X w Vl 6 o ►_. I Ch SO I10 I lul I I I v • I I I I � I I I I I O TRASH I 30, I TRASH -o I I QC) v •------------------- I II ---- --- ------------ ------ -----L 98.84' ------LS_n 219.2 100.51,- ti Q 30.00' 1269.36' ,6L 6PC 31,90,S0,100 S North 14th Avenue M a 0 Z 0 -n m- o C No of 0 c a � m a .•� -• e G y C rn 3 ono n ° , � t7 o�o z � •� `°� 0 tip m a -D say � WN p m n Opp N 7 � :S � \ � �j D - > Q 1FIGA I ION mm. , nm m zzr Atn f .Iv � � L, - O II m Ct o Ct p of these fans -,cl/or elevations without prior waten approval Lj JI 7i art u i - y �.' 1 ! u S I rna� • • COOF. BOZEMAN ' j.. DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 P.O. Box 1230 tannin p g@bozeman.net Bozeman,,Montana. 59771-1230 www.bozeman.net . DEVELOPMENT REVIEW APPLICATIO 0 'O . 1. Name of Project/Development: Amended Plat Common Area A, Lots 1:9 & 20, Bloc Walton Homestead .Subd.ivision PUD, Phase 2 ' lL, l9 LL� U U 2. Property Owner Information: L� Walton Homestead Commercial Owners Assoc. , Inc. Name:. Durston Deve 1 oment Corp. E-mail Address: APR 2 0 2005 Oakway, LLC . Marling Address: 2066 Stadium Drive, Suite 202 I DEP.^IIT'•:`:T OF PLA:SAG. Bozeman,. MT 59715 Phone: (406) 586-0302 FAX: 3.Applicant Information: ''Name: Kevin Cook E-mail Address: Mailing Address: 2066 Stadium Drive, Suite 202 Bozeman, Montana 59715 Phone: (406) 586-0302 FAX: 4. Representative Information: Name: Rocky Mountain Engineers E-mail Address: Mailing Address: 1700 West Koch Street, Suite #7 Bozeman, MT 59715 Phone: (406) 586-4859 FAX: 5. Legal Description: Common Area A., Lots 19 & 20., Block 7, Walton-Homestead Subdivision PUD Phase 2 6. Street Address: 7. PtojectDescript on: Relocation of common boundaries to enhance the configuration of the rymlor m0a property and reconfigure the parking lot. fo V 8. Zoning Designation(s): RO 9. Current Land Use(s): Vacant 10. Bozeman 2020 Community Plan Designation: Business Park Pagel Appropriate Review Fee Submitted ❑ 11.Gross Area: Acres:3.3570 Sq Feet: 146,2E 46,229 12.Net Area: Acres: 3.3570 Square Feet: 146,229. 13.Is the Subject Site Within an Overlay District? ® Yes,answer.question 13a ❑ No,go to question 14 13a. Which Overlay District? ❑ Casino ❑ Neighborhood Conservation ® Entryway Corridor 14. Will.this application require a deviation(s)? ❑.Yes No 15.Application Type (please check all that.apply): ❑O.Planned Unit Development- Concept Plan ❑A Sketch Plan for Regulated Activities in Regulated Wetlands ❑P.Planned Unit Development-Preliminary Plan ❑B. Reuse,Change in Use,Further Development Pre-9/3/91 Site ❑ Q.Planned Unit Development-Final Plan ®C Amendment/Modification of Plan Approved On/After 9/3/91 ❑R.Planned Unit Development-Master Plan. ❑D.Reuse,Change in Use,Further Development,Amendment/COA ❑S.Subdivision Pre-application ❑E.Special Temporary Use Permit ❑T.Subdivision Preliminary Plat . ❑F.Sketch Plan/COA TJ U.Subdivision Final Plat ❑ G.Sketch Plan/COA with an Intensification of Use V.Subdivision Exemption ❑H PrelimiriarySite Plan/COA ❑W.Annexation ❑I.Preliminary Site Plan ❑X.Zoning Map Amendment ❑J..PreiiminaryMaster Site Plan ❑Y.Unified Development Ordinance Text Amendment ❑K.Conditional Use Permit ❑ Z.Zoning Variance ❑L.Conditional Use Permit/COA ❑ AA Growth Policy Map Amendment ❑M.Administrative Project Decision Appeal ❑BB.Growth Policy Text Amendment ❑N.Administrative Interpretation Appeal ❑ Other: This.application must be accompanied bythe appropriate checklist(s),number of plans or plats,adjoiner information and materials,and fee (see Development.Review Application Requirements and Fees). The plains or plats must be drawn to scale on paper not smaller than 81h- by 11-inches or larger than 24- by 36-inches folded,into individual sets no larger than'81/2-by 14-inches. If 3--ring binders will be used, they must include a table of contents and tabbed dividers between sections. Application deadlines are 5:00 pm every Tuesday. This application must be signed by both the applicant(s) and the propertyowner(s) (if different) before the submittal will be accepted. As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms'and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development,approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. Finally,I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. I (We) hereby certify that the above information is true and correct to the best of my(our)knowledge. Applicant's Signature: -'� Date: Applicant's Signature: Date: Property Owner's Signature: Date: Property Owner's Signature: . Date: Property Owner's Signature: Date: Page 2 (Development Review Application-Prepared 11/25/03;Amended 9/17/04) REUSE, CHANGE IN USE OR FUI&R DEVELOPMENT/AMENDMENT (*MODIFICATION CHECKLIST I ' roject qualifies for review as a Reuse, Change of Use or Further Development of a Site Developed Before 9.3-91 or Ame ment/Modification of a Plan Approved On or After 9-3-91,these checklists shall be used. Any item checked"No" or "N/A" of applicable) must be explained in a narrative attached to the checklist. Incomplete submittals will be returned to the applic t. A- ❑ Reuse Change of Use or Further Development of a Site Developed Before 9-3-91. use, Change of Use or Further Development of a Site Developed Before 9-3-91 Yes No N/A In ation 1. Xketch plan,with north at the top of the page,including site boundaries,accurate lot ❑ ❑ ❑ d building area dimensions, street and alley frontages with names, and location of tructures with distances to the nearest foot between buildings and from buildings to p erry lines 2. Parkin and circulation ❑ ❑ ❑ 3. Drainag attems ❑ ❑ ❑ 4. Floor pla ❑ ❑ ❑ 5. Plans, sketch pictures, specifications and other data that will clearly express any El El proposed buil alterations or additions 6. Such other infornXtion as maybe suggested by the Planning Department ❑ ❑ ❑ Length of time since curre previous use: Proposed use: The Planning Director may ap. ove this application upon finding that no significant alteration of the previous use and site are propose , d upon review by the City Engineer to assure that adequate access and site surface drainage are provided. e criteria for such a detennm* ation shall include but not be limited to the following: 1. The proposed use is allowed er the same zoning district use classification as the previous use, however replacement of noncon g uses must comply with the provisions of Chapter 18.60, BMC(Nonconforming Situations); 2. Changes proposed for the site, singl or cumulatively, do not increase lot coverage by buildings, storage areas,parking areas or impervio surfaces and/or do not result in an increase in intensity of use as measured byparking requirements, fic generation or other measurable off-site impacts; a. By more than 20 percent for dev pments not meeting one or more of the criteria of Section 18.62.010.A-2.e,BMC;OR b. By more than 10 percent for develop me•is meeting or exceeding one or more of the criteria of Section 18.62.010.A-2.e,BMC; 3. The proposed use does not continue any unsafe or azardous conditions previously existing on the site or associated with the proposed use of the prope Planning ector I hereby determine that adequate site surface drainage and.access are pr 'ded on this site for the proposed use. City Engineer Page 3 (Reuse,Change of Use or Further Deve lopme nt/Amendment or Modification Checklist-Prepared 11/24/03;revis 9/21/04) >B. VeAmendmentlModifica*of a Plan Approved On or After 9-3-91. . Amendment/Modification of a Plan Approved On or After 9-3-91 Information Yes No N/A 1. All amendments or modifications shall be shown on a revised site plan drawing ❑ ❑ ❑ Based on the. information submitted with,this application, and a review of other pertinent information, I hereby find that the amended plan IS IS NOT (circle one) in substantial compliance with the originally approved plan. If the amended plan.is not in substantial compliance with the originally approved plan, the proposal shall be subject to all plan review and approval provisions '.of the Unified Development Ordinance. Substantial compliance maybe shown by demonstrating the following: 1. The proposed use is allowed under the same zoning district use classification as the previous use, however replacement of nonconforming uses must comply with the provisions of Chapter 18.60, BMC(Nonconforming Situations); 2. Changes proposed for the site, singly or cumulatively, do not increase lot coverage by buildings, storage areas, parking areas or impervious surfaces and/or do not result in an increase in intensity of use as measured by parking requirements,traffic generation or other measurable off-site impacts; a. By more than 20 percent for developments not meeting one or more of the criteria of Section 18.62.010.A-2.e,BMC,OR b. By more than 10 percent for developments meeting or exceeding one or more of the criteria of Section 18.62.0IO.A.2.e,BMC; 3. The proposed use does not continue any unsafe or hazardous conditions previously existing on the site or associated with the proposed use of the property. Planning Director Comments/Conditions of Approval: Page 4 C • Landscape Plans. If a landscaplan is required, for either type of applicatO the following information shall be provided on the landscape plan: / Landscape Plan Information Yes No N/A V 1: Date, scale, north arrow, and the names, addresses, and telephone numbers of both the ❑ ❑ ❑ property owner and the person preparing the plan 2. Location of existing boundary lines and dimensions of the lot ❑ ❑ ❑ 3. Approximate centerlines of existing watercourses, required watercourse setbacks, and the ❑ ❑ ❑ location of any 100-year floodplain; the approximate location of significant drainage features; and the location and size of existing and proposed streets and alleys, utility easements, utility lines,driveways and sidewalks on the lot and/or adjacent to the lot 4. Project name,street address, and lot and block description ❑ ❑ ❑ 5. Location, height and material of proposed screening and fencing(with berms to be delineated ❑ ❑ . ❑ by one foot contours) 6. Locations and dimensions of proposed landscape buffer strips, including watercourse buffer ❑ ❑ ❑ strips 7. Complete landscape legend providing a description of plant materials shown on the plan, ❑ ❑ ❑ including typical symbols, names (common and botanical name), locations, quantities, container or caliper sizes at installation, heights, spread and spacing. The location and type of all existing trees on the lot over 6 inches in caliper must be specifically indicated 8. Complete illustration of landscaping and screening to be provided in or near off-street parking ❑ ❑ ❑ and loading areas,including information as to the amount (in square feet) of landscape area to be provided internal to parking areas and the number and location of required of:-street parking and loading spaces 9. An indication of how existing healthy trees (if any) are to be retained and protected from ❑ ❑ ❑ damage during construction 10. Size,height,location and material of proposed seating,lighting,planters,sculptures,and water ❑ ❑ ❑ features 11. A description of proposed watering methods ❑ ❑ ❑ 12. Location of street vision triangles on the lot(if applicable) ❑ ❑ ❑ 13. Tabulation of points earned by the plan - see Section 18.48.060, BMC (Landscape ❑ ❑ ❑ Performance Standards) 14. Designated snow removal storage areas ❑ ❑ ❑ 15. Location of pavement,curbs,sidewalks and gutters ❑ ❑ ❑ 16. Show location of existing and/or proposed drainage facilities which are to be used for ❑ ❑ ❑ drainage control 17. Existing and proposed grade ❑ ❑ ❑ 18. Size of plantings at the time of installation and at maturity ❑ ❑ ❑ 19. Areas to be irrigated ❑ ❑ ❑ 20. Planting plan for watercourse buffers,per Section 18.42.100, BMC(Watercourse Setbacks), if ❑ ❑ ❑ not previously provided through subdivision review 21. Front and side elevations of buildings, fences and walls with height dimensions if not ❑ ❑ ❑ otherwise provided by the application. Show open stairways and other projections from exterior building walls Page 5 Page 1 of 1 • ! Susan Kozub From: Bob Murray Sent: Monday, May 16, 2005 9:46 AM To: Susan Kozub Subject: RE: walton storm stuff no -----Original Message----- From: Susan Kozub Sent: Monday, May 16, 2005 9:45 AM To: Bob Murray Subject: walton storm stuff Have you heard anything from Ray Center on the revised calcs for the Walton PUD minor modification (northern part)? Susan Kozub, Planner Dept.o.fPlamiing&:Community Development 201ast Olive Street P.O. Box 1230,Bozeman NIT 59771.4230 406-582-2260(P): 582-2263(F) bgp://Nvww.bozeman.net/planning.html 5/16/2005 �-- OPEN FARMLAND UWs •► woo .2M l o PARKING AREA ONE 451027 F S . 128 STALLS . NO PARKING ON NORTH 1 #6 j j BUILDING 1 9,000 S BUILDR 6,900 I . O s / LU Y w a- Cie z 1 L--- ------- Z Q I \ F g O a ' a w 1 \ w O \ o m \ BUILDI� I I j 61900 • ! BUILDING 2 !� 1000 SF. I #5 , b PARKINIG STALLS I 1 5 P RKING ST LLS BICY(AE LANE - r - - - NORTH 15TH. STREET 4 PARKI STALLS 3 P RKING ST LLS • / #4TM Ui _ Ir LU 7 BUILDING 3 LFFFMTFU 'Z 5,680 SF. ' cc FE - - - - - - -- - DITCH R.O.W. 19,650 SF. PARKING AREA ..TWO (IN( 2 ,209 SF. 3 a. i i r• • J' d o� C!q I toot wide 1 toot wide no—access strip (typ.) no-access strip (typ.) West Oak Street ` Q S 89°31'33"E 194.72' N 8903133"W 455.77' I 12 /2' o 35.50' 35.50' o — — — — 4y5,76* — — o Found aluminum - ----- ------ 40.00' -----�-�_------ --- i ______==== s_7_73' ----------------------------- ---------- - - ' -� cap by MDOT 3�4.03� 1 0 30' 1 1 M Ip ----- ----------------- -- ----------'--------- --- - C` �d 66.72 I o mInage _ - r M_- ------ I - - - - dpnrnent I I t I -_- _-__.Pa 89A�1.�3_ o I"199:43' LF -— N-89°31'33"W 196.38'_____ -- o Ul// 40' Ufl/ N 1 Eas9nrant-- -- o h N I -1 I 1 1 rn l I, 0 o ; 20-A o Ia g I 19 I o I I i 20,566 s.f o! i'� 0 1 19 4 s.f. 4 I 'F !u I z1 i z 1 �/ 111f(:i X t s�soz 8 r I I I � i I 19,9 s.f. m I I N , 20,566 s.f. !_ =NT9 00'00 .1-99. 2' Iti t 1-�- N 90 00'00" r.-196.5 > -__ F_ . - -- - -- M t� I 1 � ,Z r-, r d �00 � u 7il ZI 2g � I . S 7 rS r r1 ( 9 V Zi L 1y zS 3° �r 1 1 I ytie01 -�33 �v 3s 3u e I �° °ye i P ouS I ` ,, yl `/Z � rn I I ao I 3ILVO"L W � 1.7 Y A I I I I I CI) r - - - - - - - -- - - - ITI - - - - -- - - - - - - - - - --- �- Q ° tx� t` I IIII I Itl I S_ = 50 * 30' UT/LTY EA ENT I I I I I I I I I I I t t l l l l l l l l t _ 0. I M III1111111 1 itlltttl I •� \V °' III1111111 I I I1111 S I � 0 25 50 7 7 ,°{ 76 III1111111 I 1I111 II 77 7f 17 ! 1 M! 87 I w _ _ _ _ - -----j- 9 '0 00 18 . ' - - - +Hltfrrr+ I I --- IdI�11 - - -- - 9 0000 IB .36 N I I111111 11 1 111111 1 6 O I o0 I III I II ' I ' Co Area A-1 ' N z I N I I I III 11 1 I 111111 1 ' I1' II�1 Ili 1 lilllll W 1 C W �'I I I EyIU 111 I° 111 11111111 ( ce S/ �1r C p' �, m II 19, 0 71 `I 9a5 IY )S 76 1-17 93 4J!,� 11 firlll I I I I I I I i I I I I I I I h 1 M� laa f G P /° ,1 O ix l 1 1 1 1 111 1 111 I IIII 1111111 1' S 7 1^ I V I O ""'1""1 I I11III I I11 I 11111111111 ' t''�i.,,,,11 to � 00 G�I I I I I III I I I I I t 11 1111111 M� I 1 t I Z t�tl r� I I2 1 �^ I w w i Ir91 �; '�, t <!3 ) 11 S� S/ 2 S3�sV ss Sb 311 i ICE 5-9 1 6z h, iYJ ba�67Yj'��) Z 'J/ 7e 73 10 I h ' o I APR 2 0 2005 d N 90°00'00"W t?zm• ?z3o'I 416.2Tco I � • titan 1 I � I o I I 1 I I �-- 7/ + I 118.97- I I LO i I I 00 1 0 I v� 6 L7 I S 90900'00"E I ( d I I 1 r ON PIC,e t I 1 I I Gµ e0 45' easement for_i 1 3 I 30 easement �, °tC 05e I ----�---J----------t— � I 0° 5 `� storm water ove ow I I t for torn 1 r I Cc ko CII o t o0 I 9 0 ye between parking ots 1 t o 1 dra i e of °c Q 1 00 ' I o0 i \, O A t I o I P P V �'� d' 1 .0 1" I W I rn i and pedestrian ac ess I I o I .Z10 c�J� I rn Prepared By. °i °�a' I o '� 1 40 Rocky Mountain Engineers, P.LLC. I I g c d I � ! J f ;"�M $Ama,, 1 Civil Engineering & Land Surveying _ I I W� I I` 1' �+ Go'00_E 79.91' �'ZS Oa $� N 90'00'Oo' W B?.?6' I 1700 West Koch Street;.Suite 7 O I I 4� L I I ---- 56't 30• ----------- ° I i Bo em (+�ontano 4715 j40U586-051. IZ g I �r� Orv/Haas Easement nminanw Eirewn►ren! ;oI$ I Drow�nge ame: 38e88 end Ph dwg 03 25 2005 t y r o t. ti l wJ irdl�� I foot wide no—access strip (typ.) Z no-access foot (typ.) West Oak Sheet ® _' as If � . s 89°3>'33"E 194.72' N 89°3133"W 455.77' I 12 'I2' o 35.50' 35.50' �f5.7b — — o 40.00' Found aluminum -----i-----------=-----� i�______ ________==_- Sq_73' --------------------------- ------------- ------ --------� o cap by MDOT o il' M ____8__9____°_______=___ 86.72 I I 77Z07- Io30 I r M------------------------ N89°31'33"W 196.38' -=_ of 199.43' UN uN! I I �----- 15' wide 40' Oro7rioge FosemenJ'---- NJ o I J � I ut//~I ® �' 1 , . I I 105 00' M L I I I N I cv I Drainage Easement I W I I W I " ^ •0_ 20-A o o o 19-A I i I 20,566 s.f. o i a i s 19,904 s.f. i p I I 0 o IM o I"� I V1 ' 4 zi z I _ 44,302 st. I I I I i 4-+ I N I 20,566 s.f. i I 19,904 s.f. N 90°00'00"W 199.42' I I N 90°00'00"W 196.52' 1 y I x I Q 000 I S Q aye i 0�5 `� Building footprints shown on this FSP are , pR ca conceptual in terms of approval. Site specifics I °' including setbacks, lot coverage, height, i �+�� j �+�� I m 6, _ 111 _ _ _ -- N 0' 0' 0" W - 1 .3 _ _-- I 0 N parking,.detention areas, etc. will be evaluated -T- ---- - - - - - - - - - - -- - - t ITIT --ITI - - - - - - - _T Q tX��f 1 1 Scale: — 50' during site plan and/or building permit review. I -- +nl I ul �sJ -" 30' UT/LTY EASEMENT I I I I I I I I I I I I l l d l l l l l l l I � j� �-II�, nII1Il1 lIfilI,nIagInl lIu lI lIl lIIl III l,lid lll llII ddddd ull1ll1lll1 llnnll lllll llll ' � �iII�-- '0 0 - -8 •Idl1111 (�eti �0�0 0 25 5 0 � 7 dlllll . N 06 FINAL � I I N N Common Area A-1 2 c PLAN TeelI I , o " 4 Illlmllll I nldnllln 1 5,7 II I u ns• •�' �• ,= po ,�:- h;��I,, II Il IIo II nn1 l II1 II1I I1II II1I II1II r lII uIIII dI lI lI lI ll ll ln l h Q � REVIEW, ED & APPROVE D DEPT OF PLANNIN 't w UNITY DEVs8747 AN E lZil j ke �v 12 ► Q i 1 ' I i s Q Mom' !RECTOR I I o I N 90°00'00"W i 22.V 22 ao'i 416.27' j9/ h j I Ic II I � I � Ij 1 1 8.9T 1 oo G \y e 1a S 90100'00"E v leey I i Y' 0 45' easement or 30' easement ------4--- ———————— oa storm water oveow I fortorm�((`e ye between parking ots dro pipe vo o ° eJ a `y IIIj 00 Mo;Qr and pedestrian ac ess I , o I .t10��b I rn Prepared 8y. Rocky /Mountain Engineers. P.L.L.C. 0 rn $�'$. 40' Civil Engineering & Land Surveying 0`_-Y 000E79.91' N 9000 - ' 71 1700 West Koch Street, Site 7 MMae�oWorBong ,lem0 .0M . !.grh Dmn®av Easement 5 09 2005 oFSO2�' THE CITY OF BOZEMAN • 20 E. OLIVE• P.O. BOX 1230 BOZEMAN, MONTANA 5977 1-1 230 88 R� ENGINEERING DEPARTMENT CO 0 PHONE: (406) 582-2280 - FAX: (406) 582-2263 June 16,2005 Ray H. Center,E.S. Rocky Mountain Engineers 1700 W. Koch Street, Suite 7 Bozeman,MT 59715 Re: Walton Homestead Subdivision Dear Ray: The City of Bozeman has completed its review of the revised stormwater calculations and plan for the P.U.D.Amended Phase 2 Parking Lot. Below is a written summary of the City's review comments on the documents submitted. 1. Calculations page 1: for the slot width for basin 18A,I came up with ''/z". 2. Calculations page 1: for the slot width for basin 19A,I came up with 5/8". 3. Calculations page 2: The.three numbers given for street,sidewalk,and building area don't add up the number given for impervious area for basin 18. 4. Drawing: Where is pond 18B discharging to and how is it being conveyed? 5. Drawing Pond 18A: See comment 1 above. Also what does"slot in opposite pipe outlet"mean? 6. Drawing: Specify the slot width for both Detention Areas 18 and 19. Also using perforated pipe and the gravel void ratio to provide the required volume in the underground detention areas will not be allowed unless the bottom of the excavation is lined. Either revise the pipe size/length to provide the volume,or call for lining the excavation. 7. Drawing: See comment 2 above. Please provide a written response to the individual comments and return the attached red lines when submitting the revised plan sheet and calculations. If you have any questions regarding these comments,please call me at 582-2280. Sincere , obert J. rray Jr.,P.E. Project.Engineer cc: t usan Koziih Planner I- ERF Project File HOME.OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK so THE THE CITY OF BOZEMAN C~ 9x 20 E. OLIVE • P.O. BOX 12-30 * * BOZEMAN, MONTANA 5977 1-1 230 ENGINEERING DEPARTMENT 9?'jN CO. O� PHONE: (406)582-2280 • FAX: (406) 582-2263 June 24, 2005 Ray H. Center, E.S. Rocky Mountain Engineers 1700 W. Koch Street, Suite 7 Bozeman, MT 59715 Re: Walton Homestead Subdivision Dear Ray: The City of Bozeman has completed its review of the revised stormwater calculations and plan for the P.U.D.Amended Phase 2 Parking Lot submitted for the,above referenced project and found them to be acceptable with the following conditions: 1. The slot width for Basin 18A was not changed to ''/2" on the drawing. 2. We typically do not allow stormwater ponds to discharge to the street,but in this case since it is a relatively small basin,and there is another inlet a little over 100' down the road that will intercept the flow it will be acceptable. If you have any questions regarding these comments,please call me at 582-2280. Sincerely, WYI Robert J. array Jr., P. Project ngineer cc: <Susan--Kozub=Planner-I ERF Project File HOME-OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK ' r 3 2-Jul-03 17-Dec-03 20-Jun-05 Walton Homestead Subdivision Drainage Basins Q=CLH"3%2 Historic Runoff, Q=CiA C= 3.33 C= 0.2 A i Q H H L Historic 10 Yr 10 Yr 10 Yr Concentration 10 Yr Historic Required Pond Pipe Outlet Det. Basin Time Area Area Intensity runoff Storage Depth Diam. Slot Width Type # (minutes) (sq ft.) (acres) (1n.1hr) (cfs) (cu ft) (ft) (ft) (inches) U 1 38 102279 2.35 0.86 0.402 1171 1.50 3/4 • U 2 42 256426 5.89 0.81 0.950 4443 1.50 1-7/8 U 3 29 61097 1.40 1.02 0.287 793 1.00 1 U 4 28 88910 2.04 1.06 0.433 1046 1.50 7/8 U 5 50 232349 5.33 0.72 0.768 2609 1.50 1-1/2 S 5A 25 11924 0.27 1.13 0.062 229 0.70 3/8 None 6 16 18205 0.42 1.51 0.126 270 U 7 22 155596 3.57 1.22 0.868 2324 1.50 1-3/4 U 8 28 69106 1.59 1.06 0.335 961 1.50 5/8 S 9 19 18233 0.42 1.37 0.115 146 1.00 3/8 S 10 18 17815 0.41 1.41 0.115 144 1.00 3/8 S 11 31 18567 0.43 0.99 0.084 403 0.80 3/8 S 12 33 30635 0.70 0.95 0.133 533 1.30 3/8 U 13 31 43123 0.99 0.98 0.194 872 1.50 3/8 U 13A 15 6071 0.14 1.55 0.043 60 1.50 1/8 U 14 29 56148 1.29 1.02 0.263 1100 1.50 1/2 S 14A 31 27798 0.64 0.98 0.125 463 1.00 1/2 U 15 28 9309 0.21 1.05 0.045 180 0.66 1/4 • S 16 32 32449 0.74 0.97 0.145 664 1.20 3/8 S 17 18 7010 0.16 1.42 0.046 91 1.10 1/8 U 18 29 66223 1.29 1.02 0.263 1206 1.00 1118 S 18A 20 17738 0.41 1.29 0.105 236 0.80 1/2 S 18B 10 3050 0.07 2.05 0.029 26 0.50 318 U 19 29 59425 1.36 1.02 0.280 1264 1.00 11/8 S 19A 19 11060 0.26 1.34 0.068 112 0.50 5/8 S 20 31 22598 0.52 0.99 0.103 354 1.00 3/8 U 21 26 25445 0.58 1.10 0.128 506 0.66 7/8 U 22 16 13772 0.32 1.52 0.096 186 1.50 1/4 U 23 38 38235 0.88 0.87 0.152 791 1.50 1/4 S=Surface detention 882-Drainage4.xl U =Underground detention S Walton Homestead Subdivision - Drainage Basins 7-Jun-05 27-Jun-03 Street Sidewalk Building Driveway Impervious Landscaped Historic Total Composite , Basin# Area Area Area Area Area C Area C Area C 2 55547 7847 58022 14606 136022 0.900 120404 0.200 256426 0.571 3 13380 1962 9338 2753 27433 0.900 33664 0.200 61097 0.514 4 22751 2127 7213 4627 36718 0.900 52192 0.200 88910 0.489 5 20044 10169 29840 10926 70979 0.900 161370 0.200 232349 0.414 5A 6954 1332 8286 0.900 3638 0.200 11924 0.686 6 3675 1018 3888 2914 11495 0.900 6710 0.200 18205 0.642 • 7 50329 8190 24870 5229 88618 0.900 66978 0'.200 155596 0.599 8 15635 2460 15900 33995 0.900 35111 0.200 69106 0.544 9 212 5450 5662 0.900 12571 0.200 18233 0.417 10 212 5450 5662 0.900 12153 0.200 17815 0.422 11 11517 1727 288 13532 0.900 5035 0.200 18567 0.710 12 10996 2309 4449 17754 0.900 12881 0.200 30635 0.606 13 19200 4905 7809 29310 0.900 13813 0.200 43123 0.676 13A 2604 0.900 3467 0.200 6071 0.500 14 30263 7375 15921 37870 0.900 18278 0.200 56148 0.672 14A 15689 0.900 12109 0.200 27798 0.595 15 6283 6283 0.900 3026 0.200 9309 0.672 16 18846 1947 1427 22220 0.900 10229 0.200 32449 0.679 17 3801 3801 0.900 3209 0.200 7010 0.580 18 3948 6652 30520 41120 0.900 15103 0.200 56223 0.712 18A 9292 0.900 8446 0.200 17738 0.567 . 18B 1250 1250 0.900 1800 0.200 3050 0.500 19 3809 7733 31721 43263 0.900 16162 0.200 59425 0.710 19A 4450 0.900 6600 0.200 11050 0.482 20 12110 0.900 10488 0.200 22598 0.575 21 18026 0.900 7419 0.200 25445 0.696 22 7998 0.900 5774 0.200 13772 0.607 23 24982 0.900 13253 0.200 38235 0.657 z r Walton 74estead Subdivision - • Basin 17 9-Jun-03 0.161 = BASIN AREA(A) 0.580 = COEFFICIENT OF RUNOFF (C) 0.046 = HISTORIC RUNOFF (H) . 10 yr. Developed Developed Historic Time Intensity Runoff Runoff' Runoff Storage (min) (1n/hr) (cfs) (cu ft.) (cu ft.) (cu ft.) --------------- --------------- --------------- --------------- --------------- --------------- 5 3.22 0.300 90 14 76 10 2.05 0.191 115 27 87 15 1.58 0.147 132 41 91 20 1.31 0.122 146 55 91 25 1.13 0.105 158 69 90 30 1.00 0.094 169 82 86 35 0.91 0.085 178 96 82 40 0.83 0.078 186 110 77 45 0.77 0.072 194 124 71 50 0.72 0.067 202 137 64 55 0.68 0.063 208 151 57 60 0.64 0.060 215 165 50 Basin 18 9-Jun-03 20-Jun-05 1.291 = BASIN AREA(A) 0.712 =COEFFICIENT OF RUNOFF (C) 0.263 = HISTORIC RUNOFF(H) 10 yr. Developed Developed Historic Time Intensity Runoff' Runoff Runoff' Storage (min) (in/hr) . (CA) (cuft.) (cu ft.) (cu.ft.) --------------- --------------- --------------- --------------- --------------- --------------- 5 3.22 2.958 887 79 808 10 2.05 1.885 1131 158 973 15 1.58 1.448 1303 237 1067 20 1.31 1.201 1441 316 1126 25 1.13 1.039 1558 395 1164 30 1.00 0.923 1661 474 1188 35 0.91 0.835 1753 552 1201 40 0.83 0.765 1837 631 1206 45 0.77 0.709 1914 710 1204 50 0.72 0.662 1986 789 1197 55 0.68 0.622 2054 868 1186 60 0.64 0.588 2117 947 1170 Walton Aestead Subdivision - • Basin 19 9-Jun-03 20-Jun-05 1.364 = BASIN AREA(A) 0.710 = COEFFICIENT OF RUNOFF(C) 0.280 = HISTORIC RUNOFF (H) 10 yr. Developed Developed Historic Time Intensity Runoff' Runoff' Runoff' Storage (min) (in/hr) (CA) (cu ft.) (cu f t.) (cu Ji.) --------------- --------------- --------------- --------------- --------------- --------------- 5 3.22 3.11.6 935 84 851 10 .2.05 1.986 1191 168 1024 15 1.58 1.526 1373 252 1121 20 1.31 1.265 1518 335 1183 25 1.13 1.095 1642 419 1222 30 1.00 0.972 1750 503 1247 35 0.91 0.880 1847 587 1260 40 0.83 0.806 1935 671 1264 45 0.77 0.747 2017 755 1262 50 0.72 0.698 2093 839 1254 55 0.68 0.656 2164 922 1241 60 0.64 0.620 2230 1006 1224 Basin 20 9-Jun-03 0.519 = BASIN AREA(A) 0.575 =COEFFICIENT OF RUNOFF (C) 0.103 = HISTORIC RUNOFF(H) 10 yr. Developed Developed Historic Time Intensity Runoff Runoff Runoff' Storage (min) (in/hr) (CA) (cu ft) (cuff.) (cult) --------------- --------------- --------------- --------------- --------------- --------------- 5 3.22 0.960 288 31 257 10 2.05 0.612 367 62 305 15 1.58 0.470 423 93 331 20 1.31 0.390 468 124 344 25 1.13 0.337 506 154 352 30 1.00 0.300 539 185 354 35 0.91 0.271 569 216 353 40 0.83 0.249 596 247 349 45 0.77 0.230 622 278 344 50 0.72 0.215 645 309 336 55 0.68 0.202 667 340 327 60 0.64 0.191 687 371 317 Walton Homestead Subdivision - Basin 18A 27-Jun-03 7-Jun-05 0.407 = BASIN AREA(A) 0.567 =COEFFICIENT OF RUNOFF(C) 0.105 = HISTORIC RUNOFF (H) 10 yr. Developed Developed Historic Time Intensity Runoff Runoff Runoff Storage (min) (in/hr) (cfs) (cuft.) (cult) (cuff) 5 3.22 0.743 223 31 191 10 2.05 0.473 284 63 221 15 1.58 0.364 327 94 233 20 1.31 0.302 362 126 236 25 1.13 0.261 391 157 234 30 1.00 0.232 417 189 228 35 0.91 0.210 440 220 220 40 0.83 0.192 461 252 210 45 0.77 0.178 481 .283 198 50 0.72 0.166 499 314 184 55 0.68 0.156 516 346 170 60 0.64 0.148 532 377 154 Basin 19A 27-Jun-03 7-Jun-05 0.254 = BASIN AREA(A) 0.482 = COEFFICIENT OF RUNOFF(C) 0.068 = HISTORIC RUNOFF(H) I0 yr. Developed Developed Historic Time Intensity Runoff Runoff Runoff Storage (min) (in/hr) (cfs) (cuff) (cuff) (cult.) 5 3.22 0.393 118 20 98 10 2.05 0.251 150 41 110 15 1.58 0.193 173 61 112 20 1.31 0.160 192 82 110 25 1.13 0.138 207 102 105 30 1.00 0.123 221 123 98 35 0.91 0.111 233 143 90 40 0.83 0.102 244 164 81 45 0.77 0.094 255 184 71 50 0.72 0.088 264 204 60 55 0.68 0.083 273 225 48 60 0.64 0.078 282 245 36 A Walton Homestead Subdivision - Basin 18B 27-Jun-03 7-Jun-05 0.070 BASIN AREA(A) 0.500 = COEFFICIENT OF RUNOFF(C) 0.029 = HISTORIC'RUNOFF (H) 10 yr. Developed Developed Historic Time Intensity .Runoff Runoff Runoff Storage (min) (in/hr) (cfs) (cu.ft.) (cu ft.) (cu 0 5 3.22 0.113 34 9 25 10 2.05 0.072 43 17 26 15 1.58 0.055 50 26 24 20 1.31 0.046 55 35 20 25 1.13 0.040 59 44 16 30 1.00 0.035 63 52 11 35 0.91 0.032 67 61 6 40 0.83 0.029 70 70 0 45 0.77 0.027 73 78 -5 50 0.72 0.025 76 87 -11 55 0.68 0.024 78 96 -17 60 0.64 0.022 81 104 -24 WAL TON HOMSUVISIONP. U. D . ES TEADBDI AMENDED PHASE 2 PARKING LOT THIS PLAN IS A MODIFICATION TO SHEET SD6 OF 8 WALTON HOMESTEAD SUBDIVISION P.U.D., PHASE 2, APPROVED 09-02-03 SO I I I I i I I I I I I I I I I I 1 20 22 2 I I I I 1 d I I 1 I 1 I : € N Z &C 8.01 25 36, 1 - T- RFLOW-OUT-CUR i 1 1 FLOW-OUT-CURE W- - R i SCUPPER I I 3. 7< �� D 1 s� Sp x° 0 I I x y0 I e�S OS Q •� 1 I � I LO Q I 3 21d- ! I S 3 Detention Area #18B t L 3 71 1 Build pond with minimum �_ I I storage volume of 26 c.f. 1 _ OU T LTILE N Detention outlet structure Z 1 :; z shall be constructed to release0.029 cfs at 6" water de th , ---- -- �� -- -- �sm- -� " '1 - ; -- -- -- --- -- -- -- - 11V-- -- -- s- -- -M---- M-" --i--- 10- ear storm with 3 8" wide I ' ' ' 'I. ' ( Y ) / I U FLOW-IN-CURB Z FLOW-IN-CURB ; t,l� FLOW-IN-CURB slot. Slot Invert Elev. = 4736.60 ,n I SCUPPER: ; ' I; ; ; ' .. ISO SO Install 4" PVC pipe under sidewalk 1 W-o -c R 3 FLOW- - . . I L T c : �I' FLOW-OUT-CURB to allow runoff from detention o o It �� ,a o basin to flow under sidewalk. I 9 �' s �' INLET 19 ---I-- : : :I: I :I I t - I -------- - -- -- -- --- - -- - ^ - -- --- -- -- -- -- - --- -- -- -- - ------- - - -- SCUPPER I . 'I' ' 1 37.75 3' WIDE CONC. PAN , ) 37.56 S 3 S y0 SLOPE 0.50Y 1 I , : ; . , . ' ;I; ; : 2 3' WIDE CONC. PAN 37. ry`� I ° 3 w} I , . .I: ' , , , ,I, . , . ° SLOPE 0.50% 'S�• I •y°�' z a a I a. Q U „ .I, Nudda ' J I J3o Naa 116 1 �`° I : ; 'I: : : : : ; : : : 16 1 `T9 Z y I y1 37.81 I : 7 ; ' : : ' ' :I: : : : : �� 3X18 38.45 �? I INLET " o ; � : � :1: : : : : : '';, 0, . , , , , , , r I ( ) 6a: . Al F x I 18 I� 'I; ' ; ' : : I F x i w o j S s y s : : . :j7 7 LE:f-1LA 1 1 -1: 1 ; y0. �° 0�O y° Depress Curb I w ¢o s n �J(( >� I 0 0 1 y+ I : : : : :I: : 1 (5: : : : !j: : . : : at Cone. Pan I �++� S' it w-O. I ,. . . , . �: : : :1: , : : : : I Opa i Detention Area 18A > a FLOW-OUT-CURB a FLOW-our-CURB I o. Build pond with minimum Storage w I M co-, FLOW-IN-CURB I , ; ; ; ��� . ��' "" FLOW-IN-CURB w ! volume of 236 c.f. I y �SCUPIER. I S.°C ` PPER Detention Outlet structure shall be 24" a� ,y y � s �. I 1i Detention Area #19A RCP set vertically w/ Beehive Grate (IFCO I I ' : ; ; :I; , : ; I s Build pond with minimum 788-1) set in Bell End on top. 9po storage volume of 112 c.f. Detention outlet structure Outlet structure shall be constructed I i 1 x + I 1 shall be constructed to release to release 0.11 Cfs at water depth I 38.95 24" ID INLET RISER x I X 39.25 0 0 P I INSTALL 182 L.F. INV. IN (W)=35.00 •27 I 39. 9 d �. „ (10-year storm) With " ide slot in 12" PVC PIPE, ASTM INV. OUT(N)=35.00 I I 1 0.068 cfs at 6 water depth structure wall opposite pipe tlet. 1 $A 3034, SDR 35 INV. OUTS)=35.00 I O 'L (10-year storm) with 5/8" wide = NO SEDIMENTATION BASIN I _ slot. Discharge through curb Slot Invert Elev. = 4736.50 I U) I I I I 9 9 Pipe Invet Elev. = 4735.90 I39.23 1 39t41 Q i € opening to cross pan. Grate Elev. = 4738.00 i � i x J y� A Slot Invert Elev. = 4738.15 %1B yI I I 3y I ; 1 you• �°'� ["C� y+ I I y�� Sys ys+ 61% FLOW-OUT-CURB FLOW-OUT-CURB 1 I I FLOW-OUT-CUB FLOW-OUT-CURB 20%1 f 6 t V) d i i a € i"} Detention Area #19 Detention Area #18 Install 952 L.F. 12" diameter Hancor Perforated Install 878 L.F. 12" diameter Hancor Perforated Landmax pipe or approved equal with minimum Landmax pipe or approved equal with minimum storage volume of 1264 c.f. Flowline elevation of storage volume of 1206 c.f. Flowline elevation of Landmax pipe = 4735.00 Landmax pipe = 4735.00 Detention Inlets: Detention Inlets: North Inlet Grate elevation = 4736.70 North Inlet Grate elevation = 4736.70 South Inlet Grate elevation = 4737.20 South Inlet Grate elevation = 4737.50 Bottom elevation = 4734.25 Bottom elevation = 4734.25 Detention Outlet structure shall be constructed to Detention Outlet structure shall be constructed to release 0.300 cfs at 12" water depth (10-year Note: release 0.31 cfs at 12" water depth (10-year storm). : Construction of all underground pipe detention Prepared By. storm ) facilities shall conform to the plans for Walton Grate elevation = 4737.70 Grate elevation = 4737.70 Homestead Subdivision approved 09-02-03, including Bottom elevation = 4734.25 Rocky Mountain Engineers. P.L.LC. Bottom elevation = 4734.25 lining of the excavation for the detention pipes with a Slot width = 1X' Civil Engineering & Land Surveying Slot width = 1X" Connect to storm drainage pipe w 12 L.F. 12" ADS g pp . .Connect to storm drainage pipe w/12 L.F. 12 mil PVC liner w/sealed seams which shall extend 9 P P / Scale: 1"= 30' " ADS along the bottom and sides of the excavation to a pipe @ 1.07.. 1700 West Koch Street, Suite 7 pipe @ 1.07.. point 0.2 feet above the top of the pipe. Bozeman, Montana 59715 (406)586-4859 0 15 30 60 Drawing File Name: 2SD rain-As-Blt-882.dwg 06/11/2005