Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout638300221014986982) r
x^
P � ti,fit t'1
ly r f
18516 Cottonwood& Ida ;
PUDP
615 E Cottonwood Street& 7.20 N Ida Ave
Bangtail Partners, LLC
10/31/2018
b wr
S'
K
� I
Jr1 1 0t A
i w it
r
-1.
From: Alice Flynn
To: Agenda
Subject: Cottonwood and Ida PUD Application 18516
Date: Monday,March 25,2019 11:25:45 AM
Importance: High
Alice Flynn
431 N 4th Ave
Bozeman, MT 59715
March 25, 2019
City Commission, Brian Krueger
PO Box 1230
Bozeman MT 59771-1230
agenda la-bozeman.net
Re: Cottonwood and Ida PUD Application 18516
To Whom It May Concern:
I am writing as a home owner on the North Side and the Business Manager of
Radiant Design & Supply, Inc., 501 E Peach St.
I have lived in Bozeman since 1970. As I've watched our city grow, I have had the
same concerns as other residents regarding affordable housing, historic preservation,
and preserving the qualities of Bozeman that make this city our choice for home.
Because I have lived my entire life in Montana, I have seen 67 winters and the snow
conditions that affect traffic and parking.
I have concerns about any new development or street construction that does not plan
for the harshest winter conditions. Even for good weather, I am concerned about what
I see in the number of residents and employees projected in the plan for Cottonwood
and Ida, PUD 18516.
The standards Bozeman has for parking, setbacks, apartment buildings, and other
requirements, exist for good reasons. If the development is allowed to be built with
the variances the developers have outlined, there will be a negative impact on the
neighborhood where I work. The large flatbeds and semi-trucks that require access in
and out of our business at 501.E Peach Street will have even more difficulty with
increased traffic and parking. The parking required for our employees and customers
can be difficult to find and hazardous when snow narrows the streets.
I hope you take into consideration my concerns about a development that, in my view,
is not appropriate for this neighborhood.
Sincerely,
• •
Alice Flynn
Business &Marketing Manager
Radiant Design & Supply Inc
Formerly Radiant Engineering Inc
501 E Peach St Suite A
Bozeman, MT 59715
From: Noah&Leona Poritz
To: Agenda
Subject: [SENDER UNVERIFIED]Cottonwood and Ida PUD
Date: Monday,March 25,2019 11:37:27 AM
Greetings Honorable City Commissioners.
As a property owner in the NE Bozeman neighborhood, we object to all eleven of the applicants
requests to relax Bozeman Municipal Code zoning regulations.
We especially object to the applicant's requested alteration of maximum building height and front
setbacks. We also especially object to applicants proposed reduction of required parking
requirements.
We feel that this proposed PUD is satisfactory without the applicant's requests to relax the Code.
Sincerely,
Noah and Leona Poritz
0 •
From: Brodev Simkins
To: Anenda
Subject: Cottonwood and Ida Preliminary PUD
Date: Monday,March 25,2019 2:48:07 AM
To whom it may concern,
At Simkins-Hallin we are keen to support public and private development that improves the
community of Bozeman and the Gallatin Valley. We understand that thoughtful and
responsible developers, like your partnership has proven to be, are paramount to realizing the
community's potential.
The East Cottonwood project you have planned is one that our company supports. It provides
a unique opportunity to diversifying Bozeman's North Side. It adds needed livable units in a
desirable neighborhood. The project also furthers the creative distinction in design that our
community values, by utilizing architectural function and design appeal.
Like others in the community we desire to see the inevitable changes in Bozeman be carried
out responsibly. Proper foresight and steadfast planning are the only approach when
calculating improvements. We hope that together with the City of Bozeman and related parties
to the project that the East Cottonwood structures can become a reality under these principals.
Please accept this message as an endorsement of our company to the planning and execution
of the East Cottonwood housing and retail project.
Best regards,
Brodey Simkins
Vice President
Simkins-Hallin inc.
406,581,5494
Sent from my iPhone
From: bioski2@)bresnan.net
To: Agenda
Subject: [SENDER UNVERIFIED]Cottonwood Ida PUD
Date: Sunday,March 24,201910:07:59 AM
Hi, In regard to Application#185161 would like to make a few comments. My main concern
is the size, scope, density, and height of this project. It appears that the developers have asked
for relaxations, increases, and exemptions for any items that would increase height, square
footage, more density, and less parking etc. Why does the city try to have guidelines to keep
growth reasonable,just to have the developers come in and ask for an easy ticket to increase
their own profits at the expense of everyone who lives in the vicinity or visits there. I don't
know if you have tried to drive on N. Wallace after the other recent developments lately, but it
is becoming dangerous for all the bikers,joggers,walkers. and drivers.N. Wallace can not
handle any increase in traffic, especially with the impact and scope of this proposal. And then
there is the parking issue. I have seen and heard a trend lately of parking spaces being allotted
to denser housing developments, only to be used for storage of boats, campers, skis, lawn
mowers etc. and the residents proceed to park on the street. COB, please stand up for the
majority and keep the developers in check and help preserve the integrity and livability of our
neighborhoods. I believe the developers would still proceed with their plans without any of
the relaxations. Thank you for listening and considering the majority, not the entitled. Steve
Barber PS Love what you guys do and know you try to do right.
From: Rob Pertzborn
To: Agenda
Subject: Cottonwood&Ida Preliminary PUD(#18516)
Date: Saturday,March 23,2019 9:17:12 AM
Greetings All—
I have reviewed the Cottonwood and Ida proposed PUD documents and site. I find the overall
project to be extraordinary and believe that when it is completed, it will be an exceptional addition
to the neighborhood and an asset to our community.
Thanks for your careful review, and hopeful support, of the project.
Sincerely,
RJ P
Robert J. Pertzborn,AIA
Principal I Architect
intrinsik architecture, inc.
111 north tracy avenue
bozeman, montana 59715
t.406.582.8988 x209
From: Peter Bronken
To: Agenda
Subject: Cottonwood&Ida Project
Date: Saturday,March 23,2019 6:20:36 PM
Bozeman City Commissioners:Would like to voice my support for the Cottonwood&Ida project.As a 40+year
property owner in the Northeast Neighborhood,I feel this is a long overdue concept that will provide for a variety of
needs from residential to commercial applications.I think it will also help set the tone going forward in the rapidly
developing NE sector of Bozeman.We are lucky to have people in our midst that have the vision and fortitude to .
pursue such a worthwhile endeavor. Sincerely,Peter Bronken
Sent from my iPad
Dale Pickard
Radiant Design&Supply
Business
501 E. Peach
Residence
527 North Montana
r Bozeman MT
59715
March 17, 2019
Brian Kreuger and City Commission
PO Box 1230
Bozeman MT 59771-1230
agenda@bozeman.net
Re: Cottonwood and Ida PUD Application 18516
To those concerned,
I own and operate a business located in the Trades Guild building at 501 East Peach. I
am also an owner in the commercial building complex itself. This building complex is
located on the corner of East Peach and North Church, in close proximity-within 2
blocks of the development under review, (PUD 18516). I own my home located at 527
North Montana and I have walked, biked and driven to work at my business and property
on East Peach Street since 1988.
I have admired much of the development in our neighborhood, especially the small
homes that replaced the grain bins on Cottonwood. Even the larger building
developments seem not to have violated standards in such a way as to adversely affect our
neighborhood, especially with respect to traffic and parking.
However, I find this proposed development, (PUD 18516) untenable in several respects
and must recommend against allowing the several variances that will undoubtedly prove
inimical to our neighborhood. The requested variances include restrictions against
apartment buildings, parking, building setbacks, height restrictions, maximum restaurant
area, alteration of street construction to accommodate the development, and other "Form
and Intensity"standards regarding lot lines restrictions, lot coverage, storefront and
landscape block frontage etc.
With respect to the parking issue, it's apparent that the developers over-designed
occupancy for the lot and then compensated for lost parking by reducing the parking
• 0
standards. A third of the remaining unaccounted for parking requirement is to be
provided off site in a nebulous future development of the brewery site. The proposal
sacrifices building setbacks, sidewalks and the "adopted designs for local streets" along
that block of Cottonwood in favor of "back out angled parking". This appears again to
be a belated attempt to accommodate the excess number of vehicles the development
expects to draw to the area.
I prefer that apartment buildings not be permitted as an allowable use in the area as per
existing standards. Adhering to the existing standard would reduce the parking and traffic
conflicts associated with the site commensurately. I also prefer that existing standards
requiring building setbacks, building heights, landscaping, and maximum restaurant size
be adhered to. I have not studied the plans in detail but there needs to be some allowance
for snow removal made that is associated with the overall required parking area.
My concern is that allowing these variances will producee-a building development of a
scale and density that will necessarily produce conflicts with the existing neighborhood-
especially over parking, traffic congestion, and truck access to existing neighborhood
businesses. It's clear that important design standards were ignored to maximize the
occupancy of that block at the expense of others in the neighborhood. A development of
this intensity and magnitude will necessarily negatively impact the ability to walk and bike
in the neighborhood.
By insisting on these several variances to the norm of existing standards without reason,
the developers burden the neighborhood with an argument that we would prefer not to
have. Other developments that do not intentionally violate standards would not require
this kind'of expensive correction and input on the part of the local neighborhood. We
would have preferred to have been approached with a design that met rattier than
changed standards.
Sincerely,
Dale Pickard
From: Samuel Thompson
To: Agenda
Subject: Cottonwood&Ida Preliminary PUD#18516
Date: Wednesday,March 20,2019 10:43:06 AM
March 20, 2019
RE: Cottonwood & Ida Preliminary PUD #18516
Dear City Commission,
My name is Shaw Thompson and I reside in the grain elevator at 700 N. Wallace
Ave. on the west side of the proposed project.
This is the second letter I've written about the proposed project. My feelings have
changed slightly. While I still feel that this project is generally well designed, I do
not feel that the relaxation of the height restriction should be granted. The height of
the proposed buildings will already be massive. And those height restrictions were
put into place with good reason.
Thank you for your consideration.
Sincerely,
Shaw Thompson
i •
From: Sky Sterry
To: Agenda
Subject: Cottonwood&Ida Preliminary PUD,Application#18516
Date: Monday,March 18,2019 1:32:41 PM
3/18/19
Re: Cottonwood&Ida Preliminary PUD,Application#18516
Dear City Commission,
My name is Sky Sterry. I have lived in the Northeast neighborhood at 626 East Peach street for 22 years,I own two
houses in the neighborhood. I also have a business a couple blocks away at 412 North Broadway ave.
I have had the chance to review the plans for the above PUD,and wile I generally support and like the concept,I
have the following concerns.
I do not see anything addressing infrastructure concerns,specifically the effects of increased traffic in the
neighborhood. The only way to get to the development would be N Ida,N Wallace,and E Tamarack.
Traffic in the neighborhood is already a problem. In the winter,Wallace north of Peach is reduced to single lane,
you have to pull over to let oncoming traffic through.Peach at the intersection of Wallace is also reduced to one lane
in the winter. Tamarack is the best option to access the development,but it is inevitable that there would be a
considerable increase in traffic on both Ida and Wallace.
Has the city addressed traffic concerns with the development?
Thanks for your time.
Sky Sterry
Wookey Design Studio,406-551-2000
412 North Broadway Ave,Bozeman MT 59715
www.wookey.net
s •
Ellen Herlant
517 East Cottonwood Street
Bozeman MT, 59715 PAft*1
March 12, 2019 -��—
City of Bozeman Department of Community Development
Attn. Brian Krueger
PUD Application 18516
Hello,
I am a resident of the 500 East block Cottonwood Street in Bozeman, living in the same home for over 17 years.
Our area has seen a lot of change and growth over the last two decades. Many houses have been renovated,
some old structures torn down and a new building built in place. The neighborhood has mostly retained its
character, mixed use with individual buildings with their own unique character. Many homes in this area are small
compared to contemporary standards, building styles and materials are varied, and the overall character of the
neighborhood is quaint and slightly funky or artistic.
The PUD application#18516 is looking to place a large development on a small parcel on the edge of the current
residential area in the Northeast neighborhood. The developers of the Cottonwood and Ida PUD are proposing a
mixed use development. This does mirror the current character of the neighborhood. I presume that the
proposed very many apartment units (over 100)are in line with the City of Bozeman's desire to increase
population density within the city limits.
I do not agree with the density of the proposed development and I do not think that this development should be
granted the "RELAXATIONS" to the current standard that the City of Bozeman has decided is appropriate for this
district.
As a lay person not working in development, construction, or architectural fields it is overwhelming deciphering
the building codes but I think I clearly understand The City of Bozeman Unified Development Code stated intent
and purpose for the existing codes. (The following italic print is directly from the City of Bozeman website).
Article 1; Sec.38.100.040-Intent and purpose of chapter.(38.01.040)
A.The intent of this unfied development chapter is to protect the public health,safety and general welfare;to recognize and balance
the various rights and responsibilities relating to land ownership, use,and development identified in the United States and State of
Montana constitutions,and statutory and common law;to implement the city's adopted growth policy;and to tneet the requirements of
state law.
B.It is the purpose of these regulations to promote the public health,safety and general welfare by:preventing the creation of private or
public nuisances caused by noncompliance with the standards and procedures of this chapter;regulating the subdivision,development
and use of land;preventing the overcrowding of land;lessening congestion in the streets and highways;being in accord with the growth
policy;providing adequate light,air,water supply,sewage disposal,parks and recreation areas,ingress and egress,and other public
improvements;requiring development in harmony with the natural environment;promoting preservation of open space;promoting
development approaches that minimize costs to local citizens and that promote the effective and efficient provision of public services,
securing safety from fire,panic,and other dangers;protecting the rights of property owners;requiring uniform monumentation of
land subdivisions and transferring interests in real property by reference to a plat or certificate of survey(MCA 76-3-102).It is further
the purpose of these regulations to:,consider the character of the district and its peculiar suitability for particular uses,conserving the
value of buildings,and encouraging the most appropriate use of land throughout the jurisdictional area(MCA 76-2-304).
The proposed Cottonwood and Ida PUD 18516 is asking for "RELAXATIONS" or NEGATIONS of the current City of
Bozeman Standards. I address some of these in the following paragraphs.
BMC 38.310.040.0 Table of Uses.
Why should they be allowed to put an apartment building in an area that is zoned to NOT ALLOW apartment
buildings. The above section from the Unified Development Code clearly states that the purpose of its
regulations is to"prevent overcrowding of land". Building over 100 units of apartments on a 2 acre parcel is
completely out of character for this neighborhood and probably for Bozeman in general, and it will be incredibly
overcrowded both for the future residents and current residents of the area.
0 0
BMC 38.540.050.A.1 and BMC 38.540.050.A.2
Why should this PUD proposal be allowed to reduce BOTH the Residential Parking Standards and the
Non-Residential Parking Standards in a neighborhood that already has major parking issues because of its com-
mercial mixed use character. Adding 100 apartment units plus additional commercial space while requesting a
reduction of the City of Bozeman's Standard Parking Requirements is going to increase the chaos of the already
chaotic parking situation on the Wallace Avenue corridor.
I am concerned about the proposed parking garage, I know that there is an underground stream bed below
some houses on Broadway Avenue. This underground water has created challenges with some construction proj-
ects in the neighborhood when the maps were not properly examined before a proposal was approved.
I am wondering about the feasibility of building a parking garage in this proposed PUD, located just down the
street from the existing stream bed. I feel it is important to call attention to this matter so that the developers
and the City throughly examine existing mapping and do whatever necessary to be 100% confident that such a
garage is possible to build in this location.
If it hasn't been investigated and water is found to be located below this property after the plan has been ap-
proved, how does this affect the amount of parking in the area or the proposed height of the buildings?
BMC 38.320.050 Form and Intensity Standards
The request to increase the maximum lot coverage to 45% from the current City Code of 40% also should be
questioned, Bozeman City Code explicitly says that the purpose of the current standard is to prevent overcrowd-
ing of land and provide adequate light, parks and recreation, etc. Where are all these new residents of this apart-
ment complex going to be able to enjoy a slice of Montana sunshine?
And of course they want to increase the allowable height by 9 feet, Again the obvious question is WHY should
the City of Bozeman grant these RELAXATIONS to the following standards. Is this a way to preserve the char-
acter of the neighborhood? Is this development honoring the character of the neighborhood? Is this relaxation
honoring the rights of other nearby property owners?
BMC 38.320.050 Form and Intensity Standards
This PUD requests zero lot line conditions? How does this affect the neighborhood character, driving conditions
(can you see around the edge of buildings built right on the corner?), the neighbors property values and aes-
thetics of the community? If I lived next door, are my rights as a landowner being honored by allowing a RE-
LAXATION of current code to allow a 9 foot increase of currently deemed appropriate building height to be built
even closer to my property than the City of Bozeman currently recommends.
This PUD also proposes to decrease the front setback from 20 feet to 8 feet. This is a reduction of more than 50
percent in open space around the front of the buildings.
Again, the standards exist with the intention to "prevent overcrowding, provide adequate light.....and recreation
areas...".
Who does this benefit? How is this PUD working within the standards deemed appropriate by the City of Boze-
man?
Let me clearly repeat, these STANDARDS have been adopted by the City of Bozeman with the intended pur-
pose; "to promote public health....general welfare; preventing overcrowding of land, ...lessening congestion in
the streets...., requiring development in harmony with the natural environment; promoting preservation of open
space......
The proposed PUD 18516 asks for many "RELAXATIONS" of the City Code. Requesting to build an apartment
building is a request for a permission to do what is not currently a standard that the City of Bozeman approves
of for this neighborhood. The City of Bozeman CANNOT in good conscience approve this currently proposed
development.
I respect the land owners right to build and develop and make a profit from their investment but I propose and
request that the City of Bozeman guide them and require them to build in ACCORDANCE with the STANDARDS
that the City of Bozeman, itself, has created in order to protect the integrity and beauty of our community.
Thank you for reading and considering my comments.
Sincerely,
Ellen Herlant
From: Paul House
To: Aaenda
Subject: Cottonwood Ida PUD
Date: Sunday,March 17,2019 6:18:42 PM
March 17, 2019
Re: Cottonwood & Ida Preliminary PUD, Application #18516
Dear City Commission,
I write to you as a northeast neighborhood resident and homeowner since 1989. 1 would
like to formally express my support for the Cottonwood & Ida PUD application. I feel that
this project, as proposed, embodies a number of qualities that are exceptional:
- Creative design with public open space and multiple structures;
- Interesting architecture;
- Underground parking to maintain as much ground surface car-free as possible;
- Permeable landscaping to promote water infiltration and minimize runoff;
- Energy efficient construction;
- LEED certification, in fact the first LEED certified PUD to be proposed in
Bozeman;
- And an overall effort to listen to the neighborhood through the Rudat design
process.
Growth and development is inevitable and I feel the neighborhood is lucky to be offered
something unique that is not merely reverse engineered for maximum financial gain.
Sincerely,
Paul House
510 N Church
Bozeman, MT
0 •
From: Jeffrey Welles
To: Agenda
Subject: 'Application 18516
Date: Friday,March 15,2019 10:00:42 AM
Dear Members of the Department of Community Development,
I am writing to express my opposition to the Cottonwood and Ida Preliminary Planned Development Application
18516.The application requests the city to relax 11 standards affecting such issues as permissible building heights,
setbacks,lot line provisions,lot coverage,residential and commercial transparency,parking standards,etc.I live
adjacent to the proposed development in a recently completed condominium.That project complied to the letter of
the law with every city standard and requirement with no variances or"relaxation".I'm sure that the Department of
Community Development has well established and thoughtful requirements for development that are consistent with
the Bozeman Community Plan and Municipal Code.I don't understand why those standards and requirements
should be"relaxed"for a developer to build a more imposing,visible,and denser project.If your mission is to
balance the interests of economic development,the community,and developers,the preliminary plan seems to
overly accommodate a developer at the expense of the community and your own standards and requirements.Thank
you for considering my opposition and,if possible,I would request that you acknowledge receipt of my comments.I
also will plan to attend the City Commission public hearing on March 25th to register my opinions.
Best Regards, Jeffrey Welles
620 E.Cottonwood unit 201
Bozeman,MT 59715
1
Dear Honorable Mayor and Comp Sion members. March 18, 2019
Ida and Cottonwood application 18516
I own and work within the public notice perimeter for the above project. As such I generally support and
welcome the improvements a project of this nature will bring to the neighborhood. Because of the very distinct
and unique nature of this area I know each of you will give your careful consideration to several quantitative
issues that are in the new Bozeman Community Plan.
GOAL C-1:
Human Scale and Compatibility- Create a communityposed of neighborhoods designed
for the human scale and compatibility in which the streets and buildings are properly sized within their context
services and amenities are convenient, visually pleasing, and properly integrated. "human scale and
compatibility in which the streets and buildings are properly sized within their Context"
The project lacks human scale, and the buildings are not sized within their context. The project is out of
compliance with these standards and the majority of the relaxations are addressing these shortcomings.
Specifically, BMC 38.310.040.c oversized restaurant, BMC 38.320.050 smaller set back, BMC 38.320.050
taller building, BMC 38.320.050 greater lot coverage, BMC 38.510.030.c and BMC 38.510.030.b reduced
transparency,
OBJECTIVE C-5.2:
Encourage inclusion of plazas and other urban design features as public areas within
developments.
There is a court yard for the residents, but the design and placement do not invite the public. It is on the wrong,
side of the building and will be a cold underutilized space. If it were open to Ida street and the southern
exposure it would fulfill this requirement.
Northeast Historic Mixed-Use District - Intent and Purpose. NEHMU The majority of relaxations are a result of
this project not meeting the established zoning for the area.
The sponsored study, RUDAT is also in conflict with the project as it forever removes "special Bridger
mountain views" from this unique community. Specifically, the height of the northwest building, forty-five feet
is high for this area and equipment and mechanical can already extend higher
The project designates a parking field (sheet AS.100 1/21/2019) that is far larger than anything within the HMU
zone. This oversized, generic parking field further diminishes the historic, human, and unique character of the
neighborhood. This parking field appears to be significantly under designed compared to the rest of the
application and yet may have the largest impact on the community.
While I support the project intent of enhancing the community, I find the relaxations and parking field in direct
opposition to that intent. I encourage you to consider the number of and nature of the relaxations against the
carefully crafted Bozeman Community Plan, zoning and the community at large. This is a good project that is
too big for the site or is simply in the wrong place.
Thank you for your time, consideration and service.
Engaged citizen.
C 0 �1.
N {
Tracey Downing
509 East Cottonwood Street
Bozeman MT,59715
March 14,2019
City of Bozeman Department of Community Development
Attn.Brian Krueger
PUD Application 18516
Hello,my name is Tracey Downing. I was born on 701 North Wallace Avenue over 60 years ago.
I currently live a few houses down the street on Cottonwood Street where I have lived for 22 years.
I think that the City of Bozeman should enforc-its own standards and codes.
This PUD#18516 is asking for many rules and codes to be broken or changed.
I think the developers are asking for too much.
BMC 38.310.040.0 Table of Uses.
I don't like that they are requesting to build apartment buildings in this neighborhood. It isn't zoned for apartment build-
ings.
BMC 38.540.050.A.1 and BMC 38.540.050.A.2
One main concern is the traffic and parking in this neighborhood.
There is no way that there will be enough parking for each place. No family or couple has just one car.
BMC 38.320.050 Form and Intensity Standards
If built as proposed,every bit of green space in that area will be gone. I value green space. It contributes to my health and
to the health of the community.
If it gets much taller than allowed standards ALL views in this area will be blocked.
I am concerned this project will not fit in to the character of the neighborhood. It takes away from the charm of the area
and it isn't fair to the neighbors.
Thank you for your time.
�' c
Tracey Downing �`f _(9
3/13/19
Re: Cottonwood & Ida Preliminary PUD, Application #18516
Dear City Commission,
It is my pleasure to submit a letter of support on behalf of the proposed Cottonwood
and Ida PUD,Application 18516.
I currently co-own the 600 North Wallace building and also own the 705 East
Mendenhall building. I have an office in the 705 building and spend a lot of my time
in this neighborhood. The north -east neighborhood is a vibrant and changing part
of our town and I feel that the proposed development will be a great addition to the
area.
I am particularly excited to see that the project includes affordable housing and that
it will also be a LEED designated building. Healthy buildings that limit the impact on
the environment and are not only obtainable by those with financial resources need
to be the standard and not the exception in our growing city. In addition,this project
is a fine example of in fill development. Lastly,the developers listened to members
of the community in the planning phase and incorporated their comments and
sentiments into their design.
In appreciation-chris
Chris Bunting
13624 Kelly Canyon Rd.
Bozeman, MT 59715
� s
Robin Crough
From: Deejay Newell <deejay@treelinecoffee.com>
Sent: Tuesday, March 12, 2019 1:20 PM
To: Agenda
Subject: Cottonwood & Ida Preliminary PUD, Application#18516
Categories: Public Comment
Date: 3/12/2019
Re: Cottonwood & Ida Preliminary PUD, Application#18516
Dear City Commission,
My name is Danielle (Deejay)Newell and am the co-owner Treeline Coffee Roasters located in the North East
Side Neighborhood of Bozeman at 624 N. Wallace.
My business partner and I have been following the Cottonwood& Ida project closely as it will directly affect
our business with its close proximity to the cafe. I believe the project will be an excellent addition to the
neighborhood as it will continue to instill a sense of community in the Northside.
Right now, our neighborhood lacks affordable housing for the growing demographic of young professionals in
Bozeman. I believe this project will open up opportunities for these individuals working in Bozeman and
making Bozeman wages to live comfortably and sustainably in a neighborhood surrounded by a wide variety of
businesses to cater to their daily needs.
After reviewing the plans, I also believe that this project will enhance the aesthetic quality of the neighborhood.
Right now, the space is not being utilized in an efficient way and by adding housing, parking and room for more
business - we will continue to see the Northside grow in a sustainable and manageable way.
This project has my support the for the reasons listed above as well as others not mentioned. I believe this
project will benefit Bozeman and be an excellent addition to our community.
Best,
DEEJAY NEWELL
BEAN AMBASSADOR
P: 530-263-6752
E:DEEJAY an.TREELINECOFFEE.COM
1
0 0
From: Debra De Bode
To: Agenda
Subject: Comments on Cottonwood and Ida PUD,Application# 18516
Date: Sunday,March 10,2019 12:59:59 PM
To: City of Bozeman Department of Community Development, Attn: Brian Krueger and City
Commissioners
I am writing as an owner of commercial property located two blocks from the proposed
development, as well as a resident of the Northeast Neighborhood. I have attended several
presentations/listening sessions about this property. I support the concept of in-fill -- to a
point, but think that new developments should be planned to fit into existing neighborhoods,
rather than impose an entirely different format on them. The immediate area currently consists
almost exclusively of single-family homes and small shops and businesses -- no large
apartment buildings or office buildings.
I think that the developers are trying to do too much with a small parcel of land in a part of
Bozeman that has a deficient set of roads to handle current traffic. Peach and Wallace streets
have both recently undergone improvements and, other than the Rouse project, no other local
road improvements are planned. I do not support the project as proposed.
Specific to the variances that are being requested:
1) Apartments are needed in Bozeman, but the addition of 76 units along with an office
building, workshops and a restaurant adds an unreasonable amount of activity to this location.
If apartments are to become an allowable use in this district, the number of units need to be
scaled back and/or some of the rest of the project needs to be denied.
2) The required front setback should be maintained for any allowed apartment building or
residence. If a building is commercial in nature, having it more closely border the sidewalk
may be acceptable. A question: What are the developer's plans for snow storage and removal?
As the past two, snowy winters have demonstrated, this is a serious issue that affects parking,
mobility and visibility for drivers and pedestrians. Any allowance of reduced setbacks should
be tied to a plan to deal with snow on the property.
3) The allowable height should be maintained at 45 feet. Mountain views are an amenity for
everyone that should not be compromised.
4) Landscape and Block Frontage requirements should be maintained as set forth in code.
Bozeman prides itself on being a "tree city," "green," etc. -- not overly urban.
5)Neither Residential Parking Standards nor Non-residential Parking Standards should be
reduced AT ALL. Maintaining these standards is key to preventing an unbearable amount of
street congestion in the area.
6) The proposal to lease a significant amount of required parking on the land of the former
Lehrkind Brewery is unacceptable in that it is obviously a temporary fix for a permanent
problem. Future development of that parcel will occur and must be considered.
Thank you,
Debra De Bode
MT Hop Dogs, LLC
527 N Montana Ave.
Bozeman
debradeboden.gma
From: Samuel Thompson
To: Agenda
Subject: Cottonwood&Ida Preliminary PUD#18516
Date: Friday,March 08,2019 2:08:59 PM
March 8, 2019
RE: Cottonwood & Ida Preliminary PUD #18516
Dear City Commission,
My name is Shaw Thompson and I reside in the historic grain elevator located at
700 N. Wallace Ave. - the neighboring property to the west of the proposed project.
My family and I have restored this old building over the past 18 years and we are
happy to live in it, and feel grateful to have a successful business, operating as the
Misco Mill Gallery, in the building as well.
I wish to voice my support for this project in this letter. I like the way the project
has been presented to the neighborhood; asking for input from everyone. It seems
that the project has listened to that input. Further, I feel the design is extremely
thoughtful from the details of the buildings all the way to the landscaping. I like
the mix of open public space with the higher density community. Also, the
proposed construction methods are appealing for an environmentally conscious end
result.
Thank you for your consideration.
Sincerely,
Shaw Thompson
From: Gustav Dose
To: Agenda
Subject: Cottonwood&Ida Preliminary PUD,Application#18516
Date: Thursday,March 07,2019 12:15:45 PM
Attachments: PastedGraohic-2.tiff
Dear City Commission,
My name is Gustav Dose, I am the owner of Mountains Walking Brewery and live at 414 N
Plum.
I support the Cottonwood and Ida Project. After looking at the plans I think it will at a nice
community feel and I really like the density and walkability factors. I think the area needs
what this project provides in affordable housing.
Thank you for considering my thoughts,
With gratitude,
Gustav Dose
From:. Jessica Rounds
To: Agenda
Subject: Cottonwood&Ida Preliminary PUD,Application#18516
Date: Tuesday,March 05,2019 10:42:39 AM
Date: March 5, 2019
Re: Cottonwood& Ida Preliminary PUD,Application#18516
Dear City Commission,
My name is Jessica Rounds and I have been renting 415 N Church Ave for the last 3 years. I have
lived in a few different places around town for the last 6 years but northside area of Bozeman has
captured my heart.
I support this project because I love the idea of affordable housing that is eco-friendly and
community focused. The design is beautiful and would only serve to continue elevating the northside
aesthetic.
My best,
Jessica Rounds
415 N Church Ave
Bozeman MT 59715
• 0
From: Peter MacFadven
To: Agenda
Subject: Cottonwood&Ida Preliminary PUD,Application#18516
Date: Monday,March 04,2019 7:48:56 PM
Attachments: Pete MacFadven Cottonwood&Ida Preliminary PUD.Application#18516.odf
To whom it may concern,
Please find attached my letter in support of the Cottonwood and Ida project.
Pete
Pete MacFadyen
Founder & Executive Director
Big Sky Youth Empowerment
406.539.0399 1 B. YEP ro g
• •
3/4/2019
Re: Cottonwood & Ida Preliminary PUD, Application #18516
Dear City Commission,
My name is Pete MacFadyen and I have lived at 314 North Wallace for over 15 years now. I'm
so proud of the city for the excellent work that was completed on our street two summers ago
now with the traffic circles and general calming measures. I hear lots of folks complain but at
the end of the day as a resident the calming measures are working.
Today I am writing to express my support for the Cottonwood & Ida project. Undoubtedly it will
bring more traffic both cars and humans to our street but I must say being part of a community
far outweighs the impact of increased traffic. I've looked at the plans and love that it offers
'affordable & attainable' housing to members of our community. The design is also very
attractive (at least to my eye) and I believe it will serve to bring people together. With the
addition of the Wild Crumb and Treeline Coffee my family and I have seen nothing but
increased vitality in our neighborhood. There is something great about people on foot walking
to pick up a loaf of bread or to grab a cup of coffee. In general this means that people look up
and say hello which, of course, is one thing everyone loves about Bozeman.
Please feel free to reach out to me if you have questions about my comments. But I wanted to
let you all know that I think it's a great idea and I look forward to watching our community
continue to transform in positive and well thought out ways.
Sincerely,
Pete MacFadyen
From: Bob Bayley
To: Acienda
Subject: Development at E.Cottonwood and Ida Ave.App#18516
Date: Monday,March 04,2019 9:59:46 PM
Dear City Commission,
I am writing to strongly support the mixed use development proposed for my NE Bozeman neighborhood at the
intersection of E Cottonwood and Ida Ave.My wife and I live at 104 N Church which is about one half mile south
of the development.Although we have only lived in Bozeman for four years we were strongly attracted to the NE
Bozeman neighborhood for its mixed use and dynamic,energetic urban character.
Aspects of this development which deserve high praise and city approval include:
-Mixed use and modest scaled buildings which mesh nicely with the surrounding community
-Major affordable housing component
-Generous open space which filters throughout the development and offers easy access to occupants and the
community
-Natural,creative landscaping which will serve as an example to the city,residents and developers on how to
conserve water resources
-Energy conserving
-Ample parking,much of which will be below ground which will save valuable street level space for people,
landscaping and buildings
Sincerely,
Bob Bayley
104 N Church,Unit I B
406-570-3643
,i
'a
,dlr;' J�
1 '
` `` r f
_ 1
a
.�
*`s., �
� �� t�
- .
/'' .
`,#� � ' �z'��;
O
,9
�.
z ;x. I .
�` �
ti � � �
6 �;
�, .
. . . �,.
:1
i
r
.'
`�,,
�� � f
`�.
i
t.—
18516 City Commission Findings of Fact for the Cottonwood and Ida (PUD)
Preliminary Plan
Date: City Commission Public Hearing March 25, 2019 City Commission Room,
Bozeman City Hall, 121 North Rouse Avenue Bozeman, MT 59715
Project Description: A Preliminary Planned Unit Development (PUD) application to allow
a mixed residential and commercial development with relaxations to zoning regulations
requested for apartment building use, building height parking, street design, restaurant
design,transparency, front setbacks and a request for concurrent construction.
Project Location: 615 East Cottonwood Street and 720 North Ida Avenue. The parcels
are legally described as Lots 5-16, Block 106 including a vacated alley and Lots 17-28,
Block 105 including a vacated alley in the Northern Pacific Addition to Bozeman located
in S06, T02 S, R06 E, P.M.M., Gallatin County, Montana.
Recommendation: Approval with conditions and code provisions
Motion: "Having reviewed and considered the application materials, public comment,
and all the information presented, I hereby adopt the findings presented in the staff
report for application 18516 and move to approve the Cottonwood and Ida Planned Unit
Development application subject to conditions and all applicable code provisions."
Action Date: March 25, 2019
Staff Contact: Brian Krueger, Development Review Manager
Executive Summary
The property owner and applicant submitted an application to develop an existing
underutilized site in the Northeast Historic Mixed Use District, NEHMU. The site is
accessed from a future extension of East Aspen Street and from East Cottonwood
Street. The development proposes a mix of uses including apartment buildings, an
office building, a mixed use building including artisan manufacturing and a restaurant
building. The proposal include four buildings. The largest building includes
apartments, 64 units, and offices, 29,700 sq. ft., separated horizontally over an
underground parking structure consisting of 96 parking spaces. The other buildings on
site include a 12 unit apartment building, a mixed use building with artisan
manufacturing, 5,400 sq. ft. with 16 units mixed into the building and one 2,150 square
foot commercial restaurant building. The application includes the concurrent
construction of East Aspen Street, North Ida Avenue and the north half of East
Cottonwood Street.
The subject property is zoned Northeast Historic Mixed Use District. The site is 2.06
acres in size. The north half of the property includes four multi use storage and
warehouse buildings constructed beginning in 1960. All buildings on the north half of
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 2 of 38
the property are proposed for demolition. The south half of the site includes a grain
warehouse building constructed in 1930. The grain warehouse is proposed to remain
and be adaptively reused through the site development process for use as a
restaurant/community building.
Eleven relaxations to the Bozeman Municipal Code (BMC) zoning regulations are
proposed with the application:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of
the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
S. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom
units from 1.5 spaces per unit to 1.25 spaces per unit.
10.BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11.BMC. 38.400.050.A.1 Street Design. The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
Concurrent construction of the adjacent streets, site infrastructure and buildings is
proposed.
The criteria for granting a PUD are found in BMC 38.430.090.
A PUD is a discretionary approval and the review authority must find that the overall
development is superior to that offered by the basic existing zoning standards as required
in BMC 38.20.030.A.4.The intent of a PUD is to promote maximum flexibility and
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 3 of 38
innovation in development proposals within the City. The applicants can request
relaxations from the code in exchange for a higher quality of design.The obligation to show
a superior outcome is the responsibility of the applicant. The applicant asserts that the
overall outcome of the proposal is superior to what would be obtained from the application
of the default NEHMU district.
The Development Review Committee (DRC) has reviewed the application. Based on its
evaluation of the application against the criteria, the DRC found the application
adequate for continued review. The DRC supports the granting of concurrent
construction for this project with the satisfaction of all code requirements related to
concurrent construction with the final planned unit development application.
The Design Review Board (DRB) reviewed the application on February 27, 2019. The
Design Review Board is the design review advisory body to the City Commission on
this application. The DRB recommended approval of the project with the conditions
and code provisions outlined in this staff report.
The Recreation and Parks Advisory Board Subdivision Committee reviewed the
application on March 8, 2019 and recommended approval of the applicant's proposal
to utilize cash in lieu of parkland for the parkland requirement for the development.
The Community Affordable Housing Board reviewed the-application on March 13, 2019
and recommended approval of the applicant's proposal to utilize affordable housing in
order to meet PUD performance points.
The City Commission held a public hearing on the application on March 25, 2019. After
the City Commission reviewed and considered the application materials, staff report,
advisory review board recommendations, public comment, and all the information
presented, they made individual findings and voted 5:0 to approve the motion to
approve the application. The Commission agreed that the application met the criteria
established by the Bozeman Municipal Code. Therefore, the application was approved
with conditions and applicable code provisions outlined in these findings.
The City Commission's review, deliberation and findings may be found under the
linked minutes and recorded video of the meetings located at this web page filed under
the date 3/25/19:
https://www.bozeman.net/services/city-tv-and-streaming-audio
The City received public comment on the application. Twenty public comments were
submitted in writing prior to the public hearing and five public comments were
received at the public hearing.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 4 of 38
Unresolved Issues
There are no unresolved issues with the application.
TABLE OF CONTENTS
ExecutiveSummary............................................................................................................. 1
UnresolvedIssues............................................................................................................... 4
SECTION 1 -MAP SERIES .:.................................................................................................. 5
SECTION 2 -RELAXATIONS ............................................................................................. 14
SECTION 3 - CONDITIONS OF APPROVAL..................................................................... 14
SECTION 4- REQUIRED CODE PROVISIONS...................................................................... 17
SECTION 5 -ANALYSIS AND FINDINGS ........................................................................20
SECTION 6 -FINDINGS OF FACT, ORDER AND APPEAL PROVISIONS ................... 34
APPENDIX A-PROJECT SITE ZONING AND GROWTH POLICY................................ 36
APPENDIX B-OWNER INFORMATION AND REVIEWING STAFF........................... 36
.APPENDIX C-PLANNED UNIT DEVELOPMENT INTENT........................................... 37
ATTACHMENTS................................................................................................................... 38
v
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 5 of 38
SECTION 1 -MAP SERIES
e
E 61riRA(iK
*[ A 7
i
.' ®Mill]®�[_f I ..�..._ E 1SPEr ST -1
E A'SP! S'1'
iris,
h 1' t ra i
t
uu _
E CUT'I'U:V UD ST �
t H
I <I
Legend
13 Planning Projects saleclbn !�� -:�.+:u.-:' �yF.� � IE PE, C11 ST _
i; LA Patois
Roads
�tt Limits k r e
A
PannninglPrrojects ' , �z• �.
Zoning Classification
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 6 of 38
sc� n,�tnRnci<<�I�
Dr,nSPE\(STD '
A:,Jr�PENnST
a L rY .00010
Legend
0 Planning Projects selection
Parcels
Roads
Alleys # �`
City Llmito
QPtanning Projects C
Community Plan Future Land Use 't
Residential
Residential Emphasis Mixed Use
Suburban Residential
Regional Commercial and Services
O Community Coto
Community Commercial Mixed Use
! Business Pork Mixed Use Ei'PEACH'ST
❑Industrial --
Public.Institutions
l ]Parks.Open Space and Ruueatlonaf Lands
d Other Public Lands
Gull Course
Present Rural J
C Aezui
Growth policy designation
• • 1
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 7 of 38
V. ETA _RACK ST
• k
•a'r�-
e �
E ASPEN SI '
A k
E ASPEN ST
`1�r
Legend
Planting Projects solection r
City Limits(iNl18) r
U Mixed Use
f ReslauranllBar �P0NNOb6,+ST
® Conxnercial Retell Soles,Services,banks - —__ r'
Ho --4W
� Connmaiciaxnorcial Auto •
Administrativ,a7rofesslonal
Light Manufaluring +
3 Golf Course r
Park or Open Space sJ
C]Conservation Easement >
©Church
Public Facility A I
SchooftEducational Facility -+
[�Single-Household Residenbal
[ ; DupleATriplex Residential
(] Multi-Household Residential
Mobile Home%Alobile Park
CD Right-ol-Way, 1qT
CD Undeveloped E PEACH ST s ,
[�vacant —
C Parcels
Roads ±a
Alleys
ti City Limits t w
k O Planning Projects I j
l _ �_ ——Ci I Sozemanj
Current Land Use
131- Y---
T_
' cg ilt
s_
7 • �
1 I
� I
$ o ,
17-1
'bLz .I I I I I III rfuNKrvm
� 1
, a NTI"�. I m1Y11iMaYaILL(� � , !.� I
�t Oil 1 I
I 1 I
I I
1 1 �
1'
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 9 of 38
Nome
i I I
FLE
1 T c
� I 1
I 1 �
11 ;
-r 1 J—
®;®
LT- I UH
iT 0 I i.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 10 of 38
RESIDENTIAL
COMMERCIAL
ARTISAN MFR.
COMMUNITY
y
5 � 2 S
T
I
,,,,
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 11 of 38
JI[Jr-r' ems. ' . A
� _ -
oL—
(ID ® 4 B 11, p
A
, sear— CO 4yr.��,
I \\z
.m..� r �70 , all C''. ©� 00 1. .® t -
11I h
�+ Eli _ n + F. _1 I I n
�I1Wvf�Me_4oIlOAuOOD ,I sM e�v.,nx.soun rtonoxw000i Y••>rt•M•~
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 12 of 38
<DO! rco. 2=3
M n119, 1WffM ni UP
_ I i
FfWACEAK � i
11 C R
.�. r a=_
r—A irk a i i
f 1 Py 11
1W3AR AK
14o•d<YONYt
I.f,L uRN.am a Rom
RAW
K ili-J-�f
%-��
IIC?
ftli�ll,��
I 1L100
1]
o
I
rr- I Tj I 1I-
m :ILI T T-
IDD
co
E.i
--fa]
FIT, If�
I1'u
III
all
=I11
Fri
t'
t&_Jj
`iil—
[9
o a iII n — 1 I I� Ig- I�- ;-el 7' jli I[➢
ldL
e 1= Tu. I g
-p- IILI
ts
b 71,1 (M, j:T�ll i I
o -- _AV
—
s; Ed
V - n
5-3 '
aF all
T-
in
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 14 of 38
SECTION 2 -RELAXA TIONS
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of
the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
S. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.B Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom
units from 1.5 spaces per unit to 1.25 spaces per unit.
10.BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11.BMC. 38.400.050.A.1 Street Design. The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
The relaxations may be granted with a Planned Unit Development(PUD).The criteria for
granting PUD relaxations are included in BMC 38.430.030.A.4:c. Staff has reviewed the
criteria and finds that they are met for all eleven relaxations with the adoption of the staff
analysis and findings below for justification.
SECTION 3 - CONDITIONS OFAPPROVAL
Please note that these conditions are in addition to any required code provisions identified in this
report.
1. The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, does not, in any way, create a waiver or
other relaxation of the lawful requirements of the Bozeman Municipal Code or state
law.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 15 of 38
2. The final planned unit development plan must be submitted,reviewed,and approved
prior to the approval of any subsequent site plan.
3. The requested relaxations to the following sections are granted as proposed in the
application materials and must be reflected in the final planned unit development
plan, design guidelines and associated property owners' association documents as
approved:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add
apartment buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses.The application requests to increase the size
of the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45'to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40%to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15%to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60%to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards.The application proposes
to reduce the requirement for efficiency units from 1.25 spaces per unit to 1
space per unit. The application proposes to reduce the requirements for one
bedroom units from 1.5 spaces per unit to 1.25 spaces per unit.
10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11. BMC. 38.400.050.A.1 Street Design.The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
4. Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a
vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06
E, P.M.M., Gallatin County, Montana must be aggregated and/or the common
boundaries of said lots must be reconfigured through the applicable subdivision
review process to accommodate the project prior to final planned unit development
plan approval.
S. Ten foot front setback utility easements must be provided for as shown on the
preliminary planned unit development plans either through individual recordable
documents or thorough the subdivision exemption review process prior to final
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 16 of 38
planned unit development plan approval.
6. Public access easements must be provided for as shown on the preliminary planned
unit development plans for all publicly accessible open space areas prior to final
planned unit development plan approval.
7. No property may be removed from the covenants without written approval of the City
of Bozeman.
8. The City of Bozeman has relied upon the overall design and design standards required
as part of the planned unit development application.The design and design standards
may not be altered without consent of the City.
9. A notice prepared by the City must be filed concurrently with the amended plat so
that it will appear on title reports. It must read substantially as follows The Amended
Plat of Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105
including a vacated alley in the Northern Pacific Addition to Bozeman located in S06,
T02 S, R06 E, P.M.M., Gallatin County, Montana known as the Cottonwood and Ida
Planned Unit Development (PUD) are subject to specific design standards, unique
building setbacks and heights, parking requirements and uses. These standards may
be found in .[insert correct reference to design standard location]. Lot owners are
advised that these are specific to the Cottonwood and Ida Planned Unit Development
and are in place of the general development standards of the same subject of the City
of Bozeman Zoning. If a development standard is not specifically established in the
Cottonwood and Ida PUD approval documents the general standards of the City apply.
Modification of the special standards would require an amendment to the
Cottonwood and Ida Planned Unit Development. Modifications are strongly
discouraged. It is the obligation of the lot owner to be fully informed as to these
standards before beginning any home or site design process.Approval by the design
review entity established in the covenants of the development does not bind the City
of Bozeman to approve a construction plan.
10. The applicant must execute at the Gallatin County Clerk&Recorder's Office prior to
approval of the final Planned Unit Development, a waiver of right-to-protest creation of a
City-wide special district for parks and trail,which would provide a mechanism for the
fair and equitable assessment of costs for City parks and trails.
11.The offsite parking agreement must be for a minimum term of 25 years and must be
completed, executed and filed prior to subsequent site plan approval.
12.The offsite parking agreement must be incorporated into the property owners'
association documents as a required responsibility of the association along with the
requirement to assess for and pay any required fees to satisfy the long term offsite
parking agreement.
13. Prior to planned unit development final plan approval the applicant must provide the
following modified historic property record documentation for the demolition of the
existing structure at 620 E. Cottonwood Street: Property address, legal location,
architectural description, digital interior and exterior elevation photographs, site
map, and a quadrangle map.A modified completion of the Montana Historic Property
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 17 of 38
Record is a documentation of the current structure conditions and not an analysis of
the historic integrity of property. The modified property card will be housed
permanently online on the City's Architecture Inventory Map.
14.A deed restriction requiring affordable housing in the applicable amount proposed
for planned unit development performance per the definition in BMC 38.700.020
must be placed on Lot A, underlying buildings 1, 2,and 6.
15.If not already filed for the subject site, the applicant must provide and file with
the County Clerk and Recorder's office executed Waivers of Right to Protest
Creation of Special Improvement Districts (SID's) for the following:
a. Street improvements to East Aspen Street including paving, curb/gutter,
sidewalk,and storm drainage
b. Street improvements to Ida Avenue including paving, curb/gutter, sidewalk,
and storm drainage
c. Street improvements to Front Street including paving, curb/gutter, sidewalk,
and storm drainage
d. Street improvements to East Tamarack Street including paving, curb/gutter,
sidewalk,and storm drainage
e. Street improvements to East Peach Street including paving, curb/gutter,
sidewalk,and storm drainage
f. Street improvements to Front Street including paving, curb/gutter, sidewalk,
and storm drainage
g. Intersection improvements to North Wallace Avenue and East Tamarack
Street
h. Intersection improvements to North Wallace Avenue and East Peach Street
i. Intersection improvements to Front Street and East Aspen Street
j. Intersection improvements to Front Street and Ida Avenue
The document filed must specify that in the event an SID is not utilized for the
completion of these improvements, the developer agrees to participate in an
alternate financing method for the completion of said improvements on a fair
share, proportionate basis as determined by square footage of property, taxable
valuation of the property, traffic contribution from the development, or a
combination thereof. The applicant must provide a copy of the filed SID waiver
prior to final PUD approval.
16.The intersections of East Aspen Street and Front Street and Ida Street and Front
Street must be reconfigured to meet the City's minimum design standard. The
intersections must be improved with the first phase of development. The City's
Engineering Department may approve an alternative design incorporating the
existing park provided the City Community Development Department and Parks
Department support the alternative design.An alternative design must be approved
prior to final PUD approval.
SECTION 4-REQUIRED CODE PROVISIONS
1. BMC 38.220.050.A final approved weed control plan must be submitted prior to
planned unit development final plan approval.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 18 of 38
2. BMC 220.080. Irrigation water. Clarify proposed water demand for irrigation
system. Clarify the nature of the existing well and water right to support the new
demand. Provide letter from DNRC confirming water right or intent to issue right to
support the project prior to approval of the planned unit development final plan.
3. BMC 38.220.300 and 310.The property owners' association documents must
include the requirements of Section 38.220.300 and 320.The proposed documents
must be finalized and recorded with the planned unit development final plan.
4. BMC 38.230.020.A and C.a subsequent site plan application is required to be
reviewed and approved for all phases of this development prior to building permit
issuance.
S. BMC 38.270.030.D For concurrent construction provide a full response to the
required items in Section 38.270.030.1) BMC.The concurrent construction response
was provided,but not in accordance with the required section. Provide response to
PUD concurrent construction and finalize all of the required code elements prior to
the approval of the planned unit development final plan,approval of concurrent
construction and prior to building permit issuance.
6. BMC 38.410.060.B.4 Encroachments proposed in required ten foot private utility
easement areas required along all streets. No written approval from all utility
companies is provided as required.The current and entire list of utility companies
operating in Montana can be attained from the Montana Public Service Commission.
Provide approval for encroachment prior to approval of planned unit development
final plan.
7. BMC 38.420.030 Cash in lieu of land dedication for parkland. Cash in lieu of .
parkland has not been paid.The cash in lieu amount due is required to be paid prior
to subsequent site plan approval.
8. BMC 38.430.040.A.3 outlines the review and approval process for the planned unit
development final plan. Final plan review and approval.The final plan must be in
compliance with the approved preliminary plan and/or development guidelines.
Upon approval or conditional approval of a preliminary plan and the completion of
any conditions imposed in connection with that approval,an application for final
plan approval may be submitted. For approval to be granted,the final plan must
comply with the approved preliminary plan.This means that all conditions imposed
by the city commission as part of its approval of the preliminary plan have been met
and: The final plan does not change the general use or character of the development;
The final plan does not increase the amount of improved gross leasable non-
residential floor space by more than five percent, does not increase the number of
residential dwelling units by more than five percent and does not exceed the
amount of any density bonus approved with the preliminary plan; The final plan
does not decrease the open space and/or affordable housing provided; The final
plan does not contain changes that do not conform to the requirements of this
chapter, excluding properly granted deviations,the applicable objectives and
criteria of section 38.430.100, or other objectives or criteria of this chapter.The
final plan must not contain any changes which would allow increased
0* . •
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 19 of 38
deviation/relaxation of the requirements of this chapter; and the final plat, if
applicable, does not create any additional lots which were not reviewed as part of
the preliminary plan submittal. Final plan approval.The final plan may be approved
if it conforms to the approved preliminary plan in the manner described above.
Prior to final plan approval, the review authority may request a recommendation
from the DRB, DRC,ADR staff, or other entity regarding any part of a proposed final
plan.
9. BMC 38.520.070 Location and design of service areas. No detailed service areas
identified for gas and electric entrance locations into the buildings or proposed
methods to separate and mitigate impacts as required.Show gas and electric
locations with the true size and extent of all proposed meters as required per SP1 on
entire site and the proposed locations for private utility entrance locations into the
buildings. Planned unit development final plan must provide clear information on
utility entrances into each building and demonstrate compliance with this code
section with the subsequent site plan.
10.BMC 38.540.070 Off-site parking. Provide site plan for offsite parking that
demonstrates the proposed lot meets all requirements of the BMC and the off-site
parking code section. Clarify the uses proposed to utilize the offsite parking and
provide exhibit showing compliance with distance requirements per use. Provide
draft long term parking agreement or draft deed restriction in order to demonstrate
compliance with BMC 38.540.070.6 with planned unit development final plan.
11. BMC 38.55O.O5O.I. Irrigation plans are required to be submitted with the PUD
open space landscape plan with the subsequent site plan application.
12.BMC 38.550.O6O.A.1.The PUD open space landscape plan must meet the
requirements of 23 performance points and be finalized and completed with the
subsequent site plan application.
13.BMC 38.4OO.O5O.A1.The property owner's association must maintain the
proposed on street angled parking allowed on East Cottonwood Street including
snow plowing and maintenance of the parking surfaces.The property owners'
association documents must include language to this effect and be reviewed and
approved prior to final PUD approval.
14.BMC 38.400.O10.A.8 The existing satellite dish encroaching into the emergency
access route must be removed prior to final PUD approval to ensure emergency
services are not inhibited.
15.BMC 38.400.O90.D.2 The applicant has indicated that the emergency vehicle access
road will only be utilized by emergency service,as such the City's access standards
do not apply provided the following are met: .
a. The property owners association documents continue language describing
the accesses may only be utilized be emergency services.The language must
be reviewed and approved prior to final PUD approval.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 20 of 38
b. City approved barricades are placed at both the north and south access
points
c. The street vision triangles for the north and south access points be removed
from the final PUD submittal
16.BMC 38.400.100.0 Street vision triangles shown on the preliminary PUD submittal
exceed the City's requirements. The final PUD submittal must correctly show the
City's street vision triangles prior to approval.
17.BMC 38.410.060.A An amended plat must be completed prior to final PUD approval
for the proposed changes to the lots.
a. The public utility easements along the property street frontages must be
provided using the City's standard language prior to final PUD approval. No
encroachments may be permitted without the approval from the utility
companies registered with the Montana Public Service Commission.
b. The public access easements for required public sidewalks located outside of
the right-of-way must be provided using the City's standard language prior to
final PUD approval.
c. A public drainage easement must be provided for the drainage infrastructure
supporting the public right-of-way which is located inside of the property.
The easement must be provided,reviewed,and approved by the City prior to
final PUD approval.
18.BMC 38.410.070.A.1 Certified water and sewer design reports must be provided
prior to final PUD approval.
19.BMC 38.410.080.A A certified drainage report for the public right-of-way drainage
must be reviewed and approved by the City prior final PUD approval.
a. The applicant must submit a stormwater maintenance plan for the proposed
stormwater infrastructure for review and approval prior to final PUD
approval.The approved maintenance plan be included within the property
owner's associate document prior to final PUD approval.
20.BMC 38.430.070.A a.All public infrastructure,both on and offsite, must be installed
with the first phase of development.
SECTION 5 -ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application
materials, municipal codes, standards, plans, public comment, and all other materials
available during the review period. Collectively this information is the record of the review.
The analysis in this report is a summary of the completed review.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 21 of 38
Applicable Plan Review Criteria,Section 38.230.100,BMC.
The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, do not in any way create a waiver or other
relaxation of the lawful requirements of the Bozeman Municipal Code or State law.
In considering applications for plan approval under this title,the advisory boards and
City Commission shall consider the following:
1. Conformance to and consistency with the City's adopted growth policy
Yes.The property has a future land use designation of Industrial and is zoned NEHMU,
Northeast Historic Mixed Use.The proposed residential units, office and restaurant uses
and artisan manufacturing uses increase the intensity of commercial uses and the
density of residential uses beyond the existing development pattern. The change in
intensity is anticipated by the growth policy in areas of the city with adequate
infrastructure. The project is in conformance to and consistent with the City's adopted
growth policy,the Bozeman Community Plan,including the following goals and
objectives:
Goal LU-1: Create a sense of place that varies throughout the City,efficiently
provides public and private basic services and facilities in close proximity to
where people live and work,and minimizes sprawl.
The NEHMU district has a distinct sense of place,this project contributes to an existing
and expanding mixed use area and allows people to live in close proximity to work,
public and private basic services and minimizes sprawl.
Objective LU-1.4 Provide for and support infill development and redevelopment
which provides additional density of use while respecting the context of the
existing development which surrounds it.Respect for context does not
automatically prohibit difference in scale or design.
This project provides additional density of residential and commercial use while
respecting the context of the mixed use area.The change in scale is allowable with the
design presented as it has human scale and is compatible with the district with building
sized within their context and integrated into the neighborhood.
Objective LU-2.3: Encourage redevelopment and intensification,especially with
mixed uses,of brownfields and underutilized property within the City consistent
with the City's adopted standards.
This project includes mixed uses and increase residential density and is proposed on
underutilized property in an ongoing and developing mixed use district.
Objective E-4.2: Promulgate efficient land use practices.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 22 of 38
This project promulgates efficient land use practices and provides a high net residential
density and FAR with office, manufacturing and restaurant uses,while adding a
significant amount of usable open space area that can be used by the entire community.
Objective C-2.5 Explore and encourage innovative parking solutions for both
residential and commercial projects including parking best practices,expanding
parking districts,cash in lieu of parking and design guidelines for structured
parking.
This project proposes a parking reduction,structured parking integrated into the
building design and offsite parking that will allow the project to provide an intensity of
use today while having the ability to adapt to the changing transportation
infrastructure in town including autonomous vehicles, ridesharing, car sharing,and
increased transit service.
Goal H-1: Promote an adequate supply of safe, quality housing that is diverse in
type, density,cost,and location with an emphasis on maintaining neighborhood
character and stability.
This project provides additional quality housing at high density in an area that has
historically included smaller residential low density uses. More recent infill projects in
this neighborhood have included apartment uses over mixed commercial uses.This
project will add to the neighborhood character and the stability of this area. Residential
uses provide additional eyes on the street and have a twenty four hour presence that
will make the district safer and enhance the overall neighborhood.
For more information on the growth policy designation please see Appendix AA.
2. Conformance to this chapter, including the cessation of any current violations
Yes.The project, if approved,will conform to the Bozeman Municipal Code other than
the requested relaxations.There are no known documented violations of the BMC for
this property. Code provisions are provided related to final planned unit development
plan approval and subsequent site plan approval.
3. Conformance with all other applicable laws,ordinances,and regulations
Yes.The proposed uses of the site are consistent with the allowed uses of the NEHMU
district with the additional of the apartment building use. No specific conflicts have
been identified.Additional steps will be required including but not limited to final
payment for cash in lieu of water rights, approval of the final planned unit development,
subdivision exemption to realign and aggregate the underlying lots, dedication of the
utility easements,construction of infrastructure, PUD final plan documents and
application, site plan approval and building permits.The Building Division of the
Department of Community Development will review the requirements of the
0 •
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 23 of 38
International Building Code for compliance at the time of building permit application.
Conditions of approval and code provisions are provided related to these issues.
Condition of approval 1 requires full compliance with all applicable code requirements.
4. Conformance with special review criteria for applicable permit type as
specified in article 2
Yes.The CUP and PUD criteria are reviewed below.The project meets the requirements
and criteria as presented.
5.Conformance with the zoning provisions of article 3, including permitted uses,
form and intensity standards and requirements,applicable supplemental use
criteria,and wireless facilities and/or affordable housing provisions if applicable
Yes.The uses are permitted in the NEHMU district with the addition of apartment
building uses requested through relaxation. Form and intensity standards are met with
the proposal other than the proposed relaxations for the front setback and zero lot line
conditions,lot coverage and building heights.Affordable housing is proposed in
compliance with the PUD performance standards and will be confirmed through the
planned unit development final plan process. Condition of approval 14 requires a deed
restriction to assure the applicability of the affordable housing long term is proposed.
The north half of the property includes four multi use storage and warehouse buildings
constructed beginning in 1960.All buildings on the north half of the property are
proposed for demolition.The south half of the site includes a grain warehouse building
constructed in 1930.The grain warehouse is proposed to remain and be adaptively
reused through the site development process for use as a restaurant/community
building.Condition of approval 13 is related to documentation of the grain warehouse
prior to modifications to the building.
6. Conformance with the community design provisions of article 4,including
transportation facilities and access,community design and element provisions,
and park and recreational requirements
Yes.The proposed streets meet standards with the proposed relaxations. East Aspen
Street, East Cottonwood Street and North Ida Avenue are required to be improved with
this project. The proposed parking is to be met with reductions allowed through
relaxation of the parking requirements. Pedestrian access is provided from the street
directly through and into the project. The primary entrances into each building are
connected to the City's sidewalk system. Perimeter street frontage sidewalks are
provided on every perimeter street in conformance to standards.The lots and block
meet standards,water and sewer is provided to each lot through mains within the city
owned rights of way. The applicant will be constructing water mains to support the site.
Site surface drainage generally meets standards at this level in the design for the streets
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 24 of 38
and development. Cash in lieu of water rights is proposed and will be paid with the final
site plan for site development.
The applicant proposes to pay cash in lieu of parkland in conformance with standards,
capped at twelve dwelling units per acre.The Recreation and Parks Advisory Board
Subdivision Committee supports the use of cash in lieu for this project and recommends
approval.
Small encroachments are proposed into the required front setback utility easements.
Condition of approval S requires the establishment of utility easements to serve the
property and the surrounding utility grid. Code provision 6 requires approval of the
utility holders prior to final approval of the encroachments.
Concurrent construction of East Aspen Street, East Cottonwood Street and North Ida
Avenue and the associated sewer and water mains is proposed. The Development
Review Committee reviewed the request for concurrent construction with the
understanding that the applicant agrees to standards and to complete the requirements
in BMC 38.270.030.D with the planned unit development final plan and prior to building
permit issuance.The Development Review Committee recommends concurrent
construction be approved with all the required code elements.
7. Conformance with the project design provisions of article 5,including
compatibility with,and sensitivity to,the immediate environment of the site and
adjacent neighborhoods and other approved development; design and
arrangement of the elements of the plan;landscaping; open space;lighting,
signage;
The development is compatible with and sensitive to the immediate environment of the
site and the adjacent neighborhoods and other approved development relative to,
building mass and height,landscaping,orientation of parking and building placement
on the site.The buildings comply with permanence in building materials,building
quality,architectural integration,neighborhood identity,and orientation of parking and
service areas.The general approach to landscaping meets standards.
The design of the plan is consistent with the existing natural topography.The site will
be raised to allow the inclusion of underground parking.There are no water bodies or
significant existing vegetation on site.
A general comprehensive signage is proposed in conformance with standards.
Parking is proposed to be reduced via a relaxation for both residential and commercial
uses. 96 parking spaces are proposed in an underground parking structure and 72
parking spaces are proposed offsite for the non-residential uses. 32 on street spaces are
proposed for residential use. Prior to reductions the project would have required 2S5.3
parking spaces,with reductions the required parking is proposed at 166.1 parking
• A
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 25 of 38
spaces. 200 parking spaces are proposed to be provided through a combination of
onsite, offsite and on street as outlined above.The offsite parking must have a long term
lease established prior to final approval of the site plan and.be integrated into the
property owners association documents as a required element per conditions of
approval 11 and 12.
8. Conformance with environmental and open space objectives set forth in
articles 4-6,including the enhancement of the natural environment,
watercourse and wetland protections and associated wildlife habitats;and if the
development is adjacent to an existing or approved public park or public open
space area,have provisions been made in the plan to avoid interfering with
public access to and use of that area
Yes. Pervious pavers are proposed to treat stormwater from the development.This is in
compliance with best practices for Low Impact Development.The approach to the
stormwater system meets code standards.The final review of the stormwater system
will occur with the site plan review.The development is adjacent to a small public park
and climbing boulder. No significant impact to-the park is anticipated from this
development.
9.Conformance with the natural resource protection provisions of article 4 and
article 6
Yes.No streams,floodplains, critical plant communities or wetlands exist on site.
10.Other related matters,including relevant comment from affected parties
Public comment has been received on this application.As of the writing of this report
there were eight public comments received. Seven were in favor of the application and
• 0 .
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 26 of 38
one was not in favor of the application citing.reduced setbacks,parking reductions and
increased building height.
11. If the development includes multiple lots that are interdependent for
circulation or other means of addressing requirement of this title,whether the
lots are either:
a. Configured so that the sale of individual lots will not alter the approved
configuration or use of the property or cause the development to become
nonconforming; or
b.The subject of reciprocal and perpetual easements or other agreements to
which the City is a party so that the sale of individual lots will not cause one or
more elements of the development to become nonconforming
The property must be configured through the applicable subdivision review process to
relocate and aggregate common lot boundaries prior to the approval of the final PUD
plan. Condition 4 is related to this issue.
12.Phasing of development
The project is proposed to be constructed in one phase. Concurrent construction of East
Aspen Street,East Cottonwood Street and North Ida Avenue and the associated sewer
and water mains is proposed.The Development Review Committee reviewed the
request for concurrent construction with the understanding that the applicant agrees to
standards and to complete the requirements in BMC 38.270.030.D with the planned
unit development final plan and prior to building permit issuance. The Development
Review Committee recommends concurrent construction be approved with all the
required code elements.
Conditional Use Permit Review Criteria,Section 38.230.110,BMC.
E. In addition to the review criteria of section 38.230.100,the review authority shall,in
approving a conditional use permit, determine favorably as follows:
1. That the site for the proposed use is adequate in size and topography to
accommodate such use,and all yards,spaces,walls and fences,parking,loading
and landscaping are adequate to properly relate such use with the land and uses
in the vicinity;
The site is adequate.The proposed buildings,site design,pedestrian connectivity,open
space and mix of uses will enhance the neighborhood. Landscaped areas are
coordinated with adjoining properties and within the proposed development. The
landscape design will improve the street frontages of the site.The reduced setbacks
proposed through relaxation relate well to the historic building placements within the
vicinity.All parking is proposed either in an underground structure or offsite which
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 27 of 38
provides for an uninterrupted streetscape for pedestrians and the addition of on street
parking.
2. That the proposed use will have no material adverse effect upon the
abutting property. Persons objecting to the recommendations of review bodies
carry the burden of proof,
No adverse impacts to abutting properties have been identified.The construction of
East Aspen Street and the reconstruction and completion of North Ida Avenue and East
Cottonwood Street will improve safety for vehicles,cyclists, and pedestrians which
promotes public health and safety. General welfare will be promoted through a variety
of apartment types which will provide a variety of housing options for area.residents.
The provision of additional office, manufacturing and restaurant uses to the districts
promotes general welfare by providing an expansion and additional density to the
mixed of uses in the NEHMU.The development serviced by the existing municipal
sanitary sewer and water systems promotes public health by protecting groundwater
from degradation associated with on-site septic systems and domestic wells.
Stormwater will be managed in pervious pavers and other retention facilities to filter
out sediment and treat runoff.
3.That any additional conditions stated in the approval are deemed necessary
to protect the public health,safety and general welfare.Such conditions may
include,but are not limited to:
a. Regulation of use;
b.Special yards,spaces and buffers;
c.Special fences,solid fences and walls;
d.Surfacing of parking areas;
e. Requiring street,service road or alley dedications and improvements or
appropriate bonds;
f. Regulation of points of vehicular ingress and egress;
g.Regulation of signs;
h.Requiring maintenance of the grounds;
i. Regulation of noise,vibrations and odors;
j.Regulation of hours for certain activities;
k.Time period within which the proposed use shall be developed;
1. Duration of use;
m. Requiring the dedication of access rights;and
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 28 of 38
n. Other such conditions as will make possible the development of the city in
an orderly and efficient manner.
The requirements of the DRC review and the proposed conditions outlined in this
report,the future covenants,the maintenance plans and project design guidelines
associated with the project will address these areas.
F.In addition to all other conditions,the following general requirements apply
to every conditional use permit granted:
1.That the right to a use and occupancy permit shall be contingent upon the
fulfillment of all general and special conditions imposed by the conditional use
permit procedure; and
2.That all of the conditions shall constitute restrictions running with the land
use,shall apply and be adhered to by the owner of the land,successors or assigns,
shall be binding upon the owner of the land,his successors or assigns,shall be
consented to in writing,and shall be recorded as such with the county clerk and
recorder's office by the property owner prior to the issuance of any building
permits,final plan approval or commencement of the conditional use.
The necessary recording of documents will be addressed as part of the final PUD plan
process. Conditions 3, 7, 8,and 9 are related to this issue.
Planned Unit Development Review Criteria,Section 38.430.090.E,BMC.
The application presents the applicant's response to these criteria.
2. In addition to the criteria for all site plan and conditional use reviews,the following
criteria will be used in evaluating all planned unit development applications.
a.All development.All land uses within a proposed planned unit development
shall be reviewed against,and comply with,the applicable objectives and criteria
of the mandatory"all development"group.
(1)Does the development comply with all city design standards, requirements and
specifications for the following services:water supply, trails/walks/bike ways,sanitary
supply, irrigation companies,fire protection, electricity,flood hazard areas, natural gas,
telephone,storm drainage, cable television, and streets?
Yes, except for those standards proposed for relaxation the application conforms and in
some areas exceeds standards.
(2)Does the project preserve or replace existing natural vegetation?
Yes.The site has been substantially disturbed by development and previous land uses
and does not include significant natural vegetation.There will be substantial placement
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 29 of 38
of new vegetation within the site open spaces and perimeter street frontage.A code
provision requires a final weed control plan with the planned unit development and
further landscaping must be provided in accordance with code requirements with the
subsequent site plan application.
(3)Are the elements of the site plan (e.g., buildings, circulation, open space and
landscaping, etc.)designed and arranged to produce an efficient,functionally organized
and cohesive planned unit development?
Yes.The proposal is cohesive and has a variety of coordinating elements ranging from
efficient circulation, underground structured parking, integrated architecture between
buildings, presentations of building fronts to the streets,private residential open
spaces, open spaces available to the public,and multiple landscape configurations.
Condition of approval 6 requires the recordation of public access easement in order to
finalize all publicly accessible plaza and circulation areas as presented in the
preliminary plans.
(4)Does the design and arrangement of elements of the site plan (e.g., building
construction, orientation, and placement; transportation networks;selection and
placement of landscape materials;and/or use of renewable energy sources;etc.)
contribute to the overall reduction of energy use by the project?
Yes.The project proposes to construct to a LEED ND designation. LEED for
Neighborhood Development(LEED-ND),where "LEED" stands for Leadership in Energy
and Environmental Design, is a United States-based rating system that integrates the
principles of smart growth,urbanism and green building into a national system for
neighborhood design. LEED certification provides independent,third-party verification
that a development's location and design meet accepted high levels of environmentally
responsible,sustainable development.The LEED-ND system is a collaboration between
the United States Green Building Council,the Congress for the New Urbanism and the
Natural Resources Defense Council.A reduction in parking will require alternative
modes of transportation be utilized by residents, employees,and customers of the
developments. This will encourage enhanced transit to the area.
(5)Are the elements of the site plan (e.g., buildings, circulation, open space and
landscaping, etc.)designed and arranged to maximize the privacy by the residents of the
project?
Yes.The project is design to allow a diversity of residential types and configurations,
many ground floor units have access to outdoor spaces for their own use which provide
a public private separation for their units.Along the perimeter streets the residential
units along the frontages are raised up above the sidewalk level to a varying degree to
provide a transitional space between the public street and the private units.The
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 30 of 38
development complies with the interior special residential block frontage for all units.
Landscaping is provided along the streetscape and within the development that will
provide additional privacy.All vehicular access to the site is via the underground
parking structure that will generally only be used by the residents, city services and
their private service providers.
(6)Park land. Does the design and arrangement of buildings and open space areas
contribute to the overall aesthetic quality of the site configuration, and has the area of
park land or open space been provided for each proposed dwelling as required by section
38.420.020?
Yes. Parkland is provided per code requirements via cash in lieu of dedication. Open
space is provided for each residential building in compliance with standards. Conditions
of approval 10 requires that a parks and trails district waiver be provided with the
planned unit development final plan in accordance with BMC 38.420.100.
(7)Performance.All PUDs shall earn at least 20 performance points.
Yes.With a PUD, Section 38.430.090.E.2.a.7 requires at least 20 performance points for
the subject property.There are 11 options provided in the UDC to meet this
requirement. Points can be met using any combination of on-site and off--site open
space or other options listed in the code. The Preliminary PUD must specify how the
performance points are being met.
Open space provisions for phased PUD developments: If a project is to be built in
phases, each phase shall include an appropriate share of the proposed recreational,
open space, affordable housing and other site and building amenities of the entire
development used to meet the requirements of section 38.430.090.E.2.The appropriate
share of the amenities for each phase shall be determined for each specific project at
the time of preliminary approval and shall not be based solely upon a proportional or
equal share for the entire site.
The PUD is proposing to satisfy the performance requirements with credits for
affordable housing (21),additional open space with public access (9.37), underutilized
and brownfield sites (6.67), LEED-ND (15) and low impact development plan (6).The
tabulation is under the common open space section of the application narrative on page
25.The application satisfies the requirement with 58 performance points.The
development exceeds standards. Conditions of approval, 6 and 14 are provided related
to this issue in order to provide public access as proposed and to assure affordable
housing is provided as required to achieve the performance points.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 31 of 38
(8)Is the development being properly integrated into development and circulation
patterns of adjacent and nearby neighborhoods so that this development will not become
an isolated "pad"to adjoining development?
Yes the project will create new connections to the neighborhood around it with the
construction of additional streets sidewalks and open spaces.
c. Mixed Use.Planned unit developments in mixed-use areas (REMU,UMU,
and NEHMU zoning districts) may include commercial,light industrial,residential
and mixes of various primary and accessory uses.The particular types or
combination of uses are determined based upon its merits,benefits,potential
impact upon adjacent land uses and the intensity of development.
(1)Is the project substantially consistent with the intent and purpose statements for the
underlying zoning district?
Yes.This neighborhood includes commercial uses,offices, manufacturing and housing.
The intent of the northeast historic mixed-use district is to provide recognition of an
area that has developed with a blend of uses not commonly seen under typical zoning
requirements.The unique qualities and nature of the area are not found elsewhere in
the city and should be preserved as a place offering additional opportunities for
creative integration of land uses.This PUD provides a creative integration of land uses.
The intent of this area is to allow private and case-by-case determination of the most
appropriate use of land in a broad range of both non-residential and residential uses.
This PUD proposes appropriate use of the land with a broad range of nonresidential and
residential uses.
(Z)Is the project located adjacent or within proximity to an arterial or collector street
that provides adequate access to the site?
Yes.The project is located 300 feet from Peach Street,a collector street and 300 feet
from Tamarack Street a collector street with both streets feeding into Rouse Avenue to
the west the closest.arterial street to the project.
(3) Is the project on at least two acres of land?
Yes,the site is 2.01 acres of land.
(4)Do the uses relate to each other in terms of location within the PUD,pedestrian and
vehicular circulation, architectural design, utilization of common open space and
facilities, streetscape, etc.?
Yes,the overall site layout and design guidelines provide a comprehensive design that
coordinates pedestrian and vehicular circulation,architectural design and the
utilization of open space and facilities.
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 32 of 38
(5)Does the overall project achieve or exceed the FAR 'floor area ratios"envisioned for
the underlying district?
Yes.There is no designated FAR required in the NEHMU.The proposed total FAR of the
development is 1.8 with 46 dwelling units to the acre.
(6)Is it compatible with and does it reflect the unique character of the surrounding area?
Yes.This development will contribute to the mixed use character in this area and the
eclectic residential and nonresidential uses located in this neighborhood.
(7)Is there direct vehicular and pedestrian access between on-site parking areas and
adjacent existing or future off-site parking areas which contain more than ten spaces?
Yes.All parking spaces are accesses through the underground parking structure.The
offsite parking proposed at the northwest corner of Wallace Avenue and East Aspen
Street is within the distance requirements for off-site parking..
CB)Does the project encourage infill, or does the project otherwise demonstrate
compliance with the land use guidelines of the city growth policy?
Yes.This project is an infill project on an underutilized site.
(9)Does the project provide for outdoor recreational areas(such as urban plazas,
courtyards, landscaped areas, open spaces, or urban trails)for the use and enjoyment of
those living in, working in or visiting the development?
Yes. Private residential and publicly accessible open space are proposed for those living,
working in or visiting the development.
(10)Does the project provide for private outdoor areas(e.g.,private setbacks, patios
and/or balconies, etc.)for use by the residents and employees of the project which are
sufficient in size and have adequate light,sun, ventilation,privacy and convenient access
to the household or commercial units they are intended to serve?
Yes. Outdoor balconies and patios are proposed for many of the individual dwelling
units. Shared green roof deck opens space is provided for the apartment residents in
Buildings 1-2. Commercial open space is provided for the office use.
(11)Does the project provide for outdoor areas for use by persons living and working in
the development for active or passive recreational activities?
Yes. Private and publicly accessible open space are proposed.The project is very close
to the mountains to main street trail system.
(12)Is the overall project designed to enhance the natural environment, conserve energy
and provide efficient public services and facilities?
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 33 of 38
Yes. Enhancements to this underutilized site and connection to city services will allow a
high density residential development in close proximity to services,transit, recreation
and employment opportunities.The project is being designed as a LEED-ND
neighborhood.
(13)If the project is proposing a residential density bonus as described below, does it
include a variety of housing.types and urban styles designed to address community-wide
issues of affordability and diversity of housing stock?
Yes,Affordable housing a variety of housing types and urban styles are proposed.A
deed restriction is required in order to provide long term availability.
(14)Residential density bonus. If the project is proposing a residential density bonus(30
percent maximum)above the residential density of the zoning district or building type
within which the project is located and which is set forth in division 38.310 of this chapter,
does the proposed project exceed the established regulatory design standards(such as for
setbacks, off-street parking, open space, etc.)and ensure compatibility with adjacent
neighborhood development?The number of dwelling units obtained by the density bonus
is determined by dividing the lot area required for the dwelling unit type by one plus the
percentage of density bonus sought. The minimum lot area per dwelling obtained by this
calculation must be provided within the project. Those dwellings subject to division 38.380
must be excluded from the base density upon which the density bonus is calculated.
Not applicable. No formal density bonus is proposed.
18516 Findings of fact Cottonwood and Ida Planned Unit Development Page 34 of 38
SECTION 6 -FINDINGS OF FACT, ORDER AND APPEAL PROVISIONS
A) PURSUANT to Chapter 38, Divisions 38.230, 38.430, BMC, and other applicable
sections of Chapter 38, BMC, public notice was given, opportunity to submit comment
was provided to affected parties,and a review of the preliminary plan for the planned
unit development described in this findings of fact was conducted. The applicant
presented to the City a proposed preliminary plan for a planned unit development to
allow a mixed residential and commercial development with relaxations to zoning
regulations.The development proposes a mix of uses including apartment buildings,an
office building,a mixed use building including artisan manufacturing and a restaurant
building. The proposal include four buildings.The largest building includes apartments,
64 units,and offices, 29,700 sq.ft., separated horizontally over an underground parking
structure consisting of 96 parking spaces.The other buildings on site include a 12 unit
apartment building, a mixed use building with artisan manufacturing, 5,400 sq. ft.with
16 units mixed into the building and one 2,150 square foot commercial restaurant
building.The application includes the concurrent construction of East Aspen Street,
North Ida Avenue and the north half of East Cottonwood Street. Eleven relaxations to
City standards were proposed.The purposes of the preliminary plan review were to
consider all relevant evidence relating to public health, safety,.welfare,and the other
purposes of Chapter 38, BMC;to evaluate the proposal against the criteria and
standards of Chapter 38 BMC; and to determine whether the plat should be approved,
conditionally approved, or denied.
B) It appeared to the City Commission that all parties and the public wishing to examine
the proposed preliminary plan and offer comment were given the opportunity to do so.
After receiving the recommendation of the relevant advisory bodies and considering all
matters of record presented with the application and during the public comment period
defined by Chapter 38, BMC,the City Commission has found that the proposed
preliminary plan of the P,UI)would comply with the requirements of the Bozeman
Municipal Code if certain conditions were imposed.Therefore,being fully advised of all
matters having come before them regarding this application,the City Commission
makes the following decision.
C) The preliminary plan has been found to meet the criteria of Chapter 38, BMC,and is
therefore approved, subject to the conditions listed in Section 3 of this report and the
correction of any elements not in conformance with the standards of the Chapter
including those identified in Section 4 of this report. The evidence contained in the
submittal materials, advisory body review,public testimony, and this report,justify the
conditions imposed on this development to ensure that the final site plan and
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 35 of 38
subsequent construction complies with all applicable regulations, and all applicable
criteria of Chapter 38, BMC.
D) This City Commission order may be appealed by bringing an action in the Eighteenth
District Court of Gallatin County. The preliminary approval of this planned unit
development shall be effective for one (1) year from the date of the signed Findings of
Fact and Order approval. At the end of this period the City may,at the request of the
developer,grant individual extensions to its approval by the Community Development
Director for a period of not more than six months at a time consistent with the
requirements of Section 38.230.
DATED this 6t"day of May, 2019.
r'
BOZ'EMAN Y COMMISSION
CYNTH .A DRUS
Mayo
ATTEST:
J`n $C2
'7 • ••
ROBIN CROUGH * _
City Clerk
APPR VED AS TO FORM:
GREG LLIVAN
City Attorney
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 36 of 38
APPENDIX A -PROJECT SITE ZONING AND GROWTH POLICY
Zoning Designation and Land Uses; The property is zoned NEHMU, Northeast Historic
Mixed Use
The intent of the northeast historic mixed-use district is to provide recognition of an area
that has developed with a blend of uses not commonly seen under typical zoning
requirements. The unique qualities and nature of the area are not found elsewhere in the
city and should be preserved as a place offering additional opportunities for creative
integration of land uses. The intent of this area is to allow private and case-by-case
determination of the most appropriate use of land in a broad range of both non-residential
and residential uses.Standards for buffering between different land uses are deliberately not
as high as standards elsewhere in the community as it is assumed that persons choosing to
locate in this area are aware of the variety of possible adjacent land uses and have accepted '
such possibilities as both acceptable and desirable. It is expected that the lots within this
district will continue to develop under a variety of uses which may increase or decrease in
scope in any given portion of the district.The clear intent of this district is to support a mix
and variety of non-residential and residential uses. Nothing in division 38.300 of this article
shall be interpreted to be discouraging or prejudicial to any listed use except as set forth as
principal and conditional uses.
Adopted Growth Policy Designation: The property`is r designated as Industrial in the
Bozeman Community Plan. This classification provides areas for the uses which support an
urban environment such as manufacturing, warehousing;. and transportation hubs.
Development within these areas is intensive and.is.connected to significant transportation
corridors. In order to protect the economic base and.'necessary services represented by
industrial uses, uses which would be detrimentally impacted by industrial activities are
discouraged. Although use in these areas is intensive,these areas are part of the larger
community and shall meet basic standards for landscaping and other site design issues and
be integrated with the larger community. In some circumstances, uses other than those
typically considered industrial have been historically present in areas which were given an
industrial designation in this growth policy. Careful consideration must be given to public
policies to allow these mixed uses to coexist in harmony.
APPENDIX B - OWNER INFORMATIONAND REVIEWING STAFF
Owner: Bangtail Partners LLC 1189 Tennessee Street,Unit 103,San Francisco, CA 94107
Applicant: Imperial Development LLC 33 North Black Avenue, Bozeman,MT 59715
Representatives:Thinktank Design Group Inc.33 North Black Avenue,Bozeman,MT 59715
Report By: Brian Krueger, Development Review Manager
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 37 of 38
APPENDIX C-PLANNED UNIT DEVELOPMENT INTENT
Sec. 38.430.010. Intent. A. It is the intent of the city through the use of the planned unit
development (PUD) concept, to promote maximum flexibility and innovation in the
development of land and the design of development projects within the city. Specifically,
with regard to the improvement and protection of the public health, safety and general
welfare, it shall be the intent of this chapter to promote the city's pursuit of the following
community objectives:
1. To ensure that future growth and development occurring within the city is in accord
with the city's adopted growth policy, its specific elements, and its goals, objectives
and policies;
2. To allow opportunities for innovations in land development and redevelopment so
that greater opportunities for high quality housing, recreation, shopping and
employment may extend to all citizens of the city area;
3. To foster the safe, efficient and economic use of land and transportation and other
public facilities;
4. To ensure adequate provision of public services such as water, sewer, electricity,
open space and public parks;
S. To avoid inappropriate development of lands and to provide adequate drainage,
water quality and reduction of flood damage;
6. To encourage patterns of development which decrease automobile travel and
encourage trip consolidation,thereby reducing traffic congestion and degradation of
the existing air quality;
7. To promote the use of bicycles and walking as effective modes of transportation;
8. To reduce energy consumption and demand;
9. To minimize adverse environmental impacts of development and to protect special
features of the geography;
10.To improve the design, quality and character of new development;
11.To encourage development of vacant properties within developed areas;
12.To protect existing neighborhoods from the harmful encroachment of incompatible
developments;
13.To promote logical development patterns of residential, commercial, office and
industrial uses that will mutually benefit the developer, the neighborhood and the
community as a whole;
14.To.promote the efficient use of land resources,full use of urban services, mixed uses, I
transportation options,and detailed and human-scale design; and
15.To meet the purposes established in section 38.01.040.
i
18516 Findings of Fact Cottonwood and Ida Planned Unit Development Page 38 of 38
ATTACHMENTS
The full application and file of record can be viewed at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715.
r •
BOZ E MAN MT
Planning
March 27, 2019
Thinktank Design Group, Inc.
33 North Black Ave.
Bozeman, MT 59715
RE: Cottonwood and Ida Preliminary Planned Unite Development Application 18516-
Preliminary Approval
Dear Sirs and Madams,
On March 25,2019,the Bozeman City Commission met to consider your application for a preliminary
planned unit development application to allow a mixed residential and commercial development with
relaxations to zoning regulations requested for apartment building use, building height, parking,
street design, restaurant design, transparency, front setbacks and a request for concurrent
construction.
After the City Commission reviewed and considered the application materials, staff report, advisory
review board recommendations, public comment, and all the information presented, they made
individual findings and voted to approve the motion to approve the application. The Commission
agreed that the application met the criteria established by the Bozeman Municipal Code. Therefore,
the application was approved with conditions and applicable code provisions.
The City Commission's review,deliberation and findings may be found under the linked minutes and
recorded video of the meetings located at this web page filed under the date 3/25/19:
https://www.bozeman.neUservices/city-tv-and-streaming-audio
The following conditions of approval and code provisions are required for this application:
Conditions of approval:
1. The applicant is advised that unmet code provisions,or code provisions that are not specifically
listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the
lawful requirements of the Bozeman Municipal Code or state law.
2. The final planned unit development plan must be submitted, reviewed, and approved prior to the
approval of any subsequent site plan.
3. The requested relaxations to the following sections are granted as proposed in the application
materials and must be reflected in the final planned unit development plan, design guidelines
and associated property owners' association documents as approved:
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
1 \
BOZEMAN MT
Planning
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of the
allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to decrease
the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow zero
lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
the allowable maximum height to be increased from 45'to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to decrease
the required residential transparency from a minimum 15%to 8%.
8. BMC 38.510.030.E Storefront Block Frontage. The application proposes to decrease
the required commercial transparency from 60%to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space per unit.
The application proposes to reduce the requirements for one bedroom units from 1.5
spaces per unit to 1.25 spaces per unit.
10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to
reduce all nonresidential parking standards by 40%.
11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the
street according to the adopted designs for local streets and instead construct East
Cottonwood Street with back out angled parking.
4. Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a vacated
alley in the Northern Pacific Addition to Bozeman located in S06,T02 S, R06 E, P.M.M., Gallatin
County, Montana must be aggregated and/or the common boundaries of said lots must be
reconfigured through the applicable subdivision review process to accommodate the project prior
to final planned unit development plan approval.
5. Ten foot front setback utility easements must be provided for as shown on the preliminary
Bozeman, • 1
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
J
BOZEMAN MT
Planning
planned unit development plans either through individual recordable documents or thorough the
subdivision exemption review process prior to final planned unit development plan approval.
6. Public access easements must be provided for as shown on the preliminary planned unit
development plans for all publicly accessible open space areas prior to final planned unit
development plan approval.
7. No property may be removed from the covenants without written approval of the City of
Bozeman.
8. The City of Bozeman has relied upon the overall design and design standards required as part
of the planned unit development application. The design and design standards may not be
altered without consent of the City.
9. A notice prepared by the City must be filed concurrently with the amended plat so that it will
appear on title reports. It must read substantially as follows The Amended Plat of Lots 5-16,
Block 106 including a vacated alley and Lots 17-28, Block 105 including a vacated alley in the
Northern Pacific Addition to Bozeman located in S06, T02 S, R06 E, P.M.M., Gallatin County,
Montana known as the Cottonwood and Ida Planned Unit Development (PUD) are subject to
specific design standards,unique building setbacks and heights,parking requirements and uses.
These standards may be found in [insert correct reference to design standard location]. Lot
owners are advised that these are specific to the Cottonwood and Ida Planned Unit Development
and are in place of the general.development standards of the same subject of the City of
Bozeman Zoning. If a development standard is not specifically established in the Cottonwood
and Ida PUD approval documents the general standards of the City apply. Modification of the
special standards would require an amendment to the Cottonwood and Ida Planned Unit
Development. Modifications are strongly discouraged. It is the obligation of the lot owner to be
fully informed as to these standards before beginning any home or site design process.Approval
by the design review entity established in the covenants of the development does not bind the
City of Bozeman to approve a construction plan.
10. The applicant must execute at the Gallatin County Clerk& Recorder's Office prior to approval
of the final Planned Unit Development, a waiver of right-to-protest creation of a City-wide
special district for parks and trail, which would provide a mechanism for the fair and equitable
assessment of costs for City parks and trails.
11. The offsite parking agreement must be for a minimum term of 25 years and must be completed,
executed and filed prior to subsequent site plan approval.
12. The offsite parking agreement must be incorporated into the property owners' association
documents as a required responsibility of the association along with the requirement to assess
Bozeman, 1
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZ
MAN
MT
Planning
for and pay any required fees to satisfy the long term offsite parking agreement.
13. Prior to planned unit development final plan approval the applicant must provide the following
modified historic property record documentation for the demolition of the existing structure at 620
E. Cottonwood Street: Property address, legal location, architectural description, digital interior
and exterior elevation photographs, site map, and a quadrangle map. A modified completion of
the Montana Historic Property Record is a documentation of the current structure conditions and
not an analysis of the historic integrity of property. The modified property card will be housed
permanently online on the City's Architecture Inventory Map.
14. A deed restriction requiring affordable housing in the applicable amount proposed for planned
unit development performance per the definition in BMC 38.700.020 must be placed on Lot A,
underlying buildings 1, 2, and 6.
15. If not already filed for the subject site, the applicant must provide and file with the County
Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special
Improvement Districts (SID's) for the following:
a. Street improvements to East Aspen Street including paving, curb/gutter, sidewalk, and
storm drainage
b. Street improvements to Ida Avenue including paving, curb/gutter, sidewalk, and storm
drainage
c. Street improvements to Front Street including paving, curb/gutter, sidewalk, and storm
drainage
d. Street improvements to East Tamarack Street including paving, curb/gutter, sidewalk,
and storm drainage
e. Street improvements to East Peach Street including paving, curb/gutter, sidewalk, and
storm drainage
f. Street improvements to Front Street including paving, curb/gutter, sidewalk, and storm
drainage
g. Intersection improvements to North Wallace Avenue and East Tamarack Street
h. Intersection improvements to North Wallace Avenue and East Peach Street
i. Intersection improvements to Front Street and East Aspen Street
j. Intersection improvements to Front Street and Ida Avenue
The document filed must specify that in the event an SID is not utilized for the completion of
these improvements, the developer agrees to participate in an alternate financing method
for the completion of said improvements on a fair share, proportionate basis as determined
by square footage of property, taxable valuation of the property, traffic contribution from the
development, or a combination thereof. The applicant must provide a copy of the filed SID
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
B ®Z E MAN MT
Planning
waiver prior to final PUD approval.
16. The intersections of East Aspen Street and Front Street and Ida Street and Front Street must be
reconfigured to meet the City's minimum design standard. The intersections must be improved
with the first phase of development. The City's Engineering Department may approve an
alternative design incorporating the existing park provided the City Community Development
Department and Parks Department support the alternative design. An alternative design must
be approved prior to final PUD approval.
Code Provisions
1. BMC 38.220.050.A final approved weed control plan must be submitted prior to planned unit
development final plan approval.
2. BMC 220.080. Irrigation water. Clarify proposed water demand for irrigation system. Clarify the
nature of the existing well and water right to support the new demand. Provide letter from
DNRC confirming water right or intent to issue right to support the project prior to approval of
the planned unit development final plan.
3. BMC 38.220.300 and 310. The property owners' association documents must include the
requirements of Section 38.220.300 and 320. The proposed documents must be finalized and
recorded with the planned unit development final plan.
4. BMC 38.230.020.A and C. a subsequent site plan application is required to be reviewed and
approved for all phases of this development prior to building permit issuance.
5. BMC 38.270.030.D For concurrent construction provide a full response to the required items in
Section 38.270.030.D BMC.The concurrent construction response was provided, but not in
accordance with the required section. Provide response to PUD concurrent construction and
finalize all of.the required code elements prior to the approval of the planned unit development
final plan, approval of concurrent construction and prior to building permit issuance.
6. BMC 38.410.060.B.4 Encroachments proposed in required ten foot private utility easement
areas required along all streets. No written approval from all utility companies is provided as
required. The current and entire list of utility companies operating in Montana can be attained
from the Montana Public Service Commission. Provide approval for encroachment prior to
approval of planned unit development final plan.
7. BMC 38.420.030 Cash in lieu of land dedication for parkland. Cash in lieu of parkland has not
been paid. The cash in lieu amount due is required to be paid prior to subsequent site plan
approval.
Bozeman, • 1
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
1
BOZ E MAN MT
Planning
8. BMC 38.430.040.A.3 outlines the review and approval process for the planned unit
development final plan. Final plan review and approval. The final plan must be in compliance
with the approved preliminary plan and/or development guidelines. Upon approval or
conditional approval of a preliminary plan and the completion of any conditions imposed in
connection with that approval, an application for final plan approval may be submitted. For
approval to be granted, the final plan must comply with the approved preliminary plan. This
means that all conditions imposed by the city commission as part of its approval of the
preliminary plan have been met and; The final plan does not change the general use or
character of the development; The final plan does not increase the amount of improved gross
leasable non-residential floor space by more than five percent, does not increase the number
of residential dwelling units by more than five percent and does not exceed the amount of any
density bonus approved with the preliminary plan; The final plan does not decrease the open
space and/or affordable housing provided;The final plan does not contain changes that do not
conform to the requirements of this chapter,excluding properly granted deviations,the
applicable objectives and criteria of section 38.430.100, or other objectives or criteria of this
chapter. The final plan must not contain any changes which would allow increased
deviation/relaxation of the requirements of this chapter; and the final plat, if applicable, does
not create any additional lots which were not reviewed as part of the preliminary plan submittal.
Final plan approval. The final plan may be approved if it conforms to the approved preliminary
plan in the manner described above. Prior to final plan approval, the review authority may
request a recommendation from the DRB, DRC, ADR staff, or other entity regarding any part of
a proposed final plan.
9. BMC 38.520.070 Location and design of service areas. No detailed service areas identified for
gas and electric entrance locations into the buildings or proposed methods to separate and
mitigate impacts as required. Show gas and electric locations with the true size and extent of
all proposed meters as required per SP1 on entire site and the proposed locations for private
utility entrance locations into the buildings. Planned unit development final plan must provide
clear information on utility entrances into each building and demonstrate compliance with this
code section with the subsequent site plan.
10. BMC 38.540.070 Off-site parking. Provide site plan for offsite parking that demonstrates the
proposed lot meets all requirements of the BMC and the off-site parking code section. Clarify
the uses proposed to utilize the offsite parking and provide exhibit showing compliance with
distance requirements per use. Provide draft long term parking agreement or draft deed
restriction in order to demonstrate compliance with BMC 38.540.070.6 with planned unit
development final plan.
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
r
B®Z E MAN MT
Planning
11. BMC 38.550.050.1. Irrigation plans are required to be submitted with the PUD open space
landscape plan with the subsequent site plan application.
12. BMC 38.550.060.A.1. The PUD open space landscape plan must meet the requirements of 23
performance points and be finalized and completed with the subsequent site plan application.
13. BMC 38.400.050.A1. The property owner's association must maintain the proposed on street
angled parking allowed on East Cottonwood Street including snow plowing and maintenance of
the parking surfaces. The property owners' association documents must include language to
this effect and be reviewed and approved prior to final PUD approval.
14. BMC 38.400.010.A.8 The existing satellite dish encroaching into the emergency access route
must be removed prior to final PUD approval to ensure emergency services are not inhibited.
15. BMC 38.400.090.D.2 The applicant has indicated that the emergency vehicle access road will
only be utilized by emergency service, as such the City's access standards do not apply
provided the following are met:
a. The property owners association documents continue language describing the
accesses may only be utilized be emergency services. The language must be
reviewed and approved prior to final PUD approval.
b. City approved barricades are placed at both the north and south access points
c. The street vision triangles for the north and south access points be removed from the
final PUD submittal
16. BMC 38.400.100.0 Street vision triangles shown on the preliminary PUD submittal exceed the
City's requirements. The final PUD submittal must correctly show the City's street vision
triangles prior to approval.
17. BMC 38.410.060.A An amended plat must be completed prior to final PUD approval for the
proposed changes to the lots.
a. The public utility easements along the property street frontages must be provided
using the City's standard language prior to final PUD approval. No encroachments
may be permitted without the approval from the utility companies registered with the
Montana Public Service Commission.
b. The public access easements for required public sidewalks located outside of the
right-of-way must be provided using the City's standard language prior to final PUD
approval.
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
ti
4
BOZEMAN MT
Planning
c. A public drainage easement must be provided for the drainage infrastructure
supporting the public right-of-way which is located inside of the property. The
easement must be provided, reviewed, and approved by the City prior to final PUD
approval.
18. BMC 38.410.070.A.1 Certified water and sewer design reports must be provided prior to final
PUD approval.
19. BMC 38.410.080.A A certified drainage report for the public right-of-way drainage must be
reviewed and approved by the City prior final PUD approval.
a. The applicant must submit a stormwater maintenance plan for the proposed
stormwater infrastructure for review and approval prior to final PUD approval. The
approved maintenance plan be included.within the property owner's associate
document prior to final PUD approval.
20. BMC 38.430.070.A a.All public infrastructure, both on and offsite, must be installed with the
first phase of development.
This City Commission decision may be appealed according to the provisions of BMC 38.250,090.
An aggrieved person may present to the court of record a petition, duly verified;setting forth that
such decision is illegal in whole or part and specifying the grounds of illegality. Such petition shall be
presented to the court within the timeframe established by state law.
If you have any questions, feel free to contact me at 582-2259 or bkrueger .bozeman.net.
Respectfully,
7
Brian Krueger, Development Review Manager
C: Bangtail Partners, LLC PO Box 10195 Palo Alto, CA 94303
Imperial Development LLC 33 North Black Avenue Bozeman, MT 59715
20 East Otive Street O P.O. :.
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
18516 City Commission Staff Report for the Cottonwood and Ida (PUD) Preliminary
Plan
Date: City Commission Public Hearing March 25, 2019 City Commission Room,
Bozeman City Hall, 121 North Rouse Avenue Bozeman, MT 59715
Project Description: A Preliminary Planned Unit Development (PUD) application to allow
a mixed residential and commercial development with relaxations to zoning regulations
requested for apartment building use, building height parking, street design, restaurant
design, transparency, front setbacks and a request for concurrent construction.
Project Location: 615 East Cottonwood Street and 720 North Ida Avenue. The parcels
are legally described as Lots 5-16, Block 106 including a vacated alley and Lots 17-28,
Block 105 including a vacated alley in the Northern Pacific Addition to Bozeman located
in S06, T02 S, R06 E, P.M.M., Gallatin County, Montana.
Recommendation: Approval with conditions and code provisions
Motion: "Having reviewed and considered the application materials, public comment,
and all the information presented, I hereby adopt the findings presented in the staff
report for application 18516 and move to approve the Cottonwood and Ida Planned Unit
Development application subject to conditions and all applicable code provisions."
Report Date: March 13, 2019
Staff Contact: Brian Krueger, Development Review Manager
Executive Summary
The property owner and applicant submitted an application to develop an existing
underutilized site in the Northeast Historic Mixed Use District, NEHMU. The site is
accessed from a future extension of East Aspen Street and from East Cottonwood
Street. The development proposes a mix of uses including apartment buildings, an
office building, a mixed use building including artisan manufacturing and a restaurant
building. The proposal include four buildings. The largest building includes
apartments, 64 units, and offices, 29,700 sq. ft., separated horizontally over an
underground parking structure consisting of 96 parking spaces. The other buildings on
site include a 12 unit apartment building, a mixed use building with artisan
manufacturing, 5,400 sq. ft. with 16 units mixed into the building and one 2,150 square
foot commercial restaurant building. The application includes the concurrent
construction of East Aspen Street, North Ida Avenue and the north half of East
Cottonwood Street.
The subject property is zoned Northeast Historic Mixed Use District. The site is 2.06
acres in size. The north half of the property includes four multi use storage and
warehouse buildings constructed beginning in 1960. All buildings on the north half of
546
18516 Staff Report for thet ttonwood and Ida Planned Unit Develpment PUD Page 2 of 35
the property are proposed for demolition. The south half of the site includes a grain
warehouse building constructed in 1930. The grain warehouse is proposed to remain
and be adaptively reused through the site development process for use as a
restaurant/community building.
Eleven relaxations to the Bozeman Municipal Code (BMC) zoning regulations are
proposed with the application:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of
the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom
units from 1.5 spaces per unit to 1.25 spaces per unit.
10.BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11.BMC. 38.400.050.A.1 Street Design. The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
Concurrent construction of the adjacent streets, site infrastructure and buildings is
proposed.
The criteria for granting a PUD are found in BMC 38.430.090.
A PUD is a discretionary approval and the review authority must find that the overall
development is superior to that offered by the basic existing zoning standards as required
in BMC 38.20.030.A.4. The intent of a PUD is to promote maximum flexibility and
547
18516 Staff Report for thettonwood and Ida Planned Unit Deve^ent PUD Page 3 of 35
innovation in development proposals within the City.The applicants can request
relaxations from the code in exchange for a higher quality of design.The obligation to show
a superior outcome is the responsibility of the applicant. The applicant asserts that the
overall outcome of the proposal is superior to what would be obtained from the application
of the default NEHMU district.
The Development Review Committee (DRC) has reviewed the application. Based on its
evaluation of the application against the criteria, the DRC found the application
adequate for continued review. The DRC supports the granting of concurrent
construction for this project with the satisfaction of all code requirements related to
concurrent construction with the final planned unit development application.
The Design Review Board (DRB) reviewed the application on February 27, 2019. The
Design Review Board is the design review advisory body to the City Commission on
this application. The DRB recommended approval of the project with the conditions
and code provisions outlined in this staff report.
The Recreation and Parks Advisory Board Subdivision Committee reviewed the
application on March 8, 2019 and recommended approval of the applicant's proposal
to utilize cash in lieu of parkland for the parkland requirement for the development.
The Community Affordable Housing Board reviewed the application on March 13, 2019
and recommended approval of the applicant's proposal to utilize affordable housing in
order to meet PUD performance points.
Public comment has been received on this application. As of the writing of this report
there were eight public comments received. Seven were in favor of the application and
one was not in favor of the application citing reduced setbacks, parking reductions and
increased building height.
Unresolved Issues
There are no unresolved issues with the application.
Alternatives
1. Approve the application with the recommended conditions and report findings;
2. Approve the application with modifications to the recommended conditions and
modifications to the report findings;
3. Deny the application based on findings of non-compliance with the applicable criteria
contained within the staff report; or
4. Open and continue the review on the application with the concurrence of the applicant,
with specific direction to staff or the applicant to supply additional information or to
address specific items.
548
18516 Staff Report for the9ottonwood and Ida Planned Unit Deveipment PUD Page 4 of 35
TABLE OF CONTENTS
ExecutiveSummary............................................................................................................::...................1
UnresolvedIssues.....................................................................................................................................3
Alternatives................................................................................................................................................3
SECTION 1 - MAP SERIES............................................................................................................................5
SECTION 2 - REQUESTED RELAXATION / DEVIATIONS /VARIANCES................................ 14
SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL..................................................... 14
SECTION 4- REQUIRED CODE PROVISIONS................................................................................... 17
SECTION 5 - STAFF ANALYSIS AND FINDINGS............................................................................... 17
APPENDIX A-PROJECT SITE ZONING AND GROWTH POLICY.................................................33
APPENDIX B - OWNER INFORMATION AND REVIEWING STAFF..........................................34
APPENDIX C -PLANNED UNIT DEVELOPMENT INTENT...........................................................34
ATTACHMENTS...........................................................................................................................................35
549
18516 Staff Report for thettonwood and Ida Planned Unit Devepment PUD Page 5 of 35
SECTION 1 - MAP SERIES
lot
r - 4
_..�.. ..�.,�_ E TAMARACK tiT
i
RNA
� L►LJ
Q:
Alm
Lei
OrMOF
a
m t. -mop' 171
JON OW
� �,♦ �_► it c �.�-� {
; Y,
'�"'*—'err �► -� �,- _ .�1[J� '"'�i_
E CnT'I'UNWOOD ST y �-I M, wn U ��
MCI
Is
At
I
Legend
i Planning Projects selection +M�sir E PE ZE" ST
Roads1�
ANeys �
City Limits
C
BZoning Districts
Plarming Projects .
Zoning Classification
550
18516 Staff Report for Attonwood and Ida Planned Unit Deve@Vment PUD Page 6 of 35
E TAMARACK ST
s�
[,ASPENS ST
E ASPEN\ ST
{
� a
E C(INTO-'1V006',S� w
Legend
Planning Projects selection
Parcels
Alleys
a
' City Limits
0 Planning Projects
Community Plan Putwe Land Use �
Residential —
t
Residential Emphasis Mixed Use
Suburban Residential
Regional Commercial and Services
C] Community Coro
Community Commercial Mired Use
Busirross Perk Mixed Use ;E,rPEACH ST'
[] Industrial
Public Institutions
;u
C] Parks,Open Space and Recreational Lands
Other Pubic Lands
Goll Course
u Present Rural f
it A.
Growth policy designation
551
18516 Staff Report for thettonwood and Ida Planned Unit Develpnent PUD Page 7 of 35
E TAAIA.RACK ST
1 •`
i F, ASPEN ST
II E;ASPEN ST � J
Legend I
1...1 Planning Prolacts selection r
City Llmils(111118)
0 Mixed Use
Q Restauranit8az • � C0'1.TOlYWUUll ST
0 Commercial Retail Sales,Services,Banks _ —
HoteltMotei
Q Commercial Auto
�1' r
AdministrativelProfessianal 1
Light Manufacturing
Q God Course� Pgik or Open Space
Q Conservation Easement <w „
(] Church
Public Facility
SchoaEducational Facility
Q Single-Household Residential
Q Ou*-MTdplox ResWential � ;;w J t
Q Multi-Household Residential ��
® Mobile HomelMobile Park k r
Q Right-ol-Way k� fi • ••F
Q undeveloped E PEACH ST w
Vacant -
_ Parcels
Roads �
i Alleys 'Q'
l City Limits
Planning Projects C J
Current Land Use
552
-- ------ --�--------�—�— � __ _ I alw3nrY61u>rai II
--, —1— T� 9 �
• �� 1� r!
�/i • I f I �
IT
I` I Is
i L I :1, r 110 r v&-wi YYrm,., , f I
> r • f 1
I
l I Lem
� � 1
o
df
3� ! •� I.. �� I , ®lYUU11fA1 OJEO[� 1 't / I
_____-__-_-_ ..--
1 �
18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 9 of 35
R
1 1
1 � I M
r y
H�E
WJWW
Tf
L7
' I.
I
I
1 h I
bR
1
I
[r r I
_ . to a - • I
- s
NO
- (V•If'It'.!II'1������9?..fir � ``�
554
18516 StafjF'Report for the Cottonwood and Ida Planned Unit Development PUD Page 10 of 35
RESIDENTIAL
COMMERCIAL
ARTISAN MFR.
COMMUNITY
a �
1
' S
�ti t �
555
18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 11 of 35
.y(AAW. tYtafl WWC�Ka wiYL .Rm AYl T1fAf
JF77
all-
YYwM)4 YY/. I Y.yY.YY/IxA r ,Y.ARKV KA Ytl Yf
�YMYMVd !�' Tp�YWAV,IBx. )n .r-fAY.M aOta,
rPC.tOt11YgIYlf[. NY•r.>YXYlNAY.
p.Y6.A0Y40Y�M.'S
PV7mM1Y fW I[IJO YY Nl.uWf
ItAiri ILY1
�uwY.uw �y�
i
raufors I -�—«�om
�� 1- .. f •1 a a
faYY..f
�i'[b0[RAYr•A.f.CY ��pff ifYATfgi-
�C-I' �J�t.fOY.1.lPfR.M R!.O®vv11O uI.a MORK.O:�si�A m.11Ort Yf
- N�i�wIfYAYYA Wyli YWwilf Aln.
.HYYYtaYYM,K♦ YY1¢FYWaI.
nPRO1W..dc. a. Ya)Rd1wrlY.xi •w
.�.ApN1eA.1
WQaiY
YpYYW V nrOR� ��FAY
fOK yp �Ys
' iTn Am Q q an
Q
e a m a Ih m a B [III
rn� t r w:o
..Yx..,..,.r,.Y�A. Yam... ..,.,. ..
�IRO�RJ.O COROM/O00 ���aLYA/OlI.IOV�ICOTIOM000I Yv.xrt,.-.m
556
18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 12 of 35
tT 1 z i
IT,
,fY1AI�AtE t A4�.E65 _ h nYnttA.Ya .Y�w.c wttw.a .ay _ ' CA AM
wAp Rcrt{pAW
t FY��t:�.ew�tzurx
OIOO, I BDOI SIM= RDO,
F ,awl mco srao
f
vrnnYvr wa wr, _ I�
7 r f as f� ewe[ ,aoo meo Fm
ova tAW./ gAAYE
n hVa � Q � tAs� YrW 1no 1
RAUAQAM t
fNM6N..0
n�na,�or.rt
mwo•oerm
a� r..w�ra.�.e•
f .am aent�vww
=rY�t. _�Mi
557
18516 Staff Report for the Cottonwood and Ida Planned Unit Development PUD Page 13 of 35
.,m, YL61
��
..ate ...v ��.
AOIf)•H. O �� •O �� O -
r �/� 1 -1 ~-i'- r+i, .J+/ Ir •• T I COrtpMf0003T.
�t�llasg�lw'las�oarvlxaooct
VIA LEl
_ _ MDOt tt
1171 1l' 141 t TO,?.
.
q I�
!r:11�.�AmLL.-,•�.i "�'.1- _�P_ I�.....,.F ;.�}- � IT��- �=1 tJ 1 �1�— s_1 t�p��i�. '�i ��.11—• �f F= Ilr� —„i,F1;.F4�==1 —j� Il^�{— f—��.,��I .� � •1--+1 F"—�_—i F'T,Ld.: +--�; rJ_�],Eit f
LL06, 8=4
1
1I-F �ipll I 1
F
, ((pp ::!R•""
�•� a=1 � -�I .. � � I _ 16:i t 1 �� 1 iF1+F� IiJ�f— �.lf��f—I`FI'` I
1��sEawlr.r,s�anca noc
558
17232 Staff Report for the'gridger Vale Planned Unit Developmen'PUD) Page 14 of 35
SECTION 2 - REQUESTED RELAXATIONS
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of
the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom
units from 1.5 spaces per unit to 1.25 spaces per unit.
10.BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11.BMC. 38.400.050.A.1 Street Design. The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
The relaxations may be granted with a Planned Unit Development (PUD).The criteria for
granting PUD relaxations are included in BMC 38.430.030.A.4.c. Staff has reviewed the
criteria and finds that they are met for all eleven relaxations with the adoption of the staff
analysis and findings below for justification.
SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this
report.
1. The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, does not, in any way, create a waiver or
other relaxation of the lawful requirements of the Bozeman Municipal Code or state
law.
559
18516 Staff Report for theOttonwood and Ida Planned Unit Devetnent Page 15 of 35
2. The final planned unit development plan must be submitted,reviewed,and approved
prior to the approval of any subsequent site plan.
3. The requested relaxations to the following sections are granted as proposed in the
application materials and must be reflected in the final planned unit development
plan, design guidelines and associated property owners' association documents as
approved:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add
apartment buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size
of the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45'to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40%to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15%to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes
to reduce the requirement for efficiency units from 1.25 spaces per unit to 1
space per unit. The application proposes to reduce the requirements for one
bedroom units from 1.5 spaces per unit to 1.25 spaces per unit.
10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11. BMC. 38.400.050.A.1 Street Design.The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
4. Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a
vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06
E, P.M.M., Gallatin County, Montana must be aggregated and/or the common
boundaries of said lots must be reconfigured through the applicable subdivision
review process to accommodate the project prior to final planned unit development
plan approval.
S. Ten foot front setback utility easements must be provided for as shown on the
preliminary planned unit development plans either through individual recordable
documents or thorough the subdivision exemption review process prior to final
560
18516 Staff Report for the'L"ottonwood and Ida Planned Unit Develtment Page 16 of 35
planned unit development plan approval.
6. Public access easements must be provided for as shown on the preliminary planned
unit development plans for all publicly accessible open space areas prior to final
planned unit development plan approval.
7. No property may be removed from the covenants without written approval of the City
of Bozeman.
8. The City of Bozeman has relied upon the overall design and design standards required
as part of the planned unit development application.The design and design standards
may not be altered without consent of the City.
9. A notice prepared by the City must be filed concurrently with the amended plat so
that it will appear on title reports. It must read substantially as follows The Amended
Plat of Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105
including a vacated alley in the Northern Pacific Addition to Bozeman located in S06,
T02 S, R06 E, P.M.M., Gallatin County, Montana known as the Cottonwood and Ida
Planned Unit Development (PUD) are subject to specific design standards, unique
building setbacks and heights, parking requirements and uses. These standards may
be found in [insert correct reference to design standard location]. Lot owners are
advised that these are specific to the Cottonwood and Ida Planned Unit Development
and are in place of the general development standards of the same subject of the City
of Bozeman Zoning. If a development standard is not specifically established in the
Cottonwood and Ida PUD approval documents the general standards of the City apply.
Modification of the special standards would require an amendment to the
Cottonwood and Ida Planned Unit Development. Modifications are strongly
discouraged. It is the obligation of the lot owner to be fully informed as to these
standards before beginning any home or site design process.Approval by the design
review entity established in the covenants of the development does not bind the City
of Bozeman to approve a construction plan.
10. The applicant must execute at the Gallatin County Clerk&Recorder's Office prior to
approval of the final Planned Unit Development, a waiver of right-to-protest creation of a
City-wide special district for parks and trail, which would provide a mechanism for the
fair and equitable assessment of costs for City parks and trails.
11.The offsite parking agreement must be for a minimum term of 25 years and must be
completed, executed and filed prior to subsequent site plan approval.
12.The offsite parking agreement must be incorporated into the property owners'
association documents as a required responsibility of the association along with the
requirement to assess for and pay any required fees to satisfy the long term offsite
parking agreement.
13. Prior to planned unit development final plan approval the applicant must provide the
following modified historic property record documentation for the demolition of the
existing structure at 620 E. Cottonwood Street: Property address, legal location,
architectural description, digital interior and exterior elevation photographs, site
map,and a quadrangle map.A modified completion of the Montana Historic Property
561
18516 Staf f Report for thOotton wood and Ida Planned Unit Deveoment Page 17 of 35
Record is a documentation of the current structure conditions and not an analysis of
the historic integrity of property. The modified property card will be housed
permanently online on the City's Architecture Inventory Map.
14.A deed restriction requiring affordable housing in the applicable amount proposed
for planned unit development performance per the definition in BMC 38.700.020
must be placed on Lot A, underlying buildings 1, 2, and 6.
15. If not already filed for the subject site, the applicant must provide and file with
the County Clerk and Recorder's office executed Waivers of Right to Protest
Creation of Special Improvement Districts (SID's) for the following:
a. Street improvements to East Aspen Street including paving, curb/gutter,
sidewalk, and storm drainage
b. Street improvements to Ida Avenue including paving, curb/gutter, sidewalk,
and storm drainage
c. Street improvements to Front Street including paving, curb/gutter, sidewalk,
and storm drainage
d. Street improvements to East Tamarack Street including paving, curb/gutter,
sidewalk, and storm drainage
e. Street improvements to East Peach Street including paving, curb/gutter,
sidewalk, and storm drainage
f. Street improvements to Front Street including paving, curb/gutter, sidewalk,
and storm drainage
g. Intersection improvements to North Wallace Avenue and East Tamarack
Street
h. Intersection improvements to North Wallace Avenue and East Peach Street
i. Intersection improvements to Front Street and East Aspen Street
j. Intersection improvements to Front Street and Ida Avenue
The document filed must specify that in the event an SID is not utilized for the
completion of these improvements, the developer agrees to participate in an
alternate financing method for the completion of said improvements on a fair
share, proportionate basis as determined by square footage of property, taxable
valuation of the property, traffic contribution from the development, or a
combination thereof. The applicant must provide a copy of the filed SID waiver
prior to final PUD approval.
16.The intersections of East Aspen Street and Front Street and Ida Street and Front
Street must be reconfigured to meet the City's minimum design standard. The
intersections must be improved with the first phase of development. The City's
Engineering Department may approve an alternative design incorporating the
existing park provided the City Community Development Department and Parks
Department support the alternative design. An alternative design must be approved
prior to final PUD approval.
SECTION 4-REQUIRED CODE PROVISIONS
1. BMC 38.220.050.A final approved weed control plan must be submitted prior to
planned unit development final plan approval.
562
18516 Staff Report for thA
ttonwood and Ida Planned Unit Develpment Page 18 of 35
2. BMC 220.080. Irrigation water. Clarify proposed water demand for irrigation
system. Clarify the nature of the existing well and water right to support the new
demand. Provide letter from DNRC confirming water right or intent to issue right to
support the project prior to approval of the planned unit development final plan.
3. BMC 38.220.300 and 310.The property owners' association documents must
include the requirements of Section 38.220.300 and 320.The proposed documents
must be finalized and recorded with the planned unit development final plan.
4. BMC 38.230.020.A and C. a subsequent site plan application is required to be
reviewed and approved for all phases of this development prior to building permit
issuance.
5. BMC 38.270.030.D For concurrent construction provide a full response to the
required items in Section 38.270.030.D BMC. The concurrent construction response
was provided, but not in accordance with the required section. Provide response to
PUD concurrent construction and finalize all of the required code elements prior to
the approval of the planned unit development final plan, approval of concurrent
construction and prior to building permit issuance.
6. BMC 38.410.060.B.4 Encroachments proposed in required ten foot private utility
easement areas required along all streets. No written approval from all utility
companies is provided as required. The current and entire list of utility companies
operating in Montana can be attained from the Montana Public Service Commission.
Provide approval for encroachment prior to approval of planned unit development
final plan.
7. BMC 38.420.030 Cash in lieu of land dedication for parkland. Cash in lieu of
parkland has not been paid. The cash in lieu amount due is required to be paid prior
to subsequent site plan approval.
B. BMC 38.430.040.A.3 outlines the review and approval process for the planned unit
development final plan. Final plan review and approval. The final plan must be in
compliance with the approved preliminary plan and/or development guidelines.
Upon approval or conditional approval of a preliminary plan and the completion of
any conditions imposed in connection with that approval, an application for final
plan approval may be submitted. For approval to be granted, the final plan must
comply with the approved preliminary plan. This means that all conditions imposed
by the city commission as part of its approval of the preliminary plan have been met
and: The final plan does not change the general use or character of the development;
The final plan does not increase the amount of improved gross leasable non-
residential floor space by more than five percent, does not increase the number of
residential dwelling units by more than five percent and does not exceed the
amount of any density bonus approved with the preliminary plan; The final plan
does not decrease the open space and/or affordable housing provided; The final
plan does not contain changes that do not conform to the requirements of this
chapter, excluding properly granted deviations, the applicable objectives and
criteria of section 38.430.100, or other objectives or criteria of this chapter.The
final plan must not contain any changes which would allow increased
563
18516 Staff Report for thottonwood and Ida Planned Unit DeveAent Page 19 of 35
deviation/relaxation of the requirements of this chapter; and the final plat, if
applicable, does not create any additional lots which were not reviewed as part of
the preliminary plan submittal. Final plan approval.The final plan may be approved
if it conforms to the approved preliminary plan in the manner described above.
Prior to final plan approval,the review authority may request a recommendation
from the DRB, DRC,ADR staff, or other entity regarding any part of a proposed final
plan.
9. BMC 38.520.070 Location and design of service areas. No detailed service areas
identified for gas and electric entrance locations into the buildings or proposed
methods to separate and mitigate impacts as required. Show gas and electric
locations with the true size and extent of all proposed meters as required per SP1 on
entire site and the proposed locations for private utility entrance locations into the
buildings. Planned unit development final plan must provide clear information on
utility entrances into each building and demonstrate compliance with this code
section with the subsequent site plan.
10. BMC 38.540.070 Off-site parking. Provide site plan for offsite parking that
demonstrates the proposed lot meets all requirements of the BMC and the off-site
parking code section. Clarify the uses proposed to utilize the offsite parking and
provide exhibit showing-compliance with distance requirements per use. Provide
draft long term parking agreement or draft deed restriction in order to demonstrate
compliance with BMC 38.540.070.6 with planned unit development final plan.
11. BMC 38.550.050.I. Irrigation plans are required to be submitted with the PUD
open space landscape plan with the subsequent site plan application.
12.BMC 38.550.060.A.1.The PUD open space landscape plan must meet the
requirements of 23 performance points and be finalized and completed with the
subsequent site plan application.
13.BMC 38.400.050.A1.The property owner's association must maintain the
proposed on street angled parking allowed on East Cottonwood Street including
snow plowing and maintenance of the parking surfaces. The property owners'
association documents must include language to this effect and be reviewed and
approved prior to final PUD approval.
14.BMC 38.400.010.A.8 The existing satellite dish encroaching into the emergency
access route must be removed prior to final PUD approval to ensure emergency
services are not inhibited.
15. BMC 38.400.090.D.2 The applicant has indicated that the emergency vehicle access
road will only be utilized by emergency service, as such the City's access standards
do not apply provided the following are met:
a. The property owners association documents continue language describing
the accesses may only be utilized be emergency services.The language must
be reviewed and approved prior to final PUD approval.
564
18516 Staff Report for thet ttonwood and Ida Planned Unit Develtment Page 20 of 35
b. City approved barricades are placed at both the north and south access
points
c. The street vision triangles for the north and south access points be removed
from the final PUD submittal
16. BMC 38.400.100.0 Street vision triangles shown on the preliminary PUD submittal
exceed the City's requirements.The final PUD submittal must correctly show the
City's street vision triangles prior to approval.
17.BMC 38.410.060.A An amended plat must be completed prior to final PUD approval
for the proposed changes to the lots.
a. The public utility easements along the property street frontages must be
provided using the City's standard language prior to final PUD approval. No
encroachments may be permitted without the approval from the utility
companies registered with the Montana Public Service Commission.
b. The public access easements for required public sidewalks located outside.of
the right-of-way must be provided using the City's standard language prior to
final PUD approval.
c. A public drainage easement must be provided for the drainage infrastructure
supporting the public right-of-way which is located inside of the property.
The easement must be provided, reviewed, and approved by the City prior to
final PUD approval.
18.BMC 38.410.070.A.1 Certified water and sewer design reports must be provided
prior to final PUD approval.
19.BMC 38.410.080.A A certified drainage report for the public right-of-way drainage
must be reviewed and approved by the City prior final PUD approval.
a. The applicant must submit a stormwater maintenance plan for the proposed
stormwater infrastructure for review and approval prior to final PUD
approval. The approved maintenance plan be included within the property
owner's associate document prior to final PUD approval.
20.BMC 38.430.070.A a.All public infrastructure,both on and offsite,must be installed
with the first phase of development.
SECTION 5 -STAFF ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application
materials, municipal codes, standards, plans, public comment, and all other materials
available during the review period. Collectively this information is the record of the review.
The analysis in this report is a summary of the completed review.
565
18516 Staff Report for thattonwood and Ida Planned Unit Develoment Page 21 of 35
Applicable Plan Review Criteria,Section 38.230.100,BMC.
The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, do not in any way create a waiver or other
relaxation of the lawful requirements of the Bozeman Municipal Code or State law.
In considering applications for plan approval under this title,the advisory boards and
City Commission shall consider the following:
1. Conformance to and consistency with the City's adopted growth policy
Yes. The property has a future land use designation of Industrial and is zoned NEHMU,
Northeast Historic Mixed Use. The proposed residential units, office and restaurant uses
and artisan manufacturing uses increase the intensity of commercial uses and the
density of residential uses beyond the existing development pattern.The change in
intensity is anticipated by the growth policy in areas of the city with adequate
infrastructure.The project is in conformance to and consistent with the City's adopted
growth policy, the Bozeman Community Plan, including the following goals and
objectives:
Goal LU-1: Create a sense of place that varies throughout the City, efficiently
provides public and private basic services and facilities in close proximity to
where people live and work,and minimizes sprawl.
The NEHMU district has a distinct sense of place,this project contributes to an existing
and expanding mixed use area and allows people to live in close proximity to work,
public and private basic services and minimizes sprawl.
Objective LU-1.4 Provide for and support infill development and redevelopment
which provides additional density of use while respecting the context of the
existing development which surrounds it. Respect for context does not
automatically prohibit difference in scale or design.
This project provides additional density of residential and commercial use while
respecting the context of the mixed use area.The change in scale is allowable with the
design presented as it has human scale and is compatible with the district with building
sized within their context and integrated into the neighborhood.
Objective LU-2.3: Encourage redevelopment and intensification,especially with
mixed uses, of brownfields and underutilized property within the City consistent
with the City's adopted standards.
This project includes mixed uses and increase residential density and is proposed on
underutilized property in an ongoing and developing mixed use district.
Objective E-4.2: Promulgate efficient land use practices.
566
18516 Staff Report for thettonwood and Ida Planned Unit Develt ent Page 22 of 35
This project promulgates efficient land use practices and provides a high net residential
density and FAR with office, manufacturing and restaurant uses, while adding a
significant amount of usable open space area that can be used by the entire community.
Objective C-2.S Explore and encourage innovative parking solutions for both
residential and commercial projects including parking best practices, expanding
parking districts,cash in lieu of parking and design guidelines for structured
parking.
This project proposes a parking reduction, structured parking integrated into the
building design and offsite parking that will allow the project to provide an intensity of
use today while having the ability to adapt to the changing transportation
infrastructure in town including autonomous vehicles, ridesharing, car sharing, and
increased transit service.
Goal H-1: Promote an adequate supply of safe, quality housing that is diverse in
type,density,cost,and location with an emphasis on maintaining neighborhood
character and stability.
This project provides additional quality housing at high density in an area that has
historically included smaller residential low density uses. More recent infill projects in
this neighborhood have included apartment uses over mixed commercial uses. This
project will add to the neighborhood character and the stability of this area. Residential
uses provide additional eyes on the street and have a twenty four hour presence that
will make the district safer and enhance the overall neighborhood.
For more information on the growth policy designation please see Appendix A.
2.Conformance to this chapter, including the cessation of any current violations
Yes. The project, if approved,will conform to the Bozeman Municipal Code other than
the requested relaxations.There are no known documented violations of the BMC for
this property. Code provisions are provided related to final planned unit development
plan approval and subsequent site plan approval.
3.Conformance with all other applicable laws, ordinances,and regulations
Yes. The proposed uses of the site are consistent with the allowed uses of the NEHMU
district with the additional of the apartment building use. No specific conflicts have
been identified.Additional steps will be required including but not limited to final
payment for cash in lieu of water rights, approval of the final planned unit development,
subdivision exemption to realign and aggregate the underlying lots, dedication of the
utility easements, construction of infrastructure, PUD final plan documents and
application, site plan approval and building permits.The Building Division of the
Department of Community Development will review the requirements of the
567
18516 Staff Report for theOtton wood and Ida Planned Unit Devef)ment Page 23 of 35
International Building Code for compliance at the time of building permit application.
Conditions of approval and code provisions are provided related to these issues.
Condition of approval 1 requires full compliance with all applicable code requirements.
4.Conformance with special review criteria for applicable permit type as
specified in article 2
Yes. The CUP and PUD criteria are reviewed below. The project meets the requirements
and criteria as presented.
S.Conformance with the zoning provisions of article 3, including permitted uses,
form and intensity standards and requirements,applicable supplemental use
criteria,and wireless facilities and/or affordable housing provisions if applicable
Yes. The uses are permitted in the NEHMU district with the addition of apartment
building uses requested through relaxation. Form and intensity standards are met with
the proposal other than the proposed relaxations for the front setback and zero lot line
conditions,lot coverage and building heights.Affordable housing is proposed in
compliance with the PUD performance standards and will be confirmed through the
planned unit development final plan process. Condition of approval 14 requires a deed
restriction to assure the applicability of the affordable housing long term is proposed.
The north half of the property includes four multi use storage and warehouse buildings
constructed beginning in 1960.All buildings on the north half of the property are
proposed for demolition. The south half of the site includes a grain warehouse building
constructed in 1930.The grain warehouse is proposed to remain and be adaptively
reused through the site development process for use as a restaurant/community
building.Condition of approval 13 is related to documentation of the grain warehouse
prior to modifications to the building.
6. Conformance with the community design provisions of article 4, including
transportation facilities and access, community design and element provisions,
and park and recreational requirements
Yes. The proposed streets meet standards with the proposed relaxations. East Aspen
Street, East Cottonwood Street and North Ida Avenue are required to be improved with
this project. The proposed parking is to be met with reductions allowed through
relaxation of the parking requirements. Pedestrian access is provided from the street
directly through and into the project.The primary entrances into each building are
connected to the City's sidewalk system. Perimeter street frontage sidewalks are
provided on every perimeter street in conformance to standards. The lots and block
meet standards,water and sewer is provided to each lot through mains within the city
owned rights of way. The applicant will be constructing water mains to support the site.
Site surface drainage generally meets standards at this level in the design for the streets
568
18516 Staff Report for thettonwood and Ida Planned Unit Devel*ent Page 24 of 35
and development. Cash in lieu of water rights is proposed and will be paid with the final
site plan for site development.
The applicant proposes to pay cash in lieu of parkland in conformance with standards,
capped at twelve dwelling units per acre.The Recreation and Parks Advisory Board
Subdivision Committee supports the use of cash in lieu for this project and recommends
approval.
Small encroachments are proposed into the required front setback utility easements.
Condition of approval 5 requires the establishment of utility easements to serve the
property and the surrounding utility grid. Code provision 6 requires approval of the
utility holders prior to final approval of the encroachments.
Concurrent construction of East Aspen Street, East Cottonwood Street and North Ida
Avenue and the associated sewer and water mains is proposed.The Development
Review Committee reviewed the request for concurrent construction with the
understanding that the applicant agrees to standards and to complete the requirements
in BMC 38.270.030.D with the planned unit development final plan and prior to building
permit issuance.The Development Review Committee recommends concurrent
construction be approved with all the required code elements.
7.Conformance with the project design provisions of article 5, including
compatibility with, and sensitivity to,the immediate environment of the site and
adjacent neighborhoods and other approved development; design and
arrangement of the elements of the plan; landscaping; open space; lighting,
signage;
The development is compatible with and sensitive to the immediate environment of the
site and the adjacent neighborhoods and other approved development relative to,
building mass and height, landscaping, orientation of parking and building placement
on the site. The buildings comply with permanence in building materials,building
quality, architectural integration, neighborhood identity, and orientation of parking and
service areas. The general approach to landscaping meets standards.
The design of the plan is consistent with the existing natural topography. The site will
be raised to allow the inclusion of underground parking. There are no water bodies or
significant existing vegetation on site.
A general comprehensive signage is proposed in conformance with standards.
Parking is proposed to be reduced via a relaxation for both residential and commercial
uses. 96 parking spaces are proposed in an underground parking structure and 72
parking spaces are proposed offsite for the non-residential uses. 32 on street spaces are
proposed for residential use. Prior to reductions the project would have required 255.3
parking spaces,with reductions the required parking is proposed at 166.1 parking
569
18516 Staff Report for theettonwood and Ida Planned Unit Develpment Page 25 of 35
spaces. 200 parking spaces are proposed to be provided through a combination of
onsite, offsite and on street as outlined above.The offsite parking must have a long term
lease established prior to final approval of the site plan and be integrated into the
property owners association documents as a required element per conditions of
approval 11 and 12.
8. Conformance with environmental and open space objectives set forth in
articles 4-6, including the enhancement of the natural environment,
watercourse and wetland protections and associated wildlife habitats; and if the
development is adjacent to an existing or approved public park or public open
space area, have provisions been made in the plan to avoid interfering with
public access to and use of that area
Yes. Pervious pavers are proposed to treat stormwater from the development. This is in
compliance with best practices for Low Impact Development.The approach to the
stormwater system meets code standards.The final review of the stormwater system
will occur with the site plan review. The development is adjacent to a small public park
and climbing boulder. No significant impact to the park is anticipated from this
development.
9.Conformance with the natural resource protection provisions of article 4 and
article 6
Yes. No streams, floodplains, critical plant communities or wetlands exist on site.
10. Other related matters, including relevant comment from affected parties
Public comment has been received on this application.As of the writing of this report
there were eight public comments received. Seven were in favor of the application and
570
18516 Staff Report for theOttonwood and Ida Planned Unit Develipment Page 26 of 35
one was not in favor of the application citing reduced setbacks, parking reductions and
increased building height.
11.If the development includes multiple lots that are interdependent for
circulation or other means of addressing requirement of this title,whether the
lots are either:
a. Configured so that the sale of individual lots will not alter the approved
configuration or use of the property or cause the development to become
nonconforming; or
b.The subject of reciprocal and perpetual easements or other agreements to
which the City is a party so that the sale of individual lots will not cause one or
more elements of the development to become nonconforming
The property must be configured through the applicable subdivision review process to
relocate and aggregate common lot boundaries prior to the approval of the final PUD
plan. Condition 4 is related to this issue.
12. Phasing of development
The project is proposed to be constructed in one phase. Concurrent construction of East
Aspen Street, East Cottonwood Street and North Ida Avenue and the associated sewer
and water mains is proposed. The Development Review Committee reviewed the
request for concurrent construction with the understanding that the applicant agrees to
standards and to complete the requirements in BMC 38.270.030.1)with the planned
unit development final plan and prior to building permit issuance. The Development
Review Committee recommends concurrent construction be approved with all the
required code elements.
Conditional Use Permit Review Criteria, Section 38.230.110,BMC,
E. In addition to the review criteria of section 38.230.100, the review authority shall, in
approving a conditional use permit, determine favorably as follows:
1. That the site for the proposed use is adequate in size and topography to
accommodate such use,and all yards, spaces,walls and fences,parking,loading
and landscaping are adequate to properly relate such use with the land and uses
in the vicinity;
The site is adequate. The proposed buildings, site design, pedestrian connectivity, open
space and mix of uses will enhance the neighborhood. Landscaped areas are
coordinated with adjoining properties and within the proposed development. The
landscape design will improve the street frontages of the site.The reduced setbacks
proposed through relaxation relate well to the historic building placements within the
vicinity.All parking is proposed either in an underground structure or offsite which
571
18516 Staff Report for theOttonwood and Ida Planned Unit Deveoment Page 27 of 35
provides for an uninterrupted streetscape for pedestrians and the addition of on street
parking.
2. That the proposed use will have no material adverse effect upon the
abutting property. Persons objecting to the recommendations of review bodies
carry the burden of proof,
No adverse impacts to abutting properties have been identified. The construction of
East Aspen Street and the reconstruction and completion of North Ida Avenue and East
Cottonwood Street will improve safety for vehicles, cyclists, and pedestrians which
promotes public health and safety. General welfare will be promoted through a variety
of apartment types which will provide a variety of housing options for area residents.
The provision of additional office, manufacturing and restaurant uses to the districts
promotes general welfare by providing an expansion and additional density to the
mixed of uses in the NEHMU.The development serviced by the existing municipal
sanitary sewer and water systems promotes public health by protecting groundwater
from degradation associated with on-site septic systems and domestic wells.
Stormwater will be managed in pervious pavers and other retention facilities to filter
out sediment and treat runoff.
3.That any additional conditions stated in the approval are deemed necessary
to protect the public health, safety and general welfare.Such conditions may
include,but are not limited to:
a. Regulation of use;
b.Special yards,spaces and buffers;
c.Special fences, solid fences and walls;
d.Surfacing of parking areas;
e. Requiring street,service road or alley dedications and improvements or
appropriate bonds;
f.Regulation of points of vehicular ingress and egress;
g. Regulation of signs;
h.Requiring maintenance of the grounds;
i. Regulation of noise,vibrations and odors;
j. Regulation of hours for certain activities;
k.Time period within which the proposed use shall be developed;
1. Duration of use;
m. Requiring the dedication of access rights; and
572
18516 Staff Report for thetttonwood and Ida Planned Unit Devetment Page 28 of 35
n. Other such conditions as will make possible the development of the city in
an orderly and efficient manner.
The requirements of the DRC review and the proposed conditions outlined in this
report,the future covenants,the maintenance plans and project design guidelines
associated with the project will address these areas.
F. In addition to all other conditions,the following general requirements apply
to every conditional use permit granted:
1.That the right to a use and occupancy permit shall be contingent upon the
fulfillment of all general and special conditions imposed by the conditional use
permit procedure; and
2.That all of the conditions shall constitute restrictions running with the land
use,shall apply and be adhered to by the owner of the land,successors or assigns,
shall be binding upon the owner of the land,his successors or assigns, shall be
consented to in writing,and shall be recorded as such with the county clerk and
recorder's office by the property owner prior to the issuance of any building
permits,final plan approval or commencement of the conditional use.
The necessary recording of documents will be addressed as part of the final PUD plan
process. Conditions 3, 7, 8, and 9 are related to this issue.
Planned Unit Development Review Criteria,Section 38.430.090.E,BMC.
The application presents the applicant's response to these criteria.
2. In addition to the criteria for all site plan and conditional use reviews,the following
criteria will be used in evaluating all planned unit development applications.
a.All development.All land uses within a proposed planned unit development
shall be reviewed against,and comply with,the applicable objectives and criteria
of the mandatory"all development" group.
(1)Does the development comply with all city design standards, requirements and
specifications for the following services: water supply, trails/walks/bike ways,sanitary
supply, irrigation companies,fire protection, electricity,flood hazard areas, natural gas,
telephone, storm drainage, cable television, and streets?
Yes, except for those standards proposed for relaxation the application conforms and in
some areas exceeds standards.
(2) Does the project preserve or replace existing natural vegetation?
Yes. The site has been substantially disturbed by development and previous land uses
and does not include significant natural vegetation.There will be substantial placement
573
18516 Staff Report for thet ttonwood and Ida Planned Unit Deve*ent Page 29 of 35
of new vegetation within the site open spaces and perimeter street frontage.A code
provision requires a final weed control plan with the planned unit development and
further landscaping must be provided in accordance with code requirements with the
subsequent site plan application.
(3)Are the elements of the site plan (e.g., buildings, circulation, open space and
landscaping, etc.) designed and arranged to produce an efficient,functionally organized
and cohesive planned unit development?
Yes. The proposal is cohesive and has a variety of coordinating elements ranging from
efficient circulation, underground structured parking, integrated architecture between
buildings, presentations of building fronts to the streets, private residential open
spaces, open spaces available to the public,and multiple landscape configurations.
Condition of approval 6 requires the recordation of public access easement in order to
finalize all publicly accessible plaza and circulation areas as presented in the
preliminary plans.
(4)Does the design and arrangement of elements of the site plan (e.g., building
construction, orientation, and placement; transportation networks;selection and
placement of landscape materials;and/or use of renewable energy sources;etc.)
contribute to the overall reduction of energy use by the project?
Yes. The project proposes to construct to a LEED ND designation. LEED for
Neighborhood Development (LEED-ND),where "LEED" stands for Leadership in Energy
and Environmental Design, is a United States-based rating system that integrates the
principles of smart growth, urbanism and green building into a national system for
neighborhood design. LEED certification provides independent, third-party verification
that a development's location and design meet accepted high levels of environmentally
responsible, sustainable development.The LEED-ND system is a collaboration between
the United States Green Building Council,the Congress for the New Urbanism and the
Natural Resources Defense Council.A reduction in parking will require alternative
modes of transportation be utilized by residents, employees, and customers of the
developments. This will encourage enhanced transit to the area.
(S)Are the elements of the site plan (e.g., buildings, circulation, open space and
landscaping, etc.) designed and arranged to maximize the privacy by the residents of the
project?
Yes. The project is design to allow a diversity of residential types and configurations,
many ground floor units have access to outdoor spaces for their own use which provide
a public private separation for their units.Along the perimeter streets the residential
units along the frontages are raised up above the sidewalk level to a varying degree to
provide a transitional space between the public street and the private units. The
574
18516 Staff Report for thetttonwood and Ida Planned Unit Deveoment Page 30 of 35
development complies with the interior special residential block frontage for all units.
Landscaping is provided along the streetscape and within the development that will
provide additional privacy.All vehicular access to the site is via the underground
parking structure that will generally only be used by the residents, city services and
their private service providers.
(6)Park land. Does the design and arrangement of buildings and open space areas
contribute to the overall aesthetic quality of the site configuration, and has the area of
park land or open space been provided for each proposed dwelling as required by section
38.420.020?
Yes. Parkland is provided per code requirements via cash in lieu of dedication. Open
space is provided for each residential building in compliance with standards. Conditions
of approval 10 requires that a parks and trails district waiver be provided with the
planned unit development final plan in accordance with BMC 38.420.100.
(7)Performance.All PUDs shall earn at least 20 performance points.
Yes.With a PUD, Section 38.430.090.E.2.a.7 requires at least 20 performance points for
the subject property.There are 11 options provided in the UDC to meet this
requirement. Points can be met using any combination of on-site and off-site open
space or other options listed in the code. The Preliminary PUD must specify how the
performance points are being met.
Open space provisions for phased PUD developments: If a project is to be built in
phases, each phase shall include an appropriate share of the proposed recreational,
open space, affordable housing and other site and building amenities of the entire
development used to meet the requirements of section 38.430.090.E.2.The appropriate
share of the amenities for each phase shall be determined for each specific project at
the time of preliminary approval and shall not be based solely upon a proportional or
equal share for the entire site.
The PUD is proposing to satisfy the performance requirements with credits for
affordable housing (21), additional open space with public access (9.37), underutilized
and Brownfield sites (6.67), LEED-ND (15) and low impact development plan (6).The
tabulation is under the common open space section of the application narrative on page
25. The application satisfies the requirement with 58 performance points.The
development exceeds standards. Conditions of approval, 6 and 14 are provided related
to this issue in order to provide public access as proposed and to assure affordable
housing is provided as required to achieve the performance points.
575
18516 Staff Report for thottonwood and Ida Planned Unit Deve*ent Page 31 of 35
(8)Is the development being properly integrated into development and circulation
patterns of adjacent and nearby neighborhoods so that this development will not become
an isolated "pad"to adjoining development?
Yes the project will create new connections to the neighborhood around it with the
construction of additional streets sidewalks and open spaces.
c. Mixed Use. Planned unit developments in mixed-use areas (REMU, UMU,
and NEHMU zoning districts) may include commercial, light industrial, residential
and mixes of various primary and accessory uses.The particular types or
combination of uses are determined based upon its merits,benefits,potential
impact upon adjacent land uses and the intensity of development.
(1)Is the project substantially consistent with the intent and purpose statements for the
underlying zoning district?
Yes. This neighborhood includes commercial uses, offices, manufacturing and housing.
The intent of the northeast historic mixed-use district is to provide recognition of an
area that has developed with a blend of uses not commonly seen under typical zoning
requirements. The unique qualities and nature of the area are not found elsewhere in
the city and should be preserved as a place offering additional opportunities for
creative integration of land uses. This PUD provides a creative integration of land uses.
The intent of this area is to allow private and case-by-case determination of the most
appropriate use of land in a broad range of both non-residential and residential uses.
This PUD proposes appropriate use of the land with a broad range of nonresidential and
residential uses.
(2)Is the project located adjacent or within proximity to an arterial or collector street
that provides adequate access to the site?
Yes. The project is located 300 feet from Peach Street, a collector street and 300 feet
from Tamarack Street a collector street with both streets feeding into Rouse Avenue to
the west the closest arterial street to the project.
(3) Is the projection at least two acres of land?
Yes, the site is 2.01 acres of land.
(4) Do the uses relate to each other in terms of location within the PUD,pedestrian and
vehicular circulation, architectural design, utilization of common open space and
facilities,streetscape, etc.?
Yes, the overall site layout and design guidelines provide a comprehensive design that
coordinates pedestrian and vehicular circulation, architectural design and the
utilization of open space and facilities.
576
18516 Staff Report for thefttonwood and Ida Planned Unit Develpment Page 32 of 35
(5) Does the overall project achieve or exceed the FAR 'floor area ratios"envisioned for
the underlying district?
Yes. There is no designated FAR required in the NEHMU.The proposed total FAR of the
development is 1.8 with 46 dwelling units to the acre.
(6)Is it compatible with and does it reflect the unique character of the surrounding area?
Yes. This development will contribute to the mixed use character in this area and the
eclectic residential and nonresidential uses located in this neighborhood.
(7) Is there direct vehicular and pedestrian access between on-site parking areas and
adjacent existing or future off-site parking areas which contain more than ten spaces?
Yes.All parking spaces are accesses through the underground parking structure. The
offsite parking proposed at the northwest corner of Wallace Avenue and East Aspen
Street is within the distance requirements for off-site parking..
(8)Does the project encourage infill, or does the project otherwise demonstrate
compliance with the land use guidelines of the city growth policy?
Yes.This project is an infill project on an underutilized site.
(9) Does the project provide for outdoor recreational areas(such as urban plazas,
courtyards, landscaped areas, open spaces, or urban trails)for the use and enjoyment of
those living in, working in or visiting the development?
Yes. Private residential and publicly accessible open space are proposed for those living,
working in or visiting the development.
(10) Does the project provide for private outdoor areas(e.g.,private setbacks, patios
and/or balconies, etc.)for use by the residents and employees of the project which are
sufficient in size and have adequate light,sun, ventilation, privacy and convenient access
to the household or commercial units they are intended to serve?
Yes. Outdoor balconies and patios are proposed for many of the individual dwelling
units. Shared green roof deck opens space is provided for the apartment residents in
Buildings 1-2. Commercial open space is provided for the office use.
(11) Does the project provide for outdoor areas for use by persons living and working in
the development for active or passive recreational activities?
Yes. Private and publicly accessible open space are proposed. The project is very close
to the mountains to main street trail system.
(12) Is the overall project designed to enhance the natural environment, conserve energy
and provide efficient public services and facilities?
577
18516 Staff Report for thefittonwood and Ida Planned Unit Deve#nent Page 33 of 35
Yes. Enhancements to this underutilized site and connection to city services will allow a
high density residential development in close proximity to services, transit, recreation
and employment opportunities. The project is being designed as a LEED-ND
neighborhood.
(13)If the project is proposing a residential density bonus as described below, does it
include a variety of housing types and urban styles designed to address community-wide
issues of affordability and diversity of housing stock?
Yes,Affordable housing a variety of housing types and urban styles are proposed.A
deed restriction is required in order to provide long term availability.
(14)Residential density bonus. If the project is proposing a residential density bonus(30
percent maximum) above the residential density of the zoning district or building type
within which the project is located and which is set forth in division 38.310 of this chapter,
does the proposed project exceed the established regulatory design standards(such as for
setbacks, off-street parking, open space, etc.) and ensure compatibility with adjacent
neighborhood development?The number of dwelling units obtained by the density bonus
is determined by dividing the lot area required for the dwelling unit type by one plus the
percentage of density bonus sought. The minimum lot area per dwelling obtained by this
calculation must be provided within the project. Those dwellings subject to division 38.380
must be excluded from the base density upon which the density bonus is calculated.
Not applicable. No formal density bonus is proposed.
APPENDIX A —PROJECT SITE ZONING AND GROWTH POLICY
Zoning Designation and Land Uses: The property is zoned NEHMU, Northeast Historic
Mixed Use
The intent of the northeast historic mixed-use district is to provide recognition of an area
that has developed with a blend of uses not commonly seen under typical zoning
requirements. The unique qualities and nature of the area are not found elsewhere in the
city and should be preserved as a place offering additional opportunities for creative
integration of land uses. The intent of this area is to allow private and case-by-case
determination of the most appropriate use of land in a broad range of both non-residential
and residential uses.Standards for buffering between different land uses are deliberately not
as high as standards elsewhere in the community as it is assumed that persons choosing to
locate in this area are aware of the variety of possible adjacent land uses and have accepted
such possibilities as both acceptable and desirable. It is expected that the lots within this
district will continue to develop under a variety of uses which may increase or decrease in
scope in any given portion of the district. The clear intent of this district is to support a mix
and variety of non-residential and residential uses. Nothing in division 38.300 of this article
578
18516 Staff Report for thetttonwood and Ida Planned Unit Develliment Page 34 of 35
shall be interpreted to be discouraging or prejudicial to any listed use except as set forth as
principal and conditional uses.
Adopted Growth Policy Designation: The property is designated as Industrial in the
Bozeman Community Plan. This classification provides areas for the uses which support an
urban environment such as manufacturing, warehousing, and transportation hubs.
Development within these areas is intensive and is connected to significant transportation
corridors. In order to protect the economic base and necessary services represented by
industrial uses, uses which would be detrimentally impacted by industrial activities are
discouraged. Although use in these areas is intensive, these areas are part of the larger
community and shall meet basic standards for landscaping and other site design issues and
be integrated with the larger community. In some circumstances, uses other than those
typically considered industrial have been historically present in areas which were given an
industrial designation in this growth policy. Careful consideration must be given to public
policies to allow these mixed uses to coexist in harmony.
APPENDIX B- OWNER INFORMATION AND REVIEWING STAFF
Owner: Bangtail Partners LLC 1189 Tennessee Street, Unit 103, San Francisco, CA 94107
Applicant: Imperial Development LLC 33 North Black Avenue, Bozeman, MT 59715
Representatives:Thinktank Design Group Inc.33 North Black Avenue,Bozeman,MT 59715
Report By: Brian Krueger, Development Review Manager
APPENDIX C-PLANNED UNIT DEVELOPMENT INTENT
Sec. 38.430.010. Intent. A. It is the intent of the city through the use of the planned unit
development (PUD) concept, to promote maximum flexibility and innovation in the
development of land and the design of development projects within the city. Specifically,
with regard to the improvement and protection of the public health, safety and general
welfare, it shall be the intent of this chapter to promote the city's pursuit of the following
community objectives:
1. To ensure that future growth and development occurring within the city is in accord
with the city's adopted growth policy, its specific elements, and its goals, objectives
and policies;
2. To allow opportunities for innovations in land development and redevelopment so
that greater opportunities for high quality housing, recreation, shopping and
employment may extend to all citizens of the city area;
3. To foster the safe, efficient and economic use of land and transportation and other
public facilities;
579
ent Page 35 of 35
18516 Staff Report for thettonwood and Ida Planned Unit Deven r
4. To ensure adequate provision of public services such as water, sewer, electricity,
open space and public parks;
5. To avoid inappropriate development of lands and to provide adequate drainage,
water quality and reduction of flood damage;
6. To, encourage patterns of development which decrease automobile travel and
encourage trip consolidation, thereby reducing traffic congestion and degradation of
the existing air quality;
7. To promote the use of bicycles and walking as effective modes of transportation;
'8. To reduce energy consumption and demand;
9. To minimize adverse environmental impacts of development and to protect special
features of the geography;
10.To improve the design, quality and character of new development;
11.To encourage development of vacant properties within developed areas;
12.To protect existing neighborhoods from the harmful encroachment of incompatible
developments;
13.To promote logical development patterns of residential, commercial, office and
industrial uses that will mutually benefit the developer, the neighborhood and the
community as a whole;
14.To promote the efficient use of land resources, full use of urban services, mixed uses,
transportation options,and detailed and human-scale design; and
15.To meet the purposes established in section 38.01.040.
ATTACHMENTS
The full application and file of record can be viewed at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715.
Public Comment
The Design Review Board (DRB) minutes February 27, 2019.
The Recreation and Parks Advisory Board Subdivision Committee email March 8, 2019.
The Community Affordable Housing Board minutes March 13, 2019
Application
580
NOTICE OF A PUBCIC
HEARING FOR A PLANNED
UNIT DEVELOPMENT
APPLICATION S
The City of Bozeman Depart-
ment of Community Develop-
ment is reviewing a Prelimi-
nary Planned Unit Develop-
ment (PUD) application re-
questing permission to grant
relaxations for a planned unit
development and to develop
existing lots, consisting of
2.06 acres within the NEHMU
zoning district.
The subject property is ad-
-dressed as 615 East Cotton-
wood Street and 720 North.
Ida Avenue.The site is legal-
ly described as Lots 5-16,
Block 106 including a vacated
alley and Lots 17-28, Block
105 including a vacated alley
in the Northern Pacific Addi-
tion to Bozeman located in
S06, T02 S, R06 E, P.M.M.,
Gallatin County,Montana.
The purpose of the public
hearing is to consider the
Cottonwood and Ida Prelimi-
nary Planned Unit Develop-
ment Application 18516. The
s development proposes a mix
of uses including apartment
buildings,an office building,a
mixed use building including
'.,artisan manufacturing and a
restaurant,`buuaing.—i ne`pro:'
posal includes four buildings.
The largest building includes
' apartments, 64 units, and of-
fices, 29,700 sq. ft., separat-
ed horizontally over an under-
ground,parking,structure con-
sisting of 96 parking spaces.
The other buildings on site in-
clude a 12 unit apartment
building, a mixed use building
with artisan manufacturing,
5,400•sq. ft. with 26 units
above and one 2,150 square
foot commercial restaurant
building:.The application in-
cludes the concurrent con-
struction of East Aspen
Street, North Ida Avenue and
the north half of East Cotton-
wood Street.
The application .requests,
that the city grant relax-
ations to the following stan-
dards:
1. BMC 38.310.040.0 Table
of Uses. The application re-
quests for to add apartment
buildings as an allowable use
in the NEHMU district.
2. BMC 38.310.040.0 Table
of Uses. The application re-
quests to increase the size of
the allowable restaurant use
in NEHMU from 1,500 to
2,200 square feet. _
3.'BMC 38.320.050 Foam and
Intensity Standards. The ap-
plication proposes to de-
crease the required front set-
back from 20 to 8 feet.
4. BMC 38.320.050 Form and
Intensity Standards. The ap-
plication proposes to allow
zero lot line conditions in the
NEHMU.
5. BMC 38.320.050 Form and
Intensity.Standards. The ap-
plication proposes to increase
{ the allowable maximum
height to be increased from
45'to 54'.
6. BMC 38.320.050 Form and
Intensity Standards. The ap-
plication proposes to increase `
the maximum lot coverage in
NEHMU from 40%to'45%.
7. BMC 38.510.030.0 Land-
scape Block Frontage. The ,
application proposes to de-
crease the required residen-
tial transparency from a mini-
mum 15%to 8%.
8. BMC 38.510.030.E Store-
front Block Frontage. The ap-
plication proposes to de-
crease the required commer-
cial transparency from 60%to.
30%.
9. BMC 38.540.050.A.1 Resi-
dential Parking Standards.
The application proposes to
reduce the requirement for ef-
ficiency units from 1.25
spaces-per'unit`to'1 space-
per unit. The application pro
poses to reduce the require-
ments for one bedroom units
from 1.5 spaces per unit to
1.25 spaces per unit.
10. BMC 38.540.050.A.2
Non-residential Parking Stan-
dards. The application pro-
poses to reduce all nonresi-
dential parking standards by
40%.
11. BMC.38.400.050.A.1 /
Street Design. The applica-
tion proposes to not construct
the street according to the
adopted ,designns,for,,local
streets and instead construct ?
East Cottonwood Street with
back out angled parking.
All reviews and processes
are pursuant to Chapter 38 of
the Bozeman Municipal Code
(BMC).
The City Commission will
conduct a public hearing on
the planned unit development
on Monday, March 25, 2019
in the Commission Meeting
Room in Bozeman City Hall,
121 North Rouse Avenue,
Bozeman,MT at 6:00 p.m.
The City Invites the public '
to comment in writing and
to attend the public hearing
(s). Written comments may f
be directed to: City of Boze-
man Department of Commu-
nity Development, ATTN: Bri-
an Krueger, PC Box. 1230, ,
Bozeman;MT 59771'1230,of
emailed to agenda@boze-
man.net. Summary data on
this application kare available
at www.bozeman.neVplan-
ning. Select 'Project Docu-
ments' and navigate to appli-
cations 17231 and 17232.
The full applications may be
reviewed in the City of Boze-
man Department of Commu-
nity Development, Alfred M.
Stiff Professional Building, 20
East Olive Street, 582-2260.
For those who require accom-
modations for disabilities,
please contact the ADA Coor-
dinator Mike Gray, at 582-
3232 (voice), 582-2301
(TDD). Please reference
Application 18516 In any
I-correspondence. _ _ j
t 13A LP cufumad
1DP Pvpi_
AFFIDAVIT OF PUBLICATION
364571 1874491 STATE OF MONTANA )
)SS.
CITY OF BOZEMAN_ROBIN CROUGH County of Gallatin )
PO BOX 1230
BOZEMAN MT 59771-1230
fI � il
being duly sworn, deposes and says; that he/she
is legal ad clerk of the Bozeman Daily Chronicle,
a newspaper of general circulation, printed and
published in Bozeman, Gallatin County, Montana;
and that the notice here unto annexed
#102424 - HEARING PLANNED
NOTICE OF A PUBLIC HEARIN
has been correctly published in the regular and
entire issues of every number of said paper for
2 insertions.
Said notice was published on:
03/03/2019 03/10/2019
Subscribed and sworn to before me this
18th day of March , 2019
Notary Public or the;tana
of Montana
Residing at Belgrade,
KESSLY LOVEC
ss•• °�
. . -,,, Notary Public
1AFI/,4 :for the State of Montana
Residing at:
AL., Belgrade, Montana
s My Commission Expires:
>•'_�`� MpC�. January 31,2023
I
I
•
z
D
D
n
N
Cn
N
O
�O
i
■ nw o and Ida PreHmoonaryPUD Planning
C���� �o�l
717
• Proposed mixed use ,
residential/commercial Planned Unit "
•
Development ° �� I1 •° ;r `��
2 acre site east of North Wallace
Avenue, bound by East Aspen, Ida CID _ ,t ,PF. .T �
Avenue and East Cottonwood Street. '�
[r�IlNtiI1�1—:III IIt711 � .. r,
• Zoned NEHMU, Neighborhood . n n
Conservation Overlay District iig,,
f:au •ro���Yin sT �"��V � T ,I�
• Bozeman Community Plan map
designation-Industrial 9
y1 r T •� (�a �.
.f �r�� t3
• Demolition of most structures on site
O O
F� � Q
CoNonwood and Wo PreHomhary PUD Planning
1111t 46
• 4 buildings
a -
64 apartment units/29,700 sq. ft office
over parking structure, 96 parking
spaces
• 12 unit apartment building, artisan , . - ��'`�' `" "
mixed use building 26 units with ._� a+w. �4"
5,400 sq. ft commerical
• 2, 150 sq. ft restaurant buildingF: .<��. .,,H�
It f -�w"b 4
DMPq.cb-I.clbn
.,P40da
L.. is
ZWAV
h..w
O O
B (a m
Planning
E TAMARACK ST _
� ----I.
®ASPF
rj
E C09T0\\\'OOD ST
•
leprne
O PMMIrg
ProJ.cts el.etkn
Parcels
Roads
y Cit yf
' 'City Limns
p Pw-v Projrcb
Community Plan Fulwe land Use
_7 Residential
Resider"Emo mis Mixed Use
Suburban R*3wwttl
Repknd Cammercial and Service*
CommuM y c*m
Caemuniry Cammarcial Mbad Use
Business Park Mbod Use �^ �
�lnaustrw �E ZPEACHl�ST
Public 1mtRvlions
p Parks.Open Space and Recreational Laws !�
Other Public labs
presents Rural j
— —
C� O
o� Z7= �
Planning
r E TAMAR,CK S'f
E ASPEN ST*�
E ASPE\ ST '
r
Legend
EIP Pf*m selection
Cky Urrift(1fl/18) x -
CD Mixed Use �► -� - � ��
RestsuranINSar 41E CUgITp\\\'C)tlU S7
• Canrnerciel R*W Sales.Serocee.Bank6
HoterOA&.d
Q Commor"Auto •
.Adn*kt*WmV rofessionel K=
LipM Manufaclur4p
O Cw Course
Pax or abo ww
n Space
Q Conaervetion Ennt 15
0 Church
Pubk Faddy 1
SdrodtEducetbnat Fack4y
Skgb-Household ReddenfW -
UD QrpleAThplex Residential - I
C3 MuWHmmehold Reeldarrtial F,
M HomsWobi a Hark �in 0
obile
s ?Undewbped E PE,Ct( ST •
0 vacant }r.
Parcels
Roods
AVoys
. City l.knds
Plerrrp PraNas - ��
MT
BOZ E MAN
Planning
j LUMBER
DISTRIBUTOR
T AI HISTORIC
DEPOT
NORTHERN
PACIFIC
FORMER + •" RAILWAY
• TECH ' BREWERY
OFFICES SITE /
FFICES'& = INDUSTRIAL ,
�l -STUDIOS _ POCKET
•� _ _ , PARK
E ASPEN
�}
`•�;r
ARTISAN i -
BED& MFR.,'
BREAKFAST z -
tt
w». ARTISAN
SINGLE-FAMILY SINGLE-FAMILY FR.� ;
MI MILL j i « HRESIDENCES
RESIDENCES' 1 C� +
E.COTTONWOOD ST.
All
SINGLE-FAM ul ILY,
:RESIDENCES - CAFE MULTI-FAMILY•
i -, a RESIDENTIALLIJ
EER&17VW
3 _ ISTRIBUTOR r 1
OFFlCES&� BIKE -
STUDIOS SHOP " BAKERY .OFFICES& I,
I i - SSTUDIOS.
[_.,. E.PEACH ST. _ ,. _
TO
DOWNTOWN _ ! SINGLE-FAMILY
RESIDENCES OR
COMMERCIAL
® BUS DEPOT Tw
';;
MT
BOZEMAN
Planning
°� " "" i °°���. °� i—i �,•"M'^� 4 buildings
M
N•fH�[im i /, t�
64 apartment
' 0• "` units/29 700 sq. ft
0 . ; office over
parking structure,
r -
M 6
nuk=
-----_--- ,�,. 6M - �,,,:,' • - -;--- 96 parking
spaces
12 unit apartment
building, mixed
use building 16
units and 5,400
Tfin i•
sq. ft. commercial•
FOOTPIM&MVi
-----, � 2, 150 sq. ft
a restaurant
building
72 parking
spaces offsite, 32
' — - on street
BOZEMAN MT
Planning
- FH
�_rujm °
°°°
! tj
- - - ----------- -----------------�;up.,
nof
f rrawc� N�f �
❑ �� V - '� 'i _Ll 1
------------ ---------------------------- I
F]E]�D
�� ❑ CID
BOZEMAN MT
Planning
wl!0 OWN rf 1 sw
-730
I e n
I [�-LE 1 I
!1
a--
�i
BOZEMAN MT
17
Planning
RESMEWIAL
COMMERCIAL
ARTISAN MFR.
COMMUNITY
_ 8 i
,
•
i
CIO
•
"" .•ns •••w ati.�e�nss.f, ��
r � �m v o. � •e.o.�i>+�a�r�
T
wwi•
77 .
m
ml ! '3 L L`' -I C jju FL JUL , g`
�.a
L
L4
6UIUUBld
IM 1;/ H El ��z (a a
Planning
I ,
Id
N7.:,ZONTAE AN3 CCRF,.::a,EL: (`� `" 1` -- n ! '
KstALRC I* vLRP^_A-`—,N METAL :NG
ANJf:,N� :..HACh1 - - l fill, .,
. � �
r =
n
_ � _ fit • t f7
' l
v —
BOZEMAN MT
Planning
•
Im t 4
�.. _
1 Ct �1 { �'� 5
` rill
WAUNX AK FM ra � wa~d rF�R �m�a w I 1 rwo t A I WAK
- I oo.
Y001lOwN
A[,FO�TOOI
O00 laMNAhYtO
MO�QN�INM
1 Lpr[i¢Cnow f-w�fdnM
1
■DOA I +�� �tD01 SFACt 8=3
_ _ I .� �-
..R�.. � �.,.
• 1 ---- � 1 —1 ICR
N'ALALLAK + IACU.SS I �N OnN 10��t I A00 Owta• Ij`, MOO MOO 1 pAAK
• — �. •. - 1 '�I � ww'osra t
uaNsa+N .
!'ao�m�at
l9Mi NNmYtO
N3!•.i OR4Rr
tl W.kYCIgM•EM�NORM
• • I
p
t !
— 4�" _ -�
_ o 0 0
_cam -� ,i si
3
of o 0
a
-
17
Ye i J
I 'M
y- -,OIL M V
r
1 — ,
f
i � f
}
Y� T
3
BOZEMAN MT
Cottonwood and Ida PUD Relaxations Planning
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of the
• allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38:320.050 Form and Intensity Standards. The application proposes to decrease
the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow
zero lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
I the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
the maximum lot coverage in NEHMU from 40% to 45%. i
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to decrease
the required residential transparency from a minimum 15% to 8%. t
8. . BMC 38.510.030.13 Storefront Block Frontage. The application proposes to decrease
the required commercial transparency from 60% to 30%. i
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom units
from 1.5 spaces per unit to 1.25 spaces per unit.
10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to
reduce all nonresidential parking standards by 40%.
11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the
street according to the adopted designs for local streets and instead construct East
Cottonwood Street with back out angled parking.
MT
BOZ E MAN
Cottonwood and Ida PUD Planning
18516
{
4 Public Comment
• Project was publicly noticed twice in Bozeman Daily Chronicle, posted on-
site and mailed to property owners within 200 feet. '
• 20 public comments have been received.
• 11 in favor, 9 not in favor
Positive comments: infill, compliant with city policies, affordable housing, '
density, character of the neighborhood
i
• Negative comments: parking, inadequate streets, snow storage, character of
the neighborhood, relaxations too great-apartments, parking, setbacks,
height
BOZEMAN MT
Cottonwood and Ida PUD planning
18516
. i
Review Criteria -Q
I
• Application meets criteria-Performance met through affordable housing,
open space, LID, LEED-ND, brownfield development, 58/20 required pts.
i Recommendation
• DRB recommends approval
• CAHAB recommends approval of affordable housing performance
• RPAB recommends cash in lieu of parkland for the project
• Overall recommendation is for conditional approval with applicable code
provisions
O
I�
1 IL
• . SL
O
MT
BOZ E-.M AN
Planning
4 buildings
r� -,-� � ; ,,�-���.�_��� � ,. -" --F�-�• «��-- ' p
64 apartment
u n its/29 700 s
B '�-' ---- q ft
'` ' i
[ office over
JC ; parking structure,
---------- -;---�' 96 parking +
w?A . ImIIK AP
, roonv�mwa rooiwen:i �r
---
I spaces
'.UwI I
12 unit apartment
building, artisan
c mixed use
�- "" - V -- -- - --- § ' ; building 16 units
LJ
I' _Bann I
• i � -i ; over 5,400 sq. ft
roornmrr:L=u I_ -
pq
�•
' restaurant
building
. 72 parking
spaces offsite, 32
- - on street
CITY OF BOZEMAN .. 5}�
DEPARTMENT OF
COMMUNITY DEVELOPMENT �' � '�
O •►
20 EAST OLIVE STREET .,._ . . :
P.O. BOX 1230
USA
BOZEMIAN, MT 59771 p
4 CANDLELIGI'T^�BOZEMAN. 5.51 f E :i
Y
IVL11 D�L1V�1cti6f_r AS ADDRESSED i
T�W9 SC: 59771.323030 "2335 -18578- @�#- i1Z
_ e St ±1±�tl•tli'tiittl}1t1,11Hliit%,llit tjitit{t�1 Jii i j33��{ s
i
80Z E 'dlr= MMT
Community Development
Noticing: Public Comment Newspaper Legal Ad Site Post Adjacent Owners Mailed
Period 3/3/19 and 3/10/19 3/3/19 3/1/19
3/3/19 to 3 25 19
Decision: Authority and Decision
The City Commission public hearing and decision is scheduled for Monday, March 25,
2019 in the Commission Meeting Room in Bozeman City Hall, 121 North Rouse Avenue,
at 6:00 p.m.
This application is evaluated against the Preliminary PUD criteria of sections 38.430 of the municipal code
and associated standards.Approval or conditional approval may be granted if the decision maker
determines all criteria are met.
The public may comment orally at the public hearing or in writing at or prior to the public hearing
regarding compliance of this application with the required criteria. Comments should identify the specific
criteria of concern along with facts in support of the comment. During the notice period the City will
continue review for compliance with applicable regulations.
Written comments may be directed to: City of Bozeman Department of Community Development,ATTN:
Brian Krueger, PO Box 1230, Bozeman, MT 59771-1230, or emailed to agenda@bozeman.net. Summary
data on this application are available at www.bozeman.net/planning. Select'Project Documents' and
navigate to application 17231 and 17232. The full application may be reviewed in the City of Bozeman
Department of Community Development,Alfred M. Stiff Professional Building, 20 East Olive Street, 582-
2260. For those who require accommodations for disabilities, please contact the ADA Coordinator Mike
Gray, at 582-3232 (voice), 582-2301 (TDD). Please reference Application 18516 in any
correspondence.
-
::w �
.'1'111i I11\1IIN111.1 - �
_ej
4 f
fffrrr "4101
r
w.'s rr.. Z7J-`E I rt�i Ili}I, '-6. wh:'tom
Page 1 of 2
NOTICE OF A PUBLIC NEARING FOR
PLANNED UNIT DEVELOPMENT (PUD)
Project Name: Cottonwood and Ida PUD Application: 18516
Summary: The purpose of the public hearing is to consider the Cottonwood and Ida Preliminary
Planned Unit Development Application 18516. The development proposes a mix of uses including
apartment buildings, an office building, a mixed use building including artisan manufacturing and a
restaurant building. The proposal includes four buildings. The largest building includes apartments,
64 units, and offices, 29,700 sq. ft., separated horizontally over an underground parking structure
consisting of 96 parking spaces. The other buildings on site include a 12 unit apartment building,a
mixed use building with artisan manufacturing, 5,400 sq. ft. with 26 units above and one 2,150
square foot commercial restaurant building. The application includes the concurrent construction of
East Aspen Street, North Ida Avenue and the north half of East Cottonwood Street.
The application requests that the city grant relaxations to the following standards:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment buildings as
an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of the
allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to decrease the
required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow zero lot
line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the
allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the
maximum lot coverage in NEHMU from 40%to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to decrease the
required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage.The application proposes to decrease the
required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to reduce the
requirement for efficiency units from 1.25 spaces per unit to 1 space per unit. The application
proposes to reduce the requirements for one bedroom units from 1.5 spaces per unit to 1.25 spaces
per unit.
10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to reduce
all nonresidential parking standards by 40%.
11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the street
according to the adopted designs for local streets and instead construct East Cottonwood Street with
back out angled parking.
Parcel size: 2.06 acres Location: 615 East Cottonwood Street and 720 North Ida
Avenue, Bozeman, MT 59715
Legal Description: Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105
including a vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06 E,
P.M.M., Gallatin County, Montana.
• w
Brian Krueger
From: Mitchell Overton
Sent: Friday, March 8, 2019 3:47 PM
To: Brian Krueger
Cc: 'Richard Shanahan'; 'Brian Close'; 'Katie Bills-Walsh'
Subject: RE:Two PUD's for Parkland Review
Brian:
RPAB Sub Review motion, comments, and condition below.
RPAB: please review for anything missing.
1) Cottonwood and Ida PUD 18516 request cash in lieu of parkland for.73 acres at the City's adopted per sq.ft.
rate.
a. Improvements/installation of parking area for Depot Park appropriate and aligns with future Front
Street Path development and provides walkable access to Story Mill Spur and Story Mill Community
Park.
b. Open public movement through development site encouraged and inviting.
c. .73 acres Developer proposed cash-in-lieu of parkland dedication at$1.50/sq.ft. =$47,6982 deemed
acceptable.
i. Motion passed for above three items
2. Bridger Vale PUD 17232 and subdivision 17231 request dedication of parkland with relaxations to park frontage
and park frontage loss mitigation.
a. Park entrance improvements with on street parking.
b. Development of open space aggregated to Glen Lake Rotary Park.
c. Dedicated parkland found acceptable with alley eliminating encroachment issues, property aggregated
to Glen Lake Rotary Park, trail connecting into Glen Lake Rotary Park trail system, and condition of
installation of pet waste station.
i. Motion to approve park plan and parking relaxation approved with condition of installation of
pet waste station in dedicated parkland.
Mitchell J. Overton, MS, CPRP
Director, Parks and Recreation Department
City of Bozeman, MT
(o)406-582-3222
(c)406-595-7020
www.bozeman.net
BOZ E H1ANMT
Rocks&Recreation
From: Mitchell Overton
Sent: Monday, March 4, 2019 4:59 PM
To: Richard Shanahan<rchard@shanahanarchitects.com>; 'Brian Close' <taxatty123@gmail.com>; Katie Bills-Walsh
<katie.j.bills@gmail.com>
Subject: FW:Two PUD's for Parkland Review
1
Brian Krueger
From: Brian Krueger
Sent: Wednesday, March 6, 2019 4:12 PM
To: Erik Nelson; 'Brian Caldwell'
Subject: Cottonwood and Ida PUD advisory body continued review
Hello,
The City's Recreation and Parks Advisory Board Sub Committee will review your proposed cash in lieu for this project at
its next meeting on Friday March 8, 2019 at the Professional Building Basement conference room at 2pm.
The City's Community Affordable Housing Board will review your proposed project and affordable housing proposal at
its next meeting on Wed. March 13, 2019 at City Hall in the Commission room at Sam.
You are welcome to attend and present at these meetings.
Brian Krueger I Development Review Manager,Community Development
City of Bozeman 120 East Olive St.I P.O.Box 1230 1 Bozeman,MT 59771
406.582.2259 bkrueger@bozeman.net 1 www.bozeman.net
1
h0 •
BOZEMAN
Planning
FROM: DEVELOPMENT REVIEW COMMITTEE
RE: COTTONWOOD AND IDA PRELIMINARY PUD APPLICATION 18516
DATE: FEBRUARY 27,2019
Project Description:A Preliminary Planned Unit Development(PUD)application to allow a mixed
residential and commercial development with relaxations to zoning regulations requested for
apartment building use, building height, parking, street design, restaurant design, transparency,
front setbacks and a request for concurrent construction. The site is located at 615 East
Cottonwood Street and 720 North Ida Avenue.
Recommendation:Staff has found that the project complies with requirements of Chapter 38 of
the Bozeman Municipal Code with conditions and code provisions to be satisfied with the final
plan and is deeming the application adequate for further review.
Section 2-RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this
report.These conditions are specific to the development.
1. The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval,does not,in any way,create a waiver or other
relaxation of the lawful requirements of the Bozeman Municipal Code or state law.
2. The final planned unit development plan must be submitted, reviewed, and approved
prior to the approval of any subsequent site plan.
3. The requested relaxations to the following sections are granted as proposed in the
application materials and must be reflected in the final planned unit development plan,
design guidelines and associated property owners' association documents as approved:
a. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
b. BMC 38.310.040.0 Table of Uses.The application requests to increase the size of
the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
c. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
d. BMC 38.320.050 Form and Intensity Standards.The application proposes to allow
zero lot line conditions in the NEHMU.
e. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45'to 54'.
Bozeman, MT 59771-1230
TOD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZEMAN 10
Planning
f. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40%to 45%.
g. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15%to 8%.
In. BMC 38.510.030.E Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60%to 30%.
i. BMC 38.540.050.A.1 Residential Parking Standards.The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom
units from 1.5 spaces per unit to 1.25 spaces per unit.
j. BMC 38.540.050.A.2 Non-residential Parking Standards.The application proposes
to reduce all nonresidential parking standards by 40%.
k. BMC.38.400.050.A.1 Street Design.The application proposes to not construct the
street according to the adopted designs for local streets and instead construct
East Cottonwood Street with back out angled parking.
4. Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a
vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06 E,
P.M.M., Gallatin County, Montana must be aggregated and/or the common boundaries
of said lots must be reconfigured through the applicable subdivision review process to
accommodate the project prior to final planned unit development plan approval.
5. Ten foot front setback utility easements must be provided for as shown on the
preliminary planned unit development plans either through individual recordable
documents or thorough the subdivision exemption review process prior to final planned
unit development plan approval.
6. Public access easements must be provided for as shown on the preliminary planned unit
development plans for all publicly accessible open space areas prior to final planned unit
development plan approval.
7. No property may be removed from the covenants without written approval of the City
of Bozeman.
8. The City of Bozeman has relied upon the overall design and design standards required as
part of the planned unit development application.The design and design standards may
not be altered without consent of the City.
9. A notice prepared by the City must be filed concurrently with the amended plat so that
it will appear on title reports. It must read substantially as follows The Amended Plat of
Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105 including a
vacated alley in the Northern Pacific Addition to Bozeman located in S06,T02 S, R06 E,
P.M.M., Gallatin County, Montana known as the Cottonwood and Ida Planned Unit
Development(PUD)are subject to specific design standards, unique building setbacks
P.O. Box 1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZEMAN
Planning
and heights, parking requirements and uses.These standards may be found in [insert
correct reference to design standard location]. Lot owners are advised that these are
specific to the Cottonwood and Ida Planned Unit Development and are in place of the
general development standards of the City of Bozeman Zoning. If a development
standard is not specifically established in the Cottonwood and Ida PUD approval
documents the general standards of the City apply. Modification of the special
standards would require an amendment to the Cottonwood and Ida Planned Unit
Development. Modifications are strongly discouraged. It is the obligation of the lot
owner to be fully informed as to these standards before beginning any home or site
design process. Approval by the design review entity established in the covenants of the
development does not bind the City of Bozeman to approve a construction plan.
10. A signed and recorded waiver of right to protest a city-wide park maintenance district
must be provided with the final planned unit development plan.
11. The offsite parking agreement must be for a minimum term of 25 years and must be
completed, executed and filed prior to subsequent site plan approval.
12. The offsite parking agreement must be incorporated into the property owners'
association documents as a required responsibility of the association along with the
requirement to assess for and pay any required fees to satisfy the long term offsite
parking agreement.
13. Prior to planned unit development final plan approval the applicant must provide the
following modified historic property record documentation for the demolition of the
existing structure at 620 E. Cottonwood Street: Property address, legal location,
architectural description, digital interior and exterior elevation photographs, site map,
and a quadrangle map. A modified completion of the Montana Historic Property Record
is a documentation of the current structure conditions and not an analysis of the historic
integrity of property. The modified property card will be housed permanently online on
the City's Architecture Inventory Map.
Section 3—REQUIRED CODE CORRECTIONS All references are to the Bozeman Municipal Code.
Planning Division, Brian Krueger, bkrueger@bozeman.net, 582-2259
1. BMC 38.220.050.A final approved weed control plan must be submitted prior to
planned unit development final plan approval.
2. BMC 220.080. Irrigation water. Clarify proposed water demand for irrigation system.
Clarify the nature of the existing well and water right to support the new demand.
Provide letter from DNRC confirming water right or intent to issue right to support the
project prior to approval of the planned unit development final plan.
3. BMC 38.220.300 and 310.The property owners' association documents must include
the requirements of Section 38.220.300 and 320.The proposed documents must be
finalized and recorded with the planned unit development final plan.
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
h� •
BOZEMAN
Planning
4. BMC 38.230.020.A and C.a subsequent site plan application is required to be reviewed
and approved for all phases of this development prior to building permit issuance.
5. BMC 38.270.030.11) For concurrent construction provide a full response to the required
items in Section 38.270.030.D BMC.The concurrent construction response was
provided, but not in accordance with the required section. Provide response to PUD
concurrent construction and finalize all of the required code elements prior to the
approval of the planned unit development concurrent construction and prior to building
permit issuance.
6. BMC 38.410.060.B.4 Encroachments proposed in required ten foot private utility
easement areas required along all streets. No written approval from all utility
companies is provided as required.The current and entire list of utility companies
operating in Montana can be attained from the Montana Public Service Commission.
Provide approval for encroachment prior to approval of planned unit development final
plan.
7. BMC 38.420.030 Cash in lieu of land dedication for parkland. Cash in lieu of parkland has
not been paid.The cash in lieu amount due is required to be paid prior to subsequent
site plan approval.
8. BMC 38.430.040.A.3 outlines the review and approval process for the planned unit
development final plan. Final plan review and approval.The final plan must be in
compliance with the approved preliminary plan and/or development guidelines. Upon
approval or conditional approval of a preliminary plan and the completion of any
conditions imposed in connection with that approval, an application for final plan
approval may be submitted. For approval to be granted,the final plan must comply with
the approved preliminary plan. This means that all conditions imposed by the city
commission as part of its approval of the preliminary plan have been met and:The final
plan does not change the general use or character of the development;The final plan
does not increase the amount of improved gross leasable non-residential floor space by
more than five percent, does not increase the number of residential dwelling units by
more than five percent and does not exceed the amount of any density bonus approved
with the preliminary plan;The final plan does not decrease the open space and/or
affordable housing provided;The final plan does not contain changes that do not
conform to the requirements of this chapter, excluding properly granted deviations,the
applicable objectives and criteria of section 38.430.100, or other objectives or criteria of
this chapter.The final plan must not contain any changes which would allow increased
deviation/relaxation of the requirements of this chapter; and the final plat, if applicable,
does not create any additional lots which were not reviewed as part of the preliminary
plan submittal. Final plan approval.The final plan may be approved if it conforms to the
approved preliminary plan in the manner described above. Prior to final plan approval,
the review authority may request a recommendation from the DRB, DRC,ADR staff, or
other entity regarding any part of a proposed final plan.
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZEMAN
Planning
9. BMC 38.520.070 Location and design of service areas. No detailed service areas
identified for gas and electric entrance locations into the buildings or proposed methods
to separate and mitigate impacts as required. Show gas and electric locations with the
true size and extent of all proposed meters as required per SP1 on entire site and the
proposed locations for private utility entrance locations into the buildings. Planned unit
development final plan must provide clear information on utility entrances into each
building and demonstrate compliance with this code section with the subsequent site
plan.
10. BMC 38.540.070 Off-site parking. Provide site plan for offsite parking that demonstrates
the proposed lot meets all requirements of the BMC and the off-site parking code
section. Clarify the uses proposed to utilize the offsite parking and provide exhibit
showing compliance with distance requirements per use. Provide draft long term
parking agreement or draft deed restriction in order to demonstrate compliance with
BMC 38.540.070.6 with planned unit development final plan.
11. BMC 38.550.050.1. Irrigation plans are required to be submitted with the PUD open
space landscape plan with the subsequent site plan application.
12. BMC 38.550.060.A.1.The PUD open space landscape plan must meet the requirements
of 23 performance points and be finalized and completed with the subsequent site plan
application.
Engineering Division Comments,Griffin Nielsen,gnielsen@bozeman.net.582-2279
1. Final Engineering comments are pending.
Fire Department;Scott Mueller smueller@bozeman.net 406-582-2353
1. "Fire Lane" signage must be installed on both side of the west side fire access drive in
accordance with code section 2012 IFC D103.6.
2. Provide gates in lieu of bollards for west side fire access. Contact Fire Department for
coordination.
Solid Waste Division; Russ Ward rward@bozeman.net 406-582-3236
1. Provide final sanitation plan to solid waste for approval prior to planned unit
development final plan submittal.
2. BMC 38.520.070.E Location and design of service areas. Service areas for trash service
are not approved by the Sanitation Division.Service areas for all buildings must include
staging areas and.safe and accessible locations for trash dumpster pick up. Clarify
individuals responsible for moving the trash dumpsters to pickup area. Provide
documentation in supplementary document noting this requirement(POA documents).
NorthWestern Energy;Cammie Dooley;cammie.doolev@northwestern.com
1. Provide utility easements in coordination with site utility plan.
P.O. Box 1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZEMAN
Planning
2. Provide adequate space on each building to locate electric and gas meters with
appropriate clearances.
3. Provide adequate clearance for all transformers.
4. Coordinate with NWE on final utility plan to be submitted with the planned unit
development final plan.
Reviewers:
1. Planning Division, Brian Krueger, bkrueger@bozeman.net, 582-2259
2. Engineering Division,Griffin Nielsen,gnielsen@bozeman.net,582-2279
3. Building Division; Bob Risk brisk@bozeman.net 406-582-2377
4. Parks and Recreation;Thom White;twhite@bozeman.net 406-582-3224
S. Sustainability Division;Natalie Meyer nmever@bozeman.net 406-582-2317
6. Solid Waste Division; Russ Ward rward@bozeman.net 406-582-3236
7. Water Conservation;Jessica Ahlstrom iahlstrom@bozeman.net 406-582-2265
8. Stormwater Division; Kyle Mehrens ikmehrens@bozeman.net 406-582-2270
9. Fire Department;Scott Mueller smueller@bozeman.net 406-582-2353
10. Water and Sewer Division;John Alston ialston@bozeman.net 406-582-3200
11. Forestry Division;Alex Nordquest;anordauest@bozeman.net 406-582-3205
12. Parking Division; Ed Meece;emeece@bozeman.net 406-582-2903
13. NorthWestern Energy; Cammie Dooley;cammie.doolev@northwestern.com
Future Impact Fees- Please note that future building permit applications will require payment of
the required transportation, water, sewer and fire impact fees according to the City of Bozeman
adopted impact fee schedule in place at the time of building permit issuance. If you desire an
estimate of the required impact fees according to current rates please contact the Department of
Community Development and/or visit.
Note: During preparation of the staff report for future applications, additional conditions of
approval may be recommended based on comments and recommendations provided by other
applicable review agencies involved with the review of the project.
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
Page 1 of 2
NOTICE OF A PUBLIC HEARING FOR
PLANNED UNIT DEVELOPMENT (PUD)
Project Name: Cottonwood and Ida PUD Application: 18516
Summary: The purpose of the public hearing is to consider the Cottonwood and Ida Preliminary
Planned Unit Development Application 18516.The development proposes a mix of uses including
apartment buildings, an office building, a mixed use building including artisan manufacturing and a
restaurant building. The proposal includes four buildings. The largest building includes apartments,
64 units, and offices, 29,700 sq. ft., separated horizontally over an underground parking structure
consisting of 96 parking spaces. The other buildings on site include a 12 unit apartment building, a
mixed use building with artisan manufacturing, 5,400 sq. ft. with 26 units above and one 2,150
square foot commercial restaurant building. The application includes the concurrent construction of
East Aspen Street, North Ida Avenue and the north half of East Cottonwood Street.
The application requests that the city grant relaxations to the following standards:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment buildings as
an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of the
allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to decrease the
required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow zero lot
line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the
allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase the
maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage.The application proposes to decrease the
required residential transparency from a minimum 15%to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to decrease the
required commercial transparency from 60%to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards.The application proposes to reduce the
requirement for efficiency units from 1.25 spaces per unit to 1 space per unit. The application
proposes to reduce the requirements for one bedroom units from 1.5 spaces per unit to 1.25 spaces
per unit.
10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to reduce
all nonresidential parking standards by 40%.
11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the street
according to the adopted designs for local streets and instead construct East Cottonwood Street with
back out angled parking.
Parcel size: 2.06 acres Location: 615 East Cottonwood Street and 720 North Ida
Avenue, Bozeman, MT 59715
Legal Description: Lots 5-16, Block 106 including a vacated alley and Lots 17-28, Block 105
including a vacated alley in the Northern Pacific Addition to Bozeman located in S06, T02 S, R06 E,
P.M.M., Gallatin County, Montana.
BO6EMAUC1MT
Community Development
Noticing: Public Comment Newspaper Legal Ad Site Post Adjacent Owners Mailed
Period 3/3/19 and 3/10/19 3/3/19 3/1/19
3/3/19 to 3 25 19
Decision: Authority and Decision
The City Commission public hearing and decision is scheduled for Monday, March 25,
2019 in the Commission Meeting Room in Bozeman City Hall, 121 North Rouse Avenue,
at 6:00 p.m.
This application is evaluated against the Preliminary PUD criteria of sections 38.430 of the municipal code
and associated standards.Approval or conditional approval may be granted if the decision maker
determines all criteria are met.
The public may comment orally at the public hearing or in writing at or prior to the public hearing
regarding compliance of this application with the required criteria. Comments should identify the specific
criteria of concern along with facts in support of the comment. During the notice period the City will
continue review for compliance with applicable regulations.
Written comments may be directed to: City of Bozeman Department of Community Development,ATTN:
Brian Krueger, PO Box 1230, Bozeman, MT 59771-1230, or emailed to agenda@bozeman.net. Summary
data on this application are available at www.bozeman.net/planning. Select'Project Documents' and
navigate to application 17231 and 17232. The full application may be reviewed in the City of Bozeman
Department of Community Development,Alfred M. Stiff Professional Building, 20 East Olive Street, 582-
2260. For those who require accommodations for disabilities, please contact the ADA Coordinator Mike
Gray, at 582-3232 (voice), 582-2301 (TDD). Please reference Application 18516 in any
correspondence.
7- 7'T'T
} f'�► r
/'�11N tA i
M( --�f
�• w
r �• AtltlA r k, t
..L,1 in w.auuu: M r}.
:a. "
IA
Tr 4
,epw
Arc
NOTICE OF A PUBLIC HEARING FOR A PLANNED UNIT DEVELOPMENT APPLICATION
The City of Bozeman Department of Community Development is reviewing a Preliminary
Planned Unit Development(PUD) application requesting permission to grant relaxations for
a planned unit development and to develop existing lots consisting of 2.06 acres within the
NEHMU zoning district.
The subject property is addressed as 615 East Cottonwood Street and 720 North Ida
Avenue. The site is legally described as Lots 5-16, Block 106 including a vacated alley and
Lots 17-28, Block 105 including a vacated alley in the Northern Pacific Addition to Bozeman
located in S06, T02 S, R06 E, P.M.M., Gallatin County, Montana.
The purpose of the public hearing is to consider the Cottonwood and Ida Preliminary
Planned Unit Development Application 18516. The development proposes a mix of uses
including apartment buildings, an office building, a mixed use building including artisan
manufacturing and a restaurant building. The proposal includes four buildings. The largest
building includes apartments,64 units,and offices,29,700 sq.ft.,separated horizontally over
an underground parking structure consisting of 96 parking spaces. The other buildings on
site include a 12 unit apartment building, a mixed use building with artisan manufacturing,
5,400 sq. ft. with 26 units above and one 2,150 square foot commercial restaurant building.
The application includes the concurrent construction of East Aspen Street, North Ida Avenue
and the north half of East Cottonwood Street.
The application requests that the city grant relaxations to the following standards:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of the
allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards.The application proposes to decrease
the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to allow
zero lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to decrease
the required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to decrease
the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space per
unit. The application proposes to reduce the requirements for one bedroom units
from 1.5 spaces per unit to 1.25 spaces per unit.
10.BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to
reduce all nonresidential parking standards by 40%.
11.BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the
street according to the adopted designs for local streets and instead construct East
Cottonwood Street with back out angled parking.
All reviews and processes are pursuant to Chapter 38 of the Bozeman Municipal Code (BMC).
The City Commission will conduct a public hearing on the planned unit development on
Monday, March 25, 2019 in the Commission Meeting Room in Bozeman City Hall, 121
North Rouse Avenue, Bozeman, MT at 6:00 p.m.
The City invites the public to comment in writing and to attend the public hearing(s).
Written comments may be directed to: City of Bozeman Department of Community
Development,ATTN: Brian Krueger, PO Box 1230, Bozeman, MT 59771-1230, or emailed to
agenda@bozeman.net. Summary data on this application are available at
www.bozeman.net/planning. Select'Project Documents' and navigate to applications
17231 and 17232. The full applications may be reviewed in the City of Bozeman
Department of Community Development,Alfred M. Stiff Professional Building, 20 East Olive
Street, 582-2260. For those who require accommodations for disabilities, please contact
the ADA Coordinator Mike Gray, at 582-3232 (voice), 582-2301 (TDD). Please reference
Application 18516 in any correspondence.
SUBMITTED THURSDAY212812019 FOR SUNDAYS, 31312019 and 311012019, LEGAL
AD PUBLICATIONS. PLEASE PRINT BOLD WHERE INDICATED. PLEASE SEND AFFIDAVIT
TO BOZEMAN DEPARTMENT OF COMMUNITY DEVELOPMENT.
MT
BOZ E MAN
WEDNESDAY, FEBRUARY 27, 2019
Cottonwood and Ida PreHominary PUD Design Review Board
18516
• Proposed mixed use �I
residential/commercial Planned Unit ,
M-1 t
Development
�;': ,
• 2 acres site east of North Wallace
Avenue, bound by East Aspen, Ida ®�eF9!1 E ASPEN ST
Avenue and East Cottonwood Street. y • ; �• ice, 4
• Design Review Board required step in H M U �!� •� �' '�/ �� , ' RL ' �,
P U D process Pill
?:
r
•; Zoned NEHMU, Neighborhood 1 � + ;��
Conservation Overlay District
Is
Bozeman Community Plan map
designation-I ndustrialFMft
-P2-
• Demolition of most structures on site BM""�p"'°'
0 0
CoHonwood and Wa PUDPrOo 1mlonary Design Review Board
18516
• 4 buildings _------ _
-+' F TA\t A1G\CH ST
TT
• 64 apartment units/29 700 sq. ft office
over parking structure, 96 parking
P 9 p g
spaces L^f'4` .'
•—. r�` I. "�rat � ♦ 4'.
• 12 unit apartment building, artisan , ^� r +
' '
mixed use building 26 units over & � C _ • _: • o
5,400 sq. ft �1 Irl
• 2, 150 sq. ft restaurant building E('OTPO\\\'OGP ST -
• _
��y A
BP�■a P� r
0 0
BOZEMAN
Design Review Board
E T 1�IARACK ST
I
i
IN%
E ASPS\ ST
E ASPEN ST
I
ra
r-�
E CO'ITON 'OQU,ST
Lepand
OPT Idedion
Parcels
Roads
OP-.*v Projects -- -
Community Plan Future Land Use
[ Residential
Residential Emgmsis Mbsd Use _
Subutban Residatlal
0 Repional Commercial w4 Services
O Community care rre.a�
-;Community Commercial Milord Use
Susinsss Park MbadUse E PEACH'STi
Q Industrial
Public Insiitubans
r-3 Parks.Open Space and Recreational Lands
Other Pubic LaWs
Golf Course
C7 Present Rural
O 0
r•
mu" OZ E MAN m7
-- - -- -- Design Review Board
E 7o1ilL�1L�N S'f
E .sPeN .rr
E SPE\-ST
Legend
8 Planning Pro(ects Saloom ,
City Limits(Ifilla)
O Mixed use
CO Ras4tmPBar CO'ITON 1000 ST
Commercial Retai Sobs.Services.Banks _ -
Hotemotel
O CammardalAuto
.Adn**traWewrdaaaional
-•1.191%Manufacturing f
OGoof Course
Park or Cpan Space .t ,
Conservation F_asarnmt
M Church ••, - /fy
Public Faddty 1
SchoohEdu Wianat FadBty — yy
(_]SiglrMousehold Raddontid
OupleATripbx Rosideit l
Q I.iAti.Household Residential
Mobile HomeWobile Park
Right-d-Way
L]undevalePad E PEACIt ST
QJ vacant
Parcels ;
RoedsAftp
(� ;
City UrAS
-annin \
9 Profs `ice I Bon+nwn{
Design Review Board
LUMBER
F__,a7__DTlS_TRIBUTOR
lr s U STORIC
TRAIN IDEPOT
C,ra Pill NORTHERN
PACIFIC
COFFICES
FORMERRAILWAY
BREWERY
SITEjF _t „ e
fff & INDUSTRIAL S fT POCKET
PARK
E.ASPEN ST
ARTISAN t
BREAKFAST
MFR.
f `� ARTISAN
SINGLE-FAMILY L MISCO . 4�. SINGLE-FAMILY - MFR.
r RESIDENCES *:
MILL 7 RESIDENCES
I + �- • y
�E.COTTONWOOD ST.
SINGLE-FAMILY ��
RESIDENCES k,uj CAFE L v MULTI-FAMB[Y cam, ;t� w + �, RESIDENTIAL ` 0 W
ER&WINE
f" Q•1,' .3 z 7 W- F,.. !? .#� 4 DISTRIBUTOR r t
OFFICES& t BIKE I,Z,1 y OFFICES& r �~
STUDIOS SHOP BAKERY 11, STUDIOS
E.PEACH ST.
L44
TO KI 'd,� r
' DOWNTOWN i- SINGLE-FAMILY ` "� �%€;,'
r .sy RESIDENCES ,e p NOR
COMMERCIAL .
0 L.AkJPAi BUS DEPOT �^: .` `.�, ' �:�_ , • �. •7 0
BOZ E MAN MT
Design Review Board
1
ra 1 1 �Oo�Mm'b�tw�i.aw, ,
1
4 buildings
-, 64 apartment ,
I � 1
units/29,700 sq. ft
AAWV[ - f office over
_ ; parking structure, '
I O=RL, LI
--------- - ,u - ---� 96 parking
�K I
spaces
12 unit apartment
<=•� =� " ; `• 1 ; "�°` building, artisan
t� ; mixed use
'moo'
I ` ���_ building 26 units
over 5,400 sq. ft
2, 150 sq. ft
restaurant
building
72 parking
spaces offsite, 32
on street
BOZ E MAN MT
Design Review Board
m
i
-
; p !
ffTIT- I
P
000
L
-------------------------------
Ejl-
EN
LLJ
TAC ❑
❑ Li
i v, f ti i
- _
i ------------- - ----------------
❑ ❑ �"'� �'
❑ ❑ ❑
i
F-I= i
o
� I(1
BOZ E MAN MT
Design Review Board
Z- 7
TT
j ll�
''i'1
l i
BOZ E MAN MT
Design Review Board
RESIDENTIAL.
COMMERCIAL
ARTISAN MFR.
COMMUNITY
8
.. 1
•
i
Design Review Board
l i '� � .,.....
go
ur.unrw•eo naere.rrr rum ..r.•.�erw.na wc.�r.�msrrn
u:�wv
w•mew.iea. .w wnms wa nw
.eimat
uc.aw w.a.e o�m..
�u�ios p� `.00e.or �rrm--
go
. __ — • a
ID
i fr�e+no•e• tt.ay nyr•,w•usreei
r uu... .•sr.rp�w.aa..�xp.....w..�.- ..rn.or .ca+u*aovm...w
•ow ��r pew
an..�
ooiws.*a .,r�ao1M
c 7 ya
h
y
r.
.�_,y,r N0 oofia�000 �lartt_ftV•gon•wrtniwriw..oaw
a � a m
Design Review Board
— ff 1 1 �y � _
g d
r
WOODS:(X,,* PANELSVN3 STAND:NGSEAM HORI20NTALAND CORRUGATED
s.
METAL ROOF SJG VERTLAL SUN METAL 5<:'�NG
ANOSD.NG SHADES
• G� � � it �� _
s
74 r
AP IA RIB � �, "4 ��•
- MT
BOZEMAN !
Design Review Board
I WWK.
rmS amA anoi
i'
♦UJAa AM AccessEl
uno�oww
Roo.oeva
pf� .rasv�aiow`�.w�
�L MIMfKI •Cw�tOVl>t
Ems 1 wool so= aoo2
1 ('^
ty
,1
of 11
KALLKAK I WM MOiPrt Ti
FUAMW Ado I` pA AYY.
YLWI>MK
tlKM�00 Wf
I
1
I
MT
BOZEMAN
Design Review Board
o
u)aa.
e r�orur 'fir_ A- C� A I,IC j I.�L
11
■L0�
■D6�
n�am
ten.
w r i r -�; ��
T Ti �..{ 1 a •� t
i � j
ry
BOZ E MAN MT
Bridger Vale Preliminary PUD Design Review Board
17232
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
E 2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of the
• allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to decrease
4 the required front setback from 20 to 8 feet.
i 4. BMC 38.320.-050 Form and Intensity Standards. The application proposes to allow
i
zero lot line conditions in the NEHMU.
S. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to increase
the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to decrease
the required residential transparency from a minimum 15% to 8%. '
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to decrease
the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom units
from 1.5 spaces per unit to 1.25 spaces per unit.
10. BMC 38.540.050.A.2 Non-residential Parking Standards. The application proposes to
reduce all nonresidential parking standards by 40%.
11. BMC. 38.400.050.A.1 Street Design. The application proposes to not construct the
street according to the adopted designs for local streets and instead construct East
Cottonwood Street with back out angled parking.
BOZEMAN MT
Design Review Board
Bridger Vale Preliminary PUD
i
i 17232
• Application meets criteria-Performance met through affordable housing,
open space, LID
• Recommendation is for conditional approval
• No additional design conditions are recommended
i
Design Review Board
sit
0 0
MT
BOZ E MAN
Design Review Board
EWASMMM �. 4 buildings
f L'.
- _ - 64 apartment
units/29,700 sq. ft
91
office over
0 h
i - - F I parking structure,
I �
---------- OFM
,ea, 06M �.. - :,U. 96 parking
1
spaces
W�
R 4tQ.P � lifAn�wO � .
_ 12 unit apartment
building, artisan
v I
u - ; mixed use
` building 26 units
• — — as,s I
-- 0� over 5,400 sq. ft
13
2, 150 sq. ftL! ;
;. restaurant
r--I
_ ��.� �� ► �;- - ,�� ,, ��' ; building
I I
-----------------------r----------------- ----
72 parking
spaces offsite, 32
on street
18516 Design Review Board Staff Report for the Cottonwood and Ida (PUD)
Preliminary Plan
Date: Design Review Board, February 27, 2019, at 5:30 pm.
Project Description: A Preliminary Planned Unit Development (PUD) application to allow
a mixed residential and commercial development with relaxations to zoning
regulations requested for apartment building use, building height parking, street
design, restaurant design, transparency, front setbacks and a request for concurrent
construction.
Project Location: 615 East Cottonwood Street and 720 North Ida Avenue. The parcels
are legally described as Lots 5-16, Block 106 including a vacated alley and Lots
17-28, Block 105 including a vacated alley in the Northern Pacific Addition to
Bozeman located in S06, T02 S, R06 E, P.M.M., Gallatin County, Montana.
Recommendation: Approval with conditions and code provisions
Motion: "Having reviewed and considered the application materials, public comment,
and all the information presented, I hereby adopt the findings presented in the
staff report for application 18516 and move to recommend approval of the
Cottonwood and Ida Planned Unit Development application subject to conditions
and all applicable code provisions."
Report Date: February 19, 2019
Staff Contact: Brian Krueger, Development Review Manager
Executive Summary
The property owner and applicant submitted an application to develop an existing
underutilized site in the Northeast Historic Mixed Use District, NEHMU. The site is
accessed from a future extension of East Aspen Street and from East Cottonwood
Street. The development proposes a mix of uses including apartment buildings, an
office building, a mixed use building including artisan manufacturing and a restaurant
building. The proposal include four buildings. The largest building includes
apartments, 64 units, and offices, 29,700 sq. ft., separated horizontally over an
underground parking structure consisting of 96 parking spaces. The other buildings on
site include a 12 unit apartment building, a mixed use building with artisan
manufacturing, 5,400 sq. ft. with 26 units above and one 2,150 square foot commercial
restaurant building. The application includes the concurrent construction of East
Aspen Street, North Ida Avenue and the north half of East Cottonwood Street.
The subject property is zoned Northeast Historic Mixed Use District. The site is 2.06
acres in size. The north half of the property includes four multi use storage and
warehouse buildings constructed beginning in 1960. All buildings on the north half of
0 - 0
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 2 of 28
the property are proposed for demolition. The south half of the site includes a grain
warehouse building constructed in 1930. The grain warehouse is proposed to remain
and be adaptively reused through the site development process for use as a
restaurant/community building.
Eleven relaxations to the Bozeman Municipal Code (BMC) zoning regulations are
proposed with the application:
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of
the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
S. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom
units from 1.5 spaces per unit to 1.25 spaces per unit.
10.BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11.BMC. 38.400.050.A.1 Street Design. The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
The criteria for granting a PUD are found in BMC 38.430.090.
A PUD is a discretionary approval and the review authority must find that the overall
development is superior to that offered by the basic existing zoning standards as required
in BMC 38.20.030.A.4. The intent of a PUD is to promote maximum flexibility and
innovation in development proposals within the City.The applicants can request
relaxations from the code in exchange for a higher quality of design.The obligation to show
• 0
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 3 of 28
a superior outcome is the responsibility of the applicant. The applicant asserts that the
overall outcome of the proposal is superior to what would be obtained from the application
of the default NEHMU district.
The Development Review Committee (DRC) has reviewed the application. Based on its
evaluation of the application against the criteria, the Development Review Committee
(DRC) found the application adequate for continued review. The application is
complete for design review purposes.
The Design Review Board (DRB) is scheduled to review the application on February 27,
2019. The Design Review Board is the design review advisory body to the City
Commission on this application. The DRB is required to make a recommendation to the
City Commission on this application.
Unresolved Issues
There are no unresolved issues with the application. Code corrections have been
provided by the DRC.
Alternatives
1. Recommend Approval of the application with the recommended conditions and report
findings;
2. Recommend Approval of the application with modifications to the recommended
conditions and modifications to the report findings;
3. Recommend Denial the application based on the Design Review Board's findings of non-
compliance with the applicable criteria contained within the staff report; or
4. Open and continue the review on the application with the concurrence of the applicant,
with specific direction to staff or the applicant to supply additional information or to
address specific items.
TABLE OF CONTENTS
ExecutiveSummary.................................................................................................................................1
UnresolvedIssues.....................................................................................................................................3
Alternatives................................................................................................................................................3
SECTION1 - MAP SERIES............................................................................................................................5
SECTION 2 - REQUESTED RELAXATION / DEVIATIONS /VARIANCES................................ 14
SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL..................................................... 14
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 4 of 28
SECTION 4— REQUIRED CODE PROVISIONS................................................................................... 15
SECTION 5 - STAFF ANALYSIS AND FINDINGS............................................................................... 15
APPENDIX A—PROJECT SITE ZONING AND GROWTH POLICY.................................................26
APPENDIX B — OWNER INFORMATION AND REVIEWING STAFF..........................................27
APPENDIX C —PLANNED UNIT DEVELOPMENT INTENT...........................................................27
ATTACHMENTS...........................................................................................................................................28
0 •
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 5 of 28
SECTION 1 - MAP SERIES
In �. `' � � — � j���� �� ' I ''°� �� ►
E Crl
K ST
� 1
ri
jr
lb
r,l
1
1 �
LJ �I' I fi _ i` 1� r .: L J . .
IZNW: OD
1 out
,,
six
Liogend
Planning Projects selection 0 F PEACH ST A ��
Parcels
Roads
AIICys
tit City Limits "�. ►' C /�`
BPlanning Projects y AT
'
Zoning Classification
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 6 of 28
E TA-N7ARACK S'I�
I
E ASPEN ST
E ASPEN ST
I
I
'E CO•I.TONW0 D� T ! �
Legend
Planning Projects seledion
Parcels
Roads f`
Alleys
ity Limits l� iL ---' I
0 Planning.Projects -Community Plan future Land Use
Residential
Residential Emphasis Mixed Use i
Suburban Residential
C] Regional Commercial and Services
C] Community Core %-J"f AL-1
Community Commercial Mixed Use
Business Park Mixed Use T V EPEP ACH ST
C7 Industrial t_
Public Institutions
d Parks,Open Space and Recreational Lands 1y�7
© Other Public Lands �Q
Goff Course
Present Rural A�
Growth policy designation
0 0
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 7 of 28
IN
E TAMARACK S') i Tl
1'
g
jr
-i--E ASPS EN ST i� 1,*, +
el
T II ? .
- 3 -
04
'` ~
} a
Legend
Planning Projects selection '
City Limits(111118) ? F
U Mixed Use —-- -- — 'r.
i� RestauranllBar �_�r
cn j:roiv�voc�v sT
❑Commercial Retail Sales,Sorvices,Banks
HotellMotel
O Commercial Auto V
Ad ministrative%Profess Tonal
Light Manu(acturing
Golf Course
d Park or Open Space i?
Conservation Easement -
Church
Public Facility
®SchooAEducational Facir-ty
Singl"ousehold Residential
C i DupleATriplex Residential
Multi-Household Residential
Mobile HomeUNobile Ptak
Lj Right-of-Way -
Ci Undeveloped " r E PEACH ST f
C7 vacant _ _'' --dWY. s s
Paroels F
Roads a
Alleys Q i
City Limms
Q Planrgng Projects
lip J Bozeman
Current Land Use
T
,
1
�q
I L
IH
d
t
Fwwmurea,
T--
' ;—
MDMDAAVE"I — — — r---------r-- ------ —
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 9 of 28
SA a �
,
i
n
• I 1 f-WIE-1 J
I
_FH
I
I
l
>< a I
R
NO .y_,•S
1 � i , I
it
. ,
_'►_.== � �-�-���; �!'�-�'-�-�s-�#�_.�g-.es�.� .:mac�� +�, -' I -,
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 10 of 28
r—,
L RESIDENTIAL
COMMERCIAL
ARTISAN MFR.
COMMUNITY
•'t 5 7 z
• 1
\ 46r
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 11 of 28
wxcio+.rw�ao .w nrw.e...wnwo- ,. i srnwneni, ns�...rwne.mr..
"P 1
•..c..a+,..samn
Y.w.w
- - -- -- .m`auv."wr a r� tI �ws, L.®a.. �����,�-m...x/.. ►�mx `.m.,aa
��RF,DCRWr•AS.[Y 'iR.GNAID.•!lO.MI .ore H,Y.T..,.V x•r M.aYY
��...lK aCxnPi.[f mi0@rtwlo .,.wtWYC.KOA.�,bi�R.rVf®swlm
r .Yam
M.,111LC xA..V.,u
ram.uY
' -M[ lf 'MCI* TIM E 11 TI
y!
In] 11
.LL.DI.,. k RA➢...
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 12 of 28
.was .no. wno.
�1 ,T
4�,t rii Cis+ ►1 5
HAUAW AIE AQ S1 r•- R ^i�1w¢ r �.OiMi .wi1VKt Ww n , L1A\'E
• ��.�twf� rs
,oat.x.x us•
�LrECEfinN.ow�rMM
7�iI
may nao\ awae nm:
o�.v n..r o.e,wv mwn ,
Iv
roAl4LE Arc 4 PmAccC � ! I r ��33
i'A�E RCrPY:4�,lua,Jg_ _
•
18516 DRB Report for the Cottonwood and Ida Planned Unit Development PUD Page 13 of 28
r—i
sreus,. � _ TT4r i 1 '. �•-1 r c � � , i, � �� carrarmaoosr.
_ _ I � ..m+ara wwreo., Q..noo, ..mrua.�, bs+a. yoao�• I_
....,..� Ham"
�,
am.
_ __ rn 11
T T' �)`�T�i������)�}; mom.�. •� ���pn� 1
,tr.u.,. in n n I Q
d4r
$M SECT".KS aAPARTWRSOQ
am' SLW4
i_-! H
AWN SI � •0�tl10..� Wf1�MMlt' �: COT,0.ST
Ht
,Ecnw_,cs."Mae
r v.:♦
0 •
17232 DRB Staff Report for the Bridger Vale Planned Unit Development(PUD) Page 14 of 28
SECTION 2 - REQUESTED RELAXATION/DEVIATIONS/VARIANCES
1. BMC 38.310.040.0 Table of Uses. The application requests for to add apartment
buildings as an allowable use in the NEHMU district.
2. BMC 38.310.040.0 Table of Uses. The application requests to increase the size of
the allowable restaurant use in NEHMU from 1,500 to 2,200 square feet.
3. BMC 38.320.050 Form and Intensity Standards. The application proposes to
decrease the required front setback from 20 to 8 feet.
4. BMC 38.320.050 Form and Intensity Standards. The application proposes to
allow zero lot line conditions in the NEHMU.
5. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the allowable maximum height to be increased from 45' to 54'.
6. BMC 38.320.050 Form and Intensity Standards. The application proposes to
increase the maximum lot coverage in NEHMU from 40% to 45%.
7. BMC 38.510.030.0 Landscape Block Frontage. The application proposes to
decrease the required residential transparency from a minimum 15% to 8%.
8. BMC 38.510.030.13 Storefront Block Frontage. The application proposes to
decrease the required commercial transparency from 60% to 30%.
9. BMC 38.540.050.A.1 Residential Parking Standards. The application proposes to
reduce the requirement for efficiency units from 1.25 spaces per unit to 1 space
per unit. The application proposes to reduce the requirements for one bedroom
units from 1.5 spaces per unit to 1.25 spaces per unit.
10.BMC 38.540.050.A.2 Non-residential Parking Standards. The application
proposes to reduce all nonresidential parking standards by 40%.
11.BMC. 38.400.050.A.1 Street Design. The application proposes to not construct
the street according to the adopted designs for local streets and instead
construct East Cottonwood Street with back out angled parking.
The relaxations may be granted with a Planned Unit Development (PUD).The criteria for
granting PUD relaxations are included in BMC 38.430.030.A.4.c. Staff has reviewed the
criteria and finds that they are met for all eleven relaxations with the adoption of the staff
analysis and findings below for justification.
SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this
report.
1. The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, does not, in any way, create a waiver or
other relaxation of the lawful requirements of the Bozeman Municipal Code or state
law.
• •
18516 DRB Staff Report for the Cottonwood and Ida Planned Unit Development Page 15 of 28
SECTION 4 - REQUIRED CODE PROVISIONS
1. All required code corrections are provided through the DRC review.
SECTION 5 -STAFF ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application
materials, municipal codes, standards, plans, public comment, and all other materials
available during the review period. Collectively this information is the record of the review.
The analysis in this report is a summary of the completed review.
Applicable Plan Review Criteria,Section 38.230.100,BMC.
The applicant is advised that unmet code provisions, or code provisions that are not
specifically listed as conditions of approval, do not in any way create a waiver or other
relaxation of the lawful requirements of the Bozeman Municipal Code or State law.
In considering applications for plan approval under this title,the advisory boards and
City Commission shall consider the following:
1. Conformance to and consistency with the City's adopted growth policy
Yes. The property has a future land use designation of Industrial and is zoned NEHMU,
Northeast Historic Mixed Use. The proposed residential units, office and restaurant uses
and artisan manufacturing uses increase the intensity of commercial uses and the
density of residential uses beyond the existing development pattern. The change in
intensity is anticipated by the growth policy in areas of the city with adequate
infrastructure. The project is in conformance to and consistent with the City's adopted
growth policy, the Bozeman Community Plan, including the following goals and
objectives:
Goal LU-1: Create a sense of place that varies throughout the City,efficiently
provides public and private basic services and facilities in close proximity to
where people live and work,and minimizes sprawl.
The NEHMU district has a distinct sense of place,this project contributes to an existing
and expanding mixed use area and allows people to live in close proximity to work,
public and private basic services and minimizes sprawl.
Objective LU-1.4 Provide for and support infill development and redevelopment
which provides additional density of use while respecting the context of the
existing development which surrounds it. Respect for context does not
automatically prohibit difference in scale or design.
This project provides additional density of residential and commercial use while
respecting the context of the mixed use area.The change in scale is allowable with the
0 •
18516 DRB Staff Report for the Cottonwood and Ida Planned Unit Development Page 16 of 28
design presented as it has human scale and is compatible with the district with building
sized within their context and integrated into the neighborhood.
Objective LU-2.3: Encourage redevelopment and intensification, especially with
mixed uses, of brownfields and underutilized property within the City consistent
with the City's adopted standards.
This project includes mixed uses and increase residential density and is proposed on
underutilized property in an ongoing and developing mixed use district.
Objective E-4.2: Promulgate efficient land use practices.
This project promulgates efficient land use practices and provides a high net residential
density and FAR with office, manufacturing and restaurant uses,while adding a
significant amount of usable open space area that can be used by the entire community.
Objective C-2.5 Explore and encourage innovative parking solutions for both
residential and commercial projects including parking best practices,expanding
parking districts, cash in lieu of parking and design guidelines for structured
parking.
This project proposes a parking reduction, structured parking integrated into the
building design and offsite parking that will allow the project to provide an intensity of
use today while having the ability to adapt to the changing transportation
infrastructure in town including autonomous vehicles, ridesharing, car sharing, and
increased transit service.
Goal H-1: Promote an adequate supply of safe,quality housing that is diverse in
type,density,cost,and location with an emphasis on maintaining neighborhood
character and stability.
This project provides additional quality housing at high density in an area that has
historically included smaller residential low density uses. More recent infill projects in
this neighborhood have included apartment uses over mixed commercial uses.This
project will add to the neighborhood character and the stability of this area. Residential
uses provide additional eyes on the street and have a twenty four hour presence that
will make the district safer and enhance the overall neighborhood.
For more information on the growth policy designation please see Appendix A.
2.Conformance to this chapter,including the cessation of any current violations
Yes. The project, if approved,will conform to the Bozeman Municipal Code other than
the requested relaxations. There are no known documented violations of the BMC for
this property.
18516 DRB Staff Report foOe Cottonwood and Ida Planned Unit Alopment Page 17 of 28
3.Conformance with all other applicable laws, ordinances,and regulations
Yes. The proposed uses of the site are consistent with the allowed uses of the NEHMU
district with the additional of the apartment building use. No specific conflicts have
been identified.Additional steps will be required including but not limited to final
payment for cash in lieu of water rights, approval of the final planned unit development,
subdivision exemption to realign and aggregate the underlying lots, dedication of the
utility easements, construction of infrastructure, PUD final plan documents and
application, site plan approval and building permits. The Building Division of the
Department of Community Development will review the requirements of the
International Building Code for compliance at the time of building permit application.
Condition of approval 1 requires full compliance with all applicable code requirements.
4. Conformance with special review criteria for applicable permit type as
specified in article 2
Yes. The CUP and PUD criteria are reviewed below.The project meets the requirements
and criteria as presented.
5. Conformance with the zoning provisions of article 3, including permitted uses,
form and intensity standards and requirements,applicable supplemental use
criteria,and wireless facilities and/or affordable housing provisions if applicable
Yes. The uses are permitted in the NEHMU district with the addition of apartment
building uses requested through relaxation. Form and intensity standards are met with
the proposal other than the proposed relaxations for the front setback and zero lot line
conditions, lot coverage and building heights.Affordable housing is proposed in
compliance with the PUD performance standards and will be confirmed through the
final PUD process.
6. Conformance with the community design provisions of article 4, including
transportation facilities and access,community design and element provisions,
and park and recreational requirements
Yes. The proposed streets meet standards with the proposed relaxations. East Aspen
Street, East Cottonwood Street and North Ida Avenue are required to be improved with
this project. The proposed parking is to be met with reductions allowed through
relaxation of the parking requirements. Pedestrian access is provided from the street
directly through and into the project. The primary entrances into each building are
connected to the City's sidewalk system. Perimeter street frontage sidewalks are
provided on every perimeter street in conformance to standards. The lots and block
meet standards,water and sewer is provided to each lot through mains within the city
owned rights of way. The applicant will be constructing water mains to support the site.
Site surface drainage generally meets standards at this level in the design for the streets
18516 DRB Staff Report fo*e Cottonwood and Ida Planned Unit Selopment Page 18 of 28
and development. Cash in lieu of water rights is proposed and will be paid with the final
site plan for site development.
The applicant proposes to pay cash in lieu of parkland in conformance with standards,
capped at twelve dwelling units per acre.
7.Conformance with the project design provisions of article 5, including
compatibility with,and sensitivity to,the immediate environment of the site and
adjacent neighborhoods and other approved development; design and
arrangement of the elements of the plan; landscaping; open space; lighting,
signage;
The development is compatible with and sensitive to the immediate environment of the
site and the adjacent neighborhoods and other approved development relative to,
building mass and height, landscaping, orientation of parking and building placement
on the site. The buildings comply with permanence in building materials, building
quality, architectural integration, neighborhood identity, and orientation of parking and
service areas. The general approach to landscaping meets standards.
The design of the plan is consistent with the existing natural topography. The site will
be raised to allow the inclusion of underground parking.There are no water bodies or
significant existing vegetation on site.
A general comprehensive signage is proposed in conformance with standards.
Parking is proposed to be reduced via a relaxation for both residential and commercial
uses. 96 parking spaces are proposed in an underground parking structure and 72
parking spaces are proposed offsite for the non residential uses. 32 on street spaces are
proposed for residential use. Prior to reductions the project would have required 255.3
parking spaces,with reductions the required parking is proposed at 166.1 parking
spaces. 200 parking spaces are proposed to be provided through a combination of
onsite, offsite and on street as outlined above.
8. Conformance with environmental and open space objectives set forth in
articles 4-6, including the enhancement of the natural environment,
watercourse and wetland protections and associated wildlife habitats; and if the
development is adjacent to an existing or approved public park or public open
space area,have provisions been made in the plan to avoid interfering with
public access to and use of that area
Yes. Pervious pavers are proposed to treat stormwater from the development. This is in
compliance with best practices for Low Impact Development.The approach to the
stormwater system meets code standards.The final review of the stormwater system
will occur with the site plan review. The development is adjacent to a small public park
18516 DRB Staff Report folle Cottonwood and Ida Planned Unit Melopment Page 19 of 28
and climbing boulder. No significant impact to the park is anticipated from this
development.
9. Conformance with the natural resource protection provisions of article 4 and
article 6
Yes. No streams, floodplains, critical plant communities or wetlands exist on site.
10. Other related matters, including relevant comment from affected parties
No public comment has been received to date. Public comment will commence once the
project can be scheduled for a public hearing.
11. If the development includes multiple lots that are interdependent for
circulation or other means of addressing requirement of this title,whether the
lots are either:
a. Configured so that the sale of individual lots will not alter the approved
configuration or use of the property or cause the development to become
nonconforming; or
b.The subject of reciprocal and perpetual easements or other agreements to
which the City is a party so that the sale of individual lots will not cause one or
more elements of the development to become nonconforming
The property must be configured through the applicable subdivision review process to
relocate and aggregate common lot boundaries prior to the approval of the final PUD
plan.
12. Phasing of development
Not applicable. The project is proposed to be constructed in one phase.
Conditional Use Permit Review Criteria,Section 38.230.110, BMC,
E. In addition to the review criteria of section 38.230.100,the review authority shall, in
approving a conditional use permit, determine favorably as follows:
1. That the site for the proposed use is adequate in size and topography to
accommodate such use,and all yards,spaces,walls and fences,parking,loading
and landscaping are adequate to properly relate such use with the land and uses
in the vicinity;
The site is adequate.The proposed buildings, site design, pedestrian connectivity, open
space and mix of uses will enhance the neighborhood. Landscaped areas are
coordinated with adjoining properties and within the proposed development.The
landscape design will improve the street frontages of the site.The reduced setbacks
proposed through relaxation relate well to the historic building placements within the
18516 DRB Staff Report fooe Cottonwood and Ida Planned Unit Melopment Page 20 of 28
vicinity.All parking is proposed either in an underground structure or offsite which
provides for an uninterrupted streetscape for pedestrians and the addition of on street
parking.
2. That the proposed use will have no material adverse effect upon the
abutting property. Persons objecting to the recommendations of review bodies
carry the burden of proof;
No adverse impacts to abutting properties have been identified. The construction of
East Aspen Street and the reconstruction and completion of North Ida Avenue and East
Cottonwood Street will improve safety for vehicles, cyclists,and pedestrians which
promotes public health and safety. General welfare will be promoted through a variety
of apartment types which will provide a variety of housing options for area residents.
The provision of additional office, manufacturing and restaurant uses to the districts
promotes general welfare by providing an expansion and additional density to the
mixed of uses in the NEHMU.The development serviced by the existing municipal
sanitary sewer and water systems promotes public health by protecting groundwater
from degradation associated with on-site septic systems and domestic wells.
Stormwater will be managed in pervious pavers and other retention facilities to filter
out sediment and treat runoff. .
3.That any additional conditions stated in the approval are deemed necessary
to protect the public health,safety and general welfare.Such conditions may
include,but are not limited to:
a. Regulation of use;
b.Special yards, spaces and buffers;
c.Special fences,solid fences and walls;
d. Surfacing of parking areas;
e. Requiring street,service road or alley dedications and improvements or
appropriate bonds;
f. Regulation of points of vehicular ingress and egress;
g. Regulation of signs;
h. Requiring maintenance of the grounds;
i. Regulation of noise,vibrations and odors;
j. Regulation of hours for certain activities;
k.Time period within which the proposed use shall be developed;
1. Duration of use;
18516 DRB Staff Report fooe Cottonwood and Ida Planned Unit Oelopment Page 21 of 28
m. Requiring the dedication of access rights; and
n. Other such conditions as will make possible the development of the city in
an orderly and efficient manner.
The requirements of DRC review and the proposed covenants, maintenance plans and
design guidelines associated with the project will address these areas.
F. In addition to all other conditions,the following general requirements apply
to every conditional use permit granted:
1.That the right to a use and occupancy permit shall be contingent upon the
fulfillment of all general and special conditions imposed by the conditional use
permit procedure; and
2.That all of the conditions shall constitute restrictions running with the land
use, shall apply and be adhered to by the owner of the land,successors or assigns,
shall be binding upon the owner of the land,his successors or assigns,shall be
consented to in writing, and shall be recorded as such with the county clerk and
recorder's office by the property owner prior to the issuance of any building
permits,final plan approval or commencement of the conditional use.
The necessary recording of documents will be addressed as part of the final PUD plan
process.
Planned Unit Development Review Criteria,Section 38.430.090.& BMC.
The application presents the applicant's response to these criteria.
2. In addition to the criteria for all site plan and conditional use reviews, the following
criteria will be used in evaluating all planned unit development applications.
a.All development.All land uses within a proposed planned unit development
shall be reviewed against,and comply with,the applicable objectives and criteria
of the mandatory"all development"group.
(1) Does the development comply with all city design standards, requirements and
specifications for the following services: water supply, trails/walks/bike ways,sanitary
supply, irrigation companies,fire protection, electricity,flood hazard areas, natural gas,
telephone, storm drainage, cable television, and streets?
Yes, except for those standards proposed for relaxation the application conforms and in
some areas exceeds standards.
18516 DRB Staff Report forte Cottonwood and Ida Planned Unit Allopment Page 22 of 28
(2) Does the project preserve or replace existing natural vegetation?
Yes. The site has been substantially disturbed by development and previous land uses
and does not include significant natural vegetation. There will be substantial placement
of new vegetation within the site open spaces and perimeter street frontage.
(3)Are the elements of the site plan (e.g., buildings, circulation, open space and
landscaping, etc.) designed and arranged to produce an efficient,functionally organized
and cohesive planned unit development?
Yes. The proposal is cohesive and has a variety of coordinating elements ranging from
efficient circulation, underground structured parking, integrated architecture between
buildings, presentations of building fronts to the streets, private residential open
spaces, open spaces available to the public,and multiple landscape configurations.
(4) Does the design and arrangement of elements of the site plan (e.g., building
construction, orientation, and placement; transportation networks;selection and
placement of landscape materials,and/or use of renewable energy sources;etc.)
contribute to the overall reduction of energy use by the project?
Yes. The project proposes to construct to a LEED ND designation. LEED for
Neighborhood Development (LEED-ND),where "LEED" stands for Leadership in Energy
and Environmental Design, is a United States-based rating system that integrates the
principles of smart growth, urbanism and green building into a national system for
neighborhood design. LEED certification provides independent,third-party verification
that a development's location and design meet accepted high levels of environmentally
responsible, sustainable development. The LEED-ND system is a collaboration between
the United States Green Building Council,the Congress for the New Urbanism and the
Natural Resources Defense Council.
(5)Are the elements of the site plan (e.g., buildings, circulation, open space and
landscaping, etc.) designed and arranged to maximize the privacy by the residents of the
project?
Yes.The project is design to allow a diversity of residential types and configurations,
many ground floor units have access to outdoor spaces for their own use which provide
a public private separation for their units.Along the perimeter streets the residential
units along the frontages are raised up above the sidewalk level to a varying degree to
provide a transitional space between the public street and the private units.The
development complies with the interior special residential block frontage for all units.
Landscaping is provided along the streetscape and within the development that will
provide additional privacy.All vehicular access to the site is via the underground
parking structure that will generally only be used by the residents, city services and
their private service providers.
18516 DRB Staff Report fo$e Cottonwood and Ida Planned Unit Alopment Page 23 of 28
(6)Park land. Does the design and arrangement of buildings and open space areas
contribute to the overall aesthetic quality of the site configuration, and has the area of
park land or open space been provided for each proposed dwelling as required by section
38.420.020?
Yes. Parkland is provided per code requirements via cash in lieu of dedication. Open
space is provided for each residential building in compliance with standards.
(7) Performance.All PUDs shall earn at least 20 performance points.
Yes.With a PUD, Section 38.430.090.E.2.a.7 requires at least 20 performance points for
the subject property. There are 11 options provided in the UDC to meet this
requirement. Points can be met using any combination of on-site and off-site open
space or other options listed in the code.The Preliminary PUD must specify how the
performance points are being met.
Open space provisions for phased PUD developments: If a project is to be built in
phases, each phase shall include an appropriate share of the proposed recreational,
open space, affordable housing and other site and building amenities of the entire
development used to meet the requirements of section 38.430.090.E.2.The appropriate
share of the amenities for each phase shall be determined for each specific project at
the time of preliminary approval and shall not be based solely upon a proportional or
equal share for the entire site.
The PUD is proposing to satisfy the performance requirements with credits for
affordable housing (21), additional open space (9.37), underutilized and Brownfield
sites (6.67), LEED-ND (15) and low impact development plan (6). The tabulation is
under the common open space section of the application narrative on page 25. The
application satisfies the requirement with 58 performance points. The development
exceeds standards.
(8) Is the development being properly integrated into development and circulation
patterns of adjacent and nearby neighborhoods so that this development will not become
an isolated "pad"to adjoining development?
Yes the project will create new connections to the neighborhood around it with the
construction of additional streets sidewalks and open spaces.
c. Mixed Use. Planned unit developments in mixed-use areas (REMU, UMU,
and NEHMU zoning districts) may include commercial, light industrial, residential
and mixes of various primary and accessory uses.The particular types or
combination of uses are determined based upon its merits,benefits,potential
impact upon adjacent land uses and the intensity of development.
18516 DRB Staff Report fo a Cottonwood and Ida Planned Unit Alopment Page 24 of 28
(1)Is the project substantially consistent with the intent and purpose statements for the
underlying zoning district?
Yes.This neighborhood includes commercial uses, offices, manufacturing and housing.
The intent of the northeast historic mixed-use district is to provide recognition of an
area that has developed with a blend of uses not commonly seen under typical zoning
requirements. The unique qualities and nature of the area are not found elsewhere in
the city and should be preserved as a place offering additional opportunities for
creative integration of land uses.This PUD provides a creative integration of land uses.
The intent of this area is to allow private and case-by-case determination of the most
appropriate use of land in a broad range of both non-residential and residential uses.
This PUD proposes appropriate use of the land with a broad range of nonresidential and
residential uses.
(2)Is the project located adjacent or within proximity to an arterial or collector street
that provides adequate access to the site?
Yes. The project is located 300 feet from Peach Street, a collector street and 300 feet
from Tamarack Street a collector street with both streets feeding into Rouse Avenue to
the west the closest arterial street to the project.
(3) Is the project on at least two acres of land?
Yes, the site is 2.01 acres of land.
(4) Do the uses relate to each other in terms of location within the PUD,pedestrian and
vehicular circulation, architectural design, utilization of common open space and
facilities,streetscape, etc.?
Yes,the overall site layout and design guidelines provide a comprehensive design that
coordinates pedestrian and vehicular circulation, architectural design and the
utilization of open space and facilities.
(5) Does the overall project achieve or exceed the FAR 'floor area ratios"envisioned for
the underlying district?
Yes. There is no designated FAR required in the NEHMU.The proposed total FAR of the
development is 1.8 with 46 dwelling units to the acre.
(6)Is it compatible with and does it reflect the unique character of the surrounding area?
Yes. This development will contribute to the mixed use character in this area and the
eclectic residential and nonresidential uses located in this neighborhood.
18516 DRB Staff Report forlJfe Cottonwood and Ida Planned Unit Alopment Page 25 of 28
(7)Is there direct vehicular and pedestrian access between on-site parking areas and
adjacent existing or future off-site parking areas which contain more than ten spaces?
Yes.All parking spaces are accesses through the underground parking structure.The
offsite parking proposed at the northwest corner of Wallace Avenue and East Aspen
Street is within the distance requirements for off-site parking..
(8) Does the project encourage infill, or does the project otherwise demonstrate
compliance with the land use guidelines of the city growth policy?
Yes.This project is an infill project on an underutilized site.
(9) Does the project provide for outdoor recreational areas(such as urban plazas,
courtyards, landscaped areas, open spaces, or urban trails)for the use and enjoyment of
those living in, working in or visiting the development?
Yes. Private residential and publicly accessible open space are proposed for those living,
working in or visiting the development.
(10) Does the project provide for private outdoor areas(e.g.,private setbacks,patios
and/or balconies, etc.)for use by the residents and employees of the project which are
sufficient in size and have adequate light, sun, ventilation,privacy and convenient access
to the household or commercial units they are intended to serve?
Yes. Outdoor balconies and patios are proposed for many of the individual dwelling
units. Shared green roof deck opens space is provided for the apartment residents in
Buildings 1-2. Commercial open space is provided for the office use.
(11) Does the project provide for outdoor areas for use by persons living and working in
the development for active or passive recreational activities?
Yes. Private and publicly accessible open space are proposed. The project is very close
to the mountains to main street trail system.
(12) Is the overall project designed to enhance the natural environment, conserve energy
and provide efficient public services and facilities?
Yes. Enhancements to this underutilized site and connection to city services will allow a
high density residential development in close proximity to services, transit, recreation
and employment opportunities.The project is being designed as a LEED-ND
neighborhood.
(13) If the project is proposing a residential density bonus as described below, does it
include a variety of housing types and urban styles designed to address community-wide
issues of affordability and diversity of housing stock?
Yes,Affordable housing a variety of housing types and urban styles are proposed.
18516 DRB Staff Report foGe Cottonwood and Ida Planned Unit tolopment Page 26 of 28
(14) Residential density bonus. If the project is proposing a residential density bonus(30
percent maximum) above the residential density of the zoning district or building type
within which the project is located and which is set forth in division 38.310 of this chapter,
does the proposed project exceed the established regulatory design standards(such as for
setbacks, off-street parking, open space, etc.) and ensure compatibility with adjacent
neighborhood development?The number of dwelling units obtained by the density bonus
is determined by dividing the lot area required for the dwelling unit type by one plus the
percentage of density bonus sought. The minimum lot area per dwelling obtained by this
calculation must be provided within the project. Those dwellings subject to division 38.380
must be excluded from the base density upon which the density bonus is calculated.
Not applicable. No formal density bonus is proposed.
APPENDIX A -PROJECT SITE ZONING AND GROWTH POLICY
Zoning Designation and Land Uses: The property is zoned NEHMU, Northeast Historic
Mixed Use
The intent of the northeast historic mixed-use district is to provide recognition of an area
that has developed with a blend of uses not commonly seen under typical zoning
requirements. The unique qualities and nature of the area are not found elsewhere in the
city and should be preserved as a place offering additional opportunities for creative
integration of land uses. The intent of this area is to allow private and case-by-case
determination of the most appropriate use of land in a broad range of both non-residential
and residential uses.Standards for buffering between different land uses are deliberately not
as high as standards elsewhere in the community as it is assumed that persons choosing to
locate in this area are aware of the variety of possible adjacent land uses and have accepted
such possibilities as both acceptable and desirable. It is expected that the lots within this
district will continue to develop under a variety of uses which may increase or decrease in
scope in any given portion of the district. The clear intent of this district is to support a mix
and variety of non-residential and residential uses. Nothing in division 38.300 of this article
shall be interpreted to be discouraging or prejudicial to any listed use except as set forth as
principal and conditional uses.
Adopted Growth Policy Desi nq ation: The property is designated as Industrial in the
Bozeman Community Plan. This classification provides areas for the uses which support an
urban environment such as manufacturing, warehousing, and transportation hubs.
Development within these areas is intensive and is connected to significant transportation
corridors. In order to protect the economic base and necessary services represented by
industrial uses, uses which would be detrimentally impacted by industrial activities are
discouraged. Although use in these areas is intensive, these areas are part of the larger
community and shall meet basic standards for landscaping and other site design issues and
18516 DRB Staff Report fort Cottonwood and Ida Planned Unit De9opment Page 27 of 28
be integrated with the larger community. In some circumstances, uses other than those
typically considered industrial have been historically present in areas which were given an
industrial designation in this growth policy. Careful consideration must be given to public
policies to allow these mixed uses to coexist in harmony.
APPENDIX B- OWNER INFORMATION AND REVIEWING STAFF
Owner: Bangtail Partners LLC 1189 Tennessee Street, Unit 103, San Francisco, CA 94107
Applicant: Imperial Development LLC 33 North Black Avenue, Bozeman, MT 59715
Representatives:Thinktank Design Group Inc.33 North Black Avenue, Bozeman,MT 59715
Report By: Brian Krueger, Development Review Manager
APPENDIX C-PLANNED UNIT DEVELOPMENT INTENT
Sec. 38.430.010. Intent. A. It is the intent of the city through the use of the planned unit
development (PUD) concept, to promote maximum flexibility and innovation in the
development of land and the design of development projects within the city. Specifically,
with regard to the improvement and protection of the public health, safety and general
welfare, it shall be the intent of this chapter to promote the city's pursuit of the following
community objectives:
1. To ensure that future growth and development occurring within the city is in accord
with the city's adopted growth policy, its specific elements, and its goals, objectives
and policies;
2. To allow opportunities for innovations in land development and redevelopment so
that greater opportunities for high quality housing, recreation, shopping and
employment may extend to all citizens of the city area;
3. To foster the safe, efficient and economic use of land and transportation and other
public facilities;
4. To ensure adequate provision of public services such as water, sewer, electricity,
open space and public parks;
S. To avoid inappropriate development of lands and to provide adequate drainage,
water quality and reduction of flood damage;
6. To encourage patterns of development which decrease automobile travel and
encourage trip consolidation,thereby reducing traffic congestion and degradation of
the existing air quality;
7. To promote the use of bicycles and walking as effective modes of transportation;
8. To reduce energy consumption and demand;
9. To minimize adverse environmental impacts of development and to protect special
features of the geography;
18516 DRB a 28 of 28 Sta Re ort or Uie Cottonwood and Ida Planned Unit De4�lo ment Pa
ff p f p g
10.To improve the design, quality and character of new development;
11.To encourage development of vacant properties within developed areas;
12.To protect existing neighborhoods from the harmful encroachment of incompatible
developments;
13.To promote logical development patterns of residential, commercial, office and
industrial uses that will mutually benefit the developer, the neighborhood and the
community as a whole;
14.To promote the efficient use of land resources, full use of urban services, mixed uses,
transportation options, and detailed and human-scale design; and
15.To meet the purposes established in section 38.01.040.
ATTACHMENTS
The full application and file of record can be viewed at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715.
.0
•
Design Review Board
Wednesday, February 27th, 2019 at 5:30 pm
City Hall, Commission Room 121 N. Rouse Ave.
A. Call meeting to order and Roll Call
B. Changes to the Agenda
C. Minutes
• 2.13.19 Minutes (PDF)
• 2.13.19 Video
D. Public Comment
Please state your name and address in an audible tone of voice for the record. This is the time for individuals to
comment on matters falling within the purview of the Committee. There will also be an opportunity in
conjunction with each action item for comments pertaining to that item. Please limit your comments to three
minutes.
E. Action Items
1. 18516 Cottonwood&Ida PUDP (Krueger)
A Preliminary Planned Unit Development(PUD) application to allow a mixed residential and commercial
development with relaxations to zoning regulations requested for apartment building use, building height
parking,street design, restaurant design, transparency,front setbacks and a request for concurrent
construction.
• 18516 Staff Report
• 18516 Application Materials
• 18516 Plans
2. Election of Design Review Board Officers
F. FYI/Discussion
1. Future Agenda Items
G. Adjournment
For more information please contact Brian Krueger at bkrueaer@bozeman.net
This board generally meets the second and fourth Wednesday of the month at 5:30pm
Committee meetings are open to all members of the public. If you have a disability and require assistance, please
contact our ADA coordinator, Mike Gray at 406-582-3232 (TDD 582-2301).
BOZ E MAN MT
Engineering Division
MEMORANDUM
-------------------------7----------------------------------------------------------------------------------
TO: BRIAN KRUEGER, DEVELOPMENT REVIEW MANAGER
FROM: GRIFFIN NIELSEN, ENGINEER I
RE: COTTONWOOD AND IDA PRELIMINARY PUD REVIEW APPLICATION No.
18516
DATE: DECEMBER 20, 2018
-----------------------------------------------------------------------------------------------------------
ENGINEERING COMMENTS:
1. Bozeman Unified Development Code (UDC) Section 38.400.010.A. states: All
streets must comply with the adopted growth policy and/or transportation plan. The
arrangement, type, extent, width,grade and location of all streets must be considered
in their relation to existing and planned streets, to topographical conditions, to public
convenience and safety, and to the proposed uses of the land to be served by such
streets. The design standards contained in these regulations apply to all construction,
reconstruction and paving of streets. Review authority for exceptions or modifications
to this section is specified in division 38.220.
a. The traffic impact study must provide according to UDC section
38.220.060.A.12. and 38.400.060., the following updates are required prior to
preliminary PUD approval:
i. The report must be stamped by a professional engineering registered in
the state of Montana.
ii. The report should include the existing and projects traffic counts on
North Wallace Ave within the study.
iii. The study must include the 15 year projection for the intersection of the
City's arterial and collector streets within the study area.
2. UDC Section 38.400.050.A.1 states: All streets and roads providing access to, and
within, the proposed development shall meet the following standards: 1. Right-of-way
width and construction standards contained in this chapter, the most recently adopted
long range transportation plan, the City of Bozeman Design Standards and
Specifications Policy, and the City of Bozeman Modifications to Montana Public
Works Standard Specifications shall apply.
a. The back out angled parking proposed along East Cottonwood is non-standard and
must be requested with the PUD. The property owner's association will be required
to maintain the proposed parking including snow plowing and maintenance of the
parking surfaces. The property
Bozeman, 1
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZ E MAN A
Engineering Division
owner's association documents must include language to this effect and be
reviewed and approved prior to final PUD approval
b. City standard delineators must be installed at the ends of the parking stall islands
along East Cottonwood.
c. The proposed drive access bulb-out on East Aspen Street is non-standard and must
be removed.
3. UDC Section 38.400.010.A.8.: Second or emergency access. To facilitate traffic
movement, the provision of emergency services and the placement of utility
easements, all developments must be provided with a second means of access. If,
in the judgment of the development review committee (DRC), a second dedicated
right-of-way cannot be provided for reasons of topography or other physical
conditions, the developer must provide an emergency access, built to the standards
detailed in these regulations.
a. The applicant must provide emergency service vehicle turning diagrams to
ensure that emergency service vehicles can reasonable access the site prior to
preliminary PUD approval and clarify the following:
i. Sheet AS.302 shows an encroachment from the Misco Mill on to the
property line and emergency vehicle access road, this is inconsistent with
the plan view sheets provided.The applicant must verify that the Misco Mill
does not encroach into the emergency vehicle access road at any point.
ii. Sheet AS.101 shows an encroachment from the Building 5 on to the
emergency vehicle access road.
4. UDC Section 38.400.090.D.2 states: These standards apply to the minimum
distance between public and/or private accesses and intersections, and the
minimum distance between public and/or private accesses and other public and/or
private accesses.
a. The proposed drive accesses on to East Aspen Street do not meet the access do
not meet the City's access separation requirements. The site must separation
requirements or receive a deviation prior to preliminary PUD approval.
b. The proposed emergency vehicle access is with the 20 foot required separation
from the adjacent property to the west.
5. UDC Section 38.400.100.0 states: Drive aisles and alleys. At the intersection of
each driveway or alley with a street, no fence, wall or planting in excess of 30
inches above the street centerline grade is permitted within a triangular area where
corners are defined by two points on the right-of-way line, 15 feet on each side of
the centerline of the driveway or alley and a point on centerline ten feet outside the
right-of-way. Any driveway or alley wider than 30 feet curb to curb at the right-
of-way line must use the vision triangle standard for local streets when intersecting
local, collector, or arterial streets.
a. Street vision triangles must be shown on the landscaping plans. The vision
triangle may not be impeded by landscaping including boulevard trees. The
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZ E MAN MT
Engineering Division
proposed tree shown on the landscaping plan appear to impeded the vision
triangle
b. The street vision triangle for the emergency vehicle access on East Aspen
street, shown on sheet C1.00, is impeded by the building to the west.
c. The street vision triangle for the access to the underground parking area is
incorrectly shown on sheet C 1.00.
6. UDC Section 38.410.060.A states: Where determined to be necessary, public
and/or private easements shall be provided for private and public utilities, drainage,
vehicular or pedestrian access, etc.
a. The applicant must provide an overall plan clearly denoting the locations of the
existing and proposed right-of-way, property lines, and easements prior to
preliminary PUD approval.
b. An amended plat must be completed prior to final PUD approval for any
change in lot lines.
c. Public utility easements are required along each street the property fronts on as
per UDC Section 38.410.060.B.2.a. No encroachment may be permitted with
the approval from all utility companies.
d. The applicant must provide a public access easements for required public
sidewalks located outside of the public right-of-way.
7. UDC 38.410.070.A.1 states: The developer must install complete municipal water and
sanitary sewer system facilities, or a system allowed by section 38.350.030.D, and may
be required by the city to install municipal storm sewer system facilities. These systems
must be installed in accordance with the requirements of the state department of
environmental quality and the city, and must conform with any applicable facilities
plan. The city's requirements are contained in the Design Standards and Specifications
Policy and the City of Bozeman Modifications to Montana Public Works Standard
Specifications, and by this reference these standards are incorporated into and made a
part of these regulations. The developer must submit plans and specifications for the
proposed facilities to the city and to the state department of environmental quality and
must obtain their approvals prior to commencing construction of any municipal water,
sanitary sewer or storm sewer system facilities.
a. Per City of Bozeman Design Standards and specifications Policy Manual Section
V.D.2.c water main are required to perpendicularly cross sanitary sewer mains.
b. The water and sewer design report must be stamped by a professional engineer
register in the state of Montana and include the following additional information
prior to final PUD approval:
i. The residual pressures and velocity with in the surrounding distribution
system while the fire flow plus max hour demand is provided for the
development.
8. UDC Section 38.410.080.A. states: The developer must install complete drainage
facilities in accordance with the requirements of the state department of environmental
quality and the city, and must conform to any applicable facilities plan and the terms
Bozeman, MT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZ E MAN MT
0
•
Engineering Dd' i* Wapproved site specific stormwater control plan. The city's requirements are
contained in the Design Standards and Specifications Policy and the City of Bozeman
Modifications to Montana Public Works Standard Specifications, and by this reference
these standards are incorporated into and made a part of these regulations. The
developer must submit plans and specifications to the city and to the state department
of environmental quality (if applicable), and must obtain their approvals prior to
commencing construction of any drainage system facilities.
a. The applicant must submit a stormwater drainage report, certified by a
professional engineering within the state of Montana, for the onsite and public
right-of-way drainage and have the reports reviewed and approved prior to
preliminary PUD approval.
b. The geotechnical report notes the presents of groundwater at approximate depth
of 7-8 feet with the possibility this elevation increasing. In addition the reports
note this is of significant concern for the proposed subsurface parking area and
provides a number of design recommendations. The application is unclear as to
if any of the recommendation will be implemented. As a number of the
recommendation may affect areas outside of the project the applicant must
provide details of how the groundwater will be addressed on site with the
engineer certified drainage report prior to preliminary PUD approval. The
applicant is advised that the City do not permit sump pumps to discharge into
the City infrastructure.
c. The drainage infrastructure proposed on East Aspen is non-standard and should
be located onsite within a public drainage easement. The proposed location may
only be approved as a PUD relaxation and will require an encroachment permit.
The system will must be maintained by the property owner's association.
d. The applicant must submit a stormwater maintenance plan for the proposed onsite
stormwater system prior to preliminary PUD approval. The approved maintenance
plan be included within the property owner's associate document prior to final PUD
approval.
e. The minimum City's stormwater main is 15" and must be located a minimum of 5
feet from a sanitary sewer main, this must be addressed prior to preliminary PUD
approval.
f. The applicant must demonstrate that the existing stormwater system in Wallace
Aveune has sufficient capacity to accept the flow from the new main in East Aspen,
prior to final PUD approval.
9. UDC Section 38.410.130.A states: Prior to a final approval of all development
reviewed as a site plan, conditional use permit, planned unit development, or
subdivision and prior to an annexation of any land,one of the following must occur:
Payment must be made to the city of a payment-in-lieu of water rights, calculated
based on the annual demand for volume of water the development will require
multiplied by the most current annual unit price;
a. The applicant must pay cash-in-lieu of water rights prior to final PUD approval.
P.O. Box 1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
IW r
BOZ E MAN
Engineering Division
10. UDC Section 38.430.070.A..: Applications for phased planned unit developments.
If a planned unit development is intended to be developed over time in two or more
separate phases, application for approval of a phased planned unit development
must follow procedures established for pre-application review as outlined in this
division 38.430. After pre-application review is completed, phased PUDs may be
proposed in accordance with one of the following procedures:
a. The proposed phasing plan does not provide sufficient information to determine
is the each phase meets UDC. The applicant must clarify when the onsite
infrastructure will be constructed including stormwater, trash/recycling
facilities, pedestrian access, emergency service access, etc. The applicant
should reference advisory comment No. 1
11. If not already filed for the subject site, the applicant must provide and file with the
County Clerk and Recorder's office executed Waivers of Right to Protest Creation
of Special Improvement Districts (SID's) for the following:
a. Street improvements to North Wallace Avenue including paving, curb/gutter,
sidewalk, and storm drainage
b. Street improvements to East Tamarack Street including paving, curb/gutter,
sidewalk, and storm drainage
c. Street improvements to East Peach Street including paving, curb/gutter, sidewalk,
and storm drainage
d. Street improvements to Front Street including paving, curb/gutter, sidewalk, and
storm drainage
e. Intersection improvements to North Wallace Avenue and East Tamarack Street
f. Intersection improvements to North Wallace Avenue and East Peach Street
The document filed must.specify that in the event an SID is not utilized for the
completion of these improvements, the developer agrees to participate in an alternate
financing method for the completion of said improvements on a fair share,
proportionate basis as determined by square footage of property, taxable valuation of
the property, traffic contribution from the development, or a combination thereof. The
applicant must provide a copy of the filed SID,waiver prior to final PUD approval.
CONDITION(S) OF APPROVAL:
12. The intersection of East Aspen Street and the Front Street and Ida Street and Front
Street must be reconfigured to meet the City's intersection standards. The intersection
must be improved with the first phase of development. Any changes to the City Park at
the intersection will require the approval from the Parks Department prior to final PUD
approval.
Bozeman, NIT 59771-1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZEMANM
Engineering Division
ADVISORY COMMENTS:
1. Plans and Specifications for water and sewer main extensions, streets, and storm water
improvements, prepared and signed by a professional engineer (PE) registered in the
State of Montana shall be provided to and approved by the City Engineer. Water and
sewer plans shall also be approved by the Montana Department of Environmental
Quality. The applicant shall also provide professional engineering services for
construction inspection, post-construction certification, and preparation of mylar
record drawings. Construction shall not be initiated on the public infrastructure
improvements until the plans and specifications' have been approved and a
preconstruction conference has been conducted. Building permits will not be issued
prior to City acceptance of the infrastructure improvements unless all provisions
set forth in Section 38.270.030.0 of the Bozeman Municipal Code are met to allow
for concurrent construction.
P.O. Box 1230
O 1 East Olive Street ® Bozeman, • 1 O 416 : :1 O 416 : • bo
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
BOZ E MAN MT
Community Development
FROM: DEVELOPMENT REVIEW COMMITTEE
RE: COTTONWOOD AND IDA PRELIMINARY PUD,APPLICATION 18516
DATE: NOVEMBER 28,2018
Section 1—PROJECT GENERAL
Project Description: Preliminary Planned Unit Development(PPUD)application for a multi building mixed
use development at 615 E. Cottonwood/702 N. Ida.
Recommendation:Staff has found that the project does not comply with the requirements of Chapter 38
of the Bozeman Municipal Code and is deeming the application inadequate for further review.
Clarifications must be provided and code corrections must be satisfied prior to continued review and a
recommendation for approval.
All references are to the Bozeman Municipal Code (BMC), primarily Chapter 38.
Section 2-RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this report.
These conditions are specific to the development.
1. None at this time.Additional information is required prior to adequacy and continued review.
PLANNING COMMENTS
Planning Division, Brian Krueger,bkrueeer@bozeman.net.406-582-2259
Section 3—REQUIRED CODE CORRECTIONS All references are to the Bozeman Municipal Code.
Planning Division, Brian Krueger, bkrueger@bozeman.net, 582-2259
1. BMC 38.220.010.Update form Al project information.Update block frontage to frontage designated
on the Community Development Block Frontage Map. The map shows all frontages as mixed block
frontage. Many internal pathways include residential units that face the pathways those areas are
subject to the special residential block frontage standards. All block frontages must additionally be
noted on the site plan.
2. BMC 38.220.010. Update form Al number 5. To provide the title and position of the individuals
signing on behalf of the LLC's. The new Al submitted does not show the title and position of
individuals who have signed the application form.
3. BMC 38.220.010 38.220.080 At a minimum one site plan exhibit must have the majority of the
required data and detailing and annotations required by the SP1 form. No one exhibit shows the
required information.
O 1 East Otive Street © Box 1230 O 41. .1 Q 41.
Bozeman, 1
T 11 IY An/ 1 AA /tan, T1 i t hA^C T 1 1%1 An 1 r MI n rr
Page 2 of 7
BOZ E MAN MT
Community Development
4. BMC 38.220.010 and 38.220.080. The other specific site plan sheets that demonstrate specific
elements of the plan must have the relevant data related to what is being shown. For example the
parking sheet AS.105 does not include site vision triangles which are relevant to on street parking
allowances. The parking sheet is not annotated with parking dimensions for spaces nor does it
provide the angle of the on-street parking proposed on East Cottonwood. Another example, the
open space plan does not provide dimensions for all open space areas,does not clearly allocate open
space per building, does not show a proposed easement area to allow public access and clearly
differentiate between onsite residential open space, usable commercial open space and PUD open
space for points purposes.All detailed plans must be updated to provide the relevant information.
5. BMC 38.220.010 the Plans and Specifications (Form PLS) requirements are not met throughout the
application materials and plans. Annotations and measured dimensions are not thorough and are
not provided consistently on plans per requirements, Cover sheet data not provided as required: no
parking calculations, area schedules, dwelling unit types, FAR, net residential density open space
calculations, parkland calculations, etc. and other required site data are provided on coversheet, a
parkland tracking table is not provided, etc. Site plan index sheet must include date of preparation
of all sheets to control versioning through the review per PLS.
6. BMC 38.220.010 Digital files of PUD documents not separated as required in PLS form. Name each
document separately per digital naming protocol in PLS document.
7. BMC 38.220.010 update coversheet of the PUD document to reflect the current owners of the
property, Bangtai) Partners, LLC per the title report.The coversheet submitted shows the owners as
Imperial Development, LLC, not the owner of the property per the title report.
8. BMC 38.220.050 Weed control plan not approved by Weed Control District as required.
9. BMC 38.220.300 and 38.220.080 Supplementary Documents. The proposed ownership of the
development is a condominium, as such per requirements draft supplementary documents must be
submitted with the preliminary plan. Provide draft documents as required for 38.220.310 and
38.220.320
10. BMC 38.220.010 Utilities and utility rights of way and proposed utility easements for gas, electric
and communications not provided per code and SP1.
11. BMC 38.220.080.A.2.g requires PUD plans to provide detailed topography, transportation, street,
traffic and utility information to a distance of 200 feet from the exterior perimeter of a PUD site.This
information is not provided.
12. BMC 38.220.080 Phased site plan information is incomplete. See sub.A.2.q.
13. BMC 38.220.080 provide information of any proposed separate building occupancy phasing and how
the required parking and open space will be provided in concurrent amounts for all buildings
proposed for phasing.
14. BMC 38.220.080 Irrigation water. Clarify proposed water demand for irrigation system. Clarify the
nature of the existing well and water right to support the new demand.
15. BMC 38.220.120.A.2.a(4).The phasing plan indicates PUD concurrent construction of buildings and
on and offsite infrastructure is desired. Clarify if PUD concurrent construction is proposed. If so
provide the request along with a concurrent construction plan and respond to the criteria and
provide all information for the requirements of PUD concurrent construction in BMC 38.270.030.D.
O 1 East Olive Street © P.O. Box 1230 O 416 : •1 O 416 : • // /
Bozeman, • 1
rnn. AAA_snQ_')ani T4.IC AAnrT I I\/ARI C DI Ar-C
Page 3 of 7
BOZ E MAN MT
Community Development
16. BMC 38.320.050.0 Table of Form and Intensity Standards Minimum setbacks required for the
NEHMU district. The project does not meet setback requirements with the underlying lot
configurations. The lots must be aggregated or otherwise configured through the applicable
subdivision exemption review process in order to meet requirements. The final signed mylars have
been provided to our office to satisfy this code requirement. The amended plat must be filed prior
to final PUD approval.
17. BMC 38.320.050.0 Table of Form and Intensity Standards Minimum setbacks required for the
NEHMU district. The proposed lot configuration includes a zero lot line configuration between
proposed Lot 2 and Lot 3.The code does not authorize the use of a zero lot line configuration in the
form and intensity standards for NEHMU.A relaxation must be requested to allow this condition.
18. BMC 38.400.010.A.8 Second or emergency access. Clarify the right of way proposed for secondary
emergency access. Is the proposed a dedicated right of way to city, access easement, public access
easement, or other? Provide dimensions and total extent of proposed secondary and emergency
access areas noted as fire lane on plan sets.
19. BMC 38.400.090.C.3.c Drive accesses for multiple tenant commercial building or complexes/centers,
or industrial drive accesses must be set back a minimum of 20 feet from adjacent properties unless
such drive access is approved as a shared drive access. Clarify access shown as fire lane and how it
complies with standards. No shared access to properties to the west is proposed.
20. BMC 38.400.100 and 38.220.080 Street vision triangles not shown on plans. Clarify locations and
compliance with standards for all street intersections and drive way intersections take into account
all retaining walls, landscape berms and clarify site vision at structured parking entrance.
21. BMC 38.410.060.13 and 38.220.080 Private utility easements not shown or proposed.
22. BMC 38.410.060.8.3 No private utility plan provided as required with preliminary plan when
concurrent construction is proposed.
23. BMC 38.410.060.B.4 Encroachments proposed in required ten foot private utility easement areas
required along all streets. No written approval from all utility companies is provided as required.The
current and entire list of utility companies operating in Montana can be attained from the Montana
Public Service Commission. Clarify and update C1.00 and A51.01 as they show encroachments
differently.
24. BMC 38.410.120 Mail Delivery. Clarify location of mail delivery area on site plan, proposed detail
submitted too general to analyze any impacts to pedestrian circulation, utility easements and
services. Provide footprint and size dimensions of cluster box and required pad,proposed access and
other details to clarify.
25. BMC 38.430.020. A planned unit development may not be applied to development that does not
have one or more principal uses or structures on contiguous parcels. No entitlement or relaxations
may be granted for the offsite parking lot through this application process.
26. BMC 38.430.030.A.4.b Relaxations (deviations) Item 1 applicant must clarify specific code section
and requested relaxation from code standard. The application must also request a deviation for
apartment building use.
27. BMC 38.430.030..A.4.b Relaxations (deviations) Item 2 separate relaxation from front setback in
form and intensity table and requested modifications to block frontage standards.Clarify relaxations
requested. Each code section to be modified must be identified specifically.
O 1 © P.O. :� 1 O 416 : •1 © 416 : • b•
Bozeman, • 1
Mr). n01_1Zao_9101 TLJC AAr1CT I MART C DI Arc
Page 4 of 7
BOZ E MAN MT
Community Development
28. BMC 38.430.030.A.4.b Relaxations(deviations) Item 3 We recommend that instead of modifying the
side setback as requested that the relaxation state that zero lot line conditions are allowed as per
the other zones identified in BMC 38.320.050.0 Table of Form and Intensity Standards. Add
allowance for zero lot line to minimum setbacks required for the NEHMU district.
29. BMC 38.430.030.A.4.b Relaxations(deviations) Item 5. Clarify last statement in that section that the
application requests a relaxation of 20%to all nonresidential parking requirements consistent with
code language. Eliminate reference to commercial parking.
30. BMC 38.430.080.E.2(7)(a) PUD performance. Not eligible for affordable housing performance points
as the proposed units do not meet the definition of affordable housing in 38.700.020. PUD affordable
housing is defined separately from the requirements of BMC 38.380.
31. BMC 38.430.080.E.2(7)(b) PUD performance. Not eligible for this performance unless a specific
public access easement is proposed and the area is defined. Provide clarifications.
32. BMC 38.430.080.E.2(7)(d) PUD performance. This site is eligible to claim credit for brownfield and
underutilized sites with the appropriate calculations provided.
33. BMC 38.430.080.E.2(7)(e) PUD performance. Not eligible for the designed to meet LEED-ND
performance points as the project is not conditionally approved nor does it have precertification per
requirements.
34. BMC 38.430.080.E.2(7)(i) PUD performance. Not eligible,the recycling transfer station referenced in
the code is a community level transfer station similar in size and scale to those provided by the
Gallatin Solid Waste Management District and not recycling collection for site residents and guests.
35. BMC 38.520.060.E On-site residential open space. Provide clarification of proposed residential open
space by building. Clarify which open space credit and allotment per building. Provide calculation
and percentage of common space that applies to each building. Provide dimensions on the plans for
all open space areas per SP1 and PLS documents.Clearly separate onsite residential open space and
required PUD performance open space and usable commercial open space in calculations and
exhibits and provide code references to clearly differentiate the required spaces. Show how the
proposed public access will be achieved.
36. BMC 38.520.060.0 No usable commercial open space designated or provided as required.
37. BMC 38.520.070 Location and design of service areas. No service areas identified for gas and electric
entrance locations into the buildings or proposed methods to separate and mitigate impacts as
required. Show gas and electric locations as required per SP1 on entire site and general proposed
locations for private utility entrance locations into the buildings.
38. BMC 38.520.070.E Location and design of service areas. Service areas for trash service are not
approved by the Sanitation Division.Service areas for Building 1 and Building 4 do not include ramps
or a safe and accessible locations for trash dumpster pick up. Clarify individuals responsible for
moving the trash dumpsters to pickup area. Provide documentation in supplementary document
noting this requirement (POA documents). Trash service is being proposed on street frontages not
in accordance with Section 38.520.070.B.1 as alley access (fire lane) is present.
39. BMC 38.540.050 Number of parking spaces required. Provide parking calculations that show how
the parking demand is generated without relaxations. Provide parking calculations with proposed
relaxations implemented separate from base calculations without relaxations. Clarify parking
Tnn. A0A_cuo_1)1401 TUG AAOrT I MARI G DI Arc
Page 5 of 7
BOZEMAN M T
Community Development
calculation as commercial parking demand must utilize floor area as defined in this section and not
gross floor area provided in table. Provide parking calculations of plan set coversheet per PLS form.
40. BMC 38.540.030 Structured parking facility development standards.The proposed NE corner of the
site does not comply with structured parking requirements or block frontage transparency
requirements per BMC for landscaped frontage. The application and design must propose
compliance.with one or the other or proposed relaxations to the standards.See comment related to
grade definition in 38.700.080.
41. BMC 38.540.050.A.2.c(6)Clarify proposed reductions for bicycle parking and shower facilities as they
apply to each building with those facilities.
42. BMC 38.540.050:A.1.b(3)provide information on car share as required in Administrative Policy 2017-
1. Clarify car share reduction in parking calculation for residential uses only.
43. BMC 38.540.050.A.4 provide bicycle parking requirement calculation in parking calculations. Provide
bicycle parking locations for all buildings per SP1 and to show compliance with standards.
44. BMC 38.540.070 Off-site parking. Provide site plan for offsite parking that demonstrates the
proposed lot meets all requirements of the BMC and the off-site parking code section. Clarify the
uses proposed to utilize the offsite parking and provide exhibit showing compliance with distance
requirements per use. Provide draft long term parking agreement or draft deed restriction in order
to demonstrate compliance with BMC 38.540.070.6.
45. BMC 38.540.070 Off-site parking. Clarify proposed ownership, timing for entitlement and
construction of proposed offsite parking lot. Clarify proposed use of the balance of the property at
the time'of construction of off-site parking lot.
46. BMC 38.550.030 and 38.220.080. Landscape plan does not match civil plan or architectural site plan
and does not reflect proposed buildings
47. BMC 38.550.050.E Project proposes maximum slope and grade that exceeds standards. Clarify
landscaping along north and east property boundaries. Clarify proposed slopes along Aspen Street
and Ida Street.
48. BMC 38.560.030 Prohibited signs.The proposed sign on building 5(community building) attached to
the mechanical equipment is not a wall sign. It is a roof sign which is prohibited.A relaxation may be
proposed to allow a roof sign on the community building. Provide clarification on proposed sign
proposal for this building.
49. BMC 38.560.060.A Non Residential Sign Standards. Provide building frontage dimensions and sign
calculations for all nonresidential buildings (4,5,6) and add to comprehensive sign plan.
50. BMC 38.700.080. Grade definition. Provide more detailed exhibits of the north and east street
frontages of the site that demonstrate the relationship of the parking garage and the overall building
heights proposed in relation to the finished grade which is the lowest point of elevation of the
finished surface of the ground between the exterior wall of a building and a point five feet distance
from the building.The site sections in AS.301 and AS.302 need additional clarity along Aspen Street
and Ida Street. Clarify finished grade in relation to the proposed gabion retaining walls and the
proposed sidewalk along these elevations.Show relationship of accurate finished grade to proposed
parking garage structure with accurate floor to ceiling heights shown at garage level. Parking garage
shown with 9'floor to ceiling height on those exhibits, clarify if this is accurate.
Bozeman, NIT 59771-1230
rnn. nnA_rQ1)_1)101 TWr AA(1CT I 1\/AQI C of ArC
Page 6 of 7
BOZ E MAN MT
Community Development
ENGINEERING COMMENTS
Engineering Division,Griffin Nielsen.,gnielsen@bozeman.net,406-582-2279
1. Engineering comments are pending.
ADDITIONAL DIVISION COMMENTS
Building Division; Bob Risk brisk@bozeman.net 406-582-2377
1. Handicap accessible parking required for all uses.An accessible path to an accessible building
entrance from all the parking areas must be provided.
2. Accessible pathways between all buildings is required.
Fire Department;Scott Mueller smueller@bozeman.net 406-582-2386
1. Fire accesses must be noted and maintained during construction phases.
Stormwater Division; Kyle Mehrens ikmehrens@bozeman.net 406-582-2270
Water and Sewer Division;John Alston ialston@bozeman.net 406-582-3200
Forestry Division;Alex Nordquest; anordguest@bozeman.net 406-582-3205
1. Coordinate with the Forestry Division on tree pit design and tree species selection for street trees.
Special species selection is required for planting under power lines.
2. Provide sleeves/conduit for irrigation lines for all tree pits.
NorthWestern Energy; Cammy Dooley;cammy.doolev@northwestern.com
1. Overhead power lines may require additional building setback in order to provide clearances.
2. A ten foot front setback utility easement is required on all street frontages.
3. Coordinate for any interior ten foot utility easements that maybe required.
4. Utility plan is required for this site with the preliminary PUD submittal.
Parks and Recreation;Thom White twhite@bozeman.net
1. The City's current adopted parkland cash in lieu valuation is$1.50 per square foot per City
resolution 4938.
2. Provide parkland calculation and table on plan sheet cover page.
Solid Waste Division; Russ Ward rward@bozeman.net 406-582-3238
1. Clarifications to proposed solid waste plan are required.
2. BMC 38.520.070.E Location and design of service areas. Service areas for trash service are not
approved by the Sanitation Division. Service areas for Building 1 and Building 4 do not include ramps
or a safe and accessible locations for trash dumpster pick up.Clarify individuals responsible for moving
the trash dumpsters to pickup area. Provide documentation in supplementary document noting this
requirement(POA documents).Trash service is being proposed on street frontages not in accordance
with Section 38.520.070.B.1 as alley access (fire lane) is present.
Future Impact Fees: Please note that future building permit applications will require payment of the
required transportation, water, sewer and fire impact fees according to the City of Bozeman adopted
impact fee schedule in place at the time of building permit issuance. If you desire an estimate of the
O © P.O. :oBozem� 1 11 416861 � 1• i • ��
• 1 O O
Mr). TUC: AAr)rT I IVnRI C DI Arl:
Page 7 of 7
BOZEMANmT
Community Development
required impact fees according to current rates please contact the Department of Community
Development and/or visit www.bozeman.net.
Bozeman, MT 59771-1230
mn. TUG AAOrT i ivnRi G Di nrG
40?
BOZEMAW"
Planning
November 7, 2018
• Thinktank Design Group, Inc.
33 North Black Ave.
Bozeman, MT 59715
RE: Cottonwood and Ida Preliminary PUD 18516
Dear Sirs and Madams,
Your application for a Preliminary Planned Unit Development(PPUD)has been received and is under
review. Comments from the Development Review Committee will be issued on or after November
29, 2018. The preliminary PUD plan requires review by the Design Review Board (DRB). The DRB
is scheduled following DRC review and any required revisions that may be necessary to your PUD
prior to continued review.
If you have any questions, contact me at 582-2259 or bkrueQer(CDbozeman.net.
Respectfully,
Brian Krueger
Development Review Manager
C: Bangtail Partners, LLC PO Box 10195 Palo Alto, CA 94303
Imperial Development LLC 33 North Black Avenue Bozeman, MT 59715
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
a MT �1
B 0 Z E M MOP
Community Development ~` RC
REVISION AND CORRECTION SUBMITTAL FORM
ADDITIONAL OR REVISED PLANS OR DOCUMENTS FOR AN ACTIVE PROJECT WILL NOT BE
ACCEPTED UNLESS ACCOMPANIED BY THIS COMPLETED FORM. MAILED RE-SUBMITTALS
THAT DO NOT INCLUDE THIS FORM OR THAT DO NOT CONTAIN THE CORRECT NUMBER OF
COPIES WILL NOT BE PROCESSED. FEES ARE REQUIRED FOR THIRD AND SUBSEQUENT
REVISIONS.
SUBMITTAL REQUIREMENTS +,
All revisions / correction submittals must contain the following:
R A completed RC revision/correction submittal form.
❑■ The same number of copies and sizes and formats (including digital) as required for the initial
application. Plans and documents, including digital files must meet plans, specifications and naming
protocols. See form PLS.
0 Revised drawings must be updated with a new current date on each revised sheet.Title sheet table of
contents/plan schedule must be updated with new dates for each sheet modified. If complete plans sets
are updated, retain the original date on sheets that have not been updated or revised.
❑ A written narrative that shows an itemized summary of your submittal and description of each change or
revision in detail or document. Changes to plans sheets must include sheet and detail numbers.
❑■ All changes must be clouded or highlighted on each plan set.
■❑ Legal documents, studies, letters or other documentation must have a clear date of revision on the front
page.
❑ Fees are required for a third and subse : aiQ° =rs, 4o rected materials. The fee is 1/a of the
total original application fee.
On Re-submittal of plans must be comple spy ,if ' iy� of I ` s are modified. No individual sheets
will be accepted. l� 261
■❑ RC form must be the first item in all re ubmit�lPtis.1�';r;.
COMMUNITY DEVELOPMENT
INFORMATION
Application 18516 Application PPUD
file #: type:
Project Name: Cottonwood and Ida Mixed Use
Contact Name: Thinktank Design Group Inc. ( Erik Nelson)
Phone: 406-539-1176
Email: erik@thinktankarchitects.com
Revision and Correction RC Page 1 of 2 Revision Date 3-20-18
Required Forms: PLS
0
SUBMITTAL TYPE
NEW CHANGE: A revision or change that the applicant has made to a plan that is currently under review
that is new and has not been reviewed before.
CORRECTION: A correction to the plans that is an applicant response to a correction letter written by the
City to the applicant.
If both types are being submitted, the written narrative required above listing itemized changes must clearly
differentiate between changes and corrections and each must be clearly labeled. Changes to preliminarily
approved plans or approved plans are processed under the modification application process, use form MOD
for those changes.
Re-submittal of plans must be complete plan sets if individual sheets are modified. No individual sheets
will be accepted.
CITY USE ONLY
Date Checked and
a R
received: � '0-1 �hb ( -1 received by: j
Number of
sets Includes digital
submitted: copy Y/N:: 11
I
Superion ,
,
updated? Planner/Engineer:
Y/N:
DRC
Required? Date routed to
Y N. Engineer: 0i12
/ 8iLbO,
If no DRC, date comments du to
planner. 10 working days from
submittal date typical:
CONTACT US
Alfred M.Stiff Professional Building phone 406-582-2260
20 East Olive Street 59715 (FED EX and UPS Only) fax 406-582-2263
PO Box 1230 planning@bozeman.net
Bozeman, MT 59771 www.bozeman.net
Revision and Correction RC Page 2 of 2 Revision Date 3-20-18
Required Forms: PLS
it
To: Brian Krueger
City of Bozeman Planning Department
Re: Cottonwood and Ida Mixed Use project PPUD
Resubmittal
Plan file#18516
Date: 1-24-19
Dear Brian,
We are providing this Revision and Corrections submittal to address both planning and
engineering comments provided. We felt that there were enough clarifications to the project
that it warranted submitting an entirely new Preliminary PUD document set. This includes all
the original documents required by the PPUD checklist. We have also provided the comment
resolutions letters attached to this for easy reference in finding where we have documented
the corrections.
We look forward to the moving through the review process and brining this project to the
community as soon as possible to get their feedback on the high-level items. Please don't
hesitate to contact us should you have some initial thoughts or clarifications needed with this
extensive submittal.
Sincerely,
Erik Nelson
_._.,
Thinktank Design Group Inc.
r ,AN 28 2019 �j!r
p�4'Al l
COMMUNITY U !'I'�FN
Page li
T H I N K TA N K D E S I G N 33 N.BLACK AVE BOZEMAN MONTANA 59715 406.587.3628
thin ktankarchitects.com info@thinktankarchitects.com
Response to Comments
From: Development Review Committee
Re: Cottonwood And Ida Preliminary PUD, Application 18516
Date: November 28, 2018
PLANNING COMMENTS
Planning Division, Brian Krueger, bkrueger@bozeman.net, 406-582-2259
Section 3 - REQUIRED CODE CORRECTIONS All references are to the Bozeman Municipal
Code.
1. BMC 38.220.010. Update form Al project information. Update block frontage to
frontage designated on the Community Development Block Frontage Map. The map
shows all frontages as mixed block frontage. Many internal pathways include
residential units that face the pathways those areas are subject to the special
residential block frontage standards. All block frontages must additionally be
noted on the site plan.
Sheet AS.111 titled 'Overall Floor Plan - Level l' identifies block frontage along
internal pathways in compliance with Bozeman Municipal Code section
38.510.030.j for special residential block frontage.
2. BMC 38.220.010. Update form Al number 5. To provide the title and position of the
individuals signing on behalf of the LLC's. The new Al submitted does not show the
title and position of individuals who have signed the application form.
Al form has been updated in the revised documents in Section 1
3. BMC 38.220.010 38.220.080 At a minimum one site plan exhibit must have the
majority of the required data and detailing and annotations required by the SP1
form. No one exhibit shows the required information.
Sheet AS.101 titled 'Architectural Site Plan'contains a majority of required
data, detailing, and annotations available on 24x36"sheet.All additional
detailed information is available on sheets ASA10-111 titled 'Overall Floor
Plan:
4. BMC 38.220.010 and 38.220.080. The other specific site plan sheets that
demonstrate specific elements of the plan must have the relevant data related to
what is being shown. For example the parking sheet AS.105 does not include site
vision triangles which are relevant to on street parking allowances. The parking
sheet is not annotated with parking dimensions for spaces nor does it provide the
angle of the on-street parking proposed on East Cottonwood. Another example, the
open space plan does not provide dimensions for all open space areas, does not
clearly allocate open space per building, does not show a proposed easement area
to allow public access and clearly differentiate between onsite residential open
space, usable commercial open space and PUD open space for points purposes. All
detailed plans must be updated to provide the relevant information.
Sheet AS.101 titled 'Architectural Site Plan' has been revised to contain
comprehensive, aggregated information that references separate detailed
'Overall Floor Plan'sheets. Sheet AS.110 titled 'Overall Floor Plan - Level 0'
contains detailed parking information including garage, on-street, & off-site
parking calculations. In addition, site triangles, parking dimensions, angle of
on-street parking proposed on East Cottonwood. Sheet AS.102 titled 'Site
Usage Information' provides dimensions for all open space areas, clearly
allocates open space per building, and shows a proposed easement area to
allow public access and clearly differentiate between onsite residential open
space, usable commercial open space and PUD open space for points
purposes.
5. BMC 38.220.010 the Plans and Specifications (Form PLS) requirements are not met
throughout the application materials and plans. Annotations and measured
dimensions are not thorough and are not provided consistently on plans per
requirements, Cover sheet data not provided as required: no parking calculations,
area schedules, dwelling unit types, FAR, net residential density open space
calculations, parkland calculations, etc. and other required site data are provided on
cover sheet, a parkland tracking table is not provided, etc. Site plan index sheet
must include date of preparation of all sheets to control versioning through the
review per PLS.
Sheets ASA 10 thru ASA 14 titled 'Overall Floor Plans' include annotations and
measured dimensions consistently. Sheet AS.000 titled 'Title Sheet' includes
date of preparation of all sheets. Parking calculations, area schedules,
dwelling unit types, FAR, net residential density open space calculations,
parkland calculations, and other required site data are provide on sheets
AS.101 titled 'Architectural Site Plan'and AS.102 titled 'Site Usage Information.'
6. BMC 38.220.010 Digital files of PUD documents not separated as required in PLS
form. Name each document separately per digital naming protocol in PLS
document.
Correct digital files have been provided with this RC form
7. BMC 38.220.010 update cover sheet of the PUD document to reflect the current
owners of the property, Bangtail Partners, LLC per the title report. The cover sheet
submitted shows the owners as Imperial Development, LLC, not the owner of the
property per the title report.
Sheet AS.000 has been updated to reflect current owners of the property,
Bangtail Partners, LLC per the title report.
8. BMC 38.220.050 Weed control plan not approved by Weed Control District as
required.
This projects weed control plan has been submitted to the County Weed
Control district.We anticipate approval of this plan, and will have this
complete prior to the Final PUD. We would like this to continue as a condition
of approval.
9. BMC 38.220.300 and 38.220.080 Supplementary Documents. The proposed
ownership of the development is a condominium, as such per requirements draft
supplementary documents must be submitted with the preliminary plan. Provide
draft documents as required for 38.220.310 and 38.220.320.
Section 3.08 provides a high level outline and diagram of the proposed
ownership and Appendix L provides the full draft of the Condominium documents.
10. BMC 38.220.010 Utilities and utility rights of way and proposed utility easements for
gas, electric, and communications not provided per code and SP1.
An additional sheet (CM) has been included in this submittal to show the
utility easements for gas, electric and communications
11. BMC 38.220.080.A.2.g requires PUD plans to provide detailed topography,
transportation, street, traffic and utility information to a distance of 200 feet from
the exterior perimeter of a PUD site. This information is not provided.
Additional topographic survey of the surrounding roadways/areas has been
provided on shee C2.0.
12. BMC 38.220.080 Phased site plan information is incomplete. See sub. A.2.q.
The proposal no longer intends to have any phasing.
13. BMC 38.220.080 provide information of any proposed separate building occupancy
phasing and how the required parking and open space will be provided in
concurrent amounts for all buildings proposed for phasing.
See comment on 12 above
14. BMC 38.220.080 Irrigation water. Clarify proposed water demand for irrigation
system. Clarify the nature of the existing well and water right to support the new
demand.
City Engineering has provided estimates for water consumption we have
provided these for the irrigation.We have provided communication from the
DNRC for the potential use of an existing well on site and are expecting that
we will be able to do so.We would like to have this as a condition of approval
and will complete the exempt well water paperwork prior.
15. BMC 38.220.120.A.2.a(4).The phasing plan indicates PUD concurrent construction of
buildings and on and offsite infrastructure is desired. Clarify if PUD concurrent
construction is proposed. If so provide the request along with a concurrent
construction plan and respond to the criteria and provide all information for the
requirements of PUD concurrent construction in BMC 38.270.030.D.
We have provided a narrative in Section 5 outlining how we intend to
complete the concurrent construction.And will comply will all of the PUD
concurrent construction requirements listed in BMC.38.270.030.11) as part of
the plan.
16. BMC 38.320.050.0 Table of Form and Intensity Standards Minimum setbacks
required for the NEHMU district. The project does not meet setback requirements
with the underlying lot configurations. The lots must be aggregated or otherwise
configured through the applicable subdivision exemption review process in order to
meet requirements.The final signed mylars have been provided to our office to
satisfy this code requirement. The amended plat must be filed prior to final PUD
approval.
An additional sheet (C1.1) has been included in this submittal to show sight
triangles, proposed (reconfiguration of) lot lines, and public access easements.
The requirement to provide final signed mylars and approved amended plat is
noted and will be filed prior to final PUD approval but not provided at this
time.
17. BMC 38.320.050.0 Table of Form and Intensity Standards Minimum setbacks
required for the NEHMU district. The proposed lot configuration includes a zero lot
line configuration between proposed Lot 2 and Lot 3. The code does not authorize
the use of a zero lot line configuration in the form and intensity standards for
NEHMU.A relaxation must be requested to allow this condition.
A relaxation has been requested for this item see SEction 3, Relaxation #4
18. BMC 38.400.010.A.8 Second or emergency access. Clarify the right of way proposed
for secondary emergency access. Is the proposed a dedicated right of way to city,
access easement, public access easement, or other? Provide dimensions and total
extent of proposed secondary and emergency access areas noted as fire lane on
plan sets.
0 0
Sheets AS.101 titled 'Architectural Site Plan'and AS.111 titled 'Overall Floor
Plan - Level Vindicate dimensions and extent of emergency access areas,
including removable bollards.This is also shown on plan sheet CM.
19. BMC 38.400.090.C.3.c Drive accesses for multiple tenant commercial building or
complexes/centers, or industrial drive accesses must be set back a minimum of 20
feet from adjacent properties unless such drive access is approved as a shared drive
access. Clarify access shown as fire lane and how it complies with standards. No
shared access to properties to the west is proposed.
Given the access is only for emergency vehicles we have had discussions with
Engineering and they have indicated that this will be acceptable with the
limited use of the access.
20. BMC 38.400.100 and 38.220.080 Street vision triangles not shown on plans. Clarify
locations and compliance with standards for all street intersections and drive way
intersections take into account all retaining walls, landscape berms and clarify site
vision at structured parking entrance.
Sheet AS.101 titled 'Architectural Site Plan' includes street vision triangles that
comply with standards for all street and driveway intersections. These are
shown on C1.1 and the Landscape plans for clarification of concerns with
retaining walls, landscape berms, etc.
21. BMC 38.410.060.13 and 38.220.080 Private utility easements not shown or proposed.
An Additional Sheet C1.1 has been included in this submittal to show the
utility easements for gas, electric, and communications.
22. BMC 38.410.060.B.3 No private utility plan provided as required with preliminary
plan when concurrent construction is proposed.
We have provided an initial concurrent construction plan and will add more
detail as this project proceeds through planning and will most certainly be
complete prior to Final PUD.We would like to carry this as a condition of
approval moving forward.
23. BMC 38.410.060.B.4 Encroachments proposed in required ten foot private utility
easement areas required along all streets. No written approval from all utility
companies is provided as required. The current and entire list of utility companies
operating in Montana can be attained from the Montana Public Service
Commission. Clarify and update C1.00 and AS1.01 as they show encroachments
differently.
We have proposed minor architectural encroachments well at heights 15'to
20'above grade and only 2' out.We are waiting on a letter(s)from the utility
companies.We anticipate that these will be accepted and would like to hold
this as a conditional of approval given the minor nature of the
encroachments.
24. BMC 38.410.120 Mail Delivery. Clarify location of mail delivery area on site plan,
proposed detail submitted too general to analyze any impacts to pedestrian
'circulation, utility easements and services. Provide footprint and size dimensions of
cluster box and required pad, proposed access, and other details to clarify.
Sheet AS.111 titled 'Overall Floor Plan - Level 1' identifies location of mail
delivery areas and sheet AS.104 titled 'Site Details' includes details of proposed
mailboxes.
25. BMC 38.430.020.A planned unit development may not be applied to development
that does not have one or more principal uses or structures on contiguous parcels.
No entitlement or relaxations may be granted for the offsite parking lot through this
application process.
All parcels are contiguous as part of this proposal.We intend to lease parking
from as separate project that will adhere to all Site Plan criteria.
26. BMC 38.430.030.A.4.b Relaxations (deviations) Item 1 applicant must clarify specific
code section and requested relaxation from code standard. The application must
also request a deviation for apartment building use.
See updated list of Relaxations in Section 3
41 0
27. BMC 38.430.030..A.4.b Relaxations (deviations) Item 2 separate relaxation from
front setback in form and intensity table and requested modifications to block
frontage standards. Clarify relaxations requested. Each code section to be modified
must be identified specifically.
See updated list of Relaxations in Section 3
28. BMC 38.430.030.A.4.b Relaxations (deviations) Item 3 We recommend that instead
of modifying the side setback as requested that the relaxation state that zero lot line
conditions are allowed as per the other zones identified in BMC 38.320.050.0 Table
of Form and Intensity Standards. Add allowance for zero lot line to minimum
setbacks required for the NEHMU district.
See updated list of Relaxations in Section 3
29. BMC 38.430.030.A.4.b Relaxations (deviations) Item 5. Clarify last statement in that
section that the application requests a relaxation of 20%to all non-residential
parking requirements consistent with code language. Eliminate reference to
commercial parking.
See updated list of Relaxations in Section 3
30. BMC 38.430.080.E.2(7)(a) PUD performance. Not eligible for affordable housing
performance points as the proposed units do not meet the definition of affordable
housing in 38.700.020. PUD affordable housing is defined separately from the
requirements of BMC 38.380.
See updated PUD performance points.We are going to provide affordable
rental units at 65%AMI or below and through coordination with HRDC.
31. BMC 38.430.080.E.2(7)(b) PUD performance. Not eligible for this performance unless
a specific public access easement is proposed and the area is defined. Provide
clarifications.
We have provided public access easements for public use of the plaza. See updated
list of PUD performance points as well as plan sheet C1.1
32. BMC 38.430.080.E.2(7)(d) PUD performance. This site is eligible to claim credit for
brownfield and underutilized sites with the appropriate calculations provided.
We have provided the calculations for this point, see updated list of PUD
performance points in Section 3
33. BMC 38.430.080.E.2(7)(e) PUD performance. Not eligible for the designed to meet
LEED-ND performance points as the project is not conditionally approved nor does
it have precertification per requirements.
See updated list of PUD performance points along with Appendix K for
documentation from our LEED consultant regarding precertification.
34. BMC 38.430.080.E.2(7)(i) PUD performance. Not eligible, the recycling transfer
station referenced in the code is a community level transfer station similar in size
and scale to those provided by the Gallatin Solid Waste Management District and
not recycling collection for site residents and guests.
We have removed this from our performance point list. See updated list in
Section 3
35. BMC 38.520.060.E On-site residential open space. Provide clarification of proposed
residential open space by building. Clarify which open space credit and allotment
per building. Provide calculation and percentage of common space that applies to
each building. Provide dimensions on the plans for all open space areas per SP1 and
PLS documents. Clearly separate onsite residential open space and required PUD
performance open space and usable commercial open space in calculations and
exhibits and provide code references to clearly differentiate the required spaces.
Show how the proposed public access will be achieved.
Sheet AS.102 titled 'Site Usage Information' provides clarification, allotment,
calculations and percentages, dimensions, exhibits, and code references for
open space.
36. BMC 38.520.060.0 No usable commercial open space designated or provided as
required.
Sheet AS.102 titled 'Site Usage Information' provides calculation and location
of usable commercial open space.
37. BMC 38.520.070 Location and design of service areas. No service areas identified for
gas and electric entrance locations into the buildings or proposed methods to
separate and mitigate impacts as required. Show gas and electric locations as
required per SP1 on entire site and general proposed locations for private utility
entrance locations into the buildings.
Sheet AS.101 titled 'Architectural Site Plan' includes locations of gas and
electric entrance locations.
38. BMC 38.520.070.B Location and design of service areas. Service areas for trash
service are not approved by the Sanitation Division. Service areas for Building 1 and
Building 4 do not include ramps or a safe and accessible locations for trash
dumpster pick up. Clarify individuals responsible for moving the trash dumpsters to
pickup area. Provide documentation in supplementary document noting this
requirement(POA documents). Trash service is being proposed on street frontages
not in accordance with Section 38.520.070.B.1 as alley access (fire lane) is present.
See section 5 for our proposed solid waste plan along with the plan sheets C2.1
39. BMC 38.540.050 Number of parking spaces required. Provide parking calculations
that show how the parking demand is generated without relaxations. Provide
parking calculations with proposed relaxations implemented separate from base
calculations without relaxations. Clarify parking calculation as commercial parking
demand must utilize floor area as defined in this section and not gross floor area
provided in table. Provide parking calculations of plan set cover sheet per PLS form.
See plan sheet ASA 10 for clarification to the parking calculations.
40. BMC 38.540.030 Structured parking facility development standards. The proposed
NE corner of the site does not comply with structured parking requirements or
block frontage transparency requirements per BMC for landscaped frontage. The
application and design must propose compliance with one or the other or proposed
relaxations to the standards. See comment related to grade definition in 38.700.080.
See updated elevations AS.201 for transparency calculations and AS.303 for
clarification of this.
41. BMC 38.540.050.A.2.c(6) Clarify proposed reductions for bicycle parking and shower
facilities as they apply to each building with those facilities.
See plan sheet AS.110 for clarification to the parking calculations.
42. BMC 38.540.050.A.1.b(3) provide information on car share as required in
Administrative Policy 2017-1. Clarify car share reduction in parking calculation for
residential uses only.
The project is no longer utilizing car share in the parking calculations.
43. BMC 38.540.050.A.4 provide bicycle parking requirement calculation in parking
calculations. Provide bicycle parking locations for all buildings per SP1 and to show
compliance with standards.
See plan sheet ASA10 for clarification to the parking calculations
44. BMC 38.540.070 Off-site parking. Provide site plan for offsite parking that
demonstrates the proposed lot meets all requirements of the BMC and the off-site
parking code section. Clarify the uses proposed to utilize the offsite parking and
provide exhibit showing compliance with distance requirements per use. Provide
draft long term parking agreement or draft deed restriction in order to demonstrate
compliance with BMC 38.540.070.6.
See sheet AS.100 and AS.110 for clarification on this.
45. BMC 38.540.070 Off-site parking. Clarify proposed ownership,timing for entitlement
and construction of proposed offsite parking lot. Clarify proposed use of the
balance of the property at the time of construction of off-site parking lot.
The off site parking will be owned separately from this project and the spaces
will be leased by this project.The construction will be concurrent with the
construction of this project. There is an application in the Planning
department outlining the design and layout of this off-site lot. See plan file #
18534
0 0
46. BMC 38.550.030 and 38.220.080. Landscape plan does not match civil plan or
architectural site plan and does not reflect proposed buildings.
Sheets AS.101 titled 'Architectural Site Plan,' C2.1 titled 'Site Plan,'and L1.00
titled 'Material Plan'are coordinated and consistently reflect proposed
buildings.
47. BMC 38.550.050.E Project proposes maximum slope and grade that exceeds
standards. Clarify landscaping along north and east property boundaries. Clarify
proposed slopes along Aspen Street and Ida Street.
Sheets AS.303 titled 'Street Cross Sections,'C3.0 titled 'Grading Plan; L1.00
titled 'Materials Plan,'and 4.00 titled 'Grading Plan'show slope,grading, and
landscaping along Aspen and Ida streets.
48. BMC 38.560.030 Prohibited signs. The proposed sign on building 5 (community
building) attached to the mechanical equipment is not a wall sign. It is a roof sign
which is prohibited. A relaxation may be proposed to allow a roof sign on the
community building. Provide clarification on proposed sign proposal for this
building.
See revised sign plan Section 8
49. BMC 38.560.060.A Non Residential Sign Standards. Provide building frontage
dimensions and sign calculations for all nonresidential buildings (4,5,6) and add to
comprehensive sign plan.
Sheet AS.111 titled 'Overall Floor Plan - Level 1' provides block frontage
dimensions and sheet AS.201 titled 'Street Elevations' provides signage
locations and calculations .
50. BMC 38.700.080. Grade definition. Provide more detailed exhibits of the north and
east street frontages of the site that demonstrate the relationship of the parking
garage and the overall building heights proposed in relation to the finished grade
which is the lowest point of elevation of the finished surface of the ground between
the exterior wall of a building and a point five feet distance from the building. The
site sections in AS.301 and AS.302 need additional clarity along Aspen Street and Ida
Street. Clarify finished grade in relation to the proposed gabion retaining walls and
the proposed sidewalk along these elevations. Show relationship of accurate
finished grade to proposed parking garage structure with accurate floor to ceiling
heights shown at garage level. Parking garage shown with 9'floor to ceiling height
on those exhibits, clarify if this is accurate.
Sheets AS. 201 titled 'Street Elevations'and AS.303 titled 'Street Cross Sections'
provide detailed exhibits of the north and east street frontages.
ADDITIONAL DIVISION COMMENTS
Building Division; Bob Risk brisk@bozeman.net 406-582-2377
1. Handicap accessible parking required for all uses.An accessible path to an
accessible building entrance from all the parking areas must be provided.
Sheet ASA10 titled 'Overall Floor Plan - Level 0' identifies accessible paths from
accessible parking spaces to accessible building entrances.
2. Accessible pathways between all buildings is required.
Sheet ASA11 titled 'Overall Floor Plan - Level 1' identifies accessible paths from
public sidewalk to accessible building entrances.
Fire Department; Scott Mueller smueller@bozeman.net 406-582-2386
1. Fire accesses must be noted and maintained during construction phases.
Forestry Division; Alex Nordquest; anordquest@bozeman.net 406-582-3205
1. Coordinate with the Forestry Division on tree pit design and tree species selection
for street trees. Special species selection is required for planting under power lines.
Landscape design has been reviewed and coordinated with Forestry Division.
2. Provide sleeves/conduit for irrigation lines for all tree pits.
Building specifications requires sleeves/conduit for irrigation lines for all tree
pits.
NorthWestern Energy; Cammy Dooley; cammy.dooley@northwestern.com
1. Overhead power lines may require additional building setback in order to provide
clearances.
After meeting on-site with Derek Westveer, we are hoping to have power lines
buried as they front the proposed buildings. The lines would go aerial at the
northeast, southeast, and southwest corners of the site.
2. A ten foot front setback utility easement is required on all street frontages.
Acknowledged
3. Coordinate for any interior ten foot utility easements that may be required.
Utility easements are now shown in the CM sheet.
4. Utility plan is required for this site with the preliminary PUD submittal.
See sheet C5.0
Parks and Recreation; Thom White twhite@bozeman.net
1. The City's current adopted parkland cash in lieu valuation is $1.50 per square foot
per City resolution 4938.
Acknowledged- see appendix H for communications with Parks Department
2. Provide parkland calculation and table on plan sheet cover page.
See sheet AS.102 for parkland tracking table
Solid Waste Division; Russ Ward rward@bozeman.net 406-582-3238
1. Clarifications to proposed solid waste plan are required.
See updated solid waste plan in Section S.
2. BMC 38.520.070.13 Location and design of service areas. Service areas for trash
service are not approved by the Sanitation Division. Service areas for Building 1 and
Building 4 do not include ramps or a safe and accessible locations for trash
dumpster pick up. Clarify individuals responsible for moving the trash dumpsters to
pickup area. Provide documentation in supplementary document noting this
requirement(POA documents). Trash service is being proposed on street frontages
not in accordance with Section 38.520.070.B.1 as alley access (fire lane) is present.
Sheet AS.111 titied 'Overall Floor Plan - Level 1' identifies trash service area
locations. These locations are also noted on plan sheet C2.0.
ENGINEERING COMMENTS:
1. Bozeman Unified Development Code (UDC) Section 38.400.010.A.states:All streets
must comply with the adopted growth policy and/or transportation plan.The arrangement,
type,extent,width,grade and location of all streets must be considered in their relation to
existing and planned streets,to topographical conditions,to public convenience and safety,
and to the proposed uses of the land to be served by such streets.The design standards
contained in these regulations apply to all construction,reconstruction and paving of
streets. Review authority for exceptions or modifications to this section is specified in
division 38.220.
a. The traffic impact study must provide according to UDC section 38.220.060.A.12.
and 38.400.060.,the following updates are required prior to preliminary PUD
approval:
i. The report must be stamped by a professional engineering registered in the
state of Montana. The final traffic report has been stamped by the
author who is both a Montana Professional Engineer as well as a
Professional Traffic Operations Engineer.
ii. The report should include the existing and projects traffic counts on North
Wallace Ave within the study. Per UDC Section 38.220.060.A.12.f.2.c,
North Wallace Avenue was not included in our analysis as the site does
not have a drive way access directly onto North Wallace Avenue and is
only classified as a Local Street by the Bozeman Transportation Master
Plan. The proposed development is expected to add 24/27 trips on
North Wallace Avenue in the AM/PM peak hours.
iii. The study must include the 15 year projection for the intersection of the
City's arterial and collector streets within the study area. In prior
discussions with the City Engineer,a 15-year future horizon with a
constant yearly AGR is unrealistic in certain situations where vacant
land is at a minimum,connectivity to major arterials is limited,and
major intersections (collector/arterials)are fully built-out.
Additionally,the Transportation and Land Development Manual by ITE
• i
states the suggested horizon year analysis for a small development size
(<500 peak hour trips) is opening year of full development buildout.
Therefore,the most appropriate horizon year of future analysis is
2020 when full buildout and occupancy is expected as reported in the
traffic study.
2. UDC Section 38.400.050.A.1 states:All streets and roads providing access to,and within,
the proposed development shall meet the following standards: 1. Right-of-way width and
construction standards contained in this chapter,the most recently adopted long range
transportation plan,the City of Bozeman Design Standards and Specifications Policy,and
the City of Bozeman Modifications to Montana Public Works Standard Specifications shall
apply.
Street sections have been attached and included as part of the PUD submittal
package—meeting all of the requirements of UDC Section 38.400.050.A.1 above will
not be possible as the existing ROW width along Ida Ave.is only 45'in width and a
Bozeman street typical section for this ROW width does not exist. Additionally,the
south half of the Cottonwood Street roadway section is atypical and existing from the
recently-constructed improvements to the south. Therefore,we have proposed
street sections incorporating previous feedback from Bozeman City Engineering and
Planning Staff.
a. The back out angled parking proposed along East Cottonwood is non-standard and
must be requested with the PUD.The property owner's association will be required
to maintain the proposed parking including snow plowing and maintenance of the
parking surfaces.The property owner's association documents must include
language to this effect and be reviewed and approved prior to final PUD approval.
The back-out angled parking has been included and requested in the PUD
document. The required snow plowing,maintenance,etc.is acknowledged.
Property owner's association documents will include such language and be
approved prior to final PUD approval.
b. City standard delineators must be installed at the ends of the parking stall islands
along East Cottonwood.
City standard delineators are now called out on sheet C2.0 (and other sheets.)
c. The proposed drive access bulb-out on East Aspen Street is non-standard and must
be removed.
The previously-proposed bulb-out on East Aspen has been removed and is no
longer proposed. See sheet C2.0 (and other sheets.)
3. UDC Section 38.400.010.A.8.:Second or emergency access.To facilitate traffic movement,
the provision of emergency services and the placement of utility easements,all
developments must be provided with a second means of access. If,in the judgment of the
development review committee (DRC),a second dedicated right-of-way cannot be provided
for reasons of topography or other physical conditions,the developer must provide an
emergency access,built to the standards detailed in these regulations.
a. The applicant must provide emergency service vehicle turning diagrams to ensure
that emergency service vehicles can reasonable access the site prior to preliminary
PUD approval and clarify the following:
0 0
A vehicle turning movement has been included on the new sheet C1.1,
illustrating emergency vehicular access into the emergency vehicle access/fire
lane.
i. Sheet AS.302 shows an encroachment from the Misco Mill on to the property
line and emergency vehicle access road,this is inconsistent with the plan
view sheets provided.The applicant must verify that the Misco Mill does not
encroach into the emergency vehicle access road at any point.
There is an existing satellite dish that encroaches into the emergency
vehicle access approximately mid-way along the western property line.
This has been verbally discussed with the adjacent property owner and
will be removed from the emergency vehicle access/fire lane.
ii. Sheet AS.101 shows an encroachment from the Building 5 on to the
emergency vehicle access road.
Yes,there is an encroachment from Building 5 on to the emergency
vehicle access. This has been discussed with Deputy Fire Chief Scott
Mueller and he has approved the fire lane width at the location of this
encroachment. A screenshot of his e-mail to this effect,written on
10/17/2018 is included,below:
Erik Nelson
From: Scott Mueller<SMueller@BOZEMAN.NET>
Sent: Wednesday,October 17,2018 3:08 PM
To: Erik Nelson
Subject: RE:erik@thinktankarchitects.com
Erik,
To formalize my comments on the emergency access regarding the Cottonwood and Ida project,I would support the slight relaxation of the required 20 foot
wide road rule diminished to 17'6"on a portion of the road. If access is designed with vehicular traffic barriers,those would be operational in all weather
conditions by the fire department. We suggest gates. Also the access road would be maintained year-round.
Please contact me if you require further.
Thanks
Scott Mueller
Deputy Fire Chief-Prevention-Fire Marshal
Bozeman Fire Department
34 N.Rouse Ave
Bozeman,MT.59771
Office (406)582.2353
Mobile(406)589.6271
smuellergDbozeman.net
www.bozemanfore.com
"F Afce acd, fi9ivt�"
BOZEMANMT
FIRE 01PARTMENT
4. UDC Section 38.400.090.D.2 states:These standards apply to the minimum distance
between public and/or private accesses and intersections,and the minimum distance
between public and/or private accesses and other public and/or private accesses.
a. The proposed drive accesses on to East Aspen Street do not meet the access do not
meet the City's access separation requirements.The site must separation
requirements or receive a deviation prior to preliminary PUD approval.
0 •
The proposed"drive access,"for the emergency vehicle access ought not to be
considered a drive access but rather a drivable surface in the event of an
emergency. The emergency vehicle access drive/fire lane will be protected
with removable bollards or gate system and will not be used for deliveries,
pedestrian drop-off,etc. This applies to both the north and south end of the
emergency vehicle access. Therefore,we only propose one drive access into
the site (specifically,into the parking garage) along Aspen Street. No drive
accesses are proposed along Ida Avenue nor Cottonwood Street.
b. The proposed emergency vehicle access is with the 20 foot required separation from
the adjacent property to the west.
The proposed"drive access,"for the emergency vehicle access ought not to be
considered a drive access but rather a drivable surface in the event of an
emergency. The emergency vehicle access drive/fire lane will be protected
with removable bollards or gate system and will not be used for deliveries,
pedestrian drop-off,etc. This applies to both the north and south end of the
emergency vehicle access. Therefore,we only propose one drive access into
the site(specifically,into the parking garage) along Aspen Street. No drive
accesses are proposed along Ida Avenue nor Cottonwood Street.
5. UDC Section 38.400.100.0 states: Drive aisles and alleys.At the intersection of each
driveway or alley with a street,no fence,wall or planting in excess of 30 inches above the
street centerline grade is permitted within a triangular area where corners are defined by
two points on the right-of-way line, 15 feet on each side of the centerline of the driveway or
alley and a point on centerline ten feet outside the right-of-way.Any driveway or alley
wider than 30 feet curb to curb at the right-of-way line must use the vision triangle
standard for local streets when intersecting local, collector,or arterial streets. Note:We do
not propose a driveway or alley wider than 30 feet curb-to-curb at the right-of-way
line.
a. Street vision triangles must be shown on the landscaping plans.The vision triangle
may not be impeded by landscaping including boulevard trees.The proposed tree
shown on the landscaping plan appear to impeded the vision triangle.
Street vision triangles are now shown/included in landscaping plans.
b. The street vision triangle for the emergency vehicle access on East Aspen street,
shown on sheet C1.00,is impeded by the building to the west.
Acknowledged. We do not propose the demolition or relocation of
neighboring property/buildings. Please see our responses to comment#4,
above. The emergency vehicle access will not act as a driveway access or
access to the site but rather used only in case of emergency.
c. The street vision triangle for the access to the underground parking area is
incorrectly shown on sheet C1.00.
The street vision triangle has been drawn and shown with a point 10-feet off
of the property line with 15-foot offsets on each side of centerline as indicated
in the comment#5,above.
6. UDC Section 38.410.060.A states:Where determined to be necessary,public and/or
private easements shall be provided for private and public utilities,drainage,vehicular or
pedestrian access,etc.
An additional Sheet(C1.1) is included with this PUDP submittal package. This sheet
illustrates easements pertinent to this project as well as lot line changes,and existing
ROW.
a. The applicant must provide an overall plan clearly denoting the locations of the
existing and proposed right-of-way,property lines,and easements prior to
preliminary PUD approval.
An additional Sheet(C1.1) is included with this PUDP submittal package. This
sheet illustrates easements pertinent to this project as well as lot line changes,
and existing ROW.
b. An amended plat must be completed prior to final PUD approval for any change in
lot lines.
Acknowledged.
c. Public utility easements are required along each street the property fronts on as per
UDC Section 38.410.060.B.2.a. No encroachment may be permitted with the
approval from all utility companies.
Acknowledged.
d. The applicant must provide a public access easements for required public sidewalks
located outside of the public right-of-way.
Sheet C1.1 illustrates public pedestrian access easements for public sidewalks
located outside of the public ROW.
7. UDC 38.410.070.A.1 states:The developer must install complete municipal water and
sanitary sewer system facilities,or a system allowed by section 38.350.030.D,and may be
required by the city to install municipal storm sewer system facilities.These systems must
be installed in accordance with the requirements of the state department of environmental
quality and the city,and must conform with any applicable facilities plan.The city's
requirements are contained in the Design Standards and Specifications Policy and the City
of Bozeman Modifications to Montana Public Works Standard Specifications,and by this
reference these standards are incorporated into and made a part of these regulations.The
developer must submit plans and specifications for the proposed facilities to the city and to
the state department of environmental quality and must obtain their approvals prior to
commencing construction of any municipal water,sanitary sewer or storm sewer system
facilities.
Acknowledged. Public infrastructure plans in conjunction with this PUD are
forthcoming.
a. Per City of Bozeman Design Standards and specifications Policy Manual Section
V.D.2.c water main are required to perpendicularly cross sanitary sewer mains.
Acknowledged. Any deviation required due to existing conditions would be
submitted through the appropriate DEQ deviation process.
b. The water and sewer design report must be stamped by a professional engineer
register in the state of Montana and include the following additional information
prior to final PUD approval:
i. The residual pressures and velocity with in the surrounding distribution
system while the fire flow plus max hour demand is provided for the
development.
The water and sewer design report,along with any updates based on
PUD submittal process,will be stamped by a registered Professional
Engineer in the State of Montana and will include residual
pressures/velocities as specified prior to final PUD approval.
8. UDC Section 38.410.080.A.states:The developer must install complete drainage facilities
in accordance with the requirements of the state department of environmental quality and
the city,and must conform to any applicable facilities plan and the terms of any approved
site specific stormwater control plan.The city's requirements are contained in the Design
Standards and Specifications Policy and the City of Bozeman Modifications to Montana
Public Works Standard Specifications,and by this reference these standards are
incorporated into and made a part of these regulations.The developer must submit plans
and specifications to the city and to the state department of environmental quality(if
applicable),and must obtain their approvals prior to commencing construction of any
drainage system facilities. Acknowledged.
a. The applicant must submit a stormwater drainage report,certified by a professional
engineering within the state of Montana,for the onsite and public right-of-way
drainage and have the reports reviewed and approved prior to preliminary PUD
approval.
Acknowledged. The stormwater drainage report,along with any updates
based on PUD submittal process,will be stamped by a registered Professional
Engineer in the State of Montana.
b. The geotechnical report notes the presents of groundwater at approximate depth of
7-8 feet with the possibility this elevation increasing. In addition the reports note
this is of significant concern for the proposed subsurface parking area and provides
a number of design recommendations.The application is unclear as to if any of the
recommendation will be implemented.As a number of the recommendation may
affect areas outside of the project the applicant must provide details of how the
groundwater will be addressed on site with the engineer certified drainage report
prior to preliminary PUD approval. The applicant is advised that the City do not
permit sump pumps to discharge into the City infrastructure.
Since the original PUDP submittal to the City,the proposed parking garage has
been raised significantly. The current proposed finished slab elevation of the
parking garage is 4768.00. This proposed slab elevation is approximately 5'
below existing grade. The shallowest groundwater measured within the
monitoring wells in the geotechnical report was 7.77'below existing grade.
The date of this measurement was 4/30/2018. During monitoring,
measurements ranged from 7.77'below existing grades to 10.00'below
existing grades.
c. The drainage infrastructure proposed on East Aspen is non-standard and should be
located onsite within a public drainage easement.The proposed location may only
be approved as a PUD relaxation and will require an encroachment permit.The
system will must be maintained by the property owner's association.
To clarify,the drainage infrastructure proposed is to facilitate drainage of
public right-of-way storm drainage. As there is no regional stormwater
facility,a drainage facility within the ROW would only serve to attenuate
stormwater runoff from the public ROW. The proposed on-site stormwater
detention facilities would be located on private property and would
presumably not require any easements in favor of the City.
0 •
d. The applicant must submit a stormwater maintenance plan for the proposed onsite
stormwater system prior to preliminary PUD approval.The approved maintenance
plan be included within the property owner's associate document prior to final PUD
approval.
Acknowledged. This documentation will be provided prior to final PUD
approval.
e. The minimum City's stormwater main is 15" and must be located a minimum of 5
feet from a sanitary sewer main,this must be addressed prior to preliminary PUD
approval.
Acknowledged. Design and submittal of off-site public infrastructure is
forthcoming.
f. The applicant must demonstrate that the existing stormwater system in Wallace
Aveune has sufficient capacity to accept the flow from the new main in East Aspen,
prior to final PUD approval.
Acknowledged.
9. UDC Section 38.410.130.A states: Prior to a final approval of all development reviewed as
a site plan,conditional use permit,planned unit development,or subdivision and prior to an
annexation of any land,one of the following must occur: Payment must be made to the city
of a payment-in-lieu of water rights,calculated based on the annual demand for volume of
water the development will require multiplied by the most current annual unit price;
a. The applicant must pay cash-in-lieu of water rights prior to final PUD approval.
Acknowledged. We have been coordinating cash-in-lieu payment with Brian
Heaston.
10. UDC Section 38.430.070.A..:Applications for phased planned unit developments. If a
planned unit development is intended to be developed over time in two or more separate
phases,application for approval of a phased planned unit development must follow
procedures established for pre-application review as outlined in this division 38.430.After
pre-application review is completed,phased PUDs may be proposed in accordance with one
of the following procedures:
a. The proposed phasing plan does not provide sufficient information to determine is
the each phase meets UDC.The applicant must clarify when the onsite infrastructure
will be constructed including stormwater,trash/recycling facilities,pedestrian
access,emergency service access,etc.The applicant should reference advisory
comment No. 1
At this time,our intent is to permit the build-out of the PUD as one site plan
(SP1) application rather than a master site plan(MSP) application.
11. If not already filed for the subject site,the applicant must provide and file with the County
Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special
Improvement Districts (SID's) for the following:
a. Street improvements to North Wallace Avenue including paving,curb/gutter,
sidewalk,and storm drainage Acknowledged
b. Street improvements to East Tamarack Street including paving,curb/gutter,
sidewalk,and storm drainage Acknowledged
0 •
c. Street improvements to East Peach Street including paving,curb/gutter,sidewalk,
and storm drainage Acknowledged
d. Street improvements to Front Street including paving, curb/gutter,sidewalk,and
storm drainage Acknowledged
e. Intersection improvements to North Wallace Avenue and East Tamarack Street
Acknowledged
f. Intersection improvements to North Wallace Avenue and East Peach Street
Acknowledged
The document filed must specify that in the event an SID is not utilized for the completion of
these improvements, the developer agrees to participate in an alternate financing method for
the completion of said improvements on a fair share, proportionate basis as determined by
square footage of property, taxable valuation of the property, traffic contribution from the
development, or a combination thereof. The applicant must provide a copy of the filed SID
waiver prior to final PUD approval. Acknowledged
CONDITION(S)OF APPROVAL:
12. The intersection of East Aspen Street and the Front Street and Ida Street and Front Street
must be reconfigured to meet the City's intersection standards.The intersection must be
improved with the first phase of development.Any changes to the City Park at the
intersection will require the approval from the Parks Department prior to final PUD
approval.
Based on various conversations with personnel within the Engineering,Planning,
Parks,and Economic Development departments(as well as with stakeholders within
the neighborhood and project vicinity),we have proposed a configuration that
improves the curve along Ida Avenue,turning into Front Street as well as parking
facilities to serve the boulder park patrons with leasable parking stalls within the
Front Street public ROW.
ADVISORY COMMENTS:
1. Plans and Specifications for water and sewer main extensions,streets,and storm water
improvements,prepared and signed by a professional engineer(PE) registered in the State
of Montana shall be provided to and approved by the City Engineer.Water and sewer plans
shall also be approved by the Montana Department of Environmental Quality.The applicant
shall also provide professional engineering services for construction inspection,post-
construction certification,and preparation of mylar record drawings. Construction shall not
be initiated on the public infrastructure improvements until the plans and specifications
have been approved and a preconstruction conference has been conducted. Building
permits will not be issued prior to City acceptance of the infrastructure improvements
unless all provisions set forth in Section 38.270.030.0 of the Bozeman Municipal Code
are met to allow for concurrent construction.
The need to coordinate concurrent construction of the public infrastructure
improvements and other off-site improvements and the on-site construction of
proposed buildings and appurtenant site improvements is acknowledged. The
Developer acknowledges the need to comply with exceptions specified in subsection
D of the UDC section 38.270.030 for planned unit developments. Therein,it notes
that"a building permit may be allowed prior to completion of the public
infrastructure,provided that[criteria#1-13] are met..." These criteria are listed
below for ease of reference:
1.The subject property must be developed under the provisions of division 38.430 of this chapter;
2.The subdivider or other developer must enter into an improvements agreement to ensure the installation of
required infrastructure and other applicable improvements,to be secured by a financial guarantee in an amount to
be determined by the city,with said guarantee to be in the name of the city;
3.Approval of the final engineering design,including location and grade,for the infrastructure project must be
obtained from the engineering department,and the state department of environmental quality when applicable,
prior to issuance of any building permit for the development;
4.Building permits may be issued incrementally,dependent upon the status of installation of the infrastructure
improvements.All building construction within the PUD must cease until required phases of infrastructure
improvements as described in the PUD have been completed,and inspected and accepted by the city;
S. The subdivider must provide and maintain fire hazard and liability insurance which must name the city as an
additional insured and such issuance must not be cancelled without at least 45 days prior notice to the city.The
subdivider must furnish evidence,satisfactory to the city,of all such policies and the effective dates thereof,
6.The subdivider must recognize,acknowledge and assume the increased risk of loss because certain public services
do not exist at the site;
7.The subdivider must enter into an agreement with the city which provides for predetermined infrastructure
funding options;
8.No occupancy of any structures or commencement of any use constructed or proposed within the boundaries of the
PUD will be allowed until required infrastructure improvements have been completed,and inspected and accepted
by the city,and a certificate of occupancy has been issued;
a.No occupancy of structures or commencement of any use must occur when such action would constitute a
safety hazard in the opinion of the city;
9.The subdivider must enter into an agreement with the city to address the provision of any services on an interim
basis during construction,if deemed appropriate;
10.The subdivider must execute a hold harmless and indemnification agreement indemnifying,defending and
holding harmless the city,its employees,agents and assigns from and against any and all liabilities,loss,claims,
causes of action,judgments and damages resulting from or arising out of the issuance of a building permit under this
section;
11.The subdivider must pay for any extraordinary costs associated with the project which the city may identify,
including,but not limited to,additional staff hours to oversee the planning,engineering and construction of the
project and infrastructure improvements,inspection of the infrastructure improvements and any extraordinary
administrative costs;
12.The development must be under the control of a single developer and all work must be under the supervision of a
single general contractor.The developer and general contractor must agree that there must be no third-party
builders until required infrastructure improvements have been completed,and inspected and accepted by the city;
and
13.Subsequent to preliminary plat or plan approval,a concurrent construction plan,addressing all requirements of
this section,must be submitted for review and approval of the review authority with a recommendation from the
development review committee.
r)
r 1
'a
1; Oper: PROFCAgI Type: EP Drawer: 1
Date: 10/31/18 01 Tzipt no: 65006
Year",. limber Amount I
2018 ' 516
PZ ' " PLANING &ZONING
$19577.86
COTTONaDOD AND IDA PUDP
Tender detail
Cif Clt( 14312 $19677.86
Total tendered $19577.86
Total partnent $19677.85
Trans date: 10/31/18 Time: 12:49:2B
i Tw YOU!
BOZIEMtwo 0 Al
Community Development
DEVELOPMENT REVIEW APPLICATION
o ROJECTIMAG_E o
r
PROJECT INFORMATION VICINITY MAP_
Project name: Cottonwood and Ida T
Project type(s): Planned Unit Development/Site Plan
Description: Mixed Use project with a broad range of housing units and
commercial office/artist spaces
Street address: 615 East Cottonwood Street&720 N Ida Ave
Zip code: 59715
Zoning: NEHMU
Gross lot area: 90,013 SF l' ,
. u
Block frontage: 300 LF Cottonwood, 300 LF Ida, 300 LF Aspen � • - --� ,
LLL
Number of buildings: six ` IN
Type and Number of dwellings: 92 t! '`i'"' Ct,�
Non-residential building size(s):30,000 SF
Non-residential building height(s): 3 stories i `-} ?`_'.
18 '
120
(in stories) OCT 3 w ' f :
Number of parking spaces: 201 -'•-_.. .,,,,,"„�, . ,��•�
Yes DEPARI MENT OF � I
Affordable housing(YEN): COMMUNITY DEVELOPMEN(�
Cash in lieu of parkland(Y/N): Yes 1
i
CITY USE ONLY Q
Submittal date: Planner: {
J
Application file number: j—5' DRC required(Y/N): Revision Date:
Development Review Application Al Page 1 of 3 Revision Date:5.16.18
REQUIRED FORMS: Varies by project type,PLS
* DEVELOPMENT RE9I EW APPLICATION
1. PROPERTYOWNER
Name: Bangtail Partners LLC
Full address(with zip code): PO Box 10195, Palo Alto CA 94303-0995
Phone: 406-587-3628
Email: erik@thinktankarchitects.com
2. APPLICANT
Name: Imperial Development LLC
Full address(with zip code): 33 N Black Ave Bozeman,MT 59715
Phone: 406-587-3628
Email: erik@thinktankarchitects.com
3. REPRESENTATIVE
Name: Thinktank Design Group Inc(Erik Nelson)
Full address(with zip code): 33 N Black Ave,Bozeman,MT 59715
Phone: 406-587-3628
Email: erik@thinktankarchitects.com
4. SPECIAL DISTRICTS
Overlay District: ❑x Neighborhood Conservation ❑ None
Urban
Renewal District: ❑Downtown ❑ North 7th Avenue ❑x Northeast ❑North Park ❑None
5. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s)and the property owner(s)(if different)for all application types before the
submittal will be accepted.The only exception to this is an informal review application that may be signed by the applicant(s)only.
As indicated by the signature(s)below,the applicant(s)and property owner(s)submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject
site during the course of the review process(Section 38.34.050, BMC). I(We)hereby certify that the above information is true
and correct to the best of my(our)knowledge.
Certification of Completion and Compliance—I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan—I acknowledge that construction not in compliance with the approved
final plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application Al Page 2 of 3 Revision Date:5.16.18
REQUIRED FORMS: Varies by project type,PLS
DEVELOPMENT REVIEW APPLICATION
Applicant Signatu
Printed Name: ��lK- oN
Owner Signature: ,�j
Printed Name: G re*dC)r Y !'v 14
Owner Signature:
Printed Name:
If signing as a corporation or LLC,please provide the title and position of the individual signing on behalf of the corporation/LLC.
Attach separate sheets for additional owner signatures.
6. APPLICATION TYPES -�
Check all that apply,use noted forms. FORM FORM
❑ 1. Pre-application Consultation None ❑ 17. Informal Review INF
❑ 2. Master Site Plan MSP 1118. Zoning Deviation/Departure None
❑ 3. Site Plan SP ❑ 19. Zoning or Subdivision Variance Z/SVAR
❑ 4. Subdivision pre-application PA 1120. Conditional Use Permit CUP
❑ S. Subdivision preliminary plan PP ❑21. Special Temporary Use Permit STUP
❑ 6. Subdivision final plan FP ❑22. Special Use Permit SUP
❑ 7. Subdivision exemption SE 1323. Regulated Activities in Wetlands WR
❑ S. Condominium Review CR 1124. Zone Map Amendment(non-Annexation) ZMA
❑ 9. PUD concept plan PUDC ❑ 25. UDC Text Amendment ZTA
310. PUD preliminary plan PUDP ❑ 26. Growth Policy Amendment GPA
❑ 11. PUD final plan PUDFP 1327. Modification/Plan Amendment MOD
❑ 12. Annexation and Initial Zoning ANNX 1328. Extension of Approved Plan EXT
❑ 13. Administrative Interpretation Appeal AIA 1129. Reasonable Accommodation RA
❑ 14. Administrative Project Decision Appeal APA ❑ 30. Comprehensive Sign Plan CSP
❑ 15. Commercial Non-residential COA CCOA
❑ 16. Historic Neighborhood NCOA 1131. Other:
Conservation Overlay COA
CONTACT US
Alfred M.Stiff Professional Building phone 406.582.2260
20 East Olive Street 59715(FED EX and UPS Only) fax 406.582.2263
PO Box 1230 planning@bozeman.net
Bozeman, MT 59771 www.bozeman.net
Development Review Application Al �r Page 3 of 3 Revision Date:5.16.18
REQUIRED FORMS: Varies by project type,PLS
BOZ E MAN MT 01
Community Development PUDP
PUD PRELIMINARY PLAN REQUIRED MATERIALS
APPLICATION SETS
3 total sets are required that include 1 copy of every item below bound or folded into 81h x 11 or 81h x 14
sets.
® Complete and signed development review application form Al.
® Complete materials required by the SP1 checklist.
® Materials and plans that include all the required items listed in the preliminary PUD plan checklist
below.
Standard application sets 2 sets that include full size 1 set that include 11 x 17 inch plans
required plan sizes: 24 x 36 inch plans
❑x 2-digital versions of all materials (JPEG or PDF) on separate CD-ROM's or USB drives. Individual files
must be provided at 5MB or less in size. Files shall be named according to naming protocol.
All plans must be drawn to scale on paper not smaller than 81h x 11 inches or larger than 24 x 36
Notes: inches. The name of the project must be shown on the cover sheet of the plans. If 3-ring binders
will be used, they must include a table of contents and tabbed dividers between sections. Plans
that are rolled or not bound into sets will not be accepted.
NOTICING MATERIALS
® Completed and signed property adjoiners certificate form Nland materials
APPLICATION FEE
[� Base fee $1,666
If includes dwellings add: $94 per dwelling unit
If includes nonresidential uses add: $292 per 1000 i square feet of nonresident g g pial gross building space.
n
PUD PRELIMINARY PLAN CHECKLIST
A Planned United Development (PUD) Preliminary Plan review is the second step in the PUD entitlement
process. When a subdivision is proposed in conjunction with a zoning PUD the subdivision review shall be
coordinated with the zoning review and a subdivision preliminary plat application shall also be submitted
concurrent with this application.
1• Overall project narrative providing a thorough and extensive description of the overall project
including design intent, project goals, project timeframe, proposed uses, site improvements and
buildings.
2• A complete list of proposed relaxations to the BMC listed by individual section and reason for the
relaxation.
3. Name, mailing address and full contact information for project team including: owner, developer,
architect, civil engineer, landscape architect/designer and electrical engineer.
4• A title report for subdivision or proposed subdivision guarantee with all current property ownership.
5. Data regarding site conditions, land characteristics, available community facilities and utilities and
other related general information about proposed uses, adjacent land uses and the uses of land within
one-half mile of the subject parcel of land both existing and proposed.This shall be in narrative and/or
table formats.Provide the following supporting maps: existing land use map,community plan land use
Planned unit Development Preliminary PUDP I Page 1 of 3 Revision Date 01-26-18
Required Forms: I Al, SP1 I Recommended Forms:
designation map, city zoning map, neighborhood and entryway overlay map for property showing
conditions within 200 feet of the project boundaries.
6. Overall land use ratios for:
a. existing footprints of existing buildings and structures
b. proposed buildings and structures
c. driveways and parking areas
d. streets, roads and alleys with areas of rights of way identified separately
e. private open spaces for residential uses
f. landscape areas
g. city parkland
7. Overall project floor area ratio (FAR) and net residential density.
8. Development Schedule. If phasing is proposed, provide narrative clearly describing project phasing
with the proposed phasing of all infrastructure, buildings, driveways and parking and landscaping.
9. Phasing Plan exhibit clearly showing all site and infrastructure improvement with phase boundaries
including detailed limits of construction and approaches to mitigate any conflicts with phase
boundaries and site safety and function.
10. Phasing table that shows phase area and data for each phase including: area in acres and square feet,
lot area in acres and square feet, building foot print square feet, building floor area, FAR, street right
of way, common opens space, landscaped area, PUD open space square feet and percentage of total,
PUD performance points by type and parking space requirements.
11. Table of proposed buildings include phase information, footprint, gross square footage, stories,
whether building is existing or proposed, and building use designations by building floor.
12. Colored aerial vicinity map within one-half mile of the site with project site and other significant
community facilities, streets, trails, watercourses, railways, highways and other applicable features
identified by name.
13. Overall site illustration in color showing all building foot prints, landscaped areas, site circulation
including vehicular, bike, and pedestrian facilities.
14. Statements of objectives and conformance to city policy and plans:
a.Statement of applicable City land use policies and objectives achieved by the proposed plan and how
it furthers the implementation of the Bozeman Community Plan, provide specific land use goals and
objectives in the Community Plan that are furthered by the proposed PUD;
b. Statement of proposed ownership of public and private open space areas and applicant's intentions
with regard to future ownership of all or portions of the PUD;
c. Estimate of number of employees for business, commercial, and industrial uses;
d. Description of rational behind the assumptions and choices made by the applicant;
e.The applicant shall submit as evidence of successful completion of the applicable Community Design
objectives and Criteria of Section 38.20.090.E, documentation pursuant to these regulations for each
proposed use; the applicant shall submit written explanation for each of the applicable objectives or
criteria as to how the plan does or does not address the objective or criterion; the Director may
require, or the applicant may choose to submit, evidence that is beyond what is required in that
section; any variance from the criterion shall be described;
f. Detailed description of how conflicts between land uses are being avoided or mitigated;
g. Statements of design methods to reduce energy consumption, (e.g. - home/business, utilities,
transportation fuel, waste
recycling).
15. If not provided by subdivision application materials, physiographic data and summaries for:
landforms and geology and soils; hydrology;vegetation; noxious weeds; wildlife and viewsheds. If the
project is a brown field site, provide site history, data and copies of any environmental site
Planned Unit Development Preliminary PUDP I Page 2 of 3 Revision Date 01-26-18
Required Forms: Al, SP1 Recommended Forms:
assessments that have been completed. An approved noxious weed management plan must be
submitted.
16. Narrative descriptions of site access and overall utilities including an overview, parking, existing and
proposed condition of the streets providing access to the site, proposed accesses to the site and
utilities including water, sewer, storm drainage, solid waste, gas, electric and shallow franchise
facilities.
17. Development and Design Guidelines per Section 38.20.070.D.2 BMC.
18. Comprehensive Signage Plan, if applicable.
CONTACT US
Alfred M.Stiff Professional Building phone 406-582-2260
20 East Olive Street 59715 (FED EX and UPS Only) fax 406-582-2263
PO Box 1230 planning@bozeman.net
Bozeman,MT 59771 www.bozeman.net
Planned Unit Development Preliminary PUDP Page 3 of 3 Revision Date 01-26-18
Required Forms: I Al, SP1 Recommended Forms:
A SP1
BOZEMAN
Community Development
SITE PLAN CHECKLIST
SITE PLAN REQUIREMENTS
ALL INFORMATION AND ITEMS BELOW MUST BE ON SITE PLAN SHEETS AND NOT PRESENTED
ON SEPARATE ATTACHMENTS EXCEPT 1, 47, 77, 78, 79, 82, 83 AND STORMWATER, SEWER,
WATER AND WETLAND REPORTS, IF PROVIDED.
GENERAL INFORMATION
1. Project narrative describing the project type,proposed use scope,size(dwellings,building size(s),building height(s),number of ❑X
buildings,number of total parking spaces)intent,and phasing,if applicable.The narrative must include a response to the City's
conceptual review comments.
2. Name of project/development. XD
3. Name and mailing address of developer and owner. ❑X
4. Name and mailing address of engineer,architect,landscape architect,planner,etc. ❑X
5. Location of project/development by street address/legal description. QX
6. Location/vicinity map,including area within one-half mile of the site. ❑X
7. A construction route map showing how materials and heavy equipment will travel to and from the site. ❑X
8. Location,percentage of parcel(s)and total site,and square footage of the following:
a. Existing and proposed buildings and structures. QX
b. Driveway circulation and parking areas. ❑X
c. Landscaped areas. ❑X
d. Private open space,provide boundary/ies and dimensions of each space provided(if residential requirement)on plans or Q
separate exhibit.Provide a summary total types of dwelling units and total open space required and provided.
e. City Parks. ❑X
f. Other public lands(school sites,public access greenway corridors,trail corridors). ❑X
SITE PLAN GENERAL -
9. Boundary line of property with dimensions. ❑X
10. Date of plan preparation and changes. ❑X
11. North point indicator. x
12. Suggested scale of 1 inch to 20 feet,but not less than 1 inch to 100 feet. Q
13. Parcel size(s)in gross acres and square feet. Q
14. Estimated total floor area and estimated ratio of floor area to lot size(floor area ratio,FAR),with a breakdown by land use. Q
15. Total number(with number of bedrooms),type and density per type of dwellings,and total new and gross residential ❑X
density and density per residential parcel.The density per parcel must be presented as net residential density per
Section 38.700.130 BMC.
Site Plan Checklist SP1 Page 1 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
SITE PLAN CHECKLIST
SITE PLAN DETAILS
THE LOCATION, IDENTIFICATION AND DIMENSIONS OF THE FOLLOWING EXISTING AND
PROPOSED DATA, ONSITE AND TO A DISTANCE OF 100 FEET(200 FEET FOR PUD'S)OUTSIDE
THE SITE BOUNDARY, EXCLUSIVE OF PUBLIC RIGHTS-OF-WAY UNLESS OTHERWISE STATED.
16. Topographic contours at a minimum interval of 2 feet,or as determined by the Director. X❑
17. Location of City limit boundaries,and boundaries of Gallatin County's Bozeman Area Zoning Jurisdiction,within or near QX
the development.
18. Existing zoning within 200 feet of the site. 0
19. Adjacent streets and street rights-of-way to a distance of 150 feet,except for sites adjacent to major arterial streets where the X❑
distances shall be 200 feet.The full width of the street including curb,gutter,sidewalk,drive approaches,intersections and
street lighting must be shown for both sides of the street.
20. Block frontages.
21. On site streets and rights-of-way. Including curb gutter,sidewalks,and street lights. OX
22. Ingress and egress points. ❑X
23. Traffic flow on site.
24. Traffic flow off site. ❑X
25. All parking facilities,including circulation aisles,access drives,covered and uncovered bicycle parking and bicycle rack type Q
and detail,compact spaces,ADA accessible spaces and motorcycle parking,on-street parking(delineated by a 24'long under
interrupted space(s)directly adjacent to the project site outside of site vision triangles and hydrant locations),number of
employee and non-employee parking spaces,existing and proposed,and total square footage of each.
26. Setbacks,building footprint and any proposed encroachments.Any setback or property line encroachments must be clearly ❑X
shown and be noted with encroachment type e.g.awning,weather protection,cantilever,lighting,eave,etc.
27. Utilities and utility rights of way and easements existing and proposed,including:
a. Electric. ❑X
b. Natural Gas. ❑X
c. Telephone,cable and similar utilities. OX
d. Water. ❑X
e. Sewer(sanitary,treated effluent and storm). OX
28. Surface water,including:
a. Ponds,streams and irrigation ditches(include classifications be based upon a determination of the Gallatin Conservation District; XQ
note classification of each feature on plans).
b. Watercourses,water bodies and wetlands(include classifications based upon a determination of the Gallatin Conservation District, ❑X
Army Corps of Engineers,or Wetland Delineation Report;note classification of each feature on plans).
c. Floodplains as designated on the Federal Insurance Rate Map or that may otherwise be identified as lying within a 100 year 0
floodplain through additional floodplain delineation,engineering analysis,topographic survey or other objective and factual basis.
d. A floodplain analysis report in compliance with Article. QX
29. Grading and drainage plan,including provisions for on-site retention/detention and water quality improvement facilities as VN
required by the Engineering Division,or in compliance with B.M.C.Section 14 storm drainage ordinance and best
management practices manual adopted by the City.All surface stormwater facilities must demonstrate compliance with
Section 38.410.080 BMC including providing cross sections for each facility.
Site Plan Checklist SP1 Page 2 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N 1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
SITE PLAN CHECKLIST
30. All drainageways,streets,arroyos,dry gullies,diversion ditches,spillways,reservoirs,etc.which maybe incorporated into the
storm drainage system for the property shall be designated:
a. The name of the drainageway(where appropriate). ❑X
b. The downstream conditions(developed available drainageways,etc.). ❑X
c. Any downstream restrictions. ❑X
31. Significant rock outcroppings,slopes of greater than 15 percent or other significant topographic features. ❑X
32. Sidewalks,walkways,driveways,crosswalks,loading areas and docks,bikeways,including typical details and ❑X
interrelationships with vehicular circulation system,indicating proposed treatment of points of conflict.
33. Provision for handicapped accessibility,including but not limited to,wheelchair ramps,parking spaces,handrails and curb cuts, X❑
including signage and construction details and the applicant's certification of ADA compliance.A certification block must be
provided on the plan sheets.
34. Fences,walls,railings and handrails,including typical details. ❑X
35. Permanent trash enclosure and refuse collection areas,including typical details and elevations. ❑X
36. Construction management plan include exterior construction period material staging,spoils location and construction trash Q
enclosure location(s).A trash container type must be provided and detailed(40 yard roll off,fenced enclosure,etc.).
If spoils storage is proposed a timeline for removal must be provided.
37. Curb,asphalt section and drive approach construction details. XQ
38. Location and extent of snow storage areas. X❑
39. Location and extent of street vision triangles extended to center of right of way including adjacent street intersections and X❑
all alley and driveway access points.
40. Unique natural features,significant wildlife areas and vegetative cover,including existing trees and shrubs having a diameter 0
greater than 2.5 inches,by species.
41. Historic,cultural and archaeological resources,describe and map any designated historic structures or districts, OX
and archaeological or cultural sites.
42. Major public facilities,including schools,parks,shared use pathways,trails,etc.within a distance of 200 feet. ❑X
PARKLAND AND AFFORDABLE HOUSING
43. If residential,provide the required parkland for the development,including calculations per Section 38.420 BMC(Park and 0
Recreation Requirements)in a table format,see table format in the PLS document.
44. If cash in lieu is proposed,a thorough calculation including the base requirement and any net based upon maximum density, ❑X
narrative addressing the findings the City must make to grant cash in lieu,and the appraisal must be provided to make
the request per Section 38.420.030 BMC,unless using city valuation.
45. If parkland is proposed a park plan shall be submitted consistent with Section 38.220.060.A.16 BMC. ❑
46. Source and amount of parkland credit to be used if previously provided. If from a subdivision confirm amount provided and ❑
detailed phase information as required in table format outlined in the PLS document.
47. Describe how the site plan will satisfy any requirements of Section 38.380, BMC(Affordable Housing)which have either been ❑
established for that lot(s)through the subdivision process or if no subdivision has previously occurred are applicable to a
site plan.The description shall be of adequate detail to clearly identify those lots and dwellings designated as subject to the
section's compliance requirements and to make the obligations placed on the affected lots and dwellings readily understandable.
If affordable housing is not being provided place that statement on the site plan sheets with the site data in item 8.
48. If affordable housing is provided,or cash in lieu is proposed use form AH. ❑
Site Plan Checklist SP1 Page 3 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N 1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
SITE PLAN CHECKLIST
LIGHTING DETAILS
49. Lighting plan and electrical site plan,complete with all structures,parking spaces,building entrances,traffic areas(both vehicular ❑
and pedestrian),vegetation that might interfere with lighting,and adjacent uses,containing a layout of all proposed fixtures
by location and type.
50. A photometric lighting plan that contains a layout of all proposed fixtures by location and type and extends the photometric ❑
information to the property boundaries and rights of way. For fueling canopies a second photometric plan is required to
specifically analyze the light output underneath the drip line of the fuel canopy.
51. Details for all proposed exterior fixtures that are keyed to the fixtures noted in the lighting electrical plan and the photometric ❑
lighting plan.The detail must demonstrate compliance with full cut-off requirements in Section 38.570 BMC and be located
on the lighting plan sheets.
BUILDING DESIGN AND SIGNAGE
52. Front,rear and side elevations of all buildings,structures,fences and walls with height dimensions and roof pitches. X❑
Show open stairways,exterior lighting,weather protection,awnings and other projections from exterior building walls.
Building elevations must include proposed exterior building materials,windows and doors including a color and material
palette for all proposed features keyed to the building elevations.
53. Provide transparency calculations for any elevation that faces a street and is a block frontage. Provide minimum and maximum X❑
height of transparency from grade.Provide area of transparency and percentage in relation to total facade.
54. Provide elevations and details of all ground mounted and rooftop mechanical screening. ❑X
55. Floorplans that include all floors and roof plan.Annotate/designate uses for all rooms and areas.Seating/serving area ❑X
layout required for all restaurants.
56. Exterior signs if applicable.Include building frontage dimension(s)and maximum sign area calculation,provide sign dimensions ❑X
and square footage of each. Note—The review of signs in conjunction with this application is only review for sign area
compliance with Section 38.560 BMC(Signs).A sign permit must be obtained from the Building Division prior to
erection of any and all signs,addition design guidelines apply for signs within zoning Overlay Districts.
LANDSCAPE PLAN
A SEPARATE LANDSCAPE PLAN SHALL BE SUBMITTED AS PART OF THE SITE PLAN
APPLICATION UNLESS THE REQUIRED LANDSCAPE INFORMATION CAN BE INCLUDED IN A
CLEAR AND UNCLUTTERED MANNER ON A SITE PLAN WITH A SCALE WHERE ONE INCH
EQUALS 20 FEET.ALL INFORMATION MUST BE ON PLAN SHEETS.
57. Project name,street address,and lot and block description. ❑X
58. Date,scale,north arrow,and the names,addresses,and telephone numbers of both the property owner and the person preparing ❑X
the plan. Plan preparer shall be a state registered landscape architect;an individual with a degree in landscape design and
two years of professional design experience in the state;or an individual with a degree in a related field(horticulture,botany,
plant science,etc.)and at least five years of professional landscape design experience,of which two years have been in the state.
59. Location of existing boundary lines and dimensions of the lot. ❑X
60. Existing and proposed grade that complies with maximum allowable slope and grade. ❑X
61. Approximate centerlines of existing watercourses,required watercourse setbacks,and the location of any 100-year floodplain; ❑X
the approximate location of significant drainage features;and the location and size of existing and proposed streets and alleys,
utility easements,utility lines,driveways and sidewalks on the lot and/or adjacent to the lot.
62. Location of all pavement,curbs,sidewalks and gutters.
Site Plan Checklist SP1 Page 4 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
SITE PLAN CHECKLIST
63. Show location of existing and/or proposed drainage facilities which are to be used for drainage control including proposed ❑X
landscaping and seeding as required by Section 38.410.080.1-1 BMC.
64. Location and extent of snow storage areas. 0
65. Location and extent of street vision triangles,extended to the center of right of way. 0
66. Complete landscape legend providing a description of plant materials shown on the plan,including typical symbols, 0
names(common and botanical name),locations,quantities,container or caliper sizes at installation,heights,spread and spacing
and identification of drought tolerant and/or native and adapted species.The location and type of all existing trees on the lot
over 6 inches in caliper must be specifically indicated.
67. Size of planting at the time of installation and at maturity. ❑X
68. Complete illustration of landscaping and screening to be provided in or near off-street parking and loading areas,including ❑X
information as to the amount(in square feet)of landscape area to be provided internal to parking areas and the number and
location of required off-street parking and loading spaces.
69. Street frontage landscaping,including boulevard details and tree grate details as applicable based upon block frontage.
70. Locations and dimensions of proposed landscape buffer strips,including watercourse buffer zones demonstrating compliance
with watercourse setback planting plan requirements per Section 38.410.100.A.2.F BMC unless previously provided during
subdivision review.
71. Location,height and material of proposed landscape screening and fencing(with berms to be delineated by one foot contours). X❑
72. An indication of how existing healthy trees(if any)are to be retained and protected from damage during construction. ❑X
73. ' Size,height,location and material of proposed seating,lighting,planters,sculptures,and water features. 0
74. A description of proposed watering methods including any use of high efficiency irrigation technologies and best practice, ❑X
source of irrigation water and estimated amount of water consumption broken down by vegetation type(e.g.turf,shrubs,trees)
and total estimated water consumption.
75. Areas to be irrigated and type of proposed irrigation and the irrigation system design plan. ❑X
76. Tabulation of performance points earned by the plan per Section 38.550.060 BMC. 0
STREETS AND TRAFFIC
77. Traffic study.Street,traffic,and access information required in Section 38.220.060.A.12 BMC or that the requirement ❑X
is waived in writing by the Engineering Division prior to application submittal.
WATER AND WATER RIGHTS
78. Water rights information. If cash in lieu is proposed a cash in lieu of water rights calculation and payment amount certified by
the Engineering Division.
79. If water wells are proposed,a letter from the Department of Natural Resources confirming their intent to issue a permit Q
or exemption.
DEVIATIONS
80. Either through the site plan requirement above or separate exhibit clearly show any proposed deviations related to site ❑
requirements such as yards/setbacks,lot coverage,parking or other applicable standards.
81. Either through the building elevation requirement above or separate exhibit clearly show any proposed deviations related to ❑
building construction such as height,second story additions,or other applicable standards.
Site Plan Checklist SP1 Page 5 of 6 1 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
SITE PLAN CHECKLIST
82. For deviations in the Neighborhood Conservation Overlay a deviation narrative shall be provided stating which Section(s)
of the Bozeman Municipal Code are proposed for deviation,to what extent and include a response to the following:
a. How the modification is more historically appropriate for the building and site in question and the adjacent properties,as determined ❑
in Section 38.340.050 BMC than would be achieved under a literal enforcement of this chapter(Chapter 38,BMC);
b. How the modifications will have minimal adverse effect on abutting properties or the permitted uses thereof;and
c. How the modifications will assure the protection of the public health,safety and general welfare. ❑
d. How the requested deviation will encourage restoration and rehabilitation activity that will contribute to the overall historic character
of the community.
If more than one deviation,a response to the criteria shall be provided for each deviation.
DEPARTURES
83. For departures,a departure narrative must be provided stating which Section(s)of the Bozeman Municipal Code are proposed
for departure,the scope and extent of the plan proposed for departure and a response to the required departure criteria.
If more than one departure,a summary and response to the criteria must be provided for each departure.
' CONTACT US
Alfred M.Stiff Professional Building phone 406.582.2260
20 East Olive Street 59715(FED EX and UPS Only) fax 406.582.2263
PO Box 1230 planning@bozeman.net
Bozeman, MT 59771 www.bozeman.net
Site Plan Checklist SP1 Page 6 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
BOZ E MAN MT
Community Development N1
NOTICING MATERIALS
Notice is required for certain projects in order for citizens to participate in decision making which affects
their interests and provides opportunity to receive information pertinent to an application that would
not otherwise be available to the decision maker.
SITE PLAN, MASTER SITE PLAN, CONDITIONAL USE PERMIT,VARIANCE, DEVIATION, FIRST MINOR
SUBDIVISON AND SIMILAR REQUIRED NOTICING MATERIALS
✓❑ Completed and signed property adjoiners certificate form N1.
0 Legible list of full names and addresses of all property owners within 200 feet of the project
site,attached to this checklist.
✓❑ Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and
addresses of the adjoining property owners.
MAJOR AND SUBSEQUENT MINOR SUBDIVISION REQUIRED NOTICING MATERIALS
❑ Completed and signed property adjoiners certificate form N1.
Legible list of full names and addresses of all property owners within 200 feet of the project
❑ site and not physically contiguous (touching a boundary) to the subdivision,attached to this
checklist.Clearly label list ADJOINER NOT CONTIGUOUS.
❑ Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and
addresses of the adjoining property owners.
Legible list of full names and addresses of all property owners physically contiguous (touching
❑ a boundary) including recorded purchasers under contract for deed to be sent certified mail
attached to this checklist. Clearly label list CONTIGUOUS.
Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and
❑ addresses of the physically contiguous property owners including recorded purchasers under
contract for deed.
❑ Two sets additional mailing labels with the names and addresses of the physically contiguous
property owners including recorded purchasers under contract for deed attached.
NOTICE
Current property owners of record can be found at the Gallatin County Clerk and Recorder's Office in
the Gallatin County Courthouse 311 West Main Street Bozeman, Montana.
CERTIFICATION
1, Erik R Nelson,Thinktank Design Group Inc. hereby certify that, to the best of my knowledge, the
attached name and address list of all adjoining property owners (including all condominium owners,
within 200 feet of the property located at 615Eastcononwood . is a true
and accurate list from the last declared Gallatin County tax records. I further understand that an
inaccurate list may delay review of the project.
Erik Nelson W"��°"�`��
� Wie;10410101]0])C6W
Signature
CONTACT US
Alfred M.Stiff Professional Building phone 406-582-2260
20 East Olive Street 59715 (FED EX and UPS Only) fax 406-582-2263
PO Box 1230 planning@bozeman.net
Bozeman,MT 59771 www.bozeman.net
Noticing Materials Page 1 of 1 Revision Date 1-05.16
Required Forms: N1 Recommended Forms: Required Forms:
PROPOSED PUD POINTS
PERFORMANCE POINTS SEC 38.430.090 E.2.7
A minimum of 20 points need to be achieved;we are expecting to achieve between 43 and 62 points.
AFFORDABLE HOUSING density calculations would be 16 units)
21 POINTS
50%increase factor=8
Three points for each percent of dwellings to be constructed in Proposed number of dwelling units=92
the residential development which are provided by long term
contractual obligation to an affordable housing agency, for a Number of units increased over base density=92-16=
period not less than 20 years, with a written plan assuring on- 76 net increase
going affordability pricing and eligibility monitoring, and annual Net increase divided by the 50%increase factor=
re-certification. points=76/8=9.5
Per UDO 38.700.020 Environmentally contaminated land(does not apply)
Affordable housing. Housing for persons earning less than 65 Points reached=4.77(commercial increase)+9.5
percent of the area's annual median income for rental housing (residential increase)=14.27
and 100 percent of the area's annual median income for
purchased housing.Further,affordable housing does not require Maximum allowable(1/3) total of 6.67
greater than 33 percent of the household gross annual median DESIGNED TO MEET LEED-ND
income for housing. Annual median income is defined by the 15 POINTS
Department of Housing and Urban Development
The project design is based on LEED ND criteria. We intend on
Points achieved = 21 (7 rental units ( 7.6%] will be provided at keeping the design to this standard and hope to achieve these
rental rates at a maximum of 65%AMI points. The project has been registered and certified under
ADDITIONAL OPEN SPACE D1-L U current LEED version 4.The project is on track to achieve LEED
9.37 POINTS Neighborhood Development Plan certification and possibly LEED
Silver.See the LEED information provided in the appendix for the
One and '/c point for each percentage of the project area that is certification requirements and a breakdown of the LEED points
provided as publicly accessible open space. Project land area = expected to be achieved.
90,000 sf Publicly accessible plaza area = 6750 sf/7.5% of the
project total.See Sheet AS.102 Land Dedication Table.These are INCLUSION OF LOW-IMPACT DEVELOPMENT PLAN
the public plazas indicated as Aspen Yard and Mill Yard. 6 POINTS
UNDERUTILIZED AND BROWNFIELD SITES The use of low impact development standards is a project goal
6.67 POINTS and we hope to achieve these points by treating on-site storm
water exceeding chapter 40 requirements, incorporating a
The site is 2 acres and the south acre previously had a scale integrated snow storage management plan,select plant species
hobby train located on the site. The north half of the site has that meet drought tolerant standards,inclusion of weather based
been occupied by an industrial warehouse. Accounting for the irrigation systems and limit the amount and type of sod.
underutilized south portion a minimum of one point will be
achieved.
Per(d) BUILDING HEIGHTS p PUBLIC OPEN SPACE
PROVIDED ARE p ENHANCED STREETSCAPE
Underutilized and brownfield sites.One point for each 50 percent AVERAGE ROOF
increase in the total square footage of commercial and/or HEIGHT ABOVE THE * WAYFINDING FEATURES
industrial floor area on underutilized sites; one point for each PARKING GARAGE RECYCLING STATION
50 percent increase in the total number of dwelling units on
underutilized sites; one point for each acre developed of the
environmentally contaminated land; up to a total of one-third of j
the performance points required to be earned.
Existing industrial/commercial floor area= 10,488 �i 48'
SF 49' `
50%increase factor=5.244 SF 31'
Proposed commercial floor area=35,521 SF 35' ]
Amount of increased SF=35,521 -10,488=25,033 SF 46'
Number of 50%increase factors/points=25,033/ 10 % F
5.244=4.77
One point for each 50%increase in total=4.77 �. 5 t \%
Existing number of dwelling units=0(using base
COTTONWOOD ¢ IDA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
page 44
1 �
no 3)
gjMTg MOO D D
AVIBRANT DIVERSE ATlA1NABLECOMMUNITI'1NTHECOREOFTHENORTHEASTERNNEIGHBORHQOD
................
MIXED-USE DEVELOPMENT PROPOSAL 11 BOZEMAN, MT
t`! . r �'`I j , °.,.,gyp. 4•■rr.l ��R v`. r �
+� • ,� .. _
' • DESIGN
1
TABLE OF CONTENTS
SECTICN 1 PROJECT INTRODUCTION page 3
1 53 INTRODUCTION STATEMENT
1 O1 SITE VICINITY MAP& DIAGRAM
1 Q FRCPOSED USES&COMPILED DATA
1 03 FRCJECT TEAM
Lila CERTIFICATION OF OWNERSHIP
SECTION 2 APPLICATION FORMS&CHECKLISTS page 13
2 O] DEVELOPMENT REVIEW APPLICATIONS
201 FUCP CHECKLIST
2.02 SP1 CHECKLIST
SECTICN.3 PROJECT OVERVIEW page 36
3 O] FRCJECT OVERVIEW&GOALS
301 EXISTING CONDITIONS& HISTORY
3,02 SITE ZONING& LAND USES
3:03 GENERAL BUILDING INFORMATION
3.05 FRCPOSED PUD POINTS
3.03 PRGPOSED RELAXATIONS
3.05 ALICNMENT OF GOALS WITH DISTRICT PLANS AND VISICN NE
GOALS
3.07 FUC COMMUNITY DESIGN OBJECTIVES
3.08 PROPOSED OWNERSHIP
3.09 ESTIMATED NUMBER OF EMPLOYEES FOR BUSINESSES,
RES'ONSIBILITY FOR IMPACT MITIGATION& DESIGN METHODS
T--FEDUCE ENERGY CONSUMPTION
3A RAT;ONALE FOR CHOICES MADE BY THE APPLICANT
3."1 GENERAL SITE DATA
SECTION 4 LAND USE page 64
4.00 CITYLAND USE POLICIES&OBJECTIVES ACHIEVED
4.01 LAND USE CLASSIFICATION
4.02 ALIGNMENT OF GOALS WITH NORTHEAST URBAN RENEWA_PLAN
4.C3 ALIGNMENT OF GOALS FROM VISION NE/RUDAT REPOR-
SECTION 5 INFRASTRUCTURE page 70
5.f!0 INFRASTRUCTURE STRATEGIES&SUMMARIES
5.01 WATER RIGHTS&CONCURRENT CONSTRUCTION PLAN
SECTION 6 BUILDING&DESIGN page 77
6.00 BUILDING DESIGN OBJECTIVES
6.0 BUILDING STRATEGIES
6.{2 BUILDING MATERIALS
6.0 DES GN VIGNETTES
SECTION 7 SIGNAGE page 84
7.00 GOtvPREHENSIVE SIGN PLAN
SECTION 8 APPENDICES page 90
COTTONWOOD + IDA
RESPONSE& RESUBMITAL 11 11 JANUARY 2019
SECTION 1 PROJECT INTRODUCTION
1.00 INTRODUCTION STATEMENT
1.31 SITE VICINITY MAP & DIAGRAM
1.32 PROPOSED USES & COMPILED DATA
1.03 PROJECT TEAM
1.04 CERTIFICATION OF OWNERSHIP
COTTONWOOD ¢ IDS,
RESPONSE& RESUBMITAL II II JANUARY 2019
page 3
1t
EXCERPT FROM THE NORTHEAST NEIGHBORHOOD R/UDAT REPORT
"Today,the Northeast Neighborhood is strategically located and can support the housing
shortage,and teve-age existing infrastructure,encouraging a contemporary form of
multimcdal transportation due its proximity to downtown,the university and access to
adjacent natural amenities.The question will be how the Northeast Neighborhood can
be strategic withoLt destroying its character and the attributes that make it unique.
The chat_enge will be.accommodating new housing and commercial development with
appropriate policies and design standards to maintain the integrity and quality of life for
residents and business owners in the existing area.Design must also honor the past and
the historical significance of the location.New policies should regulate new construction
so that it fits within the neighborhood and focuses on quality context-sensitive design.
As Bozeman continues to grow,a focus on great public spaces,walkability,and
opportunities to ca-er to active lifestyles will continue to enhance Bozeman as a place
and reinforce its great quality of life and economy of choice for knowledged workers and
talented professiona.s.
One fear of additiora.development in the Northeast Neighborhood is gentrification of the
area anc increasec values in an already price sensitive market.The City should explore
a regional:policy to make housing more attainable to the region as a whole.However,
certain cevelopment;could implement a portion of housing that is below market rates in
exchange for other concessions.For example,public property could be made available
to those developers that conscientiously address some levels of affordable housing.
Design shculd be u-iigue and reflect the existing character distinguishable from other
parts of:he neighborhood."
_he Cottonwood anG Ida Neighborhood Development addresses these challenges by
providing nevv housing at reasonable prices,while maintaining the integrity of the existing
community - honoring the past and accommodating the future.
0 •
INTRODUCTION) STATENEWT
The site is in t-)e N_,--heast par of B>>eman and carries a Ile
unique Xx
unique zoning desiaiation found only in this part cf town
the Nortreast Historic Mixed-lJ=_e District INEHMUI• The r� ,
Unified Derelooment Code IUBC) describes this District as * •
s
follows,
The intent of the Northeas: His-oric Mixed Use
District is to reco provide ni-ion of an a-ea that has
P 9
devel:)?ed with a alend of uses not commonly seen IN • •
under typical zoning requ►ramerts. The unique
qualities and nature of the area are not found
elsewhere in the city and should be preserved as a p. -• ,�,`
place of'ering additional oppertun ties for creative
id..:: i.
integration of land uses."
This project propose= an integration cf a broad ra-)ge of 4
housing a-id comr-ercial activ tv along with thoughtful
public plaza spaces to connect to the existing fabric of the
neighborhood. The project will exceec _EED Neighborhood
Design Stardards, i7icorporate low impact development
approaches, and -rost impor-antly provide affordable PROJECT SITE
housing options.
I _,_ _�_,� is ... :�:' •1 ,+. � �
- Iry
tn eLDG 1 BLDG 24-1
r
Masco
AL L
BL DG BLDG d
RESPONSE& RESUBMITAL II II JANUARY 2019
page 5
'•1 l l I r - % � �r
1 •
_ •'i' L 1
I I• 1 1 111
S•� I
� -_}= , •. III � ..�,,�, .
led
11.. "-
?+ _at
Ar
1 � 1• 1 1 111 1 1+
If 7 T LII le)
INTRODUCTION STATEMENT
CONTINUED
r4
r
DILL C-.�
r _
_YJF
AERIAL VIEW
A APARTMENT- 10%AFFORDABLE E EXISTING REHABILITATED BUILDING FOR
CAFE USE-OPEN PAVILLION
B TOWNHOUSE STYLE APARTMENTS-SALE
CONDOS F OFFICE BUILDING
C GROUND FLOOR-ARTISAN MANUFACTURING G OFF-SITE PARKING
-SALE CONDOS
H PUBLIC PLAZA
D SECOND-THIRD FLOOR RESIDENTIAL LOFTS
-SALE CONDOS
C0770mt9®®® ¢ IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 7
11 �► i • i 1� � � i • i ►1 7 . ``ter _
w ..
C • i` ,- j E OAK ST ENO
'BIRCHSF ` ,r ��" yy�/ ► y '� �5;:
IL
�, � -,•. t"';r•� �' � 1 ;,ICE•�, `�`. 1
• . _� F _ � #!`�:-v r� :,1 r � �•, • poi; •max �' .1,
E;TAMARACKtST
•per, ;• ;,�jy1' E .•r 90
;. .. •s
rtrIllb
IP
m .• _ E'COTTO 5 l .ni!l •.-r.
r.' .i• M t• a
1p
t�jJ' . , -, i . , r, '1 �t�';,•A awl. ~:' '� �a-1tVJ �•`� +�*�'•'1 lj`',.\ ` t 1r♦ �\R { y%i►� ~�...
� � � � •3 �['� :��!I � '� •.���� F`IDLEY 5�����„�i5�• :� ,`'• "�.t ti?►�.� f
- 5• �•t - tti .:i ti► ,:t,`•' �=t j DAVIS'STo •'9v 'ST ,
• f t < .• yam: 7.:=] } ff
', Y.?):! tr+�,+■�t� { r y( �.�. .. \ ,
- - - • Al l+ a .+y�'� ;. .1• 6 -'^N/• a •
.Z -•
f . .."• i _a r♦ • .*� iw I .f•' Ji•i 1• ..M1.{�:. _• 1.'•1Q�;,. •, ���
- C - - t • ` • E L'AMMEiST
DENH/CII:ST
._
Cho
PROPOSED USES
A APARTMENT- 10%AFFOREAELE
B TOWNHOUSE STYLE
APARTMENTS - SALE CONDOS
C GROUND FLOOR -ARTISAN
MANUFACTURING - SALE
coNDos
D SECOND - THIRD FLOOR H
RESIDENTIAL LOFTS - SALE ,\, . I A
CONDOS
E EXISTING REHABILITATED \c
BUILDING FOR CAFE USE -
OPEN PAVILLIOPJ a ,a/
F OFFICE BUILDING ✓ �.
G OFF-SITE PARKING
H PUBLIC PLAZA
COMPILED DATA
a miom
BLDG 1 RESIDES TIAL 40.072 GSF 34,061 SF 11,631 SF 46 UNITS
BLDG 2 RESIDENTIAL 10,791 GSF 9.172 SF 3,558 SF 18 UNITS
BLDG 3 RESIDENTIAL 15,908 GSF 13,522 SF 5,192 SF 12 UNITS
BLDG 4 REEIDENTIAL 26,645 GSF 22,648 SF 8,359 SF 16 UNITS
;AFTISAN
BLDG 5 RESTAURANT/ 2,156 GSF 1,833 SF 2,156 SF
COMM-:RCIAL
BLDG 6 CF=ICE/ 29,650 GSF 25,203 SF 9,538 SF
CONMER'IAL
PUBLIC PLAZA 6,750 SF
OPENSPACE 11,650 SF
RESIDENTIAL PARKING UNDEF'3POUND 39,395 GSF 33,486 SF 36.998 SF 96 SPACES
GARAGE
TOTAL PROJECT PARKING 200 SPACES
TOTAL BUILDING SF 125,216 GSF 106,434 SF 39,422 SF
TOTAL SITE SF 90,013 SF
FLOOR AREA RATIO(F.A.R.I 1.4
COTT'OMWOOD ¢ IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 9
PROJECT TEAM
OWNER CIVIL ENGINEER
Bangtail Partners LLC. Sanderson Stewart
1189 Tennessee Street,Urit 103 Contact:Mike Russell
San Francisco,CA 94107 10t.East Eabcock Street
Bo:en-an,MT 55715
DEVELOPER 855-654-5255
Imperial Development,Ltc. STRUCTURAL ENGINEER
Contact:Jon Evans
33 North Black Ave. Ni=_hkia--Monks
Bozeman,MT 59715 Contact:Tf Mons
406-451-1470 10E WEEi Bar-ock S reet
Bo:errtn,MT 59713
40E-587--9901
ARCHITECTS Tm3nk3,al`Ilsl-klar.-)m
Openscope Studio,Inc.
Contact:Ian Dunn/Mark Hogan MEP ENGINEER
1776 18th Street Emera d City Engineers,Inc.
San Francisco,CA 94107
415-891-0954 Contact Aram French,P.E.
21705 High vay 99
IandunnfdOpenscopestudic.cDm Mointlake Terra:e,WA 98043
MarkhoganfdOpenscopestudio.com 425-741-1200
ThinkTank Design Group ACOUSTICAL
Contact:Erik Nelson/Brian Caldwell.
33 North Black Ave. Charles M.Salter Associate_,Inc.
Bozeman,MT 59715 Cortac: E[han Sate-, PE,LEED AP
406-587-3628 130 Sutter Street,Floor 5
Sar Francisco,CA 5t 104
Fernau& Hartman Archite--ts 415-39°-0442
Contact: Richard Fernau,FAIA
506 Mites Stree. BUILDING ENVELOPE
Clyde Park,MT 59018
406-686-9193 Simpscr Gunpe-tz&Heger
Cortaa:Gregory Doelp
GENERAL CONTRACT OP, 100 Pine Sweet,Suite 1600
San Franci-sco,CA 9011
Langlas&Associates 415-495-3700
Contact:Loren Cantrell
1019 East Main,Ste 101 LEED iSUSTAINABIL.ITY
Bozeman,MT 59715
406-585-3420 Kat i W L a—IS+Associates
Contact: �atl- JVi.lians
LANDSCAPE ARCHITECT PO Bo: 191
Bozema-i, WT 59771
Fletcher Studio 406.58t-3175
Contact:David Fletcher KathfdKE,hen.hams.com
2325 3rd Street,#413
San Francisco,CA 94107
415-431-7878
DftetcherfdFtetcherstudio.con
COTTOMWOO® ¢ H®A
RESPONSE& RESUBMITAL II II JANUARY 2019
page 10
CHICAGO TITLE •
INSURANCE COMPANY
Policy No. : 7170-1-1-109058-2018.72156-215267676
CHICAGO TITLE INSURANCE COMPANY
GUARANTEE
CHICAGO TITLE INSURANCE COMPANY, a Florida Corporation, herein called the Company, guarantees the Assured against
actual loss not exceeding the liability amount stated in Schedule A which the Assured shall sustain by reason of any
incorrectness in the assurances set forth in Schedule A.
1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A
or with respect to the validity, legal effect or priority of any matter shown therein.
2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of
reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount
set forth in Schedule A.
PLEASE NOTE CAREFULLY THE LIABILITY EXCLUSIONS AND LIMITATIONS AND THE SPECIFIC ASSURANCES AFFORDED BY
THIS GUARANTEE. IF YOU WISH ADDITIONAL LIABILITY, OR ASSURANCES OTHER THAN AS CONTAINED HEREIN, PLEASE
CONTACT THE COMPANY FOR FURTHER INFORMATION AS TO THE AVAILABILITY AND COST.
CHICAGO TITLE INSURANCE COMPANY
Countersigned:
{� ► k-
By. By: a�
Authorized Officer or Agent u'
Bradley C. Stratton
American Land Title Company of Montana
1800 W Koch St President
Bozeman, MT 59715
Tel:406-587-5563
Fax:406-587-8038 Attest:
Secretary
Note: This endorsement shall not be valid or binding
until countersigned by an authorized signatory.
72156 72156 Miscellaneous Guarantee Face Page 00_156
Page i of 1
SCHEDULE A
Policy Number: 7170-1-1-109058-2018.;211 6-215267676
Order No. 1-109058 (Bangtail Partners,LLC)
Liability: $200.00 Fee: $160.00
Dated: October 17,2018 at 8:00 A.M.
Assured: The County of Gallatin and in the City of Bozeman in Montana.
The assurances referred to on the face page are:
That, according to those public records which,under the recording laws, impart constructive
notice of matters relative to the following described real property:
Parcel A:
Lots 5 through 16, inclusive, all in Brock 105 of The Norther: Pacific Addition to The City of
Bozeman, Gallatin County, Montana. Together with the vacated alley,adjacent and contiguous
thereto,pursuant to Ordinance No 628,recorded July 29, 199' in film 117,page 1328„according
to the official plat thereof on file and of record in the office of the County Clerk and Recorder of
Gallatin County,Montana. [Plat No. C-23]
Parcel B:
Lots 17 through 28,Inclusive, all in Block 105 of The Northern Facific Addition to the City of
Bozeman, Gallatin County,Montana Together with the vacated alley adjacent and contiguous
thereto,pursuant to Ordinance No. 628,recorded July 29, 1991 iiI Film 117,page 1328,
according to the official plat thereof on file and of record in ftl-cff ce of the County Clerk and
Recorder of Gallatin County,Mo:itar-a. [Plat No. C-23]
Title to said real property is vested in: Bangtail Partners,LLC, a California limited liabililty
company
subject to the matters shown below under Exceptions,which Exceptions are not necessarily
shown in the order of their priority.
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
• •
SECTION 2 APPLICATION FORMS AND
CHECKLISTS
2:00 DEVELOPMENT REVIEW!APPLICATIONS
Al APPLICATION
PUDP APPLICATION
SP1 APPLICATION
N1 APPLICATION
2.01 PUDP CHECKLIST
2.02 SP1 CHECKLIST
r,oY OC`lUDOD ¢ l©Q
RESPONSE&RESUBMITAL II II JANUARY 2019
page 13
BOZ E MAN MT • • Al
Community Development
DEVELOPMENT REVIEW APPLICATION
PROJECT IMAGE
PROJECT INFORMATION 1 VICINITY MAP
Project name: Cottonwood and Ida^
Project type(s): Planned Unit Development/Site Plan
Description: Mixed Use project with a broad range of housing units and
commercial office/artist spaces
Street address: 615 East Cottonwood Street&720 N Ida Ave
Zip code: 59715 _ __
Zoning: NEHMU
Gross lot area: 90,013 SF_
I
Block frontage: Cottonwood:Mixed,Ida: Mixed,Aspen:Mixed
Number of buildings: six
Type and Number of dwellings: 92
i
i
Non-residential building size(s): 30,000 SF
Non-residential building height(s): 3 stories
(in stories)
Number of parking spaces:200
Affordabl=housing(Y/N): Yes
Cash in lieu of parkland(Y/N): Yes I J1AN 28 2019
CITY USE ONLY J " �
Submittal date: Planner: COMMA NI
Application file nimber: DRC required(Y/N): Revision Date:
Develop went Review Application Al Page 1 of 3 Revision Date:5.16.18
REQUIRED FORMS: Varies by project type, PLS
& EVELOPMENT RE\W-W APPLICATION
1. PROPERTY OWNER
Name: Bangtail Partners LLC
Full address(with zip code): 1189 Tennessee Street,Unit 103,San Francisco,CA 94107
Phone: 406-587-3628
Email: erik@thinktankarchitects.com
2. APPLICANT
Name: Imperial Development LLC
Full address(with zip code): 33 N Black Ave Bozeman, MT 59715
Phone: 406-587-3628
Email: erik@thinktankarchitects.com
3. REPRESENTATIVE
Name: Thinktank Design Group Inc(Erik Nelson)
Full address(with zip code): 33 N Black Ave, Bozeman, MT 59715
Phone: 406-587-3628
Email: erik@thinktankarchitects.com
4. SPECIAL DISTRICTS
Overlay District: ❑x Neighborhood Conservation ❑ None
Urban
Renewal District: ❑ Downtown ❑ North 7th Avenue ❑x Northeast ❑ North Park ❑None
5. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s)and the property owner(s)(if different)for all application types before the
submittal will be accepted.The only exception to this is an informal review application that may be signed by the applicant(s)only.
As indicated by the signature(s)below,the applicant(s)and property owner(s)submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject
site during the course of the review process(Section 38.34.050, BMC). I (We)hereby certify that the above information is true
and correct to the best of my(our) knowledge.
Certification of Completion and Compliance-I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan-I acknowledge that construction not in compliance with the approved
final plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application Al Page 2 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
cl � •
Imperialo Development,LLC.
Applicant Signatu
Printed Name: F �e4—$oN Managing Member
Owner Signature:
Printed Name: G rQ,j*dc)✓' Av f 6 Bangtail Partners,LLC.,Managing Member
Owner Signature:
Printed Name:
If signing as a corporation or LLC,please provide the title and position of the individual signing on behalf of the corporation/LLC.
Attach separate sheets for additional owner signatures.
6. APPLICATION TYPES
Check all that apply,use noted forms. FORM FORM
❑ 1. Pre-application Consultation None ❑ 17. Informal Review INF
❑ 2. Master Site Plan MSP ❑ 18. Zoning Deviation/Departure None
❑ 3. Site Plan SIP 1119. Zoning or Subdivision Variance Z/SVAR
❑ 4. Subdivision pre-application PA ❑20. Conditional Use Permit CUP
❑ 5. Subdivision preliminary plan PP ❑21. Special Temporary Use Permit STUP
❑ 6. Subdivision final plan FP 1322. Special Use Permit SUP
❑ 7. Subdivision exemption SE ❑ 23. Regulated Activities in Wetlands WR
❑ S. Condominium Review CR 1124. Zone Map Amendment(non-Annexation) ZMA
❑ 9. PUD concept plan PUDC ❑ 25. UDC Text Amendment ZTA
10. PUD preliminary plan PUDP ❑ 26. Growth wooli=y Amendment GPA
❑ 11. PUD final plan PUDFP 1127. Modification/Plan Amendment MOD
❑ 12. Annexation and Initial Zoning ANNX ❑ 28. Extension o=Approved Plan EXT
❑ 13. Administrative Interpretation Appeal AIA ❑ 29. Reasonable Accommodation RA
❑ 14. Administrative Project Decision Appeal APA ❑ 30. Comprenen3ive Sign Plan CSP
❑ 15. Commercial Non-residential COA CCOA
❑ 16. Historic Neighborhood NCOA 1131, Other:
Conservation Overlay COA
CONTACT US
Alfred M.Stiff Professional Building phone 406.582.2260
20 East Olive Street 59715(FED EX and UPS Only) fax 406.582.2263
PO Box 1230 planning@bozeman.net
Bozeman,MT 59771 www.bozeman.net
Development Review Application Al T Page 3 of 3 -� Revision Date:5.16.18
REQUIRED FORMS: Varies by project type,PLS
ST
BOZEMAN
Community Development PUDP
PUD PRELIMINARY PLAN REQUIRED MATERIALS
APPLICATION SETS
-
3 total sets are required that include 1 copy of every item below bound or folded into 8Y2 x 11 or 8Y2 x 14
sets.
® Complete and signed development review application form Al.
® Complete materials required by the SP1 checklist.
® Materials and plans that include all the required items listed in the preliminary PUD plan checklist
below.
Standard application sets 2 sets that include full size 1 set that include 11 x 17 inch plans
required plan sizes: 24 x 36 inch plans
0 2-digital versions of all materials (JPEG or PDF) on separate CD-ROM's or USB drives. Individual files
must be provided at 5MB or less in size. Files shall be named according to naming protocol.
All plans must be drawn to scale on paper not smaller than 8Y2 x 11 inches or larger than 24 x 36
Notes: inches. The name of the project must be shown on the cover sheet of the plans. If 3-ring binders
will be used, they must include a table of contents and tabbed dividers between sections. Plans
that are rolled or not bound into sets will not be accepted.
NOTICING MATERIALS
® Completed and signed property adjoiners certificate form Nland materials
APPLICATION FEE
Base fee $1,666
If includes dwellings add: $94 per dwelling unit
If includes nonresidential $292 per 1000 square feet of nonresidential gross building space.
uses add:
PUD PRELIMINARY PLAN CHECKLIST
A Planned United Development (PUD) Preliminary Plan review is the second step in the PUD entitlement
process. When a subdivision is proposed in conjunction with a zoning PUD the subdivision review shall be
coordinated with the zoning review and a subdivision preliminary plat application shall also be submitted
concurrent with this application.
1• Overall project narrative providing a thorough and extensive description of the overall project
including design intent, project goals, project timeframe, proposed uses, site improvements and
buildings.
2• A complete list of proposed relaxations to the BMC listed by individual section and reason for the
relaxation.
3. Name, mailing address and full contact information for project team including: owner, developer,
architect, civil engineer, landscape architect/designer and electrical engineer.
4• A title report for subdivision or proposed subdivision guarantee with all current property ownership.
S. Data regarding site conditions, land characteristics, available community facilities and utilities and
other related general information about proposed uses, adjacent land uses and the uses of land within
one-half mile of the subject parcel of land both existing and proposed.This shall be in narrative and/or
table formats. Provide the following supporting maps: existing land use map, community plan land use
Planned Unit Development Preliminary PUDP I Page 1 of 3 Revision Date 01-26-18
Required Forms: I Al, SP1 I Recommended Forms:
designation map, city zoning map, neighborhood and entryway overlay .nap for property showing
conditions within 200 feet of the project boundaries.
6. Overall land use ratios for:
a. existing footprints of existing buildings and structures
b. proposed buildings and structures
c. driveways and parking areas
d. streets, roads and alleys with areas of rights of way identified separately
e. private open spaces for residential uses
f. landscape areas
g. city parkland
7. Overall project floor area ratio (FAR) and net residential density.
8. Development Schedule. If phasing is proposed, provide narrative clearly describing project phasing
with the proposed phasing of all infrastructure, buildings, driveways and parking and landscaping.
9. Phasing Plan exhibit clearly showing all site and infrastructure irr_prcvement with phase boundaries
including detailed limits of construction and approaches to miti;;ate any conflicts with phase
boundaries and site safety and function.
10. Phasing table that shows phase area and data for each phase including: area in acres and square feet,
lot area in acres and square feet, building foot print square feet, building f.00r area, FAR, street right
of way, common opens space, landscaped area, PUD open space squa-e feet and pe-centage of total,
PUD performance points by type and parking space requirements.
11. Table of proposed buildings include phase information, fcotpri.nt, gross square footage, stories,
whether building is existing or proposed, and building use designations by building floor.
12• Colored aerial vicinity map within one-half mile of the site with project site and other significant
community facilities, streets, trails, watercourses, railways, highways and other applicable features
identified by name.
13. Overall site illustration in color showing all building foot prints, landscaped areas, site circulation
including vehicular, bike, and pedestrian facilities.
14. Statements of objectives and conformance to city policy and plans:
a. Statement of applicable City land use policies and objectives achieved by the proposed plan and how
it furthers the implementation of the Bozeman Community Plan, provide specific land use goals and
objectives in the Community Plan that are furthered by the proposed PUD;
b. Statement of proposed ownership of public and private open space areas and applicant's intentions
with regard to future ownership of all or portions of the PUD;
c. Estimate of number of employees for business, commercial, and industrial uses;
d. Description of rational behind the assumptions and choices made by the applicant;
e.The applicant shall submit as evidence of successful completion of the applicable Community Design
objectives and Criteria of Section 38.20.090.E, documentation pursuant to these regulations for each
proposed use; the applicant shall submit written explanation for each of the applicable objectives or
criteria as to how the plan does or does not address the objective or criterion; the Director may
require, or the applicant may choose to submit, evidence that is beyond what is required in that
section; any variance from the criterion shall be described;
f. Detailed description of how conflicts between land uses are being axiaidec. or mitigated;
g. Statements of design methods to reduce energy consumption:, (e.g. - home/business, utilities,
transportation fuel, waste
recycling).
15. If not provided by subdivision application materials, physic rap-'hic data and summaries for:
landforms and geology and soils; hydrology; vegetation; noxious weeds; wildlife and viewsheds. If the
project is a brown field site, provide site history, data and copies of any environmental site
Planned Unit Development Preliminary PUDP I Page 2 of 3 Revision Date 01-26-18
Required Forms: I Al, SP1 I Recommended Forms:
assessments that have been completed. An approved noxious weed management plan must be
submitted.
16. Narrative descriptions of site access and overall utilities including an overview, parking, existing and
proposed condition of the streets providing access to the site, proposed accesses to the site and
utilities including water, sewer, storm drainage, solid waste, gas, electric and shallow franchise
facilities.
17. Development and Design Guidelines per Section 38.20.070.D.2 BMC.
18. Comprehensive Signage Plan, if applicable.
CONTACT US
Alfred M.Stiff Professional Building phone 406-582-2260
20 East Olive Street 59715 (FED EX and UPS Only) fax 406-582-2263
PO Box 1230 planning@bozeman.net
Bozeman,MT 59771 www.bozeman.net
Planned Unit Development Preliminary PUDP Page 3 of 3 Revision Date 01-26-18
Required Forms: Al, SP1 Recommended Forms:
MT SP1
BOZ E MAN
Community Development
SITE PLAN CHECKLIST
_ SITE PLAN REQUIREMENTS___ �_
ALL INFORMATION AND ITEMS BELOW MUST BE ON SITE PLAN SHEETS AND NOT PRESENTED
ON SEPARATE ATTACHMENTS EXCEPT 1, 47, 77, 78, 79, 82, 83 AND STORMWATER, SEWER,
WATER AND WETLAND REPORTS, IF PROVIDED.
GENERAL INFORMATION
1. Project narrative describing the project type,proposed use scope,size(dwellings,building size(s),building height(s), number of ❑X
buildings,number of total parking spaces)intent,and phasing,if applicable.The narrative must include a response to the City's
conceptual review comments.
2. Name of project/development. ❑X
3. Name and mailing address of developer and owner. ❑X
4. Name and mailing address of engineer,architect, landscape architect, planner,etc. ❑X
S. Location of project/development by street address/legal description. ❑X
6. Location/vicinity map, including area within one-half mile of the site. QX
7. A construction route map showing how materials and heavy equipment will travel to and from the site. QX
8. Location, percentage of parcel(s)and total site,and square footage of the following:
a. Existing and proposed buildings and'structures. ❑X
b. Driveway circulation and parking areas. ❑X
c. Landscaped areas. ❑X
d. Private open space,provide boundary/ies and dimensions of each space provided(if residential requirement)on plans or ❑X
separate exhibit.Provide a summary total types of dwelling units and total open space required and provided.
e. City Parks. QX
f. Other public lands(school sites,public access greenway corridors,trail corridors). ❑X
l SITE PLAN GENERAL
9. Boundary line of property with dimensions.
10. Date of plan preparation and changes. ❑X
11. North point indicator. ❑X
12. Suggested scale of 1 inch to 20 feet, but not less than 1 inch to 100 feet. ❑X
13. Parcel size(s)in gross acres and square feet. ❑X
14. Estimated total floor area and estimated ratio of floor area to lot size(floor area ratio, FAR),with a breakdown by land use. ❑X
15. Total number(with number of bedrooms),type and density per type of dwellings,and total new and gross residential ❑X
density and density per residential parcel.The density per parcel must be presented as net residential density per
Section 38.700.130 BMC.
Site Plan Checklist SP1 Page 1 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP, N 1,PLS, DEM(if demolition),WR(if wetlands),AH(if affordable housing)
•
SITLOPLAN CHECKLIST
SITE PLAN DETAILS
THE LOCATION, IDENTIFICATION AND DIMENSIONS OF THE FOLLOWING EXISTING AND
PROPOSED DATA, ONSITE AND TO A DISTANCE OF 100 FEET(200 FEET FOR PUD'S) OUTSIDE
THE SITE BOUNDARY, EXCLUSIVE OF PUBLIC RIGHTS-OF-WAY UNLESS OTHERWISE STATED.
16. Topographic contours at a minimum interval of 2 feet,or as determined by the Director. ❑X
17. Location of City limit boundaries,and boundaries of Gallatin County's Bozeman Area Zoning Jurisdiction,within or near XO
the development.
18. Existing zoning within 200 feet of the site. XQ
19. Adjacent streets and street rights-of-way to a distance of 150 feet,except for sites adjacent to major arterial streets where the XO
distances shall be 200 feet.The full width of the street including curb,gutter,sidewalk,drive approaches,intersections and
street lighting must be shown for both sides of the street.
20. Block frontages. XO
21. On site streets and rights-of-way. Including curb gutter,sidewalks,and street lights. ❑X
22. Ingress and egress points. X❑
23. Traffic flow on site. OX
24. Traffic flow off site. ❑X
25. All parking facilities, including circulation aisles,access drives,covered and uncovered bicycle parking and bicycle rack type ❑X
and detail,compact spaces,ADA accessible spaces and motorcycle parking,on-street parking(delineated by a 24'long under
interrupted space(s)directly adjacent to the project site outside of site vision triangles and hydrant locations), number of
employee and non-employee parking spaces,existing and proposed,and total square footage of each.
26. Setbacks, building footprint and any proposed encroachments.Any setback or property line encroachments must be clearly ❑X
shown and be noted with encroachment type e.g.awning,weather protection,cantilever, lighting,eave,etc.
27. Utilities and utility rights of way and easements existing and proposed,including:
a. Electric. ❑X
b. Natural Gas. ❑X
c. Telephone,cable and similar utilities. ❑X
d. Water. ❑X
e. Sewer(sanitary,treated effluent and storm). ❑X
28. Surface water, including:
a. Ponds,streams and irrigation ditches(include classifications be based upon a determination of the Gallatin Conservation District; ❑X
note classification of each feature on plans).
b. Watercourses,water bodies and wetlands(include classifications based upon a determination of the Gallatin Conservation District, ❑X
Army Corps of Engineers,or Wetland Delineation Report;note classification of each feature on plans).
c. Floodplains as designated on the Federal Insurance Rate Map or that may otherwise be identified as lying within a 100 year ❑X
floodplain through additional floodplain delineation,engineering analysis,topographic survey or other objective and factual basis.
d. A floodplain analysis report in compliance with Article. ❑X
29. Grading and drainage plan, including provisions for on-site retention/detention and water quality improvement facilities as ❑X
required by the Engineering Division,or in compliance with B.M.C.Section 14 storm drainage ordinance and best
management practices manual adopted by the City.All surface stormwater facilities must demonstrate compliance with
Section 38.410.080 BMC including providing cross sections for each facility.
Site Plan Checklist SP1 Page 2 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N 1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
0 SITOPLAN CHECKLIST
30. All drainageways,streets,arroyos,dry gullies,diversion ditches,spillways, reservoirs,etc.which may be incorporated into the
storm drainage system for the property shall be designated:
a. The name of the drainageway(where appropriate). ❑X
b. The downstream conditions(developed available drainageways,etc.). ❑X
c. Any downstream restrictions. ❑X
31. Significant rock outcroppings,slopes of greater than 15 percent or other significant topographic features. ❑X
32. Sidewalks,walkways,driveways,crosswalks, loading areas and docks, bikeways, including typical details and 0
interrelationships with vehicular circulation system, indicating proposed treatment of points of conflict.
33. Provision for handicapped accessibility, including but not limited to,wheelchair ramps, parking spaces, handrails and curb cuts,
including signage and construction details and the applicant's certification of ADA compliance.A certification block must be
provided on the plan sheets.
34. Fences,walls, railings and handrails,including typical details.
35. Permanent trash enclosure and refuse collection areas, including typical details and elevations. ❑X
36. Construction management plan include exterior construction period material staging.spoils location and construction trash ❑X
enclosure location(s).A trash container type must be provided and detailed(40 yard roll off,fenced enclosure,etc.).
If spoils storage is proposed a timeline for removal must be provided.
37. Curb,asphalt section and drive approach construction details. ❑X
38. Location and extent of snow storage areas. 0
39. Location and extent of street vision triangles extended to center of right of way including adjacent street intersections and 0
all alley and driveway access points.
40. Unique natural features,significant wildlife areas and vegetative cover, including existing trees and shrubs having a diameter ❑X
greater than 2.5 inches, by species.
41. Historic,cultural and archaeological resources,describe and map any designated historic structures or districts, 0
and archaeological or cultural sites.
42. Major public facilities, including schools, parks,shared use pathways,trails,etc.within a distance of 200 feet. 0
PARKLAND AND AFFORDABLE HOUSING
43. If residential, provide the required parkland for the development, including calculatio-is per Section 38.420 BMC(Park and 0
Recreation Requirements) in a table format,see table format in the PLS document.
44. If cash in lieu is proposed,a thorough calculation including the base requirement and any net based upon maximum density, LIN
narrative addressing the findings the City must make to grant cash in lieu,and the appraisal must be provided to make
the request per Section 38.420.030 BMC, unless using city valuation.
45. If parkland is proposed a park plan shall be submitted consistent with Section 38.220.060.A.16 BMC. ❑
46. Source and amount of parkland credit to be used if previously provided. If from a subdivision confirm arrount provided and ❑
detailed phase information as required in table format outlined in the PLS document.
47. Describe how the site plan will satisfy any requirements of Section 38.380, BMC(Affordable Housing)which have either been ❑
established for that lot(s)through the subdivision process or if no subdivision has previously occurred are applicable to a
site plan.The description shay be of adequate detail to clearly identify those lots and dwellings designated as subject to the
section's compliance requirements and to make the obligations placed on the.affected lots and dwellings readily understandable.
If affordable housing is not being provided place that statement on the site plan sheets with the site data in item 8.
48. If affordable housing is provided,or cash in lieu is proposed use form AH. ,a Zola
ElJA
()C, fi,, ;V _ �,,
MEN
_J
Site Plan Checklist SP1 Page 3 of 6 '""" Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N1, PLS,DEM(if demolition),WR(if wetlands),AH(if aFordable housing)
SIT.PLAN CHECKLIST
LIGHTING DETAILS
49. Lighting plan and electrical site plan,complete with all structures,parking spaces,building entrances,traffic areas(both vehicular ❑
and pedestrian),vegetation that might interfere with lighting,and adjacent uses,containing a layout of all proposed fixtures
by location and type.
50. A photometric lighting plan that contains a layout of all proposed fixtures by location and type and extends the photometric ❑
information to the property boundaries and rights of way. For fueling canopies a second photometric plan is required to
specifically analyze the light output underneath the drip line of the fuel canopy.
51. Details for all proposed exterior fixtures that are keyed to the fixtures noted in the lighting electrical plan and the photometric ❑
lighting plan.The detail must demonstrate compliance with full cut-off requirements in Section 38.570 BMC and be located
on the lighting plan sheets.
BUILDING'DESIGN AND SIGNAGE i
52. Front, rear and side elevations of all buildings,structures,fences and walls with height dimensions and roof pitches. ❑X
Show open stairways,exterior lighting,weather protection,awnings and other projections from exterior building walls.
Building elevations must include proposed exterior building materials,windows and doors including a color and material
palette for all proposed features keyed to the building elevations.
53. Provide transparency calculations for any elevation that faces a street and is a block frontage. Provide minimum and maximum ❑X
height of transparency from grade. Provide area of transparency and percentage in relation to total facade.
54. Provide elevations and details of all ground mounted and rooftop mechanical screening. ❑X
55. Floorplans that include all floors and roof plan.Annotate/designate uses for all rooms and areas.Seating/serving area ❑X
layout required for all restaurants.
56. Exterior signs if applicable.Include building frontage dimension(s)and maximum sign area calculation,provide sign dimensions
and square footage of each. Note—The review of signs in conjunction with this application is only review for sign area
compliance with Section 38.560 BMC(Signs).A sign permit must be obtained from the Building Division prior to
erection of any and all signs,addition design guidelines apply for signs within zoning Overlay Districts.
LANDSCAPE PLAN���
A SEPARATE LANDSCAPE PLAN SHALL BE SUBMITTED AS PART OF THE SITE PLAN
APPLICATION UNLESS THE REQUIRED LANDSCAPE INFORMATION CAN BE INCLUDED IN A
CLEAR AND UNCLUTTERED MANNER ON A SITE PLAN WITH A SCALE WHERE ONE INCH
EQUALS 20 FEET. ALL INFORMATION MUST BE ON PLAN SHEETS.
57. Project name,street address,and lot and block description. ❑X
58. Date,scale,north arrow,and the names,addresses,and telephone numbers of both the property owner and the person preparing X❑
the plan. Plan preparer shall be a state registered landscape architect;an individual with a degree in landscape design and
two years of professional design experience in the state;or an individual with a degree in a related field(horticulture, botany,
plant science,etc.)and at least five years of professional landscape design experience,of which two years have been in the state.
59. Location of existing boundary lines and dimensions of the lot. ❑X
60. Existing and proposed grade that complies with maximum allowable slope and grade. ❑X
61. Approximate centerlines of existing watercourses, required watercourse setbacks,and the location of any 100-year floodplain; ❑X
the approximate location of significant drainage features;and the location and size of existing and proposed streets and alleys,
utility easements, utility lines,driveways and sidewalks on the lot and/or adjacent to the lot.
62. Location of all pavement,curbs,sidewalks and gutters. ❑X
Site Plan Checklist SP1 Page 4 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
0
SIT PLAN KLI HE T
C C S
63. Show location of existing and/or proposed drainage facilities which are to be used for drainage control including proposed 0
landscaping and seeding as required by Section 38.410.080.H BMC.
64. Location and extent of snow storage areas. r ❑X
65. Location and extent of street vision triangles,extended to the center of right of way. ❑X
66. Complete landscape legend providing a description of plant materials shown on the plan,including typical symbols, ❑X
names(common and botanical name),locations,quantities,container or caliper sizes at installation,heights,spread and spacing
and identification of drought tolerant and/or native and adapted species.The location and type of all existing trees on the lot
over 6 inches in caliper must be specifically indicated.
67. Size of planting at the time of installation and at maturity. ❑X
68. Complete illustration of landscaping and screening to be provided in or near off-street parking and loading areas, including ❑X
information as to the amount(in square feet)of landscape area to be provided internal to parking areas and the number and
location of required off-street parking and loading spaces.
69. Street frontage landscaping,including boulevard details and tree grate details as applicable based upon block frontage.
70. Locations and dimensions of proposed landscape buffer strips, including watercourse buffer zones demonstrating compliance 0
with watercourse setback planting plan requirements per Section 38.410.100.A.2.F BMC unless previously provided during
subdivision review.
71. Location, height and material of proposed landscape screening and fencing(with berms to be delineated by one foot contours). ❑X
72. An indication of how existing healthy trees(if any)are to be retained and protected from damage during construction. ❑X
73. Size, height, location and material of proposed seating, lighting, planters,sculptures,and water features. ❑X
74. A description of proposed watering methods including any use of high efficiency irrigation technologies and best practice, ❑X
source of irrigation water and estimated amount of water consumption broken down by vegetation type(e.g.turf,shrubs,trees)
and total estimated water consumption.
75. Areas to be irrigated and type of proposed irrigation and the irrigation system design plan. ❑X
76. Tabulation of performance points earned by the plan per Section 38.550.060 BMC. ❑X
STREETS AND TRAFFIC
77. Traffic study.Street,traffic,and access information required in Section 38.220.060.A.12 BMC or that the requirement ❑X
is waived in writing by the Engineering Division prior,to application submittal.
WATER AND WATER RIGHTS ]
78. Water rights information. If cash in lieu is proposed a cash in lieu of water rights calculation and payment amount certified by ❑X
the Engineering Division.
79. If water wells are proposed,a letter from the Department of Natural Resources confirming their intent to issue a permit ❑X
or exemption.
r DEVIATIONS -- -- - -- -- -- - - - - - -- - -- --- - --
80. Either through the site plan requirement above or separate exhibit clearly show any proposed deviations related to site ❑
requirements such as yards/setbacks, lot coverage, parking or other applicable standards.
81. Either through the building elevation requirement above or separate exhibit clearly show any proposed deviations related to ❑
building construction such as height,second story additions,or other applicable standards.
Site Plan Checklist SP1 Page 5 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N1,PLS, DEM(if demolition),WR(if wetlands),AH(if affordable housing)
0 " .
SITOPLAN CHECKLIST
82. For deviations in the Neighborhood Conservation Overlay a deviation narrative shall be provided stating which Section(s)
of the Bozeman Municipal Code are proposed for deviation,to what extent and include a response to the following:
a. How the modification is more historically appropriate for the building and site in question and the adjacent properties,as determined
in Section 38.340.050 BMC than would be achieved under a literal enforcement of this chapter(Chapter 38, BMC);
b. How the modifications will have minimal adverse effect on abutting properties or the permitted uses thereof;and
c. How the modifications will assure the protection of the public health,safety and general welfare. ❑
d. How the requested deviation will encourage restoration and rehabilitation activity that will contribute to the overall historic character
of the community.
If more than one deviation,a response to the criteria shall be provided for each deviation.
DEPARTURES
83. For departures,a departure narrative must be provided stating which Section(s)of the Bozeman Municipal Code are proposed
for departure,the scope and extent of the plan proposed for departure and a response to the required departure criteria.
If more than one departure,a summary and response to the criteria must be provided for each departure.
r CONTACT US
Alfred M.Stiff Professional Building phone 406.582.2260
20 East Olive Street 59715(FED EX and UPS Only) fax 406.582.2263
PO Box 1230 planning@bozeman.net
Bozeman, MT 59771 www.bozeman.net
Site Plan Checklist SP1 Page 6 of 6 Revision Date:5.16.18
REQUIRED FORMS: Al,SP,N 1,PLS,DEM(if demolition),WR(if wetlands),AH(if affordable housing)
I T •
BOZ E MAN
Community Development N1
NOTICING MATERIALS
Notice is required for certain projects in order for citizens to participate in decision making which affects
their interests and provides opportunity to receive information pertinent to an application that would
not otherwise be available to the decision maker.
SITE PLAN, MASTER SITE PLAN, CONDITIONAL USE PERMIT, VARIANCE, DEVIATION, FIRST MINOR
SUBDIVISON AND SIMILAR REQUIRED NOTICING MATERIALS
✓❑ Completed and signed property adjoiners certificate form N1.
✓❑ Legible list of full names and addresses of all property owners within 200 feet of the project
site,attached to this checklist.
✓❑ Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and
addresses of the adjoining property owners.
MAJOR AND SUBSEQUENT MINOR SUBDIVISION REQUIRED NOTICING MATERIALS
❑ Completed and signed property adjoiners certificate form N1.
Legible list of full names and addresses of all property owners within 200 feet of the project
❑ site and not physically contiguous (touching a boundary) to the subdivision, attached to this
checklist. Clearly label list ADJOINER NOT CONTIGUOUS.
❑ Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and
addresses of the adjoining property owners.
Legible list of full names and addresses of all property owners physically contiguous (touching
❑ a boundary) including recorded purchasers under contract for deed to be sent certified mail
attached to this checklist. Clearly label list CONTIGUOUS.
Stamped, unsealed, plain (no return address) #10 envelopes preaddressed with the names and
❑ addresses of the physically contiguous property owners including recorded purchasers under
contract for deed.
❑ Two sets additional mailing labels with the names and addresses of the physically contiguous
property owners including recorded purchasers under contract for deed attached.
NOTICE
Current property owners of record can be found at the Gallatin County Clerk and Recorder's Office in
the Gallatin County Courthouse 311 West Main Street Bozeman, Montana.
CERTIFICATION -
I Erik R Nelson,Thinktank Design Group Inc. hereby certify that, to the best of my knowledge, the
attached name and address list of all adjoining property owners (including all condominium owners,
within 200 feet of the property located at 615 East Cottonwood is a true
and accurate list from the last declared Gallatin County tax records. I further understand that an
inaccurate list may delay review of the project. 1 ,
f4gIuM�DnN EYfrl4
Erik Nelson , fi1W 4d kuSDOnDD 4au.
_ fr,c.:roie.io2e a:ss,asm ,
— --------------
Signature • 1 JAN-�8-L1t19---�------
CONTACT US _
Alfred M. Stiff Professional Building "t ho-ne 406-582-2260
LoMMUNITY
20 East Olive Street 59715 (FED EX and UPS Only) �6;581r;21263
-_f
PO Box 1230 planning@bozeman.net
Bozeman, MT 59771 www.bozeman.net
Noticing Materials Page 1 of 1 Revision Date 1-05-16
Required Forms: N1 Recommended Forms: Required Forms:
PUDP CHECKLIST
A Planned Unit Development (PUD) Preliminary Plan Review is the seccnd step in the PUD entitlement
process. When a subdivision is proposed in conjunction with a zoning PUD the subdivision review shall be
coordinated with the zoning review and a subdivision preliminary plat application shall also be submitted
concurrent with this application.
1 Overall project narrative providing a thorough and extensive descripti)n of the page 36
overall project including design intent,project goals,project timeframe,proposed
uses,site improvements and buildings.
2 A complete list of proposed relaxations to the BMC listed by individual section and page 46
reason for the relaxation.
3 Name,mailing address and full contact information for project team ircluding: page 10
owner,developer,architect,civil engineer,landscape architect/designer and
electrical engineer.
4 A title report for subdivision or proposed subdivision guarantee with all current page 90
property ownership.
5 Data regarding site conditions,land characteristics,available community facilities page 3,36
and utilities and other related general information about proposed uses,adjacent
land uses and the uses of land within one-half mile of the subject parcel of land
both existing and proposed.This shalt be in narrative and/or table formats.Provide
the following supporting maps:existing land use map,community ptar land use
designation map,city zoning map,neighborhood and entryway overlay map for
property showing conditions within 200 feet of the project boundaries.
6 Overall land use ratios for: page 36,64
A. Existing footprints of existing buildings and structures
B. Proposed buildings and structures
C. Driveways and parking areas
D. Streets,roads and alleys with areas of rights of way identified separately
E. Private open spaces for residential uses
F. Landscape areas
G. City parkland
7 Overall project Floor Area Ratio(FAR)and Net Residential Density. page 9
8 Development Schedule.If phasing is proposed,provide narrative clear y describing
project phasing with the proposed phasing of all infrastructure.buildings,
driveways and parking and landscaping,
9 Phasing Plan exhibit clearly showing all site and infrastructure improvement with
phase boundaries including detailed limits of construction and approaches to
mitigate any conflicts with phase boundaries and site safety and function.
10 Phasing table that shows phase area and data for each phase includinc:area
in acres and square feet,lot area in acres and square feet,building footprint
square feet,building floor area.FAR,street right of way,common opens space,
landscaped area.PUD open space square feet and percentage of total,PUD
performance points by type and parking space requirements.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 27
• •
PUDP CHECKLIST
CONTINUED
11 Table of proposed buildings include phase information,footprint,gross square page 9,43
footage,stories,whether building is existing or proposed,and building use
designations by building floor.
12 Colored aerial vicinity map within one-half mile of the site with project site and page 8
other significant community facilities,streets,trails,watercourses,railways,
highways and other applicable features identified by name.
13 Overall site illustration in color showing all building footprints,landscaped areas, page 8
site circulation including vehicular,bike,and pedestrian facilities.
14 Statements of objectives and conformance to city policy and plans:
A. Statement of applicable City land use policies and objectives achieved page 65
by the proposed plan and how it furthers the implementation of
the Bozeman Community Plan,provide specific land use goals and
objectives in the Community Plan that are furthered by the proposed
PUD;
B. Statement of proposed ownership of public and private open space page 57
areas and applicant's intentions with regard to future ownership of all or
portions of the PUD;
C. Estimate of number of employees for business,commercial,and page 60
industrial uses;
D. Description of rational behind the assumptions and choices made by the page 61
applicant;
E. The applicant shall submit as evidence of successful completion of
the applicable Community Design objectives and Criteria of Section
38.20.090.E Inew code reference 38.430.090.E),documentation pursuant
to these regulations for each proposed use;the applicant shall submit
written explanation for each of the applicable objectives or criteria as
to how the plan does or does not address the cbjective or criterion;the
Director may require,or the applicant may choose to submit,evidence
that is beyond what is required in that section;any variance from the
criterion shall be described;
F. Detailed description of how conflicts between land uses are being page 65,66
avoided or mitigated;
G. Statements of design methods to reduce energy consumption,(e.g. page 60
home/business,utilities,transportation fuel,waste recycling).
15 If not provided by subdivision application materials,physiographic data and page 38
summaries for:landforms and geology and soils;hydrology;vegetation;noxious
weeds;wildlife and viewsheds.If the project is a brownfietd site,provide site
history,data and copies of any environmental site assessments that have been
completed.An approved noxious weed management plan must be submitted.
16 Narrative descriptions of site access and overall utilities_including an overview,
parking,existing and proposed condition of the streets providing access to the site,
proposed accesses to the site and utilities including water,sewer,storm drainage,
solid waste,gas,electric and shallow franchise facilities.
17 Development and Design Guidelines per Section 38.20.070.D.2 BMC. page 4
18 Comprehensive Signage Plan,if applicable. page 84
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 28
i •
SP1 CHECKLIST
SITE PLAN REQUIREMENTS
All information and items below must be on site plan sheets and tot presented on separate attachments
except narratives, legal documents,traffic studies,stormwater,sewer,water and wetland reports,if provided.
GENERAL PROJECT INFORMATION
1 Project narrative describing the project type,proposed use scope,size(dwellings, sheet AS.000
building size(sl,building height(s),number of buildings,number of tota.parking
spaces)intent,and phasing,if applicable.The narrative must include a response to
the City's conceptual review comments.
2 Name of project/development. sheet AS.000
3 Name and mailing address of developer and owner. sheet AS.000
4 Name and mailing address of engineer,architect,landscape architect,planner,etc. sheet AS.000
5 Location of protect/development by street address/legal description. sheet AS.000
6 Location/vicinity map,including area within one-half mile of the site. sheet AS.000
7 A construction-oute map showing how materials and heavy equipmen•wilt travel to sheet AS.100
and from the sire out to one-half mile.
SITE PLAN DATA
8 Boundary line cf property with dimensions. sheet AS.102
9 Date of plan preparation and changes. sheet AS.100
10 Nortl-point indicator. sheet ASA00-102,
110-114
11 Suggested scale of 1 inch to 20 feet,but not less than 1 inch to 100 feet sheet AS.101
12 Parcel size(s)it gross acres and square feet. sheet AS.101
13 Estimated total floor area and estimated ratio of floor area to lot size Ifloor area sheet AS.101
ratio,FAR),with a breakdown by land use.
14 Location,percentage of parcel(sl and total site,and square footage of the following: sheet AS.102
A. Existing and proposed buildings and structures.
B. Driveway circulation and parking areas.
C. Landscaped areas.
D. Private open space,provide boundary/ies and dimensions of each space
provided[if residential requirement)on plans or separate exhibit.Provide
a summary total types of dwelling units and total open space required and
provided.
E. City parks.
F. Other public lands(school sites,public access greenway corridors,trail
corridors,etc.).
15 Total-)umber(with number of bedrooms],type and density per type of cwellings, sheet AS.102
and total new and gross residential density and density per residential parcel.
The density per parcel must be presented as net residential density peG section
38.700.130 Bmc.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 29
SM CHECKLIST
CONTINUED
SITE PLAN DETAILS
The location, identification and dimensions of the following existing and proposed data, onsite and to a
distance of 100 feet 1200 feet for PUD's) outside the site boundary, exclusive of public rights-of-way unless
otherwise stated.
16 Topocraphic contours at a minimum interval of 2 feet,or as determines by the sheet C3.0
director.
17 Location of City limit boundaries,and boundaries of Gallatin County's Eozeman Area sheet AS.100
Zoning Jurisdiction,within or near the development.
18 Existing zoning within 200 feet of the site. sheet AS.100
19 Adjacent streets and street rights-of-way to a distance of 150 feet,except for s tes sheet C1.1,2.0,2.1
adjacent to major arterial streets where the distances shall be 200 feet-The fu-t
width of the street including curb,gutter,sidewalk,drive approaches,iltersec:ions
and street lighting must be shown for both sides of the street.
20 Block frontages. sheet AS.111,201-203
21 On site streets and rights-of-way.Including curb gutter,sidewalks,anc street sheet C2.1
lights.
22 Ingress and egress points vehicular& pedestrian. sheet AS.101,110,111
23 Traffic flow on site. see PUDP Appendix E
24 Traffic flow off site. see PUDP Appendix E
25 All parking facilities,including circulation aisles,access drives,covered and sheet AS.100,AS.110
uncovered bicycle parking and bicycle rack type and detail,compact spaces,ADA
accessible spaces and motorcycle parking,on-street parking Idelineat?d by a 24'
tong under interrupted spaces)directly adjacent to the project site outside of site
vision triangles and hydrant locations),number of employee and non-e-npto,/ee
parking spaces,existing and proposed,and total square footage of each.
26 Setbacks,building footprint and any proposed encroachments.Any setoack sheet AS.101
or property line encroachments must be clearly shown and be noted w;th
encroachment type e.g.Awning,weather protection,cantilever,lighting,eave etc.
27 Utilities and utility rights of way and easements existing and proposed,including: sheet C2.0,2.1.4.0.
A. Electric 5.0.6.0
B. Natural gas
C. Telephone,cable and similar utilities
D. Water
E. Sewer(sanitary,treated effluent and storm)
28 Surface water,including: C3.0,4.0,6.0
A. Ponds,streams and irrigation ditches(include classificationE be
based upon a determination of the Gallatin Conservation District;no'e
classification of each feature on plans).
B. Watercourses,water bodies and wetlands(include classifica ions based
upon a determination of the Gallatin Conservation District,A-my Corps
of Engineers,orwetland delineation report;note classificaticn of each
feature on plans).
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II II JANUARY 20119
page 30
SP1 CHECKLIST
CONTINUED
SITE PLAN DETAILS
C. Floodplains as designated on the federal insurance rate map or that
may otherwise be identified as lying within a 100 year f(oodplain
through additional ftoodplain delineation,engineering analys s,
topographic survey or other objective and factual basis.
D. A f loodptain analysis report in compliance with Section 38.31 BMC.
29 Grading and drainage plan,including provisions for on-site retention/detention sheet C3.0,4.0
and water quality improvement facilities as required by the Engineerinc
Division,or in compliance with BMC Section 14 storm drainage ordinance
and best management practices manual adopted by the City.All surfac=
stormwater facilities must demonstrate compliance with Section 38.41).080
BMC including providing cross sections for each facility.
30 All drainageways,streets,arroyos,dry gullies,diversion ditches,spillways, sheet C3.0,4.0
reservoirs,etc.Which may be incorporated into the storm drainage system for
the property shall be designated:
A. The name of the drainageway[where appropriate).
B. The downstream conditions(developed available drainageways,etc.+.
C. Any downstream restrictions.
31 Significant rock outcroppings,slopes of greater than 15 percent or other sheet L4.00,L1.0
significant topographic features.
32 Sidewalks,walkways,driveways,crosswalks,loading areas and docks, sheet AS.101
bikeways,including typical details and interrelationships with vehicular
circulation system,indicating proposed treatment of points of conflict.
33 Provision for disabled accessibility,including but not limited to,wheetc.iair sheet AS.103,104
ramps,parking spaces,handrails and curb cuts,including signage and
construction details and the applicant's certification of ADA compliance.A
certification block must be provided on the plan sheets.
34 Fences,walls,railings and handrails,including typical details. sheet AS.104
35 Permanent trash enclosure and refuse collection areas,including typical sheet ASA11
details and elevations.
36 Construction management plan include exterior construction period material sheet AS.111
staging,spoits location and construction trash enclosure locationlsl.A:rash
container type must be provided and detailed(40 yard roll off,fenced erclosur
etc.l.If spoils storage is proposed a timeline for removal must be provided.
37 Curb,asphalt section and drive approach construction details. sheet AS.111
38 Location and extent of snow storage areas. sheet L5.00
39 Location and extent of street vision triangles extended to center of right of way sheet C2.1
including adjacent street intersections and all alley and driveway access points.
40 Unique natural features,significant wildlife areas and vegetat ve cover, sheet L2.00,L2.01
including existing trees and shrubs having a diameter greate-than 2.5 Inches,
by species.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 31
•
SP1 CHECKLIST
CONTINUED
41 Historic,cultural and archaeological resources,describe and map an-,designated sheet C1.0
historic structures or districts,and archaeological or cultural sites.
42 Major public facilities,including schools,parks,shared use pathways trails,etc. sheet AS.000
Within a distance of 200 feet.
PARKLAND AND AFFORDABLE HOUSING
43 If residential,provide the required parkland for the development,including sheet AS.102
calculations per Section 38.420 BMC(park and recreation requiremerts)in a
table format,see table format in the PLS document.
44 If cash in lieu is proposed,a thorough calculation including the base requirement see PUDP Appendix H
and any net based upon maximum density,narrative addressing the findings the
Commission must make to grant cash in lieu,and the appraisal must oe provided
to make the request per Section 38.420.030 BMC,unless using City va.tuation.
45 If parkland is proposed a park plan shall be submitted consistent with Section
38.220.060.A.16 BMC.
46 Source and amount of parkland credit to be used if previously providec.If from a
subdivision confirm amount provided and detailed phase information as required
in table format outlined in the PLS document.
47 Describe how the site plan will satisfy any requirements of Section 38.380,BMC
(affordable housing]which have either been established for that lolls]through the
subdivision process or if no subdivision has previously occurred are applicable to
a site plan.The description shall be of adequate detail to clearly identi'y those tots
and dwellings designated as subject to the section's compliance requirements
and to make the obligations placed on the affected lots and dwellings readily
understandable.If affordable housing is not being provided place that statement
on the site plan sheets with the site data in item 8.
48 If affordable housing is provided,or cash in lieu is proposed use form AH.
LIGHTING DETAILS
49 Lighting plan and electrical site plan,complete with all structures,pa-king sheet E1.0
spaces,building entrances,traffic areas(both vehicular and pedestrian).
vegetation that might interfere with lighting,and adjacent uses,contai-iing a
layout of all proposed fixtures by location and type.
50 A photometric lighting plan that contains a layout of all proposed fixtbres by sheetE1.01• .
location and type and extends the photometric information to the property
boundaries and rights of way.For fueling canopies a second photomet-ic p required to specifically analyze the light output underneath the ,rjp lire o(7150 8 2u19
fuel canopy.
51 Details for all proposed exterior fixtures that are keyed to the fi. Y
the lighting electrical plan and the photometric lighting plan.The deta l must
demonstrate compliance with full cut-off requirements in Section 38.E70 BMC
and be located on the lighting plan sheets.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 32
SP1 CHECKLIST
CONTINUED
BUILDING DESIGN AND SIGNAGE
52 Front,rear and side elevations of all buildings,structures,fences and walls sheet AS.201 -
with height dimensions and roof pitches.Show open stairways,exterior AS.204
lighting,weather protection,awnings and other projections from exterior
building walls.Building elevations must include proposed exterior building
materials,windows and doors including a color and material palette for all
proposed features keyed to the building elevations.
53 Provide transparency calculations for any elevation that faces a street and is a sheet AS.201 -
block frontage.Provide minimum and maximum height of transparency from AS.204
grade.Provide area of transparency and percentage in relation to total facade.
54 Provide elevations and details of all ground mounted and rooftop mechanical sheet AS.104
screening.
55 Floor plans that include atl floors and roof plan.Annotate/designate uses for all sheet ASA 10-
rooms and areas.Seating/serving area layout required for all restaurants. AS.114
56 Exterior signs if applicable.Include building frontage dimension(s)and sheet AS.201 -
maximum sign area calculation,provide sign dimensions and square footage AS.204
of each.Note—the review of signs in conjunction with this application is only
review for sign area compliance with Section 38.560 BMC Isigns).A sign permit
must be obtained from the building division prior to erection of any and all
signs,addition design guidelines apply for signs within zoning overlay districts.
LANDSCAPE PLAN
A separate landscape plan shall be submitted as part of the site plan application unless the required
landscape information can be included in a clear and uncluttered manner on a site plan with a scale where
one inch equals 20 feet. All information must be on plan sheets.
57 Project name,street address,and lot and block description. sheet AS.000
58 Date,scale,north arrow,and the names,addresses,and telephone numbers sheet AS.000
of both the property owner and the person preparing the plan.Plan preparer
shall be a state registered landscape architect;an individual with a degree
in landscape design and two years of professional design experience in the
state;or an individual with a degree in a related field Ihorticulture,botany,
plant science,etc.)And at least five years of professional landscape design
experience,of which two years have been in the state.
59 Location of existing boundary lines and dimensions of the lot. sheet AS.101
60 Existing and proposed grade that complies with maximum allowable slope and sheet C3.0
grade.
61 Approximate centerlines of existing watercourses,required watercourse sheet C3.0,4.0
setbacks,and the location of any 100-year floodplain;the approximate location
of significant drainage features;and the location and size of existing and
proposed streets and alleys,utility easements,utility lines,driveways and
sidewalks on the lot and/or adjacent to the lot.
COTTOMWOO® ¢ IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 33
• •
SM CHECKLIST
CONTINUED
62 Location of all pavement,curbs,sidewalks and gutters. sheet C2.1
63 Show location of existing and/or proposed drainage facilities which are to be used sheet C4.0,
for drainage control including proposed landscaping and seeding as required by sheet L4.01
Section 38.410.080.H BMC.
64 Location and extent of snow storage areas. sheet L5.0
65 Location and extent of street vision triangles,extended to the center of right of way. sheet C2.1
66 Complete landscape legend providing a description of plant materials shown on the sheet L2.00,L2.01
plan,including typical symbols,names Icommon and botanical name),locations,
quantities,container or caliper sizes at installation,heights,spread and spacing
and identification of drought tolerant and/or native and adapted species.The
location and type of all existing trees on the tot over 6 inches in caliper must be
specifically indicated.
67 Size of planting at the time of installation and at maturity. sheet L2.00,L2.01
68 Complete illustration of landscaping and screening to be provided in or near off- sheet L2.00,L2.01
street parking and loading areas,including information as to the amount lin square
feet)of landscape area to be provided internal to parking areas and the number and
location of required off-street parking and loading spaces.
69 Street frontage landscaping,including boulevard details and tree grate details as sheet L2.00,L2.01
applicable based upon block frontage.
70 Locations and dimensions of proposed landscape buffer strips,including sheet L3.00
watercourse buffer zones demonstrating compliance with watercourse setback
planting plan requirements per Section 38.410.100.A.2.F BMC unless previously
provided during subdivision review.
71 Location,height and material of proposed landscape screening and fencing Iwith sheet L2.00,L2.01
berms to be delineated by one foot contoursl.
72 An indication of how existing healthy trees lif any)are to be retained and protected sheet L2.00,L2.01
from damage during construction.
73 Size,height,location and material of proposed seating,lighting,planters, sheet L2.00,L2.01
sculptures,and water features.
74 A description of proposed watering methods including any use of high efficiency sheet L3.00
irrigation technologies and best practice,source of irrigation water and estimated
amount of water consumption broken down by vegetation type(e.g.Turf,shrubs,
trees]and total estimated water consumption.
75 Areas to be irrigated and type of proposed irrigation and the irrigation system sheet L3.00
design plan.
76 Tabulation of performance points earned by the plan per Section 38.550.060 BMC. sheet L7.00
STREETS AND TRAFFIC
77 Traffic study.Street,traffic,and access information required in Section see PUDP Appendix E
38.220.060.A.12 BMC or that the requirement is waived in writing by the
engineering division prior to application submittal.
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II 11 JANUARY 2019
page 34
SP1 CHECKLIST
CONTINUED
WATER AND WATER RIGHTS
78 Water rights information.If cash in lieu is proposed a cash in lieu of water rights see PUDP page 74
calculation and payment amount certified by the engineering division.
79 If water wells are proposed,a letter from the department of natural resour=es
confirming their intent to issue a permit or exemption.
DEVIATIONS
80 Either through the site plan requirement above or separate exhibit clearly slow sheet AS.101
any proposed deviations related to site requirements such as yards/setacfs,
lot coverage,parkir•g or other applicable standards.
81 Either through the building elevation requirement above or separate exh,bit sheet AS.201 -
clearly show any proposed deviations related to building construction such as AS.204
height,second slor+additions,or other applicable standards.
82 For deviations in the Neighborhood Conservation Overlay a deviation narralive see PUDP page
shall be provided stating which Section(s)of the Bozeman Municipal Cede a-e 38-41
proposed for deviat on,to what extent and include a response to the following:
A. How the modification is more historically appropriate fo-the bjilcing
and site in question and the adjacent properties,as determired
in Sectior 38.340.050 BMC than would be achieved under a t teral
enforcement of this Chapter(Chapter 38,BMC1;
B. How the modifications will have minimal adverse effect pn abutting
properties or the permitted uses thereof;and
C. How the modifications will assure the protection of the publi-heath,
safety and general welfare.
D. How the requested deviation will encourage restoration and
rehabilitation activity that will contribute to the overall historic
character of the community.
If mere than one deviation,a response to the criteria shall be provided for each
deviation.
DEPARTURES
83 For departures,a departure narrative must be provided stating which
Sect on(s)of the Bozeman Municipal Code are proposed for departure,the
scope and extent of the plan proposed for departure and a response to the
required departure criteria.
If more than one departure,a summary and response to the criteria must l:e
prov ded for each d aparture.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 35
• •
SECTION 3 PROJECT OVERVIEW
3.00 PROJECT OVERVIEW & GOALS
3.01 EXISTING CONDITIONS & HISTORY
3.02 SITE ZONING & LAND USES
3.03 GENERAL BUILDING INFORMATION
3.04 PROPOSED PUD POINTS
3.05 PROPOSED RELAXATIONS
3.06 ALIGNMENT OF GOALS WITH DISTRICT PLANS AND
VISION NE GOALS
3.07 PUD COMMUNITY DESIGN OBJECTIVES
3.08 PROPOSED OWNERSHIP
3.09 ESTIMATED NUMBER OF EMPLOYEES FOR
BUSINESSES, RESPONSIBILITY FOR IMPACT
MITIGATION & DESIGN METHODS TO REDUCE
ENERGY CONSUMPTION
3.10 RATIONALE FOR CHOICES MADE BY THE APPLICANT
3.11 GENERAL SITE DATA
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 36
• 0
PROJECT OVERVIEW
GOALS OF THE PROJECT
1. PROVIDE FOR DIVERSE AND AFFORDABLE HOUSING
2. THOUGHTFULLY INTEGRATE INTO THE EXISTING COMMUNITY OF THE NEIGHBORHOOD
3. PROMOTE BY EXAMPLE SUPERIOR URBAN DESIGN STRATEGIES
PROJECT VISION
Cottonwood + Ida will create a vibrant and diverse community on a 2-acre underutilized mixed use site,
providing a diverse range of housing types to meet the needs of Bozeman.
The 92 dwelling units are designed to be attainable bymiddle-income residents. In order to respond to the variety
of building uses and sizes in the surrounding neighborhood, the development is organized into four residential
buildings providing a broad set of housing types: affordable and market-rate apartments, townhouses, live-
work units, and urban lofts.
While 15% of the rental units 17 of the 46 rental units) will be set aside for those earning less than 65% AMI to
help achieve the goals established in the city's affordable housing ord.;aance, one of the guiding principles of
the development is a focus or creating units that are affordable-by-design; with modest unit sizes, reduced
parking demand, shared open space, and attractive common amenit es; all in a walkable and bike-friendly
neighborhood.
The 29,700 SF office building will attract mid-size commercial tenants looking for new or expanded space near
the downtown district.
The project supports the community's desire for a local arts culture, and acknowledges the neighborhood's
industrial past by including 5,400 SF of artisan manufacturing workshops. Located primarily along the ground
floor on Cottonwood Street, the workshops will activate the project's caen spaces, and encourage pedestrian
activity along the street edge.
A Public Mill Yard will occupy the center of the site, framed by the distinctive facade of the adjacent Misco Mill,
and lined with commercial and residential uses to provide day and evEning, weekday and weekend activation.
We will be renovating the existing grain building (building 51 to provide for a small scale restaurant/ cafe that
will activate the Mill Yard throughout the day.
We are pursuing site-wide certification under the LEER Neighborhood Development program. The specific
sustainability and certification goals for individual buildings are still being researched and coordinated.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANIJARY 2019
page 37
• •
EXISTING CONDITIONS & HISTORY
The property does not have a registered historic value;however,the project is attempting to preserve the existing
structure on the Southwest corner of the site that is believed to have predated 1937 based on aerial images from
that era. A search through Polk Directories dating back to 1935 did not turn up any commercial listing at this
site. It is believed that the Misco Mill on the adjacent property was constructed at the height of the dEpression
in 1934 and the grain bin storage shortly after that.
Below are the old ariel photographs along with current pictures of the property.
1
Site Location
I
n Uo
f fg' a 1,* � .t« +�
A
o f f 1
00
C26J (t'I O
C O
9
i
t
P_
D
0
Figure 2
1937 Aerial Photograph
605 East Cottonwood Street
Bozeman.Montana
Resource
Technologies
NOT TO SCALE 0
Inc.
C (D7yGC�C'U®00 ¢ 0A
RESPONSE& RESUBMITAL it II JANUARY 2019
page 38
• •
EXISTING CONDITIONS & HISTORY
CONTINUED
A-NORTHEAST CORNER OF PROPERTY IASPEN AND IDA) C
r
1
B-NORTHWEST CORNER OF PROPERTY(ASPEN AND WALLACE)
C-SOUTHWEST CORNER OF PROPERTY(COTTONWOOD AND WALLACE)
r
74PPM--
D-SOUTHEAST CORNER OF PROPERTY(COTTONWOOD AND IDA)
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 39
EXISTING0 0
CONDITIONS & HIST1
CONTINUED
BUILDINGEXISTING I BE REHABILITATED I PLAZA MILLION (BUILDING
' r
SOUTH EAST
Tw
R-
1 r
.r
1i►
NORTH
RESPONSE& JANUARY2019
EXISTING0 0
1N1 1N 1 •
CONTINUED
EXISTING BUILDING TO BE REHABILITATED - INTO PLAZA MILLION (BUILDING 5)
1 � P
PRESERVE-ELEVATOR INTERIOR-ELEVATOR
PRESERVE-CRIB CONSTRUCTION
INTERIOR
COTTONWOOD 1
RESPONSE& .
SITE ZONIMG LAM® USES
•r
t
ZONING 1 2 MILE ., _ K.P_ •� •�� •=�
❑ R-S (RESIDENTIAL SUBURBAN)
1 r•.
❑ R-0 (RESIDENTIAL OFFICE)
❑ R-MH (RESIDENTIAL MOBILE HOME) °'`Ar.
r � = ,.
R-5 (RESIDENTIAL MIXED USE HIGH DENSITY) ' = ; L•L�0
El R-4 (RESIDENTIAL HIGH DENSITY)
❑ R-3 (RESIDENTIAL MEDIUM DENSITY) ' �:{_n e. t� ;�
R-2 (RESIDENTIAL SINGLE-HOUSEHOLD, MEDIUM DENSITY) •t'�} w'
❑ B-3 (CENTRAL BUSINESS)
;,-� ��`,r.tom, y: ,� ry � S 1.,•y .�s� � ..
❑ B-2 (COMMUNITY BUSINESS) - r {' i- ►+ i =` "`
M-2 (MANUFACTURING AND INDUSTRIAL)
• iYy t. :1 +� Y t r .1 r' y
❑ M-1 (LIGHT MANUFACTURING) 1• ; <y, ; #�io { '�''l` >` Q �.; ,.. '.
❑ HMU (HISTORIC MIXED USE)
❑ PLI (PUBLIC LANDS/INSTITUTIONS) �' I -T;� _r ' tf `�. o ��• � ' �„ `
,� :. r r.r ' ,�1�:''�; rr — �Y y�i S ii - •�i .,ta �, -��"�1' i��y.��'J. y �• � Q�l ,v,•.
LAND USES (1/2 MILE)
❑ MIXED USE
IL
RESTAURANT/BAR �►� - :-�- ��
❑ COMMERCIAL RETAIL SALES, SERVICES, BANKS #'
HOTEL/MOTEL 1 � `" � •�� s �1 r : J,�t {:
❑ COMMERCIAL AUTO
ADMINISTRATIVE/ 0 PR F ESSIONAL i - F�'` i %�:
LIGHT MANUFACTURING f9 .Ll SK
❑ PARK OR OPEN SPACE
CHURCH
❑ PUBLIC FACILITY
�4 N' it � I � `, � !'!��! !�!_'.r�'2 `ytd�?c��L• ,`� ,. �4 ..�r�r ``�/ ��
❑ SCHOOL/EDUCATIONAL FACILITY C -� F It
SINGLE-HOUSEHOLD RESIDENTIAL .
❑ MULTI-HOUSEHOLD RESIDENTIAL I,. , _� „a: l 'M *+
❑ MOBILE HOME/MOBILE PARK
UNDEVELOPED
MOM
VACANT (
NORTHJt
C�GT7 Co LC'JCo�Col© CDQ a r
RESPONSE& RESUBMITAL II JANUARY 2019
page 42
j
:-AN 2'8-2019
, AN 28 109 -
IQOMr-. I'NITY DEVELOPMENT
GENERAL BUILDING INFORMATION
BUILDINGS AND OTHER ON-SITE IMPROVEMENTS
RESIDENTIAL
The development consists of 6 distinct buildings, providing 92 residential units, COMMERCIAL
29.700 SF of office space, 5,41JU 5f- of artisan manufacturing workshop spaces, a 96 -
space below-grade parking garage, and community space: ARTISAN MFR.
1 APARTMENT BUILDING COMMUNITY
Three and four stories over basement parking garage
22 Studio apartments r,f � r,__-�.r_—�1 �����
24 1-Bedroom flats
46 Units total
2 APARTMENT BUILDING '
Throo clorioc over bosement parking garage
10 Sludius Willi Cunimon Spaces
18 Units Total `
3 TOWNHOUSE-STYLE APARTMENTS 6
Thrpp stnrips nvpr gradf, d ��
rT
6 1-Bedroom Flats �� y✓'�
6 2-Bedroom Townhouse-Style Apartments
12 Units Total _ -
4 LOFT APARTMENT BUILDING , 1
Three stories over grade y 4Sp
4 1-Bedroom Live Work Apartments 5 2 FN
p �,\ \. S
12 2-Bedroom Loft-Style Apartments
16 Units Total \'
Artisan manufacturing(4A)
Approximately 5,400 GSF 14,59n npt SF)of ground floor workshop space to provide an active,
prdrntrinn oriented street edge along Cottonwood Ave.
5 EXISTING REHABILITATED BUILDING
Renovated open air pavillion to provide an opportunity for a cafe on the plaza,as well as
accossory program for the adjocent open spaces(bike parking,storage,etc.). / Y / / /•
3
6 OFFICE BUILDING
Approximately 29.7nn W;F P5,203, net SF)of open-plan office space
7 BELOW-GRADE PARKING GARAGE
Approximately 96 spaces
8 LEASED OFF SITE PARKING LOT �1 f
UNIT COUNT 40 34 18 92
PERCENTAGE 43% 37% 20%
I 1 1,\*�/ "I x
RESPONSE& RESUBMITAL II II JANUARY 2019 /
page 43
PROPOSED PUD POINTS
PERFORMANCE POINTS SEC 38.430.090 E.2.7
A minimum of 20 points need to be achieved;we are expecting to achieve between 43 and 62 points.
AFFORDABLE HOUSING density cal:ulaticns would be 16 units)
21 POINTS
50%increase factor=8
Three points for each percent of dwellings to be constructed in Proposed number of dwelling units=92
the residential development which are provided by long term
contractual obligation to an affordable housing agency, for a Number of units iureased over base density=92-16=
period not less than 20 years, with a written plan assuring on- 76 net increase
going affordability pricing and eligibility monitoring, and annual Net increase divided by the 50%increase factor=
re-certification. points=76/8=9.5
Per UDO 38.700.020 Environmentally contaminated land(does not apply)
Affordable housing. Housing for persons earning less than 65 Points reached=4.77(commercial increase)+9.5
percent of the area's annua. median income for rental housing (residential increase)=14.27
and 100 percent of the area's annual median income for
purchased housing.Further,affordable housing does not require Maximum allowable(1/3) total of 6.67
greater than 33 percent of the household gross annual median DESIGNED TO MEET LEED-ND
income for housing. Annuat median income is defined by the 15 POINTS
Department of Housing and Lrban Development
The project design s based on LEED ND criteria. We intend on
Points achieved = 21 (7 rental units [ 7.6%) will be provided at keeping the design to this standard and hope to achieve these
rental rates at a maximum of 65%AMI points. The project has,been registered and certified under
ADDITIONAL OPEN SPACE current LEED version 4.Tie project is on track to achieve LEED
9.37 POINTS Neighborhood Development Plan certification and possibly LEED
Silver.See the LEED information provided in the appendix for the
One and '/a point for each percentage of the project area that is certification requirements and abreakdown of the LEED points
provided as publicly accessible open space. Project land area = expected be achieved.
90,000 sf Publicly accessible p;aza area = 6750 sf/7.5% of the -
project total.See Sheet AS.102 _and Dedication Table.These are INCLUSION OF LOW-IMPACT DEVELOPMENT PLAN
the public plazas indicated as Aspen Yard and Mill Yard. 6 POINTS
UNDERUTILIZED AND BROWNFIELD SITES The use of tow impact development standards is a project goat
6.67 POINTS and we hope to achieve these points by treating on-site storm
water exceeding chapter 40 requirements, incorporating a
The site is 2 acres and the south acre previously had a scale integrated snow storace management plan,select plant species
hobby train located on the site. The north half of the site has that meet drought tolerant standards,inclusion of weather based
been occupied by an industrial Narehouse. Accounting for the irrigation systems and Jmit the amount and type of sod.
underutilized south portion a minimum of one point will be
achieved.
Per(d) BUILDING NEIGH 1 0 PUBLIC OPO4 SPACE
PROVIDED ARE [] ENHANCED STREETSCA?E
Underutilized and brownfield sites.One point for each 50 percent. AVERAGE ROOF
increase in the total square footage of commercial and/or HEIGHT ABOVE THE >k WAYFINDING FEATURES
industrial floor area on underutilized sites; one point for each PARKING GARAGE _ 3F RECYCLING STATION
50 percent increase in the total number of dwelling units on
underutilized sites; one point for each acre developed of the t t�
environmentally contaminated land; up to a total of one-third of
the performance points required to be earned. t #
Existing industrial/commercial floor area=10,488 48
SF _ 49
50%increase factor=5,244 SF 31
Proposed commercial floor area=35.521 SF 35,
Amount of increased SF=35,521 -10.488=25.033 SF
Number of 50%increase factors/points=25,033/ l
5,244=4.77
One point for each 50%increase in total=4.77
Existing number of dwelling units=0 I using base
L � _
COTTONWOOD ¢ IDS,
RESPONSE& RESUBMITAL II II JANUARY 20+9
pEge 44
• •
PROPOSED PUB POINTS
CONTINUED
AFFORDABLE HOUSING 7.6% OF THE UNITS OFFERED AT 65%AMI 21
ADDITIONAL OPEN SPACE PROJECT PROVIDES ADDITIONAL PUBLIC OPEN 9.37
SPACE OF 6,750 SF OR 7.5% OF THE PROJECT TOTAL
NOT USED- HOWEVER WE ARE PROPOSING
ADAPTIVE REUSE OF BUILDING TO REUSE THE GRAIN DEPOT BUILDING AS A 0
COMMUNITY CENTER
UNDERUTILIZED BROWNFIELD SOUTH 1 ACRE IS CURRENTLY UNDERUTILIZED AND 6.67
SITE COULD BE CLASSIFIED AS A BROWNFIELD SITE
DESIGNED TO MEET LEED-ND FOLLOWING LEED-ND CRITERIA FOR TOTAL 15
DEVELOPMENT
INCLUSION OF LOW-IMPACT GREEN PRACTICES FOR STORMWATER
DEVELOPMENT MANAGEMENT, LIMITED USE OF SOD, DROUGHT 6
TOLERANT PLANTS, ETC.
SUSTAINABLE DESIGN AND NOT USED - HOWEVER ALL BUILDINGS WILL
CONSTRUCTION INCORPORATE BEST PRACTICES FOR SUSTAINABLE 0
DESIGN
NOT USED - HOWEVER THE PROJECT WILL UTILIZE
INTEGRATED WAYFINDING USE INTEGRATED WAYFINDING MEASURES FOR 0
MEASURES PARKING, PLAZAS, OFF SITE LOCATIONS,AND
RESIDENTIAL ACTIVITIES
ON SITE RECYCLING NOT USED - HOWEVER THE PROJECT WILL INCLUDE
TRANSFER STATION RECYCLING FACILITIES FOR BOTH COMMERCIAL 0
AND RESIDENTIAL USES
NOT USED - HOWEVER ENHANCED STREETSCAPES
STREETSCAPE IMPROVEMENTS WILL BE PROVIDED ALONG COTTONWOOD,ASPEN 0
AND IDA
TOTAL POINTS NEEDED REQUIRED POINTS TO MEET PUD CRITERIA 20
TOTAL POINTS ANTICIPATED POINTS THE PROJECT IS EXPECTED TO MEET 58
C 8770MA20® ¢ FDA
RESPONSE&RESUBMITAL II II JANUARY 2019
page 45
9 •
PROPOSED RELAXATIONS
REQUESTED RELAXATIONS FROM APPLICABLE PORTIONS OF THE UDC
CHAPTER 38
Based on the underlying zoning of NEHMU we are requesting relaxations relative to the PUD for
consideration. The goal of the project is to create a development that responds to the unique character
of the district and provides for the needs of the community at large. The NEHMU is a unique district
characterized by a broad spectrum of uses from residential to industrial. In many ways, this district
was the first mixed use neighborhood in Bozeman. Our proFosal includes a mix of both residential and
commercial activity that responds well to the variety of uses. Over time the neighborhood has evolved to
include more service-oriented businesses and is now host to cafes and coffeeshops along with a strong
pattern of residential uses.
We are requesting a total of eight relaxations to achieve the project which are outlined below.
RELAXATION 1: APARTMENT BUILDINGS AS AN ALLOWABLE USE
• CODE PROVISION: 38.310.040 Authorized uses - Commercial, mixed-use and industrial
• TABLE 38.310.040.C: Permitted residential uses in commercial, mixed-use, and industrial zoning
districts
We are requesting that apartment buildings be included in the allowable uses for this project. In an effort
provide more affordable rental housing for the City of Bozeman we are looking to provide apartments as a
primary use type within the NEHMU.
Rationale:The need for market rate and affordable rentals in walkable neighborhoods is key to the future
success and livability of Bozeman. The current zoning typE (NEHMU)was developed long ago as a bridge
between residential uses and industrial uses. Overtime the neighborhood has evolved to become more of
a residential enclave hosting many homes, cafes and artist3 while keeping the unique manufacturing vibe.
Our project hopes to build on these trends and provide more opportunities and variety for housing. The
additional housing will make the opportunity for residents to work and live in the same neighborhood. The
added housing will create the possibility to provide both affordable units as well as market rate options.
• The current zoning allows for apartments as an accessory use and is permitted on
the second floors of commercial uses. We feel that our approach will make a better
connection to the street by allowing residences to occur on the ground floor, as well as
the second and subsequent floors. Residential uses are permitted on the ground floor
in other portions of the code for this district and thus this would be consistent with that.
RELAXATION 2: SMALL SCALE RESTAURANTS INCREASE IN SIZE FROM 1500 TO 2200 SF
• CODE PROVISION: 38.310.040 Authorized uses - Commercial, mixed-use and industrial
• TABLE 38.310.040.C: Permitted residential uses in commercial, mixed-use, and industrial zoning
districts
We are requesting an increase in the area of small-scale restaurants allowed in the NEHMM from 1500 SF as
noted in Table 38.310.040 from 1500 SF to 2200 SF13,000 SF if outdoor seating space is included).
Rationale:The current code provides for a maximum of 1500 SF for restaurant service area in the NEHMU.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL It II JANUARY 2019
page 46
PROPOSED RELUNIONS
CONTINUED
We are redeveloping an existing historic grain building into a possible restaurant space and would like
to utilize the entire building for a future restaurant. The building area is 2,175 SF and we have planned
to have interior service area of 1200 SF and outdoor service area of uo to 900 SF. While the space in the
interior meets the current code limits, we would like to provide outdoor seating for patrons to enjoy the
generous public plaza (Mill Yard) being created. It is understood that the outdoor seating would mostly
be activated seasonally and concurrently with a greater amount of pedestrian / bike traffic. An objective
of the Growth Policy is to provide for and support infill development that respects context of the existing
development surrounding it. By preserving and reusing this historic building and completing the plaza
space with a restaurant use it will attain many of the goals of the Growth Policy, and will produce a better
outcome than the current code would have otherwise provided.
RELAXATION 3: REDUCTION IN THE REQUIRED FRONT YARD SETBACK
• CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and other mixed
use districts
• TABLE 38.320.050: zone type NEHMU - Front Setback
The current zoning front setback requirement is listed as 20'and the project seeks to allow for a 10'setback
around the entire site at grade. The project seeks a setback of 8'along Aspen Street above the clearance requirements
Of underground utility easements. This front setback is larger than the 10' in many cases as the project has
created public through ways into the site to access an internal public plaza space.
Rationale: The intent of the project is first and foremost to create a vibrant street edge that responds to
the conditions in the neighborhood. The neighborhood is marked by several historic homes and argi-
industrial structures that were built long before setbacks were dictated in the zoning code. Because of
this there is a tremendous variation of setbacks from the street edge it the neighborhood. Our mixed-use
project is looking to develop at a pattern more consistent with urban standards to be more efficient with
land use as well as create a stronger pedestrian experience.
We are seeking the front yard setbacks be 10' rather than the required 20' at grade. The 20' setbacks certainly set a
more suburban standard and would not convey the same sense of pedestrian experience.Additionally, the properties
along both Aspen 131 and Cottonwood 110'1 currently have setbacks around this 10' dimension or less and we feel
that the street edge pattern would be better served to match these relationships. The requested 8'setback for buildings
I and building 6 along Aspen Street occurs above the clearance requirements for underground utility easements provided along
the front property boundty.This request provides shade and cover along entrances as required by the frontage requirements.
RELAXATION 4: REDUCTION IN THE REQUIRED SIDE SETBACK TO ALLOW FOR ZERO LOT LINE
CONDITION
• CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and other mixed-
use districts
• TABLE 38.320.050: zone type NEHMU - Side Setback
The current zoning side setback requirement is listed as 3'and we are requesting that zero lot line conditions
are allowed per other zones identified in the BMC 38.320.050.0 Table of Form and Intensity Standards.Adding
allowance for zero lot lines to the NEHMU minimum setbacks required for the NEHMU for this PUD.
Rationale: The setback reduction provides for the creation of separate lots on this unique mixed-use
project.This separation only occurs between lots A and B for Building 3. It will appear to all passersby that
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II I) JANUARY 2019
page 47
PROPOSED RELAXATIONS
CONTINUED
there is in fact a 20' separation between Building 2 on Lot A and Building 3 on Lot B. This is because the
only portions of the buildings that exhibit the zero lot line condition are below grade at the parking garage
level. All the appropriate easements and accesses will be reflected in the final lot boundary alignment
RELAXATION 5: INCREASE IN BUILDING HEIGHT
• CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and other mixeJ-
use districts
• TABLE 38.320.050: zone type NEHMU - Maximum building height
The current building height in the district is 45']exclusive of elevator penthouses and parapets]. Whi'e there sra
several historic buildings in the district that exceed this height limitation, it is our intent tG acnieve a building
height only marginally higher than the 45'and are requesting a maximum building height as described by cote
of 54'.
Rationale: The project proposes a cluster of 3-story buildings on the perimeter of the 2-acre site anc
create landscaped podium level with parking hidden underneath. The e-fective buitcing heigh` from the
podium level is near to or at 45' for all buildings. These additional heights are needed to 3cccmmod3.e
the parking level below the podium. The primary reason for this was to keep the parking structure ou- of
the seasonal high-water table which is at 8' below grade.The site natura'ly drops 4' from the Scuth to R,e
North which provides a way to diminish the effects the below grade parking has. Bui.ding .ieights range
throughout the project from 25' to 54' measured from the sidewalk level, with most of the street faces
having approximately a 47' height.
RELAXATION 6: SEEKING AN INCREASE IN LOT COVERAGE FROM 40%TO 45%
• CODE PROVISION: 38.320.050 Form and Intensity standards - Non-residential and othei mixec-
use districts
• TABLE 38.320.050: zone type NEHMU - Lot Coverage
The current zoning Maximum lot coverage 138.320.020.A1 is 40% for primarily residential uses and 100% for
primarily nonresidential uses. The project would be classified as primarily residential given that the bulk of th.e
use square footage is programmed as residential. Specifically, 72%is resider,tial and 26% ;s commercial use.
The project is a requesting an increase in lot coverage from 40% to 45%.
Rationale: The projec-. has been thoughtfully designed to provide for a mix of uses on tie site. Given thy.
portions of the site are in fact commercial we feel that this additional lot coverage is minimal and any loss
to the perceived open area that might have come with 5% less in lot coverage is more thar made up for in
the positive attributes of the design. The current site design is 41.4% lot coverage, however there may be
some adjustments needed through the final design, thus the request of 45%. Additional:y, a consiJerable
amount of our site area is being dedicated for public access for the community to enjoy.
RELAXATION 7: SEEKING A DECREASE IN BLOCK FRONTAGE TRANSPARENCY REQUIRENEN—S FOR
PORTIONS OF THE PROJECT
• CODE PROVISION: 38.510.030.0 Landscape Block frontage standards
COTTONWOOD + IDA
RESPONSE& RESUBMITAL it II JANUARY 2019
page 48
• •
PROPOSED RELAXATIONS
CONTINUED
The blockfrontage standards state that a "Landscaped" frontag: adjacent for residential have a minimum
transparency(percentage of glass)of 15%. We are requesting a re!9yation to this for Building 2[along the East
face, Ida frontage]and Building 3 (on the North, facing the private residential plaza and on the South, facing
the Cottonwood frontage). In all of these cases we are able to meet a 8% transparency requirement. We are
requesting that the facade transparency requirement be 8%for these locations
Rationale:The project has been thoughtfully designed to providg-for privacy,views and quality pedestrian
experience along the street and sidewalk edge. These buildings all contain residential uses and have
allocated windows for views and privacy. Given the space planning requirements for the individual
residential units, windows have been placed to correspond v,ith floors plans and to maintain energy
efficiencies. The well thoughtout landscape plan and site circL.ation has provided a quality pedestrian
experience for the guest to the site, along with the residents. These reductions in transparency will
produce a superior quality design for this project than would otherwise be sound in the strict enforcement
of the code.
REQUESTED RELAXATIONS OR DEPARTURES FROM OTHER PORTIONS OF THE
CODE
RELAXATION 8: SEEKING A DECREASE IN BLOCK FRONTAGE TRANSPARENCY REQUIREMENTS FOR
PORTIONS OF THE PROJECT
• CODE PROVISION: 38.510.030.B Storefront Block frontage standards
The block frontage standards state in table 38.510.030.B that at least 60% of the ground floor area between
30"and 10'above the sidewalk on primary facades be transparent,%glazed. Ale are requesting a reduction to
this such that a minimum of 30%is allowed. The project contains a ceuale of instances of this Building 4 along
Cottonwood Street.
Rationale: The project is designated as a mixed block front stard3rd and as such we have addressed
portions of the project as landscaped frontages and portions tha: more closely resemble storefront. In
all cases, the very best design effort has been applied to ensure -tat the invent of the code is being met.
In the case of Storefront standards the various buildings that this applies tc are Building 4, and Building
5. Building 4 is intended to be for small 'makers studio spaces" w�i..e other use may Le appropriate this
is the intent and to enhance these artist studios feet we have provided generous 8' wide glass garage
doors along with full glass entry doors for each of the studios. We feel that this approach will enhance
the character of the district by encouraging artist appropriate spaces whicl- are not necessarily spaces
that have full glass across the front because much of the work it the process might not want to be on
display. Building 4 provides 48% of the required transparency. The other irstance where this occurs in
on Building 5 which is quasi-historic grain building that has existing :rib corstructed watts on the North,
West, and South. The North face in the one that faces the street an-- given the desire to preserve as much
of these existing wood watts we needed to limit the amount of glass on this facade:The intended use for
this building is that of a small cafe while having a larger percentac? of glass along Cottonwood might be
beneficial in this case the building also enjoys three other elevat cns that face Aubh ace(thaat afford
the needed transparency for the building's occupants. Additionally,.o) .pe x nee u Inot be
sacrificed with the reduction in lass due in art the well-desi +fr�.p it fthi c in as well
9 P 9I jhi�j 4 , g 1
,COMMUNITY DEVELCPc���Erl, l
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II II JANUARY 2019
page 49
• •
PROPOSED RELAXATIONS
CONTINUED
as the abundance of pedestrian plaza space that surround this building and project. This relaxation will
produce a superior design and experiential outcome than would have otherwise been afforded with the
strict interpretation of the code as can be seen from the well thought out and unique designs of all of the
buildings.
RELAXATION 9: PARKING CALCULATION FOR RESIDENTIAL USES SPECIFICALLY FOR EFFICIENCY
AND ONE-BEDROOM UNITS
Division 38.540 Parking
38.540.050 Number of parking spaces required
A. 1. Residential uses
• CODE PROVISION: Table 38.540.050-1
EFFICIENCY DWELLING UNITS
The current code utilizes a calculation for efficiency units at a rate of 1.25 parking spaces per efficiency unit. We
are requesting a relaxation to this that is similar to other zoning districts in our community of 1 parking space
per efficiency unit.
ONE BEDROOM UNITS
The code calculates the number of parking spaces fora one-bedroom unit at 1.5 parking spaces for each one-
bedroom unit. We are requesting that a rate of 1.25 parking spaces for each one-bedroom unit which is also
applied to other zoning districts in our community.
Rationale: The mix and types of housing provide an opportunity to more critically study the parking
allowances for this project. The project is mostly composed of 1 bedroom and efficiency units that range
in size from as low as 315 SF up to 600 SF 1 bedroom units. These smaller units provide efficiency as well
as a greater likely hood of a single occupant in most cases. The parking standards used elsewhere in the
country and even within the City of Bozeman Standards allow for efficiency units to be counted at a factor
of 1 and for one-bedroom units factored at 1.25.
The location of this property within walking distance to many basic services, transit availability, car
share and well-developed bike facilities will promote the use of alternate means of transportation other
than a car. Additionatty, creating other opportunities for commercial activities on site will allow for some
residents to walk to work and not find the need for a car.
The project is taking a progressive approach to design and planning that considers modern trends in
housing and in car ownership. A recent study from Stanford University economist Tony Seba found that
private car ownership will drop 80% by 2030. While this is a bit of a stretch for rural Montana, statistics
are showing a general decline in car ownership and an increase in multimodal transportation options.
RELAXATION 10: PARKING REQUIREMENTS FOR NONRESIDENTIAL USES ADJUSTMENTS TO
MINIMUM REQUIREMENTS
• CODE PROVISION: 38.540.050 Number of parking spaces required,A. 2. Non-residential uses
• CODE PROVISION: Table 38.540.050-3
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 50
The current code provides for adjustments to minimum standards for parking in commercial zone types and
provides a genera;percentage reduction based on the type of uses and whether or not it is in a mixed-use
neighborhood. These reductions range from 10% to 50%. We are requesting a reduction to our nonresidential
parking demand of 40%.
Rationale: The current zoning district was the first mixed use designation for the City and one of the
smallest. While it holds this distinction, it is also one of the most overlooked districts as changes and
modifications have occurred elsewhere in the code to support mixed use neighborhoods. This d strict
matches what a small-scale community commercial mixed-use district looks and performs like, hosting
a variety of services, employment opportunities and housing.
We are looking to apply the same standards that are found elsewhere in the code and a similar redcction
found in the ITE standards for mixed use projects. These standards provide for a contemplated redaction
in parking for nonresidential use in a mixed use neighborhood since many of the patrons and employees
would likely live within walking distance and would not require as many parking spaces to accommodate
them. Additionally, access to other forms of transportation including, car share, transit, and welt-
developed bike faci.ities will further promote the non- reliance on the automobile.
Another practical application of this that is applied in the ITE is based on the actual hours of use based
on each use type in a mixed use project. For instance ITE calculations show that the average wee'%day
parking demand at its highest at 4:00 pm when both residential and nonresidential uses overlap 44%
and 90% respectively. This would still only require a total of 124 spaces for the project, where we cave
collectively provided 200 spaces. This is a logical use of parking reductions that will provide greater
opportunity for a successful mixed-use neighborhood.
RELAXATION 11: PROVIDE FOR BACK OUT ANGLED PARKING ALONG THE COTTONWOOD STREET
FRONTAGE
• CODE PROVISION: UDC 38.400.050.A.1
The current code states that all streets shall meet the City of Bozeman current design standards and
specifications policy and that the City of Bozeman Modifications of the Montana Public Works Standards
Specifications shall apply. These standards do not provide for back out angled parking along a local street. We
are requesting that back out angled parking be allowed given that this will,match the full existing full street
section along Cottonwood. The owner's association for the project will be responsible for snow removal for this
portion of the street.
Rationale: The existing street section along Cottonwood has back out angled parking along the South
curb line.We are proposing to continue this condition along the North curb line in front of our project The
cohesiveness of the s-.reet section will be better served by having matching conditions along both sides of
the street. Additionally, Cottonwood is not a through street in the sense that this portion of Cottonwood
only runs for three blocks in the NEHMU. The street will function more as a parking street than a through
street in this instance and will produce a superior design outcome than would otherwise be had with tie
strict enforcement of the code. All other conditions of street drainage and design specifications will De
met with the final engineering design.As mentioned above the owner's association will be responsible for
the maintenance of the proposed parking area this will include the snow removal and maintenance of the
parking surface area. This is noted in draft condominium documents.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 51
1
ALIGNMENT OF GOALS WITH DISTRICT PLANS AND VISION NE GOALS
Oil
HONOR/ENHANCE UNIOUE CHARACTER THROUGH MASSING SCALE,AND PLACEMENT OF BUILDINGS ON THE SITE THE PROJECT HONORS THE SCALE OF THE NEIGHBORHOOD.ADDITIONALLY, PROGRAM
OF PLACE
OF THE DISTRICT AND FOSTER A SENSE ,�/�J �/�/ `CJ/J ,�/A `C//J ELEMENTS SUCH AS ARTISTS, MAKERS ETC. HELP FOSTER A SENSE OF PLACE.
SUPPORT INFILL DEVELOPMENT THAT / / / / THE LOCATION OF THE SITE AND SURROUNDING EXISTING INFRASTRUCTURE CREATED A GREAT OPPORTUNITY FOR INFILL IN ITS TRUEST SENSE.THE MASSING AND
PROVIDES ADDITIONAL DENSITY AND SCALE OF THE BUILDINGS GO FURTHER TO RESPECT THE UNIQUE CONTEXT OF THE SITE BY MAINTAINING 3 STORIES WHILE STILL ADDING THE NEEDED DENSITY TO
RESPECTS CONTEXT ACHIEVE AFFORDABLE HOUSING GOALS AND REDUCE THE IMPACTS OF SPRAWL ON OUR COMMUNITY.
PROMOTE ENVIRONMENTALLY SOUND / / / THE PROJECT MEETS LEED NO STANDARDS AND INCORPORATES SEVERAL SUSTAINABLE DESIGN TECHNIQUES.THE USE OF UNDERGROUND PARKING, CLOSE PROXIMITY
BUILDING&PLANNING TECHNIOUES �v/J `/J ,`'/�J TO SERVICES,ADDITIONAL BIKE AND MULTI -MODAL TRANSPORTATION OPTIONS AND GREENROOFS ALL ADD TO THE BEST PRACTICES OF ENVIRONMENTALLY SOUND
DESIGN AND PLANNING.
PROVIDE SAFE,HEALTHY PUBLIC / / / THROUGH THE CREATION OF ADDITIONAL PUBLIC INFRASTRUCTURE AND PEDESTRIAN PLAZAS AND WALKS A HEALTHIER NEIGHBORHOOD PLAN HAS BEEN DEVELOPED
TRANSPORTATION FACILITIES AND _�/�J `�'/� `e'/� THROUGH THIS PROJECT.ADDITIONALLY THE NATURE OF THIS INFI LL DEVELOPMENT WILL DECREASE THE NEED FOR AUTOMOBILES AND WILL CONTRIBUTE TO A MORE
INFRASTRUCTURE WALKABLE COMMUNITY.
SUPPORT ARTISTS AND PROVIDE / / PROVIDING OPPORTUNITIES FOR ARTIST RESIDENCES AND STUDIO SPACES AND INCORPORATING PUBLIC ART IN THE PLAZA SPACES WILL HELP TO SUPPORT LOCAL
OPPORTUNITY FOR PUBLIC ART �`!/J �% ARTISTS AND OVERALL IMPACT OF ART IN OUR COMMUNITY.
RECOGNIZE IMPORTANCE OF BRIDGER / BY KEEPING THE BUILDINGS ON THE PERIMETER TO A MAXIMUM OF 3 STORIES AND BREAKING UP THE BUILDINGS INTO SEVERAL SMALLER BUILDINGS RATHER THAN ONE
VIEW SHED AND NEIGHBORHOOD `�fA `�J/� `C//� LARGE ONE TO MAINTAIN VIEW ANGLES THROUGH THE SITE.
IMPACTS
PROMOTE SECURE PUBLIC OPENSPACES, / / / / / THE PROJECT HAS OVER 20,000 SF OF PUBLIC PLAZA SPACES AND NEARLY A 1/4 MILE OF PEDESTRIAN WALKS THAT WILL BE IMPROVED WITH THIS PROJECT.
POCKET PARKS,URBAN ROOMS,PLAZAS ADDITIONALLY THE THROUGH CONNECTIONS ON SITE WILL INCREASE THE WALKABLITY OF THE NEIGHBORHOOD.
AND PUBLIC GATHERING SPACES
ENCOURAGE THE INCLUSION OF / / / THE PROJECT PROVIDES 7.6%OF THE UNITS AT AFFORDABLE RATES AND THE BALANCE OF UNITS ARE INTENDED TO BE ATTAINABLE AT 65%AMI.THE GOAL OF BOTH
AFFORDABLE HOUSING !`/J �VJ `V�J AFFORDABLE AND ATTAINABLE HOUSING IS AT THE CENTER OF THIS PROJECT AND WILL GO A LONG WAY TOWARDS PROVIDING THE NEEDED HOUSING STOCK FOR
BOZEMAN.
CREATE A BROAD RANGE OF HOUSING / / / THE PROJECT INCLUDES A RANGE OF HOUSING TYPES AND SIZES, FROM 2 BEDROOM TOWNHOUSE FL ATS,AS WELL AS 2 BEDROOM, 1 BEDROOM,STUDIO AND EFFICIENCY
TYPES �v/J �/J �/J APARTMENT UNITS.THIS RANGE WILL MEET THE NEEDS OF A VERY BROAD DEMOGRAPHIC AND KEEP THE NEIGHBORHOOD VIBRANT.
NEIGHBORHOOD DESIGN AND HUMAN / / / THE PROJECT FINDS THE RIGHT BALANCE OF THE NEED FOR DEVELOPMENT TO PROVIDE HOUSING, OFFICES.AND ARTIST SPACES WHILE KEEP THE SCALE OF THE
SCALE �`,/J `�//J `�//J OVERALL DEVELOPMENT COMPATIBLE WITH THE NEIGHBORHOOD AND PROVIDES A HUMAN SCALE.THIS IS DONE BY KEEPING BUILDING HEIGHTS TO THREE STORIES,
PLACING PARKING UNDERGROUND,AND BREAKING THE BUILDINGS INTO SMALL CLUSTERS THAT WILL PROVIDE THE HUMAN SCALE.
STRATEGICALLY INVEST IN URBAN / / / THE SITE IS LOCATED AT THE CENTER OF THE NORTHEAST URBAN RENEWAL DISTRICT AND THROUGH THIS DEVELOPMENT SEVERAL OF THE CONDITIONS OF BLIGHT AND
RENEWAL `CJ/J `CJ/J ,�/�J THE MUCH NEEDED INFRASTRUCTURE WILL BE COMPLETED.THIS WILL PROMOTE THE LONG TERM GOALS OF THE DISTRICT AND CONTRIBUTE SIGNIFICANTLY TO THE
OVERALL ECONOMIC DEVELOPMENT NEEDS OF THE CITY.
RESPONSE& RESUBMITAL II 11 JANUARY 2019
page 52
• •
PUD COMMUNITY DESIGN OBJECTIVES
PUDP Checklist 14 E. Explanation for each of the Community Design Objectives and criteria in -De--tiDI
38.430.090.E
SECTION 38.430.090.E DESIGN OBJECTIVES AND PUD CRITERIA
A.ALL DEVELOPMENT
1. Does the development comply with all city design standards, requirements and
specifications for the following services:water supply,trails/walks/bike ways,sanitary
supply, irrigations companies, fire protections, electricity, flood hazard areas, natural
gas,telephone,storm drainage,cable television,and streets?
Yes - all services and systems conform to the latest building codes adopted by the City cf
Bozeman Building Department. Standard services including water, sanitary supply, fire
protection meet the current standards and codes issued by the City of Bozeman. Tra,ls,
walkways and bikeways have been provided both onsite as wEll as logical connections to the
surrounding neighborhood networks.
2. Does the project preserve or replace existing natural vegetation?
N/A - there are not significant existing natural vegetation features to be preserved. The
current site conditions have about 45% of the site covered with building or paved surface and
the unpaved areas have unmaintained weeds and bushes. The project will have less_ solid
surface lot coverage and will have extensive landscaping. These are 6 trees that will need to
be removed to accommodate the podium construction. Over 30 new trees will be planted. on
site with this project.
3. Are the elements of the site plan (e.g. Buildings, circulation,open space and landscaping,
etc.) designed and arranged to produce an efficient, functionally organized and cohesive
planned unit development?
Yes - the layout of the buildings and placement of the plaza provide for open and direct
connections across the site, and efficient circulation for both the residents and the public.
4. Does the arrangement of elements of the site plan(e.g.Building construction,orientation,
and placement;transportation networks;selection and placement of landscape materials;
and/ or use of renewable energy sources; etc.) Contribute to the overall reduction of
energy use by the project?
Yes - this infill project contributes to the overall reduction of energy, as does the walk3b [it/
of the site plan and street edges. These have further been reinforced through the LEED
Neighborhood Design Status we will achieve through this development.
5. Are the elements of the site plan (e.g. Buildings, circulation, open space and landscaping,
etc.) designed and arranged to maximize privacy of the residents of the project?
Yes - special consideration has been given to the various types of dwelling units to provide
both privacy and accessibility. Ground level units will incorporate private outdoor spaces that
will function as a privacy screen from other at grade activities. The second and third. floo-
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
)age 53
• •
PUD COMMUNITY DESIGN OBJECTIVES
CONTINUED
units afford privacy due to their placement above grade. Each building is designed to maximize
privacy while encouraging interaction with the other residents and community members
through plaza spaces and shared roof decks.
6. Parkland - Does the design and arrangement of buildings and open space areas contribute
to the overall aesthetic quality of the site configuration and has the area of parkland or open
space been provided for each proposed dwelling as required by Section 38.420.020?
Yes - we have provided all the open space and parkland required by the code. The primary
organizing factor and key design goal was to create common public Spaces that invite activity
for residents, office users and neighborhood denizens to enjoy. We have accomplished this
through the thoughtful arrangements of buildings - creating open spaces that vary in scale
and character across the site. These include public plazas, private residential plazas, private
personal outdoor spaces and balconies, and shared roof decks.
7. Performance-All PUDs must earn at least 20 performance points.
Yes - we have achieved 58 points for the project. For specifics, see Section 3.04, page 44-45 of
this document.
8. Is the development being properly integrated into the development and circulation patters
of adjacent and nearby neighborhoods so that this development will not become an isolated
"pad"to adjoining development?
Yes - the project will create new connections to the neighborhood through the construction of
upgraded street networks and sidewalks. The public plaza spaces will afford access and views
through the site further connecting the project to the neighborhood.
SECTION 38.430.090.E DESIGN OBJECTIVES AND PUD CRITERIA
A. MIXED USE
Planned unit developments in mixed-use areas IREMU, UMU, and NEHMU Zoning Districts) may include
commercial, light industrial, residential and mixes of various primary and F-ccessory uses. The types or
combination of the uses are determined based upon its merits, benefits, potential impact upon adjacent
land uses and intensity of development.
1. Is the project substantially consistent with the intent and purpose statements for the
underlying zoning district?
Yes - The underlying zoning is NEHMU, the 'intent of this area is to allow private and case-by-
case determination of the most appropriate use of land in a broad range of both non-residential
and residential uses." Additionally, "The unique qualities and nature of the area are not found
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 54
• •
PUD COMMUNITY DESIGN OBJECTIVES
CONTINUED
elsewhere in the city and should be preserved as a place offering additional opportunities for
creative integration of land uses." This project is very consistent with this intent. We include
a range of housing types, and a range - and type - of commercial activity consistent with the
zoning.
2. Is the project located adjacent or within proximity to an arterial or collector street that
provides access to the site?
Yes -The property is located 300 feet from Peach Street(Collector)and 300 feet from Tamarack
Street (Collector) and 900+/- feet from Rouse Ave which is designated as a Principal Arterial in
the City street network.
3. Is the project on at least two acres of land?
Yes - 2.01 acres
4. Do the uses relate to each other in terms of location within the PUD, pedestrian and
vehicular circulation,architectural design, utilization of common open space and facilities,
streetscapes etc.?
Yes
5. Does the overall project exceed the FAR "floor area ratios" envisioned for the underlying
zoning district?
N/A - none specified for the NEHMU district. The F.A.R. for this project is 1.8
6. Is it compatible with and does it reflect the unique character of the surrounding area?
Yes - The character of the surrounding area has a mix of residential and commercial activity.
There are two- and four-story mixed-use residential projects, a 70 feet repurposed grain
elevator, metal warehouse buildings, historic brick buildings and single-family homes. We
strove to develcp a mass and scale that is consistent with this while being able to provide
opportunities for more affordable units. The use of materials and unique architecture further
reinforces the character of the district.
7. Is there direct vehicular and pedestrian access between on-site parking areas and adjacent
existing or future offsite parking areas that contain more than 10 spaces?
Yes - the project will lease parking spaces on an adjacent site which will have more than
10 spaces (72 spaces). Additionally, given that this project is surrounded on three sides by
public streets c-eates direct connections both vehicular and pedestr an with the surrounding
neighborhood.
8. Does the project encourage infill, or does the project otherwise demonstrate compliance
with the land use guidelines of the Bozeman Growth Policy?
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 55
• 0
PUD COMMUNITY DESIGN OBJECTIVES
CONTINUED
Yes -The project is exemplary of infill, it is taking an underutilized warehouse/brownfield site
and redeveloping it to include a mix of both residential uses and commercial act vity that will
efficiently use the surrounding infrastructure.
9. Does the project provide for outdoor recreational areas (such as urban plazas,,courtyards,
landscaped areas,open spaces,or urban trails)for the use and enjoyment of those living in,
working in or visiting the development?
Yes - The project has provisions for urban plazas, courtyards, landscaped areas, access to off
site open spaces and trails. See Landscape.
10. Does the project provide for private outdoor areas (e.g. private setbacks, patios and/or
balconies etc.) for use by the residents and employees of the project which are sufficient
in size and have adequate light, sun, ventilation, privacy and convenient access to the
household or commercial units they are intended to serve?
Yes - per the UDC the project has provided private outdoor spaces, )atios and balconies per
code for use by both commercial units and residential units.
11. Does the project provide outdoor areas for use by persons living and working in the
development for active or passive recreational activities?
Yes - The uses contemplated in this project would be more passivE recreation in nature,
however the project is located along a trail system that connects to the Story Mil% mark which
offers many active recreational opportunities.
12. Is the overall project designed to enhance the natural environment, conserve energy and
provide efficient public services and faculties?
Yes - The very nature of infill development and specifically this project achievinc LEED ND
Standards provides further evidence of the project's commitment to corserving energy and
preserving the natural environment.
13. If the project is proposing a residential density bonus as described below, does it include a
variety of housing types and urban styles design to address the com:runity-wide issues of
affordability and diversity of housing stock?
N/A - No density bonuses are proposed - however we meet housing diversity and Effordability
metrics.
14. Residential Density bonus.
N/A - The project is not proposing any residential density bonuses.
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II II JANUARY 2019
page 56
• 0
PROPOSE® OWNERSHIP
The project will be orcanized under a condominium regime, see Appendix L for Draft Condominium
Documents where each building will pay a proportionate share to the condo master to cover common
areas (including public common areas), limited common area, and general maintenance. Each building
wilt also have its own condominium owner's association that can manage more building-specific issues
such as elevators, stair towers, mail rooms and other common and limited common elements.
OWNERSHIP
OWNS/MAINTAINS:
Parking Lots
-• General Common Areas Outside of Bldgs(Landscaping)
• • Building#5(Public Use)
Land Under Buildings
BUILDING 4
BUILDING 6 RESIDENTIAL(SALE)I RESIDENT AIL CIONDO(SALE) RESIDENTIAL CIONDO(APTS) RESIDENT AIL CIONDO(APTS)
COMMERCIAL CONDO(RENTAL) COMMERCIAL CONDO
1
CONDO ASSOCIATION OF CONDO ASSOCIATION OF CONDO ASSOCIATION OF CONDO ASSOCIATION OF CONDO ASSOCIATION OF
UNITOWNERS UNIT OWNERS UNIT OWNERS UNITOWNERS UNIT OWNERS
OWNS I MAINTAINS: OWNS/MAINTAINS: OWNS/MAINTAINS: OWNS I MAINTAINS: OWNS/MAINTAINS:
LIMITED COMMON AREAS LIMITED COMMON AREAS LIMITED COMMON AREAS LIMITED COMMON AREAS LIMITED COMMON AREAS
OUTSIDE OF BLDG 6: OUTSIDE OF BLDG 4: OUTSIDE OF BLDG 3: OUTSIDE OF BLDG 2: OUTSIDE OF BLDG 1:
Parking Lot @ Brewery Outside of Bldg(Studs Out) Outside of Bldg(Studs Out) Outside of Bldg(Studs Out) Outside of Bldg(Studs Out)
Lease of Parking Lot @ Brewery Exterior Windows Exterior Windows Exterior Windows Exterior Windows
Outside of Bldg(Studs Out)
Exterior Windows COMMON AREAS INSIDE COMMON AREAS INSIDE COMMON AREAS INSIDE COMMON AREAS INSIDE
CONDO CONDO CONDO CONDO
COMMON AREAS FOR CONDO:
Elevator
Assigned Parking In Lot(If Any)
Entryway
Locker Room I Showers
l�u Lr1JrI/ l+P�)�ir lr� Lapp/
OWN I MAINTAINS: OWN/MAINTAINS: OWN I MAINTAINS: OWN I MAINTAINS: OWN/MAINTAINS:
Interior Unit(Studs In) Interior 1l Unit(Studs In) Interior Unit(Studs In) Interior Unit(Studs In) Interior Unit(Studs In)
�( BUILDING 5
COMMERCIAL CONDO
(PUBLIC LSE)
11 See Master„
Owners Assoc.
COTTOMWO®® ¢ [®A
RESPONSE& RESUBMITAL II II JANUARY 2019
page 57
0
GOVERNANCE
MASTER OWNERSMembers are all owners within PUD
ASSOCIATION
BUILDING 6 RESIDENTIAL(SALE)I —LDING 3 BUILDING 2 ANG I
COMMERCIAL CONDO JRENTAL) COMMERCIAL CONDO RESIDENTIAL CONDO(SALE� RESIDENTIAL CONDO(APTS) RESIDENTIAL CONDO(APTS�
DIRECTOR DIRECTOR DIRECTOR A. N—.On—.
3 #2 #3
CONDO ASSOCIATION OF CONDO ASSOCIATION OF CONDO ASSOCIATION OF CONDO ASSOCIATION OF CONDO ASSOCIATION OF
UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS
BUILDINGS
COMMERCIAL CONDO'
MANAGED BY MASTER
3 DIRECTORS PER CONDO ASSOCIATION(Elected By Unit Owners)
ONE DIRECTOR PER BUILDING WILL ALSO BE A DIRECTOR OF MASTER OWNERS ASSOCIATION
EACH OWNER WILL A MEMBER OF THE
CONDO OWNERS ASSOCIATION&MASTERS OWNERS ASSOCIATIOFINANCE
MASTER OWNERSMembers are all owners within PUD
ASSOCIATION •��
BUILDING 4
BUILDING 6 RESIDENTIAL(SALE)I BUILDING 3 BUILDING 2 )ING 1
COMMERCIAL CONDO RENTAL) COMMERCIALCONDO RESIDENTIAL CONDO(SALE) RESIDENTIAL CONDO(APTS) RESIDENTIAL CONDO JAPTS)
BUILDING S
COMMERCIAL CONDO
(PUBLIC USE)
MANAGED BY MASTER
ASSOCIATION OF ASSOCIATION OF ASSOCIATION OF ASSOCIATION OF ASSOCIATION OF
UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS UNIT OWNERS
UNIT UNIT UNIT UNIT UNIT
OWNERS OWNERS OWNERS OWNERS OWNERS
UNIT OWNERS PAY FEE TO OWNERS ASSOC."(%Based On Unit Sq.Ft./Building Sq.)
'This fee includes fee for Master Owners Assoc.
RES
OWNERS ASSOC. PAY FEE TO MASTER ASSOC.(%Based On Bldg Sq Ft./All Building Sq.)
., RESUBMITAL11 JANUARY2019
ASSOCIATION DUTIES BEYOND MAINTENANCE
ADDITIONAL RESPONSIBILITIES:
MASTER Architectural Review
OWNERS Common Parking Maintenance&Rules
ASS• • Common Area Rules including but not limited to:Pavilion Use,Snow
- Removal on Common Walkways,Signage on General Common,
Storm Water Maintenance,Collection from Each Association,
Maintenance of Sprinklers&Landscaping.
Dispute Resolution Between Building Associations
BUILDING 6 BUILDING 4 BUILDING 3 ING 2 BUILDING t
(RENTAL) COMMERCIALC CONDO BUILD
COMMERCIAL CONDORESIDENTIAL(SALE) CONDO(SALE) RESIDENTIAL CONDO(APTS) RESIDENTIAL CONDO(APTS)
ONDO
F—
CONDO ASSOCIATIONOF rr ASSOCIATION OF • r• r • • • •• • • r•ASSOCIATION OF
• • • UNIT OWNERS,
ADDITIONAL RESPONSIBILITIES ADDITIONAL RESPONSIBILITIES ADDITIONAL RESPONSIBILITIES ADDITIONAL RESPONSIBILITIES ADDITIONAL RESPONSIBILITIES
Interior Signage Interior Signage Interior Signage Interior Signage Interior Signage
Collection From Members Collection From Members Collection From Members Collection From Members Collection From Members
Member Dispute Resolution Member Dispute Resolution Member Dispute Resolution Member Dispute Resolution Member Dispute Resolution
Parking Lease Exterior of Building 4: Exterior of Building 3: Exterior of Building 2: Exterior of Building is
Exterior of Building 6: Landscaping(within X Feet) Landscaping(within X Feet) Landscaping(within X Feet) Landscaping(within X Feet)
Landscaping(within X Feet) Clean-up(within X Feet) Cleanup(within X Feet) Clean-up(within X Feet) Clean-up(within X Feet)
Clean-up(within X Feet)
BUILDING 5 MAINTENANCE RESPONSIBILITIES
COMMERCIAL CONDO MAINTAINS:
(PUBLIC USE) Common Areas,Including But Not Limited To:
See Master Pavilion
Owners Assoc. -• Landscaping Around Buildings
• • Parking Garage I Areas(excl Bldg 6 parking)
Storm Water Maintenance
Common Area Trash
Snow Removal From Entryway&Sidewalks
BUILDING 4 BUILDING 3 BUILDING 2 BUILDING 1
CONDO
COMMERCIAL CONDO(RENTAL) COMMERCIAL CONDO
BUILDING6 RESIDENTIAL( RESIDENTIAL CONDO(SALE) RESIDENTIAL CONDO(APTS) RESIDENTIAL CONDO(APTS)
SHARED DECK
• ••ASSOCIATION OF • r•ASSOCIATION OF • ••ASSOCIATION• • •• • ••
UNITOWNERS UNITOWNERS • -
MAINTAINS BUILDING 6: MAINTAIN BUILDING 4: MAINTAIN BUILDING 3: MAINTAIN BUILDING 2: MAINTAIN BUILDING 1:
Interior&Exterior Common Areas Interior&Exterior Common Areas Interior&Exterior Common Areas Interior&Exterior Common Areas Interior&Exterior Common Areas
Ind But Not Limited To: Incl But Not Limited To: Ind But Not Limited To: Ind But Not Limited To: Incl But Not Limited To:
Elevator Elevator Trash Room(share with Bldg 4) Common Walkway to Bldg 1 Elevator To Parking(share with
Entryway Interior Corridor Mechanical Room Elevator To Parking(share with Bldg 1,2,3,4)
Hallways Entry Lobbies(2) Elevator To Parking(share with Bldg 1,2,3,4) Trash Room(share with Bldg 2)
Locker Room I Showers Trash Room(share with Bldg 3) Bldg 1,2.3,4) Trash Room(share with Bldg 1) Mailroom(share with Bldg 2)
Parking Lease Area Mechanical Room Mailroom(share with Bldg 1) Entryway(share with Bldg 2,3,4)
Mechanical Room Elevator To Parking(share with Entryway Mechanical Room
Bldg 1,2.3,4) Mechanical Room Stairs
Roof Top Area(share with Bldg 1) Bike Tuning Area(share with 2)
Kitchen&Laundry Areas(limited
common expense per Pod)
OWNERS IIQW�11111111111111
RESPONSIBLE FOR: RESPONSIBLE FOR: RESPONSIBLE FOR: RESPONSIBLE FOR: RESPONSIBLE FOR:
Interiors of Unit Interiors of Unit Interiors of Unit Interiors of Unit Interiors of Unit
Patio Snow Removal Patio Snow Removal Patio Snow Removal Patio Snow Removal Patio Snow Removal
Contribute Funds to ,?^ Contribute Funds to Contribute Funds to Contribute Funds to Contribute Funds to
Association t �- A Association Association
Association Association
BUILDING 5
COMMERCIAL CONDO
R (PUBLIC USE)
•j See Master
Owners Assoc.
RESPONSE& RESUBMITAL II II JANUARY 2019
page 59
• 0
ESTIMATED NUMBER OF EMPLOYEES FOR BUSINESSES
The project contains three primary types of commercial spaces. The first is a more traditional office
format in Building b, located at the Northwest corner of the site,where there are three levels of open-plan
office.These spaces could be divided to host smaller tenants, however the intent is to lease the majority of
the building to one or two primary tenants.The second type of commercial space is one we are classifying
as 'maker spaces' in Building 4.These would be smaller spaces where creatives could maintain a studio
to showcase their work, or where a digital start-up could find an affordable foothold. Third, there is an
opportunity for a small scale cafe located in building 5 on the Plaza. This would likely be a place that
provides small dining opportunities for the office and makers as well as residents throughout the day.
Below is a matrix of spaces and uses, along with estimates of the number of employees.
COMMERCIAL OFFICE EMPLOYEES 81
ARTISAN MANUFACTURING EMPLOYEES 6
GENERAL PROPERTY MANAGER 1
SMALL SCALE CAFE b
TOTAL lEi
RESPONSIBILITY FOR IMPACT MITIGATION
The Northeast Historic Mixed-Use(NEHMUI is unique within the City-constantly evolving to accommodate
a rich variety of uses.The Cottonwood and Ida Mixed-Use project contains the residential and commercial
uses currently allowed, and promotes diverse land-uses that remain sensitive to the neighborhood
context. While apartment buildings are not specifically permitted in the district, residential units are
allowed on the second and subsequent floors above commercial spaces. The zoning code further states
that the "standards for buffering between different land uses are deliberately not as high as standards
elsewhere in the community as it is assumed that persons choosing to locate in this area are aware of
the variety of possible adjacent land uses and have accepted such possibilities as both acceptable and
desirable."The project responds to existing conditions by placing denser commercial activity closer to the
commercial office and shop spaces on surrounding blocks. Additionally, lower-scale residential units on
the site (Building 3 Townhouse-style units) are located across the street from other single-family scaled
residences. Other steps have been taken to reduce the overall mass and scale of this project by placing
parking underground and, in place of surface parking, providing public open spaces to foster connections
to the community.
DESIGN METHODS TO REDUCE ENERGY CONSUMPTION
The site planning will be certified by the US Green Building Council as a Leadership in Energy and
Environmental Design Neighborhood Development (LEED NO). The project is being planned, designed,
engineered and constructed to yield a development that makes much more efficient use of land and
resources than land-use patterns typical for the region - thus reducing overall energy consumption.
In addition to the overall site planning, strategies will be employed in the individual buildings to reduce
energy consumption and promote long-term sustainable practices across the project - including low-
flow plumbing fixtures, high-performance windows, energy efficient appliances, low-voltage lighting, and
onsite recycling facilities.
COTTOMWOOD ¢ BDfii
RESPONSE& RESUBMITAL II II JANUARY 2019
page 60
RATIONALE FOR CHOICES MADE BY THE APPLICANT
From the early planning stages of the project we insisted that it contribute a solution for the shortage
of affordable housing in Bozeman. Traditionally, more affordable housing has been pushed to the newer
parts of town, with the older neighborhood becoming more and more gentrified.
We see an opportunity to keep affordable housing options in the NEHMU District, taking advantage of
the existing infrastructure and established neighborhoods surrounding the site. We also believe that
the project needs to accommodate more than one demographic, and have included a broad range of unit
types to promote a mix of age and income levels on the site.
The project has also very intentionally approached the need to provide commercial uses in this mixed-
use neighborhood so that there are opportunities for individuals to live close to where they may work.
The hope is that both residents of the site and the surrounding neighborhood will be able to bike or walk
to work. We have planned the site and the structures as a distinct micro-urban context, with individual
residents living and working on-site, with inviting places for them to gather and enjoy the interactions
of daily life. We have provided extensive public open spaces and landscaped courtyards to serve this
purpose, and have intentionally created an open and accessible site. The unique aesthetic qualities of
this district also compelled the project to respond in a unique manner, exploring architectural styles that
respond to both the industrial and residential context.
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II II JANUARY 2019
page 61
GENERAL SITE DATA B L�
;t - tJ ERG :.$F
- __ ,' �': �' o � -�_��• �•, •.:.�
DISTRIBUTOR , ",�• �
I he Northeastern Neighborhood is host to d diver se,dctrve set of re5ide�eta, heavily
invested in preserving their community's unique identity, and intent on engaging - �" ��*��t -•� HISTORIC �� .
L .
with projects as they develop in the area. � '.'-• '��". � TRAIL DEPOT '
Al
In April 2017, the neighborhood hosted a Regional and Urban Design Assistance -" �. .� , •,x * � = - ,
Team (R/UDAT) workshop to gather community input on future development in the t NORTHERN
Northeastern Neighborhood. The team's report provided a great deal of guidance � : PACIFIC
as we established the project goals, developed a site strategy, and formulated the - - FORMER " x= F ' y ` RAILWAY
TECH BREWERY =-
relationships to the streets and surrounding properties. OFFICE SITE `, r `
t & IIQDlJSTRIALr • , }. Xs�"
FROM THE R/UDAT REPORT
8S 1�� e ,R ' . _T- + POCKET '` 4
CHARACTER: "Tlie cuiiiriiuinty Iuld the team that the neighborhood i PARK
funky.' The neighbor hood's clidi actor is authentic and unique in the131y
c,uiitext of Bozeman It iS a real place. The community also put intense
value on the eclectic identity of the area and its mix of uses- a quality that ASP S �, •_ " * :'?
�n math is embi deed dnd celebrated The PJorthcost Neighborhood is al_ ,�, _'� r - - :�;, . �._, �• � _�
up of ci cdhvc and artistic people who value its divPrsit y and freedom of
�h
self-expression. The neighborhood was widely described as livahle, hoth � A MF '
c
for its adjacency to downtown and the quality of life it provides to the BREAKFAST
who work and live here
people
STREETS: "One of the most widely shared ideas on future improvements �1
concerned the need to better connect existing assets throughout the - ' _ a�, x S
neighborhood and make its streets more friendly to pedestrians and SINGLE-FAMILY .� SIRDG E-"NE
ILY IF
bicyclists." RE ENCE ,�� M r`• E i S
DIVERSITY & AFFORDABILITY: **Two manifold interests emerged as • �, - _. i z "x� p ;� �"° N'
important The first is the preservation and strengthening of the unique
E. COTTONWOOD ST
sense of place in the iieiyhborhood and its contributing components.
The second characteristic is the accessible and affordable housing Q - _ I ( r -
proposition th it has traditionally prevailed in the neighborhood, and the Sll�i LE FALdIL"�(- 1i' n"�wT. .!r ~:- Q� ' ~~
value that df for ddhilily has in producing a diverse ncighboihoorl that ran y S_� _ > CAF MULTI-FAMILY--'
5uppui t 1-1 LatfVC professionals and working fomitics. } �;' . '� W '� RESIDENTIAIt Ln^' LU - �-
5 MINUTE WALK (1/4 MILE) 10 MINUTE WALK (1/2 MILE) _ "I,, J .. 15 & OR
• PARK TRAILS ELEMENTARY SCHOOL
• FAIRGROUNDS BOZEMAN CITY HALL
OFFICES& • BIKE r OFiCE $t• BASEBALL FIELD • DOWNTOWN RETAIL DISTRICT STUDIO . SHOP a BAKERY STUDIOS S
• CAFES 0 PUBLIC LIBRARY .1 •�_� f lrf r .- `-� - 1' f
• BUS STOP 0 LINDLEY PARK
E. PEACH ST. ,�. •� - � ,- -
• OFFICES 0 BEALL PARK
• ARTIST STUDIOS STORY MILL PARK ( *, ,fig• l ''
• PUBLIC POOL 13/4 MILE) t T TQ' C:'!ir
D�WN7l7WW1`I '{� SINGLE-FAM[l`Y - NOR
RESIDE CES� r , )
D®TTOMWO®D 0 ODA - - '
RESPONSE& RESUBMITAL II 11 JANUARY 2019 US DECO-T �''`' �
page 62
00 a r
CQ
c7 �
_� O
FROM THE R/UDAT REPORT
"The Core is the central portion of the R/UDAT project area and is an eclectic
mix Of light industrial buildings intermingled with small cottages, walking w
paths and historic sites The look and feel of the core is central to how the - .�5 _ -
resident S see themselves. Developing a strategy for defining and prutecting
the Core is essential to maintaining the residents cultural connection to the tir;,THWESTTOGALLATINPEAK %ORTrWESTTOMTBA,DY
city s history as well as their neighborhood identity as a funky, creative, and
di\,erse place to live, work and play-
SITE CONDITIONS �� �— / ' c 00
- oa,
The blocks to the East and West of the site are predominantly single-family residential, oo°�°
while the blocks to the North and South consist of larger-scale industrial buildings, �� f { � ° r
i
coo 4
as well as small multi-family development. Immediately to the West of the site is the ` ~i� �t °°00� " C�
historic Misco Mill (now housing a high-end furniture maker) and small collection of co
�o°
industrial buildings - currently being used as a pottery studio. �. ~ t °°° °°°° �� o°°°
The East Aspen St. Right of way - to the North of the site - is currently closed to °
00
o �� °o° ; ��•
t
traffic, and provides an open green space with benches and a walking trail. There are �°o°°°
no sidewalks around the street edges of the site, but there are potential pedestrian �� ��`` •:
connections across Cottonwood Street to the nearby cafe and bakery. Downtown
is 3/4 of a mile South as well, providing relatively direct pedestrian and biking „• �� - ° &APARTMENTSUILD
connections. Outdoor recreation areas to the North and Northeast of Bozeman are " 0 ° ELATE TO ADJACENTCOM
also readily accessible. • ' °
&I USTRIAL SC
o
°
The lower levels of the project will offer views to the Northeast and Southeast. Upper '� Y °o°
floors gain views across Bozeman to the Southwest, and up the Gallatin River Valley o°
to the Northwest. o°pOOO°°°
The site design responds to the variety of scales and land-use on adjacent properties '
by placing smaller-scale townhouse-style units across from the single-family
neighbors to the East, while the larger masses of the office building and apartment TOWNH S - U� %/
building sit closer to the large industrial and warehouse buildings to the North. � ' / �t RE LAe ADJACENT` �••� 00 V �IN
Buildings along Cottonwood conform to the scale and character of the recent multi- i/ , ', C RED TIALSCi4LE •' •' :� �� i
•.
falrtily devel0pnT1ents to [lie South of the site.
Pedestrian connections and through-block passages occur on the South and / / 0 y
Northeastern portions of the site while the vehicle traffic is directed Northwest toCIO
* �' •�•• ••' '
Wallace Avenue. �. o° r J N.
•••••••••• PEDESTRIAN CONNECTION �, �O - %• � `` % •'•
•••••••••• PROPOSED VEHICLE CONNECTION) �r , `� 0 •_ v ••.� '1, i�.•
ALLEYWAY ALIGNMENT / i ' •
VIEW SHEDS
t f s� •+•'•• •••••• � �`
ASPEN STREET R.O.W. % • •
PRESERVE EXISTING BUILDING �J� 1411 r.
'AERIAL FROM THE SOUTHEAST
RESPONSE& RESUBMITAL II II JANUARY 2019 .00-- ••• �. _
SOS THEAST'0 VT BLAC MORE
page 63
SECTION 4 LAND USE
4.00 CITY LAND USE POLICIES & OBJECTIVES
ACHIEVED
4.01 LAND USE CLASSIFICATION
4.02 ALIGNMENT OF GOALS WITH NORTHEAST URBAN
RENEWAL DISTRICT PLAN
4.03 ALIGNMENT OF GOALS .=ROM VISION NE/RUDAT
REPORT
COTTONWOOD + IDA
RE'SPGNSE& RESUBMITAL II II JANUARY 2019
page 04
• •
CITY LAND USE POLICIES & OBJECTIVES ACHIEVED
This infill, affordable housing, mixed use, urban plaza project exceeds many of the goals and objectives the
City has across multiple planning documents from the Community Plan, Design Objectives Plan. Northeast
Urban Renewal Plan, and the Economic Development Strategic Plan. Additionally, the design tearr and the
developer facilitated an additional series of public meetings and charettes that further reinforced th= goat=_
of the project. (The RUDAT) the following covers the high-level items from the Bozeman Community Plar
that are not covered elsewhere in the application. We have also provided a matrix of the basic policies that
we are meeting across multiple planning documents.
LAND USE - A SENSE OF PLACE
BOZEMAN COMMUNITY PLAN GOAL LU-1: Create a sense of place that varies throughout the city,
efficiently provides public and private basic services and facilities in close proximity to where people
Live and work and minimizes sprawl.
The Cottonwood and Ida project is best described as a mixed-use infill project providing for places of
work and housing within the existing fabric of a neighborhood. By Creating opportunities for multiple
demographics and varying the types of housing, this project will successfully combat t-)e pressures of
sprawl. It is estimated that if this density of both commercial and residential uses were to develop under
traditional greenfield development standards it would be nearly five times as consumptive of land. One of
the objectives under this goal is:
OBJECTIVE LU-1.4: Provide for and support infill development and redevelopment which provides
additional density of use while respecting the context of the existing-development which surrounds it.
Respect for context does not automatically prohibit difference in scale or design.
The Cottonwood and Ida project provides this much needed density while respecting the context of the
existing neighborhood by placing much of the parking below grade, breakirg up the buildings irto multiple
structures that create broad public plazas and intimate courtyards for enjoyment by tl-e resident and t-)P
visitor alike.
QUALITY COMMUNITY '
GOAL C-1: Human Scale and Compatibility- Create a community composed of neighbcrhoods designed
for the human scale and compatibility in which the streets and buildings are properly sized within their
context, services and amenities are convenient,visually pleasing,and properly integrated.
This project has placed great emphasis on the human scale and as ment oned above by breaking up tn=_
massing of the buildings to more similarly match the context of the neighborhood and creating public
spaces has created a visually pleasing and properly integrated quality set of buildings and public spaces.
GOAL C-5: Public Landscaping and Architecture- Enhance the urban appearance and environment with
architectural excellence, landscaping,trees and open space. —
OBJECTIVE C-5.2: Encourage inclusion of plazas and other urban design features as public areas within
developments. JAN 28. 2619
rJ
The Cottonwood and Ida project provides over 6,750 SF of public plaza sp thaQWlll' �ewice an ul oan pa <.
experience unique to this neighborhood. G�OM1VIiJ(VI L ,::�ul
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II II JANUARY 2019
page 65
• •
LAND USE CLASSIFICATIONS
GROWTH POLICY DESIGNATION / COMMUNITY PLAN DESIGNATION
The project area is designated as"Industrial" in the Community Plan.This classification provides areas for
uses which support an urban environment such as manufacturing,warehousing,and transportation hubs.
Development within these areas is intensive and is connected to significant transportation corridors. In
some circumstances, uses other than those typically considered industrial have been historically present
in areas which were given an industrial designation in this growth policy. Careful consideration must
be given to public policies to allow these mixed uses to coexist in harmony. The property holds a unique
identity within this context given that it is also part of the NEHMU Zoning Classification (see below). This
classification has prcvided for a mix of residential uses and commercial/ industrial uses throughout its
history. The project is compatible with this and will add to an ever-evolving future of this neighborhood.
ZONING DESIGNATION
Sec. 38.300.110. -Commercial and Mixed-use Zoning Districts- Intent and Purpose
The intent and purposes of the commercial zoning districts are to establish areas within the City that are
primarily commercial in character and to set forth certain minimum standards for development within
those areas.
Northeast Historic Mixed-Use District- Intent and Purpose. NEHMU
1. The intent of the Northeast Historic Mixed-use District is to provide recognition of an area that
has developed with a blend of uses not commonly seen under typical zoning requirements.
The unique qualities and nature of the area are not found elsewhere in the city and should be
preserved as a place offering additional opportunities for creative integration of land uses.The
intent of this area is to allow private and case-by-case determination of the most appropriate
use of land in a broad range of both non-residential and residential uses. Standards for
buffering between different land uses are deliberately not as high as standards elsewhere in
the community as it is assumed that persons choosing to locate in this area are aware of the
variety of possible adjacent land uses and have accepted such possibilities as both acceptable
and desirable. It is expected that the lots within this district will continue to develop under a
variety of uses which may increase or decrease in scope in any given portion of the district.
2. The clear intent of this district is to support a mix and variety of non-residential and residential
uses. Nothing in Division 38.300 of this Article shall be interpreted to be discouraging or
prejudicial to any listed use except as set forth as principal and conditional uses.
As stated above the unique aspects of this zone type make it very suitable for a mixed use
commercial and residential project. The project respects this identity both in the planning of
uses as well as the scale of the architecture.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 66
• •
ALIGNMENT OF GOALS WITH NEURD
(NORTHEAST URBAN RENEWAL DISTRICT) PLAN
THE NORTHEAST URBAN RENEWAL DISTRICT MISSION AND VISION:
-The plan envisions a mixed-use neighborhood that is user-friendly safe, secure and healthy.
While the plan envisions a District with diversity of housing, businesses, and amenities, it intends
to maintain the unique ambiance and historic character of the District." NEURD Plan pg. 5
We used this mission statement along with feedback from the RUDAT to develop our plan. We are seeking
to create a neighborhood that is user-friendly, offering plaza spaces and good connectivity to the surrounding
neighborhood. We are providing a healthy mix of housing, businesses and amenities that respond to the unique
ambiance of the district through massing and scale and configuration of buildings.
The NEURD plan outlines nine principles along with goals and implementation policies that it seeks to achieve
through the creation of our project it addresses many of these principals, goals, and implementation policies
aligned in the plan. In fact, our project directly addresses 7 of these principals. Specifically,
Principle 1 is to ensure health safety and security of the District by upd2ting outdated or insufficient
infrastructure. We intend to make improvements to the surrounding street network and utilities in
collaboration with the District. This project also furthers the goal of a land use pattern that facilitates
all modes of transportation. We have included substantial underground parking to provide the needed
parking while shielding the presence of"parking lots"from the neighborhood viewshed. We have provided
plazas and greenways to facilitate public pedestrian uses on the site and Atend to create specific bike
garage facilities to accommodate bike parking, storage, and maintenance areas.
Principle 2 speaks to the desire to balance commerce and livability in the 3istrict within the mixed-use
framework. Our project provides this balance and compatibility through the very best practices of urban
design. We achieve this by providing good connections to public spaces for 3I1 that improve quality of life
for the residents and business owners alike.
Principle 3 is to 'honor the unique character and vitality of the District' We have taken great effort
to include opportunities within this project for affordable and attainable housing, unique artist spaces
and commercial uses that best fit the emerging character of the District Additionally, our thoughtful
consideration of mass and scale, attention to public values, and sustainable building practices will both
honor the vitality and show a path forward that the district can truly be proud of.
Principle 4 addresses the need for public open space that contributes to the health and appeal of the
urban environment. This project creates over 20,000 SF of multiple public open spaces and provides
improvements to adjacent greenways.
Principle 5 establishes the framework to evaluate the cost of projects and programs weighted against
their benefits to the district. This project provides the much-needed benefit of affordable housing
and unique artists spaces in a progressive urban design that will enhance and preserve the unique
character of the District. The project will also substantially increase the available increment in the
District which can be used to achieve additional goals outlined in the plan [continued]
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
page 67
• •
ALIGNMENT OF GOALS WITH NEURD PLAN
(NORTHEAST URBAN RENEWAL DISTRICT)
CONTINUED
We have estimated this at $100,000 annually, after debt service, that can be used on other projects
within the District. This principal exemplifies our project in so far that it will promote the principals and
goals of the District and contribute significantly to the underlying value of the District.
Principle 6 states the private land shall not be acquired for private use through the eminent domain
process. Our project does not use any eminent domain in the redevelopment. We do offer our own
private land to the public in the form of public plazas.
Principle 7 states that projects shall consider impacts on adjacent neighborhoods. Our project has
thoughtfully addressed the surrounding neighborhood by incorpor9ting smaller scale housing next to
smaller scale adjacent homes and placed more commercially oriented uses next to existing commercial
uses.
ESSENTIAL GOALS OF THE 2006 NEURD PLAN ACHIEVED
• "Outdated or insufficient infrastructure should be repaired, replaced, or otherwise improved"
[Principle 1,pg.5 NEURD Plan)
• 'Assure compatibility of land use through appropriate urban design techniques"[Principle 2,pg.6
NEURD Plan)
• "Promote sustainable building practice and design within the District"[Principle 3, pg. 7 NEURD
Plan]
• "Encourage affordable housing"[Principle 2,pg. 6 NEURD Plan]
• "Secure public open spaces in locations that will optimize accessibility"(Principle 4, pg.7 NEURD
Plan)
• "New structures should be designed keeping in mind public values of durability, flexibility, and
simplicity. Thoughtful consideration of design, materials, and massing in construction of new
private buildings will add strength and character to the built environment. To the degree that
private sector can be influenced by a public partner in development, the community ought to
strongly encourage excellence in urban design as a basis of partnership."[Principle 3,pg.7 NEURD
Plan)
• "Harmonize commercial and industrial development with residential quality of life"[Principle 2,
pg. 6 NEURD Plan)
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 68
ALIGNMENT OF GOALS FROM THE VISION NE/RUDAT REPORT
(NORTHEAST REGIONAL URBAN DESIGN ASSISTANCE TEAM)
While not an adopted city policy document the RUDAT provided an opportunity for a broad base of
neighborhood and community engagement discussing the future direction of this District and areas
surrounding it. The RUDAT came up with a few guiding principles as follows:
• Values the neighborhood's unique vibrancy, diversity, artistry, history, commercial / industrial
interface, walk- and bike - ability, and special bridger mountain views;
• Understand that growth and change in our neighborhood is inevitable;
• Embraces the notation that change can be positive, that it can enhance the neighborhood's unique
character and vitality and increase opportunities for affordable housing, connectivity and civic
participation.
The goals of the Cottonwood and Ida project very much align with these as we endeavor to create affordable
housing opportunities and embrace the artistry and history of the District while making opportunities for
civic participation on site.
THE VISION NE/RUDAT FOLLOW-UP COMMITEE SEEKS TO:
• Enhance neighborhood character
We are looking to enhance the character through unique buildings and public spaces and provide
commercial opportunities for artists to continue to contribute to the fabric of place.
• Create new pocket parks, urban rooms and public gathering spaces
We have incorporated several public plaza spaces and pocket parks within the site to support public
gathering and invite the neighborhood to be part of the location as we ask to be part of the neighborhood.
• Provide safe transportation through residential neighborhoods
The project provides full pedestrian circulation through the site connecting to the existing sidewalk
and trail network. Transportation patterns have been considered to keep most of the traffic on existing
major roadways.
• Support artists and artisans and provide opportunities for public art
From the beginning our intent is to support and provide opportunity for the burgeoning artist
community to flourish by adding additional artist spaces, as well as affordable places for artists to live
and incorporate within the public spaces art.
• Expand the trail network and connectivity to downtown Bozeman,the North 7th Corridor,and
Story Mill Community Park
This project creates a through pathway and can become a hub of connection to the various sub districts.
• Consider the area's agricultural and light industrial historical legacy
The character of the buildings will incorporate attributes that pay homage to the legacy of the various
historical uses.
• Provide affordable housing options
Lastly- we are providing both affordable housing and attainable housing through a mix of unit types to
support the unique character of the neighborhood.
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II II JANUARY 2019
page 69
• •
SECTION 5 INFRASTRUCTURE
5.00 INFRASTRUCTURE STRATEGIES&SUMMARIES
5.01 WATER RIGHTS
CASH-IN-LIEU TABLE
WATER WELL PROPOSED FOR I.RRIGATLON
CONCURRENT CONSTRUCTION PLAN
COTTOMWOOD ¢ I®A
RESPONSE& RESUBMITAL II II JANUARY 2019
page 70
• 0
INFRASTRUCTURE STRATEGIES & SUMMARIES
CONTINUED
SITE ACCESSIBILITY
BELOW-GRADE PARKING GARAGE
Two of the residential buildings, the office building, and a portion c` the public open space 3re
constructed over a parking garage.
96 Parking spaces
Entry & exit to the parking garage is from Aspen Street in order to direct traffic to Wa.lace "-✓errue,
and reduce traffic impacts on Cottonwood Street and Ida Avenue.
EAST ASPEN STREET
The entire right-of-way adjacent to the property is currently undevelo:)ec.The proposal is tc,c,,�rstr,-,ct
a roadway,with sidewalk and other street improvements along the north and south side of t;e righ=-
of-way. In addition to the parking garage entry, the street will accommodate several parallel p3rling
spaces, and a loading zone.
EAST COTTONWOOD STREET
The Northern half of the right-of-way adjacent to the project site will ae improved. The irtention is
for the proposed improvements to match the character of recent improvements directly across h=
street -with sidewalk, street trees, and diagonal parking.
NORTH IDAAVENUE
The right-of-way adjacent to the project site will be improved with sidewalk, street tr?rs, curb,
and parallel parking. Improvements will continue East across the Id,= right-of-way up t3. Sul -i--t
including, the opposite curb.
PEDESTRIAN ACCESS
The 20'fire lane will serve as a through-block pedestrian connection between the active i:_:torwood-
Wallace Intersection, and the open green space at Aspen Street.
PUBLIC OPEN SPACES
The main open space on the site takes advantage of the distinctive Misco Mill and tie -.-IIDv3:ed
on-site building to create a plaza suitable for hosting food vendors, farmer's markets, F-ld sim:lar
community events; as well as daily informal use by the office tenants, residents, a-d Er6sa-i
community. Public services, such as event storage and restrooms will be located in the -=_nI3va.ed
building at the Southwest corner of the site.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 20'9
page 71
PARKING
The parking demand will be met primarily by the 96 space parking garage located partially
below-grade across most of the site. With nearby bus stops, and downtown within easy
walking and biking distance,we are able to provide residents and tenants with a community
that is less reliant on their cars for daily commuting and errands. With ample on-site bike
parking facilities, and a modest investment in carshare services, the reduced demand for
parking is crucial to creating a more attainable - and more diverse - set of housing options.
There will be accessible path of travel to commercial parking lot at Wallace&Aspen street.
@Ua � %� &UM [�, ij)�
COUNTS 38 36 18 92
CURRENT CODE RATIO 1.25 1.5 2 137.5
PROPOSED REDUCTION RATIO 1 1.25 2 119.0
BIKE PARKING CODE 14
PROVIDED 100(MIN)
BUILDING 4 3,591 PRIMARILY OFFICE 250 14.36
BUILDING 5 1.200 RESTAURANT(INDOOR) 50 24.00
700 RESTAURANT(OUTDOOR) 100 7.00
BUILDING 6 20,127 PRIMARILY OFFICE 250 80.51
16 COVERED BIKE AND -10% 18.051
LOCKERS
CURRENT CODE 117.8
PROPOSED PER PUD 40% 70.7
REDUCTION
ON SITE PARKING GARAGE 96 PRIMARILY RESIDENTIAL
OFF SITE LEASE 72 FOR NON-RESIDENTIAL USE WITHIN 800 FEET OF
ENTRANCE(S)
ON STREET 32 COUNTED TOWARD RESIDENTIAL ONLY
COVERED BIKE PARKING 88
ON SITE BIKE PARKING 50
TOTAL BIKE PARKING 138
TOTAL PROVIDED 200
TOTAL PER PUD REQUESTS 190
RESPONSE& RESUBMITAL II II JANUARY 2019
page 72
0 0
INFRASTRUCTURE STRATEGIES & SUMMARIES
CONTINUED
FIRE PROTECTION
Buildings 1 and 6 will have floors and/or roof decks at least 30 feet above the adjacent road where fire
equipment will have access. We are proposing standpipe systems in the exit stairs at the North end of each
of these buildings.
All of the buildings and the below-grade parking garage will be fully-sprinklered per NFPA-13, with the
exception of the single-story open-air existing building (building 5).
The site is surrounded by public right of way on the North, South and East sides. The West side of the site
will be maintained as a 20 feet wide fire equipment access route. Each side of the project will have at least
one direct and readily accessible access point from the street or on-site fire access route onto the top of the
parking garage,which functions as the ground floor for each of the buildings.
SOLID WASTE COLLECTION
A Trash room A serves the 64 studio and one-bedroom apartments in buildings 1 and 2. The 34 units
on the upper floors have access to trash and recycling chutes that terminate in a trash room at
street level. The trash chute will have a compactor, while the recycling chute will feed directly into a
dumpster.
The trash room is 300 sf (18 feet x 17 feet), and can accommodate up to four 4-yard dumpsters,
roughly 6 feel x 4 feet each, including the two at the chutes.Building staff will use a pallet jack to
move the dumpsters from the trash room to Aspen Street for pick-up, and will place them back in
the trash room once they've been emptied.
The 18 units on the ground floor will use a separate small trash room with four standard curbside
bins. Those b ns will be set out and retrieved by building staff.
B Trash room B serves the 28 one- and two-bedroom units in buildings 3 and 4, as well as the
commercial spaces in building 4. Residents and commercial tenants will place their trash and
recycling into standard curbside bins. The bins wit( be put out and retreived by building staff.
The trash room is 290 sf(21 feet x 14 feet) and is able to accommodate two 4-yard dumpsters for the
commercial tenants, and six curbside bins for the residential tenants. Building staff will place the
dumpsters and bins at Cottonwood Street for collection, and return them to the trash room when
they've been emptied.
C Trash room C serves the office building (building 61, with up to 90 employees. Janitorial staff will
collect trash and recycling from the offices, and place it in dumpsters and/or curbside bins. The
dumpsters and/or bins will be put out and retreived by building staff.
The trash room is 280 sf (15 feet x 19 feet), and able to accommodate up to four 4-yard dumpsters,
roughly 6 feet x 4 feet each.
D Trash room D serves building 5 and cafe staff will collect trash and recycling and place it in a
dumpster or =urb side bins. The bins/dumpster will be out by staff and retrieved by staff.The trash
enclosure is "0 feet x 10 feet and able to accomodate a four yard dumpster and recycling bin.
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 73
WATER RIGHTS
CASH-IN-LIEU TABLE
ISM
APARTMENT UNITS -- 92 -- 0.124 3,717,308 11.31
RESTAURANT 2,175 -- 165.000 -- 358,875 1.10
ARTISAN MANUFACTURING 4,500 165,000 742,500 2.28
(ASSUMED RESTAURANT]
OFFICE 28.700 10,000 287,000 0.88
IRRIGATION N/A(EXEMPT WELL FOR
IRRIGATION WATER)
TOTAL 15.67
LESS CILWR CREDIT FROM 0.00
LESS HISTORICAL ANNUAL AVG METERED USE -0.07
NET VOLUME FOR CILWR 15.60
FINAL CILWR FEE-18516 COTTONWOOD+IDA PUD fd$6,000/AF $93,593.00
WATER WELL PROPOSED FOR IRRIGATION
An existing well, located approximately in the Northeast corner of the project area, is proposed to be used for
landscaping irrigation. We have had discussions with the department of natural resources and conservation
and we understand that, as the project progresses, this use of the existing well is contingent upon providing
proof of water rights.
RESPONSE& RESUBMITAL II II JANUARY 2019
page 74
• •
CONCURRENT CONSTRUCTION PLAN
The Cottonwood & Ida project includes the construction of five new buildings and renovation of one existing
building with mixed use of commercial, multi-family residential and office/retail. Two of the proposed
buildings of which will be built on top of a podium above a parking garage. A courtyard/plaza, interior to
the site, will be a publicly-accessible space. These buildings will be constructed in a single phase. Off-site
infrastructure improvements will be necessary in conjunction with the aforementioned site improvements.
The Developer proposes concurrent construction of off-site infrastructure improvements in order to satisfy
the infrastructure needs of the project (water, sewer, storm drain and transportation) while progressing the
construction of the on-site parking structure, buildings and appurtenances.
It is anticipated that off-site sanitary sewer infrastructure will be the first public infrastructure element to be
installed, as it is the deepest utility, on average. Storm drain and water infrastructure will follow, as well as
widening the adjacent roads IAspen Street to the north, Ida Avenue to the west,and Cottonwood Street to the
south) to the approved roadway sections, including widened travel lanes, parking spaces, curb and gutter,
as well as landscaping boulevards and sidewalks. The anticipated construction durations for these off-site
infrastructure improvements are as follows:
SANITARY SEWER
- To be determined following PUDP review
STORM DRAIN
- To be determined following PUDP review
WATER
- To be determined following PUDP review
ROADWAY
- To be determined following PUDP review
ESTIMATED OVERALL COMPLETION DATE OF OFF-SITE INFRASTRUCTURE
IMPROVEMENTS
- To be determined following PUDP review
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
page 75
0 •
CONCURRENT CONSTRUCTION PLAN
CONTINUED
It is also likely that additional parking facilities within the Front Street Right-of-Way will be constructed in
conjunction with the proposed Cottonwood & Ida project—this will provide parking stalls within the ROW for
the City's purposes adjacent and to the northeast of the existing Boulder Park which lies northeast of the
on-site improvements.
While the off-site infrastructure improvements are progressing in their installation, it is anticipated that the
on-site improvements will be construction,with order and duration roughly as follows:
1. PARKING GARAGE CONSTRUCTION
- To be determined following PUDP review
2. BUILDINGS 1 AND 2
- To be determined following PUDP review
3. BUILDING 6
- To be determined following PUDP review
4. BUILDING 3
- To be determined following PUDP review
5. BUILDING 4
- To be determined following PUDP review
6. EXISTING BUILDING 5 RENOVATIONS
7. SITE IMPROVEMENTS, OVERALL COMPLETION DATE OF ON-SITE IMPROVEMENTS
- To be determined following PUDP review
The Developer understands the requirement that off-site infrastructure improvements must be designed,
constructed, and installed per Bozeman City standards and specifications, and ultimately approved by the
City of Bozeman prior to issuance of Certificates of Occupancy. Additionally the Developer understands and
witl comply with all parts of the BMC 38.270.030.D.
JAN 2 8 2619 ,1
L
Ut_i rtfl,�iiavi U
COMMQNITY D_ E MiIAK^�t,lf
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 76
SECTION 6 BUILDING & DESIGN
6.00 BUILDING DESIGN OBJECTIVES
6.01 BUILDING STRATEGIES
6.02 BUILDING MATERIALS
6.03 DESIGN VIGNETTES
RESPONSE& RESUBMITAL II II JANUARY 2019
page 77
0 0
��HN �U�� ���N���� ������K����
���m��o���� ���m���� �����mm���
FROM THE, ..~., . ..� ../~~~~.. REPORT
'The ^xok and (ee| n( the core /s cec|-e( /osdpn4's see ikoxr_phes and idpnjhwi(h the
ne� hho � d D ! �� i b sf/ d nN h � � h i� maintaining
/� , mo e`e npsge su eg[ ro nmgan p ec mg ns 'o,cuesser a z
t�p ros/denJs* cuduoi connecUcr, to lthe db- �stmryasoeH as the!, neighborhood identity asa
'/unky,* cxalxe. and d\veoe place to [^e. work and play."
Drawing heavily from community input gathered during the R/UDAT workshop held in apri-, 2017, a number
of design priorities have been identified:
NEIGHBORHOOD INTEGRATION The project wit( be responsive to the existing scale, massing. and Land uses in the surrounding
neighborhood,and wiR build upon the eclectic and creative spirit valued bythe Northeast?rn rEighborhood
residents. The majority of the parking will be placed in an underground garage to minimize its impact,
and in promote a pedestrian oriented and bike-friendly community.
DIVERSITY The site must provide a vide range of housing options for the resideois, and must -espect the
community's desire to have housing that is affordable and attainable by micdle-income ocat resicents.
The development must be truly mixed-use; bringing economic opportunities with new offices and maker
spaces, housing options for residents of all walks of Ute, and much'neeced community amenities and
open spaces.
CHARACTER The design of the site and buildings will enhance the neighborhood; providing a contemporary tawe on
materials and forms already present and familiar in nearby homes and bus:nesses.
SUSTAINABUU ]TY
The site will be developed to be environmentally, economically,and socially sustainable.We 3recurrently
pursuing site-wide LEED Neighborhood Development Certification, and are committed |nzradics\ and
progressive green building practices. The office space and workshops will offer new a-idexpanded
opportunities for local businesses; white the community rooms, open spaces, and overall -tegrat on of
residential, produchon, and business usesviU support vibrant, creative, and diverse community for
years tocome.
RESPONSE& RESUBMITAL11 || JANU/\RY2019
page7O
• 0
BUIL®IMGSTRATEGIES
NEIGHBORHOOD INTEGRATION OUTDOOR ROOMS
• Respect the variety of building sizes and forms • Provide outdocr rooms of different sizes to
in the neighborhood, and offer a similar variety accommodate 3 variety of uses - from small
in the design of the individual buildings, and groups to large-public events
portions of building • Screen the edges of the outdoor spaces to
• Design the ground floor of all buildings with preserve privacy within the nearby residences
a pedestrian scale - residential stoops, main . Respond to the solar orientation of our open
street storefronts, sheltered entries, inviting spaces - offer shade in the summer, and sun in
lobbies the winter
CHARACTER MATERIALS
• Design each building to be distinctive while
maintaining a coherent and cohesive project • Select materials that evoke the industrial
aesthetic heritage of the site, yet are appropriate for
residential uses, and result in durable and
• Develop individual details that respect the value sustainable structures
that the community places on its own eclectic
and creative culture
NIP
10
74
al ,'
.70
;, -1 15,
JN
�•� ',K.��• ��.'tr �\k'_ �� i h!f C\ i^��-ate _
AERIAL LOOKING NORTHWEST
RESPONSE& RESUBMITAL II I I JANUARY 2019
page 79
• •
BUILDING MATERIALS
Exterior materials have been selected in order to reference the residential and industrial buildings found
throughout the Northeastern neighborhood. The materials will be durable, with consideration given to
reducing maintenance costs for the residents where feasible. Primary exterior wall surfaces will be faced
in panel siding, and both corrugated and standing seam metal siding;while ground floor access points that
are protected from the elements - entryways, stoops, storefronts, etc. - Will have wood siding. Railings,
sunshades,fences,and similarly scaled items are still being designed but may consist of wood,steel frames,
and/or perforated corrugated metal.
Exterior materials include the following:
• Wood Siding
• Panel Siding
• Standing Seam Metal Roof and Siding
• Horizontal and Vertical Sun Shades
• Horizontal and Vertical Corrugated Metal Siding
1
4• v 'M
WOOD SIDING PANEL SIDING STANDING SEAM HORIZONTAL AND CORRUGATED
METAL ROOFING VERTICAL SUN METAL SIDING
AND SIDING SHADES
COTTOMWOO® ¢ I®A
RESPONSE& RESUBMITAL II II JANUARY 2019
page 80
0
DESIGN
z
� l�l
1� ��ltlu►
COTTONWOOD 11 1 THE CENTRAL COURTYARD
A �
ASPEN STREET
~� r
•r r� �• r
•��� ���� t , `,.it �� ��� � a
T( L r14��1��•�j,'
i
COTTONWOOD 1 i
page 81
• •
STREET EDGE DESIGN
The perimeter of the site, and the adjacent right-of-way improvements will provide safe, pedestrian routes,
landscaped with street trees and sidewalk planting; and activated with workshop spaces, residential stoops,
and welcoming lobbies.
a ' 'oil
1 i dl�
COTTONWOOD STREET
r
IDA AVE NUE TOWNHOUSE-STYLE UNITS
RESPONSE& RESUBMITAL II II JANUARY 2019
page 82
LIC R 51. 1C t
pwitl of riet So f'the`se a roof o k hop,and dog
wash,will be used only by-to esid and the��tive cottonwood frontage
will be shared with the surroundin o m iKemufdoorw sible open spaces offer pedestrian
paths through the site as well, providing a space for street life to weave its way through the block.
A VARIETY OF HOUSING TYPES
In order to serve a diverse group of residents, the
project will provide a broad range of housing types.
The individual buildings will host specific apartment
types that will attract different demographic groups,
while the community facilities will provide social _
spaces for them to mix. At the same time, the
provision of maker and office spaces will allow for
the convenience of a live-work lifestyle. -
BUILDING 1 will contain studio and 1-bedroom
apartments-. The building will also accommodate ,
most of the resident amenity spaces: roof deck,
package room, bike workshop, dog wash, etc.
BUILDING 2 will be dedicated to smaller studios. —
These "micro-units" will be provided with generous
common kitchens, living rooms, home office spaces,
and dining rooms to encourage community.
BUILDING 3 will be divided into modest 1-bedroom
flats and family-size 2-bedroom townhouse-style
units.
BUILDING 4 will make up the most urban edge of
the project, and consist of ground floor 1-bedroom
flats behind the makerspace workshops. The units
on level 2 and 3 will be 1- and 2-bedroom townhouse
/loft units.
r�
� o � a1ea'w'73M 4.d
, —
A
COTTONWOOD ¢ IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 83
SECTION 7 SIGNAGE
7.00 COMPREHENSIVE SIGN PLAN
COYYOMWOO® ¢ I®A
RESPONSE& RESUBMITAL II II JANUARY 2010
page 84
• 0
COMPREHENSIVE SIGN PLAN
The following information and accompanying drawings are to provide allowable areas per building along with
location of proposed signs to the extent possible given the current extent of building design and possible
tenants uses. Permitted sign areas are given for at( buildings.
The construction type, graphics and lighting design styles are covered below:
GENERAL SIGNAGE GUIDELINES
General building and tenant signage limitations are described below and in the attached comprehensive sign
plan drawings. The following are general criteria.
• Prior to any fabrication of any sign, a sign permit must be obtained by the City of Bozeman. All signs and
sign lighting must comply with the City of Bozeman Unified Development Code requirements and with
this comprehensive sign plan
• The following sign materials are encouraged
• Wood
Metal
• Frosted glass
• Acrylic sheet in appropriate colors and limited quantity
• Signs are encouraged to be constructed three dimensionally and not solely flat painted surfaces.
PERMITTED SIGN TYPES
The following sign types are permitted for the Cottonwood and Ida project
• Blade signs
• Projecting blade signs that address pedestrian users are highly encouraged
• Blade signs shalt be integrated into the building facade design both in placement and materiality
• Blade sign dimensions are governed by the City Sign Code
Internally tit blade signs are not permitted
• Wall signs
• Wall signs shall have a three-dimensional quality to them with either raised letters or cut-outs providing a reveal
from the surface that it is attached to
• All fasteners are encouraged to be hidden where possible
• Back lit signs are permitted on wall signs
• Signs lit from the front face are not permitted
• Temporary free-standing signs
• Temporary signage may be place outside of the tenant space and at plaza entries during tenant hours and is
encouraged
• Temporary freestanding signs must be placed as to not impede pedestrian traffic
• Signs not permitted
In addition to signs not permitted by the City of Bozeman Unified Development Code,the following sign types are not
permitted.
Exposed or surface mounted box or cabinet style signs
• Signs which are not professional in appearance
'n
1-9
COTTONWOOD + °L "'s"`' *
I1MUNIIY°EiIEL 'f�(41ChJ f
RESPONSE& RESUBMITAL II II JANUARY
page 85
0 •
COMPREHENSIVE SIGN PLAN
CONTINUED
PROPOSED SIGNS
Sign quantities, locations and types are subject to change and the tenant space sign allocations are subject
to change. Any adjustment to the sign quantities will not result in signs in excess of the total amount
allowed per the building.
• General site signs allowed per 38.560.050 signs exempt from permit
On premise directional signs not exceeding 4 sf in area and 5 feet in height
• Lot 1:4 directional signs per above-location TBD
• Lot 2:4 directional signs per above-location TBD
• Lot 3:4 directional signs per above-location TBD
• Lot 4:4 directional signs per above-location TBD
• Building 1 -Residential Building Identifier
Total signage allowable 8 sf
• Signs proposed:
Wall sign 8 sf
• Building 2-Residential Building Identifier
Total signage allowable 8 sf per frontage
• Signs proposed:
Wall sign 8 sf-along Ida Avenue
Walt sign 8 sf-along Aspen Street
• Building 3-Residential Building Identifier
Total signage allowab.e 8 sf per street frontage
• Signs proposed:
Wall sign 4 sf;along Ida Avenue
Wall sign 4 sf- along Cottonwood Street
• Building 4
• Total signage allowab.e
8 Sf-Residenlia:Building Identifier
250 Sf total-all zommerciat spaces maximum
• Signs proposed:
Wall sign 8 sf-Residential Identifier along Cottonwood Street
General buildi.-ig signage reserved 40 sf allowed/0 proposed
Tenant space 50 sf allowed/two 8 sf projection signs proposed
Tenant space 2::30 sf allowed/8 sf projection sign proposed
Tenant space 3::30 sf allowed/8 sf projection sign proposed
Tenant space a:30 sf allowed/8 sf projection sign proposed
Tenant space 5::30 sf allowed/8 sf projection sign proposed
Tenant space o::30 sf allowed/8 sf projection sign proposed
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
page 86
• 0
COMPREHENSIVE SIGN PLAN
CONTINUED
PROPOSED SIGNS
Sign quantities, locations and types are subject to change and the t=--ant space sign allocation are subject
to change. Any adjustment to the sign quantities will not result in signs in excess of the total amount
allowed per the building.
• Building 5
Total signage allowable 82.5 Sf
• Signs propcsed:
Wall s gn 72 sf
• Building 6
Total signage allowable 159 sf
• Signs propcsed:
General building wall signs 4 at 10 sf each 140 sf)
Tenant roster signs 3 at 16 sf each(48 sf)
Level 1 tenant allowance 24 sf
Level 2 tenant allowance 24 sf
Level 3 tenant allowance 24 sf
Total signage proposed with allowances 156 sf
COTTONWOOD + IDA
RESPONSE&RESUBMITAL II II JANUARY 2019
page 87
COMPREHENSIVE SIGN ELEVATIONS
RE S.GE'NT,AL BUILDING
'DENTIFiER8SF RE.SIDENT,Al-Bu!LDitvG
IDENTIFIER 4 SF
i
- t
S-ON 36 Sf J � �'�i' LF----L
� � CIO'
EL,
�
:I 0
-
'_
I•
I I
PRC iE-T+NG S:GN5
VAX R SF
SITE ELEVATION-SOUTH(COTTONWOOD)
v1s•=r-0-
PROJECTING SIGNS RESIDENTIAL BUILDING
MAX 8 SF DE.NTIFIER 8 SF
r �
a
I �_; I
-= = 8
11 79 El 9 9 -71
I 7 LT
L_ - -
SITE ELEVATION-EAST(IDA)
vi 6-=r-0°
(C0770mvV0013 ¢ ODA
RESPONSE& RESUBMIJAL II II JANUAHY 2019
page 88
COMPREHENSIVE SIGN ELEVATIONS
CONTINUED 71,.%VP E�
GENERAL B'JIL DING AL SC PLACE'-AT ALL F-BL
CENTIF ER IJSF EACH ENTRIES SCI. TH EAS' 'ESP
FACADE E ACH ACDI'IONA,
D,
I I IT
-7 FTT
- _ 4
f I
I
tC iE N' .. E: .C+rv'• Rt v' A Et. _` N'_
'iti.a>\,'�,�5'EF aSF
SITE ELEVATION-NORTH(ASPEN)
ins.=r-o'
L !
5 i I
SITE ELEVATION-WEST(MISCO MILL)
vas'_�-o•
RESPONSE& RESUBMITAL II II JANUARY 2019
page 89
a
SECTION 8 APPENDICES
A PRELIMINARY SCHEDULE
B TITLE REPORT
C GEOTECH REPORT
D WEED MANAGEMENT PLAN
E TRAFFIC STUDY
F SEWER AND WATER FLOW CAPACITIES
G WELL LOG REPORTS
H AGENCY LETTERS IF ANY
I MAILING LIST OFADJOINERS
J PLANNING DEPARTMENT COMMUNICATIONS
K LEED DOCUMENTS
L CONDOMINIUM DOCUMENTS
007 0=313 ¢ ROA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
FS ND
�1
S A N D E R S 0 N %V7f
February 12,2019 S T E W A R T
Mr. Erik Nelson
Imperial Development LLC
33 N. Black Ave.
Bozeman,MT 59715
Memo: Combined Stormwater Detention Facilities—Shared facility,easement, calculations
Cottonwood&Ida Mixed-Use Development
Bozeman,Montana
Dear Erik,
The Cottonwood&Ida project proposes to construct a subsurface chamber system that will be
vertically situation between above the high groundwater level and beneath the proposed grade of the
finished surface. This subsurface chamber system will provide stormwater detention storage volume
for both the on-site stormwater runoff as well as the off-site (public right-of-way) stormwater runoff
for the Aspen Street roadway located north of the subject site.
Based on our meeting with Griffin Nielsen on 2/11/19 in the City offices, I have provided the
following calculations as a general overview of the design intent of accommodating both public and
private stormwater detention volumes in the proposed stormwater system. This letter supplements
the "Private Utilities Plan," sheet C1.2 showing how the communications, fiber, telephone,sewer,
water, storm drain,power and gas utilities interface with each other. Public,as well as private,utility
easements are also diagrammatically shown on this sheet.
Rational Method Stormvater Calculations
Stormwater calculations have been performed based on the City of Bozeman design
storm/stormwater design manual. These calculations are separated by on-site improvements and
off-site (public right-of-way) improvements—that is to say,additional impervious surface as a result
of the proposed development.
Results of Rational Method Calculations
0
Pre-development conditions were assumed to mean"greenfield" conditions—that is to say,open
field/native conditions prior to what currently exists on site (warehouse buildings,pavement,
concrete,rooftops,etc. This is a conservative pre-development condition because this site has
experienced runoff with the hardscape improvements that are extent throughout the site for several
decades. The pre-development runoff under these assumed conditions is:
Pre-Development Peak Runoff Flow= 0.17 cfs/acre
To Plan and Design
Enduring Communities...
www.sa n d e rso n stewa rt.co m
Mr. Erik Nelson
February 7,2019
We compared this pre-development runoff and restricted our allowable discharge from the
combined public/private stormwater detention system to this flow. We assigned this conservative
pre-development peak runoff flow restriction to both the private (site) stormwater detention as well
as the public (off-site public right-of-way) stormwater detention. The resulting necessary detention
volumes were thus:
Private/site detention volume requirement= 4,615 cubic feet
Public/Aspen Street detention volume requirement = 286 cubic feet
Combined private/public detention volume requirement = 4,901 cubic feet
Designed/programmed detention volume = 7,000 cubic feet(see below)
Proposed Stormwater System
As this stage of the design is preliminary in nature and this document is being produced in
conjunction with the Preliminary Planned Unit Development(PUDP) application,we have
conservatively programmed and designed for 7,000 cubic feet of storage volume by utilizing a
subsurface chamber system that occupies the area of the Emergency Vehicle Access along the
western extents of the site. For purposes of the PUDP submittal, this should satisfy the City's need
to adequately plan for the development as well as the adjoining roadway and the corresponding
increases of stormwater runoff.
Please let me know if you have any questions.
Sincerel ,
Mike Russell,PE,MBA
Project Manager, Senior Engineer
mrusseU@sandersonstewart.com
Sanderson Stewart
Attachments: Stormwater Calculations
2
Project:Cottonwood Ida Mixed Use Development
Project 2 S A N D E R S O N % �
Date:l/9/2019 2019
RATIONAL METHOD FOR RUNOFF CALCULATIONS S T E WA R T
Pre-Development Runoff'Volume (for on-site drainage)
Design Storm Frequency= 10 years
Discharge Rate,d= 0.00 cfs
Input values for runoff coefficients from appropriate tables.
Runoff Frequency Calculation
Area rea Coefficient Factor Value
A [A/:(43W felaae) C Cf C x Cf C' C'x A
Surface T e (ft) cres =(C x Q<or=t Acres
Gravel 0 0.000 0.7 1 0.70 0.70 0.000
Rooftop 0 0.000 0.95 1 0.95 0.95 0.000
Concrete 0 0.000 0.95 1 0.95 0.95 0.000
Open Land(assumed greenfield) 90169 2.070 0.2 1 0.20 0.20 0.414
Asphalt 0 0.000 0.95 1 0.95 0.95 0.000
Totals 90169 2.07 0.414
Weighted Runoff Coefficient,Cud - SCiAi -- - 0.2000 /�"wd x Cf= 0.20
SA,
Cwd x Cf x SAi= 0.41
Where Ci is the adjusted runoff coefficient for surface type j
and Aj is the area of surface type j
A=rrr2
Rainfall Rainfall Runoff Volume Discharge Volume Site Detention Peak Flow
Duration,t Intensity,i =C"x SAi x i x t =d x t =RmoQ Vohme-Discharge Volume =Cwd x SAi x i
(m'n) (ft'�S)
1 9.16 227.58 0.00 227.58 3.79
5 3.22 399.73 0.00 399.73 1.33
10 2.05 509.48 0.00 509.48 0.85
15 1.58 587.17 0.00 587.17 0.65
20 1.31 649.37 0.00 649.37 0.54
25 1.13 702.12 0.00 702.12 0.47
30 1.00 748.38 0.00 748.38 0.42
35 0.91 789.87 0.00 789.87 0.38
40 0.83 827.66 0.00 827.66 0.34
45 0.77 862.49 0.00 862.49 0.32
50 0.72 894.89 0.00 894.89 0.30
55 0.68 925.25 0.00 925.25 0.28
60 0.64 953.86 0.00 953.86 0.26
75 0.55 1031.34 0.00 1031.34 0.23
90 0.49 1099.30 0.00 1099.30 0.20
105 0.44 1160.24 0.00 1160.24 0.18
120 0.41 1215.75 0.00 1215.75 0.17
150 0.35 1314.50 0.00 1314.50 0.15
180 0.31 1401.12 0.00 1401.12 0.13
360 0.20 1785.81 0.00 1785.81 0.08
720 0.13 2276.13 0.00 2276.13 0.05
1440 0.08 2901.06 0.00 2901.06
1,215.75 f? 0.17 (ft'/s)
Project:Cottonwood Ida Mixed Use Development
Project 2 S A N D E R S O N 600
Date:l/9/2019 2019
RATIONAL METHOD FOR RUNOFF CALCULATIONS S T E WA R T
Post-Development Increase in Impervious Cover(for on-site improvements)
Design Storm Frequency= 10 years
Allowable Discharge Rate,d= 0.17 cfs
Input values for runoff coefficients from appropriate tables.
Runoff Frequency Calculation
Area Area Coefficient Factor Value
A A/(43560 e'/acre) C Cr C x Cr C' C'x A
Surface Type (f6 Acres =1C=Q<or=t Acres
Gravel 0 0.000 0.7 1 0.70 0.70 0.000
Rooftop 39541 0.933 0.95 1 0.95 0.95 0.886
Concrete 39541 0.908 0.95 1 0.95 0.95 0.862
Grass,Landscaping,Field 4000 0.092 0.25 1 0.25 0.25 0.023
Asphalt 6000 0.138 0.95 1 0.95 0.95 0.131
Totals 89082 2.0700 1.9022
Weighted Runoff Coefficient,(:wd _ SCjAi
0.9189 Cwd x CF= 0.92
SAi
Cad x Cf x SAi= 1.90
Where Ci is the adjusted runoff coefficient for surface type j
and Ai is the area of surface type j
A=m2
Rainfall Rainfall Runoff Volume Discharge Volume Site Detention Peak Flow
Duration,t Intensity,i =C- a SA_i=t =d x t =Runoff Voh=e-3Discharge Volume =Cwd a SAl a i
(min)
1 9.16 1045.66 10.13 1035.53 17.43
5 3.22 1836.67 50.66 1786.01 6.12
10 2.05 2340.94 101.31 2239.63 3.90
15 1.58 2697.88 151.97 2545.91 3.00
20 1.31 2983.67 202.62 2781.05 2.49
25 1.13 3226.04 253.28 2972.76 2.15
30 1.00 3438.61 303.94 3134.67 1.91
35 0.91 3629.23 354.59 3274.64 1.73
40 0.83 3802.87 405.25 3397.62 1.58
45 0.77 3962.92 455.91 3507.01 1.47
50 0.72 4111.78 506.56 3605.22 1.37
55 0.68 4251.26 557.22 3694.04 1.29
60 0.64 4382.72 607.87 3774.84 1.22
75 0.55 4738.73 759.84 3978.89 1.05
90 0.49 5050.98 911.81 4139.17 0.94
105 0.44 5330.98 1063.78 4267.20 0.85
120 0.41 5586.04 1215.75 4370.29 0.78
150 0.35 6039.80 1519.68 4520.11 0.67
180 0.31 6437.78 1823.62 4614.15 0.60
360 0.20 8205.34 3647.24 4558.09 0.38
720 0.13 10458.20 7294.48 3163.71 0.24
1440 0.08 13329.61 14588.97 ----- 0.15
4,614.15 ft3 6.12 (ft3/s)
Project:Cottonwood Ida Mixed Use Development
Project 0 SANDERSON
Date:2/11/2019 19
RATIONAL METHOD FOR RUNOFF CALCULATIONS S T E WA R T
Aspen Street ROW drainage (at full build-out)
Design Storm Frequency= SO years
Allowable Discharge Rate,d= 0.17 cfs
Input values for runoff coefficients from appropriate tables.
Runoff Frequency Calculation
Area Area Coefficient Factor Value
A A/(43s60 tt/Iae) C C f C x Cf C' C'x A
Surface Type (ft) Acres =(C z Q<or=t Acres
Gravel 0 0.000 0.7 1 0.70 0.70 0.000
Rooftop 0 0.000 0.95 1 0.95 0.95 0.000
Concrete&Asphalt 13500 0.310 0.95 1 0.95 0.95 0.294
Grass,Landscaping,Field 2500 0.057 0.25 1 0.25 0.25 0.014
Totals 1 16000 0.3673 0.3088
Weighted Runoff Coefficient,Cud - SCA -
- - 0.8406 Cud x C f= 0.84
SAi
Cud x Cf x SA,= 0.31
Where Ci is the adjusted runoff coefficient for surface type j
and Ai is the area of surface type j
A=rrr2
Rainfall Rainfall Runoff Volume Discharge Volume Site Detention Peak Flow
Duration,t Intensity,i =C�z SA z i z t =d x t =Runoff Votume•'.c6 ge Volume =Cwd z SAj z i
(min) (in/hr) (ft) (ft� (ft� (ft'/s)
1 9.16 169.73 10.13 159.60 2.83
5 3.22 298.13 50.66 247.47 0.99
10 2.05 379.98 101.31 278.67 0.63
15 1.58 437.92 151.97 285.95 0.49
20 1.31 484.31 202.62 281.69 0.40
25 1.13 523.65 253.28 270.37 0.35
30 1.00 558.16 303.94 254.22 0.31
35 0.91 589.10 354.59 234.51 0.28
40 0.83 617.28 405.25 212.03 0.26
45 0.77 643.26 455.91 187.36 0.24
50 0.72 667.43 506.56 160.87 0.22
55 0.68 690.07 557.22 132.85 0.21
60 0.64 711.40 607.87 103.53 0.20
75 0.55 769.19 759.84 9.35 0.17
90 0.49 819.88 911.81 ----- 0.15
105 0.44 865.33 1063.78 ----- 0.14
120 0.41 906.73 1215.75 ----- 0.13
150 0.35 980.38 1519.68 ----- 0.11
180 0.31 1044.98 1823.62 ----- 0.10
360 0.20 1331.89 3647.24 ----- 0.06
720 0.13 1697.58 7294.48 ----- 0.04
1440 0.08 2163.67 14588.97 ----- 0.03
285.95 ft' 0.49 (ft'/s)
BOZ E MA MT
Community Development RC
REVISION AND CORRECTION SUBMITTAL FORM
ADDITIONAL OR REVISED PLANS OR DOCUMENTS FOR AN ACTIVE PROJECT WILL NOT BE
ACCEPTED UNLESS ACCOMPANIED BY THIS COMPLETED FORM. MAILED RE-SUBMITTALS
THAT DO NOT INCLUDE THIS FORM OR THAT DO NOT CONTAIN THE CORRECT NUMBER OF
COPIES WILL NOT BE PROCESSED. FEES ARE REQUIRED FOR THIRD AND SUBSEQUENT
REVISIONS.
SUBMITTAL REQUIREMENTS
All revisions / correction submittals must contain the following:
:�_-
❑o A completed RC revision/correction submittal form.
The same number of copies and sizes and formats (including digital) as required for the initial
application. Plans and documents, including digital files must meet plans, specifications and naming
protocols. See form PLS.
Revised drawings must be updated with a new current date on each revised sheet.Title sheet table of
contents/plan schedule must be updated with new dates for each sheet modified. If complete plans sets
are updated, retain the original date on sheets that have not been updated or revised.
A written narrative that shows an itemized summary of your submittal and description of each change or
revision in detail or document. Changes to plans sheets must include sheet and detail numbers.
❑■ All changes must be clouded or highlighted on each plan set.
❑■ Legal documents, studies, letters or other documentation must have a clear date of revision on the front
page.
❑■ Fees are required for a third and subsequent submittal of revised/cor4 c'd'ma(teMs.T i,e fee's i/a�off the
total original application fee. L�I
❑■ Re-submittal of plans must be complete plan sets if individual sheet ar-e- o' di#'9d @o2§%vi- al beets
will be accepted.
i
0■ RC form must be the first item in all resubmitted sets. DEPARTPliENT OF
COMMUNITY DEVELOPMENT
INFORMATION
Application #18516 Application P P U D
file #: type:
Project Name: Cottonwood and Ida
Contact Name: Erik Nelson
Phone: 406-539-1176
Email: erik@thinktankarchitects.com
Revision and Correction RC Page 1 of 2 Revision Date 3-20-18
Required Forms: PLS
SUBMITTAL TYPE
NEW CHANGE: A revision or change that the applicant has made to a plan that is currently under review
that is new and has not been reviewed before.
CORRECTION: A correction to the plans that is an applicant response to a correction letter written by the
City to the applicant.
If both types are being submitted, the written narrative required above listing itemized changes must clearly
differentiate between changes and corrections and each must be clearly labeled. Changes to preliminarily
approved plans or approved plans are processed under the modification application process, use form MOD
for those changes.
Re-submittal of plans must be complete plan sets if individual sheets are modified. No individual sheets
will be accepted.
CITY USE ONLY
Date / O Checked and
received: a. ( 3 I received by: SJV\ S
Number of In digital
sets "
submitted: copy Y/N:: \/
Superion
updated? Planner/Engineer:
Y/N:
DRC
Required? Date routed to
Y/N: Engineer:
01
If no DRC, date comments due to
planner. 10 working days from
submittal date typical:
CONTACT US
Alfred M.Stiff Professional Building phone 406-582-2260
20 East Olive Street 59715 (FED EX and UPS Only) fax 406-582-2263
PO Box 1230 planning@bozeman.net
Bozeman,MT 59771 www.bozeman.net
Revision and Correction RC Page 2 of 2 Revision Date 3-20-18
Required Forms: FP_Ls
E it
9
To: Brian Krueger
City of Bozeman Planning Department
Re: Cottonwood and Ida Mixed Use project PPUD
Resubmittal
Plan file#18516
Date: 2-13-19
Dear Brian,
Per some discussions with the Planning department we are providing some clarifications to our
plans prior to the DRC meeting scheduled for the 20th of this month. The following is the list of
information provided with this RC form.
• Clarification to Relaxation#10 Nonresidential parking reduction, Section 3.05 PUD
RELAXATIONS we have provided the entire section 3.01-3.05, but the modification only
exists on page 51
o DOCUMENT:C and I Section 3.01-3.05 Project Overview and PUD information 2-13-19
• Provided Private Utility plan per 38.410.060.B.3 This is a new sheet to be added. We
have also provided the Title sheet reflecting the updated drawings and dates
o PLANS: 0211-Cottonwood Ida--C1.2-Private Utilities Plan 2019.02.13
• Provided updated information for Stormwater New Appendices Item M
o Appendices:Appendix M Stormwater 2-13-19
We look forward to the moving through the review process and bringing this project to the
community as soon as possible to get their feedback on the high-level items. Please don't
hesitate to contact us should you have some initial thoughts or clarifications needed with these
clarifications and additions.
Sincerely,
Erik Nelson
Thinktank Design Group Inc.
Page �1
T H I N KTA N K D E S I G N th N.BLACK AVE BO.com lnfo@thinktankarchitects.com
Stan 406.587.3628
itectscom
thlnktankarchitects.com Info@thlnktankarchltects.com
c
00
Ile L
I .
COTTONWOOD + IDA MIXED-USE
� s
CONU
?3 f ----- T - ,unaminul�ynn y.cFr: y :�t rr DEVELOPMENT TA
AVBRAM,OVERSE,AITAWABIEOO/WMYNTXE
CORE OF IHEWORi7EAlTERWABOBOYODOO
�.^^F_ • I ) RDETO9EPLEORPTEYD RP LLC
OWNER BANGTAI PARTNERS,
LLC
PROxCTw"
L
SITE PLAN•SHEET INDEX
-•••'� . ,L PROACT TYPE
_ '.'i / - 'fJ RAVEDU(T aEVELaPLET7r INCLUDING,DWELLNOLMS,OFFICE BUILDING,ARTISAN MANUFACTURING
ARCMECTLRILL DATE ISSUED DEVELOPER CPA ENGINEERST -WART3 f -� WORKSHOP$PUBLIC COURTYARD.RENOVATION OF AN EXISTNGBUtDINGON SITE.ADD UNDERGROUND
AS.aB TRUE SlffT 01212ot9 CONTACT N PART TENS,LLC. CONTACT MKE RUSSE �. -
AS11B OVERALPROET SITE PUN o,2V2019 33IMT:JON EYAE CONTACT:ABCCK SRE P 1n , a.t� !\-� PROPOSED
77 NORTH BACK AVE 106 EASE BABCOCK STREET nA�
AS,11)1 ARCHITECTURAL SITE PLAN O1M20,9 BOZEMAN.Mr S97Is D0x91ANA MT ST715 '•� LA•� �.� \\ RESIDENTIAL
lI5E
AS. SITE USAGE INFORMATION PUN OVIV2019 AP541-1M70 M06922-A717 RESIDENTIAL COMMERCIAL MANUFACIWNG,COLILKNDYSPACE
AS.Ra ACCESSIBILITY DIAGRAMS OVAi2019 MRIBSEILaS�UOERSONB'fETVARi.00L1 - � Q } � ! ,IrovE
AS,IN SITE DETAILS OVt12019 � � .f', ._ DWELLNGS:
oONTACOPE DUNW.NC. BTIDICIUUL BDNEBR V �w `� 1. 92 DWELLINGS 910%TOMEETAFFORDABE HOUSENGORRANCE)
AS1'10 OVHWL FLOOR PLAN-LVLO 01/212019 O7616TH SIAN TREET
HOCiIN NSi90AN6IONK8 I15 � / �� A STUDIO UiTS /0
AS1'Ii OVERALLR-OOR PLAN•LVL1 0t2120U 17751tfM81REEr CONTACT:TYMOMTS/MATTCLONNG61 - ,���� +7�J_- L�,� `�'.. B. /®ROOM N PAOECT
AS.1'Ix OVERALL ROOK PLAN•IVLt OVNROU SAN FRANCISCO, TOO WEST BABCOCK STREET '�'L, µ7' ,YF 7N Rr`- .`��
AS1 3 OVERALL FLOOR PLAN-LVL3 0121/lOt9 115091085M BOffL1AN,MT 59715 sj` +wt_,sf-.y +_� f]7yyr�--,�,'� YU C. 2ffDR00M fe 170E
AS11M OVERALFLOORPLAN-ROOF LEVEL 0.2019 MARKNOOAN�OPENSCOPE9TIDIO.GAI 7M«xsgrats,KaxoOM } L,A- � d::.�" JII E.r� .� ♦1�i.1 p BUILDRD/6GHT(5): 52 FOOT MAXIMUM BUILDING 160R COTTONWOOD
AS1111 STREET ELEVATIONS 01212019 MLl MENwKCOM 7 �'-�`•'"P"7 t _ r 1, +
AS2112 SITE ELEVATIONS OV9Vm,9 TNMRANNDESINIGROIP Qfi `�,' I=._iI 'Ut1l`f Y ` M._Y}•-; NIA6EROFSUALONG3: 6TOTAl(SNEW.IRENOVATED) IDA
AS.ZO SITE ELEVATIONS 012t2o19 CONTACT:ERKNELSON/BRIMICALDWBL REP ENGINEER
33 NORM BLACK AVEEMERALD CITY ENGINEERS.NF •1 �'J TOTAL PARKING SPACES:MO
AS21H SIZE ELEVATIONS OVit2019 ` , 1. 9O SPACES N UNDERGROUND GARAGE
AS711 SIZE SECTIONS NGRTHSOUfH 07/2V2019 BOZEMAN.MT 59715 CONTACT'ADAM FRENCH P.E.I SHAWN DOI ly /f ) +�,• _
40SJWT-6m 21705HKHWAY99 � r�k �L.1T ;';_- 2. 32 SPACES AT ON87REET LOCATION
AS.K12 SITE SECTIONS EAST•N'EST 01/2VlO19 i, - 7: ./, i \', 3. 72 SPACES AT OFF-SE LOCATION
ERKOTHINKTAIKARCHIECTS.COM MOU T AKETERRACE.WA9O0D s v . �.
/S.313 STREET CROSS SECTIONS OvIll"I9 BRlAMQ7TN(TANKARO(IECTSCOM 425-741-1200 L"'1Y'U!3 /�L. INTENT
15 AFRENCHI@ELERALDCIIYENG.COII �jT-j�.{�/y '� �;�" CO7TONWOOD.IDAMCOEOk5E DEVELOPMENT WILL CREATE AVIBRANT AND DP49M COMMUNITY ON A 2-
FERNAU&HARTMAN ARCHITECTS sD01@EMERADarflRaC01A , r '�^•" � 'L'y.. + ACNE UMERUIMRED IDUSTRAL SITE.RlW1aNG THE MOST DIVERSE RANGE OF HOUSING TYPES
CONTACT:RICIMRD FERNAIL FNA '~� f
CIVIL SMMIESSTREET ACOUSTICAL �I7 r9 AVAaADLEM802aIua COTTI;NWOODBIDA
CIA E%L4IING TOPOGRA➢Y AAD DEMO 01272019 CLYDE PARK,MT SWIG CHNRLESM.SALTER ASSOCIATES D9G BOZENAH,Irr 59715
C1.1 PROPOSED LOT BOUNDARY Otramis Mo56eaaf97 CONTACT:EITNN SANER/FEUPE TAVERA CCC��� y
RF@FERAAUHARlYUHCOM 130 SUTTER STREET.FLOORS ' � ,�"
SAWF7.0442 O,GAN106 PROJECT Lonna 12MIEAREAAROUNDSITE
C21, PRIVATE NTIL7TV'PLAN 072Y2019 GENERAL CONTMROR SANFR0MA2
LANOAS O ASSOCIATES E IVULSILLTER@MSALTER.COM M EDGE
CLD 57DFW DRAIN PLAN o12vm,v CONTACT:LORENCANTRELL FETIPE.TAVEIU@CALVLLTER.COI VICINITY MAP PROJECT NARRATIVE 02.13-2019
CS URIrY RAN 01272019 1019 E MAN ST,SUITE 101
C5.0 EROSION CONTROL PLAN 01222019 �5971s
LNG ENVELOPE
OHEGER SITE PLAN-
C7.0 CIVIL CONSTRUCTION DETAILS 0,2220i9 LORENCOLAMOlAELCOM CONTACT MATUEW ELWORSTER
9 1 W PPE STREET,Um ls00 SP1
WOSCAPEARCNTECT SAN FRANCISCO,CA 04111 REVISIONS
FLETCHER SROO 415495-3700
LADSW'E CONTACT:DAVD FIETCHER/CHRIS WATKNS MSWORSTER@SGHCOM DATE.
U.W ILLUSTRATIVE SITE RAN OV2720,9 23253RD STREET,#Itl
L1.00 MATERIALS RAN OVL720,9 SANFRANCISCOCA94107 LLB I SUSTANABIlTY Ox/13R018
LI.Vl TAKEOFF RAN OV112019 41S�31.7878 KATH WILLIAMS-ASSOCIATES
L2W PLANT94G PALETTE 0,A2,2019 DFLETCHQt@FlETCHE7L3T1DI4COM CONTACT:KATHWl11PMS
1201 RANTNO RAN 01212019 CWATKNSpfI£rCHERSTUINO.COM P.0.B0K119,
flOZEMAKMr59771
13A0 TRRGATION PLAN 0,A212019 GEOTECINCAL ENGINEER 40566"1TS
LMAO GRADING PLAN OV272019 ALLIED ENGINEERING SERVICES KATHWTHWILLIA/SCOM
L1.01 97ORMWAIER RAN 012M019 CONI T:IEE EVA"
L5.00 SNOW STORAGE RAN 012V?OI9 3209COV Wr DRIVE LIGHTING DESIGN
LSAo LIGHTING DIAGRAM DU212ot9 BQZEMAK r59715 OPENSCOPE STUDIO.INC. _
M056520 SAN 221 CONTACT:GEORGIA KRAPF E
L7.W PERFORMANCE POINTS 01212019 LEVANSBALLEDENGPEERNG.CON 177011ITHSTREET ASNDIG7®
11 SAN FRANCISCO.CA
920641-6563
STTEUGEnlW GEOR%MUtAPF@OP0=OPESTIDID.COM
d EODI LUmLWIE SCHEDULE 012t2019
E1.W SITE UGHTNG Ota2019 HARE OF PROJECT: COTTONWOOD AND RA NLDOIBORHDOD DEVELOPMENT TITLE SHEET
EtAt SITE PHOTOOETRICS OVM,2019
3 LOCATION OF PROJECT: COTTONWOOD 6 D/L B07BMAK MT 59715
Mi SHMT9 BLOOD I LOT(S): BLOCK 105/LOTS 5.25
PARCELam(s) 207ACRES(N.013SaFT) eC
A AV9000
CONTACTS PROJECT INFORMATION
(i
�i
i
IJ CTl LL-
LLJ
N W W
tj } �
CD
U
y
O (1 m { D
WALLACE AVENUE —
GSas 05 as GS as — —
I GS SD
(CITY R/W)
0 d
r
U /
s
I , . $q a \ I
lilt a
98
al g
Dil
n —
,_ D
I
hr
a� �
�� � 1
_ I I
iIr
o
°
d I
IUt
--ramI
G C
� V
P
IDA AVE. i -
- �(
I TY C
r-- v i i
All
min p F A.-I
HIM Ril x 3 P. R m 3
S r'F S H. 411 1 p AOZ err `- X O Z Gl
8> 1
8 @@ Z z 0 0AN
rn a
9 A> g z� v T l l l l l l l
PRELIMINARY - FOR REVIEW
COTTONWOOD 8 IDA ONSITE
PNORTHERN PACIFIC ADDITION p S A N D E R S O N 4�
BOZEMAN,MONTANA $
IV UTILITIES PLAN s T E WA R T
PRIVATE
� � www.sanderonstewart.com
•
1--
��� 2i
LIJ
c� LIJ
o
>uiLi
a-L
t=--� V.
SECTION 8 APPENDIX A
PRELIMINARY SCHEDULE
. Jt
JAN 28 2019
COM ALINI1Y JEVEL0.,!"ME\l.
no
COTTom 000 IDA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
Cottonwood&Ida Mixed-Use Development m®Preliminary Project Schedule
ID Task Name iDuration ,start IFi nish ry l _, May 1 , September 1_.. lanuary_1 _ May 1 September 1_ January 1 May 1 ._ 15eptember 1 J
._.. _�__.. ! ___.__ r 2/_ _! _I 6/2 7/28 L9/22_,.L11/1�1/12�3/8 /3�6/28 8/23_I,10/18_L12/13 2/7 4/4 5/30 _7/25,1 9%19, ,11/14
1 iLANGLAS&ASSOCIATES,INC. 527 days Thu 5/23/19 Fri 5/28/21 LANGLAS&ASSOCIATES,INC.
2 1 Construction 527 days Thu 5/23/19 Fri 5/28/21 Construction
3 1 Early Work Amendments 13 days Thu 5/23/19 Mon 6/10/19 Early Work Amendments
7 Parking Garage 200 days Thu 5/23/19 Wed 2/26/20 1 Parking Garage
i
39 � Offsite Improvements 519 days Tue 6/4/19 Fri 5/28/21 ., Offsite Improvements
t -
40 Wallace Parking Lot(Use for 56 days Tue 6/4/19 Tue 8/20/19 f- 1 Wallace Parking Lot(Use for Contractor Parking During Construction)
Contractor Parking During
Construction)
I
55 ➢ East Aspen,Ida and East Cottonwood 519 days Tue 6/4/19 Fri 5/28/21 I East Aspen,Ida and East Cottonw
Streets
i I
I
82 Building 6-Office 240 days Thu 10/3/19 Wed 9/2/20 Building 6-Office
154 j Buildings 1&2-Rental Apt's&Studios 265 days Thu 10/10/19 Wed 10/14/20 1 Buildings 1&2-Rental Apt's&Studios
j I
226 Building 3&4-Townhouses&Lofts 260 days Thu 1/23/20 Wed 1/20/21 II Building 3&4 To nhouses&Lofts
I
302 Building 5-Renovation 120 days Thu 5/14/20 Wed 10128/201 1 Building 5-Renovation
r I
306 Substantial Completion 0 days Fri 5/28/21 Fri 5/28/21 Substantial Completion
Task Project Summary I Inactive Milestone O Manual Summary Rollup Deadline •
Project:Cottonwood&Ida Prelim Split ,,,,,,,,,,,,,,,,,,,,,,,,, External Tasks aiei5 Inactive Summary i'---------n Manual Summary I Critical
Date:Tue 10/2/18 Milestone ♦ External Milestone • Manual Task Start-only C Critical Split .........................
Summary 1 Inactive Task Duration-only Finish-only 7 Progress
Page 1
t
SECTION 8 APPENDIX 0
TITLE REPORT
RESPONSE& RESUBMITAL 11 11 JANUARY 2019
CHICAGO TITLE
INSUkANCE COMAN '
Policy No. : 7170-1-1-109058-2018.72156-215267676
CHICAGO TITLE INSURANCE COMPANY
GUARANTEE
CHICAGO TITLE INSURANCE COMPANY, a Florida Corporation, herein called the Company, guarantees the Assured against
actual loss not exceeding the liability amount stated in Schedule A which the Assured shall sustain by reason of any
incorrectness in the assurances set forth in Schedule A.
1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A
or with respect to the validity, legal effect or priority of any matter shown therein.
2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of
reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount
set forth in Schedule A.
PLEASE NOTE CAREFULLY THE LIABILITY EXCLUSIONS AND LIMITATIONS.AND THE SPECIFIC ASSURANCES AFFORDED BY
THIS GUARANTEE. IF YOU WISH ADDITIONAL LIABILITY, OR ASSURANCES OTHER THAN AS CONTAINED HEREIN, PLEASE
CONTACT THE COMPANY FOR FURTHER INFORMATION AS TO THE AVAILABILITY AND COST.
CHICAGO TITLE INSURANCE COMPANY
Countersigned:
(0�By: BY � �
1NSU
Authorized Officer or Agent 1�,....
Bradley C. Stratton o 0 o
.�
American Land Title Company of Montana
1800 W Koch St os SEAL } President
Bozeman, MT 59715
Tel:406-587-5563 i,,;«
Fax:406-587-8038 Attest:
Secretary
`!1
Note: This endorsement shall not be valid or binding
until countersigned by an authorized signatory. �s
ah,
u;
uF
Lt
�I
NJ
fA
72156 72156 Miscellaneous Guarantee Face Page 00_156
• Page i of 1 � •
SCHEDULE A
Policy Number: 7170-1-1-109058-2018.72156-215267676
Order No. 1-109058(Bangtail Partners,LLC)
Liability: $200.00 Fee: '3160.00
Dated: October 17,2018 at 8:00 A.M.
Assured: The County of Gallatin and in the City of Bozeman in Montana.
The assurances referred to on the face page are:
That, according to those public records which,under the recording laws, impart constructive
notice of matters relative to the following described real property:
Parcel A:
Lots 5 through 16, inclusive, all in Block 105 of The Northern Pacific Addition to The Ci v of
Bozeman, Gallatin County,Montana. Together with the vacated alley, adjacent and contiguous
thereto,pursuant to Ordinance No 628,recorded July 29, 1991 in Film 117,page 328,:ac::ord_ng
to the official plat thereof on file and of record in the office of the County Clerk Inc Recorder of
Gallatin County,Montana. [Plat No. C-23]
Parcel B:
Lots 17 through 28,Inclusive,all in Block 105 of The Northern Pacific Addition t the Ci-� A
Bozeman, Gallatin County,Montana. Together with the vacated alley adjacent aril contiguOus
thereto,pursuant to Ordinance No. 628,recorded July 29, 1991 in Film 117,page 132.3.
according to the official plat thereof on file and of record in the office of the County Clerk.and
Recorder of Gallatin County,Montana. [Plat No. C-23]
Title to said real property is vested in: Bangtail Partners,LLC,a California limited liabililry
company
subject to the matters shown below under Exceptions,which Exceptions are not reces.saril.,
shown in the order of their priority.
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
SCHEDULE A
Policy Number: 7170-1-1-109058-2018.72156-215267676
Order No. 1-109058(Bangtail Partners,LLC)
EXCEPTIONS:
PARCEL A:
1. Taxes or assessments which are not shown as existing liens by the records of any taxing
authority that levies taxes or assessments on real property or by the public records.
2. Unpatented mining claims; reservations or exceptions in.he United States Patents or in Acts
authorizing the issuance thereof, water rights, claims or title to water.
3. Title to any property beyond the lines of the real property expressly described herein, or title
to streets, roads, avenues, lanes, ways or waterways on which such real property abuts, or the
right to maintain therein vaults, tunnels, ramps, or any other structure or improvement; or any
rights or easements therein unless such property, rights or easements are expressly and
specifically set forth in said description.
4. Taxes for the year 2018 and subsequent years. Taxes for the year 2017 are paid. Taxes for
the year 2018 are a lien not yet due or payable. (Parcel No. RGH2O158)
5. Special assessments levied by the City of Bozeman for 2017-2018 under Account No. 33710:
First Half:
Arterial&Collector.
�r
District No. 8000 Street Maintenance.
District No. 8001 Tree Maintenance.
First Half Amount: Installment paid.
Second Half:
Arterial& Collector.
District No. 8000 Street Maintenance.
District No. 8001 Tree Maintenance. 4
A
Second Half Amount: Installment paid. 1,
1
No liability is assumed for any special assessments, snow removal, sewer assessment or
garbage assessment not set forth in the Assessment Books.of the City of Bozeman.
(Continued) rr
6
ui
SUBDIVISION GUARANTEE
Reorder Form No. 12421
SCHEDULE A
Policy Number: 7170-1-1-109058-2018.72156-215267676
Order No. 1-109058(Bangtail Partners,LLC)
6. Any right,title, or interest in minerals in or under said land including,but not limi-ed to,
metals, oil, gas,coal, other hydrocarbons, sand gravel or other common variety materials.,
stone,mineral rights,mining rights, easement rights,water rights,claims of title tc water c-
other matters relating thereto,whether expressed or implied and whether or not shown'-1y t-he
public records.
PARCEL B:
l. Taxes or assessments which are not shown as existing liens by the records of any --axing
authority that levies taxes or assessments on real property or by the public records
2. Unpatented mining claims; reservations or exceptions in the United States Patents or in Acts
authorizing the issuance thereof; water rights,claims or title to water.
3. Title to any property beyond the lines of the real property expressly described herein, or title
to streets,roads, avenues, lanes, ways or waterways on which such real property ab.zts, c-the
r_►en right to maintain therein vaults,tunnels, ramps, or any other structure or improvet; c=any
rights or easements therein unless such property, rights or easements are exoressl; anc
specifically set forth in said description.
4. Taxes for the year 2018 and subsequent years. Taxes for the year 2017 are paid. Taxes =o-
the year 2018 are a lien not yet due or payable. (Parcel No. RGH28111)
5. Special assessments levied by the City of Bozeman for 2017-2018 under Account No.
135880:
First Half:
Arterial&Collector.
District No. 8000 Street Maintenance.
District No. 8001 Tree Maintenance.
First Half Amount: Installment paid.
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
SCHEDULE A
Policy Number: 7170-1-1-109058-2018.72156-215267676
Order No. 1-109058 (Bangtail Partners,LLQ
Second Half:
Arterial &Collector.
District No. 8000 Street Maintenance.
District No. 8001 Tree Maintenance.
Second Half Amount: Installment paid.
No liability is assumed for any special assessments, snow removal, sewer assessment or
garbage assessment not set forth in the Assessment Books of the City of Bozeman.
6. Any right, title, or interest in minerals in or under said land including,but not limited to,
metals, oil,gas,coal,other hydrocarbons, sand gravel or other common variety materials,
stone, mineral rights, mining rights, easement rights,water rights, claims of title to water or
other matters relating thereto, whether expressed or implied and whether or not shown by the
public records.
END OF SCHEDULE A
SUBDIVISION GUARANTEE
Reorder Form No. 12421
• •
Guarantee Conditions and Stipulations (12/15/95)
SCHEDULE OF EXCLUSIONS FROM COVERAGE OF THIS GUARANTEE
1. Except to the extent that specific assurances are provided in Schedule A of this
Guarantee, the Company assumes no liability for loss or damage by reason of the
following:
(a) Defects, liens, encumbrances, adverse claims or other matters against the title,
whether or not shown by the public records.
(b) (1) Taxes or assessments of any taxing authority that levies taxes or assessments
on real property; or, (2) Proceedings by a public agency which may result in taxes
or assessments, or notices of such proceedings, whether or not the matters
excluded under (1) or (2) are shown by the records of the taxing authority or by
the public records.
(c) (1) Unpatented mining claims; (2) reservations or exceptions in patents or in Acts
authorizing the issuance thereof; (3) water rights, claims or title to water, whether
or not the matters excluded under(1), (2) or(3) are shown by the public records.
2. Notwithstanding any specific assurances which are provided in Schedule A of this.
Guarantee, the Company assumes no liability for loss or damage by reason of the
following:
(a) Defects, liens, encumbrances, adverse claims or other matters affecting the title to
any property beyond the lines of the land expressly described in the description
set forth in Schedule (A), (C) or in Part 2 of this Guarantee, or title to streets,
roads, avenues, lanes, ways or waterways to which such land abuts, or the right to
maintain therein vaults, tunnels, ramps or any structure or improvements; or any
rights or easements therein, unless such property, rights or easements are
expressly and specifically set forth in said description.
(b) Defects, liens, encumbrances, adverse claims or other matters, whether or not
shown by the public records; (1) which are created, suffered, assumed or agreed
to by one or more of the Assureds; (2) which result in no loss to the Assured; or
(3) which do not result in the invalidity or potential invalidity of any judicial or
non judicial proceeding which is within the scope and purpose of the assurances
provided.
(c) The identity of any party shown or referred to in Schedule A.
(d) The validity, legal effect or priority of any matter shown or referred to in this
Guarantee.
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
GUARANTEE CONDITIONS AND STIPULATIONS
1. Definition of Terms.
The following terms when used in the Guarantee mean:
(a) the "Assured": the party or parties named as the Assured in this Guarantee, or on
a supplemental writing executed by the Company.
(b) "land": the land described or referred to in Schedule (A)(C) or in Part 2, and
improvements affixed thereto which by law constitute real property. The term
"land" does not include any property beyond the lines of the area described or
referred to in Schedule (A)(C) or in Part 2, nor any right, title, interest, estate or
easement in abutting streets, roads, avenues, alleys, lanes, ways or waterways.
(c) "mortgage": mortgage, deed of trust, trust deed, or other security instrument.
(d) "public records": records established under state statutes at Date of Guarantee for
the purpose of imparting constructive notice of matters relating to real property to
purchasers for value and without knowledge.
(e) "date": the effective date.
2. Notice of Claim to be Given by Assured Claimant.
An Assured shall notify the Company promptly in writing in case knowledge shall
come to an Assured hereunder of any claim of title or interest which is adverse to the
title to the estate or interest, as stated herein, and which might cause loss or damage
for which the Company may be liable by virtue of this Guarantee. If prompt notice
shall not be given to the Company, then all liability of the Company shall terminate
with regard to the matter or matters for which prompt notice is required; provided,
however, that failure to notify the Company shall in no case prejudice the rights of
any Assured under this Guarantee unless the Company shall be prejudiced by the
failure and then only to the extent of the prejudice.
3. No Duty to Defend or Prosecute.
The Company shall have no duty to defend or prosecute any action or proceeding to
which the Assured is a party, notwithstanding the nature of any allegation in such
action or proceeding.
4. Company's Option to Defend or Prosecute Actions; Duty of Assured Claimant to
Cooperate.
Even though the Company has no duty to defend or prosecute as set forth in
Paragraph 3 above:
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
• •
GUARANTEE CONDITIONS AND STIPULATIONS (Continued)
(a) The Company shall have the right, at its sole option and cost, to institute and
prosecute any action or proceeding, interpose a defense, as limited in (b), or to do
any other act which in its opinion may be necessary or desirable to establish the
title to the estate or interest as stated herein, or to establish the lien rights of the
Assured, or to prevent or reduce loss or damage to the Assured. The Company
may take any appropriate action under the terms of this Guarantee, whether or not
it shall be liable hereunder, and shall not thereby concede liability or waive any
provision of this Guarantee. If the Company shall exercise its rights under this
paragraph, it shall do so diligently.
(b) If the Company elects to exercise its options as stated in Paragraph 4(a) the
Company shall have the right to select counsel of its choice (subject to the right of
such Assured to object for reasonable cause) to represent the Assured and shall
not be liable for and will not pay the fees of any other counsel, nor will the
Company pay any fees, costs or expenses incurred by an Assured in the defense
of those causes of action which allege matters not covered by this Guarantee.
(c) Whenever the Company shall have brought an action or interposed a defense as
permitted by the provisions of this Guarantee, the Company may pursue any
litigation to final determination by a court of competent jurisdiction and expressly
reserves the right, in its sole discretion, to appeal from an adverse judgment or
order.
(d) In all cases where this Guarantee permits the Company to prosecute or provide for
the defense of any action or proceeding, an Assured shall secure to the Company
the right to so prosecute or provide for the defense of any action or proceeding,
and all appeals therein, and permit the Company to use, at its option, the name of
such Assured for this purpose. Whenever requested by the Company, an Assured,
at the Company's expense, shall give the Company all reasonable aid in any
action or proceeding, securing evidence, obtaining witnesses, prosecuting or
defending the action or lawful act which in the opinion of the Company may be
necessary or desirable to establish the title to the estate or interest as stated herein,
or to establish the lien rights of the Assured. If the Company is prejudiced by the
failure of the Assured to furnish the required cooperation, the Company's
obligations to the Assured under the Guarantee shall terminate.
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
M
t.
GUARANTEE CONDITIONS AND STIPULATIONS (Continued)
5. Proof of Loss or Damage.
In addition to and after the notices required under Section 2 of these Conditions and
Stipulations have been provided to the Company, a proof of loss or damage signed
and sworn to by the Assured shall be furnished to the Company within ninety (90)
days after the Assured shall ascertain the facts giving rise to the loss or damage. The
proof of loss or damage shall describe the matters covered by this Guarantee which
constitute the basis of loss or damage and shall state; to the extent possible, the basis
of calculating the amount of the loss or damage. If the Company is prejudiced by the
failure of the Assured to provide the required proof of loss or damage, the Company's
obligation to such assured under the Guarantee shall terminate. In addition, the
Assured may reasonably be required to submit to examination under oath by any
authorized representative of the Company and shall produce for examination,
inspection and copying, at such reasonable times and places as may be designated by
any authorized representative of the Company, all records, books, ledgers, checks,
correspondence and memoranda, whether bearing a date before or after Date of
Guarantee, which reasonably pertain to the loss or damage. Further, if requested by
any authorized representative of the Company, the Assured shall grant its permission,
in writing, for any authorized representative of the Company to examine, inspect and
copy all records, books, ledgers, checks, correspondence and memoranda in the
custody or control of a third party, which reasonably pertain to the loss or damage.
All information designated as confidential by the Assured provided to the Company
pursuant to this Section shall not be disclosed to others unless, in the reasonable
judgment of the Company, it is necessary in the administration of the claim. Failure
of the Assured to submit for examination under oath, produce other reasonably
requested information or grant permission to secure reasonably necessary information
from third parties as required in the above paragraph, unless prohibited by law or
governmental regulation, shall terminate any liability of the Company under this
Guarantee to the Assured for that claim.
6. Options to Pay or Otherwise Settle Claims: Termination of Liability.
t
In case of a claim under this Guarantee, the Company shall have the following
additional options: !
(a) To Pay or Tender Payment of the Amount of Liability or to Purchase the
Indebtedness.
�i
(Continued)
{
i
i
1
SUBDIVISION GUARANTEE
Reorder Form No. 12421 1`
• •
GUARANTEE CONDITIONS AND STIPULATIONS (Continued)
The Company shall have the option to pay or settle or compromise for or in the name
of the Assured any claim which could result in loss to the Assured within the
coverage of this Guarantee, or to pay the full amount of this Guarantee or, if this
Guarantee is issued for the benefit of a holder of a mortgage or a lienholder, the
Company shall have the option to purchase the indebtedness secured by said
mortgage or said lien for the amount owing thereon, together with any costs,
reasonable attorneys' fees and expenses incurred by the Assured claimant which were
authorized by the Company up to the time of purchase.
Such purchase, payment or tender of payment of the full amount of the Guarantee
shall terminate all liability of the Company hereunder. In the event after notice of
claim has been given to the Company by the Assured the Company offers to purchase
said indebtedness, the owner of such indebtedness shall transfer and assign said
indebtedness, together with any collateral security, to the Company upon payment of
the purchase price.
Upon the exercise by the Company of the option provided for in Paragraph (a) the
Company's obligation to the Assured under this Guarantee for the claimed loss or
damage, other than to make the payment required in that paragraph, shall terminate,
including any obligation to continue the defense or prosecution of any litigation for
which the Company has exercised its options under Paragraph 4, and the Guarantee
shall be surrendered to the Company for cancellation.
(b) To Pay or Otherwise Settle With Parties Other Than the Assured or With the
Assured Claimant.
To pay or otherwise settle with other parties for or in the name of an Assured
claimant any claim assured against under this Guarantee, together with any costs,
attorneys' fees and expenses incurred by the Assured claimant which were authorized
by the Company up to the time of payment and which the Company is obligated to
pay.
Upon the exercise by the Company of the option provided for in Paragraph (b) the
Company's obligation to the Assured under this Guarantee for the claimed loss or
damage, other than to make the payment required in that paragraph, shall terminate,
including any obligation to continue the defense or prosecution of any litigation for
which the Company has exercised its options under Paragraph 4.
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
GUARANTEE CONDITIONS AND STIPULATIONS (Continued)
7. Determination and Extent of Liability.
This Guarantee is a contract of Indemnity against actual monetary loss or damage
sustained or incurred by the Assured claimant who has suffered loss or damage by
reason of reliance upon the assurances set forth in this Guarantee and only to the
extent herein described, and subject to the Exclusions From Coverage of This
Guarantee.
The liability of the Company under this Guarantee to the Assured shall not exceed the
least of:
(a) the amount of liability stated in Schedule A or in Part 2;
(b) the amount of the unpaid principal indebtedness secured by the mortgage of an
Assured mortgagee, as limited or provided under Section 6 of these Conditions
and Stipulations or as reduced under Section 9 of these Conditions and
Stipulations, at the time the loss or damage assured against by this Guarantee
occurs, together with interest thereon; or
(c) the difference between the value of the estate or interest covered hereby as stated
herein and the value of the estate or interest subject to any defect, lien or
encumbrance assured against by this Guarantee.
8. Limitation of Liability.
(a) If the Company establishes the title, or removes the alleged defect, lien or
encumbrance, or cures any other matter assured against by this Guarantee in a
reasonably diligent manner by any method, including litigation and the
completion of any appeals therefrom, it shall have fully performed its obligations
with respect to that matter and shall not be liable for any loss or damage caused
thereby.
(b) In the event of any litigation by the Company or with the Company's consent, the
Company shall have no liability for loss or damage until there has been a final
determination by a court of competent jurisdiction, and disposition of all appeals
therefrom, adverse to the title, as stated herein.
(c) The Company shall not be liable for loss or damage to any Assured for liability
voluntarily assumed by the Assured in settling any claim or suit without the prior
written consent of the Company.
9. Reduction of Liability or Termination of Liability.
All payments under this Guarantee, except payments made for costs, attorneys' fees
and expenses pursuant to Paragraph 4 shall reduce the amount of liability pro tanto.
(Continued)
t;
SUBDIVISION GUARANTEE
Reorder Form No. 12421
• •
GUARANTEE CONDITIONS AND STIPULATIONS (Continued)
10. Payment of Loss.
(a) No payment shall be made without producing this Guarantee for endorsement of
the payment unless the Guarantee has been lost or destroyed, in which case proof
of loss or destruction shall be furnished to the satisfaction of the Company.
(b) When liability and the extent of loss or damage has been definitely fixed in
accordance with these Conditions and Stipulations, the loss or damage shall be
payable within thirty (30) days thereafter.
11. Subrogation Upon Payment or Settlement.
Whenever the Company shall have settled and paid a claim under this Guarantee, all
right of subrogation shall vest in the Company unaffected by any act of the Assured
claimant.
The Company shall be subrogated to and be entitled to all rights and remedies which
the Assured would have had against any person or property in respect to the claim
had this Guarantee not been issued. If requested by the Company, the Assured shall
transfer to the Company all rights and remedies against any person or property
necessary in order to perfect this right of subrogation. The Assured shall permit the
Company to sue, compromise or settle in the name of the Assured and to use the
name of the Assured in any transaction or litigation involving these rights or
remedies.
If a payment on account of a claim does not fully cover the loss of the Assured the
Company shall be subrogated to all rights and remedies of the Assured after the
Assured shall have recovered its principal, interest, and costs of collection.
12. Arbitration.
Unless prohibited by applicable law, either the Company or the Assured may
demand arbitration pursuant to the Title Insurance Arbitration Rules of the
American Arbitration Association. Arbitrable matters may include, but are not
limited to, any controversy or claim between the Company and the Assured
arising out of or relating to this Guarantee, any service of the Company in
connection with its issuance or the breach of a Guarantee provision or other
obligation. All arbitrable matters when the Amount of Liability is $1,000,000 or
less shall be arbitrated at the option of either the Company or the Assured. All
arbitrable matters when the amount of liability is in excess of$1,000,000 shall be
arbitrated only when agreed to by both the Company and the Assured. The Rules
in effect at Date of Guarantee shall be binding upon the parties. The award may
include attorneys' fees only if the laws of the state in which the land is located
permits a court to award attorneys' fees to a prevailing party. Judgment upon the
award rendered by the Arbitrator(s) may be entered in any court having
jurisdiction thereof.
(Continued)
SUBDIVISION GUARANTEE
Reorder Form No. 12421
GUARANTEE CONDITIONS AND STIPULATIONS (Continued)
The law of the situs of the land shall apply to an arbitration under the Title Insurance
Arbitration Rules.
A copy of the Rules may be obtained from the Company upon request.
13. Liability Limited to This Guarantee; Guarantee Entire Contract.
(a) This Guarantee together with all endorsements, if any, attached hereto by the
Company is the entire Guarantee and contract between the Assured and the
Company. In interpreting any provision of this Guarantee, this Guarantee shall be
construed as a whole.
(b) Any claim of loss or damage, whether or not based on negligence, or any action
asserting such claim, shall be restricted to this Guarantee.
(c) No amendment of or endorsement to this Guarantee can be made except by a
writing endorsed hereon or attached hereto signed by either the President, a Vice
President, the Secretary, an Assistant Secretary, o-validating officer or authorized
signatory of the Company.
14. Notices, Where Sent.
All notices required to be given the Company and an), statement in writing required to
be furnished the Company shall include the numbet of this Guarantee and shall be
addressed to the Company at 1800 West Koch, Bozeman, Montana 59715.
f;
6
r
SUBDIVISION GUARANTEE
Reorder Form No. 12421
• •
GEOTECH REPORT
Part 1
DDDDDCD D 0 ADD
RESPONSE& RESUBMITAL 11 11 JANUARY 2019
FCivil Engineering . Geotechnical Engineering . Land Surveying
D 32 Discovery Drive
ENGfNFE ° Bozeman.Montana 59718
ENGIsxpvlcNEERING
Ph: 1406) 582-0221
Fax: (406) 582.5770
�O
O��erse pole
-+ May 31, 2018
Erik Nelson
-- Think Tank Design Group
33 N. Black Ave.
Bozeman, MT 59715
i
e-mail: erik@thinktankarchitects.com (Issued via email only)
r
N
r_. Re: Preliminary Geotechnical Assessment
p Cottonwood+Ida Development—Bozeman, MT
c
1r Dear Mr. Nelson:
6
L-- This letter and attachments provide our preliminary geotechnical assessment for the proposed site of
the Cottonwood+Ida Development project, located on the northeast side of Bozeman, MT. To date, our
work has consisted of the excavation of five on-site test pits and the installation of five PVC wells, the
collection of weekly groundwater monitoring data from April 24 through May 29, the review of area
soils information from the project site to the south, and the preparation of this preliminary report. Over
the next few months, we will continue to monitor groundwater levels and issue this data via email.
e Based on the three to four-story heights of the proposed buildings, we do recommend drilling deeper
borehole explorations at some point in the future to confirm that dense sandy gravel conditions
continue with depth (which we expect they will). The purpose of this initial summary is to describe the
site's soil and groundwater conditions, identify any potential issues that we foresee, and present some
preliminary geotechnical recommendations that will need to be considered for the development of this
property. This letter does not constitute a final geotechnical report with complete recommendations.
We recommend preparing a more formal report once the borehole drilling is done.
Several exhibits are provided as attachments to this letter. These include a vicinity map, a geology map,
and a test pit location map with the depths to native gravel. Also attached are our test pit logs, test pit
photos, groundwater monitoring data, and exploration logs from the neighboring project on the south
- side of E. Cottonwood St. Please refer to these exhibits while reviewing the report.
SITE LOCATION
The project site encompasses approximately two acres and is bounded on the south by E. Cottonwood
St., on the east by N. Ida Ave., on the north by the future extension of E. Aspen St., and on west by
existing buildings that line the east side of N. Wallace Ave. The subject property is comprised of Lots 5
through 28 of Block 105 of the Northern Pacific Addition. Its legal description is the SW1/4, SE1/4 of
www.alliedengineering.com • •
• •
Preliminary Geotechnical Assessment Project:18-054
Cottonwood+Ida Development—Bozeman,MT May 31, 2018
Section 6,T2S, R6E, Gallatin County and its latitude and longitudinal coordinates(near the center of site)
are 45.6870861 and-111.0272780. See Figure 1 for an aerial map showing the site location.
PROPERTY DESCRIPTION
The project site slopes to the north at grades of one to two percent, similar to most other areas around
Bozeman. The south half is largely undeveloped, except for a small old building in the southwest corner.
Most recently, this area has been used for staging for the Block 106 building construction project on the
south side of E. Cottonwood St. The majority of the north half is covered by concrete or asphalt
surfacing and contains three old, single story, metal buildings. We expect most, if not all, of the existing
buildings on the site are underlain by slab-on-grade foundations.
As we understand it, all of the buildings on the north side of the site will be demolished and removed as
part of the project. The small building in the southwest corner will be saved and renovated.
PROPOSED IMPROVEMENTS
According to planning documents from November 2017, the proposed project will be a high-density
development consisting of five, large, multi-story buildings, along with the renovated, existing building
in the southwest corner. The structures will include apartment buildings, townhouse-style apartments,
and an office building. Most will be three stories in height, while a portion of one of the apartment
buildings will be four stories. The unique feature of the project will be a partially below-grade parking
garage that covers most of the site and underlies all of the new buildings and open space areas. There
will be no on-site,at-grade parking,expect for a few spots provided along E. Cottonwood St.
GEOLOGY
According to a geology map for the Bozeman area, an excerpt of which is attached as Figure 2, the
mapped geology throughout most of the northeast side of the city consists of Quaternary-aged, alluvial
and fluvial deposits (Qal) from the Bozeman Creek and E. Gallatin River drainages. Based on previous
geotechnical experience, the dominate material within this formation is shallow cobbly, sandy gravel
that typically begins at a depth of three to five feet. The gravels are overlain by an intermediate layer of
silt/clay and capped by a thin layer of organic topsoil. In this part of Bozeman, the gravels are expected
to extend to a depth of 25 to 50 feet before overlying consolidated beds of Tertiary-aged gravels, sands,
silts, and clays,which are generally and locally considered to be "bedrock".
AREA SOILS INFORMATION
In 2005, we performed the soils investigation for the two properties to the south of the site along the
south side of E. Cottonwood St. The eastern property is home to the Mill Lofts building, while the
western property is where the Block 106 project is under construction. As part of our work, we drilled
32 Discovery Drive . Bozeman,Montana 59718. Ph:14061582.0221 .Fax:(406)582-S770 .www.alliedengineering.com Page 2
Preliminary Geotechnical Assessment Project: 18-054
Cottonwood+Ida Development—Bozeman, MT May 31, 2018
five, deep borings and dug four, shallow test pits. The locations of these explorations as well as the logs
are attached. in general, we encountered dense to very dense, clean sandy gravel beginning at depths
of 3.0 to 4.0 feet. The sandy gravel formation extended to the bottom of the 30-foot boreholes.
EXPLORATIONS,TESTING, AND SUBSURFACE CONDITIONS
Subsurface Explorations
Subsurface conditions were investigated across the site on April 24, 2018 by Lee Evans, a professional
geotechnical engineer with Allied Engineering. Five test pits, identified as TP-1 through TP-5, were dug
with a tracked excavator provided by Townsend Backhoe. All pits extended to depths of 13 to 14 feet.
Pits 1 and 2 were placed in the southwest and southeast corners of the property. Pit 3 was located near
the center; and pits 4 and 5 were in the northwest and northeast corners. During backfilling, each of the
five pits was outfitted with a 13 to 14-foot deep length of 4-inch, perforated PVC pipe (that extended to
the bottom of the pits) for future groundwater monitoring needs. The casing height of the wells (above
existing ground) generally ranges from 2.0 to 3.0 feet. The monitoring well numbering system
corresponds with the test pits, ie. MW-1 is installed in TP-1, MW-2 in TP-2, and so on. The monitoring
well identification is written on the side of the exposed casing as well as on the underside of the PVC
well caps. See Figure 3 for the approximate test pit and monitoring well locations.
During the explorations, soil and groundwater conditions were visually characterized, measured, and
logged. The relative densities of the soils were estimated based on the ease or difficulty of digging and
the side wall stability of the test pit excavation. Copies of our test pit logs are attached at the end of this
report. Each log provides pertinent field information, such as soil depths, thicknesses, and descriptions,
groundwater measurements (at the time of exploration), relative density data, soil sample information,
and a sketch of the soil stratigraphy. Please be aware the detail provided on the logs cannot be
accurately summarized in a paragraph; therefore, it is very important to review the logs in conjunction
with the report. Following completion of the fieldwork, the excavations were backfilled and cleaned up
to the best extent possible. Each test pit was staked with a wooden lath that identified it accordingly.
To better illustrate the on-site soils, two photos from each test pit are also provided. The first photo of
each set shows the sidewall of the excavation, while the second photo is of the excavated spoil pile. All
photos have been marked up to call out the soil layers and materials that are described on the logs as
well as identifying characteristics.
Note: Please be aware that no compaction of test pit backfill soils was done; therefore, these areas will
be susceptible to future soil settlement. All test pit locations should be re-excavated to their original
depth and properly backfilled and compacted if they will underlie any proposed site improvements,
including building foundations, interior slabs, underground utilities, and other hardscape areas. The test
pit locations should be easy to identify based on the presence of the groundwater monitoring wells and
the soft/loose, intermixed soil backfill conditions.
32 Discovery Drive. Bozeman,Montana 59718 . Ph:(406)S82-0221 .Fax:(406)582-5770.www.alliedengineering.com Page 3
0 0
• 0
Preliminary Geotechnical Assessment Project:18-054
Cottonwood+Ida Development-Bozeman, MT May 31, 2018
Laboratory Testing
No soil samples were collected, thus no lab testing was completed. The site's gravelly soil conditions did
not warrant the need for any such testing.
Soil Conditions
As expected, the site is underlain by shallow, clean, cobbly, sandy gravels beginning at depths of 4.0 to
4.5 feet. These gravelly materials resemble good pitrun gravel and contain abundant 4" to 6" gravels
and scattered 8" to 10" cobbles. The gravel was uniform and consistent to the bottom of the 13 to 14-
foot deep, test pits. In some pits and at varying depths, the gravel formation was laced with some
sandier pockets and/or thin sandy lenses. In general, the gravel on the south side of the site dug a little
harder and was therefore a little denser as opposed to the easier digging and looser gravels in the
middle and north parts of the property. Directly overlying the sandy gravel is a 1.0 to 2.0-foot layer of
brown to tan, silt/clay. Throughout most of the site, the uppermost 2.5 to 3.0 of soil (in all test pits) is
dark brown, silt/clay that is interbedded with thin layers of buried, black topsoil. A thin layer of surface
topsoil covers the site to depths of 0.5 to 0.8 feet. All soils that were encountered appeared to be
native except for a little bit of gravelly fill in TP-4 and TP-5 below the surface topsoil. The fill in both of
these pits was only about 0.5-foot thick.
Provided in Table 1 is a summary of the soil conditions that were observed in the test pits. The material
descriptions and soil depths in the table match the data shown on the attached test pit logs.
Table 1. Summary of Soil Conditions in Test Pits 1-5
NATIVE NATIVE NATIVE
TP TP TOPSOIL RANDOM SILT/CLAY TOPSOI? SILT/CLAY SANDY
# LOCATION FILL (BURIED LAYER)
(DK BROWN) (BROWN) GRAVEL
1 SW Corner 0.0'-0.8' -------- 0.8'-2.0' 2.0'-2.5' 2.5'-4.0' 4.0'-13.0'
2 SE Corner 0.0'-0.5' ----- 0.5'-1.0' 1.0'-1.5' 2.5'-4.0'
1.5'-2.0' 2.0'-2.5'
3 Center 0.0'-0.8' -------- 0.8'-2.0' 2.0'-2.7' 2.7'-4.3' 4.3'-13.3'
4 NW Corner 0.0'-0.5' 0.5'-1.0 1.5'-2.7' 3.0'-4.5' 4.5'-13.5'
2.7'-3.0'
5 NE Corner 0.0'-0.5' 0.5'-1.0' 1.5'-3.0' 1.0'-1.5' 3.0'-4.0' 4.0'-14.0
Notes: 1) All soil measurements are depths below existing ground.
2) The native sandy gravel is identified as the"target"bearing material for all foundation improvements.
32 Discovery Drive. Bozeman.Montana 59718 . Ph:(406)582-0221 .Fax:(406)582-5770.www.alliedengineering.com Page 4
Preliminary Geotechnical Assessment Project:18-054
Cottonwood+Ida Development—Bozeman, MT May 31, 2018
Groundwater Conditions
The site is underlain by relatively shallow groundwater conditions. During our April 24 explorations,
groundwater was generally encountered between the depths of 9 to 10 feet below existing ground.
Over the last month, we have been monitoring groundwater levels on a weekly basis and will continue
to do so over the coming months. Provided in Table 2 are the shallowest groundwater measurements
recorded in the wells to date. For the most part, groundwater has risen to the 8.0 to 8.5-foot depth in
most areas. The shallowest groundwater is at the center of the site at a depth of 7.8'. Other than TP-1,
which experienced its highest water on May 15, all other wells topped out so far on April 30. Based on
previous experience, there is a high probability that seasonal high groundwater on the north side of
Bozeman did not occur prior to the April 24 explorations; and therefore, was not missed this year.
Table 3. Summary of Groundwater Conditions in Test Pits 1 -5
TP WELL DEPTH CASING HEIGHT SHALLOWEST GW DATE OF
TP# LOCATION (BELOW EG) (ABOVE EG) (TO DATE) MEASUREMENT
1 SW Corner 13.0' 31" 7.98' 5/15/18
2 SE Corner 13.0' 36" 8.52' 4/30/18
3 Center 13.3' 27" 7.77' 4/30/18
4 NW Corner 13.5' 28" 8.46' 4/30/18
5 NE Corner 14.0' 22" 8.82' 4/30/18
Notes: 1) All groundwater measurements are depths below existing ground.
2) EG=existing ground.
Groundwater throughout the Bozeman area rises and falls on a seasonal basis depending on the time of
year. During the winter season, it is near its lowest (deepest) elevation; while at some point in April,
May, or early June, it is typically near its seasonal high as a result of runoff from mountain snowmelt and
the spring rains. In some areas(primarily on the south and west sides of Bozeman), summer agricultural
irrigation practices can cause the groundwater table to rise again in August and early September.
Depending on the location, the seasonal groundwater fluctuation (from seasonal low to seasonal high
elevations) in Bozeman typically ranges from one to three feet.
GEOTECHNICAL ISSUES
By far, the biggest issue at the site is shallow groundwater and how it may impact the partially below-
grade, parking garage. A related issue is the property is landlocked and there is nowhere to easily
discharge either a necessary or precautionary, sub-slab drainage system that was to be installed under
the parking garage floor. Other than these, the site really has no other geotechnical concerns.
Foundation bearing is a non-issue as the shallow sandy gravel will provide the required support for the
three to four-story buildings. As stated earlier, we do recommend completing some deep borehole
drilling to confirm that the dense, sandy gravel conditions continue to greater depths below the site.
32 Discovery Drive . Bozeman,Montana S9718. Ph:(406)S82-0221 .Fax:(406)582-S770.www.allieden3ineerin3.com Page 5
is
• 0
Preliminary Geotechnical Assessment Project: 18-054
Cottonwood+Ida Development—Bozeman, MT May 31,2018
Provided below is some more discussion on the two geotechnical issues that we foresee being the most
challenging for this proposed site development, particularly relating to the buried parking garage.
• Shallow Groundwater: To date, the highest recorded groundwater levels across the site have
ranged from 7.8 to 8.8 feet below existing grades. We will see what groundwater does in the
coming months as we continue to monitor. There is good chance that seasonal high water has
already occurred this year or will be occurring very soon; and will start to drop as we get into the
hotter and drier, summer season. Every year is different with respect to seasonal high water as
it depends on snowpack conditions, spring rains, and the timing and duration of runoff. This
should be a pretty good year for collecting data given how wet we have been this winter and
early spring. With that said however, it should be expected and planned that shallower ground-
water conditions could occur in future years. For this reason, garage floor elevations should be
set safely and conservatively above the high elevations that are currently documented and/or
the garage slab will need to be structurally designed to resist groundwater buoyancy uplift
forces and fully water-proofed to make it water-tight.
• Lack of Sub-Drain bischorge Area: ItIis a good idea to install a sub-drain system under the
parking garage in the event that high water was to rise to the bottom of slab. The problem with
this is where do you discharge it? Given that the entire property will be consumed by the
parking garage and.buildings, and there are no nearby creeks or drainages, this is a big issue.
The site will be bounded by city streets on the north, south, and east, and by existing buildings
on the west. The nearest potential discharge point (especially for a high volume of water) is in
to Bozeman Creek, which is located 600 to 700 feet west of the site. This would require the
construction of a discharge line in the public right-of-way along E. Aspen St. and most likely a lift
station to pump the groundwater from below the garage slab grade to the discharge location.
Rather than sinking the garage too deep and having to incur the costs for a large drain system
and outfall line, the better option may be shallower garage floor depths, increased structural
design thickness and rigidity of the slab, and water-proofing.
PRELIMINARY DEVELOPMENT RECOMMENDATIONS
.Provided below are some preliminary development recommendations for consideration. This is not an
exhaustive list, but only meant to provide some of the more important ones we foresee. Much more in-
depth design and construction-related recommendations will be included in a final geotechnical report.
Foundation Design
■ Given the dense, sandy gravel conditions at shallow depth, the parking garage and buildings can
be supported on shallow conventional foundation systems. There should be no need for deep
foundation elements, such as piles.
• We anticipate giving an allowable soils bearing pressure of 3,000 to 4,000 psf for the project.
32 Discovery Drive . Bozeman,Montana 59718 .Ph:(406)582-0221 .Fax:(406)582-5770 .www.alliedengineering.com Page 6
Preliminary Geotechnical Assessment Project: 18-054
Cottonwood+Ida Development—Bozeman, MT May 31, 2018
Foundation Support
• The dense, clean, cobbly, sandy gravel that was encountered at depths of 4.0 to 4.5 feet across
the site is the "target" foundation bearing material for all foundations. All perimeter, interior, or
exterior footings must bear directly on sandy gravel or on compacted,granular structural fill that
in turn bears on the native gravel. No fine-grained silt/clay shall be left in place under footings.
• Given the shallow depth of the gravels and the fact that the entire site will be underlain by the
partially below-grade parking structure, we expect that most areas will readily bear in the native
gravels with a limited need for structural fill.
Parking Garage
• For this site, we think it makes the most sense to try and limit the depth of the garage as much
as possible and keep the garage floor elevation safely and conservatively above the shallowest
groundwater level that has been recorded this spring. To date, the shallowest measurement has
been 7.8 feet below existing ground at the center of the property. The goal here it to keep the
garage space high and dry and essentially eliminate all possibilities of groundwater impacts.
• Given the groundwater data we have collected so far this year, which shows the shallowest
water at average depths of 8.0 of 8.5 feet, it is hard to believe that groundwater could rise by
another 2.0 feet during future years (to a depth of 6.0 to 6.5 feet). Most likely, this would be a
pretty safe assumption for how high water could rise. Please be aware this is our opinion only.
• The installation of a sub-drain system under the slab is a good idea, but as of right now, there is
no place to easily discharge it. We do not recommend pushing the garage elevation into or near
the high groundwater table and having to depend on a sub-drain system to keep it dry. This
would require the need for off-site infrastructure improvements and possibly some sort of lift
station to pump and route the water to a desirable and allowable discharge location.
■ If storm drain improvements will be installed in E. Aspen St. as a result of this project, there is a
possibility that a precautionary sub-drain system (which is still a good idea even if garage slab
elevations are raised) could be routed to the City system, which may allow for the lowering of
the garage a bit more. The idea here is that the system may never be needed to operate, but if
water comes up higher during a short period of time, it would be in place to"take the top of the
groundwater under the garage" and keep it dry.
• Unless the parking garage floor is shallowed considerably to depth of 6 feet to so (to safeguard
against the possibility of higher seasonal groundwater in the future), we recommend that the
interior slab be thickened and rigidly designed to resist buoyant forces; and a water-proofing
membrane be placed under the slab and as well as around the lower part of the walls. Thus, the
lower part of the garage would be a water-tight tank that could be submerged in groundwater.
32 Discovery Drive . Bozeman,Montana 59718. Ph:(406)S82-0221 .Fax:(406)582-S770.wwwalliedengineering.com Page 7
is is
• •
Preliminary Geotechnical Assessment Project:18-054
Cottonwood+Ida Development—Bozeman,MT May 31, 2018
LIMITATIONS
This letter provides our geotechnical summary for the proposed Cottonwood+Ida Development project,
located on the northeast side of Bozeman. Please be advised this document is only applicable for the
subject property and shall not be used for other nearby sites. Since geotechnical conditions can change
in a short distance, we recommend all project sites be evaluated on a site-specific basis.
The recommendations presented herein are based on our observation and evaluation of the project
site's subsurface conditions, knowledge of the underlying geology, our previous geotechnical experience
in the general project area, on-site groundwater monitoring results from April 24 through May 29, and
assumptions on how high groundwater could possibly rise. As stated previously, we do recommend
continued groundwater monitoring, deeper borehole drilling, and the preparation of a final geotechnical
report before this project goes to final design and construction.
If during earthwork and foundation construction, soil and groundwater conditions are found to be
inconsistent with those described in the report, we should be advised immediately so that we can
analyze the situation and modify our recommendations if need be. All individuals directly associated
with this project should consult this report during the planning, design, and construction of the site
improvements. It should be made available to other parties for information on factual data only and not
as a warranty of subsurface conditions such as those interpreted herein.
If there are any questions regarding this report, please feel free to contact us.
Sincerely,
Allied Engineering Services, Inc.
oNTA
Lee S. Evans, PE LEE SCOTT
Geotechnical Engineer .• UJ 1442NS : r
31 10
�v
enc: Figure 1 — Vicinity Map '••�� •��Egg �N
Figure 2 — Geology Map Ir •,
S ANAL ,.
Figure 3 — Test Pits w/Gravel Depths •••..
Test Pit Logs(TP-1 through TP-5)
Test Pit Photos(2 per pit) — Excavation and Spoils
Groundwater Monitoring Data from 04.24.18 through 05.29.18
Area Soils Information (Site Map, 5 BH Logs, and 4 TP Logs)
Limitations of your Geotechnical Report
REFERENCES
Slagle, Steven E., May 1995, "Geohydrologic Conditions and Land Use in the Gallatin Valley,
Southwestern Montana, 1992-93", U.S. Department of the Interior, U.S. Geological Survey.
32 Discovery Drive . Bozeman,Montana 59718. Ph:14061582-0221 .Fax:(406)582.5770.wwwzlliedengineering.com Page 8
-� r r-� Y (fl� t �f •l' '4 'i� j,,
� `Ar!1 Tr (
In i .g7 WALMART •1 J t, 'R \ L � . 1 ��' _ E TAMARACK 5T ,,]
'� ]_ f .I 1�_ � f�•- �L '� r: � � _ a•� �'�` �, ,/� ice, ` I.a n ++
Jr� /... �'.i� •••��iii••'i8 f� �� O a •`47 ' _-•
r�r ll V r. • +�• `
ae.a�i _...IL , • � ✓' L i ,
L:J
_�• < ` k '�% PROJECT SITE �+t � PROJECT SITE
O COTTONWOOD + IDA .y' +.{}" -• tom# 't COTTONWOOD + IDA
:C`�= d, ,°.• -' l•��• .t�l L' :_'�i I _ •� DEVELOPMENT '�~' '�'• ,1 J `•--��- - DEVELOPMENT -
EASPEN ST A t
�a]` ,r„� � • z ,•:l y�j{J'�ii:�«y�a� ],,, a }� y � ..r • O '' !! v �.y�yl� ���
? `!•.�F�i 1,- ° ��
It .: `1:: 31Q.Iiy
DURSTONRD ."""•_ _ aBOZEMAN .tL"' -� ��LC7: ` ..� �i�t` �� �1 ,,rCi 1 3Li, a ►'��pn:�
"• HIGH SCHOOLV r \• $ , KY�- '"f z ( iy y a A ��
.(. � Jf '�n�'d �� 'is '`' /'�L...+ { l' �►/.�-p�J�j r �1 �`�� Jr
Z �'` ��• 1
t ^F"1 �,v�!* tN .Ld `E��p [['�^ ck.'Ta.�' l \� �/ }.: ��!•' �✓ti R r'.�" �`l �-ai- . �' r.+.. r.,�
i(Z 'Y ,.t' �' '� a_ r _ a� a � f.: • i!♦.j.` �j'' f- ,» 7 3 �fy ,.,7.,�
�,i �� � �,1' �, a' r•I -'(:sW r•ur�y��n _r,• 1• {�� 1 i '� .s�..I• � �L�, ! � C} f' Y`'` �'—' 1
y_�{! � �: I. ,j 1^� `)Mw=' ,y7i•,.,lrn ice:+ -i t yt i• i'• � ,l, - �' .� '.� .�"'� .
.iL1 .sii e'.L7�l• F..-• ' -�� ,,'� 'h• �y _ � ✓ i �'.�� -�M ,#•'
5 / r af7• .•fr R— ! MAIN ST ( _ A�
�1 ♦s )Tj t - •TAY IS] - ��aT-'� f '�: o. .!a t, •�N; �.i ECOTTONWOOD ST
_0 ,,�•. i����,�, :� _ _
I/ 17.l�'„ •'{. '' O
,_c i
_ pt •A� •a WILD CRUMB
T Kttp:�Jr+� _ 'L • 1Lj' � -
�i r F, �a�1 . - BAKERY 1�n-+p
r• �y.'�! '�J � 'k `*'ram•'� .�; I •�� �
mil BLOCK 106 BUILDING
COLLEGE (UNDER CONSTRUCTION)
MONTANA STATE 'a '1•.1 ,{,.� , M. ! _ 4{. a.._ �_• .' � 2. 4
4 + I
UNIVERSITY 1 A x. f_ ` �> 01`� -►� 1 r _
�� EPEACH S7 i
BOZEMAN HEALTH i~�" .• U Z t�7 !'••v� ^�
HOSPITAL - • f' l a !' "'
.�� `' �j i J i Yr m I! ,+ ^?• erg• �i �r
r w•'1WIW
l44 � 3lip
i• 4- _`,.. ;1"I U'A 'I _ �.a--=•' ��., `. \ Vs.'�p KARST STAGE •T" * 7 ; ^ f
F ;- t' 7k A
r� yt�i ' (�fa'�` _ w� s [ • �. li
till
>i
4
OVERVIEW MAP CLOSE-UP MAP
BOZEMAN AREA PROTECT SITE AREA !
I
s
b
0 Ir 2r DDDD o 200 .00 aoo $
salt(E¢r) N scA1t(sEEn N k
NO. RENSWS DRAWN BY DALE PROJECT/:18-054
scAlE AS NOTED COTTONWOOD+IDA DEVELOPMENT moLscOVER— Civil Engineering DATE: os/z010 FIGURE
VICINITY MAP n�0�NB 1.oe) 1 Geotechn/ca Engineering I nwRE 1.DWc I
PRO.ECT ERdNEER:LSE DRAWN BY:LDr A% A
D
B07.EMAN,MONTANA Land Surveyingc
DESONED BY: LSE KE WED BY:LSE
AOL
revel128
: : I
jo
k
109
1 o. 0 C QTa .0 1..
Bozeman
F(sh Tech
QT° PROJECT SITE :A
COTTONWOOD + IDA ,-0..: to cb / �' •'�,4;,Mounte n
r DEVELOPMENT
00
fipr
I r 10.00
1
QTa ►55 � / ••550
SEC. 6, T2S, R6E,
191 GALLATIN COUNTY
smw AL
Ts
Ts/
o b 1
op All 110 167.7 }
101.1 a f 300 1
9y z 165
a
i<
000 5150
V3 W r5
A k S P
0ALI
_ a _
0
v
LEGEND
0
QTa = ALLUVIAL FAN DEPOSITS
N (QUARTERNARY/TERTIARY)
0
C 6000 12000 18000 Qal = FLUVIAL DEPOSITS (QUARTERNARY)
0
Ts = LAC:USTRINE & FLUVIAL DEPOSITS
SCALE: 1 INCH = 6000FEET UNDIFFERENTIATED (TERTIARY)
a
0
0
m
BASE MAP: GEOHYDROLOGIC CONDITIONS & LAND USE IN THE GAL_ATIN VALLEY, s
SOUTHWESTERN MONTANA; BY: STEVEN E SLAGLE, 1995
a
COTTONWOOD + IDA DEVELOPMENT Civil Engineering '&LI
FIGURE 2
Geotechnical Engineering GEOLOGY MAP Land Surveying . DDAT`E: 05/2018FttT 32 DISCOVERY DRIVE 718
PH0 E((406)`..S2.0221 .BFDAX(406)5825770 BOZEMAN MOI�TANA PROJECT g:18-054
f wwwalliedenpincenng.com a�.,,••w,,.•`•• FIGURE 2.DWG
t • 4
f
Ij
PROJECT SITE
COTTONWOOD + IDA 14
— DEVELOPMENT
:.,
t .
E ASPEN ST
4 . y
N S. � � 1' 1 �.
a TP-4. TP-5
W
g
z � >
a ;
a
Z k
� I
TP-1 TP-2
E COTTONWOOD ST #
`. APPROXIMATE
BOUNDARY
t . L
LZ
s
��h O•
.r..I fir. low 4w
O
O
DEPTH TO NATIVE GRAVEL BELOW EX. GROUND: 01
TP-1 = 4.0' TP-4 = 4.5' 1
TP-2 = 4.0' TP-5 = 4.0'
TP-3 = 4.3' LEGEND +
0
0
TEST PIT LOCATION o
0 100 200 300 (APPROXIMATE) o
U
0
ro
SCALE: 1 INCH = 100 FEET s
N
a
COTTONWOOD + IDA DEVELOPMENT Civil Engineering CEeNGINING
FIGURE 3
Geotechnical Engineering
TEST PITS 1YV'/ GRAVEL DEPTH Land Surveying DRAWN BY: GDF
32 DISCOVERY DRIVE BOZEMAN,MT 59718 DATE: 05�2018
PHONE(406)582-0221 F 406)582.5770 PROJECT #18-054
BOZEMAN,M ANA W .alliedengin I..... FIGURE 3.DWG
Civil Engineering 32 Discovery Drive w z w TEST PIT DESIGNATION: TP-1 LOCATION: SW Corner of Property
Bozeman,MT 59718
AUIED - Geotechnical Engineering Ex- HORIZONTAL DISTANCE (See Figure 3 for Approx. Location)
eHorrrremrro Phone:(406)582-0221 ,3 ,� FT CS. ( )
n^ Land Surveying Fax:(406)582-5770 \0 Q 2 4 6 g 10
0
DESCRIPTION OF MATERIALS
O{0.0'-0.8'}: Native Topsoil .
Medium stiff, black; organic clayey — Dark brown. Buried topsoil layer. —
SILT w/abundant roots; moist.
O{0.8'-2.0'}: Native Silt/Clay 2 3
Stiff; dark brown; sandy SILT to
sandy lean CLAY; moist. ` ` -`, 4 _-.-
-
Notes:
-Appears to be native. -_- _ - -- _-- --
-Does not look like fill material. 4 0 ~0- 1-13
o O
-No intermixed gravels. el o O o o ° o o c "Target" foundation bearing in
-Unsuitable bearing material. ° ° ° 00 ° 00
° sandy GRAVEL below 4.0'depth.
0 0 0 ° O po ° °t 0 0 ° ° o ° o
O{2.0'-2.5'1: Native Topsoil (Buried) ° ° [Good
« ° 0 0 0 ° ° O° ° °
Stiff-, black; clayey SILT; moist. Q ° ° ° clean cobbly, O ° ° ° ° Q °
6 ° sandy gravel throughout. 0 ° From 4.0'to 9.0': some
Notes: ° ° o 0 0 orangish brown,thin
-No roots. ° ° 0 ° ° ° C ° ° ° ° banding(multiple bands). ° °
-Black color suggests it is organic. O Denser gravels than 0 Q° Q ° O O °
-Appears to be buried topsoil layer. o TP-3,TP-4,&TP-5. o o ° 0 ° ° o
° Dug a little harder. 0 °
O{2.5'-4.0'}: Native Silt/Clay Q O V. similar to TP-2. Q O
° ESCRIPTION OF MATERIALS(cont.):
Medium stiff; brown to tan; sandy 8 ° 0 n ° o° D
o O O
{4.0'- 13.0'}: Native Sandy Gravel
SILT to sandy lean C.;LAY; v. moist. `� o O° ° ° o O ° ° °
O
o O� ° ° ° Dense; brown; sandy GRAVEL w/
Notes: ° o Q__Q_Q__q abundant gravels(4"to 6")and scattered
4_40-------o--
-More moist than above. 0 0 o 0 0 ° °O° ° ° o cobbles (8"to 10"); slightly moist to wet.cd
5
-Less stiff than above. ° o Q ° n ° Q ° O
-Lower 6"contains scattered gravels '0 10 0 0 ° °O ° Notes:
-Unsuitable bearing material. V - Clean sandy gravel.
° Monitoring well installed (MW-1) -Denser gravels than TP-3,TP-4,&TP-5. tv
c �. Casing Height=31" above EG o -Density is similar to TP-2. '
CISti Total Depth = 13.0'below EG -From 4.0'to 9.0% Some orangish brown, „
c o ° p 0 ° 0 0 ° o thin banding(multiple bands). "`
Z 14 -"Target" bearing material. (n
N
N
SURFACE ELEVATION: N/A BACKHOE TYPE: JCB JS130 Excavator JOB NUMBER: 18-054
TOTAL DEPTH.: 13.0' BACKHOE OPERATOR: Brayden Harris-Townsend Backhoe PROJECT: Cottonwood +Ida
GROUNDWATER: 9.0' (on 4/24/18) LOGGED BY: Lee S. Evans-AESI DATE: April 24,2018
Civil Engineering 32 Discovery Drive z „a w TEST PIT DESIGNATION: TP-2 LOCATION: SE Corner of Property
ALLIED Ceotechnical Engineering Bozeman,Ml'S9718 ¢ FW- na x (See Figure 3 for Approx. Location)
8 Phone:(406)582-0221 3 z �- HORIZONTAL DISTANCE(FT):
a
• -- •" Land Surveying Fax:(406)582-5770 0 Q 2 4 6 8 1
DESCRIPTION OF MATERIALS
Dark brown. -- - Buried topsoil layer.
11 10.0'-0.5'}: Native Topsoil -
Medium stiff; black; organic clayey 3
SILT w/abundant roots and some -
surface gravels; moist. 2 -' __-� Dark brown. �_ --4 Buried topsoil layer. --
2O{0.5'- 1.0'}: Native Silt/Clay
Stiff; dark brown; sandy SILT to -
. sandy lean CLAY; moist. -._ Brown to tan.-� �
Notes:Appears to be native. q 0- -0-
- o -.° ._ .o• o - �_° .- _
-Does not look like fill material. ° 0 ° ° ° ° o ° "Target" foundation bearing In
-No intermixed gravels. ° ° ° ° �� ° ° sandy GRAVEL below 4.0'de
-Unsuitable bearing material. 0 0 Good clean cobbly, ° ° o ° °
O ° ° sandy gravel throughout. ° ° O ° 0 ° ° o °
3&1.0'- 1.5'): Native Topsoil(Buried) ° ° O O ° O 0 ° °, DESCRIPTION OF MATERIALS(coot.):
Stiff; black; clayey SILT; moist. 6 Denser gravels than O
Notes: ° o ° TP-3,TP-4,&TP-5. °° O° o O Notes:
-No roots. O Dug a little harder. ° ° O° - More moist than above.
O ° -Less stiff than above.
- Black color suggests it is organic. o V. similar to TP-1. o
-Appears to be buried topsoil layer. °° ° % 0 ° °o -Lower 6"contains scattered gravels.
O ° 0 0 O O - Unsuitable bearing material.
0{1.5'-2.0'}: Native Silt/Clay 8 ° 0 From 5.5'to 7.5% some 0 0 O{4.0'- 13.0'}: Native Sandy Gravel
Stiff, dark brown;sandy SILT to ° ° ° orangish brown,thin Dense; brown sandy GRAVEL Gravel
sandy lean CLAY; moist. ° banding(multiple bands). ° '
O ° o ° ° (� abundant gravels(4" to 6")and scattered
SO{2.0'-2.5'}: Native Topsoil(Buried) ° ° ° O ° O o o °a° O ° cobbles(8" to 10"); slightly moist to wet.
Stiff; black; clayey SILT; moist. 0
O ° O ° ° ° Notes �•
O 10 -1-- -o- -0---4 o c---a-b-----Q "Clean"
sandy gravel. l9
U — a.
6 {2.5'-4.0'}: Native Silt/Clay o - �
Medium stiff, brown to tan; sandy ° Monitoring well installed(MW-2) - Denser gravels than TP-3,TP-4,& TP-5.
SILT to sandy lean CLAY; v. moist. E ti Casing Height=36"above EG ° -Density is similar to TP-l.
cn Total Depth= 13.0'below EG -From 5.5'to 7.5% Some orangish brown,
c o thin banding(multiple bands). M
Z 14 -"Target" bearing material.
SURFACE ELEVATION: N/A BACKHOE TYPE: JCB JS130 Excavator JOB NUMBER: 18-054
TOTAL DEPTH: 13.0' BACKHOE OPERATOR: Brayden Harris-Townsend Backhoe PROJECT: Cottonwood +Ida
GROUNDWATER: 10.0' (on 4/24/18) LOGGED BY: Lee S.Evans-AESI DATE: April 24,2018
_ Civil Engineering 32 Discovery Drive w z W w TEST PIT DESIGNATION: TP-3 LOCATION: Near Center of Property
iEC Bozeman,MT 59718 E—• "')
ALLIED Geolechnical Engineering ¢ �— 0. x (See Figure 3 for Approx. Location)
ENOINEFRINo a Phone:(406)582-0221 3 Z AF-, HORIZONTAL DISTANCE(FT):
o Land Surveying Pas:(406)582-5770 Q 2 4 6 8 10
0
DESCRIPTION OF MATERIALS
1Q 10.0'-0.8'}: Native Topsoil
Medium stiff; black; organic clayey - - Dark brown. _�,' 2 — Buried topsoil layer. —
SILT w/abundant roots; moist.
2
2Q10.8'-2.0'}: Native Silt/Clay 3
Stiff; dark brown; sandy SILT to _
sandy lean CLAY; moist.
Notes: _ - _ ---•_ --- _ -- ..--._ -- �:`.� —_4_-_ _ L___, -- `�1 -_.` �- .- `-� 1-
Brown to tan.
-Appears to be native.
-Does not look like fill material. 4
-No intermixed gravels. ---_ ,--_ _ __ -- _ ___--o__ __ --___ __ --_,._ __;•-�_ __.
-Unsuitable bearing material. ° ° 00 ° 00 ° "Target" foundation bearing in
0 O Good "clean" cobbey, o sandy GRAVEL below 4.3'depth.
3Q(2.0'-2.7'): Native Topsoil (Buried) Q ° ° sandy gravel throughout. ° ° Q ,
Stiff; black; clayey SILT; moist. ° ° ° O ° ° ° ° 0 ° °
6 ° ° 0 0 ° �0 ° O From 7.0'to 9.0% some
Notes: orangish brown thin
0 0 Looser gravels than o ° o
-No roots. banding(multiple bands).
TP-1 &TP-2. Dug °
-Black color suggests it is organic. ° a little easier. Similar O° Q °° 0 p o Q °` O o °
-Appears to be buried topsoil layer. , , o
o to TP-4&TP-5. 0 ° o
012.7'-4.3'}: Native Silt/Clav Q O � ° o 0, 0 Q O
o DESCRIPTION OF MATERIALS(cont.):
Medium stiff; brown to tan; sandy 8 ° ° U ° ° O p ° o ° ° 0
SILT to sandy lean CLAY; v. moist. a o o 0 o a o o 0 ° a o O{4.3'- 13.3'}: Native Sandy Gravel
° 0 O a ° q0 ° ° ° Dense; brown; sandy GRAVEL w/
Notes: O ° 0 ° O� 0 O a Q abundant gravels(4" to 6")and scattered
- More moist than above. - _ -a-a-�-v---=------- cobbles(8" to 10"); slightly moist to wet.
011
- Less stiff than above. cd ° ° a ° a O °
- Lower 6"contains scattered gravels '6to ' ° aO O ° O o a Notes:
-"Clean"sandy gravel.
- Unsuitable bearing material. a.
Monitoring well installed (MW-3) -Gravels are not as dense as TP-1 &TP-2. to
Casing Height=27" above EG ° -Density is similar to TP-4&TP-5.
Total Depth= 13.3'below.EG -From 7.0'to 9.01: Some orangish brown, 8,
c ° o ° O O ° o O o thin banding(multiple bands).
z -14 "Target" bearing material. (n
SURFACE ELEVATION: N/A BACKHOE TYPE: JCB JS130 Excavator JOB NUMBER: 18-054 &
o:�
TOTAL DEPTH: 13.3' BACKHOE OPERATOR: Brayden Harris -Townsend Backhoe PROJECT: Cottonwood + Ida
GROUNDWATER: 9.25' (on 4/24/18) LOGGED BY: Lee S.Evans-AESI DATE: April 24,2018
Civil Engineering 32 Discovery Drive Z w w TEST PIT DESIGNATION: TP-4 LOCATION: NW Corner of Property
� Bozeman.MT 59718 (--� LL] a.
�t)�tCeotechnical Engineering ¢ °' x (See Figure 3 for Approx. Location)
Phone:(406)582-0221 HORIZONTAL DISTANCE(FT):
Land Surveying Fax:(406)582-5770 e O U A 2 4 6 g 10
DESCRIPTION OF MATERIALS K.
Gravelly fill material. O2 Buried topsoil layer.
O{0.0'-0.5'}: Topsoil
Medium stiff; black;organic clayey 3
SILT w/abundant roots; moist. - - _ _- - _ _ - _ - _ _-
2 Dark brown.~ ` q y y Buried topsoil layer. L
2O{0.5'- 1.0'}: Random Fill - - - - - � .—-_ '�_ _ -
Medium stiff; dark brown; sandy
SILT w/intermixed gravels; moist. b
• Notes: OW -0-0-0�:`- _
- It is fill material based on gravels. Brown to tan. .- 6 "Target" foundation bearing in
-Not as clean and gravelly as TP-5. 4 _�_ __._ `- w •� _ __� V sandy GRAVEL below 4.5'depth. -
-Mostly silt w/some gravels. - - ,
-Unsuitable bearing material. ° 00 ° ° ° °
0° O ° Good "clean" cobbly, ° °° ° Q °p° 0 0 ° 00 0° O ° 0
3O{1.0 - 1.5 }. Native Topsoil(Buried) ° sandy gravel throughout. ° ° O o °
Stiff; black;clayey SILT; moist. 00 6 ° ° ° ° ° DESCRIPTION OF MATERIALS(cont.):cont.Looser gravels than °
Notes:
roots. ° ° TP-I &TP-2. Dug °0° 6O Notes:
- Black color suggests it is organic. ° ° a little easier. Similar ° ° -More moist than above.
° to TP-3& TP-5. ° - Less stiff than above.
-Appears to be buried topsoil layer. 0 - Lower 6"contains scattered gravels.
0{1.5'-2.7'}: Native Silt/Clay ° From 7.0'to 8.0': some o° - Unsuitable bearing material.
Stiff; dark brown; sandy SILT to 8 0 orangish brown,thin 0 O
sand lean CLAY; moist. banding(multiple bands). 0 O{4.5'- 13.5'}: Native Sandy Gravel
y ° ° ° ° ° ° Dense; brown; sandy GRAVEL w/
O{2.7'-3.0'): Native Topsoil(Buried) -- ° -°�n-----�----°n�--------° abundant gravels(4" to 6")and scattered
Stiff; black; clayey SILT; moist. Ooo ° ° ° 0 O ° o cobbles (8" to 10"); slightly moist to wet.
cyi o 0 0 ° ODO ° �.
O{3.0'-4.5'}: Native Silt/Clay U 10 40 O p ° 0 0 ° °
Notes:
Medium stiff; brown to tan; sandy h ° ° o ° 00 ° °c ° 0 -"Clean"sandy gravel. to
a
- Gravels are not as dense as TP-I &TP-2.
SILT to sandy lean CLAY; v. moist. a. ° Monitoring well installed(MW-4) - Density is similar to TP-3&TP-5.
tio CasingHeight=28" above EG
g - From 7.0'to 8.0% Some orangish brown, pi
Total Depth = 13.5'below EG thin banding(multiple bands). Fn
o
Z ° -"Target" bearing material. (A
14 N
N
SURFACE ELEVATION: N/A BACKHOE TYPE: JCB JS130 Excavator JOB NUMBER: 18-054
TOTAL DEPTH: 13.5' BACKHOE OPERATOR: Brayden Harris-Townsend Backhoe PROJECT: Cottonwood + Ida
GROUNDWATER: 9.0' (on 4/24/18) LOGGED BY: Lee S. Evans-AESI DATE: April 24,2018
Civil Engineering 32 Discovery Drive w z w cv TEST PIT DESIGNATION: TP-5 LOCATION: NE Corner of Property
C��
@EP
Bozeman,MT 59718 [--• f17 J
Geolechnical Engineering (See Figure 3 for Approx.Location)
Phone:(406)582-0221 3 Z a HORIZONTAL DISTANCE(FT): —�
. ''c, Land surveying Fax:(406)582-5770
Q 2 4 6 8 10
DESCRIPTION OF MATERIALS
Gravelly fill material. OZ Buried topsoil layer.
O{0.0'-0.5'}: Topsoil
Medium stiff, black; organic clayey 3
SILT w/abundant roots; moist.
2 22 (0.5'- 1.0'): Random Fill
Medium dense; dark brown to
brown; silty sandy GRAVEL; moist.
Notes: __ y Brown to tan. - _ __ _ - ,_ -1 - _ - •
-It is fill material based on gravels.
- More clean and gravelly than TP-4. 4 o�_. o
-Sandy gravel w/intermixed silt. 0 0 ° o o ° O O ° °c ° o O "Target" foundation bearing in
-Unsuitable bearing material. ° ° ° o Good "clean" cobbey, ° sandy GRAVEL below 4.0'depth.
° ° sandy gravel throughout. ° o ° °
33Q11.0'- 1.5'}: Native TopsoilNative T°°s°il(Buried) 0 O °° O o0 0 ° 0 ° ° Q o O 0 . oc 0 O °
Stiff; black; clayey SILT; moist. o Fs:
6 Looser gravels than o RIPTION OF MATERIALS cont.):
° ° ° ° ° °
Notes: TP-1 &TP-2. Dug
-No roots. o a little easier. Similar °p
- Black color suggests it is organic. o to TP-3& TP-4. ° ° o -More moist than above.
-Appears to be buried topsoil layer. Q o° O 0 o Q oc ° -Less stiff than above.
O o °Q - Lower 6"contains scattered gravels.
011.5'-3.0'}: Native Silt/Clay 0 ° From 8.0'to 9.0': some °o -Unsuitable bearing material.
Stiff, dark brown; sandy SILT to 8 O O orangish brown,thin p
sandy lean CLAY w/some sand ° 0 banding(multiple bands). O 0 66 14.0'- 14.0'}: Native Sandy Gravel
pockets; moist. ° ° ° ° o ° ° ° o Dense; brown; sandy GRAVEL w/ Tol
0 o Q ° 0 0� ° o abundant gravels(4" to 6")and scattered
O _ ° O ° c 0 O 0 _� cobbles(8" to 10"); slightly moist to wet.
Notes: 0� �_oCk o------e4-------- °
-Very sandy in some spots. = ° O ° ° O° O ° Notes:
o ° o ° ° °
U 10 ° O O ° O
013.0'-4.0'}: Native Silt/Clay -"Clean"sandy gravel. n.
0 0 c °
Medium stiff, brown to tan; sandy °' ° -Gravels are not as dense as TP-I &TP-2. tv
a ti Monitoring well installed (MWMonitoringwell installed -Density is similar to TP-3&TP-4.
SILT to sandy lean CLAY; v. moist. E ti. Casing Height=22" above EG o -From 8.01to 9.01: Some orangish brown,
Total Depth= 14.0'below EG
o thin banding(multiple bands). M
ZQ or
14 ° ° 0 0 ° 0 Q o -"Target" bearing material.
SURFACE ELEVATION: N/A BACKHOE TYPE: JCB JS130 Excavator JOB NUMBER: 18-054
TOTAL DEPTH: 14.0' BACKHOE OPERATOR: Brayden Harris-Townsend Backhoe PROJECT: Cottonwood + Ida
GROUNDWATER: 9.3' (on 4/24/18) LOGGED BY: Lee S. Evans-AESI DATE: April 24,2018
SECTION 8 APPENDIX
GEOTECH REPORT
Part 2
RESPONSE& RESUBMITAL II II JANUARY 2019
• 0
1
J �
/ I F
u ,
G . U
� � •. YAW. �.
!}L t.� . � ti.• e J M
� `��pt,�ri L ,• r�. •�!:fit a, .►r:i^Y"
�� 1
• �+l � '�.�� �rr� 1
.J r•'> � 7
f /K r pp
• 'i 'I `t•i'r•f f '
i y
M L
1
ro
la
J S4
V N� i ifs 7 + �•�/ �'•. r 'l
1j1
y� 4=
0
10
Vicl
a; A
Ilk
CP
17.1
..rIV
I� ._`~• ` �•� St•'1•ry•^ 71.tip.. • �•�•.� �1...1^ � '. , , , ,.
CA
C O � �'•lw 'mil•`L �'. �` .. , + .•'• (/�
J
Yam`"y. ` `..� + , ��'�, ,, ` `,,•`� �•• ��,, 1 ` V
C 61
` f
LA
_ � J
-ram^+.•� •c,1,a 4, A� Tll'
�
co
fpr
It
qu
Kj
`ter;' :.. - 'S� ;� '�,,b'�•'"�•' +, / ) � f:' � �
lt •'.,�,� ..•11 i /i �''. -�`�,y `.�{ I` 1 ��'� 1. � ), `. :, { � \
_V •i '
fter•' .l_fy'a: � ' \. ,�r. 'p. � ,•, , .' '� ).R I
�, - �'; •y. � _ � .�'_. ���� � ' • z`. .4, E ' J�J f
.v 1 / �.�Y'•, '��f•` f-�l � mil.• � ' ,!, '^ Fv'
�hY ��r,;,rl _..1 �. � Y •�.1.i•�' ram'�_. , r � yr
_ ��^ " fay`_ ' a� '• � �
air i
C
r-• tl `� - R s
4 .3 4-. 13.3
r�� ��„- = .ai,� �� '-T�� � ter. `/..� r`"'• '�
7 _fir:i•:� -.� ♦ ���7R `„ n_+'t+r a. � 'f_ .��_ - �, � � - !
'+ � � � z}� ,� Ill► "� '�!. _�M�,�y ��.�.. . L
. �•,.r 1 •• , i � .r��,,,,��,,.j� _ ' , ��" V. �'`�z•C
•� y. �•.-.,.P��`.�_�:� l �• ��'� � � ,''4� _r .w•- •..s;_�X `�.�.i- ti' - �' ' •. .'�X"7F, ',-Z'
tA
71
\, � (, i >. _�����1���r _�.fit ,���`��-:�'�. Via''`'*,� t'` ��•L�,�y,,s•�.�'�.,... _�;��.;'�+s` ,''�.�� �� i ,�
' i• �- y~ �Z•�'�' },ft..l_ .+,�.S.� '. z�a,. •_t � � '.• .max"
r ++LL
. `�"" '^ r•i x •tip�;,,. _ 4.
kr.
IV
--Wel0•rL°h•' +� 1 - „ M �r c �y,,�G7' _-r - f '� ti
_i - ' ,�`� ... �T�' if f r �i�•' _.• ..•., ✓ .. '41 L� ��7•- tom•.-o _ a
' � .r _��. ,G +�. /I• � ✓. � � �`' ..may, .F � c .r',,«r :�?S.+l.�� a.b -� r ✓'_
- � --- ��; � �, ���'� - ,�� _fir, • I ?� c:, .. •+�7 :'�:.F.,,',��,+,�i, _"�,.-+ :.11^'��A. .. � !; ,
"'—•�—� ,���> l,y.� .r�c�• of � :■ � r r •- �(q i.ar{. P,"•� 'r���`•0.,;1,"�"!�+�, .i_� '� A, - v J; i ..
--�.�aG' �.•.r.`..�» c �i� 'r�4.r �. -c� ,.1. 1�; '��`3�L:.j:�►..x� ��'- �. � _�'�'._ 'O''t` fy -y
/ r
/ � 4
i
r i• � t IFIle
r `
a a
It
414
+ fit. ?�` ;JI► ) a
Y 00
At
40
,''� • r( t ,, ''
r
,
r �
r h t01l .t�
Ir
6-1
Jr
Ir
10
}
t �r
rlt�,� � • r •�
f tt
I:
`�(� ..� III,♦� �.
f ••r'f • v v
�• � j i J/J'7'
S
/ r
r '�
r ��
w
.1 1
r '
? ,,W' ,
Groundwater Monitoring Data: Summary of Wells
Project Name: Cottonwood+Ida J
,'Project Number: 18-054 32 Discovery Drive
Location: See Maps i Bozeman, MT 59718
Date Installed:4/24/2018 I ENGINEERING Phone (406) 582-0221
Installed By: AESI seRVrcas,INc.
Fax (406) 582-5770
verse Pro}
NOTES:
1) MW-1 through MW-5 were installed during test pit explorations on 04/24/2018.
2) MW-1 was installed in TP-1, located at SW corner of property.
3) MW-2 was installed in TP-2, located at SE corner of property.
4) MW-3 was installed in TP-3, located near center of property.
5) MW-4 was installed in TP-4, located at NW corner of property.
6) MW-5 was installed in TP-5, located at NE corner of property.
7) Highest water measurement to date in each well:
MW-1 MW-2 MW-3 MW-4 MW-5
Date Time Depth to GW Depth to GW Depth to GW Depth to GW Depth to GW
below EG below EG below EG below EG below EG
(feet) (feet) (feet) (feet) (feet)
4/24/2018 NA 9.00 10.00 9.25 9.00 9.33
4/30/2018 8:45 AM 8.03 8.52 7.77 8.46 8.82
5/7/2018 4:45 PM 8.06 8.68 7.90 8.62 9.01
5/15/2018 8:15 AM 7.98 8.65 7.86 8.56 9.05
5/22/2018 8:15 AM 8.17 8.82 8.06 8.78 9.26
5/29/2018 8:00 AM 8.14 8.79 8.03 8.74 9.26
Groundwater Monitoring Data: Page 1 of 1
PCzo� c.T s-�r�
jJIT] . I . J-j
COTTONWOOD STREET
94-2
8114i
�-a
a- g r o
P ° D
. '�'„
r N D
n C t i .. m
p
1 z
p e t m
m
�" •�7-' 1 i"•4 p7�o
owl
CnEm
s
B6f1G OLE
0 600 1200 1800 YY
VEST PIT '
r
SCALE.: 1 INCH 600 FEET
�xCerP�- �r•� ZOOS
r;
THINK TANK, FREIGHT BUILDING A :,. FIGURE 4
Civil Engineering 7s DISCOVERY nAlve
SITE PLAN Land Surveying sommm'.4739711 CRAW Or CSP
PRONE(4%)S 4= DATE: os/=S
�,r��T �� 7�7 `F A BL EewD Gcotechnicnl Engineering VAX(4%1$M n7o PROJECT y: 65-°75,1
BOZEl AIN11V O , UGIN E Ine,
• ..L��s Ci.it Cn�inrrrinp �2 DSebtt7[�mr .
ALLIED R t B MT svta FIELD LOG OF BORING
Geirnrrhniral Fsu utrrrin
Phone
one(4(406))a2-0�I
ENGINEERING Land Sur.ry*.tg Fa.(406)sg,%M(l
■Uq.wC:UY .•K
PROJECT. Think Tank Freight Building JOB#: 05-075.1 DAJ'E: 5/3/05 BORING: B)1-1 PAGE: I of I
Bozeman,MT
LOCATION: See-lap ELEVATION: See flap TOTAL DEPTH: 30.2 ft DEPTH TO GW: ll.S ft(+/-)
DRILL TYPE: Mobile Drill B-61 CASWGIHAMMFR/SAMPI.ER: 2.0"O.D.Split Spoon Sampler S 140 lb Ham.
MUM Steve Malkovich,O'Keefe Drilling FIELD ENGINEER: Craig:Aladson.PE,AESI
OTHER FIELD OR
DESCRIPTION OF MATERIALS y ? v.7
SAMPLE INFORMATION
e �'s 10.0,-1.51: iIID5pn"rVA SI-A Arilt!-PiAAloyQtatnt11401;
•°• Dense.brown.silly sand%GRAVEL.slightly moist.(Bast Course) @00' 59 3,35:
(SSS)
11.5'-2.71): k d`5li 'Medium harddrillingioIlt'
Stiff.dark brown,sandy SILT,moist.(Original Topsoil) SI-B 'Smnodt drilling to 2.5%
•� @7 2.2' 52 8.3ti •Medium hud drilling from 3.0'to S 0'.
0 (SSS)
r 12.7'-30.2'1: Silt„Sgnd L%Cra ,tg$an�.,Gfp+qJ SI-C
/1 o bledium dense to very dense,brown.silty sandy GRAVEL iosandy 03.2' So— 3 7!:
Y° GRAVEL with cobbles from S-to 10".slighily moist to wet (SSS)
K A SI-D
Q269, 50• Z7%
(SSS)
•14otn 90%010.0'„seems of SAND and s(hy SAND 'Shgh(1)caster drill action from SA'
to 100'
From 9.3'to 9 S'.nted.deost.silty SAND, S I-E
10 'from 9.81 to 10.7 very dense.Sand)GRAVEL. '9 92' S4 4 4%
(SSS) •Medium drill action From 10.0'to
14 0'.
° 0 �7- SI•F
0 0 = 11 9' so-: 8.9!'.
e
ISSS)
0 Q •F(Om 14,0'to 15.0',seams of SAND and silt SAND. S 1-G 'EaSICT drill action from 14.0'to 13.0%
From 14 2'to 14,6%some slough.dense.SA;'D q 14.2' S4 MAT.(SSS) .Medium doll anion from I5.0'to270'
c •From 14.6'to 13.7':dense.sandy GRAVEL wnh cobbles
o SI•H
o �PtfS3 C116.9' 30. 21.1•r:
° Set Clround Wait r Monitoring well(2-Schedule SO PVC) (SSS)
4 SI•I
0 o ti 192' 92- w,s•�
20 (SSS)
0
o SI-)
° (2r 210 io- 14 511:
c ° ISSS)
0 0 SI-x
,r 24,0' so- 7.3%
0° iSSSI
c
SI-L
It,26 9' 50• IS 9'0
° (SSS) 'On a cobble from'.7.0'to 2b.0`
0
0 S1:K
0 O fr)`29.V Sp- 02%
?0 ...................BOtt:m o..... ..... .... ...... tsw
Renewed Bv:
•- (;i.il Engi.."rinF R M3cucen Dme
ALLIED one 1.1."�'�71g
P FIELD LOG OF BORING
, r:tntethnieaf EnLinerrinY
Phan!(a061C8:•02?1
ENGINEERING Land Sur,"ing Fav(406)W-s770
PROJECT: Think Tank Freight Building JOB f: 05-075.1 DATE: 513105 BOR1\G: Bfl-2 PAGE:1 of 1
Bozeman,A'I'T
LOCATION: See NJap ELLVXrI.0\t: See flap 'TOTAL DEPTH: 30.0 ft DEPTH TO GHr: 12.3 ft
DRILLTYI'E: ARobile Drill B-61 CASING/HAWMERISAMPLER: 2.0"O.D.Split Spoon Sampler& 140 II) Ham.
DRILLER: Steve 1lalkorich,O'Keefc Drilling FIELD EI\GINEER: Craig Madson,f E,ACSl
L OTHER FIELD OR
O DESCRIPTION OF MATERIALS a n'z SAMPLE INFORMATION
a < C Gp
L V
:Zc LU
c
• �. � (0.0'-1.0'I: $2nd�Gf3>';) 52•A Riit)1AYAtU9n.9h�en__-_atiJlnJi
Medium dense.brown.sandy GRAVEL,moist.(Base Course). �?00- 2S S.0%
(SSS) •Medium drilling to 1.5'.
-� 11.0'-35'1: 5?nd3ll( S2-B 'Easy dulling from IT to4.0'.
Soft to stiff.dark brown toblad..wind)S1L'faith gravel intermixed. 02,0' 1S 16.0%
slightly moist to moi$L (SSS)
S2•C 'Diedium dell action at 4 0' Some
06 4 0' 52 10.0% Oriding at gravel contact.
° (3S'-29.i'I- SIB.Cantu SirarSl!25ioe1�. [�!S)' (SSS)
o Dense to very dense.light broom to dark brown.tihy sandy GRAB"EL to D
31 o sandy GRAVEL with cobbles from 8-to 10".rnoist to wet' rr$I D OS< 3.8!:
(SSS)
0
� o S2•E •Hard drill action from 9.0'to l l W.
C
10 9,0' SO- 3.0% •Medium drill action from I I W ita
^ fSSSI 20.0'.
0
0 S2•F
0 0 _�. . . . . . . . . . . . . . ... rr 12 0 48 10 3S:
e — (SSS)
0
•Fmm14.0'ro15.5;17.O'toIS.0%19.0'm20.0:22.0'to230% S2•G
27.0'to 30.0%seams of SAID(Alluvium). ,#-t3 0- 65 t3.7!:
(SSS)
o S2-H
Dies: (a 17,0' 63 16.3%
Set Ground Water s4onRo»rag Weil(2'Schedule 80 PVC): (SSS)
0
S2.1
q190, 58 16 6%
20 (SSS) •Hard drill action 20.0'.
O 0 •:Medium to hard drill action from.
°
o ° S2.1 20.0'l0 24 0' Hard cobble contacted
e,27r 91, 1S3% 0124.0'.
isss) •kiedium drill action fronr24.0'to 30.0'.
52-1:
Cin 24 2' $3 t 14
°
isss)
a S2•l.
OSS)
SUM
130uunrofborchvl!(fp 30.U' 1,29.2' 50, 17.OS:
30 ....... . ...............- ....................... ISSS)
I
1
7�
J
Reviewed Bet
F�-
Gittt VOK."'wing 32 D.scmxq Dmc
ALLIED `6) 2-022 FIELD LOG OF BOI.tING
<:rotechnien)F,n6innring Vtpnc (aopj Stt.0_2I
ENGINEERING (.andSuneytna rJ\ (406)$92.$770
♦6w N[:l• .rv4
r
PROJECT: Think Tank Freight Building JOB 05-075.1 DATE: 5/3/05 BOR1\tG: BH-3 PAGE: I of!
Bozeman,NIT
LOCATION: See Map ELEVATION: See Map TOTAL DEPT14: 30.0 ft DEPTB TO GW: 11.8 ft
DRILLTYPE: While Drill 8-61 CASIN'G/13AMMER/SAMPLER: 2.0"U.D.Split Spoon Sampler& 1401h Ham.
DRILLER: S(eve iNlalkovich,O'Keefe Drilling .FIELD ENGINEER: Craig Madson.PE,AESI
L • 0= ?7_ OT14ER FIELD OR.
C D.ESCRIPTI01' OF 1\1A1'ERIALS ? ✓� SAMPLE I\FORMATfO\
c �6 p0
L CA. xa ;;_U
(0.0'•ISI: �qan4-Gans) S3-A P-rAN"tc1c1iaa9�Krrtl�rs
.,. Daux.broun,sandy GRAVEL.shghtly moist.(Base Course) n 0.0' 50- 2'"',
ISSS) •Medium drilling to I.Y.
St!_n.Qf-sill SS a 'F.asydMiingfrom ISto3.0'
Medium stiff to stiff.dark bmun,sand\SILT with gratel.moist. 'Grave)contact
(Original Topsoil). 020, 36 2.ES6 'Mediuntddllactionlo63%
IS551
SS•C Medium drill aetion at 4.0%Some
13.0%30.5'): Sap}f.Cra l C 4 1' 46 3 5!r grinding at gn%el contact.
Medium dense to very dense.dark broun,sand%GRAVEL uith cobbles ISSS)
from 8"to t0",moist to wet, S3•D
@,7,0' 30- 3.6% 'Far,•d6n action from TO'to 7.5*
o ISSS) 'Medium drill action to 12.5'.
° S -E
0 q?9.1 65 494.10
10 0 0 (SSS)
n
0 S3•F
4 ef 12 0' z0 9 si: •Hard 611 action from 11.S'to 14.0'
a o (SSSI
•Medium drill action from la 0`to
0
S3•G -'4 01
From4.0'to7.5%14.0'to14-6'iI&Vto19.5%2).0'to22.0%23.5' Ca14.r 4$- 17.3"
to 24.5%29.0'to 30 s':seams of SA.N D(.4,1lumm).. (SSS)
O o
a
$3-H
o Ca,17.0' So- N0 Rct.
o ISSS)
. J31
r(A 19-0' 76• I1:-,%
20 (SSS)
S3-)
22 0' 50+ 12 2:,
a ISSS)
S •�
ra 2,0' 5D• 12.4%
I$S$)
n o 'Hwrg up on Cobble at 25.0'
t/ a
a
0
41 11.3?.
30 i5ss)
Bottom o-n
fban4iole
_....
Net9etsed Bt•: C in>{��
�� Cit it Enpinrerinp 12 Discovery Drive
4 Bozeman,NIT 5n716
ALLIED (eosrehnrrolCnpnetnnq FIELD LOG OF BORING
PAMie (411t,)582.02:1
ENGI;:EERING I.anrl$urtryinq Fm (4061M-$,70
.�q•nurs ,w
t.
PROJECT: 'Chink Tank Freight Building 10B k: 05-075.1 DATE: 5/4105 BORING: BH4 PAGE: 1 of 1
Bozeman. .N1T
LOCATION: See Map ELEVATION: Sec Nlap TOTAL DEPTH: 30.0 ft DEPTH TO GW: 12.5 ft
DRILLn"PE: Mobile Drill B-61 CASE\'GIHA.,\I,IER/SAMPLER: 2.0"O.D.Split.Spoon Sampler cC 140 lb Ham.
DRILLER: Steve 14alkovich,O'Keefe Drilling FIELD ENGNEER: Craig iladson.M AESI
tr
t v- ~1z. OI'1lER FIELD OR
t- DESCRIPTION OF MATERIALS < SA.MPLE INFORMATION
� Z= %U
O.D'•L0' $itl!�R�ly ClAi'C1 S4•A D 1 n 1 t' htc
' Dmtc,brown,silty sandy GRAVEL,slishds mist.(Base Course) C0,00. 40 4 21:
(1.0`-L0'1:�rganit Silh�1agTopso (SSSI •\ledium dnlling to 1.0'.
Stiff,dark brats n to black.organic silty CLAY topsoil,m0151 S4.8 'Easy diilling from 10' to 3.5'
12.0'•4.0'): SHI SIrtd ro_tiaAdyUJ Lr 2 1• 50 5.8m -Gravel comet at 3.5'.
Medium dense,dark brown.silty SAND to sandy SILT with gravel. ISM
0 0 slightly moist. •Harder at 4,0%Some grinding.
4.0 30- 14.7•d .° (SSS) Medium drill action to 5.0'.Some
(4.0'•27.0'I: CpndRGr�re( cobbles.
Medium dense to dense,brown to dark brown.sandy GRAVEL with cobbles S4.D 'Easy to medium drill action from 5 0'
o from S-to 10".slightly moist to wet(Alluvium). r 7.0' 50t 3.5% to 20.0'.
o (SSS)
° S4•E
y 9.0 so- 3.6%
10 (SSS)
n
0 O SI.F
° 0 . . . . . . . .. . ...M. . . . . . . . -( 50 5 6Ye
o (SSSjSS{
S4•G
•From 6.0'to 7.0':90 w 10 0%13.0'w 15.0%16.0'to 17.5':19.0' !@ 14 1' 30» 11.0%
to 19.S':22.0'to 2-1.5%seams of coarse SAND. (SSSI
0
SA-H
\Dies:, La ITT' S0- 12.4%
Set Ground Water 4loniroring Well(2-Schedule 80 PVCL (SSS{
aa.190, 64 13.2%
20 0 o jSS$) •Medium dnll action from 20 0'to
n 220'.
0 0 S-14
° 6220' 00 2034
a (SSSI
0
544:
0 C F;24 0' SO- 18 1% Cobbles from 24.0'to?6 0`
'.SSSI
Q o
•Easy dnlhng from 27 0'to 29 2•
a
127.0'-30.0'1: Saj0j_S7(loAII[q.Sgn0
Mcdiuns deitse to sn0:brown.sandy SILT 10 silty SAND.wet yl•L
Ei.29.I' 40 16.91:
130.0'•30.7'l: CjILt_Cr?tely,Cand (SSSI 'Auger ranee out encased in sandy Sll T
30 Medium dense,dart;brown to black,siha gravely SAND wet slid itascneounlered at the boitoni of
..................... __ the borcholr.
Botminofbotchoic ji;i0
i
Revictted 8y:
ONO t:gginreritg 22 Dismer5 Dti.e
$971
ALLIED Phw*(4W) .022 FIELD LOG OF BODING
Geowcl.niral knrinrerit)
Phone(�D6)$Ci•0221
ENGINEERIKG lAndSur.r�ltlg Fa.(406)522.$770
PROJECT: Think Tank Freight Building JOB#: 05-075.1 DATE: 514105 BORING: 13H-5 PAGE: 1 of 1
Bozeman,NIT
LOCA11ON: See Map ELEVATION: See Nlap TOTAL DEPTH: 30.0 ft DEPTH TO GW: 13.5 ft y+/-)
DRILL WPE: Mobile Drill B-61 CASING(HAMMER/SA.MPLER: 2.0"O.D.Split Spoon Sampler&- 140�b Ham.
DRILLER: Steve Malkovich.O'Keefe Drilling FIELD ENGINEER: Craig Nladson,P1E,AESI
0"fNER FIELD OR
L o DESCRIPTION OF,\4ATERIAIS z> ✓z SAMPLE INFORMATION
�-' L3 '✓�-" z o 5 U
{00'-I.0'): Sandy�ta�ct SS-A �illlin�elcl(9nQtns7± ti92T
^ Medium dense,brown,sandy GRAVEL,slighth moist.(Rase Course) 07 00- 42 3.7%
11.0'-2,01): Qr�;alt }h1 a�tq�gnd. 1 (SSS) 'Medium dolling to 10.
Stiff,dart,brown,organic silty CLAY to sandy SILT w'/seal gtavd,moist SS•B -Easy dnitin=from 1.0'toa.C'.
•Medium dnT(action from_0'to90'.
^^ (2.0'-4.0'): .S,.a�rd ;ilt V120- 33 6V.
Stiff,dart brown.sandy SILT with frravvi,moist (SSS)
SS-C •Some cobbles encountered Moten
£40' SO. 4'N 5 Wand 95'.
c (SSS)
° Dense,brown to black,sandy GRAVEL with cobbles as lute as V.moist S5-D
° to wet @ 7.0' 501 23%
C (SSS)
o SS-E
f 90' SO- 5.2! 'Slow advancervent orauget from 9 S'
10 0 0 (SSSI to 12.0'.
0 SS•F
° .T.;c ?12.0' IS$ O
° ° . . . . . . . . . . . . . . . .. �aZ. . . . . . . . . . . . . . . . . (SSSI
° — 55•G
O •From 17.0'to 19.0:19.0'to?0.0':22.0'to 23.0'.24 0'to 27' Ef 14 0' SO• 9 613
seams of coarse SAND(Allumm). (SSS) 'Faster auger advaneeme»t front 14.0'
to I£.0'bruise of u sd seams
0`
° S5-H
�9tSi M 17,0' 63- 11,7,-
(SSS)
Generally true cobbles than to pre.ious boreholes •Medium to easy auger ad%incrnem
° S5.1 from IS 0'to 20.0' Ginding through
47102' SS• 19.1!e same cobbles
70 (SSS)
n
0 0 $54
° G220' so, 15.$%
(SSSI
° 55•I;
(SSSI
55.1
rz 270'
° (SSS)
0
° SS•id
0 it 291' 27 21.61:
(SSS)
30 •kasy dn11 action from 3;1Vto 33.0%
yledwrrt s:iiT to viIT.brown.sand;SILT wct
bottom nfb.rreholt�a 330'
Test Pit Designation: TP-1
!��C Cldl►.atineerint �. C 0 `i 9
IMrrman,MT 5n715 tC Q) Q �
t':ro,rrAalral►:ntlntrAop� C E .- Horizontal Distance in Feet Location: See Ma
ALLIED PM,nr Irro►se2•n221 o CL �' P
lNGIYt]:ttlNl+ land Sorvrgiut Fax (NID)192•$770 u (� N
. • O 2 4 C S 10
Description Of Materials o `a`'� „; •
.�'— l.3' .'•OO•. •.q, QO•_ ..Q� yO.. e.v qv•. -
i Tedium dense; brown: sandy n• _ �n
GRAVF;L;slightly moist:
(Tlase course). 2 2
Stiff; black;organic silty CLAY ; f bf �.�✓.� � f. `' r
topsoil; moist; (Original topsoil). � / , f:
Stiff; brown;sandy SILT with gn4.0 4 0' ,�' D.
gravel; moist. (Nucko p. �. .�. �. O Q
Medium dense; reddish brown; <7 O O O d C
sandy GRAVEL with rounded CO C:> a.'
cobbles up to 4"inches in dia.; G
slightly moist to moist(Alluvium).
8
10 -=r
a
I
Surface Elevation: N/A Backhoe Type: John Deere 31OG Job Number: 05-075.1
Total Depth: 6.0' Backhoe Operator: Mike -Townsend Backhoe Project: Think Tank
Groundwater: Dry Logged by: CRM Date: 05/16/05
�� CIS:1►.n�Inr�rinR 1011 „^sypc^ 2 a� v Test Pit Designation: TP-2
narrnun.At7 So71S Cfl N Q
ALLIED ('ewnChnlcvli:wpin�srSn� �,r 1� %I 5 715 M o F Q Horizontal Distance in Feet Location: see map
ILKCi1NF.M.li 11Y(i lend$vrre�lnl! Fa.(4n6)582-SM o V U)
0
••�• 0 2 4 6 $ 10
Description Of Materials 'n ' -' "- ^ ' ' ° °• '' "'°• =a ' °=
, .off•. •.n� - , .off•. •:o�.•O.o`.. •.n>• ' 'OG.• - .;�.
1OU.0`1.3 0.. .0:'0 A; t,:'O �•�;:,:'c� "t�;:d,,:'t�
Medium dense; brown; sandy •
GRAVEL; slightly moist; 2.
(Base course). 2 r r � %• %rr/J�r ;r rir�i r��� �' i r r--
2 I X- 1.8'
Stiff: dark brown to black; organic '
silty CLAY with gravel; moist; •
(Originallopsoil). � G � � �
O l.t;'_2.8' 4 Q. �.
Stiff; brown;sandy STI;t with �' �' (0.
gravel and scattered cobbles; moist. a Q a 0
O 2.8 -6.Q_ O Q
Mcdium dense. reddish brown; O•d.O.�.G7
sandy CRAVEL wish cobbles up to _
4" inches in dia.; occasional cobbles
up to R•' in din.; slightly moist;
(Alluvium).
8
n
S
10
tZ
Surface Elevation: N/A Backhoe Type: John Deere 31OG Job Number: 05-075.1
Total Depth: 6.0' Backhoe Operator: Mike -Townsend Backhoe Project: Think Tank
Groundwater: Dry Logged by: CRM Date: 05/16/05
101 r,Main.Suite � ~-' in Test Pit Designation: TP-3
,�;�J ,� (-rat Enetoeerinq
ALLIED Camct We Fnelr,earinq R o E tZ Horizontal Distance in Feet Location: See Map
rVOINF"ING Land Surreylne 1;m (4001582.5770 c (� Iv 1(]
Q 2 4 6 8
Description Of Materials °'
O1 SGU�l.U• O '�-o.'0 .�� 'C1••o o: o.aon Q^o..�!•:o. '..G.�4D�hh-�°.A.
Kedium dense;brown; sandy
GRAVI~L; slightly moist; 2
(Rase course). 2,
Stiff; black; organic silty CLAD
topsoil; moist: i "f �/,� i% /�" i` X.
(Original topsoil).
p.�.O.�. .Q.O.�.o.<.0
5)-n p
O?"3.�3 JSe to;4.0' 4 p .O -O •O•' •O x
tnllereo
Medium stiff;dark brown;sandy
S1121' to sandy CLAY with gravel Q'p'd'4'CZ>•� 4Q,'�'<Z) <Z'
and cobbles; moist; o a I
(Transition Layer).
O 3:5�k2 6
Medium dense; reddish brown;
sandy GRAVEL with cobbles up to
4"inches in dia.;scattered cobbles
up to 8" in dia.; moist;
(Alluvium).
8 i
r�•
10 c.
Surface Elevation: N/A Backhoe Type: John Deere 31OG Job Number: 05.075.1
Total Depth: 6.01 Backhoe Operator: Mike -Townsend Backhoe Project: Think Tank
Groundwater: Dry Logged by: CRM Date: 05/16/05
l Mam.snrltA lot l' a? a Test Pit Designation: TPA
cc.il Enpl�arMe C v
Fk»!n an.M T c0T1 S (D (t) Q
r .
�Crrvicchnkal l:n InrrrinR
Ah,L1Ei� ^hr,a.,•,�a?.^221 o E Q Horizontal Distance in Feet —� Location: See Map
Hraeslra��nl I nn s...ggne Fay 16tY•1 SRZ S7To o C J (n 0 2 4 6 8 10
ILI-
Description Of Materials
-nn �`�;•• •nC, %•.� - e•`e�• - ego.•. • ;}��.
04.0'7 1.0' C1, •�o:'O ��. 'G.'„-a.'(C� :o- 0,'0 o.'ta:�• -Cl;•�o:'��:..
Medium dense; brown: sandy
GRAVEL;slightly moist; 2
(!take course). 2
Q IA' 2.0. �����'O3
Stiff;black; organic silty CLAP �
topsoil; moist; - -(Original topsoil).
d.o.QG.
$a-A •
Medium stiff; brown with significant
snit deposition;sandy SILT with
gravel and scattered cobbles; moist.
Medium dense; reddish brown; 6
sandy GRAVEL,with cobbles up to
4" inches in din.;scattered cobbles
up to A" in dia.; siltier in uppermost
I'of layer; moist.
3
A
P
r
S.
G
Surface Elevation: N/A Backhoe Type: John Deere 310G Job Number: 05-075.1
Total Depth: 6.0' Backhoe Operator: Mike-Townsend Backhoe Project: Think Tank
Groundwater: Dry Logged by: CRM Date: 05/16/05
Y'� P
AL�1ED
ENGINEERING
SERVICES,M.
410i rse Pr
LIMITATIONS OF YOUR GEOTECHNICAL REPORT
GEOTECHNICAL REPORTS ARE PROJECT AND CLIENT SPECIFIC
Geotechnical investigations, analyses, and recommendations are project and client specific. Each project
and each client have individual criterion for risk,purpose, and cost of evaluation that are considered in the
development of scope of geotechnical investigations, analyses and recommendations. For example, slight
changes to building types or use may alter the applicability of a particular foundation type, as can a
particular client's aversion or acceptance of risk. Also, additional risk is often created by scope-of-
service limitations imposed by the client and a report prepared for a particular client (say a construction
contractor) may not be applicable or adequate for another client(say an architect, owner, or developer for
example), and vice-versa. No one should apply a geotechnical report for any purpose other than that
originally contemplated without first conferring with the consulting geotechnical engineer. Geotechnical
reports should be made available to contractors and professionals for information on factual data only and
not as a warranty of subsurface conditions, such as those interpreted in the exploration logs and discussed
in the report.
GEOTECHNICAL CONDITIONS CAN CHANGE
Geotechnical conditions may be affected as a result of natural processes or human activity. Geotechnical
reports are based on conditions that existed at the time of subsurface exploration. Construction operations
such as cuts, fills, or drains in the vicinity of the site and natural events such as floods, earthquakes, or
groundwater fluctuations may affect subsurface conditions and, thus, the continuing adequacy of a
geotechnical report.
GEOTECHNICAL ENGINEERING IS NOT AN EXACT SCIENCE
The site exploration and sampling process interprets subsurface conditions using drill action, soil
sampling, resistance to excavation, and other subjective observations at discrete points on the surface and
in the subsurface. The data is then interpreted by the engineer, who applies professional judgment to
render an opinion about over-all subsurface conditions. Actual conditions in areas not sampled or
observed may differ from those predicted in your report. Retaining your consultant to advise you during
the design process, review plans and specifications, and then to observe subsurface construction
operations can minimize the risks associated with the uncertainties associated with such interpretations.
The conclusions described in your geotechnical report are preliminary because they must be based on the
assumption that conditions revealed through selective exploration and sampling are indicative of actual
0 0
• •
conditions throughout a site. A more complete view of subsurface conditions is often revealed during
earthwork; therefore,you should-etain your consultant to observe earthwork to confirm conditions and/or
to provide revised recommendations if necessary. Allied Engineering cannot assume responsibility or
liability for the adequacy of the report's recommendations if another party is retained to observe
construction.
EXPLORATIONS LOGS SHOULD NOT BE SEPARATED FROM THE REPORT
Final explorations logs developer by the consultant are based upon interpretation of field logs(assembled
by site personnel), field test results, and laboratory and/or office evaluation of field samples and data.
Only final exploration logs and data are customarily included in geotechnical reports. These final logs
should not be redrawn for inclusion in Architectural or other design drawings, because drafters may
commit errors or omissions in the transfer process.
To reduce the likelihood of exploration log misinterpretation, contractors should be given ready access to
the complete geotechnical report and should be advised of its limitations and purpose. While a contractor
may gain important knowledge from a report prepared for another party,the contractor should discuss the
report with Allied Engineering and perform the additional or alternative work believed necessary to
obtain the data specifically appropriate for construction cost estimating purposes.
OWNERSHIP OF RISK AND STANDARD OF CARE
Because geotechnical engineering is much less exact than other design disciplines, there is more risk
associated with geotechnical parameters than with most other design issues. Given the hidden and
variable character of natural soils and geologic hazards, this risk is impossible to eliminate with any
amount of study and exploration. Appropriate geotechnical exploration, analysis, and recommendations
can identify and lesson these risks. However, assuming an appropriate geotechnical evaluation, the
remaining risk of unknown soil conditions and other geo-hazards typically belongs to the owner of a
project unless specifically transferred to another party such as, a contractor, insurance company, or
engineer. The geotechnical engineer's duty is to provide professional services in accordance with their
stated scope and consistent with:he standard of practice at the present time and in the subject geographic
area. It is not to provide insurance against geo-hazards or unanticipated soil conditions.
The conclusions and recommendations expressed in this repot are opinions based our professional
judgment and the project parameters as relayed by the client. The conclusions and recommendations
assume that site conditions are not substantially different than those exposed by the explorations. If
during construction, subsurface conditions different from those encountered in the explorations are
observed or appear to be present, Allied Engineering should be advised at once such that we may review
those conditions and reconsider our recommendations where necessary.
RETENTION OF SOIL SAMPLES
Allied Engineering will typically retain soil samples for one month after issuing the geotechnical report.
If you would like to hold fle samples for a longer period of time, you should make specific arrangements
to have the samples held longer or arrange to take charge of the samples yourself.
Allied Engineering Services,Inc. Page 2
Groundwater Monitoring Data: Summary of Wells
Project Name:Cottonwood+Ida
Project Number: 18-054 ) "; 32 Discovery Drive
Location: See Maps Bozeman, MT 59718
ALLIED
Date Installed:4/24/2018 I ENGINEERING Phone (406) 582-0221
Installed By: AESI i DeRV1 ES,'"` '' Fax (406) 582-5770
rse P'0
NOTES:
1) MW-1 through MW-5 were installed during test pit explorations on 04/24/2018.
2) MW-1 was installed in TP-1,located at SW corner of property.
3) MW-2 was installed in TP-2,located at SE corner of property.
4) MW-3 was installed in TP-3,located near center of property.
5) MW-4 was installed in TP-4,located at NW corner of property.
6) MW-5 was installed in TP-5,located at NE corner of property.
7) Highest water measurement to date in each well:
MW-1 MW-2 MW-3 MW-4 MW-5
Date Time Depth to GW Depth to GW Depth to GW Depth to GW Depth to GW
below EG below EG below EG below EG below EG
(feet) (feet) (feet) (feet) (feet)
4/24/2018 NA 9.00 10.00 9.25 9.00 9.33
4/30/2018 8:45 AM 8.03 8.52 7.77 8.46 8.82
5/7/2018 4:45 PM 8.06 8.68 7.90 8.62 9.01
5/15/2018 8:15 AM 7.98 8.65 7.86 8.56 9.05
5/22/2018 8:15 AM 8.17 8.82 8.06 8.78 9.26
5/29/2018 8:00 AM 8.14 8.79 8.03 8.74 9.26
6/5/2018 8:15 AM 8.10 8.72 7.98 8.74 9.23
6/12/2018 8:00 AM 8.45 9.05 8.32 9.07 9.56
6/19/2018 3:15 PM 8.31 8.96 8.21 8.95 9.35
6/26/2018 8:15 AM 8.52 9.08 8.38 9.13 9.59
7/3/2018 3:45 PM 8.50 9.04 8.35 9.10 9.52
7/9/2018 8:00 AM 8.83 9.38 8.68 9.45 9.86
7/16/2018 2:00 PM 9.17 9.69 9.02 9.79 10.18
7/24/2018 11:25 AM 9.54 10.03 9.36 10.06 10.48
7/31/2018 11:30 AM 9.89 10.34 9.67 10.37 10.76
n
;r
Groundwater Monitoring Data: Page 1 of 1
MUM 0 APPENOM 0
NEED MANAGEMENT PLAN
00Y, VOKI,W000 GO Ca
RESPONSE& RESUBMITAL 11 11 JANUAR``2019
SECTION 8 APPENDIX E
TRAFFIC STUDY
w
.s
COTTONWOOD + IDA
RESPONSE& RESUBMITAL 11 11 JANJUARY 2019
SANDERSON ��•�
STEWART
�4
i
M1 ,
IN
v {
i
y
l a
J�
Cottonwood & Ida Mixed-Use Development
-; TRAFFIC IMPACT STUDY
a., hnu Project No. 06020.03
NTAiy,� prepared for:
rr,
b OpenScope Studio
Jos1776 181h Street
a ST San Francisco, CA 94107
rots ' 8 P
prepared by:
r7 ,
Sanderson Stewart
106 East Babcock
. '� Bozeman, MT 59715
w; JAN 28 id IJ
'1 ,J J D ' .TN : ;F _ January 2019
COMMUM iY OtVt c P{'T
i
SCAM DERSOMSTEWARICOG�►►1
,�„-,"`''�.."'..� �-�`'"�` Yes h-•�=-~ �I
y
'off N 0 S 3 0 N V S
• A � RSO STE ART ' �i
S N N W %
TABLE OF CONTENTS
INTRODUCTION ................................................................................................................................ l
SITE LOCATION & DESCRIPTION ........................................................................................................ 1
SITE DEVELOPMENT PLAN ................................................................................................................. 1
EXISTINGCONDITIONS......................................................................................................................3
Streets......................................................................................................................................... 3
Intersections ............................................................................................................................... 6
TrafficVolumes........................................................................................................................... 7
CrashHistory .............................................................................................................................. 7
IntersectionCapacity................................................................................................................. 1 1
TRIP GENERATION........................................................................................................................... 1 1
TRIPDISTRIBUTION......................................................................................................................... 12
TRAFFIC ASSIGNMENT..................................................................................................................... 12
TRAFFICIMPACTS........................................................................................................................... 17
TrafficVolumes......................................................................................................................... 17
IntersectionCapacity................................................................................................................. 17
MitigationAlternatives .............................................................................................................. 21
CONCLUSIONS & RECOMMENDATIONS............................................................................................22
Conclusions .............................................................................................................................. 22
Recommendations...................................................................................................................... 22
APPENDICES
APPENDIX A - TRAFFIC COUNT DATA
APPENDIX B - CAPACITY CALCULATIONS - EXISTING CONDITIIONS (2018)
APPENDIX C - CAPACITY CALCJLATIONS - FULL BUILDOUT (2020)
APPENDIX D - TURN-LANE WARRANT WORKSHEETS
APPENDIX E - OFF-SITE IMPROVEMENT SCHEMATIC
APPENDIX F - PARKING ANALYSIS
Cottonwood& Ida mixed-use development TIS
SANDERSON STEWART �'�
LIST OF TABLES
TABLE 1 : INTERSECTION CRASH FREQUENCY/SEVERITY SUMMARY................................................... 10
TABLE 2: INTERSECTION CRASH COLLISION TYPES........................................................................... 1 1
TABLE 3: EXISTING CONDITIONS (201 8) CAPACITY CALCULATION SUMMARY .................................. 13
TABLE 4: TRIP GENERATION SUMMARY............................................................................................ 14
TABLE 5: FUTURE BUILDOUT (2020) CAPACITY CALCULATION SUMMARY ........................................ 20
LIST OF FIGURES
FIGURE1 : SITE LOCATION................................................................................................................. 2
FIGURE2: SITE LAYOUT..................................................................................................................... 3
FIGURE 3A: EXISTING (2018) TRAFFIC VOLUMES................................................................................. 8
FIGURE 313: EXISTING (2018) TRAFFIC VOLUMES ................................................................................ 9
FIGURE 4A: TRIP DISTRIBUTION AND ASSIGNMENT.......................................................................... 15
FIGURE 413: TRIP DISTRIBUTION AND ASSIGNMENT........................................................................... 16
FIGURE 5A: FUTURE BUILDOUT (2020) TRAFFIC VOLUMES................................................................ 18
FIGURE 5B: FUTURE BUILDOUT (2020) TRAFFIC VOLUMES................................................................ 19
Cottonwood& Ida mixed-use development TIS
S N ARSON 57EW A RY QW44
INTRODUCTION
This traffic impact study (I'IS) summarizes the projected impacts associated with the proposed Cottonwood and Ida nused-
use development in Bozeman, Montana.The purpose of the study was to assess the traffic-related impacts that the project
may have on the surruundin',transportation system and ro provide reca»emendations to miti,Tate any- such impacts.The
merhodoh)q and analysis procedures used in this stud-employ the latest technology and nationally accepted standards in the
areas of sire development and transportation impact assessment. Recommendations made in this report are based on
professional judgment and these principles.
SITE LOCATION & DESCRIPTION
The Cottonwood and Ida niised-usc development site is located on the northeast corner of the Cottonwood Street and Ida
:Avenue intersection in Bozeman, MT. The legal description of the site property is Lors 5-28,Block 105,Northern Pacific
_addition. In the immediate vicinin there is a wide varicry of structures,most of,\x-hich are single family homes. although there
are also a few commercial businesses.The block to the north of sire contains Theory Hair Salon and other commercial
buildings. To the cast of the site, there is Bell Plumbing and I Icatin"alon(y with a fcv\-sirne'le-family homes. 011 the block to
the south of the sire there arc restaurants including Trecline Coffec Roasters,Wild Crump,and hink's Delicatessen,along-with
other businesses including CS Motorsports, SAV Di""iral I�csi�rn,Live From the Divide,and Stella (foods Bed and Breakfast.
To the south and west, the development is mosth residential except for the lArkind Mansion Bed and Breakfast. Figure I on
the following page depicts the study area,including key :and the current site conditions for the development.
SITE DEVELOPMENT PLAN
The site plan for the Cortoriw()od&Ida mixed-use dcvclopmenr proposes the demolitil m of most of the structures that
currently reside on the site. ()nce demolition is complete,construction will begin on fire new buildings and the renov arion of
the building in the southm-est corner of the property-. There will be one apartment building with twenty-three studio
m units. Building rn-n vrill he a a,-lining facility Neirh eighteen studio apartments.
aparrments and nvenry-three one-bedroo
Building three-rill be a townhome structure consistin-1 of siy unc-hedroofn units ;,nd six rwo-bedroom units. The fourth
building_,will consist of four one-bedroom units and m-ch-c t-\>-o-bedroom units. In total there will he four ne"r residential
buildin(*s with '92 units.Building fire NN-ill he renovated and Turned into ,a commercial braiding with a ?.1-S square-foot
f� orprint. Building six will be c"nsrrucrcd as a 28,681 square-ffi)or office building.The sire will also pr,,ride a 39,-22 uyuare-
fuot undcrground parkin; g:aragc\vith ')h rc,r:al space. l'i«ure_' shows the proposed site layuur.
.Access to the (:ortoMrood & Ida mixed-u',c dcrclnpnxnt Will 11:11'C one print-,try locsaiun. 'There will be unc <access to the
undergr„und parkin,*pinwIe on ncC norrhwcsr side of the proper;\ off aspen Street. ']'here is also dialmmal parking(16 spaces)
on the sourh of the propert\-aloriv ('ortonNruud Street and parallci parkinp, '1 G spaces' on the north and cast sides of ncc
prol,err\ along.Aspen Street and Ida lrenue,but it a c\pcctcd ahsa mosr trips\rid .access the sire from the,garage.
n
Cottonwood and Ida mixed-use development TIS
SANDERSON STEWART47
ao��
k r
4
i - }
,a�. •'` `%� �- �c�'`' � it - `�:i' i' .�
'.S rt ��rl Tail t �!i _• -ft :,.���" ! .9 !,1. '
♦r `���'�! `,. ��•. �:+� �.�...i'-0 0 tip.rlCr. •-.
At j
a
iA
At-
or
,�' ':��.bx Sri s �.•- ,_. c .r � ''
iI s •�.
•i1'�� !� �x
�• o-- r
dor
x x r
Figure 1:Site Location
Cottonwood and Ida mixed-use development TIS
• R T E A R ''•,SAND SONS W T
ASPEN STREET t
w _ �,Ci TY R/wy
.�. + 4
} 1 y•I�r1 'jM'!tt�+ t.T - ♦, 4 T -+-�•1 • ` w ' '4 {i
r i rs
� f
1 `-� :- �tea►s+ir.i,a�[... l 1�
-Y-♦• YI•w
� � �� eam essa••�r.r-fie—. ;'�.-` e. 1< "• e�
POIR
3 �
.r.,,,� � a'"" a i+..��• ° �+ •` +w+l.�i4 .� ' j
! �
Figure 2:Site Layout
Streets
•I-lie hropOsed of this hr,)jcct site mill hive a direct impact On the adjacent streets and intersections. The
f,11(oxin par,>,grahhs describe the exisrin area roadways that are m()st likeh-to be affected by the traffic vohumes ;encrated by
this ncNN-cOnstrUctIN1.
Cottonwood and Ida mixed-use development TIS
• 0
SIl juauadolanap asn-paxiva npl pun pooMuovoD
LiOUJ.lJljl LjJw,) Lit 1;). 1rn I(, ulna (oxi qnJ \j1:JllliJ .11llll-TI,t)j `{,.,"\rLi r Sl]»Tiq ull'.I\ 'ILI,I]s.\s uUl]l'..11j1S,rl_l J�,l.U, s LIl'•LLM/(,jj
jO ml;) ,)III pull Spil! ullis ir[1(,TJJin11 >,J,CII� III()(],•\(I jl'•(ITJLipd lll' pil Lit: ,i: p,)ijisslaJ SI uluj�
,laal�S UIPW
'li(ILLi C-)(i OJ p,),)d,s p:1J,()CI t,ll Si ,lT,lll.i. 'a lll`jll'.(l i�lll'•1l'.CI J»TJs-uO Ju:l]JTL I.)nii pull. sx)pjlll,Ll, i,)m..Ts
lj]T.\\ jv.)idL j j,l_Al'.(l lull-t,.w i' S..)tIN)x)q j7l' m )lj] Jl1TJ,�]Llr)T,j)Ili t)J nLIn1LnJIM,J j,ul'•JvTJ(;.\-,)Jp T,j llissm:)T,7J4N'
's")hls lj]l,(i uo Il_Al'Tn LIJI.\\ \1'..\\pr(m jl l.Al:(i T sr,p,)TJ` sl.\l'.Cj IIJT_\A Ur,l]IJST,I]LiT SIT it'. ,In;),) j ,liILTJ.A`' la,I 'Luli1S_\s 11Ol]l',lTjissl'.il
J»3J, ,Lll:uylO�j jO.Vl;) .-)qj llllll sjl]1'pullis twut'.ntjls,l'•jl ll'u(I;JJCI?j s j.Cjj� glO(i.\q J,l•7.U5 jlaOj 1'.. St'. jl,7TjlsslljJ Sl ,li1LT,l_A�' I:III
anuaAV epl
'Li(ILu c- :1(I()I p.nunssr. )(i ur-)JT Jn(I 'J1LLT1l p,),-) I, l,)],()LI
()tl Si ,,)K)tj jI 'J»T]", 1—wil".Lur.I lIJl.1\ SJJISJl]LTl Jl iiJull ,T,,Iljlll,lls l�.\T U;LIJiA\ pv()T jll\1'(I'Ir iLLU' ,lLll'.j-(,.\1J l'. Si'.1.I1101.1
PUT'.]:»TJ`l,l)O_\\u()]JU,) LIM\uuUJ:15T7Jul ,I] Ir, suUi,)q imp .\1L\1j1rt,T it, 1.101.1s V. si 1X)jJ`]LIOT,I 'LL7,)Js.\11,Ll(Ii r-n4l,sri)
S lll'.Lly'ZOR jO.Ul;) )Ili l,ur sj,Tl"pul'J, Ili i111(11J)u114 SJ,CII� LIJO(j.1(j J„Tis ju.)(nT l' sl'p,)jTssl:jJ ST]»TJs Jut IT,j
J.90JIS JUOJ4
tjdLU c- -)(i ()I III!.)AT Jll(j'J,),-vJS hUU.1111uJJrY) li(,lr.Jnuil Il;l:1L1s I,.-)J,O(I Ou sl
�sllt)�j jU J,J_A\lljJ OJ TJJJlI j,Lll'•(I11):1 Li]I.,\ jlJ_ll'(I usu. smltll]llo))JJJTJ` ymiq;)Jr tij,LiJ
I,rw )Ili jT]Iln ism\ pi.m. a1n1,_\1' 'al'jll'1�jlur llllll.,.\�' r.Ilj q y:,Oj(i-1,Tul suT,;,(j �ljr..\v)p!s I»]rT1:(I.,s-j,Tr_yjnO(i
N- 'S,)j,Ts LjJ()(j ll().11JJtl pur (jln, Lj]t.\\ jilllll_1J q.)-rlil ) j,Lll'.,,illy_At' 1'I,I Li�.l•\U•l�j 'Ll((1JJ,lS
h'.J1LLU hula-r).\1] jll_\l d V. ,,)w(o.)q hrt)T )Lj] )TILT.\\ llpj J1 Iullll]SI'.) ,lljJ (,] s,,)IIUIJIIOJ]I ',T,)jl111Ogs i,7_\rT<
Lliu\I,rUT lll_\1 d jrJl(IU ILIIa-li\\] r ,u J,7lTJt Ll n1d I,]l.\\llt)1JJ.l,JI]ili SIT Jr All ICI Jll.uti jluU.i\utUl(Y) 'LLII]s.AS uOut'.11jissl'.i�JLlTJ,
s LiI:LLI'VOR jt,.Air) )qi j,til' Sj1Tl'•Illll'.]> IN)UI:JIjTsslal iP,UU;J�LRIj ,.j.Clj� IIJt,CI_AC�JIIT], Iral,j 1' sr si JILut, j,()0_A\V0JJO,)
1.90j)s pooMuojjo)
'LILILLi c- XI M 11JLLT1'ISSI', XI IM-)it Jil(! 'JiLulj j,l)Lls jl)J,l)(I Uu sl Llllj i 's,lllls
lll()(j un `ljr.,iv)pIs I]IT.IUUI j,)Jl'.Il'(IIS-I1.111.Aljnt,l{1! (,sIl' `i ITI1j j '7SL\\ pill'. Jsr,) -)Ul 11]0(1 Llt,JIJJa;i{lull (i n.-) llr uT urd jljjiuvd
JI.l1J,-l1O,jj1\\l-m. l.1J xw;-O.\\t 1' ,1 tpm\ u()IJ )I Lit SIT )II'.LLTISO.1dLit'
TOj LIJToI: s.)nuuu(,J pull JIITJS ,,!q Ii l.v1 Lloll IU SJ:Jl' ,u::?I(1 I,t't)T )LjjL 'ltl)JS A, uuLirxIIsS la:)JiiTJ, ,ul'Ll;llU(j jr,_AJI")
ILIJ At JOIX-)IiOD L' pull SPjupuvls LIt,T;I'Jtilti,l'j?1rU((LyLII'_j S..i_(M Atl TUirlll Limp"., -or st'
anuan V Aempe l8
l:.l;h jl'.Ul),7jl1sJT t' .\jllluul ,LATI, LL,(I,N' ,ll LILILLI C� )(I uJ j,JilT:1S,l'
I(j 1117.) 11 Jgl(I '.mml l»,,)ds IIIJSU(I Otl ,l ).l,7ll i ',Illl, tj]t,(I LIO TIJ]tla j1L11)lLll"ll llllll i L11`lTl'•ll llije]rtl]ILUS 11U MIA\'jl'..litj.\J ,7u1'I-O A\J
U lj]l.Al sm-i"Tutl( l jll't,.l IT 'J,I•AA:)u1IlUlJuOJ j1Lll'Illty.A� .1SIlt,�j.,�UI,St).Ll TI]j>;' '�Tllljlll,ll,l.l_Au_li +T.A\ j,i'(,T Ili wd jr.)I I.AJ .ltll'j
-t,.\\J l'. sL' 'Illl;l.A`' `>llc)lj I,LTI'• I:1tl,7.A� IJlajl 1(� L;II_lli,l(j�,Oj(j-,llllll "I'l V ,liinJ(j llt)l]l,,s)ll'.U.l Ilj j II Ll�_A�' l�l'lji:1�pill, IT1U.l A\
l:I,j ull.vvJ,1(I].7.1j �II I;�.1j.:JT'•CulCr a;(9(;i' ,jam;IJCI jal.ta `t.j,'Jlt,l;l:(;t),`.^,.ljl,lS;l-j�IXn1i i'.hI :�:;" jlt u,.vvL'OJJt r) I,�sUUuT(l ItIJ all,,1.lI,TOtI
aJJOu Ill]a,t1Ol1' >i,l.11'.t.l]; sr glu.l.l. ..1'Itr.� Ij,I,L'J:t,� ,7L'] c Il.;l?: u,Y:'s'g ht r'; �LLT. °,.?1:U� .,I: r). :?j�jl`r etj, ➢,l.At::; t' mill r-Tl'(I
gh'.LLIs l: S�]Itl;lal;l iiliTj.A\ .l.lj,jill,lj, I-10li I,I(I:iro I`• Lj,'i.\\jll'•t)J J A't:.11� j➢'y(i.\J �iil'?-r,.A\J l' ,'V \PO(I ,l',➢r).;1,] ,hit,?JSZ jl\]t'J.L,J]ti
Jlkl.l.j ljJI.AA lir)TJ11sJ•l;Lil �Jl >Llla l(I q�`.iJ;ll,ld, 'III.JS.A, LU,1Jl'1,j1„l::J �,�'..!> s Ul'.ililct,�j jt,.A s;) .11jJ ;11T1: til,Tl'•j�la'J, Iir,ul:Jij;s,l'.j_l
jl'.LlOIJJLIiIj �.j(Ij�, �,tl(,U1'J.iO(slll'T.j,jt,.lullu.1.11'LIJ(j uui'<ur,j� iLIJ ljJt r(j \(I J.l?:JS Il'Jl,j 1' >i'jl�Tjl,slllJ Sl JILU� uILi,�•
jaal,is uadsd
f 1 VG�A Vic- N ®SN3C1NVS
SAND�RSON STE ART
STEW ART
Through the downtown corridor, M in Street has curb and glitter and sidewalk along) bath sides of the road as well as on-
street parking.The posted speed limit is 25 mph.
Mendenhall Street
'Mendenhall Street is classified as an urban minor arterial bi,both MDT's functional,_la:,sificadon standards and the City-of
Bozeman's street classification sy tem. Mendenhall Street begins at its intersection with Broadway Avenue as a two-lane t\-pical
section with on-street parallel parking and curb and gutter on either side.There is also boulevard separated sidewalk on the
north side of the road.To the west of Wallace Avenue, the n'pical section rem,-.ins similar,but with the addition of boulevard-
separated sidewalk to the south. T1iis typical section continues to Mendenhall Street's ternunus at the intersection with 11 th
Avenue. The posted speed lvnir is 25 mph.
Oak Street
Oak Street is classified by IIDT as a local street except between Rouse Avenue anc 7th Avenue,where it is classified as an
urban nunor arterial. The City of Bozeman classifies Oak Street as a principal arreria . ()ak Street begins as a two-lane,paved
street with bike lanes on both sides and gravel shoulders. There is also a pared niuld-use path on the south side of the road.
This Apical section continues until the Walmart access (025 nines east of 7th Avenue) The road then transitions to a three-
lane typical section with a two-way-left-rurn lane in the noddle,curb and gutter and boulevard-separated sidewalk on both
sides until the 7th Avenue intersection. To the west of 7th Avenue, Oak Street has a fire-lane typical section with a center
two-w-ay left-turn lane. The posted speed lin>it is 35 mph.
� Peach Street
Peach Street is classified as an urban minor arterial between 7th Avenue and Rouse Avenue and an urban major collector
between Rouse Avenue and Plum Avenue b MDT's functional classification standards.The City of Bozeman classifies Peach
Street as a collector. Peach Street begins at its intersection with Plum Avenue as a paved, two-lane street with inrermirtenr
j stretches of on-street parallel parking,curb and gutter, and boulevard-separated side,,valk until the Rouse Avenue intersection.
To the west of Rouse Avenue, the road is a paved, tvo-lane street with bike laces to the north and south, and on-street parallel
I parking on the north side of the road.The road also has curb and gYutter with s:dew-alk on both sides. The south side has
interniitrent sections of boulevard-separated sidewalk. The posted speed liner is 25 mph.
! Rouse Avenue
a Rouse Avenue is classified as an urban nunor arterial by MIDT's functional classificatior_standards. The City of Bozeman
classifies Rouse Street as principal arterial. Between Olive Street and '.Main Street,Rouse Avenue has a paved, rw-o-lane n-pical
section with parallel parking,curb and gutter and sidewalk on both sides of the stree-. Between Main Street and Lamme Street,
Rouse Avenue has a three-lane n.pical section with a T\XZTL, curb and gutter,and sidewalk. There is on-street parallel parking
on the east side of the road,and varying parking ern the wesr. Between Lamme Srree,and Cottonwood Street,Rouse Avenue
becomes a rwo-lane street with parking,curb and glitter, and sidewalk on the east.T he %rest side of the road has a gravel
shoulder with varying sections of guardrail, intermitted parking,curb and gurte_,and sidewalk. North of Cottonwood Street,
curb and gutter and sidewalk ends leaving only a gravel shoulder on both sides. The-)o-.ted speed linvt is 25 mph.
Tamarack Street
Tamarack Street is classified as an urban major collector by both MDT's funcri,)nal classification standards and the City of
Bozeman'; street classification system. Benveen Front Street and Wallace_Avenue.Tannarack Street is a pared, rwo-lane street
Cottonwood and Ida mixed-use development TIS
SIl juauadolanap asn-paxlua npl pun pooMuollo3
pl)L'ilJJL'-1LUas si puu,, UL'ld asrgd-o.w aldwis L' tl]l:\\
Salrlado lL'U lS Jl��L'T] aLIZ-a)url n.Ty L'pLil',aurl uTnl-JgnTT/my ;)TL'Llti L: SL'Ll al Jsra aq.L 'curl-nTlp r pur curl ulnl-J}al/n1Lp
palrgs L' Srq (laall�uTl.1v 'Slu;)wJ)-\OLU;iunTTIIJ I,aJJtT]JalLlil yi.\\,)uuj ,l tlTs l? sl'•Ll (anUa.\`7_1L'.1\puma)i61 Lp.lou
aq.L '1ruc;is- J1}}L'Tl L' q]L\1 pallOJIUOD Sl lall UOT=JaslaJul.\L'.\\-aalq] L' ST allu;).\`' puu JaaTiS L nqL to LioIJJaSlalul :)q j
anuaA d APmppoa8 / jaaals uipp/
LTl'.ld asl'.gd-o.AQ )IdLuis L' q)T.A\ aq,7 'Uol1JaTTp la_AL'TJ punogJSa.11 L' g7LV\.%'nx aUo -, TUuj-O.w L'
-jo LnuuT�9:aq agl sJ (ixuiJ llrguapuaj�)r?.)l Jsa.\\aq.L'SJu-,)wP-\OLU<uluTn] p;)nj3isaTun qM\ aUrl )j,'iUlS U ST (JaaTJg jlrgtlapuaj�)
.`0;)l )sr,) ags.'Purl ulnl-lgilT/nTLp L' pur curl Lum-Jjal pmuunisap r a.\rq yoq asno-d) seal ynos PUT'' LJJJOU
aql'lrLlnTs :)jjjuTJ L' yi.vv pallonuoJ Si JrLll I, sl lxwl grqu,)puaj�puu )sno-U)o uor7JaSla]Lll aq L
.laaals HPyuapuRH / anuaAV asnod
'(]dal puu `nTg1 `JLlii'1l) sluauaa_l w,�UTuam
111' TO} S.AvO1113 al L1Jra LiO aUL'l r-)ui.Tmu;)aqs.'aUrl 91.113TV) pLJU n?UTlalU,) ali,Li1S r J_1L'q Seal 11F' 'S al lsa_vv puu ism ;)y Uo pallol]UOJ
-dots sT JL'LlJ Uou N),S.alLll L' Sl (Seal]Sa.A\/lsl;a)1aaT1q q:)rad pur (seal L nos/g]TOu) )nu,)-AV aSilo-d jo UOTnxa-Tz)m)LIJ
.1aaals yapad / anuaAV asnod
'Ur..ld asrgd-w,.a )1dwis L'Ll]T.\\ ;a)mlado lL'LTr?Ts JT}4L'll atl_L '(Jail puu `illy `Jgi,TT) SJUaLUa_\OUT iuruJni
11L'JOB s.\\ollr nal gJr.a Llo aL1L%l nLIlTaJUa all, 'SaLTrI nUl]iv) pLll; 3U11a)Lla alnLJTS l:a.\rq sisal 11V '1rLlnls Jl4)L'Tl r Ll7L\\pallOT]LIOJ
Sl 7L'LlJ L1011�asTaJLTT.AL'.A\-TilCi� L', Sl (sisal )sa.A\/7Sl�a) laaTl� `1�lL1LLUP..L pLlr (S,`,al gJiloS/g]JOU) allLla.A�7 aSilo�jO LlO1JJaSJalul agL
.1aaws >/apapcup1 / anuaA d asnod
'Z)11arT) pur punocl)sra
lc)a sluaula.\c)ui 11114 )LlJ pTTLIJ x1i 'sulnJ a.vssnulad q]t.\\asrgd pun()ggxnos/punogy.Tou
lua u-'). ()LLT hill L' of Sa UtiLlJ UaLp 11 'drp,).\o U111J-Jg iT pulloy,;ra pur sultu-]Pal pa)Jalold qJL\\ )srgd JLmw.)-ww llllj l: srLl iial
1111-TU5 aq.L 'pa1L'il]JL'-nuas Sl PUE UUld aSL'Lld-aalg] r L1JL\\ SalrTadO lrLliils :)jjjvll aqJ, 'JLlrl q:)v.mddL' aliLTiS L' srq";al lsra )y par,
aLTl:l LITJll-11a1/1lTL1J a puu aLlrl LiTTI]-iq,i1T pa]rid'1sap L' sl;ll (JaaTl�>lq))dal 1sa.\\ag L -,)ui l LunJ-Jgi,11/1lTLl] L' PUl' aLiL'l LlTnl Taal
pall:Ll 1Sap L' St;ll{,al ynos �)y alrq.\\ (J}p pur`1l1Lll `iq<`)11) 1LiaW,-)A W�iUTUT11) gJl'•l T()4 allrl paJuul iis.)p L' sL'Ll (;)nu;)-lV)snoa) al
g1TOU aq j 'lL'LT is :)q.jw1 L' q]l.\\pallojiuoD si hill Uol1DaSTalLIT L' Sl In()pul" asllmd to um1Jaslalur all,l
jaaa157 >/pp / anuaA d asnod
'luauJdoj.).vap.vvau aq).iq pv)udun aq.illrn i,)iod
lll-\\pur ails luauTdl)l,)_1)p ag] 01 JLiaJL'IpL' aJL']rq1 SL101JJasTa]lil JaaT]S T(,IP.ui iiL111s1\a all] ag1lJSap Sgdl:liiL:Jt',d ii'UT.\l01101 )ql
suoilDasaalul
'gdtu c� si=Tuill paads pa1s()d aql •ylr.";)pis paJrlydas-pTr.\alnoq purx)jjni pur qln:) srq
Jllq)aaT1s )uv.l-o_\u P.).od L' sr, S:)llL1UU03�lJlul:wrj `mu').\\- tll` pLTl'• ailLla.\�' asllO21 Llaa.\\la�j 'slaplllogs la.\l',Tn sill alUO Pull
la1Jn,`,'pM clln:) alp sas()1 ]aall�y�rlrtur._T.`anLa_\� asnc,�l pur. anua.\� »rlll'.1\ uaa.\\Ja�l sapls gJ()q u()Tal]n pur cpn�Lpi.\\
`� AVM31S N0S� 30NVS
SAND RSON 57EWAR7 •��.�
Ida Avenue / Front Street
J he intensection of Ida Aventic (south lcL,; and l,ront Street ;cast,,.west lc;:_>s; is a thi:LC-vvav intersection that;s current:v
unc"ntr„lled. All the legs of the intersecrion have unresrr-ictcd rurninr muN-rmenrs.
Ida Avenue /Aspen Street
'I le intersection of Ida AN cnue (north/south lc;,,s and Aspen Street (cast 1c,r)is a thrcc-,vay intelsection that is curmnrl_v
uncontrolled. AD the lc•tis of the intersection have unrestricted rurning,mo\-emenrs.
Front Street /Aspen Street
The intersection of l-runt Street !norrh/south legy and .kslen Street (west lei* is a three-wav-intcrscctiori that is cur--ently
unconrrolled. .All the lc;;,s of the intersection have unrestricted turnip"rnovc111CUI.
Ida Avenue / Cottonwood Street
The intersection of Ida Avenue (north,`sourh legs and Cottonwood Street ;east„wc:.r legs,•is a four-\\a\•in-c•rscction -hear is
currenriv uncontrolled. .A11 the Icus of the intersection have u:.restrictcd ru nin m-,vements.
Traffic Volumes
Weekday AM and P.M peak hour turning movement counts were collected for ncC intersections of House .peanut with ()A
Street,Tamarack Street,Peach Street,and 'Mendenhall Street, the intersections o:Ida Avenue\\•irh I•rcrit Strevr,Asper >rrcct,
and Cottonwood Street, the intersection of Broadvvav Avenue with Main Sneer, tr.d the intersections of I`r.)r.t Street-xith
Aspen Street on Thursday,'March 29,dill/. In g,cneral, the\\•eckda\ leak hour p_•rio.is were fount: to occur f_um -:45 to 8:4i
AM and -hill to ti:,ill RM. Raw count data was adlusred for seasonal variation using -hc Montana Department of
"Transportation's seasonal adjustment factors. Figures 1.1 and 3B S and 9; s.,mtnarize the resulrin;,c:;lculare.l I•:Xisrin,r
Conditi„ms(2015) leak hour turning,movemert Volumes for the AM and PM leak hours. Detailed -raffic count data
worksheets are included in:kppcndi_X A
Crash H story
I lisro�rical crash data was obtaincd from MDT for the ;-vcar periud from 1.u1uar.• I. 2012 throuigh Dccc_i:h;r 31• _ l G. The
data wa,, anal/c•d for the purposes of calculating,intersect,,On crash and sry centy :a:cs and evahrar n;: collish,n rv-pc rends.
'Tables 1 :and ?illustrate the results of thar analysis. Inrcrstction crash vacs were c.alc-ulared un the s-andarc hasis of crashes
per million\-chicle entering, ,\MVI for each intcrscctiun. •t he \I\•I, intuit \\•;as esrirnared based c•n pallid-,rei historical ADT
\•oltuncs frO M The MITI \\•chsire. Crash rates for the stud\•:area intersections rangc_1 .'tom 0.04 \I\ ];to 0 ;a1
crashes,MVI•.,while severity rates rangred from 0.04 cravhcs/J VI: to 0.64 era<h_�,°:,I\ I:. In orris ur h:,rli _rcyucncy a-Id
,,everir\, rho>c tarts arc rclati\cl\ a\erase for the current orlon t:1\ir„nme nr hasecM on con\ersatio�s a irll \Il7"1'Saf.n
personnel. It should be noted rh tr MITT did not prov;de:!m•crash hisn ir\ at the 11Mrsecti,,ns of 1.1: Avenue m irh 1•ron-
Strcct. \slen Street. ,anti Cotton,vood Street and t':;c intersection of l Front S%rcct \vit t Aspen Strec-t.The;C =tyre inrcrs:c:iun.
\\-ill not be an:ti\•rcd in tilt'M-minder of-lie crash hisrorY section of this rcporr.
Cottonwood and Ida mixed-use development TIS
SANDERSON STEWART ao°�
KEY
,� f r
\; f ��, XX — A.M. PEAK HOUR
(XX) — P.M. PEAK HOUR
105 248 0
y a 1 ..�.'/ • ' �� i/- - (131)165 0(0)
_ t+ X ; ~T._`�J [ Jam=/ •r (3)0 —► t— 1(1)
41
,1.• ' . .f:L '•0 •' _ eft; i 1 'sr ? f�'., t 110 275 0
;, :- ..;;.•.., 1 •, ,�`�' � i�'�t r^ rTr •,T + (233)(257) (0)
Y•� K Wit: �: n (— ]____(30)(451)(25)
I � i
(45)39, 46(42)
M I`Yr (40)53. -► — 23(58)
F y A}+ 12 289 7
(25) (392)(13)
(51) 62
(403)(48)
'� � 3 •fir- ` Dom(/• ' I . ♦
C f� �ti (27)15 -� �- 42(102)
(� G. (88).79 '4 , 1(5)
1i � i r •
31 250 17
r TV
(157)(265)(38)
7 A �, .�fjR;�, •� r 112 141 39
�� ,t� (�' � •>� i f '�i C�p�r'�"ir;�(�'1� .df� 566(21
41
r� r .' 42 260 16
4r u ��►"t 6 # ► 1..: - r �•Kf "�K!(`f'� t .� (79) (317) (9)
rr web (481 (0) (140)
22 0 100
(94)4' 94(115)
.�
(647)475 —► t— 581(621
•` $ 9 i� Y.Y tom`;.1. ��w(�. �i'�. rt'Q t 0 0
,§,Qr�
Figure 3A:Existing(2018)Traffic Volumes
Cottonwood and Ida mixed-use development TIS
S A AR T E A o:D
N SONS W RT dea,
KEY
• J` 4 ; r XX — A.M.PEAK HOUR
(XX) P.M.PEAK HOUR
1 F ^ �•
t � �
•\ -
. fir. ;f"ti ' >♦ s
6
g ..
(4)2 —► 0(4) IP
(24)10 o(0) ;
ell Or
(77) (0) w fir '
'�up
s.
7 (24) (0)
10 0
r
(17) (0)
8 - �
(o)°
(0)o
91 (2 (9) (0) a C"
(0)2 J" 0(0) 44
(0)0 f- 0(2) _r ►Y� ��
(2)3
C'
2 10 0
Figure 38:Existing(2018) Traffic Volumes
Cottonwood and Ida mixed-use development TIS 51
SANDERSON STEWART '�
The anah-sis of collision tope showed that the most common type of collision at aLl intersections was a rear-end collision
(45o'o). The second most common collision t-j)e was a left-turn opposite direr tion and fixed object collision (14( o each). Two
of the three total fixed object collisions were determined to be by impaired divers.The remainder of the crashes were right
angle, sideswipe, and bicycle collisions (all 91 u). When broken down by intersection, the trend continues. The motif common
type of collision at the Rouse Avenue with Oak Street/Tamarack Street/beach Street intertiectlons is a rear-end ci)llisi in
(1000'0, 100"o, and 50'o, respectively). Both rear-end and side-'swipe collisions represented 5)'i) of total crashes for the ��lain
Street and Broadway Avenue intersection,with the remaining 50°o distributed between each other tape of collision. The
sideswipe collisions could be due to sudden lane changes made by through vehicles waiting behind left-turning vehicles on
,\lain Street. the intersecrion of Rouse Avenue With Mendenhall Street is the main exception where the most freCluent t}-pe of
collision was with a fixed object (5000), but it still had 23o o Lear end collisions. The next highest collision type at the
intersection of Rouse Avenue with Peach Street was a left-turn opposite direction collision (33°0).
The collision analysis highlii;hts the high rate of rear end crashes throughout the study area.Typically, right-angle and rear end
collisions are often the most common collision types at signalized and unsignalized urban intersections. Specifically, at
signalized Intersections, there are several contributing circumstances that can cause a high incidence of rear-end collisions,
inclucling inadequate yellow change intervals and/or the need for auxiliar\,turn lanes. Another cause could be high speeds
and/or downhill grades on an approach, but those conditions are not seen at intersections In this stud\,except for a downhill
grade on the east approach at the :\lain Street/Broadway Avenue intersection,which has the lowest proportion of rear end
collisions. The second most common type of crash at the study intersections, left-turn opposite-direction collisions,could be
caused by a lack of protected left turn phases at signalized intersections. The.Rouse Avenue/Peach Street intersection Ina
have more left-turn opposite-direction collisions because the Peach Street(east/west) approaches are skewed and have high
delays. It is important to note that these evaluations are speculative, and more detailed information about individual crashes
would be needed to deternune exact causes for each collision. In general, the crash rates were quite small so it does not appear
that there are any significant crash frequency or severity problems at the stud;-area intersections.
Table 1:Intersection Crash Frequency/Severity
TDEV1
012-2016 Reported Crash T e Rates (per MVE3
Intersection Crashes2 PDO Injury Fatality Crash Severi
Rouse Avenue& Oak Street 14813 1 1 0 0 0.04 0.04
Rouse Avenue&Tamarack Street 13040 3 3 0 0 0.13 0.13
Rouse Avenue&Peach Street 13605 6 1 5 0 0.24 0.64
Rouse Avenue&Mendenhall Street 13250 4 4 0 0 0.17 0.17
Main Street&Broadway Avenue 14691 8 6 2 0 0.30 0.45
i Daily Entering Volume (DEV) estimated from 2012 through 2016 MDT published ADTs.
Crashes reported from January 1,2012 to December 31,2016 r
3 Crash and severity rates expressed as crashes per million vehicles entering (MVE) based on MDT severity factors
4F!
ri
6;
i
III„
Cottonwood and Ida mixed-use development TIS
• SAND RSON STEWART
4®e�
Table 2:Intersection Crash Collision Types
Collision Type
Intersection Rear End RiLyht Anele Sideswi a Left Turn OD Bicycle Fixed Object Total
Rouse Avenue& Oak Street 1 0 0 0 0 0 1
Rouse Avenue&Tamarack Street 3 0 0 0 0 0 3
Rouse Avenue&Peach Street 3 0 0 1 2 1 0 6
Rouse Avenue&Mendenhall Street 1 1 0 0 0 2 4
Main Street&Broadway Avenue 1 2 1 2 1 1 1 1 1 8
TOTALS 1 10 2 2 3 2 3 22
Intersection Capacity
Existing Conditions (2018)intersection capacity,calculations were performed for the study area intersections using 5Ynchro,
Version 10,which relies on the HighvvaN-Capacin•Manual 6th Edition (HCiNJ) (Transportation Research Board, 201-)
methudololries. The J 101 defines level of service (LOS) as "a quality•measure describing operational conditions,,vithin a
traffic stream,gencralIN-in terms of such service measures as speed and travel time, freedom to maneuver,traffic interruptions,
comfort and convenience." L()S is a qualitative measure of the performance of an intersection\vith values ranging from L()5
A.indicating good operation and loxv vehicle delays, to LOS F,,\vhich indicates congestion and longer vehicle delays.
The results of the Existing Conditions (2018) capacity-calculations shoved that all intersections within the soulv-area operate
at LOS C or higher during both peak periods except for the inrersection of Rouse avenue and Peach Street,where the east
and Nvest legs operate at LOS E and Fin the PM peak hour. For the west leg, the 95th percentile queue is seven vehicles long
Nvith an average delay of 86.7 seconds per vehicle. The east leg experiences a four vehicle 93rh percentile queue with an
average delay of 3 ? seconds per vehicle. 'Table 3 (page 13) display s the results of the Existing Conditions (2U 18) capacity
calculations. Capacity,calculation worksheets for each of the study area intersections can he found in appendix B.
The Ciro°of Bozeman has expressed concerns of the safen- and traffic operations of the adjacent intersections to the park
comprised of the intersection of_aspen Street,front Street,and Ida Avenue. .Addirionall\% the existing road\viN_sections of lda
Avenue and Cottonwood Street adjacent to the sire are not up to Cin srandar&. Finalh•, aspen Street is proposed to connect
Ida avenue and Wallace Ave.
TRIP GENERATION
An accurate estimate of site-generated traffic mint be made to anal\re the impacrs of the new Cottonwood and Ida mired-use
development on the surrounding transportation sN-1tun. This studv-utilized Trip Generation, 10rh Edition,published by the
Inrirute of Transportation Engineers (1'IT- which is the most widely accepted source for determining trip generation
project)ons. 1�or the purposes of rhis stud, trip generation was calculated using various land uses including Multifamily
I lowing(Mid-Rise) -Land Use 221,Small ()ffice Building- Land Use -1? ()tialin-Restaurant—Land U- e 931,and General
Office Building-Land Use-1().Table 4 ',page 14; illustrire,, the results of the rrip generation calculations for this site.
Cottonwood and Ida mixed-use development TIS Fil
S11 juawdojanap asn-pax!w Op/pun pooMuo.No.D
'91 purr1 s-),-id) Ht
1,lll'•\-f :IliLil,1 Lll h,,JP.1Jsil1ll OS1r. -ur, sJ,IOLI jw:)d J�(l },un 1C\• )qj TO) JultUL1 lssn J)gjr,.dJ .,Lll jO sJlntial �L1J.'sjTt>-\\]•,11
.\r..\\hnOT rur,.\}„lJs )LIJ O1 1,JL1?lssr �):[.m\]LI�LLiI!(lj,,.Ll},.,Sil-},�\ALi upl pur },OO,\\UOJJO,) �)Lll .10) SLIt.Tl }I,,JL'T�Lilil-�Jls `LlJr.Ulddl:
STLll trls 1 lll1 j( iLld XjJ JIM, lIO1J11(ll11s11,diTJ j,.,ll'j11JIl J ,,LIJ LIO 1,.,sn(j s.1P..\\,,.\lT}, ssx),)r' )Its
pur suopT )J)sTliu! 'sllllJs r.,.lr.\I„lis O] )lt: sdi1J )IJn};).1 ll}J St 1U�)WIL41!Ssl .lt��P.11
1N31NNDISSV DIJJVdi
•tu�'tsi},Ja�ll�JUOl.I/J�,,1J� Ll.,dsV- �� uOnd�)�iLnsn
�pil1s sigi T( ) )iu.)gD1, 1.10pi1(1llJsq) dpl -)qj 1Lms ud 91 pur l j .)d rd It() �l1 lJllx t.l }�lll'. \"l lTne`,t,l ',,Jls IL1J ()1 s,)Jn()T
,-)SOL}J jO.A1IUTTSOTd sit jp.A\ SL' s.,JI1( .1 1.10 sJ1L1111O.A JU)LI.M.AOLU a LlliluilJ Tnoq _jr ld )_AUnpT )ql LIO
l,asn(l �)U MLIJS U0!111(ji111;!p dl.Tl )111 '.PINS JU mp llillp, sll.Iowd Jgum i,•LIUsy
,U(maxlsq Idwy u(, put; smm a 1jC11'lu:_1l' sIIOTJr.A JOj -)uT!J l.l_ll:.TJ }O LTOL't:lillll'.J'Sl.)}lOL[I l)LIVLLZ:)p 1.l_AUT1 1,:)7.p.)jndul(,.)
SE L1J,lS s1,( LJJ:)LLI jl1l.AJs Llnil-Y)1LJ1 )(I ur,) 11-,lll.AV )3rU:!.0s,)ill: Sl dl1J V'
Noiinol2JiSIG dl2li
7U�LlTllO1J_\,,j,.\\,,U Ili �q OJ 1,,,Jns'Old ti•IMIl.l.1 }O.Injunu put)J )Ljl :,JltT,;n111 �t'1 ., la! l lcjl'.l. ij„1Js
slLll jO Slsc,dlnd )Ll,1()4 �1(Ite;tla`-)LI u,).\1 sQu -1t1 and Sail 111.1111 l,lll'• iJTlrnh sill.\j110 JL1,)u1LlO!?.\, 1,
.\\:,U Na s\' •suopuis s11u 1-)L,r. s1»1TL'Lll 1-111,11I,1.1llUJ 'S;lll'•Tnl'Js•,T sl'• ,)sn purl ;)d.\J 11';.l.L)UI[III .).1(1 .1}TTCL I!Jd
mu An .\(1-sed mJ1S Int-1J OJ Ss,)J,,l'J».Ti1,1,JJ4jt,Jr11.) Ur.LiO .1t1 LllSsl'.d,_ )Jn sdl.0 .1(j-Ssr(l
1TU1JP.lIT]5�1, dpi ill'.LUTJd r (11 lll,`,'l.U,jO JlltOd L' uT(,uj .\I,A\ )LIJ 11O sdOJti r �)1,t'LU ).it!JrljJ sdp. , ).in sd1TJ .\(1-Csr(l
Illt)Ll >Il'.l(l l�(l .,ilJ llLTnl, 11.,J1'JJI,.,a� '.;'P,lltz., 9 lI1TaJt;., 9 sd,-11 j put, .imj
N1,1 Lil.1,l ,,lll'..l�ll�n` .,LiOLi l JT.\\.1l',>1,,.\\•,i}l'.iJ.11" •)Up
},.,1Z.11(,Td >l 11 `s�1I11,.,JOTI! :l.i.i i U;s i '�.11lJdl.l 1r.11.L,Ju1 •,[tlUs ,.\na 111.0•,TO�J.1.,tlJ put, s,.;1 IIUI; 1O .,L'.1J StL1J ,I'll.JUJLudo p-\al, rhl
}lilt' 1,()(u\11O1J1,: di1J 1r111.,J111 iu •,JLi.I tl IU t:]l(!'u\�, ..,sn hurl 1,11T1`irll.iJunu(„ '1l'UU.,1,IS,T J1,,Ll..\\
sJL1�ll1LlO1�.L,1, )1,11-p1X! I Ul u,1nJO Li:IJJO mum sdlul ;)l sU011l'.J�dO.,li�l'..0 jla1JJ1\.y 110 JJrdl.tll 111' •,.\rl1 JOLI ()1,.61.11 '.iflr.tLt�Jut
AID'V) SdIJJ .)l �Jlll� '•,]ls 1,l,l�OJd n OJ u0 sUt h:JU .,.\i'll JO11 Oh 1111.1 Sd!T] ,,s()LIJ .,11' 1�d!.lj :')},, ")I11Jdr.)lrli.MJ1.11
�ll,ttlU .111'.Ll.l';ll'.1(j )p ul sd1Tl 1,t11:"LIT.TJ .1(j-sSnd )111Jdn:) lrlLlJ1U1 JOi JlinOJ?i' ),] .,jll'.LLI .uj LT.,1JO;NIILLI `1t1)LLIJs11!}�r
Uls .,L1J OJ 1nLJ.l.la\l s�l�lll.,.\ IMMST)L1, \(l 11)PLU s(h.,JJ.\1�U )O J•l(lL;711u J,)U .,':J �.Jlal]s., OJ T�}l.l(I It! K)\J.\\O}1 •Ju.-)U1dOp-\:)j)
l: ,(l I,1110_A\.11'L1J ?Ll!.0)(I.1J(1LL,titl VO U .11ll Y) •l;rlL:ls,,Lll: .,PM),Id sLl)1I1J.,�t 1JCl Uu,Jn3.,lL,i7 Llla l
lnr)Ll `l:.�d Jed .')IIJ ''Ln1nh l»Jta�u•,
�a�11:.11V� CC ,"(' sd,u1 ,Lu:la(,L >r.JLI JhJ e,-hlpll, ,,,)1:;.,ll.,a '.`IIilJTS.I ( l[1.i�»:L, + t sdUJ 1)?1.11 SLlt.1J .Al'1,�J�-1A
1G ! 1 ! ]\\ I 1 1. `_
ss0.i `(,O lU p'l(1J l: OJ l)J1JJ(1)Jd sl l;l�iud(,:.,.,.,1, a.:1-1,��uu r}l1 liar• l�u,,.(�u(,J.O') .,L11 ']t1O1,1p1(i li'li 1\
U \�V-4M: �3 N0S� 3 ® NVS
• SAND•RSON STEWART ' '�
Table 3:Existing Conditions(2018)Capacity Calculations
Existin (2018)
AM Peak PM Peak
Intersection Approach Avg 95th% Avg 95th%
Delay Queue Delay Queue
s/veh LOS (ye h s/veh LOS veh
Intersection Control Sign ed
EB 27.7 C 7 26.8 C 6
Rouse Avenue & WB 25.0 C 1 26.2 C 1
NB 4.9 A 5 5.9 A 4
Oak Street SB 8.6 A 7 11.2 B 11
Intersection 13.5 B -- 12.6 B --
Intersection Control Si nali ed
EB 23.8 C 3 23.8 C 4
Rouse Avenue & WB 23.3 C 2 23.6 C 3
NB 2.8 A 4 3.4 A 5
Tamarack Street SB 3.4 A 5 3.8 A 6
Intersection 7.3 A -- 7.7 A --
Intersection Control Two Way Stop Controlled(EV WB)
EB 22.3 C 3 86.7 F 7
Rouse Avenue & WB 16.0 C 1 37.2 E 4
NB 0.8 A 1 1.7 A 1
Peach Street SB 1.3 A 1 0.8 A 1
Intersection 5.6 A -- 15.6 C --
Intersection Control Sign "
WB 21.5 C 5 27.6 C 8
Rouse Avenue & NB 5.6 A 4 8.7 A 6
Mendenhall Street SB 5.7 A 3 9.1 A 8
Intersection 10.0 A -- 13.5 B --
Intersection Control Si nali�ed
EB 16.0 B 6 22.9 C 8
Main Street& WB 17.0 B 7 18.0 B 7
NB 10.2 B 1 13.4 B 1
Broadway Avenue SB 11.5 B 3 16.6 B 5
Intersection 16.1 B -- 20.0 C --
Intersection Control Uncontrolled
EB 7.2 A -- 7.1 A --
Ida Avenue & WB 7.2 A -- 7.1 A --
Front Street NB 0.0 A -- 6.4 A --
Intersection 7.2 A -- 7.1 A --
Intersection Control Uncontrolled
EB 7.1 A -- 7.1 A --
Ida Avenue & WB 7.2 A -- 7.2 A -
Aspen Street NB 0.0 A -- 8.1 A --
Intersection 7.2 A -- 7.2 A --
Intersection Control Uncontrolled
EB 0.0 A - 0.0 A --
Front Street& NB 0.0 A -- 7.3 A --
Aspen Street SB 7.8 A -- 7.5 A --
Intersection 7.8 A -- 7.4 A --
Intersection Control Uncontrolled
EB 7.6 A -- 6.5 A --
Ida Avenue & WB 7.2 A 7.8 A
NB 7.4 A -- 7.2 A --
Cottonwood Street SB 7.2 A 7.2 A
Intersection 7.4 A - 7.2 A --
Cottonwood and Ida mixed-use development TIS
SANDERSON STEWART �!''
Table 4:Trip Generation Summary
Inde endent VariableT Average WeekdayAM Peak Hour PM Peak Hour
Land Use Intensi Units total enter I exit total enter exit total enter exit
8 uildink#1
Multifamily Housing Pklid-Rise l 46 1 Dwelling Units 250 125 125 17 4 13 20 12 8
Internal Capture Tri s** 8 2 6 0 0 0 3 1 2
General Office Building 2 0.2 T1000 ft'GFA 2 1 1 0 0 0 0 0 0
Internal Capture Trips** 0 0 0 0 0 0 0 0 0
Net NewE.rternal Personal Vehicle Trips 244 124 120 17 4 13 17 11 6
Buildin #2
Multifamily Housing Mid-Rise 1 18 1 Dwelling Units 98 49 49 G 2 4 8 15 3
Internal Capture Tri s** 3 1 2 0 0 0 2 1 1 1
Net New External Personal Vehicle Trips 95 48 47 6 2 4 6 1 4 2
Building#3
Multifamily Housing Mid-Rise 1 12 Dwelling Units 65 33 32 4 1 3 5 3 2
Internal Ca ture Tri s** 2 0 2 0 0 0 0 0 0
Net New External Personal Vehicle Trips 63 33 30 4 1 3 5 3 2
Buildin #4
iblultifami1v Housing \-Gd-Rise 1 16 IDwellingUaits 87 44 43 G 2 4 7 4 3
Internal Capture Tri s** 3 1 2 0 0 0 1 0 1
Small Office Building3 5.2 1000 ft'GI=r\ 84 42 42 10 8 2 13 4 9
Internal Capture Tri s** 6 4 2 0 0 0 0 0 0
Net New External Personal Vehicle Trips 1 162 81 81 16 10 6 19 8 11
Building#5
Quality Restaurant 4 2.2 1000 ft2 GFA 184 92 92 2 2 0 17 11 6
Internal Capture Trips** 21 11 10 0 0 0 3 2 1
Net New External Personal Vehicle Trips 163 81 82 2 2 0 14 9 5
Buildine#6
General Office Building 2 28.7 1000 ft2 GFA 280 140 140 33 28 5 33 5 28
Internal Capture Tri s** 9 7 2 0 0 0 3 2 1
Net New External Personal Vehicle Trips 271 133 138 33 28 5 30 3 27
Total Gross Trips 1050 526 524 78 47 31 103 44 59
Total Internal Capture Trips 52 26 26 0 0 0 12 6 6
Total New External Personal Vehicle 998 500 498 78 47 31 91 38 1 53
(1) Multifamily Housing(Mid-Rise)-Land Use 221* Units=Dwelling Units
Average Weekday: Average Rate=5.44 (50%entering/50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=0.36 (26%entering/74%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and G Pkl: Average Rate=0.44 (61%entering/39%exiting)
(2) General Office Building-Land Use 710* Units=1000 ft2 Gross Floor Area(GFA)
Average Weekday: Average Rate=9.74 (50%entering/50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=1.16 (86%entering/14%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Average Rate=1.15 (16%entering/84%exiting)
(3) Small Office Building-hand Use 712* Units=1000 ft2 Gross Floor Area(GFA)
Average Weekday: Average Rate=16.19 (50%entering/50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=1.92 (83%cntering/17%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Average Rate=2.45 (32%entering/68%exiting)
(4) Quality Restaurant-Land Use 931* Units=1000 ft2 Gross Floor Area(GFA)
Average Weekday: Average Rate=83.84 (50%entering/50%exiting)
Peak Hour of the Adjacent Street,One Hour between 7 and 9 AM: Average Rate=0.73 (80%entering/20%exiting)
Peak Hour of the Adjacent Street,One Hour between 4 and 6 PM: Average Rate=7.80 (67%entering/33%exiting)
*Trip Generation, 10th Edition,Institute of Transportation Engineers,2017
**Trip Generation Handbook,3rd Edition,Institute of Transportation Engineers,2017
Cottonwood and Ida mixed-use development TIS m
• SA ARSO TE ART
N N S W
N •, r ._ _ h KEY - -
;�'
p r r XX — A.M.PEAK HOUR
�� r (XX) — P.M.PEAK HOUR
IM
.y XX% — DISTRIBUTION PERCENTAGE
•
r� �° ti'•R, 1 (0) (4) (0)
l — O 0 5 0
L1 5%: .�.. \ (0)0 0(01
(0)0 0(0)
t (6)7 — 0(0)
C 4 5 3 0
01, (8) (5) (0)
04
(0) (0) (10)
0 0 12
r . � .5/p, 2 30/�.. of
•r• t M� (0)0 s f 0(0)
�,-'����' �*•. �
��,
/� rr.
w �b�•j . k r . +, r J .�- r 3 (0) (0) (0)
rr`Y �. . • *C t•e r1��,i i 4*7
XF r
\ -—�� (p)5 —► �— 5(5)
Ln
70
•:�i i►4 t �r rt� t7 Ark 4 (2) (6) 0
S
001
—� --5'0 D. 5 - 7(5)
44
' • `
° o °
Figure 4A: Trip Distribution and Assignment
Cotronwood and Ida mixed-use development TIS
SANDERSON STEWART as°�
KEY
XX — A.M. PEAK HOUR
(XX) — P.M. PEAK HOUR
XX% — DISTRIBUTION PERCENTAGE
ter }•tl� �_ ,�. X\a
ca3 } X-1 •�+'� met ; �'
E - J, t 1
7 (0) (0) (0) Eli r�185% ® �.. 15% - �: b• _ ,
OOo 7
r
loco o(o) am' ate.•
(4)2 —► �— 4(3) -
a -room,,
(4)2 G
WIN,; � .
(2) (0) (0)
)� •f ,
8 (0) (4) (0) vim' t
0 I2 0
(o)0 1. 0(0)
r
0 3 0 /46s[ t•auAIAUt j►
° ° 0 0 D - 0cm
8
C
Figure 4B: Trip Distribution and Assignment
Cottonwood and Ida mixed-use development TIS FRI
SAN STEW ART
ARSONSTE Q)
TRAFFIC IMPACTS
Traffic Volumes
for the purlioscs of this snub-,based on Information from the Client.it was ,issruncd rhat full huildout a.nd occupanc: for the
G)ttonwood and Ida mixed-use development\vwould occur by the end of calendar rear 2020. In add:tion to the site-puncrated
traffic from the subject development, background traffic voltaanes are also expected ro increase for sady area erects and
intersections due to"cneral _,,ro,\vth.To account for that growrli, Sander<on Stewart_evicm-ed recent historical traffic nolumc
Mara for the:u ea and determined that an annual hack,,,round rowth rare of?.i percent would he ca)_nsen arivc_`-appropriate
for mudeling ambient gro,,N-rh. ligure 5.1 and l'i'aire 5B 'pages IS and 1'), illusrratc the projected and I'M peak h,nir lull
Buildout `2 2 I, scenario traffic vt kook projecriums that were calculated for this Study.
Intersection Capacity
Sanderson Stewart performed intersection capacitN* calculations for the Full Buildout'20-20, scenario Mr -he AM and I'M peak
hour traffic vohime projections presented in ITILI cs DA and 5B. The calculations vs ere initially performed based on crostin-kr
lane co,nfl,,urarions and traffic control features for off-utc lntersecriom, except for:1 nhilned waffle Sltina: NID l prl)'ect rO be
constructed in 2020? ar the Ruusc Avcnuc'Pcach Street interzccriun. Near the •ite,several changes to rho. curr_rt stre:t "vstem
are proposed by Sandera,n Stew art based the City's recomnnendarions to rennov'e the sc;"nncnt of I-ro nt�t:ect bctwccn Ida
Avenue and aspen Street. Removal of the roadvc:n- su—nnerir is shown in Figure ;B. f'apacity calculati�,ns�t ere performed
ba,�cd on this updated configuration.«-hieh includes a rwo-way !cast and west approach) ;top-conrrol at the innrsccrions of
.Aspen Street with Isla Avenuc. 'I lie existing intersection on Front Street become free-flowing setimenrs.The sire access
intersection was initially assumed to he stop-controlled With no auxiliary turn lanes.
Table a Cpa«c ?llj shows, the results of the I'ull Buildout(_'ll?Il) scenario capacity calculations.Thu resat,, shoe that tL-c
planned traffic signal at the Rousc Avcnuc,,;Pe:tch Street intersection xvill improve()perarions even with t.ne ad-li-ion of site
rraffic and hackLround gro-wth. Thar intersection is predicted to operate at no than I.OS(: fo_ _he casrho=and and
-westbound ]c,,,s during .1\I and PM peak hour, AH other intrrsccrions\yill continue ro operate ,it or ahoy e LOB.(- for both
1\I and PM peak hour•. Detailed capacity calculation\yorkshcuts for the Fa 11 BUildour'O2O traffic--)ro ection scenario are
included in.Appendix i:.
Because the rrtffic signal at the Rouse.Avcnuc with Pcttch tirreet intersccriou is:tlr'All,planned by MI71'_and al_ other study
area intersections arc projected to continue ro operate at acceptable levels,no traffic signal��arranrs xyerc ev alua-cd for this
deN•clopment. Turn-Lune warntnrs were cyaltutted for the project intersections and are descrihcd in a later section of this
report.
[ij D �.: . ) ))
Cottonwood and Ida mixed-use development TIS m
SANDERSON STEWART 0o°�
de40
KEY'
XX A.M. PEAK HOUR
�� / ,\� � �''•,� ,�! (XX) — P.M. PEAK HOUR
IE
Irv \. + w ,l 1 (216)(383) (0)
' 4 110 266 0
Y .f 4
8)173
1,, l ♦ r„� '••i+J •, (165)207 0 0)
;9+' ^� „C'fir r Gl r +, ,tii•► t �f : 121 292 0
y.� .*. c..• t3 ��A _� ' (253)(275) (0)
t
sr. �1;:•s+i. •�)T +1C1 �r' iy[�' � • , 2 (32)(474)( )
o.31 35 379 48
(47)r41 1 56(57)
_ • �. }- _ f C a. (44)58 '26(64)'
.�- �o4ti` --fir.♦ �•�� '�:: � t ' ' �,Rl 1 (�/
_ 11 13 7
_
+`rF.L ''N� t•---. � � (zs) (412a12)(1a)
- • f'� .� .1� '4��`v:. �'•:>_L�r.�J��-{ 1 �' ISM
�A�O a- C' ► +J t ''j F'r V (55)(423)(50)
�,+ 1 53 288 65
r. t J. 'rr ,+ `''n •� (28)16 44(107)
7 G + (48)55 29(21)
(71)83 603)
tj
Aw
33 263 25
(82) (338)(t7)
:f :
(167)(284)(40)
+ c • • r Z�" 'i ' �p` 119 152 41
1— 175(228
gab
44 280 17
$�r s 71� +' # t J r � A�Ir :`.� �' (83) (339) (9)
77 ` Yw.r
�" l•, 4 ' • - L—• �,}ice+ 1��� 5 (50) (0) 055)
_ Q . [�j�l T s• 23 0 109
•� 5 (99)49 106(126
+ r• ' ~ !� '�`' (688)504 —i .4 — 617(658
� rv. �: • �'�1�tr,r. rra 1 0 0
a f r �2-f� p�'_w (0) (0}
Figure SA:Full Buildout(2020)Traffic Volumes M
Cottonwood and Ida mixed-use development TIS N1
A DIR
S N SON STEWART aea,
7KEY :. NM.PEAK HOUR = '
�.
(XX) — P.M.PEAK HOUR
t
r
17
7 (0) (25) (4) iark
0 11 2 - --
•�_T7_•
3 7 0 E --
2 /
81 2 11 0 .l..a.ata...a -
� 1 � 7d
(0)2 0(0) • !• r
(0)0 0(2) "A
2 11 0 •� " �.
9 Fil
(33)40 �Rl �- 7(5) C' .I I � Efi-rb
27 4 •r � , �.
(45) (8) C* i C�
i
n
Figure 5B:Full Buildout(2020) Traffic Volumes
Cottonwood and Ida mixed-use development TIS F%
SANDERSON STEWART Q#§5,21f
Table 5:Future Buildout(2020)Capacity Calculations
Future 2020 + Site
AM Peak PM Peak
Intersection Approach Avg 95th% Avg 95th%
Delay Queue Delay Queue
s/veh LOS veh s/veh LOS veh
Intersection Control Si nali ed
EB 27.6 C 7 26.8 C 7
Rouse Avenue & WB 24.7 C 1 26.3 C 1
NB 5.4 A 5 6.6 A 5
Oak Street SB 9.2 A 7 12.4 B 12
Intersection 13.9 113.4 B --
Intersection Control Si nali ed
EB 23.8 C 4 23.7 C 4
Rouse Avenue & WB 23.6 C 2 24.0 C 3
NB 3.0 A 4 3.7 A 6
Tamarack Street SB 3.8 A 6 4.2 A 7
Intersection 7.7 A -- 8.2 A --
Intersection Control Si nali ed
EB 28.6 C 3 21.0 C 2
Rouse Avenue& WB 26.4 C 2 21.4 C 2
NB 6.8 A 5 8.1 A 6
Peach Street SB 6.4 A 6 10.9 B 9
Intersection 11.8 B -- 12.3 B --
Intersection Control Si na# ed
WB 21.4 C 5 27.6 C 8
Rouse Avenue & NB 6.0 A 5 9.5 A 7
Mendenhall Street SB 6.0 A 4 10.1 B 9
Intersection 10.2 B -- 14.2 B --
Intersection Control Si nali ed
EB 16.3 B 6 24.9 C 14
Main Street& WB 17.4 B 7 17.8 B 9
NB 10.2 B 1 14.6 B 1
Broadway Avenue SB 11.7 B 3 18.5 B 6
Intersection 16.4 B -- 1 21.0 C --
Intersection Control Two-Way Stop Controlled B & WIB
EB 8.8 A 0 8.9 A 0
Ida Avenue& WB 9.3 A 0 8.9 A 0
NB 2.2 A 0 0.7 A 0
Aspen Street SB 1.1 A 0 1.0 A 0
Intersection 3.5 A -- 2.9 A --
Intersection Control Uncontrolled
EB 7.6 A -- 6.5 A --
Ida Avenue & WB 7.2 A -- 7.8 A --
-- --
Cottonwood Street NB 7.4 A 7.2 ASB 7.3 A -- 7.3 A --
Intersection 7.4 A -- 7.2 A --
Intersection Control 0 -Way Stop Controlled B
EB 0.0 A 0 0.0 A 0
Site Access& WB 7.3 A 0 7.3 A 0
Aspen Street NB 8.8 A 1 8.8 A 1
Intersection 4.2 5.5 --
Cottonwood and Ida mixed-use development TIS m
SAND RSON STEWART
Mitigation Alternatives
Auxiliary Turn Lanes
Sanderson Stcwirt performed an auxiliary turn lane warrant anal\its for the study area:ntersectons t, determine if the such
improvements would he warranted based on the applicable MDT and .USI 1T() criter a.^'he analysis results sho "ved that
southbound auxiliary-left-turn and right-turn lanes should be considered for t17e R:)usc Avenuc/Peach Street intersection with
existing traffic volumes while a two-vray stop-controlled inter�section. .lddirionalh-,aux:liary left-Turn and right-turn lanes
should also be considered for the Rouse AN-cnue/peach Street intersection with em—mr-A traffic volumes. A copy of the
auxiliary lane warrant worksheets for all the applicable project inrcr,�ections are attached in Appendix D.
Pedestrian & Bicycle Facilities
Sanderson Stem-arr completcc an off-site improvements concept schematic (Appendix E) for the area adjacent to the site. The
schematic Shows a sidewalk surrounding the site on the north, east, and south pro -)ert,�lines-with intersection ramps and ADA
facilities. ()n the north side of Aspen Street,an 8-foot wail is shown to connect adjacent facilities. lnrur<ccrion bulb-ours are
sho,wrl to shorten the pedestrian crossing;distances.
Roadway Facilities
Also Shown in the off-site improvement concept schematic, are roadway desitnn ,< for.aspen Street,Ida Street, and Cottonwood
Street. The Aspen Street and Cottonwood Street sections march the Ciro• standarus and include on-street parallel parking;on
both sides of Aspen Street and on-street diagonal parking;on both sides of Co:tonwo(:d Street. Ida Avenue has restricted
right-of-,vay and therefore the schematic shows a smaller roadway section With on-street parallel parking on the west side only.
With the restricted road,,vay secrion,a woonerf design is being considered ,N-here uie roadway becomes a shared space for cars,
bicyclists,and pedestrians ,Nith a slower speed limir and traffic calming measures.
Site Area Intersections
The three inrersecdons and triangle park created by aspen Street,Ida:1vroue,any Fro -it Strerr were noted as a concern by the
City of Bozeman as they exist roday. Reviem'Ing traffic turning;moVements through data collection efforts,it was obsen-ed
vehicles turning; from 1•ronr Street onto Ida Avenue and aspen Street mancuv_r turns at hi'ghcr than desired speeds due to the
intersection gkc-ws. 1 he traffic volumes ar the intersections are low and could he consr.idated into a single intersection. Three
options (Option .1,()ptiun B,()ption C,and Option D) have been submitted to the C,fy for reN•ie,,x-. With the extension of
aspen Street from Wallace .1 cnue to Ida .\vcnue.it is anticipated the traffic Laving the&N-clopment heading east on .lsprn
gill use Ida.��enue and Front Street for destinations ru the�ourh and cast of the site. :'raftic leaving the development with
destinations to the north and.rest of the site are anticipated to head Nvc,<t on .aspen Street to then access Wallace �vcnue.
Therefore, the segment of Ida Avenue ber-ween .Aspen Srrect 1•ront Street is nor anticipated to be primary route for traffic
from the development.
Cottonwood and Ida mixed-use development TIS
® SIl Juawdolanap asn-pax.7w opl puo pooMuonoD
'(CID1,n]�1) ti3J1A3Q iOT]UOD Ji14LTJ LUlo3Tui*'I.uo 113"LlU
3LI] pLIL' SpTL'pums umL Zog to A]lD yyA% 3JUL'pTOJJL' LIl p3LlSis3p 3d 11L'Lis -,iuPLl13Ao1duii p31L'l3T-LioT]p]1odsue.] iiV -
3]1S 3Li] q)llwy
.\llAU:)PULIUJ ui ij]S3p3d]uL'lidwo:)-V QN.7 Lllp]L11L'LLi o1 311s .1]13doTd 3Ll] ]o 3SL']LIoT}SLIoIL'.\]lAi]J3L uw 111,T] p11L`Ii13A\3p1S -
LioudO Llr�ls3p L13soq:) u0 p3sL'ci UoT]J3sT3]Lll 3111.13AV LpIp33T1� u,)dsV o
1a311q u3dsV uo (dal Lpnos) ss3JJL 31T� o
:suopL'JOI 5ui.mollol -4y 1L' 113iiL]sUl a)q pinoLls (i-CN sWiis awi,,u izxms pUL (I-III) suoiS do]q -
'sau>l3pin5 uxw,,,3p upul3zog to.iii:)SuLmollo4 3nu3AV 3Jelllfll 01 3na3AV UPI WOTJ mclsV 3J3uuoD -
•.iI,mpdOJdch,
SLl.�ls loT]uOJ :)jjyT] 3]L'pdn PUU UOTIJ3ST3]Lll ]33T1�11.103d/311U I.\V L'pl/]a3T]� U;)dSV 3LI1 4o 31;)uo uopuLgV -
:Togmi3
3Lp ]o]L w2 'pn( iLuoiss34old alp pup.ipnls siy LuOJl gns'3T sls.iiL'uL 3LI] Uo p3SL'cl si sL1owpu;)LLTLuoJ3T to iq c ul:\\oli(l 3L1�
su0i11?puaww0:)a�j
s3ul;I ssaTa�ss3Tuui aluls
yum palapow uigiA\nuln3nb iVl_UTLITLU LI1L\\3JLLl3s to i3:\3i 3ICIL]d3JJL'Liu ii'• ..m,T3do o] p3]i3di:)p L Si uoAJ3ST3]Lll ss3JJL' ,ms 3LI,L
"I tlpu3ddV Ul p3plAold
s1S.\iL'UL'siurjaL'd 3LIoIL'-pums`iLwj(.)j 3Li1 ui p3pL\old sL' ,uoiMInJiLJ[SUPITL'd p3TL'Lis alp sp3aJ\3 q:)iq.m`s3JL'ds&TyTI'•d 133T]s
3JL'l.11s zc pul"`101 33L'1Tns p3SL'3l L: ui S3JL'ds L/ 'S3JL'ds 96 yiA\D&,Iu'S punUlii13p1111 ']l 'Ls GGL`G� L' S3SOclOJ(l ULid 3]1S 3Ll]
']J3Iold IG]�_L' LiSIIOTLI] LK)UJnT1SLioJ Tol p3UUL'ld pUL p3]Lll',TTI?.\\ Sl iL'LIn1S L
T3_\3;\\Ol_l 'LIODJ.lsTaltli ]33T1� LiJl:3Cl/311113.\�J 3ti11U21 Jll] ]L p31LIL'TTL':\\3Tti s3lli:1 Li ru-i Sit pLIL'1131 punoclynos put,, punoclll]lou
1Ly puno] ]TL':\\3]S uosT3puv� '.vi,)LLI03n pa.\\,ys 3LI1 _\cl pismn S3Llsi aJ TOl 1J3T1OJ pli oy, L1pl1J3ti.13]Lll 13,111�lIJU-)
pLlp 311L13AN? - S,.nw 13Li1 jU LI(iul'.ZTIL'll lS pLlli 1L XUUnl]L'3T 3LIy'i3LiuoST3d ]QI� LI11:\1 Sllol]l:dl3.\L1oJ uo p3SLcl 1LI3 uU0JTAU3 ut,. n
1L13T1113 3Li] 101 p31J3dS3 sr 3cl o1 ptmol 3.13:1\ suol]J3sT3]LIl L'31L'.1pi11S�')unsls3 3y lo] s3]L'1:All-L)A3S pLIL' L)SL'TJ 3Li T •Sd1T] 3]1S
pup Lp.\\o.Td punoT _yJLcl to uonippL 3Lp qIM U3:\3 p3A0ldWl 3cl ILIA\�0- os `ii,.Wiis Jll]L'T] L Li]L\\pa]JaTTo,3cl of p3Lml'.id sl ]i1ci
sL100TpUOJ VUlIsl\3 3Lp Lil ]L13S31d sl .1--nu)Jl]3p -,iqj_']3:)l1q LIJL';)d �o Ilk)T]J3sT31ui )y m ,-, igm'ojddv. 3idljnw
lo] p3111]Li3lll 3T3.\\ suoilluoJ SLilll,)nh pLIL' qo -1 pLIL' s133T]s l'.311?TO] PuEu 3p Jl]ll'.T1 :\\3U to -)Will()-\
imiluilu L'• 3]t'.T3113)ill.\\I:)A01d]U3LUdol3.\3p 3si1-pazl-LLl LpI pul;pOO.\\ll(;]1o1 3Lp]Lip u.\wLls SL'LI sis.ilLL i,,2uyp3J31d 3Lij
suoisnl:)uoD
SN0liVGN3NA0DTd 'R SNOMIDNOD
r• AVM31S NOS� 3ON`dS
• •TRAFFIC COUNT DATA
v
�QQGICaQ4
SAND ERSO N STEWARTICOM
i
SANDERSON %�:�
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Broadway Ave&Main Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: AM Peak Flour 7:45-8:45 Ate
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Broadway Avenue East/West Street: Main Street
Vehicle Volumes and Adjustments
Broadway Avenue Broadway Avenue Blain Street Main Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.0(1 1 1.00
7:45 AM 4 0 31 0 35 0 0 0 0 0 0 1 121 9 0 130 29 154 0 0 183 348
8:00 AM 3 0 15 0 18 0 0 0 0 0 0 112 13 0 125 21 142 0 0 163 306
8:15 AM 5 0 28 0 33 0 0 1 0 1 1 132 10 0 143 22 151 0 0 173 350
8:30 AIVI 10 0 26 0 36 0 0 0 0 0 0 110 15 0 125 22 134 0 0 15G 317
Grand Total 22 0 100 0 122 0 0 1 0 1 1 475 47 0 523 94 581 0 0 675 1321
Medium Truck% 0.0 0.0 1.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0 0.4 1.1 0.0 0.0 0.0 0.1
Total Truck% 0.0 0.0 1.0 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.0 0.8 1.1 0.0 0.0 0.0 0.1
Total%1 1.7 0.0 7.6 0.0 9.2 0.0 0.0 0.1 0.0 0.1 0.1 36.0 3.6 0.0 39.6 1 7.1 44.0 0.0 0.0 51.1 100.0
PHF 0.94
Broadway Avenue
In Out
122 141
RT TH I LT I U
22 J 0 1 100 1 0
41
y
S c,
0 J„
v
Total Entering o e
1321 a•
c Cn
F �
� n
0
t~ r
c ^ a v O
H nl J G
x 1
0 1 0 0
U LT TH RT
1 1
Out In
Ak
Broadway Avenue
1300 North Tianstech Way Billiner tone 59102 1 Phone 406.656.5255 1 Fox 406.656.1* wvnv.sandersonstewart.com
SANDERSON t�.►.
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Broadway Ave&Main Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/DDT
Count Time Period: PM Peak Hour(4:30-5:30 PD
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Broadway Avenue East/West Street: Main Street
ehicle Volumes and Adjustments
Broadway Avenue Broadway Avenue Main Street Main Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Fight Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 1 0.98 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4:30 PM 10 0 30 0 40 0 0 0 0 0 0 161 21 0 182 28 132 0 0 160 382
4:45 PM 9 0 29 0 38 0 0 1 0 1 1 161 26 0 188 25 146 0 0 171 398
5:00 PM 11 0 53 0 64 0 0 0 0 0 1 165 24 1 191 31 176 0 0 207 462
5:15 PM 18 0 28 0 46 0 0 0 0 0 0 160 22 0 182 31 167 0 0 198 426
Grand Total 48 0 140 0 1 188 0 0 1 0 1 2 1 647 93 1 743 115 621 0 0 1 736 J1661
Medium Truck% 2.1 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.0 0.3 0.9 0.3 0.0 0.0 0.4
Heap Truck% 2.1 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.6 1.1 0.0 0.7 2.6 0.6 0.0 0.0 1.0
Total Truck% 4.2 0.0 0.0 0.0 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.9 1.1 0.0 0.9 3.5 1.0 0.0 0.0 1.4
Total%1 2.9 0.0 8.4 0.0 11.3 0.0 1 0.0 0.1 1 0.0 0.1 0.1 38.8 5.6 0.1 44.5 6.9 37.2 0.0 0.0 1 44.1 100.0
PHF 0.90
Broadway Avenue
In Out
188 208
RT TH LT IU
e48 0 140 0
N x
C,
12 J
O r w
o
Total Entering
v
1668
r
a
r M a J O
rr W
0 1 0 0
U LT TH RT
2 1
Out In
Broadway Avenue
1300 North TtoWech Way Erggs,Monona 59102 1 Phone 406.656.5255 1 Fox 406.656.0967 j www.sandersoWewart.com
At,
SANDERSON Ra
AVW
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Cottonwood Street&Ida Avenue
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/INOT
Count Time Period: AM Peak Hour :45-8:45 At\,I)
Project Number: 06020.03 Project Description: Cottomvood/Ida Mixed Use Project
North/South Street: Ida Avenue East/West Street: Cottonwood Street
Vehicle Volumes and Adjustments
Ida Avenue Ida Avenue Cottonwood Street Cottonwood Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
7:45 AM 1 2 0 0 3 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 5
8:00 AM 0 4 0 0 4 0 4 1 0 5 1 0 0 0 1 0 0 0 0 0 10
8:15AM 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 1
8:30 AIVI 1 3 E 0 0 4 0 4 0 0 4 2 0 1 1 4 0 0 1 0 1 13
Grand Total 2 9 0 0 11 0 10 2 0 12 3 0 1 1 5 0 0 1 0 1 29
Medium Truck% 0.0 0.0 i 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 50.0 11.1 j 0.0 0.0 18.2 0.0 10.0 5 0.0 0.0 16.7 0.0 0.0 100.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0
Total Truck% 50.0 11.1 i 0.0 0.0 18.2 0.0 10.0 50.0 0.0 16.7 0.0 0.0 100.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0
Total%1 6.9 31.0 0.0 1 0.0 1 37.9 0.0 1 34.5 1 6.9 1 0.0 1 41.4 10.3 0.0 3.4 3.4 17.2 0.0 0.0 3.4 0.0 3.4 100.0
PHF
0.56
Ida Avenue
In Out
11 11
RT I =9d
2
L o �
� o
a Total Entering o C o
� o
0 29
0 0
3 0
c °-
o
V
n o O
� o
x M 1 I
0 1 2 1 10 1 0
U I LT I TH I RT
13 12
Out In
Ida Avenue
1300 North Tramutech Way Bar"ontano 59102 1 Phone 406.656.5256 1 Fccc 406.656.f• www.sandersorstewart.com
r
SANDERSON 4!.v
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Cottonwood Street&Ida Avenue
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/DDT
Count Time Period: PM Peak Hour(4:30-5:30 PI\
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Ida Avenue East/West Street•. Cottonwood Street
eWcle Volumes and Adjustments
Ida Avenue Ida Avenue Cottonwood Street Cottonwood Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4:30 PM 1 2 0 0 3 0 1 5 0 0 5 1 0 0 0 1 0 1 0 0 1 10
4:45 PM 0 6 0 0 6 0 5 0 0 5 0 0 0 0 0 0 1 0 0 1 12
5:00 PM 0 12 0 0 12 0 5 0 0 5 1 0 0 0 1 0 0 0 0 0 18
5:15 PD1 1 6 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 8
Grand Total 2 26 0 0 28 0 15 0 0 15 2 0 0 0 2 0 2 1 0 3 IJ
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 50.0 3.8 0.0 0.0 7.1 0.0 6.7 0.0 0.0 6.7 0.0 0.0 0.0 0.0 0.0 0.0 50.0 0.0 0.0 33.3
Total Truck% 50.0 3.8 0.0 0.0 7.1 0.0 6.7 0.0 0.0 6.7 0.0 0.0 0.0 0.0 0.0 0.0 50.0 0.0 0.0 33.3
Total%1 4.2 1 54.2 1 0.0 1 0.0 1 58.3 1 0.0 31.3 0.0 0.0 31.3 4.2 0.0 0.0 0.0 4.2 0.0 4.2 2.1 0.0 6.3 100.0
PHF 0.67
Ida Avenue
In Out
28 15
RT TH I LT U
2 26 0 0 t
Total Entering
v� o
0 48 a
0 0
C: 0a.
o cr
F
U '� o rfl
F o
O
7 Fir
N
0 1 0 1 15 1 0
U I LT I TH I RT
29 15
Out In
Ida Avenue
1300 North Tmnstech Way I Billings,Montana 59102 1 Phone 406.656.5255 I Fox 406.656.0967 www.sondewrts eNod.com
SANDERSON A1730�
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Front Street R Aspen Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: AM Peak Hour(7:45-8:45 AD-I)
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Front Street East/West Street: Aspen Street
Vehicle Volumes and Adjustments
Front Street Front Street Aspen Street N/A
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thor Left U-turn Total Ri ht Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15AM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
8:30 AD4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 50.0 0.0 0.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Truck% 0.0 50.0 0.0 0.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total%1 0.0 1 100.0 0.0 0.0 100.01 0.0 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0
PHF 0.25
Front Street
In Out
2 0
RT TH I I U
0 2 0
O
o
Total Entering
a 2
V
c
n.
d
� o
4 O
° a
0
l � T
000
U LT TH
2 0
Out In
AL
Front Street
1300 North Tmmtech Way Billinlertona 59102 I Phone 406.656.5255 I Fox 406.656. wyew.sandersonstewart.com
SANDERSON 49A
ST EWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Front Street&Aspen Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: PM Peak Hour 4:30-5:30 Pl\
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street. Front Street East/West Street: Aspen Street
Vehicle Volumes and Adjustments
Front Street Front Street Aspen Street N/A
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Ri ht Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
4:30 PM 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2
4:45 PM 0 1 0 0 1 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 3
5:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
5:15PM 0 1 0 0 1 0 1 1 0 2 0 0 0 0 0 0 0 0 0 0 3
Grand Total 0 1 3 0 0 3 0 4 2 0 6 0 0 0 0 0 0 0 0 0 0 9
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 50.0 0.0 16.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 50.0 0.0 16.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total%1 0.0 1 33.3 0.0 0.0 33.3 0.0 1 44.4 1 22.2 1 0.0 66.7 1 0.0 1 0.0 1 0.0 1 0.0 0.0 1 0.0 1 0.0 0.0 1 0.0 1 0.0 1 100.0
PHF 0.75
Front Street
In Out
3 4
RT TH I IU
0 3 0
� N
0
Total Entering
U
U
9
C
n.
� o
o
a
H
0 2 4
U LT TH
3 6
Out In 17
Front Street
1 3100 North Tionstech Way I Vings,Montono 59102 Phone 406.656.5255 I Fox 406.656.0967 www.sondewnstewad.com
SANDERSON A17%7
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Front Street&Ida Avenue
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: A1\4 Peak Hour(7:45-8:45 Al l)
Project Number 06020.03 Project Description: Cottonwood/Ida Mired Use?roject
North/South Street: Ida Avenue East/West Street: Front Street
Vehicle Volumes and Adjustments
N/A Ida Avenue Front Street Front Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Fight Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
7:45 AM 0 0 0 0 0 0 0 2 0 2 4 0 0 0 4 0 0 0 0 0 6
8:00 AIM 0 0 0 0 0 0 0 2 0 2 3 0 0 0 3 0 0 0 0 0 5
8:15AM 0 0 0 0 0 0 0 0 0 0 1 2 0 0 3 0 0 0 0 0 3
8:30 AM 0 0 0 0 0 0 0 3 0 3 2 0 0 0 2 0 0 0 0 0 5
Grand Total 0 0 0 0 0 0 0 7 0 7 10 2 0 0 12 0 0 0 0 0 19
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.3 0.0 14.3 10.0 0.0 0.0 0.0 8.3 0.0 0.0 0.0 0.0 0.0
Total Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.3 0.0 14.3 10.0 0.0 0.0 0.0 8.3 0.0 0.0 0.0 0.0 0.0
Total%1 0.0 1 0.0 1 0.0 1 0.0 1 0.0 1 0.0 1 0.0 1 36.8 1 0.0 1 36.8 1 52.6 1 10.5 1 0.0 1 0.0 1 63.2 0.0 0.0 0.0 0.0 0.0 100.0
PHF 0.79
~ � T
O
0
Total Entering C
^
19
w
:D o
O
07 0
U LT RT
10 7
Out In
AL
Ida Avenue
1300 North Tronsiech Way Billinlerio o 59102 1 Phone 406.656.52551 Fat 406.656.10
www.sandersomtewart.com
SANDERSON
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Front Street&Ida Avenue
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: PM Peak Hour 4:30-5:30 PTD
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Ida Avenue East/West Street: Front Street
Vehicle Volumes and Adjustments
N/A Ida Avenue Front Street Front Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4:30 PM 0 0 0 0 0 0 0 6 0 6 2 0 0 1 3 0 2 0 0 2 11
4:45 PM 0 0 0 0 0 0 0 8 0 8 6 1 0 0 7 0 1 0 0 1 16
5:00 PM 0 0 0 0 0 0 0 3 0 3 11 1 0 0 12 0 0 0 0 0 15
5:15PM 0 0 0 0 0 0 0 0 0 0 5 1 0 0 6 0 1 0 0 1 7
Grand Total 0 1 0 0 0 0 0 0 17 0 17 24 3 0 1 1 28 0 4 0 0 4 49
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.9 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.9 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total%1 0.0 1 0.0 0.0 0.0 0.0 0.0 0.0 34.7 0.0 34.7 49.6 6.1 0.0 1 2.0 1 57.1 0.0 8.2 0.0 0.0 8.2 100.0
PHF 0.77
0 N A Z
O �
Total Entering c
49
0
G N
o �
w
a
C N W O
M
N
0 17 0
U LT RT
24 17
Out In
Ida Avenue
1300 North Trotulech Way &.1ings,Montana 59102 Phone 406.656.5255 1 Fax 406.656.0967 www.sondersonsfewad.com
SANDERSON �
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Ida Avenue&Aspen Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/bIDT
Count Time Period: AM Peak Hour 7:45-8:45 AD'
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Ida Avenue East/West Street: Aspen Street
Vehicle Volumes and Adjustments
Ida Avenue Ida Avenue N/A Aspen Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 1.00 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.)0 0.00 0.00 0.00 1.00 1.00 1.00 H
7:45 AM 0 4 0 0 4 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 6
8:00 AM 0 3 0 0 3 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 5
8:15AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
8:30 AM 0 2 0 0 2 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 5
Grand Total 0 10 0 0 10 0 7 0 0 7 0 0 0 0 0 0 0 0 0 0 17
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 10.0 0.0 0.0 10.0 0.0 14.3 0.0 0.0 14.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Truck% 0.0 10.0 0.0 0.0 10.0 0.0 14.3 0.0 0.0 14.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total%1 0.0 58.8 0.0 0.0 58.8 0.0 41.2 0.0 0.0 41.2 0.0 0.0 0.0 0.0 0.0 0.0 1 0.0 0.0 1 0.0 1 0.0 100.0
PHF ljot-0
Ida Avenue
In Out
10 7
TH LT U
10 0 0
o
o �
o �
Total Entering
17 °
0
o O
71r
0 7 1 0
U TH RT
10 7
Out In
Ida Avenue
1300 North Tronstech Way Billimemtano 59102 Phone 406.656.5255 Fox 406.656.1* www.sondersonstewort.com
SANDERSON 410
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Ida Avenue&Aspen Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: PM Peak Hour 4:30-5:30 P
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Ida Avenue East/west Street: Aspen Street
Vehicle Volumes and Adjustments
Ida Avenue Ida Avenue N/A Aspen Street
Southbound Northbound Eastbound Westbound Int.
Start Time Fight Thru Left U-turn Total Right Thru Left U-turn Total Right Thor Left U-turn Total Fight Thru Left U-turn Total Total
Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00
4:30 PM 0 2 0 0 2 0 6 0 0 6 0 0 0 0 0 0 0 0 0 0 8
4:45 PM 0 6 0 0 6 0 8 0 0 8 0 0 0 0 0 0 0 1 0 1 15
5:00 PM 0 11 0 0 11 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 14
5:15PM 0 5 0 1 0 5 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 6
Grand Total 0 24 0 0 1 24 0 17 0 0 17 0 0 0 0 0 0 0 2 0 2 43
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 0.0 0.0 0.0 0.0 0.0 5.9 0.0 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 50.0 0.0 50.0
Total Truck% 0.0 0.0 0.0 0.0 0.0 0.0 5.9 0.0 0.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 50.0 0.0 50.0
Total%1 0.0 1 55.8 0.0 0.0 55.8 0.0 39.5 0.0 0.0 39.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.7 0.0 4.7 100.0
PHF 0,72
Ida Avenue
In Out
24 17
TH LT U
24 0 0
o %d
ti
N �
IV
Total Entering o
43
5
q
o O
c
Fir
0 1 1 17 1 0
U I TH I RT
26 17
Out In
Ida Avenue
IMO North Tmwech Woy I &"ings,Moremn 59102 Phone 406.656.52551 Fox 406.656.0967 1 www.sondersonsiewod.com
AN
SANDERSON A�:`�
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue&Mendenhall Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/' IDT
Count Time Period: Aid(Peak Hour(7:45-8:45 ADI)
Project Number: 06020.03 Project Description: Cottonwood/Ida D4ixed Use Project
North/South Street: Rouse Avenue East/West Street: Mendenhall Street
Vehicle Volumes and Adjustments
Rouse Avenue Rouse Avenue Mendenhall Street Mendenhall Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 1.00 1.00 1.00 1.00
7:45 AM 48 33 12 0 93 2 58 13 0 73 0 0 0 0 0 10 34 0 0 44 210
8:00 AM 21 38 7 0 66 6 62 12 0 80 0 0 0 0 0 10 47 3 0 60 206
8:15 AM 23 32 12 0 67 3 80 7 0 90 0 0 0 0 0 18 50 2 0 70 227
8:30 AM 20 38 8 0 66 5 60 10 0 75 0 0 0 0 0 18 35 4 0 57 198
Grand Total 112 141 39 0 292 16 260 42 0 318 0 0 0 0 0 56 166 9 0 231 841
Medium Truck% 2.7 0.0 0.0 0.0 1.0 0.0 0.4 4.8 0.0 0.9 0.0 0.0 0.0 0.0 0.0 5.4 2.4 0.0 0.0 3.0
Heavy Truck% 0.9 2.8 2.6 0.0 2.1 6.3 1.5 2.4 0.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 0.0 0.9
Total Truck% 3.6 2.8 2.6 0.0 3.1 6.3 1.9 7.1 0.0 2.8 0.0 0.0 0.0 0.0 0.0 5.4 3.6 0.0 0.0 3.9
Total%1 13.3 1 16.8 4.6 1 0.0 34.7 1 1.9 30.9 5.0 0.0 37.8 0.0 0.0 0.0 0.0 0.0 6.7 19.7 1.1 0.0 27.5 100.0
PHF 0.93
Rouse Avenue
In Out
292 316
RT TH LT I U
112 141 39 0
O ~ CCT Ti N
O M
C1 7
Total Entering C a
a
841 8
r s
c �
-°10 cn
c �
v
c o O
� o
E�
xCD
l Fr
0 1 42 1 260 1 16
U I LT I TH I RT
150 318
Out In
Ak
Rouse Avenue
1300 North Tronstech Way Bitlin'Ontona 59102 I Phone 406.656.5255 1 Fax 406.6561* www.sandersonstewart.com
SANDERSON
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue&Mendenhall Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: PM Peak Hour 4:30-5:30 PM)
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Rouse Avenue East/West Street. Mendenhall Street
Vehicle Volumes and Adjustments
Rouse Avenue Rouse Avenue Mendenhall Street Mendenhall Street
Southbound Northbound Eastbound Westbound Int.
Start Time Fight Thru Left U-rum Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 1.00 1.00 1.00 1.00
4:30 PM 49 70 9 0 128 0 78 18 0 96 0 0 0 0 0 14 42 2 0 58 282
4:45 PM 30 68 6 0 104 3 80 22 0 105 0 0 0 0 0 14 46 1 0 61 270
5:00 PM 48 82 10 0 140 5 80 23 0 108 0 0 0 0 0 18 63 3 0 84 332
5:15 PM 30 45 13 0 88 1 79 16 0 96 0 0 0 0 0 13 63 1 0 77 261
Grand Total 157 1 265 38 0 460 9 317 79 0 405 0 0 0 0 0 59 214 7 0 1 280 1145
Medium Truck% 1.3 0.8 0.0 0.0 0.9 0.0 0.6 1.3 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.0 0.7
Heavy Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.9 1.3 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 14.3 0.0 0.7
Total Truck% 1.3 0.8 0.0 0.0 0.9 0.0 1.6 2.5 0.0 1.7 0.0 0.0 0.0 0.0 0.0 0.0 1.4 14.3 0.0 1.4
Total% 13.7 23.1 3.3 0.0 40.2 0.8 27.7 6.9 0.0 35.4 0.0 0.0 0.0 0.0 1 0.0 5.2 1 18.7 0.6 0.0 1 24.5 100.0
PHF 0.86
Rouse Avenue
In Out
460 376
RT TH LT I U
157 265 38 0
� x
O A Z 00
[J
v
b Total Entering j
1145
L y
C _
41
(~ O
o J O
F I f
0 79 317 9
U LT TH RT
272 405
Out In
Rouse Avenue
1300 North Tmnslech Way V.:ngs,Montano 59102 ( Phone 406.656.5255 1 Fax 406.656.0967 I www.sondersonstewatt.com
05111
JF
SANDERSON 7
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue&Oak Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: AM Peak Hour(7:45-8:45 AM)
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Rouse Avenue East/West Street: Oak Street
Vehicle Volumes and Adjustments
ROGse Avenue Rouse Avenue Oak Street Oak Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Fight Thru Left U-turn Total Total
Factor 0.98 1 0.98 0.98 0.98 0.98 0.98 0.98 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
7:45 AM 27 55 0 0 82 0 51 23 0 74 70 0 50 0 120 0 1 0 0 1 277
8:00 AM 26 56 0 0 82 0 59 27 0 86 43 0 37 0 80 0 0 0 0 0 248
8:15 AM 26 84 0 0 110 0 74 29 0 103 45 0 37 0 82 0 0 0 0 0 295
8:30 tA�4 26 53 0 0 79 0 91 31 0 122 32 0 41 0 73 0 0 0 0 0 274
Grand Total 105 1 248 0 0 353 0 275 110 0 385 190 0 165 0 355 0 1 0 0 1 1094
Medium Truck% 0.0 1.6 0.0 0.0 1.1 0.0 0.4 1.8 0.0 0.8 0.5 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 1.9 2.4 0.0 0.0 2.3 0.0 2.2 7.3 0.0 3.6 3.2 0.0 1.8 0.0 2.5 0.0 0.0 0.0 0.0 0.0
Total Truck% 1.9 4.0 0.0 0.0 3.4 0.0 2.5 9.1 0.0 4.4 3.7 0.0 1.8 0.0 2.8 0.0 0.0 0.0 0.0 0.0
Total%1 9.6 22.7 0.0 0.0 1 32.3 0.0 25.1 10.1 0.0 1 35.2 1 17.4 0.0 15.1 1 0.0 32.4 0.0 0.1 0.0 0.0 0.1 100.0
PHF 0.93
Rouse Avenue
In Out
353 440
RT I TH I LT fU
105 248 0 0
L o
O N � o r
Total Entering
v O
a 1094
O rt
D o
c O
n
E-' O
O
z
i 0 1 110 275 0
U I LT TH RT
438 385
Out In
Rouse Avenue
1300 North Tmr6tech Way ( Billin"O rtana 59102 I Phone 406.656.5255 I Fac 406.656.fo wvnv.sondersoWexort.corn
SANDERSON
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue&Oak Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: PM Peak Hour(4:30-5:30 PD
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Rouse Avenue East/west Street. Oak Street
Vehicle.Volumes and Adjustments
Rouse Avenue Rouse Avenue Oak Street Oak Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-tum Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4:30 PM 50 94 0 0 144 0 64 47 0 111 37 0 27 0 64 0 1000300E
1 0 2 321
4:45 PM 48 71 0 0 119 0 69 62 0 131 36 1 35 0 72 0 0 0 322
5:00 PM Gl 118 0 0 179 0 57 65 0 122 33 2 32 0 67 0 0 0 368
5:15 PM 47 78 0 0 125 0 G7 59 0 126 45 0 37 0 82 0 0 0 333
Grand Total 206 361 0 0 567 0 257 233 0 490 151 3 131 0 285 0 1 1 0 2 1344
Medium Truck% 1.0 0.0 0.0 0.0 0.4 0.0 0.8 0.4 0.0 0.6 0.0 0.0 1.5 0.0 0.7 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.5 0.6 0.0 0.0 0.5 0.0 1.6 0.0 0.0 0.8 1.3 0.0 2.3 0.0 1.8 0.0 0.0 0.0 0.0 0.0
Total Truck% 1.5 0.6 0.0 0.0 0.9 0.0 2.3 0.4 0.0 1.4 1.3 0.0 3.8 0.0 2.5 0.0 0.0 0.0 0.0 0.0
Total%1 15.3 1 26.9 0.0 0.0 42.2 1 0.0 1 19.1 17.3 0.0 36.5 11.2 0.2 9.7 0.0 21.2 0.0 0.1 0.1 0.0 0.1 100.0
PHF 0.91
Rouse Avenue
In Out
567 388
RT TH LT U
206 361 0 0
0 It
O
Total Entering
O
y 1344
rZ
O rt
a o
� a p
N W �.,
L.
M
l 1 F*ir
0 1 233 1 257 1 0
U I LT I TH I RT
513 490
Out In
Rouse Avenue
1300 North Tronsiech Way ( Wings,Monlono 59102 1 Phone 406.656.5255 1 Fax 406.656.0967 www.sondersonstewort.com
SANDERSON � �
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue&Peach Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: AM Peak Hour(7:45-8:45 AA
Project Number: 06020.03 Project Description: Cottonwood/Ida iblixed Use Project
North/South Street: Rouse Avenue East/West Street: Peach Street
Vehicle Volumes and Adjustments
Rouse Avenue Rouse Avenue Peach Street Peach Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Fight Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
7:45 AM 6 89 11 0 106 5 46 13 0 64 23 12 1 0 36 11 6 0 0 17 223
8:00 AM 11 55 15 0 81 3 51 9 0 63 23 9 4 0 36 7 12 1 0 20 200
8:15 AM 21 77 24 0 122 8 78 7 0 93 14 15 4 0 33 10 5 0 0 15 263
8:30 AM 13 53 12 0 78 1 75 2 0 78 19 12 6 - 37 14 2 0 0 16 209
Grand Total 51 1 274 62 0 387 17 250 31 0 1 298 79 48 15 0 142 42 25 1 0 68 895
Medium Truck% 2.0 0.7 0.0 0.0 0.8 5.9 0.8 0.0 0.0 1.0 2.5 0.0 0.0 0.0 1.4 0.0 0.0 0.0 0.0 0.0
Heavy Truck% 0.0 2.9 1.6 0.0 2.3 0.0 3.2 0.0 0.0 2.7 2.5 4.2 0.0 0.0 2.8 2.4 8.0 0.0 0.0 4.4
Total Truck% 2.0 3.6 1.6 0.0 3.1 5.9 4.0 0.0 0.0 3.7 5.1 4.2 0.0 0.0 4.2 2.4 8.0 0.0 0.0 4.4
Total%1 5.7 1 30.6 1 6.9 1 0-.0t 43.2 1 1.9 1 27.9 3.5 0.0 1 33.3 8.8 5.4 1.7 0.0 1 15.9 4.7 2.8 0.1 0.0 7.6 r 100.0
PHF 0.85
Rouse Avenue
In Out
387 307
RT TH LT I U
e5l 274 62 0
A `rb
N ...1
r V .T. C,
7 00 7
O � y
Total Entering C
895
x
Pi
� o
C1l a
C " N O
00
4 7
x 1 I Fir
r
0 1 31 1 250 1 17
U I LT I TH I RT
354 298
Out In
Rouse Avenue
1300 North Tmrstech Way I Bininertono 59102 1 Phone 406.656.5255 I fcec 406.656'• voww.sondersonste`artxom
SANDERSON
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue&Peach Street
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: PM Peak Hour 4:30-5:30 PD
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Rouse Avenue East/West Street: Peach Street
Vehicle Volumes and Adjustments
Rouse Avenue Rouse Avenue Peach Street Peach Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
4:30 PM 14 112 12 0 138 3 79 16 0 98 18 15 6 0 39 18 13 1 0 32 307
4:45 PM 10 80 8 0 98 1 77 14 0 92 19 9 8 0 36 27 9 3 0 39 265
5:00 PM 14 122 18 0 154 3 84 29 0 116 22 5 7 0 34 31 14 1 0 46 350
5:15 PM 14 89 10 0 113 3 82 19 0 104 9 13 6 0 28 26 15 0 0 41 286
Grand Total 52 403 48 0 1 503 10 322 78 0 410 68 42 27 0 137 102 51 5 0 158 1208
Medium Truck% 0.0 0.5 0.0 0.0 0.4 0.0 0.0 1.3 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 2.0 20.0 0.0 1.3
Heavy Truck% 0.0 0.7 2.1 0.0 0.8 0.0 0.3 0.0 0.0 0.2 0.0 2.4 0.0 0.0 0.7 1.0 0.0 0.0 0.0 0.6
Total Truck% 0.0 1.2 2.1 0.0 1.2 0.0 0.3 1.3 0.0 0.5 0.0 2.4 0.0 0.0 0.7 1.0 2.0 20.0 0.0 1.9
Total% 4.3 1 33.4 4.0 0.0 41.6 1 0.8 26.7 6.5 0.0 33.9 5.6 3.5 2.2 0.0 11.3 8.4 4.2 0.4 0.0 13.1 100.0
PHF 0.86
Rouse Avenue
In Out
503 451
RT TH LT U
52 403 48 1 0
o �
� � o
Total Entering e
V) 1208
x
a
a
� o
r N
o C
n
H �
0 78 322 10
U LT TH RT
476 410
Out In
Rouse Avenue
1300 North Tronstech Woy ( &.1ings,Montno 59102 1 Fhone 406.656.5255 1 Fox 406.656.0967 www.soridersonsfewad.com
SANDERSON &'-p
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue cC Tamarack Steer
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/MDT
Count Time Period: AM Peak Hour(7:45-8:45 AN
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street•. Rouse Avenue East/West Street: Tamarack Street
Vehicle Volumes and Adjustments
Rouse Avenue Rouse Avenue Tamarack Street Tamarack Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Right Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 1 0.98 0.98 0.98 0.98 0.98
7:45 AM 4 99 13 0 116 2 54 5 0 61 1 16 7 0 24 9 6 3 0 18 219
8:00 Atli 12 75 12 0 99 1 55 2 0 58 5 10 15 0 30 17 5 2 0 24 211
8:15 AM 12 117 4 0 133 2 87 2 0 91 5 10 8 0 23 7 6 1 0 14 261
8:30 AM 5 70 5 0 80 2 93 3 0 98 7 17 9 0 33 13 6 1 0 20 231
Grand Total 33 361 34 0 428 7 289 12 0 308 18 53 39 0 110 46 23 7 0 76 922
Medium Truck% 6.1 0.6 0.0 0.0 0.9 0.0 0.7 0.0 0.0 0.6 11.1 3.8 0.0 0.0 3.6 0.0 4.3 0.0 0.0 1.3
HeavyTruck% 0.0 2.5 8.8 0.0 2.8 0.0 1.0 8.3 0.0 1.3 5.6 3.8 7.7 0.0 5.5 4.3 17.4 14.3 0.0 9.2
Total Truck% 6.1 3.0 8.8 0.0 3.7 0.0 1.7 8.3 0.0 1.9 16.7 7.5 7.7 0.0 9.1 4.3 21.7 14.3 0.0 10.5
Total%1 3.6 39.2 3.7 0.0 46.4 0.8 31.3 1.3 1 0.0 1 33.4 1 2.0-1 5.7 1 4.2 1 0.0 1 11.9 t 5.0 2.5 0.8 1 0.0 1 8.2 100.0
PHF 0.88
Rouse Avenue
In Out
428 374
RT TH LT U
33 361 34 0
♦- tJ -i
7 GO W T
O V P 7
v
Total Entering c
V g
1 922 y
E R
ro �
4 D O n
0
co
Fir
0 1 12 1 289 1 7
U I LT I TH I RT
386 308
Out In
Rouse Avenue
1300 North hardech Way I Blllin xi0ona 59102 Phone 406.656.5255 1 Fox 406.6560 1 www.sandewnslewart.com
SANDERSON 49'
STEWART
INTERSECTION TURNING MOVEMENT COUNT SUMMARY
General Information
Counted By: A.Paull Intersection: Rouse Avenue&Tamarack Steet
Agency/Company: Sanderson Stewart
Date Performed: Thursday,March 29,2018jurisdiction: City of Bozeman/DIDT
Count Time Period: PNI Peak Hour 4:30-5:30 PD
Project Number: 06020.03 Project Description: Cottonwood/Ida Mixed Use Project
North/South Street: Rouse Avenue East/West Street: Tamarack Street
Vehicle Volumes and Adjustments
Rouse Avenue Rouse Avenue Tamarack Street Tamarack Street
Southbound Northbound Eastbound Westbound Int.
Start Time Right Thru Left U-turn Total Right Thru Left U-turn To all Right Thru Left U-turn Total Ri ht Thru Left U-turn Total Total
Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
4:30 PM 5 124 3 0 132 3 85 6 0 94 13 6 16 0 35 9 12 4 0M25286
4:45 PM 10 87 6 0 103 2 108 5 0 115 8 12 7 0 27 13 17 1 0276
5:00 PM 9 138 8 0 155 4 96 8 0 10811 12 11 0 34 11 14 5 0327
5:15 PM 6 102 8 0 116 4 103 6 0 113 10 10 11 0 31 9 15 1 0285
Grand Total 30 451 25 0 506 13 392 25 0 430 42 40 45 0 127 :4.8
58 11 0 111 1174
Medium Truck% 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.5 4.8 0.0 0.0 0.0 1.6 0.0 0.0 0.0 0.0
HeavyTruck% 3.3 0.7 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.7 4.8 0.0 2.2 0.0 2.4 5.2 0.0 0.0 4.5
Total Truck% 3.3 0.7 0.0 0.0 0.8 0.0 1.3 0.0 0.0 1.2 9.5 0.0 2.2 0.0 3.9 5.2 0.0 0.0 4.5
Total% 2.6 38.4 2.1 0.0 43.1 1.1 33.4 2.1 0.0 36.6 3.6 3.4 3.8 0.0 10.8 3.6 4.9 0.9 0.0 9.5 1 W 0
PHF 0.90
Rouse Avenue
In Out
506 479
RT TH LT U
e30 451 25 0
00
In
Total Entering c
1174 v
V (1
4 �
ECD
R
F � o
10
FT T-1
E~ �
a
H o
V 7 T Fir
0 25 1 392 1 13
U I LT I TH I RT
504 430
Out In
AL
Rouse Avenue
1300 North Tmnstech Way Vings,Mon!=59102 1 Phone 406.656.5255 1 Fax 406.656.0967 www.sandersortmewad.com
CAPACITY CALCULATIONS -
EXISTING CONDITIONS (2018)
•
v
�34�G7a QQ
SAND ERSOONSTEWART.COM
HCM 6th Signalized Intersection Summary
1: Rouse Ave & Mendenhall St 05/08/2018
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 T T
Traffic Volume(vehlh) 0 0 0 9 166 56 42 260 16 _ 39 __ 141 _ 112
Future Volume(veh/h) 0 0 0 9 166 56 42 260 16 39 141 112
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00_ 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/ln 1900 1841 1900 1796 1870 1870 1856 1856 1856
Adj Flow Rate,vehlh 10 178 60 45 280 17 42 152 120
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh,% 0 4 0 7 2 2 3 3 3
Cap,veh/h 14 251 85 693 1037 63 696 570 450
Arrive On Green 0.20 0.20 0.20 0.59 0.59 0.59 0.59 0.59 0.59
Sat Flow,veh/h 71 1261 425 1061 1744 106 1070 959 757j
Grp Volume(v),veh/h 248 0 0 45 0 297 42 0 272
Grp Sat Flow(s),veh/h/ln 1757 0 0 1061 0 1850 1070 0 1715
Q Serve(g_s),s 6.6 0.0 0.0 1.1 0.0 3.9 1.0 0.0 3.9
Cycle Q Clear(g c),s 6.6 0.0 0.0 4.9 0.0 3.9 4.9 0.0 3.9
Prop In Lane. 0.04 0.24 1.00 0.06 1.00 0.44
Lane Grp Cap(c),veh/h 350 0 0 693 0 1100 696 0 1026
V/C Ratio(X) 0.71 0.00 0.00 0.06 0.00 0.27 0.06 0.00 0.27
Avail Cap(cga),vehlh 1219 0 0 693 0 1100 696 0 1020
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay(d),s/veh 18.8 0.0 0.0 6.1 0.0 4.9 6.1 0.0 4.9
Incr Delay(d2),s/veh 2.7 0.0 0.0 0.2 0.0 0.6 0.2 0.0 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(500/o),veh/In 2.7 0.0 0.0 0.2 0.0 1.2 0.2 0.0 1.2'
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 21.5 0.0 0.0 6.3 0.0 5.5 6.3 0.0 5.
LnGrp LOS C A A A A A A A A
Approach Vol,veh/h 248 342 314
Approach Delay,s/veh 21.5 5.6 5.7
Appro LOS C A A
Timer-Assigned Phs 2 6 8
Phs-Duration(G+Y+Rc),s_ 35.2 35.2 15.2
Change Period(Y+Rc),s "5.2 *5.2 5.2
Max Green Setting.(Gmax),s *30 _*30_ 35.0
Max Q Clear Time(g_c+l1),s 6.9 6.9 8.6
Green Ext Time(p_c),s 2.1 1.9 - 1.6
Intersection Summary
HCM 6th Ctrl Delay _ 10.0_
HCM 6th LOS A
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary
8: Rouse Ave/Rouse Avenue & Tamarack St 05/08/2018
"', --0. --* (- *-- � 4\ t �► ♦ -4/
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations c� _� �, 4+
Traffic Volume veh/h 39 53 18 7 __ 23 46 -_12 _ _28_9_- 7 34 361 33
Future Volume(veh/h) 39 53 18 7 23 46 12 289 7 34 361 33
Initial Q Qb,veh 0 0 0 0 0 0 0 0 0 0 0 0,
Ped-Bike Adj(A_pbT) _ 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00
Parking Bus,Adj - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -1.00 1.00 1.00 1.00 01 0
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1781 1781 1781 1574 1574 1574 1870 1870 1870 1856 1856 1856
Adj Flow Rate,veh/h 44 60 20 8 26 52 ~14 328 8 39 410 38
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 80 8
Percent Heavy_Veh,% 8 8 8 22 22 22 _2 2 2 3 3 3
Cap,veh/h 143 111 32 80 59 103 86 1299 31 125 1142 101
Arrive On Green 0.12 0.12 0.12 0.12 0.12 0.12 0.73 0.73 0.73 0.73 0.73 0.73
Sat Flow,veh/h 443 911 260 65 488 846 24 1774 42 74 1560 138,
Grp Volume(v),veh/h 124 0 0 86 0 0 350 0 0 487 0 0
Grp Sat Flow(s),veh/h/In 1614 0 0 1399 0 0 1839 0 0 1772 0 0,
Q Serve(g_s),s 0.7 0.0 0.0 _ 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c),s 3.8 0.0 0.0 3.1 0.0 0.0 3.4 0.0 0.0 5.3 0.0 0.0
Prop In Lane 0.35 0.16 0.09 0.60 0.04 0.02 0.08 0.08
Lane Grp Cap(c),veh/h 285 0 0 242 0 0 1415 0 0 1369 0 0
V/C Ratio(X) 0.43 0.00 0.00 0.36 0.00 0.00 0.25 0.00 0.00 0.36 0.00 0.00
Avail Cap(c=a),veh/h 1205 0 0 1072 0 0 1415 0 0 1369 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay(d),s/veh 22.7 0.0 0.0 22.5 0.0 0.0 2.4 0.0 0.0 2.7 0.0 0.0
Incr Delay(d2),s/veh 1.0 0.0 0.0 0.9 0.0 0.0 0.4 0.0 0.0 0.7 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Vile BackOfQ(50%),veh/In 1.5 0.0 0.0 1.0 0.0 0.0 0.8 0.0 0.0 1.2 0.0 0.0
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 23.8 0.0 0.0 23.3 0.0 0.0 2.8 0.0 0.0 3.4 0.0 0.0
LnGrp LOS C A A C A A A A A A A A
p ach Vol,vehlh 124 86 350 487
Approach Delay,s/veh 23.8 23.3 2.8 3.4
Appro OLhca S C C A A
Timer-Assigned Phs 2 4 6 8
Phs Duration(G+Y+Rc),s 44.0 10.6 44.0 10.6
Change Period(Y+Rc),s 4.0 4.0 4.0 4.0
Max Green Setting(Gmax),s 40.0 40.0 40.0 40.0
Max Q Clear Time(g_c+l1),s 5.4 5.8 7.3 5.1
Green Ext Time(p`c),s 2.5 0.8 3.8 0.5
Intersection Summary
HCM 6th Ctrl Delay 7.3
HCM 6th LOS A
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM 6th Signalized Intersection Summary
11: Rouse Avenue & Oak Street/Birch Street 05/08/2018
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 r 4 T + r
Traffic Volume(veh/h) 165 0 190 0 1 0 110 275 0 0 248 105,
Future Volume(veh/h) 165 0 190 0 1 0 110 275 0 0 248 105
Initial Q_(Qb),veh 0 0 0 0 0_ 0 _ _0__ _0- _ __0 _ 0 __ -0_ 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
M Sar'-' t Flow,vehlh/In 1900 1900 1841 1900 1900 1900 1767 1856 1856 1900 1841 1870
Adj Flow Rate,veh/h 177 0 204 0 1 0 118 296 0 0 267 113
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh,% 0 0 4 0 0 0 9 3 3 0 4 2
Cap,veh/h 341 0 360 0 319 0 660 1266 0 100 1023 880,
Arrive On Green 0.17 0.00 0.17 0.00 0.17 0.00 0.06 0.68 0.00 0.00 0.56 0.56
Sat Flow,veh/h 1435 0 1560 0 1900 0 1682 1856 0 1100 1841 1584;
Grp Volume(v),veh/h 177 0 204 0 1 0 118 296 0 0 267 113
Grp Sat Flow(s),veh/h/ln 1435 0 1560 0 1900 0 1682 1856 0 1100 1841 1584,
Q Serve(g_s),s 8.4 0.0 8.3 0.0 0.0 0.0 1.9 4.3 0.0 0.0 5.4 2.5
Cycle Q Clear(g c),s 8.4 0.0 8.3 0.0 0.0 0.0 1.9 4.3 0.0 0.0 5A 2.5
Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c),veh/h 341 0 360 0 319 0 660 1266 0 100 1023 880
V/C Ratio(X) 0.52 0.00 0.57 0.00 0.00 0.00 0.18 0.23 0.00 0.00 0.26 0.13
Avail Cap(cga),veh/h 799 0 856 0 924 0 1139 1266 0 100 1023 880,
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1_00 0.00 1.00 -0.00 1.00 1.00 0.00_ 0.00 1.00 1.00,
Uniform Delay(d),s/veh 28.5 0.0 24.5 0.0 25.0 0.0 5.3 4.3 0.0 0.0 8.3 7.7
Incr Delay(d2),s/veh 1.2 0.0 1.4 0.0 0.0 0.0 0.1 0.4 0.0 0.0 0.6 0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 2.8 0.0 3.1 0.0 0.0 0.0 0.6 1.5 0.0 0.0
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 29.7 0.0 25.9 0.0 25.0 0.0 5.4 4.8 0.0 0.0 8.9 8.0
LnGrp LOS C A C A C A A A A A A A
Approach Vol,veh/h 381 1 414 380
Approach Delay,s/veh 27.7 25.0 4.9 8.6
Appro LOS Lhca OS C C__ A A
Timer-Assigned Phs 2 4 5 6 8
Phs Duration(G+Y+Rc),s 54.5 17.5 9.1 45.4 17.5
Change Period(Y+Rc),s 5.4 5.4 *4.6 5.4 5.4
Max Green Setting(Gmax),s 40.0 35.0 *25 40.0 - _35.0
Max Q Clear Time(g_c+I1),s 6.3 10.4 3.9 7.4 2.0
Green Ext Time(p_c),s 2.0 1.6 0.3 2.2- - 0.0
Intersection Summary
HCM 6th Ctrl Delay 13.5
HCM 6th LOS B
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
HCM 6th Signalized Intersection Summary
15: Private Access/Broadway St & Main St 05/08/2018
k_ 4% t 10� �►
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 0 4T 4 4
Traffic Volume(vehlh) 47 475 1 0 581 94 1 0 0 100 0 22
Future Volume(veh/h) 47 475 1 0 581 94 1 0 0 100 0 22
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0,
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/hlln 1885 1885 1885 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adj Flow Rate,veh/h 50 505 1 0 618 100 1 0 0 106 0 23
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh,% 1 1 1 0 0 0 0 0 0 0 0 0
Cap, evCap,h hlhl 122 1133 2 0 1163 188 760 0 0 630 10 118
Arrive On Green 0.37 0.37 0.37 0.00 0.37 0.37 0.45 0.00 0.00 0.45 0.00 0.45
Sat Flow,veh/h 157 3026 6 0 3202 502 1452 0 0 1185 22 262
Grp Volume(v),veh/h 273 0 283 0 359 359 1 0 0 129 0 0
Grp Sat Flow(s),veh/h/In 1475 0 1714 0 1805 1803 1452 0 0 1468 0 0
Q Serve(g_s),s 0.5 0.0 8.3 0.0 10.4 10.4 0.0 0.0 0.0 3.0 0.0 0.0
Cycle Q Clear(g c),s 10.9 0.0 8.3 0.0 10.4 10.4 0.0 0.0 0.0 3.4 0.0 0.0
Prop In Lane 0.18 0.00 0.00 0.28 1.00 0.00 0.82 0.18
Lane Grp Cap(c),veh/h 616 0 642 0 676 675 760 0 0 758 0 0
V/C Ratio(X) 0.44 0.00 0.44 0.00 0.53 0.53 0.00 0.00 0.00 0.17 0.00 0.00
Avail Cap(c=a),veh/h 835 0 898 0 946 945 760 0 0 758 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay(d),s/veh 15.3 0.0 15.7 0.0 16.3 16.3 10.2 0.0 0.0 11.1 0.0 0.0
Incr Delay(d2),s/veh 0.5 0.0 0.5 0.0 0.6 0.7 0.0 0.0 0.0 0.5 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
"/vile BackOfQ(50%),veh/ln 2.9 0.0 3.1 0.0 4.1 4.1 0.0 0.0 0.0 1.2 0.0 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 15.8 0.0 16.1 0.0 17.0 17.0 10.2 0.0 0.0 11.5 0.0 F0,
LnGrp LOS B A B A B B B A A B A A
Approach Vol,veh/h 556 718 1 129
Approach Delay,s/veh 16.0 17.0 10.2 11.5
Approach LOS B B B B
Timer-Assigned Phs 2 4 6 8
Phs Duration(G+Y+Rc),s 35.9 30.9 35.9 30.9
Change Period(Y+Rc),s 5.9 5.9 5.9 5.9
Max Green Setting(Gmax),s 30.0 35.0 30.0 35.0
Max Q Clear Time(g_c+11),s 2.0 12.9 5.4 12.4
,Green Ext Time(p=c),s 0.0 3.8 0.7 4.9
Intersection Summary
HCM 6th Ctrl Delay 16.1
HCM 6th LOS B
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
Queues
1: Rouse Ave & Mendenhall St 05/08/2018
4\ t j
Lane Group WBT NBL NBT SBL SBT
Lane Group Flow(vph) 248 45 297 42 272
v/c Ratio 0.61 0.07 0.28 0.07 0.27
Control Delay 22.7 6.4 7.0 6.4 5.7
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 22.7 6.4 7.0 6.4 5.7
Queue ue Length 50th(ft) 60_ _ 5_ _39 5_ __ 27
Queue Length 95th(ft) 117 20 92 19 71
Internal Link Dist(ft) 419 417 1833
Turn Bay Length(ft) 50 50
Base Capacity_(vph) 1146 610 1078 621 1019
Starvation Cap Reductn 0 0 0 0 0
Spillback CapCap Reductn 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0
Reduced v/c Ratio 0.22 0.07 0.28 0.07 0.27
Intersection Summary
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
Queues
8: Rouse Ave/Rouse Avenue & Tamarack St 05/08/2018
Lane Group EBT WBT NBT SBT
Lane Group Flow(vph) 124 86 350 487
v/c Ratio 0.48 0.30 0.26 `0.37
Control Delay ^� � 26.1 13.5 4.1 4.8
Queue D al y 0.0 0.0 0.0_ 0.0
Total Delay 26.1 13.5 4.1 4.8
Queue Length 50th(j) 35 10 34 53
Queue Length 95th(ft) 74 40 76 116
Internal Link Dist(ft) 555 547 989 _ 992_
Turn Bay Length(ft)
Base Capacity(vph) 1020 1052 1367 1304
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.12 0.08 0.26 0.37
Intersection Summary
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
Queues
11: Rouse Avenue & Oak StreeUBirch Street 05/08/2018
--0. -,* '~ 4\ t 1
Lane Group EBT EBR WBT NBL NBT SBT SBR
Lane Group Flow(vph) 177 204 1 118 296 267 113
u/c Ratio 0.66 0.29 _ _0.00 0.17 0.24 0.29 0.14
Control Delay 42.7 3.6 26.0 5.7 6.2 13.9 5.3
Queu D y _ _ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 42.7 3.6 26.0 5.7 6.2 13.9 5.3
Quer ue Length 50th(ft) 82 0 0 17 49 72 7
Queue Length 95th(ft) 153 38 4 43 104 152 39
Internal Link Dist(ft)=_ 553 170 992 418
Turn Bay Length(ft) 200 215 80
Base Capacity(vph)_ 623_ 977 840 853 1622 923 824
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0_ 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced vlc Ratio 0.28 0.21 0.00 0.14 0.18 0.29 0.14
Intersection Summary
r
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
Queues
15: Private Access/Broadway St & Main St 05/08/2018
t 1
Lane Group EBT WBT NBT SBT
Lane Group Flow(vph) 556 718 1 _129
u/c Ratio 0.50 0.54 0.00 0.20
Control Delay 17.9 17.3 11.0 8.9
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 17.9 17.3 11.0 8.9
Queue Length 50th() 89 112 0 20
Queue Length 95th(ft) 132 160 3 51
Internal Link Dist(ft) 3.00 185 172 257
Turn Bay Length(ft)
Base Capacity(vph) 1545 1847 569 659
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.36 0.39 0.00 0.20
Intersection Summary
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
• a •
HCM 6th Signalized Intersection Summary
1: Rouse Ave & Mendenhall St 05/08/2018
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 44 T+ 1�
Traffic Volume_(vehlh) -- - 0 _ 0- 0 7 214 59 79 317 9 38 265 157;
Future Volume(veh/h) 0 0 0 7 214 59 79 317 9 38 265 157
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.98 0.99 0.99
Parking Bus,Adj 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1900 1885 1900 1856 1870 1870 1900 1885 1885;
Adj Flow Rate,veh/h 8 249 69 92 369 10 44 308 183
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh,% 0 1 0 3 2 2 0 1 1
Cap,veh/h 10 308 85 501 1079 29 607 657 391,
Arrive On Green 0.25 0.25 0.25 0.60 0.60 0.60 0.60 0.60 0.60
Sat Fl6w,veh/h 40 1234 342 897 1811 49 1014 1104 656,
Grp Volume(v),veh/h 326 0 0 92 0 379 44 0 491
Grp Sr at Flow(s),veh/h/In 1616 0 0 897 0 1861 1014 0 1759
Q Serve(g_s),s 12.7 0.0 0.0 4.3 0.0 6.9 1.5 0.0 10.5
Cycle Q Clear(g c),s 12.7 0.0 -0.0 14.8 0.0 6.9 8.5 0.0 10.5
Prop In Lane 0.02 0.21 1.00 0.03 1.00 0.37
Lane Grp Cap(c),-veh/h 403 - 0_ 0 501 0 1108 607 0 1048
VIC Ratio(X) 0.81 0.00 0.00 0.18 0.00 0.34 0.07 0.00 0.47
Avai CI Cl ap�=a),veh/h 843 0 0 501 0 1108 607 0 1048
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay(d),s/veh 23.7 0.0 0.0 11.8 0.0 6.9 9.0 0.0 7.6
Incr Delay(d2),s/veh 3.9 0.0 0.0 0.8 0.0 0.8 0.2 0.0 1.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50°/o),veh/In 5.1 0.0 0.0 0.9 0.0 2.6 0.4 0.0 3.8,
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 27.6 0.0 0.0 12.6 0.0 7.7 9.3 0.0 9.1;
LnGrp LOS C A A B A A A A A
Approach Vol,veh/h - -- _326 - 471 535
Approach Delay,s/veh 27.6 8.7 9.1
Appro hh LOS - C A A
Timer-Assigned Phs 2 6 8
Phs Duration(G+Y+Rc),s _ 45.2 - _ __ 45.2_ 21.9 )
Change Period(Y+Rc),s *5.2 *5.2 5.2
Max Green Setting(Gmax),s *40 _ *40- _ 35.0
Max Q Clear Time(g_c+l1),s 16.8 12.5 14.7
Green Ext Time(pc),s _ _ --__ -3.1 _ - 4.0 2.0
Intersection Summary
HCM 6th Ctrl Delay 13.5
HCM 6th LOS B
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary
8: Rouse Ave/Rouse Avenue & Tamarack St 05/08/2018
--* --0- ---* 'r *-- *.- ~*\ t �► l 4,
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR,
Lane Configurations _ 4) _ _� � 4_ _
Traffic Volume(veh/h) V 45 40 42 11 58 42 25 392 13 25 451 30
Future Volume(veh/h) _ 45 40 42 11 58 42 25 392_ 13 25 451 30
Initial Q Qb ,veh _ __0 0 0 _ 0 0 0 0 -_0 0_ 0 0 _ 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj__ 1.00 1.00 1.00 1.00 1.00 1.00 1 AO_ 1.00 1.00_ 1.00 1.00 1.00,
Work Zone On Approach No No No __ _ No
Adj Sat Flow,veh/h/In- 1900 1900 1900 1826 18-2 11826 1885 1885 1885 __1885 1885 188$
Adj_Flow Rate,veh/h 50 44 47 12 64 47 28 436 14 28 501 33
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh,% 0 0 0 5 5 5 1 _ 1 _ 1 1 _ 1 1
Cap,veh/h _ 149 83 72 83_ 121 82 103 1255 _39 98 1223 78
Arrive On Green 0.13 0.13 0.13 0.13 0.13 0.13 0.73 0.73 0.73 0.73 0.73 0.73
Sat Flow,veh/h 479 656 568 89 957 647 46 1723 53 40 1680 107�
Grp Volume(v),veh/h 141 0 0 123 0 0 _ 478 0 0 562 0 0
Grp Sat Flow(s),veh/h/In 1703 0 0 1692_ 0 0 1823 0 0 1827 0 0
Q Serve(g_s),s 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g c),s _ 4.0 0.0 0.0 3.7 0.0 0.0 5.1 0.0 0.0 6.4 0.0 0 0,
Prop In Lane 0.35 0.33 0.10 0.38 0.06 0.03 0.05 _0.06
Lane Grp Cap(c),veh/h 304 0 0 286 0 0 1396 0 0 1398_ 0 0
V/C Ratio(X) 0.46 0.00 0.00 0.43 0.00 0.00 0.34 0.00 0.00 0.40 0.00 0.00
Avail Cap(c a),veh/h 1237 0 0 1273 0 0 1396 0 0 1398 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay(d),s/veh 22.7 0.0 0.0 22.6 0.0 0.0 2.7 0.0 0.0 2.9 0.0 0.0
Incr Delay(d2),s/veh 1.1 0.0 0.0 1.0 0.0 0.0 0.7 0.0 0.0 0.9 0.0 0.0,
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 1.7 0.0 0.0 1.5 0.0 0.0 1.2 0.0 0.0 1.5 0.0 0.0
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 23.8 0.0 0.0 23.6 0.0 0.0 3.4 0.0 0.0 3.8
LnGrp LOS C A A C A A A A A A A A
- - ------ - -- --- ------ - - - -- --- - - --------------
Approach Vol,veh/h 141 1-23 478- ---5-
62
Approach Delay,s/veh 23.8 23.6 3.4 3.8
Appro LOS C C A A
Timer-Assigned Phs 2 4 6 8
Phs Duration(G+Y+Rc),s 44.0 11.0 44.0 11.0
Change Period(Y+Rc),s 4.0 4.0 4.0 4.0
Max Green Setting(Gmax),s 40.0 40.0 40.0 40.0
Max Q Clear Time(g_c+ll),s _7.1 6.0 8.4 5.7
Green Ext Time(pc),s 3.7 0.9 4.5 0.8
Intersection Summary
,HCM 6th Ctd Delay 7.7
HCM 6th LOS A
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM 6th Signalized Intersection Summary
11: Rouse Avenue & Oak Street/Birch Street 05/08/2018
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 r +T+ T+ I t r
Traffic Volume(veh/h) 131 3 151 1 1 0 233 257 0 0 361 2M
Future Volume(veh/h) 131 3 151 1 1 0 233 257 0 0 361 206
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0'
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00
Parking B_us,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1900 1900 1885 1900 1900 1900 1900 1870 1870 1900 1885 1870
Adj Flow Rate,vehlh 144 3 166 1 1 0 256 282 0 0 397 226
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91i
Percent Heavy Veh,% 0 0 1 0 0 0 0 2 2 0 1 2
Cap,veh/h 303 4 421 110 88 0 594 1281 0 96 1001 841;'
Arrive On Green 0.17 0.17 0.17 0.17 0.17 0.00 0.09 0.68 0.00 0.00 0.53 0.53
Sat Flow,veh/h 1212 25 1588 220 511 0 1810 1870 0 1115 1885 1584
Grp Volume(v),veh/h 147 0 166 2 0 0 256 282 0 0 397 226
Grp Sat Flow(s),veh/h/In 1237 0 1588 731 0 0 1810 1870 0 1115 1885 1584
Q Serve(g_s),s 0.0 0.0 6.5 0.0 0.0 0.0 4.3 4.2 0.0 0.0 9.4 5.9
Cycle QClear(g c),s 9.1 0.0 6.5 9.1 0.0 0.0 4.3 4.2 0.0 0.0 9.4 5.9
Prop In Lane 0.98 1.00 0.50 0.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c),veh/h 307 0 421 197 0 0 594 1281 0 96 1001 841;
V/C Ratio(X) 0.48 0.00 0.39 0.01 0.00 0.00 0.43 0.22 0.00 0.00 0.40 0.27
Avail
Cl ap c-a),vehlh 729 0 886 635 0 0 1026 1281 0 96 1001 841
HCM Platoon Ratio •1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00_ 1.00_ - 1.00 0.00_ 0.00 1.00 1.00
Uniform Delay(d),s/veh 29.6 0.0 22.7 26.2 0.0 0.0 6.6 4.4 0.0 0.0 10.5 9.7
Incr Delay(d2),s/veh 1.2 0.0 0.6 0.0 0.0 0.0 0.5_ _0.4- _0.0_ _0.0_ 1.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
/oile_BackOfQ(50%),veh/In 2.5 0.0 2.4 0.0 0.0 0.0 1.5 1.4 0.0 0.0 3.9 2.1'
Unsig.Movement Delay,s/veh `
LnGrp Delay(d),slveh 30.8 0.0 23.3 26.2 0.0 0.0 7.1 4.8 0.0 0.0 11.7 10.5
LnGrp LOS C A C C A A A A A A B B
Approach Vol,vehlh 313 2 538 623
Approach Delay,slveh 26.8 26.2 5.9 11.2
Appro LOS Lhac OS C C A B
Timer-Assigned Phs 2 4 5 6 8
,Phs Duration(G+Y+Rc),s _--- ----57 O---- - -- - 16.3 11.6 45.4 18.3
Change Period(Y+Rc),s 5.4 5.4 *4.6 5.4 5.4
Max Green Setting(Gmax),s 40.0 35.0 *25 40.0 35.0
Max Q Clear Time(g_c+ll),s 6.2 11.1 6.3 11.4 11.1
Green Ext Time(p=c),s 1.9- _ 1.3_ 0.7 _ _3.6 0.0 - - -_
Intersection Summary
HCM 6th Ctrl Delay 12.6
HCM 6th LOS B
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
HCM 6th Signalized Intersection Summary
15: Private Access/Broadway St & Main St 05/08/2018
.,,* --V ,(- 4-- t4\ T �► 1 4/
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 41 +TT 4T+ 4
Traffic Volume(veh/h) 94 647 2 0 621 115 1 0 0 140 0 48
Future Volume(veh/h) 94 647 2 0 621 115 1 0 0 140 0 48
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.96 1.00 1.00 0.99 0.99
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1885 1885 1885 1885 1885 1885 1900 1900 1900 1900 1900 1900
Adj Flow Rate,veh/h 104 719 2 0 690 128 1 0 0 156 0 53
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh,% 1 1 1 1 1 1 0 0 0 0 0 0
Cap,vehlh 147 1070 3 0 1281 237 684 0 0 535 11 160
Arrive On Green 0.43 0.43 0.43 0.00 0.43 0.43 0.43 0.00 0.00 0.43 0.00 0.43
Sat Flow,veh/h 212 2501 7 0 3090 555 1393 0 0 1072 26 373
Grp Volume(v),veh/h 367 0 458 0 412 406 1 0 0 209 0 0
Grp-Sat Flow(s),veh/h/In 1006 0 1714 0 1791 1760 1394 0 0 1471 0 0
Q Serve(g_s),s 15.0 0.0 17.1 0.0 14.0 14.0 0.0 0.0 0.0 6.9 0.0 0.0
Cycle QClear(g c),s 29.1 0.0 17.1 0.0 14.0 14.0 - 0.0 0.0 0.0 7.6 0.0 0.0,
Prop In Lane 0.28 0.00 0.00 0.32 1.00 0.00 0.75 0.25
Lane-Grp Cap(c),veh/h 487 0 733 0 766 753 684 0 0 706 0 0
V/C Ratio(X) 0.75 0.00 0.62 0.00 0.54 0.54 0.00 0.00 0.00 0.30 0.00 0.00
Avail Cap(cca),veh/h 563 0 838 0 876 861 684 0 0 706 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter 1)- 1.00 0.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay(d),s/veh 22.4 0.0 18.3 0.0 17.4 17.4 13.4 0.0 0.0 15.5 0.0 0.0
Incr Delay(d2),s/veh 4.9 0.0 1.2 0.0 0.6 0.6 0.0 0.0 0.0 1.1 0.0 0.0,
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1$ile BackOfQ(50%),veh/In 7.0 0.0 6.7 0.0 5.7 5.6 0.0 0.0 0.0 2.7 0.0 0.0
Unsig.Movement Delay,s/veh
LnGrp_Delay(d),s/veh 27.3 0.0 19.5 0.0 18.0 18.0 13.4 0.0 0.0 16.6 0.0 0.0
LnGrp LOS C A B A B B B A A B A A
Approach Vol,veh/h - 825 818 1 209�
Approach Delay,s/veh 22.9 18.0 13.4 16.6
Approach LOS C B B B
Timer-Assigned Phs 2 4 6 8
Phs Duration(G+Y+Rc),s 40.9 40.9 40.9 40.9 -
Change Period(Y+Rc),s 5.9 5.9 5.9 5.9
Max Green Setting(Gmax),s 35.0 40.0 35.0 40.0
Max Q Clear Time(g_c+I1),s 2.0 31.1 9.6 16.0
Green Ext Time-(p c),s 0.0 3.9 1.3 _ _ 5.9_
Intersection Summary
,HCM 6th Ctrl Delay 20.0
HCM 6th LOS C
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
I Page 4
11
Queues
1: Rouse Ave & Mendenhall St 05/08/2018
.— 4\
Lane Group WBT NBL NBT SBL SBT
Lane Group Flow(vph) 326 92 379 44 491
u/c Ratio 0.71 0.20 0.34 0.08 0.46
Control Delay 30.5 9.2 8.9 7.8 9.5
Queue_Delay_ 0.0 0.0 0.0 0.0 0.0
Total Delay 30.5 9.2 8.9 7.8 9.5
,Queue_Length 50th(ft) _ 115 _ 15_ 69 7 87
Queue Length 95th(ft) 181 45 145 23 187
Internal Link Dist(ft) 419 417 1833
Turn Bay Length(ft) 50 50
Base Capacity_(vph) 945 461 1105 564 1060
Starvation Cap Reductn 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0
Reduced v/c Ratio 0.34 0.20 0.34 0.08 0.46
Intersection Summary
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
Queues
8: Rouse Ave/Rouse Avenue & Tamarack St 05/08/2018
T 1
Lane Group EBT WBT NBT SBT
Lane Group Flow(vph) 141 123 478 562
vlc Ratio _ 0.54 0.41_ 0_.35 0_.41
Control Delay 24.2 18.5 4.6 5.1
Queue Delay_ 0.0 0.0 0.0 0.0
Total Delay 24.2 18.5 4.6 5.1
Queue Length 50th_(ft) 32 24 50 63
Queue Length 95th(ft) 78 63 115 143
Internal Link Dist ft 555 547 989 992
Turn Bay Length(ft)
Base Capacity(vph) 1005 1150 1353 1356 _
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced vk Ratio 0.14 0.11 0.35 0.411
Intersection Summary
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
Queues
11: Rouse Avenue & Oak Street/Birch Street 05/08/2018
t 1
Lane Group EBT EBR WBT NBL NBT SBT SBR
Lane Group Flow(vph) 147 166 2 256 282 397 226
v/c� Ratio 0.64 0.26 0.01 0.37 0.22 0.43 0.28
Control Delay 46.1 3.5 29.0 6.3 5.5 17.7 8.7
Queue l y _ _ 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.1 3.5 29.0 6.3 5.5 17.7 8.7
Quer ue Length 50th(it) 71 0 1 38 44 126 30
Queue Length 95th(ft) 142 33 7 84 94 263 95
Internal Link Dist(ft) 553 _170 992 418
Turn Bay Length(ft) 200 215 80
Base Capacity(vph) 567 853 720 850 1573 913 810
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn _0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.26 0.19 0.00 0.30 0.18 0.43 0.28
Intersection Summary
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
Queues
15: Private Access/Broadway St & Main St 05/08/2018
t 1
Lane Group EBT WBT NBT SBT
Lane Group Flow(vph) 825 818 1 209
vlc Ratio__ 0.85 _0.56 0.00� 0.33
Control Delay 31.0 18.5 15.0 15.4 _
Queue Delay_ 0.0 0.0 _0.0 _ 0.0
Total Delay �31.0 18.5 15.0 15.4
Queue Length 50th(ft) 191 152 0 56 _
Queue Length 95th(ft) 270 205 4 119
Internal Link Dist(ft) 300 185 172 257 4
Turn Bay Length(ft)
Base Capacity(vph) 1149 1733 526 629
Starvation Cap Reductn 0 0 0 0
Spillback CapCap Reductn ,_ 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.72 0.47 0.00 0.33
Intersection Summary
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
HCM 6th TWSC
2: Rouse Ave & Peach St 05/08/2018
Intersection
Int Delay,s/veh 5.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations +T+ +T+ 4 4
Traffic Vol,veh/h 15 48 79 1 25 42 31 250 17 62 274 51
Future Vol,veh/h 15 48 79 1 25 42 31 250 17 62 274 51
Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - -
Ueh in Median.Storage,#_ _ 0_ 0 - 0 - 0 _-
Grade,% - 0 - - 0 - 0 - 0 -
Peak Hour Factor _ _ 85 85 _ 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles,% 0 4 5 0 8 2 0 4 6 2 4 2
Mvmt Flow 18 56 93 1 29 49 36 294 20 73 322 60
Major/Minor Minor2 Minorl Majorl Major2
Conflicting Flow All 913 884 352 949 904 304 382 0 0 314 0 0
498 _ 498 -_ 376 376 - - - - - - -
Stage 2 415 386 - 573 528 - - -
,Critical dwy 7.1 6.54 6.25 7.1 _6.58_ 6.22_ 41— -_ 4.12 - _ -
Critical Hdwy Stg 1 6.1 5.54 - 6.1 5.58 - - -
Critical_Hdvuy St g 2 6.1 5.54 - 6.1 5.58 - - - _ - _ -
Follow-up Hdwy 3.5 4.036 3.345 3.5 4.072 3.318 2.2 2.218
Pot Cap-1 Maneuver 256 282 685 242 271 736 1188 - -_ 1246 - -_
Stage 558 541 - 649 606 - - -
Stage 2 619 607 - 508 518 - - - - - - -
Platoon blocked,%
M2v_Cap-1_Maneuver 199 251 685 159 241 736 1188 1246 - -
Mov Cap-2 Maneuver 199 251 - 159 241 - - - -
Stage_1__ 537 500 - _ 625 584 _ - - _ - _ -
Stage 2 528 585 - 360 479 -
Approach EB WB NB SB
HCM Control Delay,s 22.3 16 0.8 1.3 J
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl _SBL SBT SBR
Capaci veh/h — 11.88 - _- 372 407. 1246 _- _ -
tY(veh/ )
HCM Lane V/C Ratio 0.031 - 0.449 0.197 0.059 -
HCM Control Delay(s) 8.1 0 - 22.3 16 8.1 0 -
HCM Lane LOS A A C C A A
HCM 95th%tile Q(veh) 0.1 - - 2.2 0.7 0.2 - -
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
• Page 1
HCM 6th TWSC
2: Rouse Ave & Peach St 05/08/2018
Intersection
Int Delay,s/veh 15.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations cl� *T+ +T+ 4
Traffic Vol,veh/h 27 42 68 5 51 102 78 322 10 48 403 52
Future Vol,veh/h 27 42 68 5 51 102 78 322 10 48 403 52
Conflicting Peds,#/hr 0_ 0 _0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length
Veh in Median Storage,# - 0 - - 0 - _- 0 _ - - 0 -
Grade,% - 0 - 0 - 0 0 -
Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86
Heavy Vehicles,% 0 2 0 20 2 1 1 0 0 2 1 0
Mvmt Flow 31 49 79 6 59 119 91 374 12 56 469 60
Major/Minor Minor2 Minorl Majorl Major2
Conflicting Flow All 1262 1179 499 1237 1203 380 529 0 0 .386 0 0
Stage1 611 611 - 562 562 - - - - - -
Stage 2 651 568 - 675 641 - - - -
Critical Hdwy 7.1 6.52 6.2 7.3 6.52 6.21__4.11 _ - - 4.12 - -
Critical Hdwy Stg 1 6.1 5.52 - 6.3 5.52 - - -
Critical Hdwy Stg 2 6.1 5.52 - 6.3 5.52 - - - - - - -
Follow-up Hdwy 3.5 4.018 3.3 3.68 4.018 3.309 2.209 - - 2.218 -
Pot Cap-1 Maneuver 148 190 576 140 184 669 1043 - - 1172 - -
Stage 1 484 484 - 481 510 - - -
Stage 2 461 506 - 416_ 469 - _ __- __ - - - -
Platoon blocked,%
Mov Cap-1-Maneuver 75 _158_ _576 80 153 669 1043 - - 1172 - -
Mov Cap-2 Maneuver 75 158 - 80 153 - - -
Stage 1 430 451 - 428 453 - -
Stage 2 293 450 - 298 437 -
Kpproach EB WB NB SB
HCM Confrol Delay,s_-86.7' 37.2 _ _ _ _ 1.7 -.8 -
HCM LOS F E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity(veh/h) 1043 - - 184__288_1172 - - !�
HCM Lane V/C Ratio 0.087 - - 0.866 0.638 0.048 -
HCM Control Delay(s_) 8.8 0_ - 86.7 37.2 8.2 0 -
HCM Lane LOS A A - F E A A -
HCM 95th%tile Q(veh) 0.3 - - 6.3 4 0.1 -
i
y
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
0
HCM Unsignalized Intersection Capacity Analysis
19: Ida Ave & Cottonwood St 05/08/2018
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 +T* +T+ 41+
Sign Control Yield_ Yield Yield Yield
Traffic Volume(vph) 2 0 3 1 0 0 2 10 0 0 9 2
Future Volume(v_ph) 2 0 3 1 0 0 2 10 0 0 9 2
Peak Hour Factor 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56
Hourly flow rate_(yph) 4 0 5 2 0 0 4 18_ 0 0 16 4.'
Direction,Lane# EB 1 WB 1 NB 1 SB 1
,Volume Total(vph) 9_ _2 22 20
Volume Left(vph) 4 2 4 0
,Volume Right(vph) 5 0 0_ _ 4
Hadj(s) 0.51 0.20 0.33 0.20
Departure Headway(s) 4.5 4.2 4.3 4.1_
Degree Utilization,x 0.01 0.00 0.03 0.02
Capacity_(v-eh/h) 786 _843 _827 860
Control Delay(s) 7.6 7.2 7.4 7.2
Apprr oath Del ay_(§) 7.6 7.2 7.4 7.2 __
Approach LOS A A A A
Intersection Summary
Delay 7.4
Level of Service A
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period(min) _ 15_
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
23: Ida Ave & Aspen St 05/08/2018
'r 4.�- t `► l
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations Y T
Sign Control _ Yield Yield _ Yield 4
Traffic Volume(vph) 0 0 7 0 0 10�
Future Volume(vph) 0 0 7 0 0 10
Peak Hour Factor 0.71 0.71 0.71 0.71 0.71 0.71
Hourly flow rate(v_ph) 0 _0 10 0 Oi 14
Direction,Lane# WB 1 NB 1 SB 1
Total(Volume vph) 0 10 14 ]
Volume Left(vph) 0 0 0
Volume Right(vph) 0 0 0
Hadj(s) 0.00 0.24 0.17
Departure Headway_(s) 4.0 4.2 4.1
Degree Utilization,x 0.00 0.01 0.02
Capacity(veh/h) 900 853 877
Control Delay(s) 7.0 7.2 7.1
Approach Delay(s) 0.0 _ 7.2 7.1
Approach LOS A A A
Intersection Summary
Delay 7.2
Level of Service A
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period(min) 15
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
y
HCM Unsignalized Intersection Capacity Analysis
24: Front St & Aspen St s 05/08/2018
'1
Movement EBL EBR SET SER NWL NWT
Lane Configurations Y $�
Sign Control_ Yield Yield Yield
Traffic Volume(vph) 0 0 2 0 0 0
Future Volume(vph) - 0 0 2 0 0 0
Peak Hour Factor 0.25 0.25 0.25 0.25 0.25 0.25
Hourly flow rate(yph) 0 0_ 8 0__ 0 0
Direction,Lane# EB 1 SE 1 NW 1
Volume Total(v_ph) 0 8_ 0
Volume Left(vph) 0 0 0
Volume Right(yph) _ 0 ___ 0_ 0
Hadj(s) 0.00 0.85 0.00
Departure Headway—(s) 3.9 4.8 3.9
Degree Utilization,x 0.00 0.01 0.00
Capacity(vehlh) 912 754 916
Control Delay(s) 6.9 7.8 6.9
Appr�oach`Delay(s) 0.0 7.8_ 0.0
Approach LOS A A A
intersection Summary
Delay 7.8
Level of Service A
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period(min) 15
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
HCM Unsignalized Intersection Capacity Analysis
25: Ida Ave & Front St 05/08/2018
T 1 t
Movement NBT NBR SBL SBT NWL NWR
Lane Configurations` 1� +T Y
Sign Control __Yield Yield Yield
Traffic Volume(vph) 7 0 2 10 0 0
Future Volume(vph) i__ 7 _0 2 10 _0 _ 0
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79� 0.79
Hourly flow rate(vph) 9 0 3 13 0 0
Direction,Lane# NB 1 SB 1 NW 1
Volume Total(vph)_- 9 16 0 _
Volume Left(vph) 0 3 0
Volume Right(vph)_ 0 0 0
Hadj(s) 0.24 0.18 0.00
Departure Headway(s) 4.2 4.1 4.0
Degree Utilization,x 0.01 0.02 0.00
Capacity(yehlh) 853 876 900
Control Delay(s) 7.2 7.2 7.0
Approach Delay(s) 7.2 7.2 0.0
Approach LOS A A A
Intersection Summary
Delay 7.2
Level of Service A
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period_(min) 15
Existing(2018)AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 5
• . •
HCM Unsignalized Intersection Capacity Analysis
19: Ida Ave & Cottonwood St 05/08/2018
--* --* --* ' � *-- 4\ t �► 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 +T+ 4 +T+
Sign Control Yield __ Yield Yield Yield
Traffic Volume(vph) 0 0 2 1 2 0 0 15 0 0 26 2
Future Volume(vph) 0 0 2 1 2 0 0 15 0 0 26 2
Peak Hour Factor 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67
Hourly flow rate(vph) 0 0 3 1 3 0 0 22 0 0 39 3
Direction,Lane# EB 1 WB 1 NB 1 SB 1
Volume Total(vph) 3 4 22 42 3
Volume Left(vph) 0 1 0 0
Volume Right(vph)_ 3 0 0 3
Hadj(s) -0.60 0.69 0.12 0.08
Departure Headway(s) 3.4 4.7 4.1 4.0
Degree Utilization,x 0.00 0.01 0.02 0.05
Capacity(veh/h) 1020 747 868 889
Control Delay(s) 6.5 7.8 7.2 7.2
Appro ch Delay(s) 6.5 7.8 7.2 7.2
Approach LOS A A A A
ntersection Summary
Delay 7.2
Level of Service A
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analyses is Period(min) 15
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
23: Ida Ave & Aspen St 05/08/2018
4e t t �► 1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations Y T #T
Sign Control _ Yield Yield Yield
Traffic Volume(vph) 2 0 17 0 0 24
Future Volume(vph) 2 0 17 __0 __ 0 _ _ 24
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72
Hourly flow rate(vph) 3 0 24 0 0 33
Direction,Lane# WB 1 NB 1 SB 1
Volume Total_(v_ph) 3 24 33
Volume Left(vph) 3 0 0
Volume Right(vph) 0 0 0
Hadj(s) 1.05 0.10 0.00
Departure Headway(s) __ 5.1 _ 4.0 3.9 _
Degree Utilization,x 0.00 0.03 0.04
Capacity(veh/h) _ _697 876 909
Control Delay(s) 8.1 7.2 7.1
Approach Delay(s) 8.1 7.2 7.1_
Approach LOS A A A
Intersection Summary
Delay 7.2
Level of Service A
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period(min) _ 15
;a
V.
fY
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
HCM Unsignalized Intersection Capacity Analysis
24: Front St & Aspen St 05/08/2018
Movement EBL EBR SET SER NWL NWT
Lane Configurations Y T +T
Sign Control Yield Yield Yield
Traffic Volume(vph) 0 0 3 0 2 4
Future Volume(vph) 0 0 3 0 2 4
Peak Hour Factor 0.75 0.75 0.75 0.75 0.75 0.75
Hourly flow rate(YOL 0 0 4 0 3 5
Direction,Lane# EB 1 SE 1 NW 1
Volume Total(vph) 0 4 _ 8
Volume Left(vph) 0 0 3
Volume Right(vph) __ __0_ 0 _ 0
Hadj(s) 0.00 0.56 0.39
Departure Headway(§)_ _ 3.9 4.5 4.3
Degree Utilization,x 0.00 0.00 0.01
Capacity_(veh/h) 910 801 825
Control Delay(s) 6.9 7.5 7.3
Apprr oach Delay_(§) 0.0 7.5 _ 7.3_
Approach LOS A A A
Intersection Summary
Delay 7.4
Level of Service A
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period(min) 15
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
HCM Unsignalized Intersection Capacity Analysis
25: Ida Ave & Front St 05/08/2018
T ♦ f-% ti
Movement NBT NBR SBL SBT NWL NWR
Lane Configurations '+ 4 Y
Sign Control Yield_ _ _ Yield Yield
Traffic Volume(vph) 17 0 4 24 0 4
Future Volume(vph) 17 0 4 24 0 4 `
Peak Hour Factor 0.77 0.77 0.77 0.77 0.77 0.77
Hourly flow_rate_(vph) 22 0 5 31 0 5
Direction,Lane# NB 1 SB 1 NW 1
Volume Total(vph)_ _ ___ 22 36 b
Volume Left(vph) 0 5 0
Volume Right(vph) 0 0 5
Hadj(s) 0.10 0.03 -0.60
Departure Headway-(s)- 4.0 4.0 3.4
Degree Utilization,x 0.02 0.04 0.00
Capacity(vehlh) 874 903 1027
Control Delay(s) 7.1 7.1 6.4
Approach Delay(s) 7.1 7.1 6.4
Approach LOS A A A
Intersection Summary
Delay 7.1 ,
Level of Service A
Intersection Capacity Utilization 14.7% ICU Level of Service A
Analysis Period(min) 15
u
r
C
Existing(2018)PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 5
I
OPACITY CALCULATIONS -
FULL BUILDOUT (2020)
v
JAN 8
I_
CQ�l1Uil�IVI lY L}tS(L!Ui'�4��_r�_��'
HCM 6th TWSC
23: Ida Ave & Aspen St 01/17/2019
Intersection
Int Delay,s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations *T* 4# _ _* _ _ 4+ _
Traffic Vol,veh/h 0 2 2 T 0 4^- 0 3 _7 0 2 T 11 0
Future Vol,veh/h 0 �2 2 0 4 0 3 7 0 2 11 0_ _
Conflicting Peds,Whr 0 0 0 0_ 0 0 0 0 0 0 0 0
Sign Control _Stop Stop_Stop Stop Stop _Stop Free Free Free Free Free Free_
RT Channelized__ _T- - None - - None --None - None
Storage Length - - _
Veh in Median Storage,# - 0 - __ _ 0 - = 0 - - -_0
Grade,% _- 0 _ - _ _0 - - 0 - - 0_ -
Peak Hour Facto_r _ 71 71 71 -71 71 _ 71 7_1_71 71 71 71
Heavy Vehicles,% 2 2 2 0 2 2 2 2 0 2 2 2
Mvmt Flow _ 0 3 3 0 66 0 4 10 0 3 15 0
Major/Minor Minor2 Minorl Majorl Major2
Conflicting Flow All 42 39 15 42 39 10 15 0. 0 10 0 0
Stage 1 21 21 - 18 18 - - - - - - -
Stage 2 21 18 - 24 21 - - - - -
Critical Hdwy- 7.12 6.52 6.22 7.1 6.52 6_.22 4.12 - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.1 5.52 - - -
.Critical SwyHl dd tg 2 6.12 5.52 - 6.1 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.5 4.018 3.318 2.218 - 2.218
Pot Cap-1 Maneuver 961 853 1065 966 853 1071 1603 - - 1610 - -
Stage1 998 878 - 1006 880 - - - -
Stage 2 9.98 8.80_ - 999 878 - - - - - - -
Platoon blocked,% -
Mov Cap-1 Maneuver 952 849 1065 957 849 1071 1603 - - 1610 - -
Mov Cap-2 Maneuver 952 849 - 957 849 - - -
Stage 995 876 _- 1003 877 - - - - - -
Stage 2 989 877 - 991 876 - - - -
Approach EB WB NB SB
HCM Control Delay,s - 8.8 9.3
HCM LOS A A
Minor Lane/Major Mvmt NBL NBT NBR EBLnlWBLnl SBL SBT SBR
Capacity(veh/h) 1603 - - 945 849 1610 - -
HCM Lane V/C Ratio 0.003 0.006 0.007 0.002 -
HCM Control Delay-(s) _7_.3 0 - 8.8 9.3 7.2 0 -
HCM Lane LOS A A - A A A A
HCM 95th%tile Q(veh) 0 - - 0 0 0 - -
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th TWSC
25: Site Access & Aspen St 01/17/2019
!ntersection
Int Delay,slveh 4.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations T+ +T Y
Traffic Vol,veh/h 0 40- 7_ 0 27 4
Future Vol,vehlh 0 40 7 0 27 4
Conflicting Peds,Whr 0 0 0 0__ 0 _ 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 -
Ueh in Median Storage,# 0_ - - 0 0 -
Grade,% 0 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles,% 2 2 2 2 2 2
Mvmt Flow 0 43 8 0 29 4
Major/Minor Majorl Major2 Minorl
Conflicting Flow All 0 0 43 0 38 22
Stage 1_-_ - _ - - - 22 -
Stage 2 - 16 -
Crit Hlcai dwy - ___- 4.12 - _6.42 6.22
Critical Hdwy Stg 1 - 5.42 -
Critical Hdwy Stg 2�_- - - _5.42 -
Follow-up Hdwy 2.218 3.518 3.318
Pot Cap-1 Maneuver - - 1566 _ - -974 1055
Stage 1 - - 1001 -
Stage - - 1007 -
Platoon blocked,% -
Mov Cap-1 Maneuver - - 1566_ _- 969-_1055
ov Cap-2 Maneuver - - - 969 -
Stage 1 - - - _ _- 1001 -
Stage 2 - 1002
r
Approach EB WB NB
HCM Control Delay,s 0 7.3 8.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity_(veh/h) 979 - - 1566 -
HCM Lane VIC Ratio 0.034 0.005
HCM Control Delay(s) 8.8 - - 7.3 0
HCM Lane LOS A A A
HCM 95th%tile Q(veh) 0.1 - - 0 -
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
19: Ida Ave & Cottonwood St 01/17/2019
--* -10. ---* � � � � t �► l
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBA
Lane Configurations + *T+ 44 _
Sign Control '_ � _Yield _ Yield � _!_�__ Yield Yield
Traffic Volume(vph) 20 3 1 0 0 2 140 0 11 2
Future Volume(v_ph) ^' 2 0 3 1 0 0 2 14 0 0 "11 2
Peak Hour Factor 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 _0.56 0.56 0.56 0.56
Hourly flow rate(vph) _4 0 _ 5 _ 2 0 _ 0 4 25� _ 0 0 20 4
Direction,Lane# EB 1 WB 1 NB 1 SB 1
Volume Total(vph) 9 2 29 24
Volume Left(vph) 4 2 4 0
Volume Right(yph) 5 0 _ 0 4
Hadj(s) 0.51 0.20 0.29 0.20
Departure Headway(s) _ 4.5^ 4.2 T 4.2 �4.2
Degree Utilization,x 0.01 0.00 0.03 0.03
Capacity(veh/h) 780 836 833 859 T
Control Delay(s) 7.6 7.2 7.4 7.3
Approach Delay_(§) 7.6 7.2 7.4 7.3
Approach LOS A A A A
Intersection Summary
Delay 7.4
Level of Service A
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period(min)_ 15
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary
1: Rouse Ave & Mendenhall St 01/17/2019
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations + T+ T+
Traffic Volume_(veh/h) 0 0 0_ 9 175 _ 59__ 44 280 17 41 152 119,
Future Volume(vehlh) 0 0 0 9 175 59 44 280 17 41 152 119
Initial 0(Qb),_veh - - 0 0 0 0 0 0 0 0 0,
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In 1900 1841 1900 1796 1870 1870 1856 1856 1856
Adj Flow Rate,vehlh 10 188 63 47 301 18 44 163 128
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh,% 0 4 0 7 2 2 3 3 3
Cap,veh/h 14 263 88 667 1027 61 668 565 444
Arrive On Green 0.21 0.21 0.21 0.59 0.59 0.59 0.59 0.59 0.59
Sat Flow,veh/h 67 1266 424 1043 1746 104 1048 961 755
Grp Volume(v),veh/h 261 0 0 47 0 319 44 0 291
Grp Sat Flow(s),veh/h/In 1757 0 0 1043 0 1851 1048 0 1716
Q Serve(g_s),s 7.0 0.0 0.0 1.2 0.0 4.4 1.1 0.0 4.3
Cycle Q Clear(g p.,s 7.0 0.0 0.0 5.5 0.0 4.4 5.5_ 0.0 _ 4.3
Prop In Lane 0.04 0.24 1.00 0.06 1.00 0.44
Lane Grp Cap(c),veh/h 365 0 0 667 0 1089 668 0 1009
V/C Ratio(X) 0.72 0.00 0.00 0.07 0.00 0.29 0.07 0.00 0.29
Avai p(cCa),veh/h 1206 0 0 667 0 1089 668 0 1009
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay(d),s/veh 18.8 0.0 0.0 6.6 0.0 5.2 6.6 0.0 5.2
Incr Delay 02),s/veh 2.6 0.0 0.0 0.2 0.0 0.7 0.2 0.0 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),y_eh/In 2.9 0.0 0.0 0.3 0.0 1.4 0.2 0.0 1.3
Unsig.Movement Delay,slveh
LnGrp Delay(d),s/veh 21.4 0.0 0.0 6.8 0.0 5.9 6.8 0.0 5.9
LnGrp LOS C A A A A A A A A
- -_ r z- - - - - - - - -- ._---_- -. - --= --
Approach Vol,yeh/h - - 261 366 335
Approach Delay,slveh 21.4 6.0 6.0
Appro� ach LOS C A A
(Timer-Assigned Phs 2 6 8
Phs Duration(G+Y+Rc),s -35.2 35.2 15.8
Change Period(Y+Rc),s *5.2 *5.2 5.2
Max Green Setting(Gmax),s *30_ - *30 35.0
Max Q Clear Time(g_c+l1),s 7.5 7.5 9.0
Green Ext Time =S),s 2.2 - 2.1 1.7
Intersection Summary
HCM 6th Ctrl Delay - 10.2
HCM 6th LOS B
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary
2: Rouse Ave & Peach St 01/17/2019
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations r _ t r T+ T
Traffic Volume(veh/h) 16 55 83 6 29 44 33 263 25 65 288 - 53
-------- ----------------------------------- -- -------
Future Volume(veh/h) 16 55 83 6 29 44 33 263 25 65 288 53
Initial Q(Qb) veh _ 0____ 0 _-___ 0 0 0 0 _ 0 0 0-- 0_- 0 0
Ped-Bike Adj(A_pbT) 1.00_ 1.00 1.00 1.00 1.00_ 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 __1.00_ 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 01 0
Work Zone On Approach _ No No No _ No
Adj_Sat Flow,veh/h/In 1900 1841 1826 1900 1781 18_70 1900 _1841 -1841 1870 1841 1841
Adj Flow Rate,veh/h 19 65 98 7_ 34 52 39 309 29_ 76 339 62
Peak Hour Factor _ __0.85 _ 0.85 0._8.5 _0.85 0_.85__0.85 0.85__ _0.85 0.85 0.85 0.85 0.85;
Percent Heavy_Veh,% 0 _4 _ 5_ 0 8 2 0 __ 4 4 2 _ 4 4
Cap,veh/h _ 213 178 221 186 173 261 711 1005 94_ _766 _ 951 _4
Arrive On Green _ 0.10 0.10 0.10 0.10 0.10 0.10 0.05 0.61 0_.61 0.07 0.63 0.63
Sat Flow,veh/h 1332 1841 1547 1242 1781 1585 1810 1657 156 1781 1514 2771
Grp Volume(v),veh/h 19 65 98 7 34 52 39 0 338 76 0 401
Grp Sat Flow(s),veh/h/In 1332 1841 1547 1242 1781 1585 1810 0 1813 _ 1781 0 1791
Q Serve(g_s),s 0.9 2.2 3.9 0.4 1.2 1.9 0.5 0.0 _6.1 1.0 0.0 7.2
Cycle Q Clear(g_c),s 2.1 2.2 3.9 2.6 _ 1.2 1.9 0.5 0.0 6.1 1.0 0.0 7.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.09 1.00 0.15
Lane Grp Cap(c),veh/h 213_ 178 221 186 173_ 261 711 0 1099 766 0 1125
V/C Ratio(X) 0.09 0.36 0.44 0.04 0.20 0.20 0.05 0.00 0.31 0.10 0.00 0.36
Av lai Cap(c_a),veh/h 591 701 _660 539 678 710 826 0 1099 868 0 1125,
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay(d),s/veh 28.9 28.4 26.4 29.6 28.0 24.3 4.4 0.0 6.4 4.0 0.0 6.0
Incr Delay(d2),slveh 0.2 1.2 1.4 0.1 0.6 0.4 0.0 0.0 0.7 0.1 0.0 0.
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 1.0 1.5 0.1 0.5 0.7 0.2 0.0 2.2 0.3 0.0 2.5
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 29.1 29.7 27.8 29.7 28.5 24.6 4.4 0.0 7.1 4.1 0.0 6.9
LnGrp LOS C C C C C C A A A A A A
-- -- -- --- - --- - - - - - ----- -- - - - -- - - ----- -- -
Approach Vol,veh/h 182 _ 93 377 477- -
Approach Delay,s/veh 28.6 26.4 6.8 6.4
Appro Lhac OS C C A A
Timer-Assigned Phs 1 2 4 5 6 8
P_hs Duration(G+Y+Rc),s 9.1 46.2 11.9 7.7 47.6 11.9
Change Period(Y+Rc),s *4.6 5.4 5.4 *4.6 5.4 5.4
Max Green Setting(Gmax),s *8.4 40.8 25.6 *7.4 41.8 25.6
Max Q Clear Time(g_c+ll),s 3.0 8.1 5.9 2.5 9.2 4.6
Green Ext Time(p c),s_ 0.1 2.4 0.7 0.0 2.9 0.3
Intersection Summary
HCM 6th Ctrl Delay 11.8
HCM 6th LOS B
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM 6th Signalized Intersection Summary ,
8: Rouse Ave/Rouse Avenue & Tamarack St 01/17/2019
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations +T+ 4� +T+ +T+
Traffic Volume(veh/h) 41 58 19 7 26 56 13 304 7 48 379 35
Future Volume(vehlh) 41 58 19 7 26 56 13 304 7 48 379 35
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0,
Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/ln 1781 1781 1781 1574 1574 1574 1870 1870 1870 1856 1856 1856
Adj Flow Rate,veh/h 47 66 22 8 30 64 15 345 8 55 431 40
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh,% 8 8 8 22 22 22 2 2 2 3 3 3
Cap,veh/h 144 119 34 77 60 113 86 1287 29 151 1089 96,
Arrive On Green 0.13 0.13 0.13 0.13 0.13 0.13 0.73 0.73 0.73 0.73 0.73 0.73
Sat Flow,veh/h 437 924 265 53 467 876 25 1773 40 109 1500 132
Grp Volume(v),veh/h 135 0 0 102 0 0 368 0 0 526 0 0
Grp Sr at Flow(s),veh/hlln 1626 0 0 1396 0 0 1838 0 0 1742 0 0
Q Serve(g_s),s 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g c),s 4.1 0.0 0.0 3.7 0.0 0.0 3.7 0.0 0.0 6.1 0.0 0.0,
Prop In Lane 0.35 0.16 0.08 0.63 0.04 0.02 0.10 0.08
Lane Grp Cap(c),veh/h 297 0 0 250 0 0 1402 0 0 1337 0 0
V/C Ratio(X) 0.45 0.00 0.00 0.41 0.00 0.00 0.26 0.00 0.00 0.39 0.00 0.00
Avair I Cap(c a),veh/h 1194 0 0 1063 0 0 1402 0 0 1337 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(1) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay(d),slveh 22.7 0.0 0.0 22.5 0.0 0.0 2.6 0.0 0.0 2.9 0.0 0.0
Incr Delay(d2),s/veh 1.1 0.0 0.0 1.1 0.0 0.0 0.5 0.0 0.0 0.9 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
File BackOfQ(50%),veh/In 1.6 0.0 0.0 1.2 0.0 0.0 0.9 0.0 0.0 1.4 0.0 0.6
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 23.8 0.0 0.0 23.6 0.0 0.0 __3.0_ _ 0.0 0.0 3.8 0.0 0.0
LnGrp LOS C A A C A A A A A A A A
Approach_Vol,veh/h 135 102 368 526 1
Approach Delay,s/veh 23.8 23.6 3.0 3.8
Appro Lhca OS C C A A
Timer-Assigned Phs 2 4 6 8
Phs Duration(G+Y+Rc),s 44.0 -_ 11.1 44.0 11.1 -T]
Change Period(Y+Rc),s 4.0 4.0 4.0 4.0
Max Green Settingng(Gmax),s 40.0 40.0 40.0_ 40.0
Max Q Clear Time(g_c+11),s 5.7 6.1 8.1 5.7
Green Ext Time(pc),s _2.7 --- 0.9_ _ 4.2 0.7
Intersection Summary
HCM 6th Ctrl Delay _ _ _ __ 7.7
HCM 6th LOS A
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
HCM 6th Signalized Intersection Summary
11: Rouse Avenue & Oak Street/Birch Street 01/17/2019
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBA
Lane Configurations *T r 4+ _ ►� >� t r
Traffic Volume(vehlh)__ ___173__ 0 207 _0 1 0 121 292 _ 0 0 266 110
Future Volume(veh/h) 173 0 207 0 1 0 121 292 0 0 266 110
Initial Q(Qb),veh 0 0 _0_ 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 __ 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00_ 1.00 1.00 1.00 1.001.00 1.00 1.00 1.00 1.00 1.00 1.06,
Work Zone On Approach No No No No
Adj Sat Flow,veh/hlln _ 1900 1900 1841 1900 1900 1900 1767 1856 1856 1900 1841 1870
Adj Flow Rate,veh/h 186 0 223 0 1 0 130 314 0 0 286 118
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93,
Percent Heavy Veh,% _ _ 0 0 4 0 0 0 9 3 3 0 4 2
Cap,veh/h _ _ 354 0 377 0 338 _ 0 636 1251 0 99 1008 8671
Arrive On Green 0.18 0.00 0.18 0.00 0.18 0.00�0.06 0.67 0.00 0.00 0.55 0.55
Sat Flow,veh/h 1435 0 1560 0 1900 0 1682 1856 0 1082 1841 1584,
Grp Volume(v),veh/h 186 0 223 0 1 0 130 314 0 0 286 118
Grp Sat Flow(s),vehlh/ln 1435 0 1560 0 1900 0 1682 1856 0 1082 1841 1584
Q Serve(g_s),s 8.9 0.0 9.2 0.0 0.0 0.0 2.2 4.8 0.0 0.0 6.1 2.7
Cycle Q Clear(g c),s 9.0 0.0 9.2 0.0 0.0 0.0 2.2 4.8 0.0 0.0 6.1 _2.1
Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c),veh/h 354 0 377 0 338 0 636 1251 0 99 1008 867�
V/C Ratio(X) 0.53 0.00 0.59 0.00 0.00 0.00 0.20 0.25 0.00 0.00 0.28 0.14
Avail c- ,veh/h 787 0 847 0 911 0 1105 1251 0 99 1008 8671
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00
Uniform Delay(d),s/veh 28.4 0.0 24.5 0.0 24.7 0.0 5.7 4.7 0.0 0.0 8.8 8.1
Incr Delay d2),s/veh 1.2 0.0 1.5 0.0 0.0 0.0 0.2 0.5 0.0 0.0 0.7--( 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 3.0 0.0 3.5 0.0 0.0 0.0 0.7 1.7 0.0 0.0 2.4 0.9
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 29.6 0.0 26.0 0.0 24.7 0.0 5.8 5.1 0.0 0.0 9.6 8.4
LnGrp LOS C A C A C A A A A A A A
Approach Vol,veh/h 409 1 444 404
Approach Delay,s/veh 27.6 24.7 5.4 9.2
Approach LOS C C A A
Timer-Assigned Phs 2 4 5 6 8
Phs Duration(G+'O ;,s 54.6 18.4 9.2 45.4 16-A
Change Period(Y+Rc),s 5.4 5.4 '4.6 5.4 5.4
Max Green Setting(Gmax),s 40.0 35.0 *25 40.0 35.0
Max Q Clear Time(g_c+ll),s 6.8 11.2 4.2 8.1 2.0
Green Ext Time(p_c),s 2.1 1.8 0.3 2.3 0.0
Intersection Summary
HCM 6th Ctd- Delay 13.9
HCM 6th LOS B
Notes
HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
f
. � I
HCM 6th Signalized Intersection Summary y
15: Private Access/Broadway St & Main St ; 01/17/2019
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4T +TT 4 4
Traffic Volume(veh/h) 49 504 1 0 617 106 1 0 0 109 0 23
Future Volume(veh/h) 49 504 1 0 617 106 1 0 0 109 0 23
Initial Q(Qb),veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00
Parking.Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Say' t Flow,vehlh/ln 1885 1885 1885 1900 1900 1900 1900 1900 1900 1900 1900 1900
Adj Flow Rate,veh/h 52 536 1 0 656 113 1 0 0 116 0 24
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh,% 1 1 1 0 0 0 0 0 0 0 0 0
Cap,veh/h 117 1115 2 0 1151 198 762 0 0 635 9 113
Arrive On Green 0.37 0.37 0.37 0.00 0.37 0.37 0.45 0.00 0.00 0.45 0.00 0.45
Sat Flow,veh/h 143 2980 6 0 3169 529 1456 0 0 1194 21 251
Grp Volume(v),veh/h 287 0 302 0 385 384 1 0 0 140 0 0
Grp S at Flow(s),veh/h/In 1414 0 1714 0 1805 1798 1456 0 0 1467 0 0
Q Serve(g_s),s 0.8 0.0 8.9 0.0 11.3 11.4 0.0 0.0 0.0 3.4 0.0 0.0
Cycle QClear c),s 12.1 0.0 8.9 0.0� 11.3 11.4 0.0 0.0 0.0 3.8 0.0 0.0
Prop In Lane 0.18 0.00 0.00 0.29 1.00 0.00 0.83 0.17
Lane Grp Cap(c),veh/h 593 0 642 0 676 673 762 0 0 757 0 0
V/C Ratio(X) 0.48 0.00 0.47 0.00 0.57 0.57 0.00 0.00 0.00 0.18 0.00 0.00
Avaiill^Cap(cca),veh/h 809 0 898 0 946 942 762 0 0 757 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay(d),s/veh 15.5 0.0 15.9 0.0 16.6 16.6 10.2 0.0 0.0 11.1 0.0 0.0
Incr Delay_02),s/veh 0.6 0.0 0.5 0.0 0.8 0.8 0.0 0.0 0.0 0.5 0.0 0.0,
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
/oile_B-ackOfQ(50%),veh/ln 3.1 0.0 3.4 0.0 4.5 4.5 0.0 0.0 0.0 1.3 0.0 0.0
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 16.1 0.0 16.4 0.0 17.4 17.4 10.2 0.0 0.0 11.7 0.0 0.0
LnGrp LOS B A B A B B B A A B A A
Approach-Vol,vehlh ---_ ---589 - 769_ 1 140 )
Approach Delay,s/veh 16.3 17.4 10.2 11.7
Approach LOS - B B B B
Timer-Assigned Phs 2 4 6 8
Phs Duration(G+Y+Rc),s 35.9 30.9� 35.9- 30.9 }
Change Period(Y+Rc),s 5.9 5.9 5.9 5.9
Max Green Setting(Grn ),s 30.0 - --- -_ 35.0 _ 30.0 35.0
Max Q Clear Time(g_c+ll),s 2.0 14.1 5.8 13.4
Green Ext Time(p.c),s 0.0 4.1 0.8 5.3
Intersection Summary
HCM 6th Ctrl Delay 16.4 }
HCM 6th LOS B
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 5
Queues
1: Rouse Ave & Mendenhall St 01/17/2019
4\ t `* 1
Lane Group WBT NBL NBT SBL SBT
Lane Group Flow(vph) 261 47 319 44_291
v/c Ratio — 0.62 0.08 0.30 0.07 0.29
Control Delay 22.9 6.7 7.4 6.6 6.1
Queue Delay __0.0 0.0 0.0 0.0 0.0
Total Delay 22.9 6.7 _ 7.4 6.6 _6.1
Queue Length 50th(ft) 64 6 44 _5 __30
Queue Length 95th(ft) 123 21 102 20 79 _
Internal Link Dist(ft) 419 _ 417 _ 1833
Turn Bay Length_(ft) 50 50
Base Capacity(vph) 1144 593 1066 601 1007
Starvation Cap Reductn 0 0 0 0 0 _
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0 0 0 _
Reduced vlc Ratio 0.23 0.08 0.30 0.07 0.29
Intersection Summary
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
0 •
Queues
2: Rouse Ave & Peach St-. 01/17/2019
--* `� 1 �► 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT
Lane Group Flow(vph) 19 65 98 7 34 52 39 338 76 401
ulc Ratio 0.12 0.31 0.22 0.05 0.17 0.12 0.05 0.28 0.09 0.34
Control Delay 30.0 33.2 6.1 28.7 30.5 6.7 3.0 8.2 3.1 8.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 30.0 33.2 6.1 28.7 30.5 6.7 3.0 8.2 3.1 8.3
Auer' ue Length 50th @)_ __ 8 27_ 0 3 _ _14 0 3 67 7 80
Queue Length 95th(ft) 25 58 27 13 36 21 10 117 17 137
Internal Link Dist(f4)_ 422 423 1833 989
Turn Bay Length(ft) 50 50 50 50 50 50
Base Capacity(v_ph) 512 670 474 498 645 473 794 1192 852 1195
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.04 0.10 0.21 0.01 0.05 0.11 0.05 0.28 0.09 0.34
Intersection Summary-
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
Queues
8: Rouse Ave/Rouse Avenue & Tamarack St 01/17/2019
—♦ t 1
Lane Group EBT WBT NBT SBT
Lane Group Flow_(vph) 135_ 102 368 526 _
v/c Ratio _ 0.52 0.33 0.27_ 0.42 _
Control Delay 26.6 13.1 4.3 5.4
Queue Delay _ _ 0.0 _0.0 0.0 0.0
Total Delay 26.6 13.1 4.3 5.4 _
Queue Length 50th(ft-L 38 11 38 62
Queue Length 95th(ft) 80 44 84 136
Internal Link Dist(ft) 555 547 989 992
Turn Bay Length(ft)
Base Capacity(vph) 1004 1060 1353 1266
Starvation Cap Reductn 0 0 0 0 _
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.13 0.10 0.27 0.42
Intersection Summary
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
Queues
11: Rouse Avenue & Oak Street/Birch Street 01/17/2019
Lane Group EBT EBR WBT NBL NBT SBT SBR
Lane Group Flow(vph) 186 223 1 130 314 286 118
v/c Ratio 0.68 0.31 0.00 0.19 0.25 0.31 0.15
Control Delay 43.3 3.5 26.0 6.0 6.6 14.8 5.9
Queue Delay 0.0 0.0 _ 0.0 0.0 0.0 0.0 0.0
Total Delay 43.3 3.5 26.0 6.0 6.6 14.8 5.9
,Queue-Le ngth 50th(ft) 87 0 0 19 __ 54 80 9
Queue Length 95th(ft) 161 38 4 49 114 170 43
Internal Link Dist(ft) 553 _ 170 992 418
Turn Bay Length(ft) 200 215 80
Base Capacity(v_ph) 615 986 828 833 _1600 910_ 813
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0_ 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.30 0.23 0.00 0.16 0.20 0.31 0.15
Intersection Summary
r
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
Queues
15: Private Access/Broadway St & Main St 01/17/2019
t 1
Lane Group EBT WBT NBT SBT
Lane Group Flow(vph) 589 769 1 140
u/c Ratio 0.54 0.57 0.00 0.22
Control Delay 18.4 17.6 11.0 9.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 18.4 17.6 11.0 9.5
Queue Length 50th(ft) 96 122 0 23
Queue Length 95th(ft) 142 172 3 59
Internal Link Dist(ft) 300 185 172 257
Turn Bay Length(ft)
Base Capacity(vph) 149_0 183.3 560 6.51
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced We Ratio 0.40 0.42 0.00 0.22
Intersection Summary
Future(2020)+Site AM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 5
HCM 6th TWSC
23: Ida Ave & Aspen St 01/17/2019
Intersection
Int Delay,slveh 2.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 +T+ +T+ 4
LTraffic Vol,veh/h 0 4 4 2 3 4 2 18 0 4 25 0
Future Vol,vehlh 0 4 4 2 3 4 2 18 0 4 25 0
Conflicting Peds,#/hr_ 0 0 0 _ 0 0 0 0 0 _ 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - None
Storage Length - -
Ueh in Median Storage,# - 0 - - 0 - - 0 - - 0 -
Grade,% - 0 - 0 - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles,% 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 4 4 2 3 4 2 20 0 4 27 0
Major/Minor Minor2 Minorl Majorl Major2
Conflicting Flow All 63 59 27 63 59 20 27 0 0 20 0 0
35 35 - 24 24 - - - - - - -
Stage 2 28 24 - 39 35 - -
Criticaldwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 -_ - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 2.218
Pot Cap-1 Maneuver 932 832 1048 932 832 1058 1587 - 1596 - -
Stage 1 981 866 - 994 875 - - - -
Stage 2 989 875 -_ 976 . 866_ - - - - - - -
Platoon blocked,% -
Mov Cap-1 Maneuver 923 829 _1048_ 922_ _829 10581587 _ - 1596 - -
Mov Cap-2 Maneuver 923 829 - 922 829 - - -
Stage 1 _980 _863 _ _ - _ 993 874 - -
Stage 2 980 874 - 964 863 - -
Approach EB WB NB SB
HCM Control Delay,s 8.9 8.9 0.7 1
HCM LOS A A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLnl SBL SBT SBR
Capacity(veh/h) 1587 - - 9.26 _941 _1596 - -
HCM Lane VIC Ratio 0.001 - - 0.009 0.01 0.003 - -
HCM Control Delay(s)- 7.3 0 - 8.9 8.9 7.3 0 -
HCM Lane LOS A A - A A A A -
HCM 95th%tile Q(veh) 0 - - 0 0 0 -
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th TWSC
27: Site Access & Aspen St 01/17/2019
Intersection
Int Delay,s/veh 5.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations a
;Traffic Vol,veh/h 0 33 5 0 45 8
Future Vol,veh/h 0 33 5 0 45 8
Conflicting Pe_ds,#/hr _0_ 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0
Ueh in Median Storage,#_ 0 _- - 0 0 -
Grade,% 0 - 0 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles,% 2 2 2 2 2 2
Mvmt Flow 0 36 5 0 49 9
Major/Minor Majorl Major2 Minorl
Conflicting Flow All 0 0 36 0 28 18
Stage 1 - - - - 18 -
Stage 2 - - 10 -
Critical Hdwy - - 4.12 6.42 6.22_
Critical Hdwy Stg 1 - - 5.42 -
Critical Hdwy 9tg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - 3.518 3.318
Pot Cap-1-Maneuver - - 1575 - 987 1061_
Stage 1 - - 1005 -
Stage 2 - - - -_1013 _ __ -
Platoon blocked,% -
Mov Cap-1 Maneuver - - 1575 984 1061
Mov Cap-2 Maneuver - 984 -
Stage 1005 -
Stage 2 1010
Approach EB WB NB
HCM Control Delay,s 0 7.3 S 8.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity(veh/h) -- - 995 - _- - 1575
HCM Lane V/C Ratio 0.058 - 0.003 -
HCM Control Delay(s) 8.8 _ - _ - 7.3 0
HCM Lane LOS A A A
HCM 95th%tile Q(veh) 0.2 - - 0 -
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
19: Ida Ave & Cottonwood St 01/17/2019
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 +T+ 4 4
Sign Control Yield __ Yield _ _ Yield Yield
Traffic Volume(vph) 0 0 2 1 2 0 0 18 0 0 31 2
Future Volume(vph) 0 0 2 1 2 0 0 18 0 0 31 2
Peak Hour Factor 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67
Hourly flow rate(yph) 0 0_ 3 1_ 3 0 0 27 0 0 46 3,
Direction,Lane# EB 1 WB 1 NB 1 SB 1
-- ---- --- - --- - ------ - - - ---
VolumeTotal_(vph) -_ 3 4 27 49
Volume Left(vph) 0 1 0 0
Volume Right(vph) 3 0 0_- -3
Hadj(s) -0.60 0.69 0.12 0.08
Departure Headway_(s) 3.5 4.8 4.1 - 4.0
Degree Utilization,x 0.00 0.01 0.03 0.05
Capacity_(veh/h) 1009 741 866 888
Control Delay(s) 6.5 7.8 7.2 7.3
Approach Deelay_(s) 6.5 7.8 7.2 7.3
Approach LOS A A A A
Intersection Summary
Delay 7.2
Level of Service A
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period(min) - 15
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary
1: Rouse Ave & Mendenhall St 01/17/2019
s __10. - � � � 4\ t ► 1 41
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations _ _ __�, _ ►�
Traffic Volume(veh/h) 0 0 0 7 228 62 _ 83 339 9 40 284 167i
Future Volume(veh/h) 0 0 0 7 _228 62 83 339 9 40 284 167
Initial Q(Qb),veh i_ 0 0 0 0 0 0 0 0 0,
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.98 1.00 0.99
Parking Bus,Ad' 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow,veh/h/In _ 1900 1885 1900 1856 1870 1870 1900 1885 1885
Adj Flow Rate,veh/h 8 265 72 97 394 10 47 330 194
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh,% 0 1 0 3 2 2 0 1 1
Cap,veh/h 10 324 88 464 1065 27 574 650 382
Arrive On Green 0.26 0.26 0.26 0.59 0.59 0.59 0.59 0.59 0.59
Sat Flow,veh/h 38 1243 338 870 1815 46 992 1108 652
Grp Volume(v),veh/h 345 0 0 97 0 404 47 0 524
G_rp Sat Flow(s),veh/h/In 1618 0 0 870 0 1861 992 0 1760,
Q Serve(g_s),s 13.7 0.0 0.0 5.0 0.0 7.8 1.8 0.0 11.9
Cycle Q Clear(g c),s 13.7 0.0 0.0 17.0 0.0 7.8 9.6 0.0 11.9
Prop In Lane 0.02 0.21 1.00 0.02 1.00 0.37
Lane Grp Cap(c),veh/h 422 0 0 464 0 1092 574 0 1033
V/C Ratio(X) 0.82 0.00 0.00 0.21 0.00 0.37 0.08 0.00 0.51
Avail Cap(c=a),veh/h 831 0 0 464 0 1092 574 0 1W,
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay(d),s/veh 23.7 0.0 0.0 13.3 0.0 7.4 10.0 0.0 8.3
Incr Delay(d2),s/veh 3.9 0.0 0.0 1.0 0.0 1.0 0.3 0.0 1.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/In 5.4 0.0 0.0 1.1 0.0 3.0 0.4 0.0 4.4
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 27.6 0.0 0.0 14.3 0.0 8.4 10.3 0.0 10.1
LnGrp LOS C A A B A A B A B
Approach Vol,veh/h 345 501 571
Approach Delay,s/veh 27.6 9.5 10.1
Approach LOS C A B
Timer-Assigned Phs 2 6 8
Phs Duration(G+Y+Rc),s 45.2 45.2 23.0
Change Period(Y+Rc),s *5.2 '5.2 5.2
Max Green Setting(Gmax),s '40 '40 35.0
Max Q Clear Time(g_c+ll),s 19.0 13.9 15.7
Green Ext Time(p=c),s 3.2 4.3 2.1
Intersection Summary
HCM 6th Ctrl Delay 14.2
HCM 6th LOS B
Notes
HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
HCM 6th Signalized Intersection Summary
2: Rouse Ave & Peach St 01/17/2019
Movement EBL EBT EBR. WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations t r t r
Traffic Volume(veh/h) 28 48 71 13 21 107 82 338 17 50 423 55;
Future Volume(veh/h) 28 48 71 13 21 107 82 338 17 50 423 55
Initial Q_(Qb),veveh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1900 1870 1900 1604 1870 1885 1885 1900 1900 1870 1885 1885
Adj Flow Rate,vehlh 33 56 83 15 24 124 95 393 20 58 492 64
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh,% 0 2 0 20 2 1 1 0 0 2 1 1
Cap�veh/h 261 214 319 224 214 285 552 969 49 646 852 111
Arrive On Green 0.11 0.11 0.11 0.11 0.11 0.11 0.08 0.54 0.54 0.06 0.52 0.52
Sat Flow,veh/h 1259 1870 1610 1072 1870 1598 1795 1792 91 1781 1634 213,
Grp Volume(v),veh/h 33 56 83 15 24 124 95 0 413 58 0 556
Grp Sat Flow(s),veh/h/In 1259 1870 1.610 1072_ 1870_ 1598__ 1795_ 0 1884 1781 0 1847j
Q Serve(g_s),s 1.3 1.5 2.4 0.7 0.6 3.8 1.2 0.0 7.1 0.8 0.0 11.3
Cycle Q Clear(g c),s 2.0 1.5 2.4 2.2 0.6 3.8 1.2 0.0 7.1 0.8 0.0 11.3
Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.05 1.00 0.12
Lane Grp Cap(c),veh/h 261 214 319 224 214 285 552 0 1019 646 0 963,
V/C Ratio(X) 0.13 0.26 0.26 0.07 0.11 0.43 0.17 0.00 0.41 0.09 0.00 0.58
Avai p(cca),veh/h 691 852 868 590 852 831 598 0 1019 730 0 963
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay(d),s/veh 22.7 22.2 18.6 23.2 21.8 20.1 5.8 0.0 7.4 5.2 0.0 9.0
Incr Delay(d2),s/veh 0.2 0.6 0.4 0.1 0.2 1.0 0.1 0.0 1.2 0.1 0.0 2.5,
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
/wile BackOfQ(50%),veh/In 0.4 0.7 0.9 0.2 0.3 1.4 0.4 0.0 2.6 0.2 0.0 4.4
Unsig.Movement Delay,slveh
LnGrp Delay(d),slveh 22.9 22.8 19.0 23.3 22.0 21.1 6.0 0.0 8.6 5.3 0.0 113
LnGrp LOS C C B C C C A A A A A B
Approach Vol,veh/h 172 163 508 614
Approach Delay,s/veh 21.0 21.4 8.1 10.9
roachL S C C A B
Timer-Assigned Phs 1 2 4 5 6 8
Phs Duration(G+Y+Rc),s 8.1 35.1_ - 11.7 9.2 34.0 11.7
Change Period(Y+Rc),s *4.6 5.4 5.4 `4.6 5.4 5.4
Max Green Setting(Gmax),s *6.1 28.5 25.0 *6 28.6 25.0
Max Q Clear Time(g_c+I1),s 2.8 9.1 4.4 3.2 13.3 5.8
Green Ext Time(p c),s 0.0 2.6 0.6- 0.0 3.5 0.5
Intersection Summary
HCM 6th Ctrl Delay- _ 12.3
HCM 6th LOS B
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
HCM 6th Signalized Intersection Summary
8: Rouse Ave/Rouse Avenue & Tamarack St 01/17/2019
-A --. 'e- *-- I--- 4\ t /00. 1. 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations _ #14 _ _ 4+ _ _ 4 +4
Traffic Volume(veh/h) - 47 44 44 12 64 57 26 412 14 _ 36 474 32
Future Volume(vehlh) 47 44 44 12 64 57 �26 412 14 36 474 32
Initial Q(Qb),veh _ 0 0_ 00 0 0 _0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 _ 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj _ 1.00 1.00 1.00_ 1.00 _1.00 1.00 _1.00 1.00 1.00 1.00 1.00 01 0
Work Zone On Approach No _ No_ No No
Adj SS F,veh/h/In 1900 1 000 1900 1826 1826_ 1826 1885 1885 1885 1885 1885 1885,
Adj Flow Rate,veh/h 52 49 49 13 71 63 _29 458 16 40 527 36
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh,% 0 0 0 5 5 _5_ 1 1 1 1 1 1
Cap,veh/h _ 151 93 76 81 119 97 102 1237 42 113 1119-7 6
Arrive On Green 0.13 0.13 0.13 0.13 0.13 0.13 0.72 0.72 0.72 0.72 0.72 0.72
Sat Flow,veh/h 469 691 563 79 881 720 46 1715 58 60 163 05 11 8,
Grp Volume(v),vehlh 150 0 0 147 0 0 503 0 0 603 0 0
Grp Sat Flow(s),vehlhlln 1723 0 0 1680 0 0 1819_ 0 _ 0 1803 0 0
Q Serve(g_s),s 0.0 0.0 0.0 0.3 0.0 0.0 0.0 0.0_ 0.0 0.0 0.0 0.0
Cycle Q Clear(g c),s 4.3 0.0 0.0 4.5 0.0 0.0 5.7 0.0 0.0 7.4 0.0 0.0
Prop In Lane 0.35 0.33 0.09 0.43 0.06 0.03 0.07 0.06
Lane Grp Cap(c),veh/h 320 0 0 297 0 0 1380 0 0 1369 0 Q
V/C Ratio(X) 0.47 0.00 0.00 0.49 0.00 0.00 0.36 0.00 0.00 0.44 0.00 0.00
Avail Cap(c_a),veh/h 1224 0 0 1254 0 0 1380 0 0 1369 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 PA
Uniform Delay(d),s/veh 22.6 0.0 0.0 22.7 0.0 0.0 3.0 0.0 0.0 3.2 0.0 0.0
Incr Delay(d2),s/veh 1.1 0.0 0.0 1.3 0.0 0.0 0.7 0.0 0.0 1.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0. 00.0 0.0 0.0 0.0 0.0 0.0 0.0
/pile BackOfQ(50%),veh/ln 1.8 0.0 0.0 1.8 0.0 0.0 1.4 0.0 0.0 1.8 0.0 0.0
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 23.7 0.0 0.0 24.0 0.0 0.0 3.7 0.0 0.0 4.2 0.0 0.0
LnGrp LOS C A A C A A A A A A A A
Approach Vol,veh/h 150 147 503 603
Approach Delay,s/veh 23.7 24.0 3.7 4.2
Appro LOS C C A A
Timer-Assigned Phs 2 4 6 8
Phi;Duration(G+Y+Rc),s 44.0 11.5 44.0 11.5
Change Period(Y+Rc),s 4.0 4.0 4.0 4.0
Max Green Setting(Gmax),s 40.0 40.0 40.0 40.0
Max Q Clear Time(g_c+ll),s 7.7 6.3 9.4 6.5
Green Ext Time(p_c),s 4.0 1.0 5.0 0.9
Intersection Summary
HCM 6th Ctrl Delay 8.2
HCM 6th LOS A
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
HCM 6th Signalized Intersection Summary ,
11: Rouse Avenue & Oak Street/Birch Street 01/17/2019
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4 r 41* � T � t r
Ira-ffic Volume(vehlh) 138 3 165 1 1 0 253 275 0 0 383 216
Future Volume(veh/h) 138 3 165 1 1 0 253 275 0 0 383 216
Initial Q(Qb),veh 0 0 0 0 _0 - 0_- _ 0 0 0 0 0 0
Ped-Bike Adj_(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus,Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/hlln 1900 1900 1885 1900 1900 1900 1900 1870 1870 1900 1885 1870
Adj Flow Rate,veh/h 152 3 181 1 1 0 278 302 0 0 421 237
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh,% 0 0 1 0 0 0 0 2 2 0 1 2
Cap,veh/h 307 4 451 107 86 0 573 1267 0 93 975 819
Arrive On Green 0.18 0.18 0.18 0.18 0.18 0.00 0.10 0.68 0.00 0.00 0.52 0.52
Sat Flow,veh/h 1175 23 1589 203 469 0 1810 1870 0 1094 1885 1584
Grp Volume(v),veh/h 155 0 181 2 0 0 278 302 0 0 421 237
Grp Sat Flow(s),veh/h/ln 1198 0 1589 672 0 0 1810 1870 0 1094 1885 1584
Q Serve(g_s),s 0.0 0.0 7.1 0.0 0.0 0.0 5.0 4.8 0.0 0.0 10.7 6.6
Cycle QClear c),s 10.3 0.0 7.1 10.3 0.0 0.0 5.0 4.8 0.0 0.0 10.7 6.6
Prop In Lane 0.98 1.00 0.50 0.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c),veh/h 312 0 451 193 0 0 573 1267 0 93 975 819,
V/C Ratio(X) 0.50 0.00 0.40 0.01 0.00 0.00 0.49 0.24 0.00 0.00 0.43 0.29
Avai�l^Cap(cca),veh/h 700 0 880 593 0 0 977 1267 0 93 975 819
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(!) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00,
Uniform Delay(d),s/veh 30.0 0.0 22.4 26.3 0.0 0.0 7.4 4.8 0.0 0.0 11.6 10.6
Incr Delay_(d2),s/veh 1.2 0.0 0.6 0.0 0.0 0.0 0.6 0.4 0.0 0.0 1.4 0.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
[/oile_BackOfQ(50%),veh/In 2.7 0.0 2.7 0.0 0.0 0.0 1.7 1.7 0.0 0.0 4.6 2.3'
Unsig. Movement Delay,s/veh
LnGrp Delay(d),s/veh 31.2 0.0 23.0 26.3 0.0 0.0 8.1 5.2 0.0 0.0 13.0 11.5
LnGrp LOS C A C C A A A A A A B B
Approa_ch Vol,veh/h 336 2 580 658
Approach Delay,s/veh 26.8 26.3 6.6 12.4
Appro LOS C_- C A B
Timer-Assigned Phs 2 4 5 6 8
Phs Duration(G+Y+Rc),s 57.8 19.6 12.4 _ 45.4 19.6
Change Period(Y+Rc),s 5.4 5.4 *4.6 5.4 5.4
Max Green Setting(Gmax),s _ 40.0 35.0 *25 40.0 35.0
Max Q Clear Time(g_c+l1),s 6.8 12.3 7.0 12.7 12.3
Green Ext Time-(p_c),s 2.0 1.4 0.8 3.8 0.0
Intersection Summary
HCM 6th Ctrl Delay 13.4
HCM 6th LOS B
Notes
*HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 4
HCM 6th Signalized Intersection Summary
15: Private Access/Broadway St & Main St 01/17/2019
-.4 -• 'r '- 4\ t `► ♦ 4/
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations 4-o4
Traffic Volume(veh/h) 99 688 2 0 658 126 1 0 0 155 0 50
Future Volume(veh/h) 99 _ 688 _ 2 0 _658 126 1 0 0 155 0 50
Initial Q Qb,veh 0 0 0 0 0 0 _0 0 0_ 0 .
_ 0
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.96 1.00 1.00 0.99 0.99
Parking Bus,Adj 1.00 1.00 1.00 1.00__1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow,veh/h/In 1885 1885 1885 1885 1885 1885_ 1900 1900 1900_1900 1900 _ 1900
Adj Flow Rate,veh/h 110 764 2 0 731 140 1 0 0 172 0 56
Peak Hour Factor 0.9_0_ 0.90 0.90 0.90 0.90 0.90 - 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh,% 1 1 1 __1 1 1 0 0 0 0 0 0
Cap,veh/h _ - _148_ 1097 3 01332 _255 660_ _ 0 0 522 11 149
Arrive On Green 0.45 0.45 0.45 _0.00 0.45 0.45 0.41 0.00 0.00 0.41 0.00 0.41
Sat Flow,veh/h 208 2451 7 0 3073 570 1391 0 0 1083 25 361
Grp Volume(v),veh/h 382 0 494 0 439 432 1 0 0 228_ 0 0
Grp Sat Flow(s),veh/h/ln 952 0 1714 0 1791 - 1758 1391 0 0 1469 0 0
Q Serve(g_s),s 18.2 0.0 18.9 0.0 15.2 15.2 0.0 0.0 0.0 8.3 0.0 0.0
Cycle Q Clear(g c),s 33.4 0.0 18.9 _ 0.0 15.2 15.2 0.0 0.0 0.0 9.0 0.0 0
Prop In Lane 0.29 0.00 0.00 0.32 1.00 0.00 0.75 0.25
Lane Grp Cap(c),veh/h _ 481 0 767 0 801 786 660 0 0 682 0 0
V/C Ratio(X) 0.79 0.00 0.64 0.00 0.55 0.55 0.00 0.00 0.00 0.33 0.00 0.00
Avail Cap(c=a),veh/h 511 0 810 0 846 830 660 0 0 682 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(l)_1.00 0.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay(d),s/veh 23.4 0.0 18.2 0.0 17.1 17.1 14.6 0.0 0.0 17.2 0.0 0.0
Incr Delay(d2),s/veh 8.1 0.0 1.6 0.0 0.7 0.7 0.0 _ 0.0 0.0_ 1.3 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),v0/In 8.1 0.0 7.5 0.0 6.2 6.1 0.0 0.0 0.0 3.2 0.0 0.0
Unsig.Movement Delay,s/veh
LnGrp Delay(d),s/veh 31.5 0.0 19.8 0.0 17.8 17.8 14.6 0.0 0.0 18.5 0.0 0.0
LnGrp LOS C A B A B B B A A B A A
Approach Vol,veh/h 876 871 1 228
Approach Delay,s/veh 24.9 17.8 14.6 18.5
Approach LOS _ C B B _ B
Timer-Assigned Phs 2 4 6 - 8
Phs Duration(G+Y+Rc),s 40.9 43.8 40.9 43.8
Change Period(Y+Rc),s 5.9 5.9 5.9 5.9
Max Green Setting(Gmax),s 35.0 40.0 35.0 40.0
Max Q Clear Time(g_c+l1),s 2.0 35.4 11.0 17.2
Green Ext Time(p c),s 0.0 _ 2.5 1.4 6.3 _ ^�
Intersection Summary
HCM 6th Ctrl Delay 21.0
HCM 6th LOS C
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 5
� i
r
Queues '
1: Rouse Ave & Mendenhall St 01/17/2019
4\ T �► 1
Lane Group WBT NBL NBT SBL SBT
Lane Group Flow(vph) 345 97 404 47 524
u/c Ratio 0.72 0.23 0.37 0.09 0.50
Control Delay 30.8 10.1 9.6 8.3 10.5
Queu lay _ 0.0 0.0 0.0 0.0 0.0
Total Delay 30.8 10.1 9.6 8.3 10.5
Queue Length 50th @) _ 124_ 17 __78 __ 8 __ 100
Queue Length 95th(ft) 192 50 162 26 213
Internal Link Dist(ft) 419 417 1833
Turn Bay Length(ft) 50 50
Base Capacity(v_ph) 934 _ 426 1092 534 1048
Starvation Cap Reductn 0 0 0 0 0
Spillback_Cap Reductn 0 0_ 0 0 0
Storage Cap Reductn 0 0 0 0 0
Reduced v/c Ratio 0.37 0.23 0.37 0.09 0.50
Intersection Summary
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 1
Queues
2: Rouse Ave & Peach St 01/17/2019
-,* --0. 'r ~ 4\ T
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT SBL SBT
Lane Group Flow(vph) 33 56 83 15 24 124 95 413 58 556
vlc Ratio 0.14 0.22 0.18 0.08 0.10 0.25 0.15 0.35 0.08 0.48
Control Delay 23.4 24.3 4.9 22.8 22.8 4.7 3.6 9.2 3.3 10.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 _ 0.0 0.0 0.0 0.0
Total Delay 23.4 24.3 4.9 22.8 22.8 4.7 3.6 9.2 3.3 10.6
Queue Length 50th(ft) 10 18 0 _5 7 __ 0 _ _ 8 - 82 5 _ 122
Queue Length 95th(ft) 30 43 21 18 24 26 19 .142 13 206
Internal Link Dist(ft) 422 423 1833 989
Turn Bay Length(ft) 50 50 50 50 50 50
Base Capacity_(vph)_ 816 880 469 680 880 498 622 1177 743 1158
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.04 0.06 0.18 0.02 0.03 0.25 0.15 0.35 0.08 0.48
Intersection Summary
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 2
Queues
8: Rouse Ave/Rouse Avenue & Tamarack St 01/17/2019
-• '~ t 1
Lane Group EBT WBT NBT SBT
Lane Group Flow(vph) 150 147 503 603
u/c R is otis of 0.57 0.47 0.40 0.48
Control Delay 25.4 18.7 5.3 6.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 25.4 18.7 5.3 6.1
Que a Length 50th(ft) _ __ _ _36 28 56 73
Queue Length 95th(ft) 84 72 128 167
Internal Link Dist(ft)a 555 547 989 992
Turn Bay Length(ft)
Base Capacity(v_ph) 966 1118 1264 1251
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.16 0.13 0.40 0.48
intersection Summary
JAN 208
,!J u'D� n n. rL ! E ,�iT�
COMMUtiIiY
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 3
Queues
11: Rouse Avenue & Oak Street/Birch Street 01/17/2019
t 1
Lane Group EBT EBR WBT NBL NBT SBT SBR
Lane Group Flow(vph) 155 181 2 278 302 421 237
v/c Ratio 0.66 0.27 0.01 0.41 0.23 0.47 0.30
Control Delay 47.4 3.3 29.5 6.9 5.8 19.2 9.7
Queue Delay _0.0 _0.0_ _ 0.0 0.0 0.0 0.0 0.0
Total Delay 47.4 3.3 29.5 6.9 5.8 19.2 9.7.
Queue Length 50th(ft) 77 0 1 43 49 143 36
Queue Length 95th(ft) . 151 33 7 94 105 296 108 _
Internal Link Dist(ft) 553 170 _ _992 418
Turn Bay Length(ft) 200 215 80
Base Capacity(vph) 556 858_ 707 824 1543 895 796
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn- _ 0_ 0 _ 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.28 0.21 0.00 0.34 0.20 0.47 0.30
Intersection Summary
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline rk` Synchro 10 Report
's Page 4
Queues
15: Private Access/Broadway St & Main St 01/17/2019
—► T 1
Lane Group EBT WBT NBT SBT
Lane Group Flow(vph) 876 871 1 228
u/c Ratio_ _ _ _ 0.90 0.57 0.00 0.37
Control Delay 35.1 18.4 16.0 16.9
Queue Delay 0.0 0.0 0.0 _ 0.0_
Total Delay 35.1 18.4 16.0 16.9
Queue Length 50th( ) _ 214 166 0 71
Queue Length 95th(ft) #336 221 4 131
Internal Link Dist(ft)= 300_ _185 _ 172 257_
Turn Bay Length(ft)
Base Capacity_(yph) 1079 1678 5_02 610 _
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 _0 _ 0_
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.81 0.52 0.00 0.37
ntersection Summary
# 95th percentile volume exceeds capacity,queue may be longer. 7
Queue shown is maximum after two cycles.
Future(2020)+Site PM Peak Hour 05/07/2018 Baseline Synchro 10 Report
Page 5
D
0
Fd
S133HSMOM
1NV AVM 3Ndl-Mni
North Rouse Avenue& East Cottonwood Street& East Aspen Street& East Aspen Street&Front North Ida Avenue&
Auxiliary Turn East Peach Street North Ida Avenue North Ida Avenue Street Front Street
Lane Warrants
AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak
NB Right-Turn Yes Yes NO NO NO NO n/a n/a n/a n/a
Left-Turn NO Yes NO NO n/a n/a NO NO n/a n/a
SB Right-Turn Yes Yes NO NO n/a n/a NO NO n/a n/a
Existing(2018) Left-Turn Yes Yes NO NO NO NO n/a n/a n/a n/a
Volumes EB Right-Turn n/a n/a NO NO n/a n/a n/a n/a NO NO
Left-Turn n/a n/a NO NO n/a n/a n/a n/a n/a n/a
WB Right-Turn n/a n/a NO NO NO NO n/a n/a n/a n/a
• Left-Turn n/a n/a NO NO NO NO n/a n/a NO NO
NB Right-Turn n/a n/a NO NO n/a n/a n/a n/a n/a n/a
Left-Turn n/a n/a NO NO n/a n/a NO NO n/a n/a
SB Right-Turn n/a n/a NO NO n/a n/a NO NO n/a n/a
Future(2020) Left-Turn n/a n/a NO NO n/a n/a n/a n/a n/a n/a
Volumes EB Right-Turn n/a n/a NO NO NO NO n/a n/a n/a n/a
Left-Turn n/a n/a NO NO n/a n/a n/a n/a n/a n/a
WB Right-Turn n/a n/a NO NO n/a n/a n/a n/a n/a n/a
Left-Turn n/a n/a NO NO NO NO n/a n/a n/a n/a
Existing Traffic Volumes(2018)-Right-Turn Lanes at Unsignalized Intersections on 2-Lane Highways
Right-Turn Volume Required Right-Turn Warranted Right-
Total DHV During DHV Volume for Turn Lane?
Approach Time (veh/hr) (veh/hr,one direction) Warranted Lane (Y/N)
Rouse&Peach NB AM weekday 895 17 1 Y
PM weekday 1172 10 -36 y
Rouse&Peach SB AM weekday 895 52 1 y
PM weekday 1172 52 -36 Y
Cottonwood&Ida NB AM weekday 29 C 116 N
PM weekday 48 C 114 N
Cottonwood&Ida 58 AM weekday 29 2 116 N
PM weekday 48 2 114 N
Cottonwood&Ida EB AM weekday 29 - 116 N
PM weekday 48 2 114 N
Cottonwood&Ida WB AM weekday 29 C 116 N
PM weekday 48 C 114 N
Aspen&Ida NB AM weekday 17 C 118 N
PM weekday 43 C 114 N
Aspen&Ida WB AM weekday 17 G 118 N
PM weekday 43 C 114 N
Aspen&Front58 AM weekday 2 G 120 N
PM weekday 9 G 119 N
Ida&Front EB AM weekday 19 30 117 N
PM weekday 49 24 113 N
• •
Future Traffic Volumes(2020)-Right-Turn Lanes at Unsignalized Intersections on 2-Lane Highway!
Right-Turn Volume Required Right-Turn Warranted Right-
Total DHV During DHV Volume for Turn Lane?
Approach Time (veh/hr) (veh/hr,one direction) Warranted Lane (Y/N)
Cottonwood&Ida NB AM weekday 35 0 115 N
PM weekday 53 0 113 N
Cottonwood&Ida SB AM weekday 35 2 115 N
PM weekday 53 2 113 N
Cottonwood&Ida EB AM weekday 35 3 115 N
PM weekday 53 2 113 N
Cottonwood&Ida WB AM weekday 35 0 115 N
PM weekday 53 0 113 N
Aspen&Ida EB AM weekday 27 2 116 N
PM weekday 55 3 113 N
Aspen&Front SB AM weekday 24 11 117 N
PM weekday 57 25 112 N
Guidelines for Right-Turn Lanes at Unsignalized Intersections
on 2-Lane Highways (Figure 28.4A)
120
•Future(2020)+Sit
•Existing(2018)
100
FVGW TURN LANE MAY
BE JUSTIFIED
80
a
0
o �
W
3 60
RIGHT TURN LANE MAY
NOT BE JUSTIFIED
M
40
•
20
0 100 200 300 400 600 600 700
TOTAL DKV VEHICLES PER HOUR.IN ONE DIRECTION
f
N� NON
• •
Existing Traffic Volumes(2018)-Left-Turn Lanes at Unsignalized Intersections on 2-Lane Highways
Val=Total left-turn Warranted Left-
Va=Total advancing volume in advancing Percent left-turns in Vo=Total opposing Turn Lane?
Approach Time traffic volume traffic Va traffic volume (Y/N)
Rouse&Peach NB AM weekday 298 31 10.4% 387 N
PM weekday 410 78 19.0% 503 Y
Rouse&Peach SB AM weekday 387 62 16.0% 298 Y
PM weekday 503 48 9.5% 410 Y
Cottonwood&Ida NB AM weekday 12 2 16.7% 11 N
PM weekday 15 0 0.0% 28 N
Cottonwood&Ida 5B AM weekday 11 0 0.0% 12 N
PM weekday 28 0 0.0% 15 N
Cottonwood&Ida EB AM weekday 5 2 40.0% 1 N
PM weekday 2 0 0.0% 3 N
Cottonwood&Ida WB AM weekday 1 1 100.0% 5 N
PM weekday 3 1 33.3% 2 N
AM weekday 10 0 0.0% 7 N
Aspen&Ida SB PM weekday 24 0 0.0% 17 N
Aspen&Ida WB AM weekday 0 0 MDIV/0! 0 N
PM weekday 2 2 100.0% 0 N
AM weekday 0 0 NDIV/0! 2 N
Aspen&Front NB PM weekday 6 2 33.3% 3 N
Ida&Front WB AM weekday 0 0 NDIV/0! 12 N
PM weekday 4 0 0.0% 28 N
Future Traffic Volumes(2020)-Left-Turn Lanes at Unsignalized Intersections on 2-Lane Highways
Val=Total left-turn Warranted Left-
Va=Total advancing volume in advancing Percent left-turns in Vo=Total opposing Turn Lane?
Approach Time traffic volume traffic Va traffic volume (Y/N)
AM weekday 16 2 12.5% 13 N
Cottonwood&Ida NB PM weekday 18 0 0.0% 32 N
Cottonwood&Ida SB AM weekday 13 0 0.0% 16 N
PM weekday 32 0 0.0% 18 N
AM weekday 5 2 40.0% 1 N
Cottonwood&Ida EB PM weekday 2 0 0.0% 3 N
Cottonwood&Ida WB AM weekday 1 1 100.0% 5 N
PM weekday 3 1 33.3% 2 N
Aspen&Ida WB AM weekday 13 11 84.6% 4 N
PM weekday 29 27 93.1% 6 N
Aspen&Front NB AM weekday 2 2 100.0% 13 N
PM weekday 8 4 50.0% 28 N
40 mph
800
5�o Left turn treatment
700
should be considered
10%
20%
600
3'0%
0 500 •—E-zisting �----
v • F ture
E 400
0
bn
300
N
0
Q
OL
0 200
100 Left"turn treatment
Jiiiiis.not necessary
0 1 - " -- I I I --- I
0 100 200 300 400 500 600 700 800
Advancing Volume (Va)
. .
•uj
CL
CL
1d3DNOD IDS kWNIWIII�d
-----------WAU:AGE-MENU€—�—_
— — — — — — — — — — — ��-
}
I I
I I I
I
I
l o x.0
ofe
m . rn
r m
d9 d9 SIN y
to-) --- --- �� -° ----i --- -----
o--------------
--------------
>s I f
s I �
II I
9 Q 4 I
prp
Ml
A
p! 1;
gig
' a
39
Q El
��•a PRELIMINARY-FOR REVIEW
x eat COTTONWOOD a IDA ONSITE
€ 8 g
e lOT5S78 §
sv NOMERPArICA°° ax
a SANDERSONo
N+
BOZEMAN,KO NA S T E W A R T
O OVERAII IMPROVEMENTS PLAN gg
Qwww.sondersonstaw°rt.com
PARKING STUDY
SANDERS&NSTEWART.COM
•
v
4('
J
�34L��aG�4 k.
o
A
S A N D E R S 0 N W
STEWART
January 18, 2019
Mr. Brian Krueger, Development Review Manager
City of Bozeman
20 East Olive Street
Bozeman,MT 59771
Reference: Cottonwood&Ida Mixed-Use Development Parking Analysis
Project No. 06020.03
Dear Brian:
This letter summarizes the findings of a detailed parking analysis that was completed in support of a
proposed mixed-use development to be constructed in the northeast side of town, specifically
located on a block along the north side of East Cottonwood Street and on the west side of North
Ida Avenue in Bozeman,MT. The attached site plan shows the planned location for the
development, as well as the locations of parking facilities and site access features for the overall
development. The study addresses shared parking allocation for Lots 5-28,Block 105, Northern
Pacific Addition. The site will contain a total of 96 on-site:parking spaces in an underground garage,
72 spaces in a leased surface lot (300 feet away from the entrance of Building#1), and 32 on-street
spaces after the development.
Section 38.540.050 of the Bozeman Unified Development Code (UDC) outlines the number of
parking spaces required for residential and non-residential uses.The tables attached to this letter
provide a summary of the calculations completed to address the UDC requirements. Table 1
provides a summary of general land use information for each building in the development, code-
required parking calculations, and similar calculations based on data from the ITE Parking Generation
(4th Edition, 2010)reference manual. The code-required parking demand calculations in Table 1
address the requirements of Section 38.540.050 of the UDC. For residential uses those calculations
are based on the number and type of dwelling units, and for commercial uses the calculations are
based on 85 percent of the gross floor area (GFA), consistent with Section 38.540.010 of the UDC.
Adjustments were made to the code-required parking calculations based on the City's allowable
reductions for on-street parking. In total,it was calculated that 260 parking spaces would be
required before the on-street parking deduction. Thirty-three (32) on-street spaces are available and
with an eight (8) spot reduction for showers/locker rooms the final number of required spaces is
220 based on the UDC requirements.
For the ITE Parking Generation-based calculations the number of units and gross floor area were
utilized as the independent variables. Land use categories were selected based on the judgement of
the author to best represent the residential housing type and the best-known future use of the
commercial spaces. A side-by-side comparison of results based on the two calculation methods
showed them to be similar.
r 'kW To Plan and Design
—� ----�-� Enduring Communities...
www.sa ndersonstewa rt. com
Mr. Brian Krueger
January 18, 2019
Page 2
The development is requesting a further reduction in code-required parking. The proposed reduced
parking rates would require 160 spaces and include the specific reductions:
• Studio/Efficiency Units from 1.25 spaces/unit to 1.0 spaces/unit
• 1-Bedroom Units from 1.5 spaces/unit to 1.25 spaces/unit
• 2-Bedrrom Units remains at 2.0 spaces/unit
• Commercial/Non-residential a 40-percent reduction
Table 1 provides a summary of the total number of parking spaces required, but it does not address
how the overall demand is affected by the assumed hours of operation for each commercial space or
general variations in parking demand throughout the day at a residential location. As shown in
Tables 2 and 3, these variations can be estimated by use of the average weekday time-of-day
distributions provided in ITE Parking Generation for each land use. Table 2 shows the time-of-day
distributions applied to the Code-required parking demand totals for an average weekday. Table 3
shows the time-of-day distributions applied to the proposed reduced Code-required parking demand
totals for an average weekday. Table 4 shows the time-of-day distributions applied to the ITE
parking demand totals for an average weekday. Based on this analysis, the maximum number of
parking spaces needed for the Code-required calculations would be 123 spaces for an average
weekday. The maximum number resulting from the proposed reduced Code-required calculations
would be 92 spaces for an average weekday. Finally, the maximum number resulting from the ITE
calculations would be 125 spaces for an average weekday.
Based on this analysis,it is our assessment that the total number of spaces available (200) meets and
in fact exceeds the maximum number of parking spaces required on an hourly basis by either the
Code-based, proposed code-reduced, or ITE calculation methods.
Recommendations provided herein are based on the accuracy of the assumed business hours of
operation and provided square footage, as well as the number, type, and occupancy of residential
units. Changes or inaccuracies =o any of the provided data may change the analysis and
recommendations of this study. Please feel free to call me at 406/922-4306 if you have any questions
or would like to discuss these calculations further.
Sincerely,
Joey Staszcuk,PE, PTOE
Project Transportation Engineer
JHS
Enc.
P:06020.03_Cottonwood_Ida_Parking—Letter_011919
,x
Table 1. Parking Demand Summary
Code Required Puking Proposed ITE arking Generation
# Serving Gross Weekday
Residential Total Area or Parking % Puking Floor Weekday Avg Peak Parking
Dwelling Commercial Indoor/ 85%of Puking Spaces Puking Reduction Spaces Area Period Puking Spaces
Btril Description D-e Type Units SF Hours of Operation Outdoor GFA Rate Required Rate from Code Required ITE Land Use Units (SM Demand Re aired
Residential Studio Efficiency Unit 23 n/a 1.25/Unit 28 1.0/Unit 25% 23 Multifamily Housing(Mid-Rise)(221) 23 1.20/Unit 28
1 Residential I-bedroom 23 n/a 1.5/Unit 34 1.25/Unit 17% 28 Multifamily Housing(Mid-Rise)(221) 23 1.20/Unit 28
_ `C_ommereial - Management Offices_ _ 191, 8-_5 klon-Sat Ind— 167 1/250 SP 0 1/350 SP 409% 0 Office Building 01) 196 2.47/1000 SF OI-A 0
Sub-total• 46 1 62 51 46 196 56
----------------------Y''�---- ` �__... —......... ........_...._.._............ ---------------- -------------------- ..... �.... � ......
2 _ _Rcsidcntial Studio liffieiene unit 18 _ n/a 1.25/Unit 22 1.0/unit 25% 18 Multifamily Housing(Nlid-Rise 221) 18 1.20/Unit 22
Sub-total, -^—_ �18 _ 22 18 18 22
3 Residential I Bedroom 6-�� n/a 1.5/Unit 9 1.25/Unit 17% 7 Plultifamlly Housing(Plid Rise)(221) 6 1.20/Unit 7
3-Bedroom _-__ l -_ n/a 2.0/12nit 12 2.0/Unit -- 12 Plultifa��How sing(Dlid-Rise)(221) 6 1.20/Unit 7
Sub-total: J T�� 12 21 19 12 14
----------- ------------------- ------------ ------ ._-___. ........
Residential 1-Bedroom 4 n/a 1.5/Unit 6 1.25/Unit 17% 5 Multifamily Housing(Mid-Rise)(221) 4 1.20/121nit 5
4 Residential 2-Bedroom 12 n/a 2.0/Unit 24 2.0/unit — 24 iMultfamily Housing(Mid-Rise)(221) 12 1.20/Unit 14
_Commercial )ffices 5,207 8-51\lon-Sat Indoor 3.591 I/250SF 14 1/350Sl-. 40% 10 Office Building(701) 5,207 2.47/1000Sl-GI'A 13
Sub-total: - T v� 16 3,591 1 44 39 16 517M32
5 Commercial Restaurant 2,175 II-IOSun-Sat Indoor 1,200 1/50 SP 24 I/90 SF 40% 13 uali Restaurant 931 2,175 I0.60/1000 SIGFA 23
Outdoor 700 1/100SI.- 7 1/I80SF 40% 3
Sub-toml: ��— 1,900 31 16 2175 23
6 Commercial _ Offices 28,681 8-5 Mon-Sat Indoor 20,127 1/250 SI-- 80 1/350 SI- 40% 57 Office Building 201) 28,681 2.47/1000 SI:GI:A 71
L• ��Sub-tota 20127 80 57 28.681 71
Total• 92 36,259 25,785 260 200 92 36,259 —M218
Reduction for Available On-Street Par (1 per 24 LF) 32 32
Reduction for Commercial Bike Rack/Locker Room(101/.) 8 8
djttue Parld Spaces Required =220� A•160�
t t
Table 2. City Code Parking Demand by Time of Day(Weekday)
Average Wee Time of Da Hour Be
Business 4 AM 5 AM 6 AM 7 AM 8 AM 9 AM 10 AMI 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PMJ 11 PM 12 PM
Residential
Percent of Peak Period* 100% 96% 92% 74% 64% - - -- - - - - 44% 59% 69% 66% 75% 77% 92% 94% 100%
Parking Demand 103 99 95 76 66 ^- ^- ^- -- -- ^- 45 61 71 68 77 79 95 97 103
Commercial-Office
Percent of Peak Period** -- - - 19% 64% 91% 99% 99% 98% 96% 100% 99% 90% 58% - - -
Parkin Demand - -- 16 55 78 85 85 84 83 86 85 77 50
Commercial-Restaurant
Percent of Peak Period*** - 20% 51% 56% 40% 27% 27% 39% 71% 100% 97% 93% 71% - -
Parking Demand - - - 6 16 17 12 8 8 12 22 31 30 29 22 ^- ^-
Total Parking Demand: 103 99 95 93 121 78 85 85 84 83 86 85 ■1232 111 71 68 77 79 95 97 103
• "`Used Low/Mid-Rise Apartment(ITE Land Use 221)percentages as distribution data for all Residential units.
**Used Office Building(ITE Land Use 701)percentages as distribution data for all office commercial spaces.
***Used Quality Restaurant(ITE Land Use 931)percentages as distribution data for restaurant space.
ITE Parking Generation 4th Edition does not provide data for this time period.
s
Table 3. Proposed Parking Demand by Time of Da (Weekday)
Ave a Weekday Time of Da Hour Beginning)
Business 4 AM 5 AM 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12PMI 1 PM 2PMI 3PMI 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 PM
Residential
Percent of Peak Period* 100% 96% 92% 74% 64% ^- -- - - ^- - ^- 44% 59% 69% 66% 75% 77% 92% 94% 100%
IParking Demand 85 82 78 63 54 ^- - ^- -- ^- - -- 37 50 59 56 64 65 78 80 85
Commercial-Office
Percent of Peak Period** ^- ^- -- 19% 64% 91% 99% 99% 98% 96% 100% 99% 90% 58%
jPaxking Demand -- ^- ^- 11 38 54 58 58 58 57 59 58 53 34
Commercial-Restaurant
Percent of Peak Period**': -- - - - - - 20% 51 o 56% 40% 27% 27% 39% 71% 100% 97% 93% 71% ^-
Parkin Demand ^- ^- ^- ^- ^- 3 8 9 6 4 4 6 11 16 16 15 11 -- --
Total ParkingDemand: 85 82 78 74 M92M 54 58 58 58 57 59 58 91 84 59 56 64 65 78 80 85 T
Used Low/bfid-Rise Apartment(ITE Land Use 221)percentages as distribution data for all Residential units. •
*"Used Office Building OTE Land Use 701)percentages as distribution data for all office commercial spaces.
***Used Quality Restaurant(ITE Land Use 931)percentages as distribution data for restaurant space.
1TH Parking Generation 4th Edition does not provide data for this time period.
•
Table 4. ITE Parking Generation Demand by Time of Da (Weekday)
Avermage Wee ay Time of Da Hour Be
Business 4AMI 5 AM 6 AM 7 AM 8 AM 9 AM 10 AM 11 AM 12 PM 1 PM 2 PM 3 PM 4 PM 5 PM 6 PM 7 PM 8 PM 9 PM 10 PM 11 PM 12 PM
Residential
Percent of Peak Period'* 100% 96% 92% 74% 64% ^- — — — — — 44% 59% 69% 66% 75% 77% 92% 94% 100%
Parkin Demand 111 107 102 82 71 ^- ^- ^- ^- 49 65 77 73 83 85 102 104 111
Commercial-Office
PercentofPeak Period— _ 19% 64% 1 91% 99% 99% 98% 96% 100% 99% 90% 58%
Parking Demand 16 54 76 83 83 82 81 84 83 76 49
Commercial-Restaurant
Percent of Peak Period'*** 20% 51% 56% 40% 27% 27% 39% 71% 100% 97% 93% 71%
Parkin Demand — ^- ^- ^- 5 12 13 9 6 6 9 16 23 22 21 16 ^- �--
Total Par Demand: 111 107 102 98 a 17S; 76 83 83 82 81 84 83 124 114 77 73 83 85 102 104 111
• *Used Low/Mid-Rise Apartment(1TE Land Use 221)percentages as distribution data for all Residential units.
**Used Office Building(ITE Land Use 701)percentages as distribution data for all office commercial spaces.
**Used Quality Restaurant(ITE Land Use 931)percentages as distribution data for restaurant space.
ITE Parking Generation 4th Edition does not provide data for this time period.
•
SECTION 8 APPENDIX F
SEWER AND WATER FLOW CAPACITIES
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
8104
SANDERSON %We
STEWART
April 3, 2018
Project No. 06002.03
WATER AND SEWER PRELIMINARY DESIGN REPORT
FOR
COTTONWOOD + IDA MIXED USE DEVELOPMENT
LOTS 5-28, BLOCK 105, NORTHERN PACIFIC ADDITION, BOZEMAN MT
SITE NARRATIVE
The following report summarizes the water and sewer design for a mixed-use development located
on Lots 5 through 17,Block 105 of the Northern Pacific Addition Subdivision (and portion of
vacated alley) in northeast Bozeman, Montana. The project is bound by East Aspen Street to the
north,Ida Avenue to the east, East Cottonwood Street to the south and existing commercial parcels
to the west that front on North Wallace Avenue. The subject parcel is approximately 2.1 acres of
mixed-use consisting of residential apartments,ground floor artisan manufacturing spaces, an office
building and renovation of an existing building. Almost all of the development will be built over a
new below grade parking garage.
WATER
Currently the municipal water system adjacent to the site consists of a 6-inch water main in East
Cottonwood Street at the south boundary of the site. This main will be replaced with an 8-inch
main from the Cottonwood and North Wallace intersection to the East Cottonwood and Ida
Avenue intersection. There will also be a new 8-inch water main installed in East Aspen Street from
North Wallace to Front Street.
There are existing fire hydrants at North Wallace and East Aspen intersection, the North Wallace
and East Cottonwood intersection and at the East Cottonwood and Ida intersection. A new hydrant
will be set at the East Aspen and Ida intersection giving an east/west spacing of approximately 450
feet and a north/south spacing of approximately 320 feet. The City of Bozeman conducted a fire
hydrant flow test at the corner of Ida and Cottonwood on May 12, 2017. The static pressure at the
time of the test was 147 psi,with a residual pressure of 110 psi at 1760 gpm.
Water for the proposed development will be served by one domestic and one fire service for each of
the new individual building. For purposes of sizing the water meter and domestic service, the
AWWA M22 fixture unit calculation is used with an assumed pressure of 100 psi. Irrigation flow of
8 gpm is assumed through the service to the existing building at the southwest corner of the site.
The total estimated fixture units, peak flow and recommended meter sizes for each building are
summarized below: To Plan and Design
jo 1__ _..,. Enduring Communities...
www.sandeoonstewart.com
FIXTURE INVENTORY
BLDG BUILDING TOILET TOILET RESIDENTIAL COMMERCIAL KITCHEN SHOWER-
NO. 71PE :ANK FLUSH LAVATORY LAVATORY SINK DISHWASHER BATHTUB
I Residential 45 45 45 45 45
2 IL-sidential 18 18 18 18 18
3 Residential 12 12 12 12 12
4 ltmdrntial/Comm. 18 2 18 2 18 IS 18
5 Community 2 2
6 Office 16 10
93 20 93 14 93 93 93
TOTAL FIXTURE UNITS
BLDG BUILDING TOILET TOILET RESIDENTIAL COMMERCIAL KITCHEN SHOWER- FIXTURE
NO. TYPE TANK FLUSH LAVATORY LAVATORY SINK DISHWASHER BATHTUB UNITS
1 Residential 180 0 67.5 (1 99 90 360 796.5
-2 Residential 72 0 27 0 39.6 36 144 318.E
3 Residential 48 6 I8 0 26.4 24 46 212.4
4 Resdendal/Cann. 72 70 27 3 39.6 36 144 391.6
5 Community _ 0 70 0 3 0
6 Office 0 560 0 13 Il 0 It 575
372 718) 139.3 21 2(W.6 186 74411
RECOMMENDED METER SIZE
PEAK MINIMUM SERVICE RECOMMENDED SERVICE
BLDG BUILDING FI-KTURE FLOW METER VELOCITY METER VELOCITY
NO. 'nTE L\ITS GPM SIZE(IN) rr/SEC SIZE(IN)** FT/SEC
1 Residential 794.5 80 1.3 14.92 1.5 14.52
2 Residential 318.6 51 1 20.83 1.5 9.26
3 Residential 212.4 41 1 16.75 1.5 7.44
,I RvAcntial/Comm. 391.6 57 1 2328 1.3 I(1.35
Community V 73 70 1.5 12.i1 1.; 12.71
6 Office 375 129 2 13.17 2 13.17
'Includes 81,mai far imgm-on
"based on 15 feet Pc strand
For water main sizing, the peak hourly flow will be used. The flows are separated to services
coming off of the East Cottonwood 8-inch main and the East Aspen 8-inch main. The residential
flews are based on the City-of Bozeman Design Standards and Specifications Policy; 2.11 people per
duelling unit, an average daily usage of 170 gallons per day per person, and a maximum hour to
average day ratio of 3:1. The commercial and office flows are more difficult to estimate. Based on
the 88 parking spaces for Eie office and artisan manufacturing spaces (prior to reduction),you could
assume fcr estimating purposes that each space is an employee. DEQ 4 circular estimates that there
is a usage of 13 gallons per day per employee. This peak hourly flow rate to each main are as
follows:
East Aspen Peak Hourly Domestic Water Demand
Average Daily Flow(res) = 63 units x 2.11 persons/unit a 170 gpd/person = 22,598 gal/day
Average Daily Flow(comm) = 84 employees x 13 gpd/person = 1,092 gal/day
Total Avg Daily Flow = 23,690 gal/day
Total A•Jg Daily Flow = 23,690 gal/day / 1440 min/day = 16.5 gal/min
Peak:11:)urly Flow Rate = 16.5 gal/min x 3 = 49.5 gal/min
Cottonwood Mixed Use
V:16020_03_UdLitE,_Design_Re?ort 2 (4/3/18)TRP
East Cottonwood Peak Hourly Domestic Water Demand
Average Daily Flow(res) = 30 units x 2.11 persons/unit x 170 gpd/person = 10,761 gal/day
Average Daily Flow(comm) = 5 employees x 13 gpd/person = 65 gal/day
Total Avg Daily Flow = 10,766 gal/day
Total Avg Daily Flow = 10,766 gal/day / 1440 min/day = 7.5 gal/min
Peak hourly Flow Rate = 7.5 gal/min x 3 = 22.5 gal/min
SANITARY SEWER
Currently the municipal sanitary sewer system adjacent to the site consists of a 6-inch main in East
Cottonwood Street at the south boundary of the site and a 6-inch main in East Aspen Street at the
north boundary of the site. Both mains flow to the east. The sanitary sewer in East Cottonwood
will be replace with an 8-inch from the manhole at the southwest corner of the site to a point
approximately 540 feet to the east where it will tie into an existing manhole at the furthest east end
of Cottonwood Street. This existing manhole has a 10-inch main outfall that flows to the north.
The sanitary sewer in East Aspen will be replaced with an 8-inch main from the manhole at the
northwest corner of the site to a point approximately 480 feet to the east where it will tie into an
existing manhole at Front Street. This existing manhole also has a 10-inch main outfall that flows to
the north.
Sanitary sewer wastewater from each of the proposed buildings will flow to the closest of the new
sewer main in either East Cottonwood or East Aspen. The design flow rates calculated below for
both the residential and commercial uses to determine the impact to the City of Bozeman municipal
sanitary sewer system. The residential flows are based on the City of Bozeman Design Standards
using an average daily flow rate of 89 gpd/person using 2.11 persons per unit. The commercial flow
rates are calculated the same as they were as describe above in the water section. The flow rates also
included is an infiltration rate at 150 gpm/acre infiltration rate.
The residential and commercial flows to each of the mains is summarized below:
East Aspen Sanitary Sewer
Residential Avg Daily Flow = 63 units x 2.11 persons/unit x 89 gpd/person = 11,830 gpd
Office Avg Daily Flow = 84 employee x 13 gpd/employee = 1,092 gpd
Total Avg Daily Flow (with no infiltration) = 12,922 gpd
InfiltrationFlow = 1.05 ac x 150 gpd/ac = 158 gpd
Total Avg Daily flow w/ infiltration = 158 gpd + 12,922 gpd = 13,080 gpd
Total Avg Daily Flow Rate = 13,080 gpd / 1440 min/day = 9.1 gpm
Cottonwood Mixed Use
V:16020_03_Udlity_Design_Report 3 (4/3/18)TRP
0 •
Peaking Factor = (18+0.133 '-')/ (4+0.133 °5) = 4.21
Peak Hourly Flow Rate = (4.21 x 12,922gpd + 158 gpd)/ 1440min/day) = 37.9 gpm
East Cottonwood Sanitary Sewer
Residential Avg Daily Flow = 30 units x 2.11 persons/unit x 89 gpd/person = 5,634 gpd
Commercial Avg Daily Flow = 5 employee x 13 gpd/employee = 65 gpd
Total Avg Daily Flow (with no infiltration) = 5,699 gpd
InfiltrationFlow = 1.05 ac x 150 gpd/ac = 158 gpd
Total Avg Daily flow w/ infiltration = 158 gpd + 5,699 gpd = 5,857 gpd
Total Avg Daily Flow Rate = 5,857 gpd / 1440 min/day = 4.1 gpm
Peaking Factor = (18+0.063 1.5)/ (4+0.063 05) = 4.29
Peak Hourly Flow Rate = (4.29 a 5,699gpd + 158 gpd)/ 1440min/day) = 17.1 gpm
Sanitaa Sewer Service Line Sizing (maximum flow from building#1 base on 45 units.)
Residential Avg Daily Flow = 45 units x 2.11 persons/unit x 89 gpd/person = 8,451 gpd
Total Avg Daily Flow Rate = 8,451 gpd / 1440 min/day = 5.9 gpm
Peaking Factor = (18+0.095'-')/ (4+0.095 °5) = 4.25
Peak Hourly Flow Rate = 4.25 x 5.9 gal/min = 25.1 gpm
The maximum capacity of a 6-inch sanitary sewer service at 2% slope flowing 0.75% full is
approximately 287 gpm which is significantly more than the maximum 25.1 gpm flow from
the worst case building , therefore, the sanitary sewer services for each building shall be 6-
inch.
CONCLUSION
Upgrading the municipal water system and sanitary sewer system and installing the service sizes as
described above is assumed to provide adequate capacity to meet the minimum design standards
from the City of Bozeman and the Montana Department of Environmental using the flows rates
provided in this report. The new utility improvements and flows will be modeled by the City of
Bozeman to confirm the standards are met. Modifications may be required to the assumed utility
improvements if said modeling shows any system inadequacies. These changes will be reflected in
the final engineering report.
Cottonwood Mixed Use
V:16020_03_Udbty_Design_Report 4 (4/3/18)TRP
SECTION 8 APPENDIX G
WELL LOG REPORTS
4
AI
COTTONWOOD + IDA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
bZ� afo� a� bC-
ONTANA WELL LOG REPORT
Form No.SM R2-99 Well ID#
This log reports the activities of a licensed Montana well driller and serves as the offtclal record of work done within the borehole and casing and describes the
amount of water encountered. This fom is to be completed by the driller and filed with DNRC within 60 days of completion of the work Acquiring
Water Rights Is the well owner's responsibility and Is not accomplished by the filing of this raporL Wall log Information is stored in the Groundwater
Information Center at the Montana Bureau of Mines and Geology(Butte)and water right information Is stored in the Water Rights Bureau records(Helena). For
fields that are not applicable,enter NA. Optional Bolds are In italics. Record additional information in the REMARKS section.
1. WELL OWNER: All depth measurements shall be from the top of the we#casing.
Name DONNA EDGERLY Time of recovery Is hours/minutes since pumping slopped.
Mailing address 306 N.CHURCH Air test'
BOZFMAN.IRT WRI IS _20 gpm with driill stem set at 45.,fL for` I tours
Time of recovery hrs/min. Recovery water level T It.
2. WELL LOCATION: List%from smallest to largest OR Bailor test'
_ SW Y.�E._K Y. Y.,Section 6 gpm with R.of drawdown after hours
Township 2S.WS Range County SAr-t ATIN Time of recovery hrahmin. Recovery water level R
Lot Tracl0k SubdiWslon Name
We/1Address OR Pump WC
GPS ClYes O NO Depth pump set for test IL
r Latitude Longitude gpm pump rate with—ft.of drawdown after_hm pumping
Error as reported by GPS 1wetor(±feet) Time of recovery hrs/min. Recovery water level ft.
Hmmlal datum O NAD27 O WGS54
OR Flowing Artesian'
3. PROPOSED USE: M Domestic O Stock I rlaatlan gpm for tours
O Public water suoab O Monitodna W ❑Other. Flow controled by
•During Me wet feat ft dsdrarge rate shot be es unkbrm as potslbde.This rate may
4. TYPE OF WORK: or may not be ft sustakabb yield of the wM. SustMabb yield does not kmt de the
E New WaI O Deeoen exdslina welt 0Abandon eAstlno well reservohof the welt csskv.
Method: OCable pRotary O 0ther.
7. WELL LOG: f�
6. WELL CONSTRUCTION DETAILS: Depth.Few I Material:
Borehole: From To Calmirock and ty aklesaiptor(example:bkrolshaWhwd,or brown
Oda. 6 In.from . n ft.to IL pravevvraler,orbroomVur i/heavin
Die. in.from (L to R 0 1 TOP SOiL 3 GRAVEL
Dia. in.from ft to ti 1 35 SAND 3 GRAVEL
Casing: 35 46 CLAY
Steel: .250 Wall thickness OThrosded O Welded 46 50 SAND 6 GRAVEL
Die. 6 In.from +18' k to 49 R
Dia. In.from IL to ft.
Plastic: Pressure Rating lbs. OThreaded OWelded
Dla. in.from ft.to ft
Perforatlons/Slottad Pipe:
Type of perforator used
Size of perforationsislats fin.
no.of perforatlonsislob from ft.to ft
no.of perforations/alots from R to ft.
Screens: O Yes 10 NO
Material
Die. Slot size from—ft to ft.
Die. Slot size from 11.to fL
Gravel Packed: O Yes 13 NO
Size of gravel
Gravel placed from ft.to ft.
Packer. O Yes 13 NO
Type Depth(s)
Grout: Material used: BENTONITE O ADDRIOXAL SHEETS ATTACHED
Depth from fL to fl. OR C Coniinuos Feed a. DATE WELL COMPLETED 1011102
9. REMARKS:
6. WELL TEST DATA:
A well teat Is required for all wells.(See detsh on wes bg report cow.)
p�,,,�IevN L^ft.below top of casing or 10. OWt.LEWCONTRACTOR'S CERTIFICATION:
13 Close"aftalan oremm psi. All work performed and reported in this well log is in compliance with the
How was test flow measured: Montana well construction standards.This report Is true to the best of my
b�et/stoowatch.weir,flume,tlowmeter,etc Name,firm,or corporation(print)
Yellowstone groundwater cosure area only-Water Temperature OF
O AQUIFER TEST DATA FORM ATTACHED Address
Test-1 hour minimum Signature
Drawdown Is the amount water level Is lowered below stalfc level. Date 10/231D2 Ucenae no. 380
MRMfb TTl a
Mnnfmna nmoe,c r► onv
•Ir * r
joy a
r
• f
L. •►
jAV _ .
P �
lit � N
'
"
O
{
�o
�.. V. M
Groundwater Monitoring Data: Summary of Wells
,Project Name:Cottonwood+Ida
Project Number: 18-054 ,5 32 Discovery Drive
Location: See Maps Bozeman, MT 59718
ALLIED,Date Installed:4/24/2018 ! ENGINEERING Phone (406) 582-0221
Installed By: AESI 1 SERVIces,�MC. So`° Fax (406) 582-5770
�1eerse vrole��s•
NOTES:
1) MW-1 through MW-5 were installed during test pit explorations on 04/24/2018.
2) MW-1 was installed in TP-1,located at SW corner of property.
3) MW-2 was installed in TP-2,located at SE corner of property.
4) MW-3 was installed in TP-3,located near center of property.
5) MW-4 was installed in TP-4,located at NW corner of property.
6) MW-5 was installed in TP-5,located at NE corner of property.
7) Highest water measurement to date in each well:
MW-1 MW-2 MW-3 MW-4 MW-5
Date Time Depth to GW Depth to GW Depth to GW Depth to GW Depth to GW
below EG below EG below EG below EG below EG
(feet) (feet) (feet) (feet) (feet)
4/24/2018 NA 9.00 10.00 9.25 9.00 9.33
4/30/2018 8:45 AM 8.03 8.52 7.77 8.46 8.82
5/7/2018 4:45 PM 8.06 8.68 7.90 8.62 9.01
5/15/2018 8:15 AM 7.98 8.65 7.86 8.56 9.05
5/22/2018 8:15 AM 8.17 8.82 8.06 8.78 9.26
5/29/2018 8:00 AM 8.14 8.79 8.03 8.74 9.26
6/5/2018 8:15 AM 8.10 8.72 7.98 8.74 9.23
6/12/2018 8:00 AM 8.45 9.05 8.32 9.07 9.56
6/19/2018 3:15 PM 8.31 8.96 8.21 8.95 9.35
6/26/2018 8:15 AM 8.52 9.08 8.38 9.13 9.59
7/3/2018 3:45 PM 8.50 9.04 8.35 9.10 9.52
7/9/2018 8:00 AM 8.83 9.38 8.68 9.45 9.86
7/16/2018 2:00 PM 9.17 9.69 9.02 9.79 10.18
7/24/2018 11:25 AM 9.54 10.03 9.36 10.06 10.48
7/31/2018 11:30 AM 9.89 10.34 9.67 10.37 10.76
Groundwater Monitoring Data: Page 1 of 1
SECTION 8 APPENDIX H
STATE LETTERS IF ANY
Jai
COTTONWOOD + IOA
RESPONSE& RESUBMITAL II 11 JANUARY 2019
Erik Nelson
From: Scott Mueller <SMueller@BOZEMAN.NET>
Sent: Wednesday, October 17, 2018 3:08 PM
To: Erik Nelson
Subject: RE: erik@thinktankarchitects.com
Erik,
To formalize my comments on the emergency access regarding the Cottonwood and Ida project, I would support the slight relaxation of the required 20 foot
wide road rule diminished to 17'6" on a portion of the road. If access is designed with vehicular li dffiL bdi I ierb, those would be operationdl in dII weather
conditions by the fire department. We suggest gates. Also the access road would be maintained year-round. •
Please contact me if you require further.
Thanks
Scott Mueller
Deputy Fire Chief-Prevention-Fire Marshal
Bozeman Fire Department
34 N. Rouse Ave
Bozeman, MT. 59771
Office (406) 582-2353
Mobile (406) 589-6271 ,
smueller@bozeman.net
www.bozemanfire.com
�f ce���7ce orw/at�wit�,•
BOZEMANMT �
FIRE DEPARTMENT
From: webadmin@bozeman.net<webadmin@bozeman.net>
Sent: Monday, October 15, 2018 10:59 AM
To: Scott Mueller<SMueller@BOZEMAN.NET>
Subject: erik@thinktankarchitects.com
i
Message submitted from the <City Of Bozeman> website.
Site Visitor Name: Erik Nelson
Site Visitor Email: erik a,thinktankarchitects.com
Scott,
We spoke a while back regarding the Cottonwood and Ida mixed use project. Specifically about the width of the fire lane being primarily 20'
however at a stretch that has an existing building we would need to diminish it by 2.5' so 17'6" width. As I recall from my notes we reached
agreement on this, however i never received a letter as such from you indicating this. We are set to re-submit our application and I am in need of
something that best categorizes your thinking on this. Please call me when you can to discuss-406-539-1176
Regards
• Erik Nelson - Thinktank Design Group Inc..
City of Bozeman emails are subject to the Right to Know provisions of Montana's Constitution (Art. II, Sect. 9) and may be considered a "public record" pursuant
to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender and receiver, and the contents may be available for public disclosure and will be
retained pursuant to the City's record retention policies. Emails that contain confidential information such as information related to individual privacy may be
protected from disclosure under law.
•
2
Erik Nelson
From: Strasheim, Kerri <kstrasheim@mt.gov>
Sent: Friday, October 26, 2018 6:04 PM
To: Erik Nelson
Cc: Brian Heaston
Subject: RE: irrigation well - Cottonwood and Ida
Erik -
Thank you for the opportunity to provide comments on the irrigation plans for the 605 E. Cottonwood
Project in the City of Bozeman. Groundwater use is specified as lawn and garden irrigation up to 1.25
acre-feet (AF) per year. The rest of the water use will be provided by the City of Bozeman. Since
these two lots are becoming one project, the project will fall under the 1987 rule, limiting the entire
project to 10 AF of groundwater use. Proposed groundwater use does not exceed 10 AF. No water right
permitting is required. Each well used cannot exceed a flow rate of 35 gallons per minute (GPM).
Regarding the well log provided, that well log is for the property at 305 N. Church, still owned by the
Edgerlys (GWIC ID 199860). I could not find an obvious well log or water right for the property being
developed.
Standard language:
In Clark Fork Coalition, et. al.v. DNRC, et. al., 2016 MT 229, 384 Mont. 503, 380 P.3d 771,the Montana Supreme Court
concluded that the definition of"combined appropriation" in Admin. R. Mont. 36.12.101(13)was invalid. The Court
reinstated the Department's 1987 Rule defining"combined appropriation" as: "An appropriation of water from the
same source aquifer by means of two or more groundwater developments,the purpose of which, in the department's
judgment,could have been accomplished by a single appropriation. Groundwater developments need not be physically
connected nor have a common distribution system to be considered a "combined appropriation." They can be separate
developed springs or wells to separate parts of a project or development. Such wells and springs need not be developed
simultaneously. They can be developed gradually or in increments. The amount of water appropriated from the entire
project or development from these groundwater developments in the same source aquifer is the "combined
appropriation."
Under this Rule,the Department interprets subdivisions that are pending before the Department of Environmental
Quality for approval on October 17, 2014 or filed after that date to be a single project that can be accomplished by a
single appropriation. Consequently, all wells in such a subdivision will be considered a "combined appropriation"for the
purposes of Mont. Code Ann. 85-2-306. The only exception to this interpretation is that a subdivision which has
received preliminary plat approval prior to October 17, 2014 will not be considered a project under the "combined
appropriation" 1987 Rule; individual lots will still be evaluated under the 1987 Rule at the time of an application to the
Department. 2015 Mont. Laws§ 1, Ch. 221.
This communication does not serve as a pre-approval for a water right.
Thank you,
Kerri
Kerri Strasheim
i
Regional Manager - Gallatin, Madison, and Park Counties
MT DNRC Water Resources
2273 Boot Hill Court, Suite 110
Bozeman, MT 59715
Ph: 406-556-4504
Fax: 406-587-9726
kstrasheim@mt.gov
From: Erik Nelson <erik@thinktankarchitects.com>
Sent: Monday, October 01, 2018 10:25 AM
To: Strasheim, Kerri <kstrasheim@mt.gov>
Subject: irrigation well-Cottonwood and Ida
Greetings Kerri,
I spoke with one of your team members the other day regarding an existing well on a city lot in Bozeman that we would
like to use for our projects domestic irrigation needs.They recommended that I send you an email with the information
—however upon reading the inquiry instruction it appears that I will also need to send a copy via mail to your office.
Could you please take a look at the outline of information below and provide some advice—to move forward on.
Per the inquiry—
The location of the project is in the City of Bozeman 605 E Cottonwood—see attached existing conditions site map
Attached is the existing well log data from the well located on site that we intend to use for landscape irrigation.The
copy I have has the well log ID#cut out hoping you can track it.
The project is a mixed use project offering commercial space (30,000 sf) and residential units (90 with 20%affordable)
on roughly 2 acres. We intend to landscape above a podium over a parking garage as well on the remaining openspaces.
Attached are the landscape plans for the project with building footprints as well as landscape materials and planting
strategies provided by the landscape architect.
The flow rate required for the project provided by the landscape architect is:
•Estimated Flow Rate: 64.5 AF @ 60 PSI static pressure
•Purpose: Lawn &Garden
•Estimated volume: 0.5 acres of planting area = 1.25 AF/season (Per form 615 from Montana DNRC)
We would like to include your approval for the use of the well in our submittals to the City-please advise on the steps
needed and any additional information you may require to complete this.
Thanks for your time.
Regards,
Erik
t.
2
0 0
PARKLAND DEDICATION MEMORANDUM
MEMORANDUM
TO: Community Development- DRC
FROM: Recreation and Parks Advisory Board Subdivision Review Committee
CC: Mitch Overton—Director of Parks and Recreation
DATE: 1/31/18
SUBJECT: Recommendations for Application No. 17547—Cottonwood & Ida Concept PUD
MEETING DATE: 1/18/18
In attendance: Chair Richard Shanahan, Beth Thorsen, Salal Huber-McGee, Katie Walsh
Staff present: Carolyn Poissant, Trails Open Space and Parks Design and Dev. Manager(Parks)
Proposal Review Comments:
• The applicant's proposal for cash in lieu is for cash in lieu of parkland (CILP) dedication for
0.73 acres. At the most recently received appraised value ($1.36), the CILP amount is
$42,654.
• Recommendation: approval
Meeting motion:
Moved by Walsh, seconded by Huber-McGee, / hereby move to recommend city commission
approve the Cash in lieu of parkland dedication proposal submitted for Application No. 17547—
Cottonwood & Idea Concept PUD in the a m o u n t of approxim ately $42,654, subject to approved
appraisal. The com mittee would also like to acknowledge that thi3 area of downtown is park
poor and recommend additional amenities be included in the development that will make it
more publicly inviting. Further, we recommend that Commission explore acquiring additional
parkland in this area.
Approved 3-0.
Note. this recommendation is from the Subdivision Review committee and was not reviewed
by the full RPAB.
COTTOC:I 000 ¢ IDA
RESPONSE& RESUBMITAL II OCTOBER 2018
page 59
UNfFEDSTATES
POSTAL SERVICE
2201 Baxter Lane
Bozeman, MT 59718-9998
1-800-275-8777 or 1-406-586-1508
January 15, 2019
Erik Nelson
Think Tank Design Group, Inc.
33 North Black Ave.
Bozeman, MT 59715
Re: N. Cottonwood St. and N. Ida Ave Project
Erik,
The Postmaster for Bozeman agrees with your decision for locations of Cluster Box Units and Outside Parcel
Lockers for the project. The first location outside and in front of building 6. Second location outside between
buildings 2 and 3 near the north end of building 3. Third location outside next to building 4 on the east side of
the building.
Respectfully,
Mike Novotny
Maintenance
USPS Bozeman MT
• •
SECTION 8 APPENDIX I
MAILING LIST OF ADJOINERS
C®TTIOM OOD ¢ IDA
RESPONSE& RESUBMITAL 11 11 JANUARY 2019
p it
COTTONWOOD & IDA PUD - NOTICING
DATE: October 17, 2018
l 1 r „k �♦ � ",
F7�
�Zr t `
. 1__ i• �' �,�•,� �" �
a t� �' 4
el, 4L
ak
i ti 1 e• � 1. � �� �4 �`
{' I'aw #Am I i lT
MAILING LIST MAP
Page 1
T H I N KTA N K D E S I G N th N.BLACK AVE BO.com lnfo@thinktankarchitects.com
5tan 406.587.3628
itects.com
• thinktankarchitects.c� info@thinktankarchitects.com
ri t
Contact Information
Property Address: Property Address:
516 E Tamarack St Bozeman, MT 59715 701 N Wallace Ave Bozeman, MT 59715
Owner: EMERALD TAMARACK LLC Owner: MADISON MARLYN SUE,HEDGLIN VALERIE
1627 W MAIN ST#248 ANN,PETERSEN DIANA LEE,DOWNING TRACEY LYNN
BOZEMAN,MT 59715-4011 220 SACAJAWEA PEAK DR
BOZEMAN,MT 59718-9392
Property Address:
716 N Church St Bozeman, MT 59715 Property Address:
Owner: EMERALD TAMARACK LLC 707 N Wallace Ave Bozeman, MT 59715
1627 W MAIN ST#248 Owner: WIESE DWIGHT R&JEANNE WESLEY
BOZEMAN,MT 59715-4011 707 N WALLACE AVE
BOZEMAN,MT 59715-3063
Property Address:
704 N Church St Bozeman, MT 59715 Property Address:
Owner: DOEHRING DANIEL J&ANNA 719 N Wallace Ave& Lot 2A, PLAT C-23-A32
704 N CHURCH AVE (behind) Bozeman, MT 59715
BOZEMAN,MT 59715-3054 Owner: OASIS PROPERTIES LLC
LEHRKIND MANSION BED&BREAKFAST
Property Address: 719 N WALLACE AVE
509 E Cottonwood St Bozeman, MT 59715 BOZEMAN,MT 59715-3063
Owner: MADISON MARLYN SUE,HEDGLIN VALERIE
ANN,PETERSEN DIANA LEE,DOWNING TRACEY LYNN Property Address:
220 SACAJAWEA PEAK DR 801 N Wallace Ave Bozeman, MT 59715
BOZEMAN,MT 59718-9392 Owner: SCALA PROPERTIES LLC
PO BOX 1137
Property Address: TRUSSVILLE,AL 35173-6100
513 E Cottonwood St Bozeman, MT 59715
Owner: BARBER STEVE Property Address:
513 E COTTONWOOD ST 803 N Wallace Ave Bozeman, MT 59715
BOZEMAN,MT 59715-3059 Owner: SCALA PROPERTIES LLC
PO BOX 1137
Property Address: TRUSSVILLE,AL 35173-6100
517 E Cottonwood St Bozeman, MT 59715
Owner: HERLANT ELLEN A Property Address:
517 E COTTONWOOD ST Non provided on Cadastral
BOZEMAN,MT 59715-3059 Legal Description:MINOR SUB 3, S06, T02 S,
R06 E, Lot 3, NOR PAC ADD BOZ AMND PLAT
C-23-A 18
Owner: SCALA PROPERTIES LLC
PO BOX 1137
Page 12
N.BLACK AVE BOZEMAN S 4 .THINKTANKDESIGN thinktankarchitects.com info@thinktankarchitects.com
[j td
TRUSSVILLE,AL 35173-6100 Property Address:
522 E Cottonwood St Ave Bozeman, MT 59715
Property Address: Owner: OSTERHOLM ERIK&WATERS SHANNON
Non provided on Cadastral 522 E COTTONWOOD ST
Legal Description:MINOR SUB 3, S06, T02 S, BOZEMAN,MT 59715-3060
R06 E, Lot 2, NOR PAC BOZ AMND PLAT
C-23-A18 Property Address:
Owner: SCALA PROPERTIES LLC 526 E Cottonwood St Ave Bozeman, MT 59715
PO BOX 1137 Owner: HANSEN DAVID&LEANNE TRUSTEES
TRUSSVILLE,AL 35173-6100 526 E COTTONWOOD ST
BOZEMAN,MT 59715-3060
Property Address:
502 E Cottonwood St Ave Bozeman, MT 59715 Property Address:
Owner: BRYAN VAN K&WALLIS MORGER 530 E Cottonwood St Ave Bozeman, MT 59715
21 W BABCOCK ST Owner: HERR STEVE&JEAN
BOZEMAN,MT 59715-4662 530 E COTTONWOOD ST
BOZEMAN,MT 59715-3060
Property Address:
506 E Cottonwood St Ave Bozeman, MT 59715 Property Address:
Owner: WOOD EDWARD A&SHANA D 611 N Wallace Ave Bozeman, MT 59715
506 E COTTONWOOD Owner: HUSTON STEVE
BOZEMAN,MT 59715 3551 CURTIS LN
MANHATTAN,MT 59741-8263
Property Address:
510 E Cottonwood St Ave Bozeman, MT 59715 Property Address:
Owner: DOYLE MARK 605 N Wallace Ave Bozeman, MT 59715
510 E COTTONWOOD ST Owner: GROTH FLORENCE J
BOZEMAN,MT 59715-3060 3300 E GRAF ST UNIT 24
BOZEMAN,MT 59715-7185
Property Address:
514 E Cottonwood St Ave Bozeman, MT 59715 Property Address:
Owner: NELSON PETER M®AN M 501 E Peach St Bozeman, MT 59715
514 E COTTONWOOD ST Owners: TRADES GUILD CONDO OWNERS
BOZEMAN,MT 59715-3060 ASSOCIATION
501 E PEACH ST UNIT D
Property Address: BOZEMAN,MT,59717
518 E Cottonwood St Ave Bozeman, MT 59715
Owner: DOMENECH JOSE M&ELIZABETH A Unit 1&A
518 E COTTONWOOD ST MT HOP DOGS LLC
BOZEMAN,MT 59715-3060 527 N Montana Ave
Bozeman,MT,59715
Page 3
N.BLACK AVE BOZEMAN A Stank 406.587.3628THINKTANKDESIGN thinktankarchitects.com lnfo@thinktankarchitects.com
F:jFtl
Unit 4 Property Address:
DAVIS JACK 629 E Peach St Bozeman, MT 59715
PO BOX 5077 Owner: 600 NORTH WALLACE AVENUE LLC
BOZEMAN,MT 59717-5077 217 INTERNATIONAL CIRCLE
HUNT VALLEY,MD 21030-1332
Unit 5,Unit D,Unit E
XREA LLC Property Address:
817 S 3RD AVE 621 E Peach St Bozeman, MT 59715
BOZEMAN,MT,59715 Owner: GILLAM CON K REVOCABLE TRUST
&GILLAM DAPHNE REVOC TRUST
Unit 6,7&Unit F PO BOX 937
JACKSON JOEL DEAN&JACKSON DEBBIE J BOZEMAN,MT 59771-0937
501 EAST PEACH SUITE F
BOZEMAN,MT 59715 Property Address:
627 E Peach St Bozeman, MT 59715
Unit 12 Owner: MEDIA STATION INC
DAVIS JACK M&SUSAN K 627 E PEACH ST
PO BOX 5077BOZEMAN,MT 59717-5077 BOZEMAN,MT 59715-3033
Unit B Property Address:
RADIANT ENGINEERING INC 630 E Cottonwood Ave Bozeman, MT 59715
501 E PEACH STREET,SUITE B Owner: RCAR LLC
BOZEMAN,MT 59715 PO BOX 161297
BIG SKY,MT 59716-1297
Unit G
MANGAS REGAN L Property Address:
5321 E GALLATIN RD 626 E Cottonwood Ave Bozeman, MT 59715
BELGRADE,MT 59714-8527 Owners: MILL STREET LOFT CONDOMINIUM
OWNERS ASSOCIATION,INC.
Unit H c/o Leah Belair,Registered Agent
EYORE LCC 626 E.COTTONWOOD AVE
PO BOX 6114 BOZEMAN,MT 59715
BOZEMAN,MT 59771-6114
Loft#1
Property Address: JOSEPH PFANKUCH
600 N Wallace Ave Bozeman, MT 59715 626 E COTTONWOOD RD UNIT 1 .1 `,
Owner: 600 NORTH WALLACE AVENUE LLC BOZEMAN MT 59715 JAN 28 LU iJ i !
c/o BUNTING MANAGEMENT V'-- %
217 INTERNATIONAL CIRCLE Loft#2 1-Cj0W-11jNllY
HUNT VALLEY,MD 21030-1332 LOFT DREAMS LLC
9999 BRIDGER CANYON RD
BOZEMAN,MT 59715-8606
Page 14
T H I N KTA N K D E S I G N 33 N.BLACK AVE BOZEMAN MONTANA 59715 406.587.3628
thin ktankarchitects.com info@thinktankarchitects.com
PALO ALTO,CA 94303-0995
Loft#3
626 COTTONWOOD LLC Property Address:
19 HOFFMAN DR 615 E Cottonwood Ave Bozeman, MT 59715
BOZEMAN MT 59715 Owner: BANGTAIL PARTNERS LLC
PO BOX 10195
Property Address: PALO ALTO,CA 94303-0995
620 E Cottonwood Ave Bozeman, MT 59715
Owner: BLOCK 106 PARTNERS INC Property Address:
618 N WALLACE AVE 529 N Ida Ave Bozeman, MT 59715
BOZEMAN,MT 59715-3042 Owner: SPEAKMAN MIKE
526 N 9TH AVE
Property Address: BOZEMAN,MT 59715-3332
618 N Wallace Ave Bozeman, MT 59715
Owner: POMEGRANATE LLC Property Address:
3919 RAIN ROPER DR 820 N Wallace Ave Bozeman, MT 59715
BOZEMAN,MT 59715-0632 Owner: WALLACE NORTH LLC
810 N WALLACE AVE UNIT B
Property Address: BOZEMAN,MT 59715-3020
624 N Wallace Ave Bozeman, MT 59715
Owner: WACKAMOLEY LLC Property Address:
3919 RAIN ROPER DR 802 N Wallace Ave Bozeman, MT 59715
BOZEMAN,MT 59715-0632 Owner: WALLACE NORTH LLC
810 N WALLACE AVE UNIT B
Property Address: BOZEMAN,MT 59715-3020
601 Cottonwood Ave Bozeman, MT 59715
Owner: THOMPSON SAMUEL S III&BEAM TRUSTEE, Property Address:
THOMPSON NATHANIEL L,THOMPSON SAMUEL S IV Non provided on Cadastral
712 E ASPEN ST Legal Description:NORTHERN PACIFIC ADD,
BOZEMAN,MT 59715-3002 S06, T02 S, R06 E, BLOCK 104, Lot 7— 16
Owner: REISTAD CORY S
3919 RAIN ROPER DR
Property Address: BOZEMAN,MT 59715-0632
724 N Wallace Ave Bozeman, MT 59715
Owner: NORTH WALLACE DESIGN GUILD LLC Property Address:
724 N WALLACE AVE STE 2 N Ida Ave Bozeman, MT 59715
BOZEMAN,MT 59715-3095 Legal Description: NORTHERN PACIFIC ADD,
S06, T02 S, R06 E, BLOCK 101, Lot 1 —3
Property Address: Owner: GIOVANINI TERRY LEE
720 N Ida Ave Bozeman, MT 59715 720 N IDA AVE
Owner: BANGTAIL PARTNERS LLC BOZEMAN,MT 59715-3022
PO BOX 10195
Page 15
33 N.BLACK AVE BOZEMAN MONTANA 59715 406.587.3628
T H I N K TA N K ® E S I G N• thinktankarchitects.com Info@thinktankarchitects.com
I it
Property Address:
705 E Cottonwood Ave Bozeman, MT 59715 Property Address:
Owner: BIG DOG REAL ESTATE LLC 725 E Cottonwood Ave Bozeman, MT 59715
8S CANVAS CT COS Owner: 777 LLC BOZEMAN
BOZEMAN,MT 59715-0675 PO BOX 13
BOZEMAN,MT 59771-0013
Property Address:
707 E Cottonwood Ave Bozeman, MT 59715 Property Address:
Owner: MATHEWS GREGORY Non provided on Cadastral
3261 HARRISON ST Legal Description:NORTHERN PACIFIC ADD,
SAN FRANCISCO,CA 94110-5212 S06, T02 S, R06 E, BLOCK 101, TRACT 1 PLAT
C-23-A27 BEING PART OF LOTS 9, 10 & E17'
Property Address: LOT 11 &VAC ST
713 E Cottonwood Ave Bozeman, MT 59715 Owner: SCHLEGEL MICHAEL J
Owner: MAGUIRE JOSEPH G 4 CANDLELIGHT DR
713 E COTTONWOOD ST BOZEMAN,MT 59718-7213
BOZEMAN,MT 59715-3013
Property Address:
Property Address: 720 FRONT ST Bozeman, MT 59715
717 E Cottonwood Ave Bozeman, MT 59715 Legal Description: NORTHERN PACIFIC ADD,
Owner: THOMPSON SAMUEL S&BEAM D S06, T02 S, R06 E, BLOCK 101, TRACT 5 PT
712 E ASPEN ST LOT 9,10& PT E 17' LOT 11
BOZEMAN,MT 59715-3002 Owner: PAVLIC ROBERT&VANDEGRIFT DARVIN
720 FRONT ST
Property Address: BOZEMAN,MT 59715-3067
712 E Aspen St Bozeman, MT 59715
Owner: THOMPSON SAMUEL S III&BEAM TRUSTEE, Property Address:
THOMPSON NATHANIEL L,THOMPSON SAMUEL S IV Non provided on Cadastral
712 E ASPEN ST Legal Description: NORTHERN PACIFIC ADD,
BOZEMAN,MT 59715-3002 S06, T02 S, R06 E, BLOCK 102, Lot 1 -3, PLAT
C-23
Property Address: Owner: CITY OF BOZEMAN
710 E Aspen St Bozeman, MT 59715 PO BOX 1230
Owner: FISH VICKI BOZEMAN,MT 59771-1230
710 E ASPEN ST
BOZEMAN,MT 59715-3002 Property Address:
Non provided on Cadastral
Property Address: Legal Description: NORTHERN PACIFIC ADD,
707 E Peach St Bozeman, MT 59715 S06, T02 S, R06 E, BLOCK 101, Lot 12— 13
Owner: BRONKEN Owner: CITY OF BOZEMAN
PO BOX 188 PO BOX 1230
BOZEMAN,MT 59771-01880 BOZEMAN,MT 59771-1230
Pagel 6
T H I N KTA N K D E S I G N th N.BLACK AVE BOZEMAN lnfo@t i Stan 4 itects. 628
com
thinktankarchitects.com info@thinktankarchitects.com
[Jit
Property Address: Property Address:
Non provided on Cadastral Non provided on Cadastral
Legal Description:NORTHERN PACIFIC ADD, Legal Description: NORTHERN PACIFIC ADD,
S06, T02 S, R06 E, PT LOT 8 TR A S06, T02 S, R06 E, ACRES 0.28508, TRACT
Owner: CITY OF BOZEMAN LYING ADJ BLOCKS 101 & 104, LEASE
PO BOX 1230 #500499
BOZEMAN,MT 59771-1230 Owner: MONTANA RAIL LINK INC,PROPERTY
MANAGEMENT MRL
&TREASURE STATE OIL COMPANY
PO BOX 16624
MISSOULA,MT 59808-6624
Page 7
T H I N K TA N K E S I G N 33 N.BLACK AVE BOZEMAN MONTANA 59715 406.587.3628
thinktankarchitects.c0 info@thinktankarchitects.com
• •
SECTION 8 APPENDIX J
PLANNING DEPARTMENT COMMUNICATIONS
RESPONSE& RESUBMITAL 11 11 JANUARY 2019
� 0Z E MAH MT
Community Development
FROM: DEVLOPMENT REVIEW COMMITTEE
RE: COTTONWOOD AND IDA CONCEPT PUD,APPLICATION 17547
DATE: JANUARY 5, 2018
Project Description: Concept Planned Unit Development (CPUD) application for a multi
building mixed use development.
Project Location: 615 E. Cottonwood/702 N. Ida
Recommendation: Not applicable to a CPUD application. Code provisions must be satisfied
with submittal of a formal application.
All references are to the Bozeman Municipal Code (BMC), primarily Chapter 38.
PLANNING COMMENTS
Planning Division, Brian Krueger, bkrueger0bozeman.net,406-582-2259
Code Provisions
1. The applicant shall submit with the next, formal application for Preliminary PUD Plan
review and approval, a written narrative stating how they have responded to each of
these comments. This narrative shall be in sufficient detail to direct the reviewer to the
appropriate plat, plan, sheet, note, covenant, etc. in the submittal.
2. The PUD must conform to the requirements of the Unified Development Code criteria. A
PUD is a discretionary approval and the review authority must find that the overall
development is superior to that offered by the basic existing zoning standards. See
Section 38.20.030.A.4, BMC. The obligation to show a superior outcome is the
responsibility of the applicant as conveyed by the PUD design guidelines.
3. What is the proposed future underlying legal lot configuration proposed? Individual
lots? One large lot? Condominium?
4. How do you proposed to phase the project with a parking structure underlying the
entire project site?
5. A site plan is required following PUD approval for each building. In the case of the
entire lot being occupied by a parking structure, it complicates the entitlement and
TDD: 406-582-2301 • THE MOST LIVABLE PLACE.
Page 2 of 7
COX
� `..V� � n� MT
Community Development
process for a project that would be constructed and occupied over time. We would have
to discuss the proposed phasing more before giving definitive direction on site plan
entitlement for construction.
6. How do you propose to provide private residential open space for the multi-household
residential uses on site per Section 38.27.020.E? Public access open space plazas cannot
be counted towards the private residential open space requirements for the residential
units.
7. The minimum required front yard setback staff would support on this project is ten feet
via a relaxation. A ten foot utility easement is required on all street frontages per
Section 38.23.060.
8. Staircases and other architectural elements may not encroach on the 10' front yard
utility easement per NorthWestern Energy comments.
9. The proposed apartment and apartment building uses must be identified as such and
not as an accessory residential use to M-1 uses. The apartments and apartment
buildings may be requested as a proposed use via a relaxation through the PUD. See
Section 38.14.020.B.2.b. The code refers to uses approved as part of a PUD as
conditional uses. The apartment use is requested as a conditional use/requested via a
relaxation through the PUD.
10.The maximum lot coverage in the HMU district may not exceed 40 percent for
principally residential use project. This project is a principally residential use project. If
the project exceeds 40% lot coverage a relaxation is required to be requested.
11.The proposed relaxation to utilize another zones parking table and have it apply to this
zone is not allowable by code. Unlike land uses, the code does not allow cross zone
utilization of standards. For the purposed of this PUD individual parking relaxations
must be requested for individual uses from table 38.25.040-3. E.g. If a 30% reduction is
requested for office uses, request a 30% reduction in the required parking for office.
Anticipate future nonresidential uses and propose reductions accordingly. List the
relaxations individually, by use in the preliminary PUD.
12. Section 38.23.120 requires a location for mail delivery. The USPS will require multiple
cluster box units for a project of this size. A street frontage location will be required
with a loading zone. A location for this must be coordinated with the USPS prior to
preliminary PUD submittal.
13. Consider providing significant secure covered bike parking.
14. Consider utilizing a greywater or roof drain water capture system for landscape
irrigation.
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
Page 3 of 7
nO)aOZENAHMT
Community Development
15. No on street parking may be eligible to be counted on North Ida Avenue as the right of
way is substandard at 45' in width. A final determination on this issue may be made
following confirmation of the final design of the full section of North Ida Avenue. The
right of way may not be large enough to accommodate drive lanes, pedestrian facilities
and on street parking on both sides of the street.
16. Provide draft development design guidelines with the preliminary PUD if phasing is
proposed.
17.The proposed design guidelines shall include a section which clearly indicates portions
that rely upon approval of the PUD, and identify a summary of items associated with
relaxations and PUD performance. The City of Bozeman will rely upon the overall
design standards required as part of the planned unit development application. The
design standards may not be altered without consent of the City.
18.The preliminary plan submittal shall identify the uses to be allowed in the
nonresidential spaces,both as proposed and for potential future allowed uses. Parking
must be analyzed based upon those uses.
19. Provide an exhibit with the preliminary PUD that demonstrates the connectivity
between each building and the proposed open spaces. There needs to be a system of
hard surfaces and ADA accessibility between each building and the open spaces. The
open spaces must be clearly delineated with the limits of each area, dimensions, and
whether they are proposed as private or public access. PUD open spaces must meet a
minimum of 23 landscape performance points.A PUD open space landscape plan is
required with the preliminary application.
20.The parking requires commensurate provision of ADA parking stalls. Design of such
stalls in the proposed parking structure does not appear to meet current building code.
Please consult with the Building Division to establish requirements for meeting
accessible space minimums for the project on the whole. For example, the residential
portion of the parking garage must also include ADA parking stalls for the residential
uses.
21.A notice prepared by the City shall be filed concurrently with the PUD so that it will
appear on title reports. It shall read substantially as follows: Lots within the
Cottonwood and Ida PUD are subject to specific design standards and restrictions on
use. These standards may be found in [insert correct reference to design standard
location]. Lot owners are advised that these are specific to Cottonwood and Ida PUD and
are in place of the general development standards of the City of Bozeman Zoning. If a
development standard is not specifically established in the Cottonwood and Ida PUD
approval documents the general standards of the City apply. Modification of the special
standards would require an amendment to the Cottonwood and Ida Planned Unit
Development. Modifications are strongly discouraged. It is the obligation of the lot
TDD: 406-582-2301 0 0 THE MOST LIVABLE PLACE.
Page 4 of 7 • •
MT
Community Development
owner to be fully informed as to these standards before beginning any home or site
design process.Approval by the design review entity established in the covenants of the
development does not bind the City of Bozeman to approve a construction plan.
22. Formal applications for preliminary plan must be submitted within one calendar year of
the date of the comment letter.
Advisory Comments
1. Next steps for the subject application review:
• Design Review Board (DRB) consideration of the CPUD per Sec.38.19.040. on
January 10, 2018
• Recreation and Parks Advisory Board consideration of the proposed cash in lieu of
parkland January 18, 2018.
2. Next steps following completion of this application review, including opportunities
highlighted for recommended concurrent review include:
• Complete lot line adjustment (once all parcels are under one ownership) to
aggregated all parcels into one lot.
• Prepare and submit a PPUD application that clearly outlines all relaxation requests,
provides draft guidelines and PUD performance point provisions, and incorporates
modifications responsive to CPUD feedback, among other PPUD criteria.
• Prepare and submit a FPUD with site plan review with CCOA. May request
concurrent construction for infrastructure improvements.
ENGINEERING COMMENTS
Engineering Division, Shawn Kohtz, P.E., skohtzC@bozeman.net.406-582-2288
1. The applicant must provide an estimate of sanitary sewer peak-hour flows from the
proposed project, so the City Engineering Division can verify downstream sewer
capacity for the proposed project.
2. The applicant must provide a traffic impact study with the preliminary PUD application.
3. The applicant must construct E.Aspen Street to a complete City local street standard
between N.Wallace Avenue and Ida Avenue.
4. The applicant must construct Ida Avenue to a complete City local street standard
between E. Aspen Street and E. Cottonwood Street. Additionally, the City's
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
Page 5 of 7
O- �7 L� Il"IJIr� H MT
Community Development
Transportation Master Plan indicates a requirement for a bike boulevard in Ida Avenue,
which must be incorporated in the street design.
5. The property owners' association will be required to maintain the proposed on-street,
angled parking along E. Cottonwood Street including snow plowing and maintenance of
the parking surfaces.
6. The applicant must clarify public infrastructure completion in the phasing plan.
7. The 6-inch clay sanitary sewer mains in E. Aspen Street and E. Cottonwood Street are
insufficient to accommodate sanitary sewer flows from the proposed project. The
applicant must upgrade the 6-inch sanitary sewer mains to a minimum 8-inch PVC main
from the manholes near the west property boundary to the locations on E.Aspen Street
and E. Cottonwood Street where the existing sewer mains increase to 10-inch mains
near Front Street.
8. The applicant proposed townhomes along Ida Avenue. However, there is not currently
a sanitary sewer main in Ida Avenue. The applicant proposed a single, sanitary sewer
service to connect the townhome complex on Ida Avenue to the sanitary sewer main in
E. Cottonwood Street. Building code does not allow this configuration for townhome
units. If the applicant keeps the townhome units in the design,the applicant must
construct a sanitary sewer main in Ida Avenue from the southern edge of the
townhomes and connect that main to the existing sanitary sewer main in E. Aspen
Street. Subsequently, the applicant must construct individual sanitary sewer services to
each townhome unit. A single sanitary sewer service may be constructed to serve an
apartment complex or a condo complex, but building code does not allow a single sewer
service to serve a townhome complex.
9. Bozeman Municipal Code (BMC) Section 38.23.030.A states: The developer shall
install complete drainage facilities in accordance with the requirements of the state
department of environmental quality and the city, and shall conform to any
applicable facilities plan and the terms of any approved site specific stormwater
control plan. The city's requirements are contained in the design standards and
specifications policy and the city modifications to state public works standard
specifications.
10.The applicant must define snow storage for snow plowed from the fire access lane and
the accesses to the courtyard. The fire access lane and the courtyard area must be
maintained to allow emergency responders to access these areas year-round. The
property owner's association will be required to provide the necessary maintenance.
P.O.20 East Olive Street :.
Bozeman, MT 59771-1230 406-582-2260
TDD: 406-582-2301 • • THE MOST LIVABLE PLACE,
Page 6 of 7 • •
051 Z E lvL/�M MT
Community Development
11.The applicant must develop solid waste collection locations and coordinate those plans
with the Solid Waste Superintendent (Kevin Handelin).
12.The applicant must abandon any existing, unused water services at the main per City
Water and Sewer Division requirements.
13.The applicant must abandon any existing, unused sanitary sewer services per City
Water and Sewer Division requirements.
14.The applicant must update the existing water meter installation upon renovation of the
existing building. The applicant must contact the City Backflow Prevention Specialist
(Jubal Whitlock) in the City Water and Sewer Division to inspect the existing water
meter installation and provide guidance to upgrade the installation.
15.The applicant is advised that a grease interceptor, conforming to the latest adopted
edition of the Uniform Plumbing Code must be installed with any development
responsible for food preparation.
16.The applicant must contact the City Engineering Division (Brian Heaston) for an
analysis of cash-in-lieu (CIL) of water rights and pay any CIL of water rights due prior to
site plan approval.
17.The applicant must analyze vision triangles through the project to ensure pedestrian,
bike, and vehicular safety.
18.The applicant must construct a City standard street light at the intersection of E.Aspen
Street and Ida Avenue.
ADDITIONAL DIVISION COMMENTS
Building Division; Bob Risk brisk@bozeman.net 406-582-2377
1. Building permit applications and plans for review are now submitted to the Building
Division electronically. To be sure that your plans are corrected formatted and
organized, please review the submittal information on our website,
http:/Zwww.bozeman.net/Departments/Fire/Building/Apply-for-Building-Permit or
contact our Permit Coordinator Ashley Koenig at 406-582-2371) for more information.
2. Handicap accessible parking required for all uses.An accessible path to an accessible
building entrance from all the parking areas must be provided.
3. Accessible pathways between all buildings is required.
Fire Department; Jack Coburn icoburn@bozenian.net 406-582-2386
1. The Fire Department needs access to the exterior of all buildings within the complex, i.e.
be able to fight fire from all sides of all buildings.
2. The Fire Department needs access to the Fire Department Connections for all fire
sprinklers and standpipes for the S-2 parking garage and all buildings.
20 East Olive Street P.O. Box 1230
TDD: 406-582-2301 THE MOST LIVABLE PLACE.
Page 7 of 7
Mo [E
% Z
o M
G=�1 H
M T
Community Development
3. There must be a fire hydrant within 100 feet of any dry standpipe connection.
Water Conservation; Jessica Ahlstrom jahlstrom@bozeman.net 406-582-2265
Stormwater Division; Kyle Mehrens jkmehrens@bozeman.net 406-582-2270
Water and Sewer Division; John Alston jalston@bozeman.net 406-582-3200
Forestry Division;Alex Nordquest; anordquest@bozeman.net 406-582-3205
1. Coordinate with the Forestry Division on tree pit design and tree species selection for
street trees. Special species selection is required for planting under power lines.
2. Provide sleeves/conduit for irrigation lines for all tree pits.
NorthWestern Energy; Cammy Dooley; cammy.dooley@northwestern.com
3. Overhead power lines may require additional building setback in order to provide
clearances.
4. A ten foot front yard utility easement is required on all street frontages. No stairway
encroachments will be permitted.
Parks and Recreation; Carolyn Poissant; cpoissant@bozeman.net 406-582-2908
Sustainability Division; Natalie Meyer nmeyer@bozeman.net 406-582-2317
Solid Waste Division; Kevin Handelin khandelin@bozeman.net 406-582-3238
1. A solid waste &recycling plan needs to be provided.
Future Impact Fees: Please note that future building permit applications will require
payment of the required transportation, water, sewer and fire impact fees according to the
City of Bozeman adopted impact fee schedule in place at the time of building permit
issuance. If you desire an estimate of the required impact fees according to current rates
please contact the Department of Community Development and/or visit
www.bozeman.net.
20 East OLive Street © ' 0
TDD: 406-582-2301 • • THE MOST LIVABLE PLACE.
Page 1 of 12
17547 Cottonwood and Ida Concept Planned Unit Development Staff
Report
Date: Design Review Board, January 10, 2018
Project Description: A concept planned unit development for a multi-building, mixed use
development.
Project Location: The site is located at 615 E. Cottonwood Street/702 N. Ida Avenue. The
legal description is Lots 5-28 plus vacated alley, Northern Pacific Addition, Section 6
Township 2S, Range 6E, PMM City of Bozeman, MT. The lots combined contain a total of
2.04 acres. The project is zoned HMU, Historic Mixed Use District. The project does not lie
within an Overlay District.
Recommendation: Provide comments on concept PUD
Report Date: January 4, 2018
Staff Contact: Brian Krueger, Development Review Manager
Executive Summary
The planned unit development (PUD) concept review is a pre-application review and
discussion with the City's Development Review Committee (DRC), Design Review
Board (DRB), other applicable advisory boards and the planning staff of the applicant's
proposal and any requirements, standards or policies that may apply. This step
represents an opportunity to identify any major problems that may exist and identify
solutions to those problems before formal application.
The property owner/applicant has made a PUD concept plan application for the
construction of a mixed use development on 2 acres bound by a future extension of
Aspen Street, Ida Avenue and East Cottonwood Street. The site is presently partially
developed with older light industrial buildings.
The PUD concept plan is for the development of a single phase project to construct an
underground parking structure on the majority of the property, with five buildings
placed on top of the parking podium and with one existing building to be renovated as
a community center/commons building. The uses are proposed as a mix of residential
(72%), office (22%), artisan manufacturing (4%), and the community building (2%).
This application is reviewed against the Unified Development Code plan review criteria
that apply to all site plan applications, conditional use permit criteria and the criteria
of the PUD chapter specific to the proposed nature of the PUD. If relaxations to the zoning
standards are requested with the PUD the review authority must find that the
17547 Cottonwood and Ida Concept PUD Staff Report Page 2 of 12
deviation will produce an environment, landscape quality and character superior to
that produced by the existing standards of this chapter, and which will be consistent
with the intent and purpose of this article, with the adopted goals of the city growth
policy and with any relevant adopted design objectives plan. The Design Objectives
Plan for the Entryway Corridors 2005 is the relevant adopted design objectives plan at
this time.
The Development Review Committee reviewed the application and provided comments
on the application (attached). The Design Review Board will consider the application
on January 10, 2018. The Board is required to provide a comments and
recommendations to the applicant as to whether the concept plan meets the City's
requirements, standards and policies.
TABLE OF CONTENTS
ExecutiveSummary............................................................................................................ 1
SECTION 1 - MAP SERIES ...........................................................:........................................ 3
SECTION 2 - REQUESTED RELAXATION/DEVIATIONS /VARIANCES.................... 5
SECTION 3 - STAFF ANALYSIS AND COMMENTS......................................................... 6
APPENDIX A—PUD INTENT STATEMENTS .................................................................. 10
APPENDIX B - PROJECT SITE ZONING AND GROWTH POLICY ............................... 11
APPENDIX C - OWNER INFORMATION AND REVIEWING STAFF............................ 12
ATTACHMENTS................................................................................................................... 12
• •
17547 Cottonwood and Ida Concept PUD Staff Report Page 3 of 12
SECTION 1 -MAP SERIES
i�}Y LUMBER ——r'��''�
DISTRIBUTOR "
s HISTORIC
TRAIN DEPOTi
7.71 .
Jt NORTHERN
- _ PACIFIC
o FORMER ` ' `'� - RAILWAY
TECH BREWERY ~`
OFFICES SITE
OFHCt & -" INDUSTRIAL
- STUDIOS �; -- - °�� POCKET'
PARK
t=-r_._
E.ASPEN ST-
w ;
.. ARTISAN
BED& MFR.
%BREAKFAST
haw
s .�'f✓ .- .. r�4: yr' ;�. 'Y ' J �. j' ARTISAN
SINGLE-FAMILY S� r `. SINGLE-FAMILY!f - MFR,`
RESIDENCES W. MILL �' RESIDENCES
E.COTTONWOOD Sl _ --
SINGLE-FAMILY
RESIDENCES ��> CAFE - 6 MULTI-FAMILY
w +) I RESIDENTIAL r,w fzz
F -BEER&WINE~~ -
.DISTRIBUTOR %=
OFFICES& BIKE " : OFFICES&
STUDIOS SHOP +' !f BAKERY STUDIOS '4
E.PEACH ST. TO
- ' SINGLE-FAMILY
j ( DOWNTOWN •` RESIDENCES, t �' r µ ti NORTH\
i
COMMERCIAL
{ h .y• BUS DEPOT
17547 Cottonwood and Ida Concept PUD Staff Report Page 4 of 12
PROPOSED USES
A VAR*MENT Bl _01NG
8 TCa,NHOLSE-STYLE APAOTMENT; f
C SROuN7 P'J0R ,RT SAM NIANUFA:[JRItJG SPACES ..
0 :?ENDATEJ E<IS 14 EJILING Y l
E PALIC OPEN SPAC E
F 7E Ct BYWING ` r
o �
• •
17547 Cottonwood and Ida Concept PUD Staff Report Page 5 of 12
EAST ASPEN STREET
@174T�ING xIm
APARTMENT
II fB�tIL6�FiG
r ROOF DECK
W y
I..
7
a ����',• •i SPAR Ef1i,. I �
O - O
2 ` 2
EAST COTTONWOOD STREET
SECTION 2 - REQUESTED RELAXATION I DEVIATIONS/ VARIANCES
a. Apartment building use in HMU. This is a proposed new conditional use in the HMU
district.
b. Reduction to front yard setbacks from 20' to10'.
c. Increase in allowable building height from 45' top 48'.
d. Reduced parking ratio for the residential uses: studio and efficiency units from 1.25
spaces per unit to one space per unit and a reduction in the ratio for one bedroom
units from 1.5 to 1.25 spaces per unit.
e. Reduced parking rations for nonresidential uses: reduction of 20% for office uses
and 30% reduction for artisan manufacturing and other commercial uses.
17547 Cottonwood and Ida Concept PUD Staff Report Page 6 of 12
SECTION 3 -STAFF ANALYSIS AND COMMENTS
The purpose of the Concept PUD is for discussion of the applicant's proposal with the
designated review committees in order to identify any requirements and applicable
standards and policies, as well as offering the applicant the opportunity to identify
major problems that may exist and identify solutions prior to making formal
application. Staff has evaluated the project and offers the following comments and
questions for the DRB's consideration.
Conformance to and consistency with the City's adopted growth policy
The project site has a future land use designation of industrial and a zoning designation
of NEHMU, Northeast Historic Mixed Use. This project proposes apartment buildings
within the NEHMU. While residential uses are allowed in HMU, they are only allowed as
accessory to another industrial principal use and configured as no more that 50% of the
gross area of a building.This project proposes apartment buildings. 93 dwelling units are
proposed. A PUD relaxation is required in order to grant the apartment building use.
The industrial land use designation description in the growth policy states "This
classification provides areas for the uses which support an urban environment such as
manufacturing, warehousing, and transportation hubs. Development within these areas
is intensive and is connected to significant transportation corridors. In order to protect
the economic base and necessary services represented by industrial uses, uses which
would be detrimentally impacted by industrial activities are discouraged. Although use
in these areas is intensive, these areas are part of the larger community and shall meet
basic standards for landscaping and other site design issues and be integrated with the
larger community. In some circumstances, uses other than those typically considered
industrial have been historically present in areas which were given an industrial
designation in this growth policy. Careful consideration must be given to public policies
to allow these mixed uses to coexist in harmony." If the PUD project were approved and
constructed, how would this alter the NEHMU district?Would future industrial uses ever
locate in the vicinity of this project?Will a significant increase in residential units create
future conflicts between the current industrial uses? It is arguable that the district
changes substantially if this project is constructed with a stronger likelihood that more
residential projects would follow and with an increase of conflicts between residential
uses and industrial uses.
The NEHMU zoning intent states "The unique qualities and nature of the area are not
found elsewhere in the city and should be preserved as a place offering additional
opportunities for creative integration of land uses. The intent of this area is to allow
private and case-by-case determination of the most appropriate use of land in a broad
range of both nonresidential and residential uses." Is this project a creative integration
of land uses or an inappropriate addition of new apartment building uses that were not
• •
17547 Cottonwood and Ida Concept PUD Staff Report Page 7 of 12
anticipated in this district? Will the unique qualities and nature of the area be
detrimentally impacted by the new apartment building uses?
The following goals and objectives from the Bozeman Community Plan are included for
discussion:
Goal LU-1: Create a sense of place that varies throughout the City, efficiently
provides public and private basic services and facilities in close proximity to where
people live and work,and minimizes sprawl.
The historic northeast mixed use district neighborhood has a distinct sense of place. Does
this project contribute to the existing and expanding sense of place in this neighborhood?
This is a developing urban center and this project would allow people to live in close
proximity to work, public and private basic services and minimizes sprawl.
Objective LU-1.4: Provide for and support infill development and redevelopment
which provides additional density of use while respecting the context of the
existing development which surrounds it. Respect for context does not
automatically prohibit difference in scale or design.
This project is infill development and is the redevelopment of an underutilized site that
provides additional density of housing and new office space.The NEHMU district has not
historically included significant amounts of office space or apartment buildings.
Traditionally offices were only included in buildings as accessory to other light industrial
uses.These buildings propose residential and office uses at a density not seen previously
in the district. Does this larger scale respect the context of the existing development
which surrounds it? Will the new uses respect the context of the existing development
around it?
Goal LU-2: Designate centers for commercial development rather than corridors to
encourage cohesive neighborhood development in conjunction with non-
motorized transportation options.
The project is not along a corridor. This project provides additional housing density and
allows residents to access services and recreation with non motorized transportation
options.
Objective LU-2.3: Encourage redevelopment and intensification, especially with
mixed uses, of brownfields and underutilized property within the City consistent
with the City's adopted standards.
This project includes mixed uses and is proposed on underutilized property.
Objective C-1.3: Support compatible infill within the existing area of the City rather
than developing land requiring expansion of the City's area.
17547 Cottonwood and Ida Concept PUD Staff Report Page 8 of 12
This project is compatible with the B-3 zoning district, the downtown neighborhood and
is an infill project within the City.
Objective C-5.2 Encourage the inclusion of plazas and other urban design features
as public areas within developments.
This project includes a public access plaza open space and integrates urban design
features into the public areas.
Objective H 1.1 - Encourage and support the creation of a broad range of housing
types in proximity to services and transportation options.
This project provides new apartment housing options for singles or couples that do not
exist in the NEHMU.The location is in proximity to services and transportation options.
Objective H2.2 -Support infill development and the preservation of existing
affordable housing and encourage the inclusion of additional affordable housing
in new infill developments.
This project proposes long term restricted affordable housing within an infill
development.
In staffs review, the single largest policy discussion regarding this PUD is around the
proposed character and the intensity of uses proposed within a relatively small area in
the NEHMU that has not been seen historically or anticipated through the current
zoning district regulations.
Performance Points:With a PUD, Section 38.20.090.E.2.a.7 requires at least 20
performance points for the subject property. Points can be met using any combination
of on-site and off-site open space or other options listed in the code. The Preliminary
PUD must specify how the performance points are being met.The concept plan
provides an inventory and small discussion of how the PUD performance requirements
are to be met onsite. The proposal is to utilize a variety of options to satisfy the PUD
performance requirement.
Development Guidelines: With a PUD, Section 38.20.070.D.2 BMC requires
development guidelines for all phased PUD's. This project is proposed as one phase, as
such development guidelines are not required, but each building will be required to be
submitted with full design and site plan level materials with the preliminary PUD or
subsequent with the final PUD plan review in order that building permits for all
portions of the development can be issued simultaneously. The alternative is to submit
a phasing plan and development guidelines.
Pedestrian and Bicycle Circulation: The pedestrian circulation system is a strong
element of the design. A hierarchy of types of circulation is provided and connections
are available both in the north/south and east/west orientations. Bicycle racks are
• •
17547 Cottonwood and Ida Concept PUD Staff Report Page 9 of 12
required and should covered, numbered and placed near key building entrances or
open spaces.
Automobile Connections: A two vehicular connections are provided from the primary
adjacent streets. Two accesses are proposed from East Aspen Street. One access is
proposed to the parking structure, with a second designated fire access along the west
property boundary. The DRC discussed the need to provide a stronger secondary
surface access to accommodate fire apparatus and sanitation trucks. The fire
department noted a need to have better access into the plaza space in order to access
the upper floors of the building during a fire event. The parking areas are entirely
subgrade. While the code requires a minimum site size of 30 acres in order to institute a
wayfinding district, smaller wayfinding signage is recommended for development of
this size.
Innovative Stormwater: The concept plan proposes performance points for low
impact development stormwater design that localizes the treatment and conveyance of
stormwater. This type of design is highly supported by staff. Opportunities exist to
collect roof water underground for surface landscape irrigation.
Landscaping: At the concept level,the application does not delineate in detail the
amount of landscape features that are intended. Overall, the landscape plan should
provide at least 23 performance points for landscape open space areas. The concept
plans shows a mixture of trees, turf, plaza landscaping areas. No surface stormwater
areas are shown. Common site furniture and outdoor plaza design should exhibit
commonalities of theme and design. Public art is recommended in all plaza areas and
near building entrances.
Lighting: As with landscape features and site furniture, lighting of open space and
major entrances into the development and individual buildings should implement a
common theme that supports the concept of this mixed use PUD. A hierarchy of lighting
types are recommended to direct pedestrians in the evening hours. A security lighting
plan should be developed to provide an adequate level of light after business hours
without lighting the entire development. LED lighting is highly recommended in all
areas.
Signage: Because this project contains multiple tenants,the Preliminary PUD should
include a comprehensive signage plan which is required by code. Signs should be an
integral part of the overall architectural design and should be part of the Development
Guidelines. A common signage program that specifies location, size, lighting, materials,
and unified graphic design for both shared and individual signs should be developed.
This project is proposed on a singular lot, the code allows a maximum of 250 for the
project.
17547 Cottonwood and Ida Concept PUD Staff Report Page 10 of 12
Public Areas and Plazas: Consideration should be given to identifying a general theme
for the central public outdoor plaza area(s) with landscape furniture, landscape
features, public art, and lighting.While the proposed open space plaza in the center of
the development is proposed as public it is unlikely to be used as such as designed. A
larger street presence for the plaza or other strategies to open it up to the public street
spaces in order for the plaza to be utilized as public access performance points.
Consideration should be given to shade structures/ elements within the outdoor areas.
Landscape features, outdoor furniture, lighting, seating areas, and outdoor vendor areas
should also be integral elements of these areas.
Building Design:. While a single project the initial building designs read as if the
project may have developed organically with each building.This is desirable in this
location as the neighborhood context is a diverse mixture of building sizes/types and
styles. The initial sketches demonstrate high quality design. The larger outstanding
question is whether the dense intensity of uses is in conflict with the environment
anticipated in the NEHMU zoning. The NEHMU district was adopted to reflect an
existing local community character and did not anticipate a development of this
intensity and size.
Service and Utility areas: The proposal does not provide adequate circulation for
deliveries, trash service, and outdoor storage. Depending on the overall mix of uses
that develop within the project, demands for services may vary substantially. Some
manufacturers and offices have a much higher demand for deliveries and services than
other low intensity uses. Thought should be given to a flexible approach to trash
enclosures and loading/delivery areas to service the development. Currently the
proposal does not address this element in a way that would satisfy the criteria for the
project.
APPENDIX A - PUD INTENT STATEMENTS
Sec. 38.20.010. Intent.
A. It is the intent of the city through the use of the planned unit development (PUD)
concept, to promote maximum flexibility and innovation in the development of land and
the design of development projects within the city. Specifically,with regard to the
improvement and protection of the public health, safety and general welfare, it shall be
the intent of this chapter to promote the city's pursuit of the following community
objectives:
1. To ensure that future growth and development occurring within the city is in accord
with the city's adopted growth policy, its specific elements, and its goals, objectives and
policies;
• •
17547 Cottonwood and Ida Concept PUD Staff Report Page 11 of 12
2. To allow opportunities for innovations in land development and redevelopment so
that greater opportunities for high quality housing, recreation, shopping and
employment may extend to all citizens of the city area;
3. To foster the safe, efficient and economic use of land and transportation and other
public facilities;
4. To ensure adequate provision of public services such as water, sewer, electricity,
open space and public parks;
S.To avoid inappropriate development of lands and to provide adequate drainage,
water quality and reduction of flood damage;
6.To encourage patterns of development which decrease automobile travel and
encourage trip consolidation, thereby reducing traffic congestion and degradation of
the existing air quality;
7.To promote the use of bicycles and walking as effective modes of transportation;
8.To reduce energy consumption and demand;
9. To minimize adverse environmental impacts of development and to protect special
features of the geography;
10. To improve the design, quality and character of new development;
11. To encourage development of vacant properties within developed areas;
12. To protect existing neighborhoods from the harmful encroachment of incompatible
developments;
13. To promote logical development patterns of residential, commercial, office and
industrial uses that will mutually benefit the developer,the neighborhood and the
community as a whole;
14. To promote the efficient use of land resources, full use of urban services, mixed
uses, transportation options, and detailed and human-scale design; and
15. To meet the purposes established in section 38.01.040 BMC (Intent of the Unified
Development Code).
APPENDIX B- PROJECT SITE ZONING AND GROWTH POLICY
Zoning Classification
The subject property is zoned "NEHMU" (Northeast Historic Mixed Use District). The
intent of the northeast historic mixed-use district is to provide recognition of an area
that has developed with a blend of uses not commonly seen under typical zoning
requirements. The unique qualities and nature of the area are not found elsewhere in
the city and should be preserved as a place offering additional opportunities for
17547 Cottonwood and Ida Concept PUD Staff Report Page 12 of 12
creative integration of land uses. The intent of this area is to allow private and case-by-
case determination of the most appropriate use of land in a broad range of both
nonresidential and residential uses. Standards for buffering between different land uses
are deliberately not as high as standards elsewhere in the community as it is assumed
that persons choosing to locate in this area are aware of the variety of possible adjacent
land uses and have accepted such possibilities as both acceptable and desirable. It is
expected that the lots within this district will continue to develop under a variety of
uses which may increase or decrease in scope in any given portion of the district. The
clear intent of this district is to support a mix and variety of nonresidential and
residential uses.
Adopted Growth Policy Designation
The property is designated as "Industrial" in the Bozeman Community Plan. This
classification provides areas for the uses which support an urban environment such as
manufacturing, warehousing, and transportation hubs. Development within these areas
is intensive and is connected to significant transportation corridors. In order to protect
the economic base and necessary services represented by industrial uses, uses which
would be detrimentally impacted by industrial activities are discouraged.Although use
in these areas is intensive, these areas are part of the larger community and shall meet
basic standards for landscaping and other site design issues and be integrated with the
larger community. In some circumstances, uses other than those typically considered
industrial have been historically present in areas which were given an industrial
designation in this growth policy. Careful consideration must be given to public policies
to allow these mixed uses to coexist in harmony.
APPENDIX C- OWNER INFORMATION AND REVIEWING STAFF
Owner: Bangtail Partners LLC PO Box 10195 Palo Alto CA 94303
Applicant: Imperial Development LLC 33 N. Black Avenue Bozeman, MT 59715
Representative: Thinktank Design Group Inc. 33 N. Black Avenue Bozeman, MT 59715
Report By: Brian Krueger, Development Review Manager
ATTACHMENTS
PUD Concept Plan
Development Review Committee Memorandum January 5, 2018
The full application and file of record can be viewed at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715.
t
SECTION 8 APPENDIX K
LEED DOCUMENTS
JA N r8t r
� dlJ
COMM OFJ•�J!
ur!yL)
'-LUPMENT
COTTOMWOOD ¢ 10A
RESPONSE& RESUBMITAL II 11 JANUARY 2019
LEED v4 for Neighborhood Development Plan
Report prepared by Kath Williams, LEED Fellow
January 15, 2019
Plans for Sustainable Neighborhoods can now be,registered and certified
under current LEED version 4. This replaces the older Neig.tiborhood
Development program where there was an option for "precertification.
Cottonwood & Ida
LEED-ND version 4 Project # TEMPND090
December 24, 2018 (confirmation attached)
Registration for LEED v4 ND Plan is available for neighborhood-scale
projects in any phase of planning and design with no more than 75% of
the project's total floor area constructed. The Version 4 adaptation helps
sustainable neighborhood projects market and find support for the project
among prospective tenants, financiers, and public officials by affirming
the project's intended sustainability strategies.
Once the project is fully entitled, the project will submit complete
documentation to Green Business Certification Institute (GBCI) for third-
party review. After the conventional LEED response to review comment
period, the project will pursue recognition as a LEED certified Plan. Once
the project is built, the project may pursue certification "as built."
Attached is the current LEED-ND scorecard which will grow and be adapted based on
upcoming decisions and changes to the Cottonwood & Ida Plan.
LEED v4 for Neighborhood Development Plan Project Name: Cottonwood+ Ida
Project Checklist Date: 1/16/2019
Yes ? No Yes ? No
10 0 181 Smart Location&Linkage 28 8 8_1 151 Green Infrastructure&Buildings 31
Y Prereq Smart Location Required Y Prereq Certified Green Building Required
Y Prereq Imperiled Species and Ecological Communities Required Y Prereq Minimum Building Energy Performance Required
Y Prereq Welland and Water Body Conservation Required Y Prereq Indoor Water Use Reduction Required
Y Prereq Agricultural Land Conservation Required Y Prereq Construction Activity Pollution Prevention Required
Y Prereq Floodplain Avoidance Required 5 Credit Certified Green Buildings 5
5 5 Credit Preferred Locations 10 2 Credit Optimize Building Energy Performance 2
2 Credit Brownfield Remediation 2 1 Credit Indoor Water Use Reduction 1
7 Credit Access to Quality Transit 7 2 Credit Outdoor Water Use Reduction 2 •
2 Credit Bicycle Facilities 2 1 Credit Building Reuse 1
3 Credit Housing and Jobs Proximity 3 2 Credit Historic Resource Preservation and Adaptive Reuse 2
1 Credit Steep Slope Protection 1 1 Credit Minimized Site Disturbance 1
1 Credit Site Design for Habitat or Welland and Water Body Conservation 1 4 Credit Rainwater Management 4
1 Credit Restoration of Habitat or Wetlands and Water Bodies 1 1 Credit Heat Island Reduction 1
1 Credit Long-Term Conservation Management of Habitat or Wetlands and Water 1 1 Credit Solar Orientation 1
Bodies
3 Credit Renewable Energy Production 3
201 4 1171 Neighborhood Pattern&Design 41 2 Credit District Healing and Cooling 2
Y Prereq Walkable Streets Required 2 Credit Infrastructure Energy Efficiency 1
Y Prereq Compact Development Required 1 Credit Wastewater Management 2
Y Prereq Connected and Open Community Required 1 Credit Recycled and Reused Infrastructure 1
2 4 3 Credit Walkable Streets 9 1 Credit Solid Waste Management 1
4 2 Credit Compact Development 6 1 Credit Light Pollution Reduction 1
2 2 Credit Mixed-Use Neighborhoods 4
5 2 Credit Housing Types and Affordability 7 0 5 l 1 1 Innovation&Design Process 6�
1 Credit Reduced Parking Footprint 1 5 Credit Innovation 5
2 Credit Connected and Open Community 2 1 Credit LEED°Accredited Professional 1 •
1 Credit Transit Facilities 1
1 ^1 Credit Transportation Demand Management 2 3 1 0 Regional Priority Credits 4
---- ------
1 Credit Access to Civic&Public Space 1 1 Credit Regional Priority Credit:Region Defined 1
1 Credit Access to Recreation Facilities 1 1 credit Regional Priority Credit:Region Defined 1
1 Credit Visitability,and Universal Design 1 1 Credit Regional Priority Credit:Region Defined 1
2 Credit Community Outreach and Involvement 2 1 Credit Regional Priority Credit:Region Defined 1
1 Credit Local Food Production 1
2 Credit Tree-Lined and Shaded Streetscapes 2 41 18 51 PROJECT T• 1
1 Credit Neighborhood Schools 1 Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points. Platinum: 80+points
SECTION 8 APPENDIX L
CONDOMINIUM DOCUMENTS
COTTONWOOD ¢ IDA
RESPONSE& RESUBMITAL II II JANUARY 2019
•
Return Recorded Document to:
Bangtail Partners,LLC
P.O.Box 10195
Palo Alto, CA 94303
DECLARATION
FOR THE
IDA AND COTTONWOOD CONDOMINIUM
THIS DECLARATION is hereby made and entered into this day of ,
2019, by BANGTAIL PARTNERS, LLC, a California Limited Liability Company, of P.O. Box
10195, Palo Alto, Ca 94303, hereinafter referred to as the "Declarant", whereby the real property
hereinafter described are submitted to the provisions of Chapter 23,Title 70,MCA, also known as
the"Unit Ownership Act" as a condominium.
The property subject to this Declaration shall be known as the IDA AND COTTONWOOD
CONDOMINIUM. The address of IDA AND COTTONWOOD CONDOMINIUM is
Bozeman, Montana, 59715.
NOW, THEREFORE,the Declarant hereby declares that the property subject to this
Declaration shall be.held, conveyed,mortgaged, encumbered, leastd,rented,used, occupied,
sold and improved subject to the Declaration's, limitations, covenants,conditions,restrictions
and easements contained in this Declaration, all of which are imposed as equitable servitudes
pursuant to a general plan for the development for the purpose of enhancing and protecting the
value and attractiveness of the property, and every part of it in accordance with the plan for the
improvement of the property and its division into condominiums. All of the limitations,
covenants, conditions, restrictions and easements shall constitute covenants that run with the land
and are binding upon, and inure to the benefit of, Declarant, the Association and all parties
having, or acquiring any right,title or interest in or to any part of the property.
This Condominium Declaration is established in accordance with the Montana Unit
Ownership Act. The Condominium development shall contain individual units for commercial
use, as set forth herein and in the Bylaws, each unit owner shall have an exclusive right to
his/her/its unit and shall have an undivided and inseparable right with other unit owners in the
common elements as set forth herein.
Page 1 of 40
I.
DEFINITIONS
Unless expressly provided otherwise,the following definitions shall pertain throughout this
Declaration and in the interpretation thereof:
1. Association or Association of Unit Owners.shall mean all of the Unit Owners acting
as a group and in accordance with duly adopted Bylaws and this Declaration.
2. Board or Board of Directors shall mean the Board of Directors of the Association
as more particularly defined in the Bylaws.
3. Building or Buildings shall mean the single unit buildings comprising a part of the
property,which may be further subdivided or subjected to further and additional
condominium regimes to include additional units as set forth further in this
Declaration.
4. Bylaws shall mean the Bylaws promulgated by the Association under this
Declaration and the Unit Ownership Act.
5. Common Elements shall mean both General Common Elements and Limited
Common Elements.
a. General Common Elements include all those elements which are for the use
of all Unit Owners, business invitees, and guests of Unit Owners of IDA
AND COTTONWOOD CONDOMINIUM. Specifically included are: The
foundations, columns, girders, beams, supports, exterior walls, roofs,
entrances, and exits of the Buildings; grounds surrounding the buildings,
(except those grounds appurtenant to or directly in front of a Unit which
shall be limited common elements and further described on Exhibit B),
driveways,the land on which the buildings are located,paths,sidewalks and
walkways,.storm water facilities, including but not limited to retention
ponds and , parking. areas not specifically allocated to a
particular Unit, (but not including the parking areas within the Parking
Garage Unit which are a limited common element as described below), any
irrigation system placed on the property for landscape,maintenance of trees
and vegetation, any portions of the Buildings designated on the floor plans
as common to all Units. All utilities including electrical (power), gas,
heating, telephone, hot and cold water and sewer lines (waste disposal),
refrigeration and air conditioning that serve all of the Units, landscaping,
plants and other materials and improvements separate from and outside of
the Building containing the Unit, and other common facilities in which all
of the Unit Owners own an allocated interest therein and in general all
Page 2 of 40
apparatus and installations existing for common use; all structures,
Common Elements and improvements for amenities, maintenance, storage
and other uses which are owned by the Association or for the use of all of
the owners, and other elements necessary for the safety, maintenance and
existence of IDA AND COTTONWOOD CONDOMINIUM in which each
Unit Owner shall have his designated percentage of interest, as set forth in
Section IV below. All exterior windows and monument signage for the
Buildings shall be considered General Common Elements. The General
Common Elements are further depicted on Exhibit B.
b. Limited Common Elements as used in this Declaration shall mean those
Common Elements which are reserved for the use of Unit Owners or any
subset thereof, or their business invitees, and guests, to the exclusion of
other Unit Owners of IDA AND COTTONWOOD CONDOMINIUM, or
their business invitees, and guests. As to any given Unit Owner(s), Limited
Common Elements shall mean the Common Elements which are located
within or axed to the Building containing the Unit in which the elements
are located or situated on the Condominium's real property. Specifically
included are: .
(i) flues, chimneys, ducts, cables, conduits, public utility lines,
water, sewer, electrical, gas, cable television lines, hot and
cold water pipes (all such utility pipes and lines that service
less than all Units,including connections of all types needed
to link General Common Elements to Limited Common
Elements, are Limited Common Elements; whereas those
serving all Units shall be General Common Elements),
balconies,entrances, stoops,furnaces,patios, decks,boilers,
hot water tanks, and fixtures, or other portions of the
Building servicing only a particular Unit or less than all of
the Units. The proportional percentage interest of the Units
in the Limited Common Elements shall be computed by
determining the number of Units that have use of the Limited
Common Elements and taking the percentage of interest of
each such Unit and dividing it by the total percentages of
interest of the Unit(s) making use of the particular Limited
Common Element. The Limited Common Elements are
further depicted on Exhibit B;
(ii) the first five(5)feet,located directly around each building as
shown on Exhibit B;
(iii) The Parking Garage and its elevator shall be a Limited
Common Element to Units 1, 2, 3, 4, 5 and Unit 6 shall not
use the Parking Garage;
(iv) The leased parking area (as depicted on Exhibit C) shall be
a Limited Common Element for Unit 6 only;
Page 3 of 40
(v) The garbage compactor and recycling area in Unit 1 shall be
a Limited Common. Element shared with Unit 2; The
garbage compactor and recycling area in Unit 4 shall be a
Limited Common Element with Unit 3;
(vi) The bike turning area, mailroom, rooftop and entryway of
Building 1 and walkway/bridge between Units 1 and 2 shall
be a Limited Common Element to Units 1 and 2.
6. Common expenses shall mean expenses of administration, maintenance, repair or
replacement of General Common Elements, expenses agreed upon as common by the
Association of all Unit Owners, and expenses declared common by the Unit Ownership
Act.
7. Declaration shall mean this document and all parts attached thereto or incorporated
by reference, and subsequent amendments thereto.
8. Declarant means BANGTAIL PARTNERS, LLC,the initial owner of the Property
and the entity that subjected the Property to the Unit Ownership Act.
9. Limited Expenses shall mean the expense attributable to the maintenance, repair
and replacement of Limited Common Elements, and are expenses only for owners of Units
within the respective Building for which the expenses are accrued.
10. Manager shall mean the Manager, the: Board of Directors, management,
corporation, or any other person or group of per retained or appointed by the
Association of Unit Owners for the purpose of conducting the day-to-day operations of
IDA AND COTTONWOOD CONDOMINIUM.
11. PropeM shall mean the land, buildings, improvements and structures thereon, and
all easements, rights and appurtenances belonging thereto, which are herewith submitted
to the provisions of the Unit Ownership Act.
12. Recording Officer shall mean the county officer charged with the duty of filing and
recording deeds, mortgages and all other instruments or documents relating to this
Declaration and the Property which is its subject.
13. Sub Units shall mean each Unit may be further subjected to additional
condominium regimes and may contain condominium Units of additional condominium
regimes. These additional condominium regime Units shall be referred to as "sub-units"
and those sub-units shall not be considered Units in IDA AND COTTONWOOD
CONDOMINIUMS,but rather shall be a part or portion of an IDA AND COTTONWOOD
CONDOMINIUMS Unit.
14. Unit shall be the separate Condominium,Units of IDA AND COTTONWOOD
CONDOMINIUM and is a parcel of real property intended for any type of independent
use, and with a direct exit to a public street or highway or to a common area, limited
.1„
Page 4 of 40
common area, or areas leading to a public street or highway; at present, each Building on
the Property constitutes one Unit.
15. Unit Desi ation shall mean the combination of letters, numbers, or words which
identifies each designated Unit separately.
16. Unit Owner or Owner(s) shall mean the person or persons owning a fee simple
absolute,or one who is a co-owner in any real estate tenancy relationship that is recognized
under the laws of the State of Montana, in one or more Units of IDA AND
COTTONWOOD CONDOMINIUM.
17. Voting Interest shall mean the vote of the Unit Owners based on their respective
percentile interest of ownership of the common elements as set forth in Section IV unless
otherwise set forth herein.
II.
REAL ESTATE
Description
The Property which is by this Declaration submitted and subject to the Montana
Unit Ownership Act is described in Exhibit"A"attached thereto.
The Condominium shall consist of six (6) separate Units designated as Units 1, 2,
3, 4, 5 and 6. Each Unit is currently its own Building. The Declarant reserves the right to
create Sub-Units in the future should Declarant so choose by subjecting a Unit to an
additional Condominium regime. The common element includes an Underground Parking
Garage and a Leased Parking Area.
The provisions of this Declaration and the Bylaws shall be construed to be
covenants running with the land, and shall include every Unit and shall be binding upon
all Unit Owners,their heirs, successors,personal representatives and assigns for as long as
this IDA AND COTTONWOOD CONDOMINIUM Declaration and Bylaws are in effect.
Condominium Units
Each Unit, together with the appurtenant undivided interest in the Common
Elements of IDA AND COTTONWOOD CONDOMINIUM shall together comprise one
Condominium Unit, shall be inseparable, and may be conveyed, leased, rented, devised or
encumbered as a Condominium Unit. The Units comprising the Condominium shall be
located in six (6) separate Buildings with each Building being its own separate Unit.
Any balcony or deck which is accessible from,associated with or joins a Unit shall,
without further reference hereto be a Limited Common Element to that Unit.
Page 5 of 40
Encroachments
If any portion of the General Common Elements or Limited Common Elements
encroaches upon a Unit or Units, a valid easement for the encroachment and for the
maintenance of the same, so long as it stands, shall'and does exist. If any portion of Unit
encroaches upon the General Common Elements,'or Limited Common Elements, or upon
an adjoining Unit or Units, a valid easement for the encroachment and for the maintenance
of the same, so long as it stands, shall and does exist. Such encroachments and easements
shall not be considered or determined to be encumbrances either on the General Common
Elements, Limited Common Elements, or on the Units for the purpose of marketability of
title.
During the construction of the Building(s) any encroachment easement over the
Common Elements is reserved and granted unto the Declarant, its contractors, agents,
employees, successors and assigns and utility companies for movement and temporary
storage of equipment,machinery, construction materials and parking for workers.
Parkin Areas
There are three (3) separate types of Parking Areas:
i
(i) Underground Parking Garage. The underground parking garage is
located under Units 1, 2 and 6 and shall be a Limited Common
Element for Units 1, 2, 3, 4 and 5. Unit 6 shall not use the
Underground Parking Garage, and shall rather use street parking
areas or the Leased Parking.Area(as defined below). The rules and
regulations for the use of the Underground Parking Garage shall be
established by Units 1, 2, 3, 4 and 5. The Underground Parking
Garage is further depicted on-Exhibit D.
(ii) Leased Parking Area. The Leased Parking Area is located at
and is further depicted on Exhibit C,and shall be for the
exclusive use of Unit 6 and shall be a Limited Common Element of
Unit 6. Unit 6 shall establish the rules and regulations regarding the
use of the Leased Parking Area.
(iii) Street Parking and other unassigned Parking Areas. Any Unit
Owner may park on the adjoining streets in accordance with all
parking regulations established by the City of Bozeman.
Creation of Sub-Units
While there will initially be six(6)Units comprising the IDA AND COTTONWOOD
CONDOMINIUM each Unit shall itself be made'up of several Sub-Units, which will be
submitted to their own additional condominium regime within the Unit. Any such
subsequent Sub-Unit created will be encumbered with the terms, conditions, restrictions
Page 6 of 40
and provisions contained and set forth in this Declaration and these Bylaws and shall for
all intent and purposes hereunder be considered a part of the Unit. Declaration and Bylaws
for any additional condominium regime shall not conflict with this Declaration or the
Bylaws for IDA AND COTTONWOOD CONDOMINIUM. In event of a conflict, this
document shall govern.
All Owners and purchasers, their heirs, successors, assigns and mortgagees consent
that the Units may be further subject to additional condominium regimes and divided into
Sub-Units as set further above by the Owners of such Units,their successors or assigns. In
this regard, all Owners,purchasers, their heirs, successors, assigns and mortgagees of any
Unit or interest in and to the condominiums created hereunder agree to and do hereby
appoint said Owners of such Units or that Owner's successor, assign or designee as having
a power of attorney to effectuate the creation of such'Sub-Units in so far as may be required
to amend this Declaration and agree to the Amendment of this Declaration as may be
needed to reflect changes in the site plan and floor plans of a Unit upon the creation of an
additional condominium regime within that Unit and the resulting Sub-Units.
Any change made to the right and ability of a Unit Owner to subject their Unit to
additional condominium regimes and create Sub-Units as set forth above must receive
100% approval vote from all the Unit Owners.
Unit Boundaries
Each Unit shall include the entire Building constructed on that portion of the
Property depicted as such Unit as shown on the Site Plan, including any exterior walls of
such Building and anything attached thereto.
III.
EASEMENT, COMMON ELEMENT—INTERIOR REMODELING
Common Element Easements
A nonexclusive right of ingress,egress and support through the Limited Common Elements
is appurtenant to each Unit, and all of the General Common Elements are subject to such rights.
Except as otherwise limited in this Declaration, each Unit Owner shall have the right to use the
Common Elements for all purposes incident to the use of, and occupancy of, the Unit and such
other incidental uses permitted by this Declaration, which rights shall be appurtenant to and run
with the whole Unit.
Easement for Utilities
A non-exclusive easement shall exist through, over and across each Unit for inspection,
installation, maintenance, replacement and repair of such utility lines and mechanical equipment
for the use of all of the Unit Owners. Such inspection, installation, maintenance, replacement or
repair of such easement rights shall only be done under the direction and approval and with the
Page 7 of 40
i
authority of the Association and/or the Manager unless an emergency exists in which event any
action may reasonably be taken which is justified under the circumstances to minimize damage
which would otherwise occur as a consequence of such emergency. Such lines and/or equipment
shall be so installed,maintained,inspected,replaced and repaired in a manner such that it does not
unreasonably interfere with or interrupt the use of the Unit by the Owner of the same. The
Declarant reserves the right at any time during the development of the Condominium or during the
creation of any Sub-Units to grant easements for utilities,including but not limited to power, gas
and electric, cable TV and other communications and computer facilities over, under and across
the Condominium project to appropriate governmental agencies or public utility companies. Any
such easement may be conveyed by Declarant without the consent of any Unit Owner, Mortgagee
or other person and shall be evidenced by an appropriate amendment to this Declaration. All of
the Unit Owners and Mortgagees of Units and other persons interested or to become interested, in
the condominium from time to time shall be deemed to have irrevocably and unanimously
consented to such amendment of this Declaration as may be required to effectuate the foregoing
grant of easement. i
Easement for Maintenance.Repair and Replacement
The Declarant,the Association and all public or private utilities shall have easements over,
under, across and through the condominium and Property, including all Units and Common
Elements, as may be necessary to fulfill any responsibilities of maintenance, repair, replacement,
or construction which they, or any of them, are required or permitted to perform under this
Declaration or by law. These easements include without any implication of limitation,the right of
the Association to obtain access at all times to meters, controls, valves, pipes, conduits and other
Common Elements located within or to gain access through any Unit or its appurtenant Limited
Common Elements. Such easements shall not unreasonably interfere with or interrupt a Unit
Owner's quiet enjoyment of his, her or its Unit.
If the Property Owner's Association fails to install or maintain improvements according to
plans approved by the City of Bozeman, the City may, at its option, complete construction or
improvements and/or maintain improvements. The City's representative, contractors and
engineers shall have the right to enter upon the property and perform such work, and the
Association must permit and secure any additional costs associated with the installation or
maintenance of improvements. The cost of the City to maintain may become a lien against both
the Common Elements and the Units in the same way that the Association has the right to lien a
Unit Owner for failure to pay its assessments.
Interior Remodeling, Exterior Maintenance and Repair
Each Unit Owner shall have the exclusive right to paint, repaint, tile, wax, paper, panel,
carpet, brick or otherwise maintain, refinish and decorate the inner surfaces of the walls, ceilings,
and floors bounding his own Unit, and the interior thereof, so long as such owner does not affect
the structural integrity of the Building in which his Unit is located. Each Unit Owner shall have
the right to decorate the surface of its exterior windows and exterior doors so long as it complies
with the City of Bozeman Sign code and the Unit Owner obtains prior written approval of the
Association,which shall not be unreasonably withheld.
i
Page 8 of 40
Each Unit shall maintain, repair and replace the exterior and roof of its Unit and other
Limited and General Common Elements as necessary. If a Unit fails to maintain their Unit, the
Association may do so on behalf of the Unit after having first sent a written notice to the Unit
Owner stating the repair/maintenance needed and providing the Unit Owner fails to do so after
notice,the Association may perform the repair/maintenance and charge the same,plus 10%to the
non-complying Unit Owner. The Unit Owner shall first receive written approval from the
Association prior to any remodel or change in the exterior of the Building or other Limited
Common Elements.
IV.
OWNERSHIP AND VOTING—EXHIBITS—USE
Percentage of Interest
Each Unit Owner shall be entitled to the exclusive ownership, use and possession of his
Unit. Additionally, each Unit Owner shall have a percentage of undivided interest in the General
Common Elements of IDA AND COTTONWOOD CONDOMINIUM. Such percentage
represents his ownership interest in the General Common Elements, his liability for Common
Expenses, and his voting interest in all matters concerning the Association of Unit Owners and
this Declaration. The percentage of interest in the General Common Elements for the respective
owners shall be computed by taking the Building square footage of each Unit as set forth below
and dividing it by the total Building square footage of all the Units having an interest in the General
Common Elements of IDA AND COTTONWOOD CONDOMINIUM. Such percentage of
interest owned by each of the initial Units of the Building in IDA AND COTTONWOOD
CONDOMINIUM shall be according to the percentages set forth below:
PERCENTAGE OF
BUILDING INTEREST IN
UNIT SQUARE GENERAL COMMON
NO. FOOTAGE ELEMENTS
1 39,882 32.176%
2 10,592 8.545%
3 15,879 12.811%
4 26,385 21.287%
5 2,175 1.755%
6 29,037 23.426%
Total 123,950 100%
Page 9 of 40
All Unit Owners and purchasers acknowledge that while initially there has been
constructed six(6)Buildings containing six (6) separate Units that the initial percentages set forth
are based upon, that at such time as construction is completed, that the percentages of ownership
of Common Elements and voting interest may change to adjust to the exact as built square footages
upon completion.
All Unit Owners and purchasers,their heirs, successors and assigns agree and consent that
the real property described on Exhibit A shall be developed with the construction of the Units by
Declarant or Declarant's successors or assigns. In this regard, all Owners,mortgagees,purchasers
and their heirs, successors and assigns of any Unit or interest into the Condominium created
hereunder agree to and do hereby appoint the Declarant or Declarant's successors, assigns or
designee as having a Power of Attorney to effectuate the development of this Property, including
filing any supplemental Declarations required to adjust the Percentage of Interest in the General
Common Elements to reflect the actual square footages once each Unit is built, or as may be
necessary to create Sub-Units.
The above Agreement shall be a covenant running with the land and shall be binding upon
the Unit Owners of the then existing Units who upon acquiring titles to such Units by this covenant
agree and consent to the filing of such Amendment and by this covenant agree to and consent to
the appointment of the Declarant as their attorney in fact so that the Declarant may in its discretion
simply file the Amendment on its own initiative having been herein given the power and authority
to make such Amendments for and on behalf of all subsequent Unit Owners in the Condominium.
After the recording of such Supplement all Unit Owners shall have a non-exclusive right
and license,subject to the provisions herein to use and enjoy all of the General Common Elements
created by such Supplement. In addition, the Unit Owners shall further have the non-exclusive
right and license to use and enjoy the Limited Common Elements which are appurtenant to and
part of their respective Units which may be added to the Condominium regime which are limited
to the use of less than all of the Unit Owners.
Except as otherwise specifically provided in this Declaration or in Supplemental
Declarations, all of the provisions,terms and definitions herein contained shall,upon recording of
the same,be deemed expanded to include the additional Sub-Units.
Floor Plans and Exhibits
IDA AND COTTONWOOD CONDOMINIUM will consist of six (6) Buildings located
on the Property described in Exhibit "A" which shall contain a total of six (6) separate Units as
shown on the proposed site plans. For identification and descriptive purposes, the following
Exhibits are attached and by reference hereto incorporated into and made a part of this Declaration:
Exhibit A: Legal Description.
Exhibit B: Description of Common Elements
Exhibit C: Leased Parking Area
Exhibit D: Underground Parking Garage
Page 10 of 40
Exhibit E: Site Plan showing the proposed location of the Buildings containing IDA AND
COTTONWOOD CONDOMINIUM Units on the Property.
Exhibit F: showing the floor plans which include elevations, area, dimension, and
designation for each Unit of IDA AND COTTONWOOD CONDOMINIUM. The floor
plans attached hereto are subject to change upon completion of construction of each Unit
as more specifically described below.
Exhibit G: showing the Architect's Certificate.
Exhibit H: showing the Certificate of Name.
Exhibit P showing Storm Water Maintenance Plan
Supplemental Plans and Certificate Following_Construction
Each Unit Owner must construct and locate his or her Building within the area designated
for that particular Unit on the Site Plan. Within thirty (30) days upon completion of the
construction of the Building containing the Unit or from the date of the first occupancy of the Unit,
whichever occurs first, the Unit Owner shall file a supplement to this Declaration as to that Unit
only and setting forth the following information:
a. Final floor plans as to such Unit;
b. A certificate executed by an architect,land surveyor or engineer certifying that the final
floor plans fully and accurately depict the layout of the Unit and the improvements in
the Building as constructed and the date that the construction of such Unit and Building
was completed; and
c. A description of the Building and the materials of which it is constructed;
The Owner of the Unit need not obtain the consent of any other Unit Owner or mortgagee
when recording a Supplemental Declaration as to his or her Unit, however, the Supplemental
Declaration may not alter the boundaries of any other Unit, the General Common Elements, or
make any other substantive change to this Declaration without a duly executed Amendment to this
Declaration as herein provided.
Construction of Unit/Building
The Unit Owner constructing his or her Building and Unit shall give all notices and comply
with all laws, ordinances, rules, regulations, and lawful orders of any public authority having
jurisdiction. When constructing his or her Unit, the Unit Owner shall fully comply with this
Declaration,any duly adopted rules and regulations of the Association,and other applicable private
covenants and restrictions. The Unit Owner shall be responsible for all safety precautions in
connection with the construction of the Unit. Prior to commencement of construction, the Unit
Owner shall obtain all building permits, other permits, licenses, inspections and government
approvals necessary for construction. The Unit Owner shall insure that the area of construction is
cleaned up on a daily basis,including all construction generated debris,drink cans,food wrappers,
and/or other trash.
To the fullest extent permitted by law, the Unit Owner undertaking construction of his or
her Unit shall indemnify, defend and hold harmless the Association, other Unit Owners and their
Page l l of 40
representatives, owners, employees, members, managers and agents from all claims, losses,
damages and expenses, including attorney's fees arising out of or resulting from the construction
of the indemnifying Unit Owner's Unit and Building.
During periods of construction of a Unit,the Association may assign and designate certain
portions of the General Common Elements as construction staging areas for such Unit. Such
assignment shall be fair and non-discriminatory. The Unit Owner shall limit any construction
materials to the site of the Unit as asset forth on the Site Plan and any designated construction
staging area of the general Common Elements as assigned by the Association.
The Unit Owner undertaking construction will keep the Common Elements free and clear
of any and all construction liens. In the event the Unit Owner should allow any lien or
encumbrance of any type or nature to be placed upon the Common Elements,and in the event such
Unit Owner should fail, refuse, or neglect to discharge, satisfy, pay and/or remove any such lien
or encumbrance from the Common Elements within thirty(30) days of the filing of the same, the
Association may, at the Association's option, elect to pay, discharge, satisfy, and/or remove any
said lien or encumbrances, and in the event the Association elects to exercise the Association's
option to pay, discharge, satisfy, and/or remove any such lien or encumbrance, any amount of
monies paid by the Association in connection with the payment and satisfaction of any lien or
Encumbrance shall be due and payable immediately from the Unit Owner to the Association and
any such sums shall bear interest at the rate of ten percent(10%)per annum until paid in full and
such unpaid amount shall be considered an assessment against the Unit and shall be the basis for
the Association filing an assessment lien against the Unit. The Association's remedy to pay,
discharge, satisfy, and/or remove any lien or encumbrances placed upon the Common Elements
thirty (30) days after the notice of filing in the same is not exclusive, and the Association may
exercise any and all remedies available under this Declaration and/or at law or in equity, the cost
of which, including reasonable attorney's fees, shall be ch-_atgeable to the Unit Owner.
Storm Water Maintenance Plan
Attached hereto as Exhibit I is the Storm Water Maintenance Plan that is binding upon the
Condominium. The Association shall follow and adhere to such plan.
Construction Materials
The proposed principal materials of construction of the Units are concrete for the
foundations, footings, and slabs. Framing materials shall include structural steel columns and
beams, wood beams and dimensional lumber,wood trusses, and wood structural panels(plywood
or OSB). Siding and exterior finishes shall include brick, metal panels, and various manufactured
cementitious siding products. Interior common area finishes may consist of solid wood or
manufactured wood trims, carpet, tile, drywall and paint, acoustical ceiling tiles and/or or others.
Roof materials will consist of asphalt shingles on typical sloped roofs and rubber membrane
roofing on flat or low slope roof sections. Upon completion of each Unit, if the construction
material Varied from what is described herein,the Unit Owner shall include in its Supplement,the
building material for that Unit.
Page 12 of 40
1
1
Subdivision Provisions: Additional Condominium Regimes and Sub-Units
The Owner of each Unit shall have the right to file an additional Condominium Declaration
pursuant to the terms of the Montana Unit Ownership Act; Title 70, Section 23, Montana Code
Annotated in order to.subdivide his or her Unit and create an additional condominium regime
within such Unit. Such right, however, shall be subject to the Unit Owner's obligation to obtain
all necessary approvals and permits from the City of Bozeman and any other legal entity with
jurisdiction thereof. The rights and interest of any additional condominium regime Unit Owner
shall be subject to the terms and conditions of this Declaration and the additional Condominium
Declaration. Upon the creation of-a within a Unit, the voting interest and all other rights of such
Unit provided hereunder shall thereafter be exercised and controlled by the Unit Owners
Association of such additional condominium regime and all references set forth herein to "Unit
Owner" shall be deemed to apply to the Unit Owners Association of such additional condominium
regime.
Use
The use of Units 1, 2 and 3 in IDA AND COTTONWOOD CONDOMINIUM shall be
residential use only. The use of Unit 6 shall be commercial only. The use of Unit 4 shall be mixed,
with the first floor consisting of mixed residential and commercial uses and all other floors shall
be residential. Unit 5 shall be commercial. Nothing shall prohibit a Unit Owner from leasing or
renting his Unit to third persons or holding it out for lease`oi rental,or entering into an Agreement
or contract with others for the lease or rental of his Unit.The use of the General Common Areas
shall be for the use of the Unit Owners, their guests, tenants, lessees, employees and business
invitees. The Units and common elements shall be limited as follows:
a. No automobile fuel sales or repair shall be allowed.
b. No tattoo parlors, marijuana dispensaries (medical or otherwise), vape shops, and
laundromats.
C. There shall be no obstruction of the Common Elements,nor shall anything be stored
in or on the Common Elements without the prior written consent of the Association.
Each Owner shall be obligated to maintain and keep in good order and repair the
interior of their Unit.
d. Nothing shall be done or kept in any Unit or in the Common Elements which will
increase the rate of insurance on the Building or contents thereof, without the prior
written consent of the Association. No owner shall permit anything to be done or
kept in their Unit or in the Common Elements which will result in the cancellation
of insurance on the Building,or contents thereof,or which would be in violation of
any law. No waste will be permitted on the Common Elements.
e. Except for appropriate signs, as discussed under Article III above and
Miscellaneous below, Unit Owners shall not cause or permit anything to be hung
or displayed on the outside of windows or placed on the outside walls or roof of a
building, and no awning, canopy,radio, satellite dish or television antenna shall be
Page 13 of 40
affixed to or placed upon the exterior walls or roof of any part thereof, without the
prior written consent of the Association. Further all signs must meet the provisions
of the City of Bozeman Sign Code. : i
f. No nuisances shall be allowed upon the Property nor shall any use or practice be
allowed which is a source of annoyance to the Unit Owners or which interferes with
the peaceful possession and proper use"of the Property by its residents. No
offensive or unlawful use shall be made of the Property nor any part thereof, and
all valid laws,zoning ordinances and regulations of all governmental bodies having
jurisdiction thereof shall be observed.
g. Nothing shall be done in any Unit or in, on or to the Common Elements which will
impair the structural integrity of the Building or which would structurally change
the Building, except as is otherwise provided herein.
h. No animals of any kind shall be raised, bred, or kept in any individual residential
unit located within a Unit, except as allowed by each Unit or sub-association and
as established by each Units or Sub Unit Association's rules and regulations. The
Association may make rules and regulations from time to time should each Unit or
sub-association fail to properly manage animals upon the Common or Limited
Common Elements. All dogs must be kept on a leash while on the Property.
Additionally, Unit Owners, their tenants, and any guests, shall be responsible for
the immediate clean-up of any pet waste and the repair of any damage caused by
pets to any of the General Common Elements or Limited Common.Elements. Any
pet which bites another animal or a human'lupon the premises shall be immediately
and permanently removed unless it can be shown by clear and convincing evidence,
as determine by the Board, that the animal was unreasonably provoked into such
action. For purposes of the foregoing sentence, any animal which is restrained in
some reasonable fashion but is approached by another animal or human shall be
presumed to be the non-aggressor. Failure to timely remove the pet(s) can result in
a fine not to exceed$50.00 per day for each day the pet remains on the Property or
in the Unit, which fine shall become part of the assessments for that Unit. Failure
to immediately pick up after a Unit Owner's animal or an animal belonging to a
tenant of the Unit on the common area swill result in a$50.00 fine for each offense,
which shall also become a part of the assessment for the Unit,regardless of whether
the offending animal is owned by the Unit:Owner or by a tenant of the Unit or any
portion thereof. Failure of an Owner to adhere to pet regulations and requirements
shall be grounds for the Association and other Unit Owners to maintain a nuisance
action to remove the offending pet(s). The Association shall have the authority to
ban certain breeds of dogs or individual dogs from IDA AND COTTONWOOD
CONDOMINIUM, provided that such actions are based upon objective criteria
related to aggressive tendencies of the breed or individual dogs. In the event that
an Owner leases his or her Unit to a person who has pets, the Owner of the Unit
shall be responsible for the enforcement of the pet restrictions and rules, and any
fines imposed shall be a charge against the,Unit, for which the Association may
obtain satisfaction in the same manner as-if the Unit Owner failed to pay an
assessment imposed against the Unit. The.Association shall have the right to file a
lien against the Unit and shall have the right to foreclose said lien in the same
manner as provided herein.
Page 14 of 40
i. Nothing shall be altered or constructed in or removed from the Common Elements,
and no easements, liens or encumbrances placed on the Common Elements, except
upon the written consent of one hundred percent (100%) of the Unit Owners
affected by such action.
j. Unit 1 shall have a trash compactor and recycling located inside the Building,which
it shall share with Unit 2. Unit 4 shall have:a trash compactor and recycling in its
Building, which it will share with Unit 3. Units 5 and 6 shall each have their own
trash compactors and recycling areas located inside their Buildings.
k. Campers, trailers, boats and other recreational vehicles may only be brought onto
the Property or onto any street bordering the Property for loading and unloading for
immediate use. No inoperable vehicles, -and no campers, boats, recreational
vehicles, or trailers, shall be left parked in the condominium parking areas or
underground garage parking area or on any street bordering the condominium
Property for more than two(2)hours at one time. Repeated parking of such vehicles
or trailers is also prohibited. No one may reside in any recreational vehicles,
trailers, or motor homes upon the Property. Violators of this paragraph are subject
to towing and fines levied by the Board in the Board's discretion.
1. Canvassing, solicitation and peddling the Condominium property is prohibited and
Unit Owners shall report and otherwise cooperate to prevent the same. .
in. No building or structure shall be occupied or open for business until the exterior is
completed and the interior of the space open to the public as completed. All
applicable government agencies, inspections and permits shall be obtained and
followed prior to occupancy.
n. All zoning, land use regulations and all other laws, rules and regulations of any
government or agency under whose jurisdiction the land lies are considered to be
part of and enforceable hereunder,and all of the Owners of said land shall be bound
by such laws, rules and regulations. In the event there is a conflict between the
covenants and the applicable zoning, the most restrictive provision of either the
covenants or the zoning shall control.
o. No repair nor maintenance of vehicles is to be done in the Parking Garage or Leased
Parking Area.
Exclusive Ownership
M
Each Owner shall be entitled to exclusive ownership and possession of their Unit. Such
Owners may use the General and Limited Common Elements in accordance with the purposes for
which they are intended and as they may otherwise agree between themselves, so long as they do
not hinder or encroach upon the lawful rights of other Unit Owners.
V.
i
THE ASSOCIATION
Membership
Page 15 of 40
An Owner of a Unit in IDA AND COTTONWOOD CONDOMINIUM shall automatically,
upon becoming the Owner of said Unit, be a member of the Unit Owners Association (or
Association), and shall remain a member of said Association until such time as his membership in
said Association shall automatically cease. The membership shall be limited to Unit Owners as
defined in this Declaration. The Association may not be voluntarily dissolved without the
permission of the commissioners for the City of Bozeman.
Function
It shall be the function of the Association to:
a. Adopt Bylaws for the governance of the Association.
i
b. Make provisions for the general management and/or repairs and maintenance of
IDA AND COTTONWOOD'CONDOMINIUM.
C. Levy assessments as provided for in the Declaration, Bylaws and Unit Ownership
Act.
d. Adopt and implement policies,rules and regulations necessary or desirable for
managing the Association's affairs.
e. Enter into contracts or hire personnel for the management of the affairs of the
Association including the maintenance and repair of common areas.
Voting
On all matters,unless excluded by this Declaration,to be decided by the Association, each
Unit Owner shall have a vote equal to his or her percentage of interest in the General Common
Elements. Multiple owners of a single condominium Unit shall collectively have such voting
interest. In the event that a "sub-condominium" is declared for any Unit, such Unit's voting
interest shall be exercised by the Association of Unit Owners for such condominium.
An Owner of a condominium Unit, upon becoming an Owner, shall be a member of the
Association and remain a member for the period of his or her Unit ownership. Except as otherwise
provided in the Unit Ownership Act, this Declaration or. the Bylaws, a majority of the Unit
ownership percentage present at any meeting or by proxy shall be sufficient to act on matters
brought before the Unit Owners. Meetings of the Unit Owners shall only be conducted when a
quorum is present, as defined in the Association Bylaws.
Failure to Comply
Each Owner shall comply strictly with the provisions of this Declaration, the Bylaws of
the Association, and the rules, regulations, decisions and resolutions of the Association adopted
pursuant thereto as the same may be lawfully amended from time to time. Failure to comply with
any of the same shall be grounds for an action to recover sums due,for damages or injunctive relief
Page 16 of 40
or both, and for reimbursement of all costs, including attorney fees incurred in connection
therewith, which action shall be maintainable by the Manager in the name of the Association, on
behalf of the Owner, or in the proper case, by an aggrieved"Owner.
Enforcement
The Association through its Board shall have the power to impose reasonable fines for
violation of any duty imposed under the Declaration, Bylaws or any rules and regulations duly
adopted hereunder;provided,however,nothing herein shall authorize the Association or the Board
of Directors to limit ingress and egress to or from a Unit or to suspend an Owner's right to vote
due to nonpayment of assessments. In the event that any occupant of a Unit violates the
Declaration, Bylaws or a rule or regulation and a fine is imposed, the fine shall first be assessed
against the occupant;provided,however,that if the fine is-not paid by the occupant within the time
period set by the Board,the Owner shall pay the fine upon notice from the Association. The failure
of the Board to enforce any provision of the Declaration, Bylaws or any rule or regulation shall
not be deemed a waiver of the right of the Board to do so thereafter.
(a) Notice. Prior to imposition of any sanction, the Board or its delegate shall serve the
alleged violator with written notice describing (i) the nature of the alleged violation,
(ii)the proposed sanction imposed, (iii) a period of not less than 10 days within which
the alleged violator may present a written request to the Board of Directors for s
hearing; and(iv) a statement that the proposed sanction shall be imposed as contained
in the notice unless a challenge is begun within 10 days of the notice. If a timely
challenge is not made, the sanction statCd in the notice shall be imposed.
(b) Hearing. If a hearing is requested in a timely manner,the Board shall conduct a hearing
affording the alleged violator a reasonable opportunity to be heard. Prior to the
effectiveness of any sanction hereunder, proof of proper notice shall be placed in the
minutes of the meeting. Such proof shall be deemed adequate if a copy of the notice,
together with a statement of the date and manner of delivery, is entered by the officer,
Director or agent who delivered such notice. The notice requirement shall be deemed
satisfied if the alleged violator appears at the meeting. The minutes of the meeting
shall contain a written statement of the results of the hearing and the sanction, if any,
imposed. The Board of Directors may, but shall not be obligated to, suspend any
proposed sanction if the violation is cured within the 10 day period. Such suspension
shall not constitute a waiver of the right to sanction future violations of the same or
other provisions and rules by any person.
(c) Additional Enforcement Rights. Notwithstanding anything to the contrary herein
contained,the Association, acting through the.Board of Directors,may elect to enforce
any provision of the Declaration, the Bylaws or the rules and regulations of the
Association by self-help (specifically including, but not limited to, the towing of
vehicles that are in violation of parking rules:and regulations) or by suite at law or in
equity to enjoin any violation or to recovery monetary damages or both without the
necessity of compliance with the procedure set forth above. In any such action, to the
maximum extent permissible, the Owner or occupant responsible for the violation of
Page 17 of 40
1
which abatement is sought shall pay all costs actually incurred, including reasonable
attorney's fees.
Payment of Assessments
All assessments shall be due thirty(30)days from the date such assessment is placed in the
mail following the meeting during which assessments are levied by the Association, and may be
payable in monthly installments. The amount of the Common Expenses assessed against each
Unit, and the amount of Limited Common Expenses assessed against each Unit, shall be the
personal and individual debt of the Owner thereof. No Owner may exempt himself from liability
for this contribution toward the common and the Limited Expenses by waiver of the use of
enjoyment of any of the General Common Elements or Limited Common Elements or by
abandonment of his Unit. All assessments which are not paid within thirty(30)days from the date
they are due and payable become delinquent and are subject to any penalty that may be established
in the Bylaws for the purpose and the maximum interest charges permitted by law. The
Association or Manager shall have the responsibility of taking prompt action to collect any unpaid
assessment which becomes delinquent. In the event of delinquency in the payment of the
assessment, the Unit Owner shall be obligated to pay interest at the statutory rate provided for
under Montana law on the amount of the assessment from the due date thereof, together with all
expenses, including attorney fees incurred, together with such penalties as are provided in the
Bylaws of the Association. Suit to recover a money judgment for unpaid Common Expenses and
Limited Expenses may be maintainable without foreclosing or waiving the lien securing the same.
In the event that an additional condominium regime is declared for a Unit as herein
provided, the Association of Unit Owners for such additional condominium regime shall be
responsible for paying all assessments levied against the Unit and shall be considered the Unit
Owner for such purpose. The Association shall retain the right to file a lien against any or all of
the sub-association condominium units in the event that the Association of Unit Owners for such
sub-condominium fails to make timely payment of its assessment.
Leyying Assessments—When Made—Purposes
The Association of Unit Owners shall levy assessments upon the Unit Owners in the
following manner and for the following reasons:
a. Assessments shall be made as a part of the regular business of the Association at
any regular or special meeting thereof as provided in the Bylaws of the Association.
Notice of the assessment and the purpose for which it is made whether regular or
special, shall be served on all Unit Owners. affected by delivering a copy of the
same to the Owner personally or by mailing a copy of the notice to the Owners at
their addresses of record at least ten (10) days prior to the date for such meeting.
An Owner may request notice be sent by email by providing such request to the
Association and providing an email address..
Page 18 of 40
b. Assessments shall be made for the repair, replacement, general maintenance,
management and administration of Common Elements, fees,costs and expenses of
the Manager, taxes for common areas 1 insurance and for the Unit Owner's
percentage share of any Special Improvement District Assessments. Assessments
shall be based upon and computed by using the percentage of interest that each Unit
Owner has in the General Common Elements, unless, however the tax-exempt
status of a Unit Owner requires the re-allocation of real property taxes assessed
against the Common Elements of the Condominium in another matter to account
for this tax-exempt status.
C. Assessments may also be made for the payment of Limited Common Element
expenses such that the Unit Owners are chargeable only for the expenses relating
to their respective units. Unit Owners shall share in the payment for Limited
Expenses for the repair, maintenance and replacement of Limited Common
Elements for which the assessment is being made. If only one Unit is associated
with the Limited Common Elements involved, then the entire cost of such repair,
maintenance or replacement shall be borne by that Unit.
d. Assessments may also be made for any purpose contemplated by this Declaration
and for any purposes set out in the Montana Unit Ownership Act.
e. Common expenses and profits, if any, of the Condominiums shall be distributed
and charged to, the Unit Owners according to the percentage of undivided interest
of each in the General Common Elements.
f In a voluntary conveyance of a Unit, the Grantee of the Unit shall be jointly and
severally liable with the Grantor for all unpaid assessments by the Association
against the latter for his share of the Common Expenses up to the time of the grant
or conveyance,without prejudice to the Grantee's right to recover from the Grantor
the amount paid by the Grantee therefor. However, any such Grantee shall be
entitled to a statement from the or Board of Directors of the Association,as the case
may be, setting forth the amount of said unpaid assessments against the Grantor
due the Association and such Grantee shall not be liable for, nor shall the Unit
conveyed be subject to a lien for, any unpaid assessments made by the Association
against the Grantor in excess of the amount therein set forth.
g. The monthly assessment for Common Expenses shall be fixed by the Board and
shall be based upon the estimate of the actual cost thereof, excluding therefrom any
estimated amount for contingencies, reserves or sinking funds. Each Unit Owner
shall pay its pro rata share of monthly assessments for Common Expenses based
upon its Percentage of Interest as defined in Article IV;provided,however,that for
Units owned by Declarant and for which the interior construction is incomplete and
the Unit is unoccupied, charges for garbage, sewer and water shall be excluded
from the monthly assessments levied against said Unit(s). Such exclusion shall not
apply to Units for which the interior construction is complete, and which are
temporarily vacant.
Page 19 of 40
The Board may also create a reserve budget, into which reserve assessments shall be
deposited. If made,reserve assessments shall not apply to Units owned by Declarant for
which the interior construction is incomplete until September 1, 2024. After September
1, 2024 reserve assessments shall apply to all Units,regardless of completion.
VI.
DECLARANT'S RIGHT TO CHANGE
The Declarant reserves the right to change the interior design and arrangement of all Units,
and alter the boundaries between Units, so long as the Declarant owns the Units so altered. No
such change shall increase the number of Units or alter the boundary of the General Common
Elements without an amendment of this Declaration.
Until the Building and the shell for one hundred percent(100%) of all Units, including the
expansion, have been built, Declarant reserves the right to establish easements, reservations,
exceptions and exclusions consistent with the Condominium project and this Declaration, as may
be needed to facilitate the expansion.
Notwithstanding any other provisions expressly or impliedly to the contrary contained in
this Declaration,the Articles of Incorporation or Bylaws of the Association,Declarant reserves the
right to appoint three(3) of the members of the initial Board of Directors of the Association, who
shall serve until the first annual meeting of the members of the Association,at which time one (1)
of their successors shall be elected by the members. Declarant reserves the right to then appoint
two (2) members of the Board of Directors until the date on which 75% of the Units have been
occupied or transferred by Declarant to a third party or until September 1,2024,whichever occurs
first.
V11.
AMENDMENT
Amendment of this Declaration shall be made in the following manner:
At any regular or special meeting of the Association of Unit Owners,such amendment may
be proposed as a resolution by any Unit Owner, the Board or Manager. Upon adoption of the
resolution by majority of a those present,the amendment shall be made a subject for consideration
at the next succeeding meeting of the Association with notice thereof, together with a copy of the
amendment,to be furnished to each Owner no later than ten.(10) days in advance of such meeting.
At such meeting, the amendment shall be approved upon jeceiving the favorable vote of seventy-
five percent (75%) of the total percentage vote of all of the Unit Owners. If so approved, it shall
be the responsibility of the Association or its delegate to file the amendment with the Clerk and
Recorder's Office of Gallatin County, Montana.
Page 20 of 40
• I •
Notwithstanding the procedure set forth above,the Declarant may amend this Declaration,
or any other project document, prior to any sale or lease of a Unit or interest thereof, and reserves
the right at any time to file any supplements necessary to add the Building Expansion in to the
Condominium Declaration as further described in Section IV by filing a Supplement hereto
without the requirement of holding a meeting.
Further, Declarant or its successors or assigns may file a Supplemental Declaration upon
completion of each Building or upon the creation of Sub:Units.
VIII.
MAINTENANCE, CHANGES,REPAIRS AND LIENS
Alterations by Unit Owners Association
The interior plan of a Unit may be changed by the Owner. The boundaries between Units
may be changed only by the Owners of the Units affected. No Units may be subdivided without
the approval of seventy-five percent (75%) of the total percentage vote of all of the Unit Owners
and compliance with all laws, rules and regulations relating to the same. No change in the
boundaries of Units shall encroach upon the boundaries of the Common Elements.
Boundary walls must be equal in quality of design and construction to the existing
boundary walls. A change in the boundaries between Units shall be set forth in an amendment to
this Declaration. In addition to compliance with the provisions of Paragraph VII above, such
amendment must further set forth and contain plans for the Units concerned showing the Units
after the change in boundaries, which plans shall be drawn by an architect licensed to practice in
Montana, and attached to the amendment as exhibits, together with the certificate of architect or
engineer required by the Unit Ownership Act. Such 'an amendment shall be signed and
acknowledged by the Owners of the Units concerned, as well as those Owners with an interest in
any common element affected. The amendment shall also be approved by the Board of Directors
of the Association, and signed and acknowledge by all lienors and mortgagees of the Units
concerned. Any change in the exterior boundary of a Unit mus= be approved by the City of
Bozeman.
Maintenance by Unit Owners
Each Owner shall maintain and keep in repair the interior and exterior of his own Unit,
including the fixtures thereof. All fixtures and equipment installed in the Unit, commencing at a
point where the utilities enter the Unit,shall be maintained and kept in repair by the Owner thereof.
An Owner shall do no act nor any work that will impair the structural soundness or integrity of the
Building or impair any easement.
Each Owner shall also keep any entrance area appurtenant to his Unit in a clean and sanitary
condition. The right of each Owner to repair,alter,and remodel the interior of their Unit is coupled
with the obligation to replace any finishing or other materials removed with similar type or kinds
of materials. All exterior window replacement shall be by the same manufacturer with similar
Page 21 of 40
quality, shade and design and done by the Association. No act or alteration, repairing or
remodeling by any Unit Owner shall impair in any way the integrity of the adjoining Units or the
integrity of Limited Common Elements or General Common Elements.
Exterior Alterations
No Owner may change, alter or remodel the exterior of his Unit without the prior written
approval of the Association.
Snow Removal and Open Space Maintenance
Each Unit shall be responsible for snow removal pursuant to City policy from the sidewalks
adjacent to the common areas. The snow removal contractor will also ensure that the inlets and
outlets to the storm water detention basins are unobstructed. The Association shall be responsible
for snow removal from Common Area walkways and Parking Areas.
The Association shall be responsible for following,the regular maintenance program for
Common areas, including but not limited to the following:
The Association, shall also retain a contractor to maintain the open space as healthy, clean
and well kept. Any grass and/or trees located in the common open space shall be trimmed as
needed and any law sprinkler system shall be kept in working order. Common Area pathways
shall be maintained by the Association and kept and maintained in a safe condition. Any Common
Area lighting must be kept in working order by the Association. The Association shall be
responsible for following the storm water maintenance plan shown on Exhibit . These
responsibilities shall be the responsibility of the Declarant until such rights and responsibilities are
turned over to the Association.
Liens for Alterations
Labor performed and materials furnished and incorporated into a Unit with the consent of
or at the request of the Unit Owner, his agent,his contractor or subcontractor shall be the basis for
the filing of a lien against the Unit or the Unit Owner consenting to or requesting the same. Each
Unit Owner shall indemnify and hold harmless each of the other Owners from and against all
liability arising from the claim of any lien against the Unit or any other Owner or against the
General or Limited Common Elements for construction performed or for labor,materials, services
or other products incorporated in the Owner's Unit at such Owner's request.
Liens and Foreclosures
All sums assessed but unpaid for the share of general Common Expenses and Limited
Common Expenses chargeable to any Unit shall constitute a lien on such Unit superior to all other
liens and encumbrances, except only for tax and special assessment liens on the Unit in favor of
any assessing authority, and all sums unpaid on a first mortgage, a first trust indenture, or contract
for deed, of record. To evidence such lien, the Association shall prepare a written notice of lien
Page 22 of 40
assessment setting forth the amount of such unpaid indebtedness, the amount of accrued interest
and late charges thereon, the name of the Unit Owner, and a description of the Unit. Such notice
shall be signed and verified by one of the officers of the Association or by the Manager, or his
authorized agent, and shall be recorded in the office of the Clerk and Recorder of Gallatin County,
Montana. Such lien shall be attached from the date of recording such notice. Such lien may be
enforced by the foreclosure of the defaulting Owner's Unit by the Association as provided in the
Unit Ownership Act in like manner as foreclosure of a mortgage on real property. In any
foreclosure,the Unit Owner shall be required to pay a reasonable rental for the Unit,if so provided-
in the Bylaws, and the plaintiff in such foreclosure action shall be entitled to the appointment of a
receiver to collect the same. Suit to recover a money judgment for unpaid Common Expenses
shall be maintainable without foreclosure or waiving tho -lien securing the same. In any such
proceeding the Owner may be required to pay the costs, expenses and attorney's fees incurred in
filing a lien, and in the event of foreclosure proceedings, additional costs, expenses and attorney's
fees incurred.
If a lien becomes effective against two or more Units,the owner of each Unit subject to the
lien has the right to have the Owner's Unit released from the lien by payment of the amount of the
lien attributable to the Owner's Unit.The amount of the lien attributable to a Unit and the payment
required to satisfy a lien, in the absence of agreement, must be determined by application of the
percentage established herein. A partial payment, satisfaction, or discharge may not prevent the
lienor from proceeding to enforce the lienor's rights against any Unit and the undivided interest in
the common element pertaining to a Unit not released by a payment, satisfaction, or discharge.
Biddiniz at Foreclosure
The Association shall have the power to bid on the Unit at a foreclosure or other legal sale,
and to acquire and hold, lease, mortgage and vote the votes appurtenant to, convey or otherwise
deal with the same. Any lienholder holding a lien on a Unit may pay, but shall not be required to
pay, any unpaid General Common Expenses, or Limited Common Expenses payable with respect
to any such Unit, and upon such payment such lienholder shall have a lien on said Unit for the
amount paid of the same priority as the lien of his encumbrance without the necessity of having to
file a notice or claim of such lien.
IX.
INSURANCE
Purchase
All insurance policies upon IDA AND COTTONWOOD CONDOMINIUM Property shall
be purchased by the Association and shall be issued by an insurance company authorized to do
business in Montana.
a. Named Insured: The named insured shall be the Association individually and as
agent for the Unit Owners without naming them. Such policies shall provide that
payments for losses thereunder by the insurer shall be paid to the insurance Trustee
Page 23 of 40
hereinafter designated,and all policies and endorsements thereon shall be deposited
with the insurance Trustee. Unit Owners may obtain insurance coverage, at their
own expense, upon their own personal property and for their personal liability and
living expense.
b. Copies to Mortgagees: One copy of each insurance policy and of all endorsements
thereon shall be furnished by the Association to each mortgagee of a Unit Owner
on request.
Coverage
a. Casualty: All buildings and improvements upon the land shall be insured in an
amount equal to the maximum insurable ,replacement value, and all personal
property included in the Common Elements shall be fully insured, with all such
insurance to be based on current replacement value, as determined annually by the
Board of Directors, but subject to such deductible clauses as are required in order
to obtain coverage at reasonable costs. ;'Such coverage shall afford protection
against:
(1) Loss or damage by fire and other hazards covered by a standard extended
coverage endorsement; and
(2) Such other risks as from time to time shall be customarily covered with
respect to buildings similar in construction,location and use as the buildings
on the land,including,but not limited to,vandalism and malicious mischief.
(3) Errors or Omissions Insurance for the Directors, Officers and Managers if
the Association so desires, in amounts to be determined by the Board.
The policies shall state whether roof tope equipment, air handling or service
equipment should be included or excluded. Each Unit's interior fixtures,finishes and floor
coverings shall not be included within the Association's insurance. It shall be the
responsibility of each Unit Owner to insure these items under their own insurance.
b. Public Liability: In such amounts and with such coverage as shall be required by
the Board of Directors of the Association; including, but not limited to, hired
automobile and non-owned automobile coverage, if applicable, and with cross-
liability endorsement to cover liabilities of the Unit Owners as a group to a Unit
Owner.
C. Other Insurance: Such other insurance as the Board of Directors of the Association
shall determine from time to time to be desirable and as may be required by the
Federal and State laws.
Premiums
Page 24 of 40
Premiums for insurance policies purchased by the Association shall be paid by the
Association as a common expense, except that the amount of increase in the premium occasioned
by use, misuse, occupancy or abandonment of a Unit or:its appurtenances or of the Common
Elements by a Unit Owner shall be assessed against the Owner. Not less than Ten(10) days prior
to the date when a premium is due,evidence of such payment shall be furnished by the Association
to each mortgagee listed in the roster of mortgagees.
Insurance Trustee
All insurance policies purchased by the Association shall be for the benefit of the
Association and the Unit Owners and their mortgagees as their interests may appear, and shall
provide that all proceeds covering Property losses shall be paid to such bank in Montana with trust
powers as may be designated as insurance trustee by the Board of Directors of the Association,
which trustee is herein referred to as the insurance trustee. The insurance trustee shall not be liable
for payment of premiums, nor for the renewal or the sufficiency of policies,nor for the failure to
collect any insurance proceeds. The duty of the insurance trustee shall be to receive such proceeds
as are paid and hold the same in trust for the purposes elsewhere stated in this instrument and for
the benefit of the Unit Owners, and their mortgagees in the following shares, but which shares
need not be set forth on the records of the insurance trustee:
a. Unit Owners—An undivided share for each Unit Owner,such share being the same
as the undivided share in the Common Elements appurtenant to his Unit.
b. Mortgagees — In the event a mortgagee endorsement has been issues as to a Unit,
the share of the Unit Owner shall be held in trust for the mortgagee and the Unit
Owner as their interests may appear; provided, however, that no mortgagee shall
have any right to determine or participate in the determination as to whether or not
any damaged property shall be reconstructed or repaired, and no mortgagee shall
have any right to apply or have applied to the reduction of a mortgage debt any
insurance proceeds except distributions thereof made to the Unit Owner and
mortgagee pursuant to the provision of this Declaration.
Distribution of Proceeds
Proceeds of insurance policies received by the insurance trustee shall be distributed to or
for the benefit of the beneficial Owners in the following Manner:
a. Miscellaneous-Expenses of administration,the insurance trustee,and construction
or remodeling supervision shall be considered as part of the cost of construction,
replacement or repair.
b. Reconstruction or Repair—If the damage for which the proceeds are paid is to be
repaired or reconstructed by the Association,the remaining proceeds shall be paid
to defray the costs thereof as elsewhere provided. Any proceeds remaining after
defraying such costs shall be distributed to the beneficial Owners, remittances to
Unit Owners and their mortgagees being payable jointly to them.
Page 25 of 40
C. Failure to Reconstruct or Repair — If it is determined in the manner elsewhere
provided that the damage for which the proceeds are paid shall not be reconstructed
or repaired, the remaining proceeds shall be distributed to the beneficial Owners,
remittances to Unit Owners and their mortgagees being payable jointly to them.
d. Certificate — In making distribution to Unit Owners and their mortgagees, the
insurance trustee may rely upon a certificate from the Association made by its
representative or Manager as to the names of the Unit Owners and their respective
shares of the distribution.
Association as Agent
The Association is irrevocably appointed agent for each Unit Owner and for each Owner
of a mortgage or other lien upon a Unit and for each-Owner of any other interest in the
condominium Property to adjust all claims arising under insurance policies purchased by the
Association and to execute and deliver releases upon the payment of claims.
Benefit to Mortgagees
Certain provisions in this paragraph entitled "Insurance" are for the benefit of mortgagees
or trust indenture beneficiaries of condominium parcels, and all such provisions are covenants for
the benefit of any mortgagee of a Unit and may be enforced by such mortgagee or beneficiary.
Reconstruction
A. Repair After Casualty
If any part of the condominium property shall be damaged by casualty, whether or not it
shall be reconstructed or repaired shall be determined in the following manner:
1. Lesser Damage — If a Unit or Units are found by the Board of Directors of the
Association to be tenantable after the casualty, the damaged Property shall be repaired.
2. Greater Damage—If a Unit or Units are found by the Board of Directors to be not
tenantable after the casualty,the damaged Property shall be reconstructed or rebuilt.
3. Certificate — The insurance trustee may rely upon a certificate of the Association
made by its president and secretary to determine whether or not the damaged Property is
to be reconstructed or repaired.
B. Plans and Specifications.
Any reconstruction or repair must be substantially in accordance with the plans and
specifications and the original improvements, or if not, then according to plans and specifications
approved by the Board of Directors and by more than Seventy-five percent (75%) of the Unit
Page 26 of 40
Owners, including the Owners of all Units the plans for which are to be altered. Any such
reconstructions not in accordance with the original plans and specifications must be set forth in an
amendment to the Declaration, which amendment shall be prepared and filed of record in
accordance with the provisions of such amended filing, more particularly set forth in Paragraph
VII and Paragraph VIII, subparagraph 1, hereinabove.
C. Responsibility.
The responsibility for reconstruction or repair after casualty shall be the same as for
maintenance and repair of the Property, and the Association shall work with the insurance trustee
to carry out the provisions of this Article.
D. Assessments.
If the proceeds of insurance are not sufficient to defray the estimated costs of reconstruction
or repair for which the Association is responsible, or if at any time during such reconstruction or
repair, or upon completion of such reconstructions or repair,the funds for the payment of the costs
thereof are insufficient, assessments shall be made against all Unit Owners in sufficient amounts
to provide funds to the payment of such costs. Such assessments shall be in proportion to the
Owner's percentage of interest in the General Common Elements.
E. Construction Funds
The funds for payment of costs of reconstruction or repair after casualty, which shall
consist of proceeds of insurance held by the insurance trustee and funds collected by the
Association from assessments against Unit Owners, shall be disbursed in the sound discretion of
the trustee and according to the contract of reconstruction or repair,which contract must have the
approval of the Board and Unit Owners involved.
F. Surplus.
It shall be presumed that the first monies disbursed in payment of costs of reconstruction
and repair shall be from the insurance proceeds. If there is a balance in a construction fund after
payment of all costs of the reconstruction and repair for which the fund is established,such balance
shall be paid to the Association for the use and benefit of the Unit Owners.
X.
REMOVAL OR PARTITION—SUBDIVISION
IDA AND COTTONWOOD CONDOMINIUM may only be removed from condominium
ownership, and may only be partitioned or sold, upon compliance with each of the conditions
hereof:
Page 27 of 40
a. The Board of Directors of the Association must approve the plans of removal,
partition or sale, including the details of how any partition or sale, and the
distribution of Property or funds,shall be accomplished.
b. The plan of removal,partition,or sale must be approved as provided in the Montana
Unit Ownership Act. Upon obtaining such approval,the Board shall be empowered
to implement and carry out the plan of removal,partition, or sale.
I :
C. No Unit may be divided or subdivided into a smaller Unit, nor a portion thereof
sold or otherwise transferred, except as provided above.
d. This section shall not apply to the sale of individual Units and shall not be
considered as a right of first refusal.
e. The Common Elements of IDA AND COTTONWOOD CONDOMINIUM shall
not be abandoned,partitioned,subdivided, encumbered, sold or transferred without
compliance with all of the above requirements.
XI.
REMEDIES
All remedies provided in this Declaration and Bylaws shall not be exclusive of any other
remedies which may now be, or are hereafter, available tQ the parties hereto as provided for by
law.
XII.
SEVERABILITY
The provisions hereof shall be deemed independent and severable and the invalidity,partial
invalidity or unenforceability of any one or more provisions shall not affect the validity or
enforceability of any other provision hereof.
XIII.
INTERPRETATION
The provisions of the Declaration and of the Bylaws to be promulgated and recorded
herewith, shall be liberally construed to effectuate the purpose of the Declaration and Bylaws and
to create a Building or buildings subject to and under the provisions of the Unit Ownership Act.
XIV.
ADDITIONAL CITY REOUIR.ED COVENANTS
A. All County declared noxious weeds will be controlled by the Association.
Page 28 of 40
B. Lot Owners and residents of the subdivision are informed that adjacent uses may be
agricultural. Lot Owners accept and are aware that standard agricultural and farming
practices can result in dust, animal odors and noise, smoke, flies, and machinery noise.
Standard agricultural practices feature the use of heavy equipment, chemical sprays and
the use of machinery early in the morning and sometimes late into the evening.
C. That all fence bordering agricultural lands must be maintained by the Association in
accordance with State law.
D. That any covenant which is required as a condition of the preliminary plat approval and
required by the City Commission may not be amended or revoked without the mutual
consent of the Owners in accordance with the amendment procedures in the covenants
and the City Commission.
E. Open space shown on the approved final plan or plat must not be used for the
construction of any structures not shown on the final plan.
XV.
MISCELLANEOUS
Utility Easements
In addition to the easements provided for herein; easements are reserved through the
condominium Property as may be required for utility services, including heat, air conditioning,
water, sewer, power,telephone, natural gas and cable television, in order to serve IDA AND
COTTONWOOD CONDOMINIUM adequately. However, such easements through the Property
or Units shall be only according to the plans and specificAtions for the Unit Building, as set forth
in the recorded plat, or as the Building is constructed, unless approved in writing by the Unit
Owner.
Right of Access
The Association shall have the irrevocable right, to be exercised by the Manager or Board
of Directors, to have access to each Unit from time to time during reasonable hours as may be
necessary for the maintenance, repair or replacement of any of the Limited Common Elements
therein or accessible therefrom, or for making emergency repairs therein necessary to prevent
damage to the general or Limited Common Elements or to any other Unit.
Damage to the interior or any part of the Unit' resulting from maintenance, repair,
emergency repair or replacement of any of the general or Limited Common Elements,or as a result
of an emergency repair within another Unit at the instance of the Association, shall be designated
either Limited or General Common Expenses by the Association and assessed in accordance with
such designation.
Page 29 of 40
Expenditures
No single expenditure or debt in excess Five Thousand Dollars ($5,000.00) may be made
or incurred by the Association or Manager without the prior approval or Seventy-five percent
(75%) of the Unit Owners, according to their percentile interest.
Benefit
Except as otherwise provided herein,this Declaration shall be binding upon and shall inure
to the benefit of the Declarant, the Association and each Unit Owner, and the heirs, personal
representatives, successors and assigns of each.
Service of Process
The name and address of the person to receive service of process for IDA AND
COTTONWOOD CONDOMINIUM until another designation is filed of record shall be:
Holly March Summers
March Law, P.C.
517 S. 22"d Avenue, Suite 1
Bozeman,MT 59718
Warranties
The Declarant expressly makes no warranties or representations concerning the Property,
the Units,the Declaration,Bylaws, or deeds of conveyance except as specifically set forth therein,
and no one may rely upon such warranty or representation not so specifically expressed therein.
Estimates of Common Expenses are deemed accurate, but no warranty or guarantee is made or is
intended,nor may one be relied upon.
Signs
The size, location and placement of all signs, including but not limited to signs on siding,
exterior doors and exterior windows must be approved by the Owners Association before
installation,which approval shall not be unreasonably withheld. All signs must be in conformity
with city zoning and sign ordinances then in effect.
IN WITNESS WHEREOF, the Declarant has caused this Declaration to be made and
executed according to the provisions of the Montana Unit.Ownership Act, Title 70, Section 23,
MCA.
Bangtail Partners, LLC
Page 30 of 40
By:
Member
STATE OF )
:ss
County of )
On this day of , 20 before me, a Notary Public in and
for the State of ,personally appeared ,known to
me to be a Member of Bangtail Partners, LLC and the person whose name is subscribed to the
within instrument and acknowledged to me that he executed the same pursuant to the authority
granted in him.
1N WITNESS WHEREOF, I have hereunto set my hand and seal the day and year first
above written.
Notary Public for the State of
Residing at:
My Commission Expires:
Page 31 of 40
EXHIBIT A
LEGAL DESCRIPTION
INSERT LEGAL
L
Page 32 of 40
EXHIBIT B
COMMON ELEMENTS
Page 33 of 40
EXHIBIT C
LEASED PARKING AREA
Page 34 of 40
EXHIBIT D
UNDERGROUND PARKING GARAGE
Page 35 of 40
FEYNOTELEGEND
AC `inJ lE licl IlD `awJ L .11 R!l AL �uJ�+xJ 10 iJ .a rur
1 I 1 7 7 T I 1 1 1 Y Y 1
I I I I I I I I I III II I I I I
1 I I 1 1
N
1' ;nv' rc'o.� ['ia➢ I I I wu+a I _—" I "'^ II uomr... ' I I 1 1 I
I I I a 1
r ' i • ei.
meat T . %•G I \ ;-k I' i ; L I j� p '
' ' I
1 IF
i =�.=� �b Q�j a. .�j ...�j a o j, .,�< �j , .�j ,u.� •�ql�j.,.� a.�jo j�l,� �' , . ' ...»..�..,m��,.�,�o�
' I I, -I-�- 1 1 `I``� I, 'I `��'�� I, I I �•I I - ' �� j I BLDG0-FLOOR PLAN-GENERAL NOTESDonomm
ml
-- (
1 � I
1 ' FLOOR PLAN-LEGEND
\\oam.,I , I n.a ..vq , auuo .ol I wr m r►�o ,,.src�a c. y V.
I ! Im• II 1 •», 1 I M� m..l. ce I I , PARKINGlina�.
1 1 - ';•�\\1 ' a I rY 1 1 i I I 1�� t n
MIDESIGR
11 \
, 0EVaoPhlEH
' I 1 I I I L 1 ,� j i .a.uY.om.,r.v+vow.no®�ovaarm
(��Y CCC999 •mn��va w.sva.nn.�„oa...0
I I I I l i I I I III jl II I I
1
1
u�
1 GARAGE.
�@ L FLOOR PIAN
,Iy�o�.uta. � c��"��JJJJ
fr' SITENEY PLAN-BLWO AQ.10
HMED tYtlO�ttilaf AY T�r ,
�1C,'._LII—.•Ij:•;11�Ji...I l.t_I-`I I: 1_L,:11...,;...I1,..:i:_J�I -L-'tl-1.1!'_:'L•• L.:_I:_ •;: : ., -
ir1_! ht pl fflc'I?�Jl iIl_�lt' ! r-'.I I JG_dIL 11c!r l
r�=11ir ill_.�
1=11�IF 1tEi1 lli-nt_: ifL] - :__li1`...: Ir
ffI!-.
Il..ill 11=iI�HIH:f-Lf=l�h:!-i =II.)
:. 1 1: �� :_ 1;;=IIf-
LLII-II"!IIF 'IIF�I .Ii'NJl..:i=-�F II '!_ —:Ir�.I,F!1 3 a 9b taC p
-i F: -1 ..:i �1-. Il. f�IHrF 11:�. F=
„�,!,-11r_iFi.._n-_I�Jl-['.lk..IL ' f� :_ I.... a r i ... 1 Lt '
I !I„JTrr:�llr�:r_;u-.11 n..rfr=rrr_::. n_: -----------ilL
IIII��I ! /, rHiIFT �a
SM
Ill=JIF1�=I1-- i ?
-
!
IIL;I�4.�; G
�zU _is ,fl
if=!i �f�
•11T�1
a!JIL_Tl....a lI
JW r I
?�lii:!I I
i
:
i�'u1=ITS !•� '� :! � � I
TIT
i
_ u
9 e x ..I]Ecc:.1J"?i i_/ �j:.-J_ -d a": T —�•t �I:F:'I_= —I` IF`-II4'..L':iI'`�
Ik ;_] •[E_:[�-��f ='�i l,.vlT.-,.171
't1E:IlE= - k-_:�;�'IIFr-IIG-1il—II 1. f.-":_:� r_•n_-II•-. l:
LrmJ.
�
I'll r l
" '� .I•iLi.Frri ° .
f
L�51
5
01
MM
a
� 4
)s i Y Nj
EXHIBIT E
SITE PLAN
Page 36 of 40
EXHIBIT F
FLOOR PLANS
Page 37 of 40
'.-'�'�,'a'l'fAr"�a: cit`l tsl fa 8 ,''+•�' � Q
a g
G
7 N
i
i
.......... . .. L.:..:�---.:_:`J:.:'.'. _
i
ar I
,
I I I i
.I f. .::..:.....:.:.....L,..-,.....,.....L.,,. ...........
P I I O'.1
I
ij
1
I :! J
f'
a
'I
I
I
a Hi r
:
'J
I
I:
�u
•'I
.i.. fj
_
_..
r,frtttuf3x :•Lr�:,:: ' I•. .: :::::::_;; �;::
,
�=r
Rj
I!I_...-1.. _ �,. ..... . i:: :_•I- ..._..:_,::
t �
Ul.
:
��d,j,R
IT
>
F-
I !
: p ..:..=J�` :.•- ,.. III': I i -- -
,
:I _ __ C; !I'll, .'ry •I i ,�.. I f i I I I v ,:, ! .. � I I ,
L_
�r I
i
:
t :
A L_
:
:
I r.�SJ 3 i
I 1
r'I:
I . •I
anarm'uaavux. a�,aa
3 �
i ---- �
Iiy(Snif,:r. :::.l+ry ai
IL
I Y
LM
T T Q Q4 4 1� 4 T. QED
Il��,
o- '1 •
I I I I 1 I � ' • I � I I
I G
rl7
' Sol I I � 4
O ' I y , E i • }
La
TEP
I I, I =4• �I� � :Lh'1 4J• dLl� y]A 1 I ��j�' I
'I
1 ����g ° I • 1 I � I 1 � 4
I
i I I I I I I 1
1: !I lilt III I ! fill f ilf il!�li l; _—_—
i
7,1
TZ
I t,,,ti,t,tl•lj�U�"Il,i„+''I••Ip
, i ! 1 ll}''i�,�ul}y d`;t li•;hry'!��1..
::i, ,.•� 1�1`I;tlllti�,';�;tlll'y'y'11~I yl'
D „1 !i
!t
�I t'P •1• 1 t. + t.
tt
•11 , +, t, t''
I 1
'•1 �
Il,
I i ::I:; , ,1'!1 '`''i tUl�u;�.l!'•;ylil�,!,1i11',,
I Ili,III'+11'``1,1;1 '!!dl�;l''•„lil!`"11
i lyt`!li'`yl t11'•i�l'1'iy+�'�•,1R,1!j�,11����`�,
i
• .' � " it i i+I I I '
tt
' I I it � I i� .I � I u;l u,•,•,al:'.y,•y�ili.ut�,ll!11!'1;I'���',1�1�`i'•
I Innwuuewct muw
Irl'�r fm
qq P
it Rall it 151�
'_%lifi{41 a' n FV g Q
I
� I 4(x'e�Ir:il�G%ixil:
o I m
1
o W
C
I ,
ED
1
a
�lo1i 1 t°r+ 1 -----------_CAI I I I r7
l 1
1 I I I I
I 1
1
I
• 7 I ' rI I t
o- L��- -- rt t-- -1-- -�- -- - --- -- -- --- _ 1-1 ---- -;-- -
® o
+---I---;I--- --�
TT T ED
I r I I
I i i I I I
I I I I I I
I �
I I I
II
i
I
I
gyp`
' I
1 I I
I I I I
' m¢ao:unwum muad
U' V t'JO'1B NVId A3113LS
013AM
10Ma IT,
� O
� I I
1
. I
r
wo I I I
®
cm
1
EA
O-- — ----- - --- O—
I I ..
IT— _: - -- --- I ----
- —V7
1
I -
o
- Ll
�u
a M:_�y=:� oN303131oxA371 a� �, e� r�
r11 ail� �• �� �� sF �� � �� ss �-
t __
42
: I
I
t1-:b
F
I I 1 I
..........
ID
J 7
I
P pp��YY
I: I
. . . .. .. :..
_ 1
I
I'.
"1 -y s�-- ::
y
F.
i'� g
6
}E••'
q
I
�1
Q j q T T'
T''•:'i• (•'' 1
I
I'
I
I.
'I
1 I 1 I
' MRLfI,ltNlltRt Q3lG4tl
Pim Adlbk '
�3
c _li
_.. fi"'fly i
rz
J_ I��':! •I'i'll� _ •�is-
l
I
-; -_- _j
tt
i-•
r
!
Ij
N
a
-- I
!;. { Rio;
8 `
• IR
r
i R I
tin
bC i�.lR, N�C � FE �31
�
i
3
e ev . I 4
3� A�,�� I!� O x
e. pF
I I$ ? I I I -
I
II.
• i
!..�= .. .--- -fl� �K:.�� IyifKiKKi:V+I%T�S✓i�
;
— .
r..
01
I '
. :
.. F
...I c-� .a—.o- ...... I _ _.I - —•_ _
i•... :•;:' .i.;b;.y �.:__... A:Ltllill`N�!^ •!•I'IO':I ti' ";
I- �I'
,t
ti
Q ..' ;'�. :!,?•.111,E .I....: ::'f�' I +i'I I'I I!
F er i I icli I7 —
,I .:5:
is � �{' .I;.,: �'-i _ ,I• I Y`I Lill
-t—i
:_.:._;:.:__._
I
.71
"v.
I
�� :tI:F.If••'.�I �I,'•E'I �I�! ' _I•!.•is —.......
•,�1� ,'+�"'ill'!I!� I �I O•I;:'i � ���
.I`
_ .GPI,'.•
MM
• IIVRII:IIIlmlt4l m11Lid
Nlbfl[p llPiyl.ltro°9.W
'r
,
I
,
o
low � oll � J ag°
� tl i
T p,
Ic I
r J �
Via-'-- ---�--- c� ,� — I•, a 1
4
C C C C C C C
� o
® Iva,xa�verue
� O
m s
IN
r7P:1:r.1 3ti i�r'•.'
W, S
a a aQ a a a a
1
Sig
1 ••
icy �---
------I B- ��-
I r I-
et- d
,
Q Q Q
aa� I I I O i
I ? III I I I I
��:• II I I f ,
t
I
�7 •
i I
1 II a.
PWM ,mvnn,,,vn.. Iddilk . Am
I I I II 1 1
I i t it l 1
I I I I II
1
i
I
-- -tom
�O
® I
m S
m
� I g ��b,::l,t�;,�;•r�i,, tt.
K
S,'p
S
----
�
I: 1
IL --1
. ..........
.............
12
3 - ; r ' ;rlr'rr ili II I I'I �I III��I I I i I I
Jill -Q
If �ilr�rj!rrr1 r'!'!!ri
:l �lush/, ,
l
o-�----- i!�j ri(lr!��+ 7lf',�
, will1J ; rl;(I !J I1? , i I+IJ IIj1 llllil I i
J' rllr'j� r
!jf!ry!jJrf J',!,r!►!'!!�I jr�j��rl�J,),! �J1J!j1,!!I jll I jl�� I;�II;I ,;II '�,II I I
---
l1 Ili
PWMD Im1DOlt PMw
:1 I
I ..
F
L..I
-1
-6 41
t•.:.;is-:: ...j... - <d'; �. j I � �
I 5 r i_ j5 'cj --,�
Fll
_ I f •I. ...............
t-
+ I Al
I TT
- -�- ----�-- j
y
m I
O
S I
Is
Lp
7x 8 �• Fh 'rl�,,,�(,
Yff t'
KEYROTELEGERD
G�vma
: �. _.._ • r.'r tort
{{'--'--��
..(• 1 ...... :: �1 . 7.
I
-L�...........
- -' t 1
h.
I
AtNM�]-GRflF'AId1 •
_� �, -..��� -- � 11�.•r .1�1:�
1 i
_ ERAR FIKISR satEou�E
ExT
I: ._.___ �i•:;�27 r.,{i 9 �::. .— _. "a�'-'.:3dFl:•;-= '���i.' l�j-•� 1: 42.tti 31P!i'�I
W T HA70
.{ .e:11E11 Qj'lA19Y ._..._—_........._- FDA
una°�
OPNZNT
........... -=
oEYEL
................
;
-------
.'i VV
Y 4
I
'l..—._.......---- .
;— .i. ;j:j _L:h cam'I �------�-���.,•..,-•_':-;_; y -- I
w
- �� '-i»•: �; .._. � of
.pt.
�! I
I
.k ,
BIGG 7
EN
Tr
_ .. _ ._..-�:..:r.,-�._-___ '-._- � .!•J::n _ _ _ - _ •__ _ ___ -_ -_�'�-';'tom'
_ _ �.:.e....�.�-:�-• _- nZrQs � -'"ti��1 EXTERIOR
e r
- - - EEY0. r
;
e.
F -
t...
A tj-a0rP1i*Aan.ml _ I�aOOeiZ.V,,InmAey .____...._....:..... SfIEKEYPIAN-BL000 A3r21
I I I I I I
S' I
Now
p 9- 1:::'
JLL
I b b o o b o b
IED
.a anuo
-
I
---CI
JI i 1
� I
p 1QP5-
E7,7L -
h slL 6
vil -
C r r ti e
® XO MUAAI[
it
F
I
I I
1
� I I
1 ,
Nil
C
-4jr
t
ll
-
I I I to I I I
}
Q O O Q Q Q
I I 1 1 I
I I I
I I I I
I I I I I
o-------- -- - -- - --- I ----
8�
I I I I 1 I
• 111fLlLll ltOplfR1 Q]IIRN
KEYMDTELEGENO
I I
I
I '
I
—I
I I 1
Ij 1
I I ® — --- -- ----- — i RiiE-
conwimm
�VA
I -
!
p a
� I
I Oar I V I SG%OESIGN
, , r 1n1 ( DEYELOPM
I !
I I
a BLOG3-
LEYE17
.F„��,s Irma-vm[cemcunwul ®
CC ® SREMYPLAM•BLDG3 A3.13
''L�iril„', f9:L..sR�� $• ., d'� 5{�i P � � Q
lI.
IN
�1
Mi
Q 4 0 0 4 Q q i
, I ,
6 ....;.....,.,
6 5
Fn
P■ __ 35i I
R
i..•
FEW-
77
® -- -- i
=7-=' 11=77,
' I
I , I
I I I i
r � I
,
t 1
In�LInlcVbiLn 4u"
r Now
L •r:�'_ ' �. 1:...'y� 'Pi 6..1'-"Ci•:"'I -1--- I O .i-I -- -—;---QQ
I I
6 x S ---I
III I I I I--• " - —Q
F LW
�_ !-
�
77-11
-I; __i _'.� � ��' � -- ! l i I is r� "—�' —•Fy,`'
I dT IE
I �.. � ! �� i I III ; .;•:�:,..: ;.�\ i -� I =.I.° I � .c.,.�l I
'x I
I
fl
I
MR -
b F 7 i
e
1
I �
I
, �!
o _�,yM CH
tit1�%Ri'+fiHI:' L 0-1 L
�J4I.7�1'�i f9 i j s+3 a A E g
i
a � I ll' qaq
ED
Q QQ Q ® Q QQ Q
O '�1
I I I I
I �•_� ------------
il4 n
_
'' P Y-1
a I —u 1•
I I I 11
11
I
_—
! I I I
4 1
.......... '
"�-- —
� P17 9 •!,1
I �
I
L 1 II I
1 pl�rn�V'
I a I
....
I
. 1(IfI.fllllloUH![l Q{Ilyd
PMM Adilk Adilk
—-—-—-—- -—-
QD
HIP ---L
--------- -
I M-
Salt �e
----------
r--m
all-IL—L-JW
------------
ON
-
a Q
O
f�
jai 1
W, I
� 1 FL
T T T T° q
LET
I
I I I
I Y.
I
I
I ayI Yet, a
! J , I
I7
4
I
--1-
�. e I
--- —';� --I-
6 I
t � I
I
I
InK I:tt1iELILCI p�.,ye
P�6'!!ED uYiMullyr]cw -
i
O�
i
Ak
--- _...........-------.--. ,
...........
I
............--...
_-- ---- _--- -----
I
tia
!
N I
XEYNOTE LEGEND
,
i
_
-- —
1
_
�a —e
_ ,:. — —— •'is
.I.
J j �•y 2 - A
t i
!
I
i —
_
Y I
,
1 � 1
- T-.
_Its
n - —
:. — � 1 Hma
E%TERIOR FINISH SgiFOUlE
HUM
I A
a:::.. i,�..-,...- `,I::•" n:..r. :,--__,., ..` ••_.�.
_ .
.44
1
_ .. r if it �• � I
:.._.... .� ,::.:.. `- -- �.;. .:I:. :'i �is�i:' , .I'.1_ L.i.: I..:.•r...:�!:.::-� .[:.
. ooTmlmvao
�-•'a i 1;?: r ��:i.:;;- -_ � _.-:>±�:. DEVELOP
_..._ �'+ +
pq
- 5
+4`l rN-
/ I
--art
T
,
— — _
�Mx.
EXTERNM
ELEVAMNS
: I .
I-
i;.f
,InooY�neAv tvY _—.-_ 'I ;.���"• SDENEYPUN•DLM4 A4.21
IAVIFD llQNfII,C,C]llll
� I
I ! !
=11H
jll>
I:_I.k
ICI
-.,;;-y -�- ,• � l..'" L,.-..-,III I i
I it. I ' :I fl:.;'j'_
- _u -ram-
-
I , I
C
I I I
S°
I
II
i
I
1�jyL � 2
`r; 6
1
I
t
"...
{�J
3
�I rtl
I i
:u
ED
Ll
ED
ED
-- f
I
I
I -
I
i
I
C�
xrm�:u.tww21 v311gw
� zY
3a ��
x
;�iL_`jR�,1l`r'L`.�,.'•�_�1`'� ?[F.tt�±_�I.13ey'�I`�1!^jj:-7"t±r[���j'-t> j'is �.�.
i"
_
i
I
i
i
i
wr
----
DDnDmym
.In wner.mw •a,
tOilpooma
M
OCtONtlffHi4
4Ld4
C'4 sox oEs-
� I
y
EX7ERION
ELEVATIONS
,Lrs�azv.mw tty_=prs.werr.rtw SRE KEY MAN•BL005 Q5,21
0 -1 di� q
0
� I
•` i I
1 i5 s vl 1—
ru
4� t
' :11 T
.............
.� '
..
IT
� I
J��{I 0 I f
'LI --6 I I _�._ I I I I ���-� C4 i
r ;I -�-- -----�- I ----
Ing-
m
I e l a l T�J,;
I lit
I I I li i
---------------
I II
,-
I. I>
I
I I I I I I I I
4 Q Q
I I 1 1 I
I
I I I I
I -
1
V -- I •�1� y1= �.;.: :`tl i'. - III II , I --------
I I 1 1
4
- r i. l
I i
o--- - , - - --- - - --- - - --- -,t;,I -----
li s�
! I 1 I ' I• w
I I I I I li
it I I I I I ! I
: I
1
I � I
I I I
6
I I I I
I I I I ( I I l
I I I I I O I I I I
Ask
ED
--—-—- lie IO O •O 10
j
I I
I I I
O• I 1 I I 1 1 13
I i �� � I i I �• I 1 I I
o
1
0
1 I I I I 1 1 I 1 1 1
C C o O 0
Z 2
� m
p
I
Ell
,��FrIF•}itr7 y-'
r.:
KEYNOiELEGEND
i
•�g
M O ID IE ID
1 --
4`A -- --- -----�� � =-
I I II I i
I I ,
I I I
---- --- — — ----- -- -- - ---'---0 ---- ail-----�--�---- ----�-� -
1 •
I +
p'
_ I
O -------7- i I O
------ -- - -- - ---- ----- o --- ' ------ I -----I r •�
i
Lmo
I V
SDS DESIGN
— � I I I I � I I � DEVELOP
I
I
I I I =nl't•"=
..a
I I
I
a� Q ��-
ED SITE KEY PLAN•BM 6 A6.13
KEYNOTE LEGEND
1 I Y Y
o
----- - �_: -- -----o
comm000
I--''���:: ��;.I:��`:::.��-�, �- : �:��j:'.;� .;:::�:•:;.- •. ;.1, I�rrH
l�::•y:::::r.�• EYFIDPY
I
J I
a ...
LU ER"
f�r::i•�IUR ® �r—� ROOF
SGEKV PLAN•GLOG6 A6.14
a F2 e ayti60 t�i
mi
@
JR
I I I i l I
--- I —
--
>r — . — _ —
_....._...__._._..__.._......._.._......._._.....1.. _
;
:
f-
i _...__...._......__ i .......,_ is � :.
....._._.._...
:
,
i : Id
l lii 1
74
I�,,flll
111'lGflAI IIWW[I Q3lWMd
Vg11FD tIIf1R.,111.)!IL
• II ':
I L. i I
t ! �• I I
I , �
-- — ----- ------ '-�
L------ -
1 II 1111IF1
g I
it
.. :. ..
lu-
c.. Ly ..
-• r
-
- I
O ¢ ¢
i
9!4i4-5 f
m s
I I 1 m
• o
7..,hrnNi�.
c r 9 413 IN,,]' BI r jya
e II a3fi.s1s�
EXHIBIT G
CERTIFICATE OF ARCHITECT
The undersigned, being a duly registered professional architect in the State of Montana,
herewith certifies the following:
That the floor plans, for the IDA AND COTTONWOOD CONDOMINIUM situated
according to the official plat thereof on file and of record in the office of the County Clerk and
Recorder of Gallatin County,Montana,as duly filed with the Declaration and Bylaws thereof,fully
and accurately depict the layout, location, Unit Designation and dimensions as built of the IDA
AND COTTONWOOD CONDOMINIUM and that such floor plans are an accurate copy of the
plans filed with and approved by the officials and officers of the City of Bozeman having
jurisdiction to issue building plans. Such floor plans rend-.r hand representation of the actual
building.
Dated:
(Name)
Registered Professional Architect
Number:
Page 38 of 40
EXHIBIT H
CERTIFICATE OF NAME
The undersigned being the duly authorized agent of the Department of Revenue of the
State of Montana within the County of Gallatin,herewith executes the following certificate
relating to the IDA AND COTTONWOOD CONDIMINIUM situated as follows:
INSERT LEGAL
1. That the name IDA AND COTTONWOOD CONDOMINIUM is not the same as,
similar to or pronounced the same as a word in the name of any other property or
subdivision within Gallatin County, except for the word"Condominium", and
2. All taxes and assessments due and payable for the said IDA AND COTTONWOOD
CONDOMINIUM have been paid to date.
Dated:
County Assessor
Page 39 of 40
EXHIBIT I
STORM WATER MAINTENANCE PLAN
9
Ci
I '
Page 40 of 40 "'
ARTICLES OF INCORPORATION
OF AND FOR
IDA AND COTTONWOOD CONDOMINIUM
OWNERS ASSOCIATION, INC.
A MONTANA NON-PROFIT CORPORATION
KNOW ALL PERSONS BY THESE PRESENTS:
I, the undersigned, pursuant to Title 35, Chapter 2, Montana Code Annotated,
acting as incorporator of a corporation under the Montana Non-Profit Corporation Act,
Section 35-2-113 et.seq., MCA, do hereby adopt the.following Articles of Incorporation
for such corporation:
I.
That the name of the corporation is:
IDA AND COTTONWOOD CONDOMINIUM OWNERS ASSOCIATION, INC.
II.
That the period of its duration is perpetual.
III. .
That the purposes for which said corporation is formed are as follows, to wit:
(a) To carry out and conduct all corporate powers enumerated in the Montana
Non-profit Corporation Act, as the same exists from time to time;
(b) To carry out and conduct the business of a homeowners association,
IV.
That the name and address (physical and mailing) of the corporation's initial
registered agent is HOLLY MARCH SUMMERS at 517 S. 22"d Avenue, Suite 1,
Bozeman, MT 59718.
V.
That pursuant to §35-2-126, MCA, this corporation shall be designated a mutual
benefit corporation.
VI.
That this corporation shall have members.
VI I.
That the distribution of assets upon dissolution of this. corporation shall be
consistent with the provisions of§35-2-721, MCA.
VI II.
That the provisions for the regulation of the internal affairs of this corporation are
set forth in the By-laws of the corporation, and if not set forth therein, shall be controlled
by the laws of the State of Montana, as the same exist from time to time.
IN WITNESS WHEREOF, I have set my hand and seal this day of
, 2019.
HOLLY MARCH SUMMERS,
Registered-Agent and Incorporator
STATE OF MONTANA )
ss
County of Gallatin )
On this day of , 2019, before me, a Notary Public for
the State of Montana, personally appeared HOLLY MARCH SUMMERS, known to me
to be the person whose name is subscribed to the within instrument and acknowledged
to me that she executed the same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial
Seal as of the day and year first above written.
Notary Public for the State of Montana
(Seal) Residing at:
My Commission Expires:
-2. -