Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
055 - C200 Erosion Control Plan
SD D >>>>SDSDSD SD SD SD SDSDSDD D SD >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDD D D D D 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8WDYH DYH8W 8W 8W 8W 8W 8W 8W 8W 8W8W 8W 8W 8W B B B B FIRE FIRE FIRE W W W W W W W W W W W W W W W WWWWWWWWWWWW W W WW W W WWBT BT BT BT BT BT BT BT BT BT BT BT BT BT BPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPNGNGNGNGNGNGNG BPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT NGNGNGBP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BPNGNGNGNGNGNGNGNGNGNGNG BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT8S 8S 8S 8S 8S 8S 8S 8S 8S 8S8S8S8S8S8S8S8S8S8S8S8S8SS S8S 8S 8S 8S 8S S S 8S 8S 8S 8S 8S 8S 8S 8S S S 8S 8S 8S 8SS SSSSSS S SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SSSSSSSSSSSSSS333.91'L=87.04'58.54'728.45'62.01'465.11'101.19'199.71'42.00'101.19'LOT 1 1.94 acs. N90°00'00"W 223.21'L=100.30'L=21.55'289.22'56.49'17.44'BLOCK 4 N90°00'00"E 309.42'S0°00'00"E420.41'N90°00'00"E 486.42' 30.00'30.00' 30.00'S0°00'00"E 521.60'157.72'90.70' N90°00'00"W 199.71' BLOCK 5 N0°00'00"E 385.75'427.50'177.00' 83.75' O.S. 6 0.24 acs. SD SD SD SDSDSDSDBP BT BT BT BT BT BTBPBP BP BPBT BT BT BTBPBPBP BP BP BP BP BPBP BT BT BT BT BT BT BT BT BT BT BT BT BT BTBTBP BP BP BP BPBPBPBTBPBPBPBPBTBTBTBTBT BT BT BT BTBT BTBP BP BP BP BP BP BPBP BT BT BT BT BT BTBPBP BP BPBT BT BT BTBPBPBP BP BP BP BP BPBT BT BT BT BT BT BT BT BT BT BT BT BTBTBP BP BP BP BPBPBPBTBPBPBPBPBT BT BT BT BTBT BTBP BP BP BP BP BP BPBTBTBTBTVERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! 2023COPYRIGHT © MORRISON-MAIERLE, SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\5659\019 - SWX SITE PLANS 1-3\ACAD\SHEETS\002 BLOCK 5 LOT 2 SHEETS\C200 EROSION CONTROL PLAN.DWGREVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle PLOTTED BY:CELINE SAUCIER ON Aug/01/2023 SRX BLOCK 5 LOT 2 BOZEMAN MONTANA EROSION CONTROL PLAN 5659.019 4 C200 CMS CMS JAU 8/1/2023 30 6015300 SCALE IN FEET 8/1/2023 LEGEND PROPOSED CONCRETE SURFACE CONSTRUCTION LIMITS STRAW WATTLE (4/C700) AREA TO BE PAVED NOTES BY SYMBOL: INSTALL TYPE D INLET PROTECTION FILTER PER DETAIL 3 ON SHEET C700 PRIOR TO THE DISTURBANCE OF ANY PORTION OF THE SITE. 3 INSTALL TRACKOUT CONTROL SYSTEM PER DETAIL 1 ON SHEET C700 OR AS RECOMMENDED BY MANUFACTURER 1 INSTALL CONCRETE WASHOUT FACILITY PER DETAIL 2 ON SHEET C7002 R Know what's below. before you dig.Call EROSION & SEDIMENT CONTROL NOTES: 1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE (BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016. 2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN. 3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION. 6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED. 7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY. No. 49499 CELINE M PROFESSIONAL E N G INEERM O N TANA LICENSED SAUCIER TEMPORARY SANITARY FACILITY TEMPORARY JOB SITE TRAILER CONSTRUCTION TRASH ENCLOSURE LOCATION SEE SHEET C015 FOR DETAIL BROOKDALE DRIVE CANTER AVENUE3 1 2 1 2 3 33