HomeMy WebLinkAbout032 - A2.08 - PLAN 3B -TRANSPARENCY CALCULATIONS8/1/2023 1:32:59 PM
A2.08PLAN 3B - TRANSPARENCY
CALCULATIONS20220931BOZEMAN, MONTANA
SOUTH RANGE CROSSING
CLIENT
PROVIDENCE DEVELOPMENT
529. E. MAIN STREET
.
BOZEMAN, MT 59715
providencedevco.com
406.595.4560
Architecture + Planning
3660 Blake St
Suite 500
Denver, CO 80205
ktgy.com
303.825.6400
PLAN 3B - FRONT ELEVATION PLAN 3B - LEFT ELEVATION
2050 FX - 10.0 SQ FT x 1 = 10.0 SQ FT
2050 FX - 10.0 SQ FT x 1 = 10.0 SQ FT
3050 FX - 15.0 SQ FT x 3 = 45.0 SQ FT
TOTAL FACADE AREA: 609 SQ FT
GLASS AREA: 98.5 SQ FT
TRANSPARENCY: 16.2%
TOTAL FACADE AREA: 680 SQ FT
GLASS AREA: 110 SQ FT
TRANSPARENCY: 16.2%
3050 SH - 15.0 SQ FT x 3 = 45.0 SQ FT
2640 FX - 10.0 SQ FT x 1 = 10.0 SQ FT
6050 SL - 30.0 SQ FT x 1 = 30.0 SQ FT
3050 FX - 15.0 SQ FT x 2 = 30.0 SQ FT
2640 FX - 10.0 SQ FT x 1 = 10.0 SQ FT
FRONT DOOR LITE - 8.5 FT x 1 = 8.5 SQ FT
4026 FX - 10.0 SQ FT x 1 = 10.0 SQ FT