Loading...
HomeMy WebLinkAbout032 - A2.08 - PLAN 3B -TRANSPARENCY CALCULATIONS8/1/2023 1:32:59 PM A2.08PLAN 3B - TRANSPARENCY CALCULATIONS20220931BOZEMAN, MONTANA SOUTH RANGE CROSSING CLIENT PROVIDENCE DEVELOPMENT 529. E. MAIN STREET . BOZEMAN, MT 59715 providencedevco.com 406.595.4560 Architecture + Planning 3660 Blake St Suite 500 Denver, CO 80205 ktgy.com 303.825.6400 PLAN 3B - FRONT ELEVATION PLAN 3B - LEFT ELEVATION 2050 FX - 10.0 SQ FT x 1 = 10.0 SQ FT 2050 FX - 10.0 SQ FT x 1 = 10.0 SQ FT 3050 FX - 15.0 SQ FT x 3 = 45.0 SQ FT TOTAL FACADE AREA: 609 SQ FT GLASS AREA: 98.5 SQ FT TRANSPARENCY: 16.2% TOTAL FACADE AREA: 680 SQ FT GLASS AREA: 110 SQ FT TRANSPARENCY: 16.2% 3050 SH - 15.0 SQ FT x 3 = 45.0 SQ FT 2640 FX - 10.0 SQ FT x 1 = 10.0 SQ FT 6050 SL - 30.0 SQ FT x 1 = 30.0 SQ FT 3050 FX - 15.0 SQ FT x 2 = 30.0 SQ FT 2640 FX - 10.0 SQ FT x 1 = 10.0 SQ FT FRONT DOOR LITE - 8.5 FT x 1 = 8.5 SQ FT 4026 FX - 10.0 SQ FT x 1 = 10.0 SQ FT