Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
006 - A1.03 - PLAN 1B -ELEVATION
T.O. SLAB0"T.O.SH'G10' -7 3/4"T.O.PL.19' -8 3/4"26' - 0 1/2" BUILDING HEIGHT1' - 3" HEEL9' - 1"1' - 6 3/4"9' - 1"8' - 0" TYP. HEADER HEIGHT5.0:125.0:128' - 0" TYP. HEADER HEIGHT8' - 3" BOTTOM OF AWNINGT.O. SLAB0"T.O.SH'G10' -7 3/4"T.O.PL.19' -8 3/4"26' - 0 1/2" BUILDING HEIGHT9' - 1"1' - 6 3/4"9' - 1"8' - 0" TYP. HEADER HEIGHT8' - 0" TYP. HEADER HEIGHT5.0:125.0:12T.O. SLAB0"T.O.SH'G10' -7 3/4"T.O.PL.19' -8 3/4"26' - 0 1/2" BUILDING HEIGHT9' - 1"1' - 6 3/4"9' - 1"5.0:125.0:128' - 0" TYP. HEADER HEIGHTT.O. SLAB0"T.O.SH'G10' -7 3/4"T.O.PL.19' -8 3/4"26' - 0 1/2" BUILDING HEIGHT9' - 1"1' - 6 3/4"9' - 1"8' - 0" TYP. HEADER HEIGHT10/4/2023 11:40:00 AMA1.03PLAN 1B - ELEVATION20220931BOZEMAN, MONTANASOUTH RANGE CROSSINGCLIENTPROVIDENCE DEVELOPMENT529. E. MAIN STREET.BOZEMAN, MT 59715providencedevco.com406.595.4560Architecture + Planning3660 Blake StSuite 500Denver, CO 80205ktgy.com303.825.6400ROOF MATERIAL: 'MALARKEY ROOFING CORPORATION' COMPOSITION ASPHALT ROOF SHINGLES SERIES OR APPROVED EQUALROOF MATERIAL: 'BERRIDGE METALS ' STANDING SEAM METAL ROOFING OR APPROVED EQUALWALL MATERIAL: FIBER-CEMENT HORIZONTAL LAP SIDING. MFGR: JAMES HARDIE, CEDARMILL FINISH, 7" EXPOSUREWALL MATERIAL: FIBER-CEMENT BOARD AND BATTEN: MFGR: JAMES HARDIE, HARDIE PANELS, CEDARMILL FINISH, WITH MERATEC TREATED EXTERIOR COMPOSITE BATTEN STRIPSWALL MATERIAL: FIBER-CEMENT SHINGLE SIDING: MFGR: JAMES HARDIE, STAGGERED EDGE PANEL, CEDARMILL FINISHTRIM: 4" x 5/4" MERATEC TREATED EXTERIOR COMPOSITE TRIM FIBER-CEMENT TRIMTRIM: MERATEC TREATED EXTERIOR COMPOSITE TRIM FIBER-CEMENT TRIMBELLY BAND TRIM: MERATEC TREATED EXTERIOR COMPOSITE TRIM FIBER-CEMENT TRIMFASCIA: FIBER-CEMENT FASCIA , MFGR: JAMES HARDIEGARAGE DOOR: OVERHEAD STEEL SECTIONAL; GARAGE DOOR STYLE AS SHOWN, CLOPAY OR EQUALDECORATIVE EXTERIOR COACH LIGHTING: INSTALL PER MFGR. REQUIREMENTSGUARDRAIL: 42" METAL AT SECOND FLOOROUTLOOKER: UNDER GABLE END RIDGEWOOD COLUMNAWNING: STANDING SEAM AWNING PROVIDING 3'-0" MIN. OVERHANG AT ENTRY1A1B2A2B2C3A3B45679108BUILDING MATERIAL LISTRIGHT ELEVATIONLEFT ELEVATIONFRONT ELEVATIONREAR ELEVATION2A 4 8 3B 5 9 1A 10 6 2C 3A 7 SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"SCALE: 1/4" = 1'-0"11111111 1111