HomeMy WebLinkAbout23 - Task Orders 4 - HDR Engineering, Inc - Permit renewal for CoB WRF discharge permitWRF Task Order No. 4 1
Exhibit A to Professional Services Agreement
TASK ORDER NUMBER 04
Issued under the authority of Professional Services Agreement between the City of Bozeman
and HDR Engineering, Inc. for: A range of professional and technical services related to permit
renewal assistance for the City of Bozeman Water Reclamation Facility (WRF).
This Task Order is dated , 2023 between City of Bozeman (City) and
HDR Engineering, Inc. (Contractor).
The following representatives have been designated for the work performed under this Task Order:
City: Brian Heaston Contractor: Coralynn Revis
SCOPE OF WORK: (attach additional sheet(s) as required)
1. Provide permit renewal assistance for the City of Bozeman WRF discharge permit. Work may include,
but is not limited to, updating technical reports concerning the East Gallatin River, preparing comments
to the Montana Department of Environmental Quality during open comment periods, and preparing
any necessary documentation.
COMPENSATION:
Contractor shall be reimbursed on a Time and Materials basis not to exceed $30,000, without prior written
authorization from the City of Bozeman. Contractor shall notify the City of Bozeman prior to executing
additional work, and shall not proceed with additional work without written authorization from the City of
Bozeman. Contractor shall invoice no more often than monthly for services provided in the prior month.
The provisions of the Professional Services Master Task Order Agreement and any Special Terms and
Conditions and/or Exhibits or Attachments to this Task Order shall govern the Work.
IN WITNESS WHEREOF, the parties authorized to commit resources of the companies have executed this
Task Order:
City of Bozeman HDR Engineering, Inc.
By: By:
Title: Title:
Date: Date:
Fed. ID. No.
DocuSign Envelope ID: C42FFA5E-047B-4215-B009-BF07EE762F6E
July 11th
7/12/20237/12/2023
City Manager
Rate Table
Resource
Code Description Billing Rate
.
PJM32 Project Principal Engineer 461.5$
EWR30 Engineer Water Resources Sr 185.1$
PJM13 Project Manager Engineer 249.2$
SEN30 Environmental Scientist 3 252.7$
ECI20 Engineer Civil 176.9$
ESA10 EIT Sanitary 131.2$
ADM10 Administrator 121.1$
ACT04 Accountant Sr 103.1$
DocuSign Envelope ID: C42FFA5E-047B-4215-B009-BF07EE762F6E