Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
009 Open Space
DNDNDNDNDNDNPHASE 1PHASE 2ARNOLD DRIVECONSTRUCTEDIN PHASE IS 21ST AVECONSTRUCTEDIN PHASE IBLDG A36-PLEX1 & 2BEDROOMUNITSPHASE II(d)BLDG D36-PLEX1 & 2BEDROOMUNITSPHASE 11(c)BLDG B36-PLEX1 & 2BEDROOMUNITSPHASE II(a)BLDG C34-PLEX1 & 2BEDROOMUNITS& CAFEPHASE II(b)LANTERN DRIVECONSTRUCTED IN PHASE I(60' R.O.W.)LEGENDSHEETMADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 (406) 586-5740 FAXNEXUS POINT PH2BOZEMAN, MT NEXUS POINT PHASE II 1" =0SCALE30'60'15'30'C1.4OPEN SPACEOPEN SPACEOPEN SPACE AREA "A" - 7,108 SFOPEN SPACE AREA "B" - 2,312 SFOPEN SPACE AREA "C" - 2,819 SF