Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
030 Building Elevations Front 50 Plex
T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" 7 7 T.O. SLAB -MAIN LEVEL 100' -0" T.O. SLAB -MAIN LEVEL 100' -0" T.O. GYPCRETE -SECOND LEVEL 110' -9 3/8" T.O. GYPCRETE -SECOND LEVEL 110' -9 3/8" T.O. ROOF 155' -8" T.O. ROOF 155' -8" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -3RD LEVEL 130' -7 7/8" T.O. PLATE -3RD LEVEL 130' -7 7/8" T.O. PLATE -2ND LEVEL 119' -10 1/2" T.O. PLATE -2ND LEVEL 119' -10 1/2" 14 14 11 11 9 9 T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. GYPCRETE -4TH LEVEL 132' -4 1/8" T.O. GYPCRETE -4TH LEVEL 132' -4 1/8" 10 10 12 12 5 5 4 4 8 8 ? EX-02 EX-05 ?EX-02 EX-01 EX-03 EX-05 EX-03 EX-01 EX-03 EX-01 EX-02 7" / 12"1 1 1 T.O. PLATE -4TH LEVEL 141' -5 1/4" T.O. PLATE -4TH LEVEL 141' -5 1/4" 13 13 6 6 2 2 3 3 7" 12" 7" 12"7" / 12"7" / 12"7" / 12"2 ?? ? EX-06 ? ? EX-06 ? ?EX-01 EX-05 EX-05 EX-05 EX-02EX-02 EX-02 EX-06 3 EX-03 EX-03 EX-03 ? T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" 7 7 T.O. SLAB -MAIN LEVEL 100' -0" T.O. SLAB -MAIN LEVEL 100' -0" T.O. GYPCRETE -SECOND LEVEL 110' -9 3/8"T.O. GYPCRETE -SECOND LEVEL 110' -9 3/8" T.O. ROOF 155' -8" T.O. ROOF 155' -8" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -3RD LEVEL 130' -7 7/8"T.O. PLATE -3RD LEVEL 130' -7 7/8" T.O. PLATE -2ND LEVEL 119' -10 1/2" T.O. PLATE -2ND LEVEL 119' -10 1/2" 14 14 11 11 9 9 T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. GYPCRETE -4TH LEVEL 132' -4 1/8" T.O. GYPCRETE -4TH LEVEL 132' -4 1/8" 10 10 12 12 5 5 4 4 8 8 EX-01 ? EX-01 EX-03 EX-05 ? EX-08 1 1 1 T.O. PLATE -4TH LEVEL 141' -5 1/4" T.O. PLATE -4TH LEVEL 141' -5 1/4" 13 13 EX-03 6 6 2 2 3 3 EX-05 EX-03 EX-03 EX-03EX-02 ? EX-06 ? ? EX-06 ?? ? EX-06 EX-03 EX-05 EX-05 EX-05 7" / 12"7" / 12"7" / 12"7" / 12"7" / 12"7" 12" EX-02 EX-02 EX-01 EX-01 EX-02 EX-01 EX-02 ? EX-06 ? EX-01 ? EX-03 SHEET PROJECT NUMBER 81211 Gallatin Rd. Suite E Bozeman, Montana 59718 406.587.9968 studiohdesigninc.comPRINTED ON:PROJECT #:FILE PATH:PROJECT NAME:DRAWN BY:CHECKED BY:THESE DRAWINGS ARE THE ORIGINAL UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED OR USED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT.REVISIONS ISSUED ISSUE DATE:10/25/2023 3:32:35 PMC:\Users\SHD8\Documents\20102-03_GC PH 4_Apartments_50-Plex_r2022_sclaytonYP63S.rvtAP3.01 202102-03 BUILDING ELEVATIONSGRAN CIELO -PHASE IVAP3.01202102-03GRAN CIELO -PHASE IVTF, MNSC10/25/202310/25/2023 SITE PLAN SUBMITTALBOZEMAN, MONTANA50 -PLEX1/8" = 1'-0"AP3.01 1 FRONT ELEVATION 1/8" = 1'-0"AP3.01 2 STREET ELEVATION TRANSPARENCY CALCULATIONS ELEVATION % TRANSPARENT FRONT STREET SIDE 1 SIDE 2 25.0% 31.2% 20.6% 23.0% FACADE AREA GLAZING AREA 11,346 SF 11,313 SF 6,835 SF 6,756 SF 2,832 SF 3,534 SF 1,411 SF 1,556 SF EXTERIOR FINISH SCHEDULE MARK DESCRIPTION MANUFACTURER MODEL SERIES DIMENSIONS FINISH COLOR COMMENTS EX-01 CEMENTITIOUS LAP SIDING JAMES HARDIE HARDIE PLANK LAP SIDING SELECT CEDARMILL 8 1/4" WIDTH; 7" EXPOSURE FACTORY PAINT AGED PEWTER EX-02 CEMENTITIOUS BOARD AND BATTEN SIDING JAMES HARDIE HARDIE PANEL VERTICAL SIDING SMOOTH 48" WIDTH; 16" O.C. BATTEN FACTORY PAINT NIGHT GRAY INSTALL W/ RAINSCREEN PER MFG. EX-03 VERTICAL RIB METAL SIDING BRIDGER STEEL TUFF RIB WALL 9" RIBS, 36" COVERAGE, 26 G.A. FACTORY PAINT WINTER WHITE EX-04 DURABLE EXTERIOR CLADDING TOPCOAT - S SIPARILA -TOPCOAT - S 1X6 FACTORY PAINT ROASTED WHEAT INSTALL W/ RAINSCREEN PER MFG. EX-05 ASPHALT SHINGLES MALARKEY - HIGHLANDER NEX, AR - FACTORY PAINT MIDNIGHT BLACK CLASS B ROOF COVER, MIN. EX-06 STRUCTURAL STEEL FRAMING PER CONTRACTOR - - - FIELD PAINT "IRON ORE" SW7069 STRUCTURAL STEEL, SUPPLY FROM FABRICATOR PRE TREATED AND PRIMED EX-07 DECK RAILING PER CONTRACTOR - - 2"X4"X1/8" FIELD PAINT "IRON ORE" SW7069 SUPPLY FROM FABRICATOR PRE TREATED AND PRIMED EX-08 FASCIA PER CONTRACTOR - - - FIELD PAINT "IRON ORE" SW7069 FASCIA EX-09 80 MIL TPO MEMBRANE ROOFING CARLISLE SURE WELD SELF ADHERING NON-REINFORCED - - WHITE CLASS B ROOF COVER, MIN.. SUBMIT ALTERNATES FOR REVIEW EX-10 80 MIL TPO MEMBRANE ROOFING CARLISLE SURE WELD SELF ADHERING NON-REINFORCED - - GRAY CLASS B ROOF COVER, MIN.. SUBMIT ALTERNATES FOR REVIEW EX-11 80 MIL TPO MEMBRANE ROOFING CARLISLE SURE WELD SELF ADHERING REINFORCED - - GRAY CLASS B ROOF COVER, MIN.. SUBMIT ALTERNATES FOR REVIEW EX-12 WIRE MESH PER CONTRACTOR - - 4"W X24"H FIELD PAINT "IRON ORE" SW7069 SUPPLY FROM FABRICATOR PRE TREATED AND PRIMED SHEET NOTES 1 EXTERIOR WALL SCONCE "VESTA AT7924", TYP. 2 PLANTER, SEE MAIN FLOOR PLAN 3 ADDRESS LOCATION; NUMBERING VARIES PER SITE POSITION