Loading...
HomeMy WebLinkAbout183_A100_Trash_Enclosure8"12'-4"8"6"8"11'-6"13'-2"6"5'-2"6'-4"8"6"11'-6"13'-2"6"7'-4 1/2"4'-1 1/2"8"6"2 A100 3 A100 4 A100 5 A100 12'-4"6" 27'-8"9'-6"9'-6"27'-8" 6'-5"8"6'-9"6'-9"6'-5"8" HEAVY DUTY PAVING PER CIVIL DRAWINGS 8"Ø CONC. FILLED PIPE BOLLARDS TYP. 10'-10"10'-10"1'-0"8"1'-0"1'-0"8"1'-0"8" TRASHTRASH 8"12'-10"8"12'-10"8" GALVANIZED STEEL POSTS TRASH ENCLOSURE9'-6"COMPOSITE FENCING SLATS WELDED STEEL FRAME METAL ROOFING 1 A100 Trash Enclosure Plan 1/4" = 1'-0"A100 5 A100 Trash Enclosure West Elevation 1/4" = 1'-0" 4 A100 Trash Enclosure North Elevation 1/4" = 1'-0" 3 A100 Trash Enclosure East Elevation 1/4" = 1'-0" 2 A100 Trash Enclosure South Elevation 1/4" = 1'-0" THIS DRAWING IS THE PROPERTY OF NEQUETTE ARCHITECTS, INC. NO PERMISSIONS ARE GRANTED TO REUSE, REPRODUCE, OR ALTER, UNLESS GRANTED IN WRITING FOR A SPECIFIC PURPOSE BY NEQ.COTTAGES AT BOZEMANBOZEMAN, MTNEQUETTE PROJECT NUMBER: 20048DISTRIBUTION LOG 07/15/22 SITE PLAN SUBMISSION 07/07/23 SITE PLAN RESUBMISSION1