Loading...
HomeMy WebLinkAbout135_A101_Building_T-Floor_Plans6:12SLOPE6:12SLOPE6:12SLOPE6:12SLOPE6:12SLOPE6:12SLOPE6:12SLOPE6:12SLOPE6:12SLOPE6:12SLOPE3.5:12 SLOPE 3.5:12 SLOPE12'-0"12'-0"VENTING NOT REQUIREDCLOSE OFF ROOFDECKING AT RIDGE,TYPICAL AT OVERHANGS4'-0"4'-0"RIDGE VENT REQUIRED TO BECLOSED OFF FOR A MINIMUMOF 4'-0" FROM FIRE PARTITIONBETWEEN UNITS24'-0"50'-0" 23'-10"1'-9"4"6'-9 1/2"1'-0"1'-0"1'-0"12'-0"12'-0"24'-0"23'-10"1'-9"6'-9 1/2"1'-0"1'-0"1'-0" 8'-6 1/2"8'-6 1/2"1CH01-T/1CH01-T1 BR CARRIAGE TWINTHIS DRAWING IS THE PROPERTY OF NEQUETTE ARCHITECTS, INC. NO PERMISSIONS ARE GRANTED TO REUSE, REPRODUCE, OR ALTER, UNLESS GRANTED IN WRITING FOR A SPECIFIC PURPOSE BY NEQ.COTTAGES AT BOZEMAN BOZEMAN, MT NEQUETTE PROJECT NUMBER: 20048DISTRIBUTION LOG07/15/22SITE PLAN SUBMISSION07/07/23SITE PLAN RESUBMISSION1A101ATTIC VENTILATION REQUIREMENTS 1BR CARRIAGE HOUSEPRODUCTS USED:COR-A-VENT V600 RIDGE VENT - 20si per lfSOFFIT VENT 3" dia - 7.06si eachCALCULATIONS "1BR CARRIAGE HOUSE"82,947 square inches / 150 = 553 si requiredHigh13 lf (V600) = 260 si = 47% of 553 (minimum high ventilation)Low@ 260 high, maximum low is 293 si (53% of total ventilation = maximum low ventilation)42 soffit vents equally spaced at bays1A101Roof Plan1/4" = 1'-0"