HomeMy WebLinkAbout011 L0.1 North Wallace Residence PLANTING PLAN.pdf54.009.00'CONCRETE2.00'9.00'9.00'10.00'28.2541.50'DROP CURBVISION
T
RI
A
N
GL
E
VISION TRIANGLE3'-0"10.00' UTILITYEASEMENT10.00' UTILITYEASMENT20.00'DRIVE AISLE5'-0"SETBACK15'-0"SETBACK5'-0"SETBACK15'-0"SETBACK12L0.221L0.2NEW WATER LINENEW GAS LINEEXISTING GAS LINESHRUBSCODEQTYBOTANICAL / COMMON NAMESIZECM4CHAMAEBATIARIA MILLEFOLIUM5 GALDESERT SWEETES3ERICAMERIA NAUSEOSA SPECIOSA1 GALBLUE RABBITBRUSHGRASSESCODEQTYBOTANICAL / COMMON NAMESIZEDO30DESCHAMPSIA CESPITOSA 'TAUTRäGER'1 GALTAUTRäGER TUFTED HAIR GRASSFS60FESTUCA IDAHOENSIS 'SISKIYOU BLUE'4" POTSISKIYOU BLUE FESCUEHS37HELICTOTRICHON SEMPERVIRENS 'SAPPHIRE'1 GALSAPPHIRE BLUE OAT GRASSPERENNIALSCODEQTYBOTANICAL / COMMON NAMESIZEBD3BAPTISIA X 'DUTCH CHOCOLATE' TM1 GALDUTCH CHOCOLATE DECADENCE WILD INDIGOGE16GERANIUM IBERICUM 'JOHNSON'S BLUE'1 GALIBERIAN GERANIUMNW12NEPETA X FAASSENII 'WALKER'S LOW'1 GALWALKER'S LOW CATMINTSY12SALVIA X SYLVESTRIS 'CARADONNA'1 GALMEADOW SAGEGROUND COVERSCODEQTYBOTANICAL / COMMON NAMECONTSPACINGSD36SEDUM DASYPHYLLUM2" POTS18" o.c.GREY STONECROPTS1,699 SFTURF SODSODDROUGHT TOLERANT FESCUE BLENDPLANT SCHEDULESYMBOLDESCRIPTIONEXISTING TREES TO REMAINBLACK BASALT 1"12REFERENCE NOTES SCHEDULEDRAWING NUMBER:PHASE:DATE:DRAWING TITLE:PROJECT NUMBER:DRAWN BY /CHECKED BY:REVISIONS:0"1"2"PERMIT SETGROVE 3 SF SUMMARYLIVING LEVEL843GARAGE LEVEL377UPPER LEVEL1228SOLARIUM345TOTAL2793GARAGE SF568L0.1PLANTINGPLAN22-000545NORTHWALLACERESIDENCESAUGUST 24, 2023JBMGSITE PLAN428 NORTH WALLACENO.DESCRIPTIONDATECALL BEFORE YOU DIGGENERAL LANDSCAPE NOTES1.THE LANDSCAPE ARCHITECTURAL PLANS ARE TO BE USED INCONJUNCTION WITH THE CIVIL, IRRIGATION, MECHANICAL,ELECTRICAL, AND ARCHITECTURAL SITE PLANS TO FORMCOMPLETE INFORMATION REGARDING THE SITE.2.LANDSCAPE CONSTRUCTION SHALL CONFORM TO ALL APPLICABLESTATE AND LOCAL CODES AND SPECIFICATIONS.3.ALL MATERIAL AND WORKMANSHIP SHALL BE MAINTAINED ANDGUARANTEED FOR A PERIOD OF 12 MONTHS FOLLOWING THESUBSTANTIAL COMPLETION DATE.4.LANDSCAPE CONTRACTOR SHALL EXAMINE THE SITE CONDITIONSUNDER WHICH THE WORK IS TO BE PERFORMED, NOTIFY THEGENERAL CONTRACTOR IN WRITING OF UNSATISFACTORYCONDITIONS. DO NOT PROCEED UNTIL CONDITIONS HAVE BEENCORRECTED.5.BEFORE COMMENCING WORK, LANDSCAPE CONTRACTOR SHALLCONTACT APPROPRIATE UTILITY COMPANIES FOR UTILITYLOCATIONS, AND COORDINATE WITH GENERAL CONTRACTOR INREGARD TO LOCATION OF PROPOSED UTILITIES, IRRIGATIONSLEEVES, CONDUITS, ETC. CONTRACTOR IS RESPONSIBLE FORANY DAMAGE AS A RESULT OF THE LANDSCAPE CONSTRUCTION.6.VERIFY THAT SUBGRADE PREPARATION HAS BEEN COMPLETED TOACCEPTABLE TOLERANCES PRIOR TO BEGINNING ANY WORK.PLANTING NOTES1.ALL TREE AND SHRUB LOCATIONS ARE TO BE STAKED ON SITE FORAPPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TOINSTALLATION.2.SUBSTITUTIONS: THE LANDSCAPE ARCHITECT SHALL APPROVEANY SUBSTITUTION.3.DO NOT PRUNE PLANTS UNLESS DIRECTED TO DO SO BY THELANDSCAPE ARCHITECT.4.CONTAINER STOCK IS PREFERRED FOR ALL PLANTS. IFCONTAINER STOCK IS NOT AVAILABLE FOR TREES, THEN ALL B&BPLANT MATERIAL SHALL HAVE ALL WIRE, TWINE, OR OTHERCONTAINMENT MATERIAL, EXCEPT FOR 100% HEMP BURLAP,REMOVED FROM THE TRUNK AND ROOT BALL OF THE PLANT PRIORTO PLANTING. REMOVE THE TOP 2/3 OF THE HEMP BURLAP AFTERPLACING PLANT IN THE PIT.5.PLANTING SOIL FOR ALL PLANTING AREAS:a.DO NOT STORE BULK MATERIALS NEAR STRUCTURES, OVEREXISTING PLANTING, OVER UTILITIES, WALKWAYS ANDPAVEMENTS.b.PROVIDE EROSION CONTROL MEASURES TO PREVENTDISPLACEMENT OF BULK MATERIALS, DISCHARGE INTOWATERWAYS OR SEWERS, AND AIRBORNE DUST.c.PREPARING PLANTING AREAS, AND SPREADING SOIL SHALL BECOMPLETED BY THE LANDSCAPE CONTRACTOR ANDSUPERVISED BY THE GENERAL CONTRACTOR SO THATGRADES ARE MET AS NOTED ON THE GRADING PLANS.d.ALL IMPORTED PLANTING AREA SOIL SHALL BE 2-WAY (60%SAND, 40% COMPOST) TOPSOIL FROM AN APPROVED SOURCE.PROVIDE A 1-QUART SAMPLE FOR APPROVAL PRIOR TOIMPORTING ANY SOIL. TOPSOIL NOT MEETING INDUSTRYSTANDARDS FOR COMPOSITION AND NUTRIENTS SHALL BEREJECTED.e.QUANTITY OF IMPORTED SOIL SHALL BE EQUAL TO A MINIMUMOF THREE (3) INCHES DEPTH IN ALL LANDSCAPE BEDS. THESOIL INSTALLATION PROCESS OUTLINED BELOW SHALLCOMBINE THIS QUANTITY OF IMPORTED SOIL WITH SUBSOIL TORESULT IN AN EIGHT (3) INCH DEPTH OF PLANTING SOIL.f.SOIL INSTALLATION: APPLY TWO (2) INCHES OF APPROVEDIMPORTED SOIL OVER PREPARED SUBGRADE. TILL IMPORTEDSOIL INTO TOP TWO (2) INCHES OF SUBSOIL TO CREATEAMENDED SOIL. APPLY AN ADDITIONAL INCH (1) INCH OFIMPORTED SOIL OVER AMENDED SOIL, TO CREATE AN THREE(3) INCH LAYER OF PLANTING SOIL. ROLL AND RAKE SMOOTH.ENSURE NO ROCKS OR OTHER DEBRIS EXCEEDING 3 INCHES INDIAMETER REMAIN.g.IF PREPARED SOIL OR PREPARED SUBGRADE ISRE-COMPACTED, RESTORE AS DIRECTED BY THE LANDSCAPEARCHITECT.7.MULCH ENTIRE LANDSCAPE AREA TO A DEPTH OF 2 INCHES WITHAGGREGATE MULCH TO BE APPROVED BY LA. PROVIDE A 1-QUARTSAMPLE FOR APPROVAL PRIOR TO IMPORTING ANY MULCH.8.MULCH SHALL NOT BE ABOVE OR MORE THAN 1/2 INCH BELOWADJOINING SURFACE. MULCH SHALL BE HELD BACK 2-3 INCHESFROM THE STEMS AND TRUNKS OF PLANTS.9.ROOT BARRIER SHALL BE INSTALLED ON ALL TREES WITHIN 6' OF ACURB OR SIDEWALK.10.DURING PLANTING OPERATIONS, KEEP ADJACENT PAVING AREASCLEAN AND PROTECTED FROM DAMAGE. WORK AREA SHALL BEKEPT CLEAN AND ORDERLY.11.DO NOT REMOVE NURSERY TAGS, STAKES, AND TIES UNTILDIRECTED TO DO SO BY THE LANDSCAPE ARCHITECT.12.WARRANTY: INSTALLER AGREES TO WARRANTY PLANTING THATFAILS IN MATERIALS, WORKMANSHIP OR GROWTH WITHIN AWARRANTY PERIOD OF 12 MONTHS FROM THE DATE OF PLANTINGCOMPLETION.13.PLANT SYMBOLS SHALL DICTATE PLANT COUNT.14.ALL LANDSCAPING SHALL BE PLANTED AND MAINTAINED IN A LIVINGCONDITION BY THE CONTRACTOR UNTIL FINAL OWNERACCEPTANCE.1807 FLORENCE AVE, BUTTE, MT 59701P: 406.792.2020SCJSTUDIOLA.COM1DRAFTLANDSCAPE2022-0721MONTANAL A N D SCAPE ARCHITECTLICENSEDNo. 20067MARK S. GARFF2SITE PLAN2023-0824IRRIGATION WATER REQUIREMENTANNUAL WATER USE CALCULATIONS(USING THE EQUATION: BASELINE = ETo x A x Cu)WHERE:·ETo = 1.44 INCHES/MONTH·A = 2,320 S.F. LANDSCAPED AREA·Cu = 0.6233 (FOR RESULTS IN GALLONS/MONTH)OUTPUT BASELINE= 2,082 GALLONS/MONTH·2,082 GALLONS/MONTH x 5 MONTHS = 10,410 GALLONS/YEARTOTAL ANNUAL WATER USE DEMAND = 10,410 GALLONS PER YEAR33IRRIGATIONWATER USE2023-1010