HomeMy WebLinkAbout012.01 - Appendix K - L.Lehigh email Re CCON_1
Cody J. Croskey
From:Mikaela Schultz <mschultz@BOZEMAN.NET>
Sent:Thursday, September 21, 2023 12:07 PM
To:Jenny Connelley; Lance Lehigh; Cody J. Croskey
Cc:Tyler Steinway; Henri Foch <hfoch@intrinsikarchitecture.com>
(hfoch@intrinsikarchitecture.com)
Subject:RE: [EXTERNAL]23243 Cooper Block SP Fire Line CCON
Attachments:ATT00001.txt; ATT00002.htm
Cody,
Please be sure to submit this correspondence with your site plan submial via PDox to resolve this CON R maer.
Thanks for reaching out on these items.
City of Bozeman MT
Mikaela Schultz, EI | Transportation and Engineering
(406) 582-2388
From: Jenny Connelley <jconnelley@BOZEMAN.NET>
Sent: Thursday, September 21, 2023 11:35 AM
To: Lance Lehigh <llehigh@BOZEMAN.NET>; Cody.Croskey <cody.croskey@tdhengineering.com>
Cc: Mikaela Schultz <mschultz@BOZEMAN.NET>; Tyler Steinway <tsteinway@intrinsikarchitecture.com>; Henri Foch
<hfoch@intrinsikarchitecture.com> (hfoch@intrinsikarchitecture.com) <hfoch@intrinsikarchitecture.com>
Subject: RE: [EXTERNAL]23243 Cooper Block SP Fire Line CCON
This will need to go through MDT for permi?ng if you are cu?ng into Main Street.
Jenny Connelley | Engineering Technician
City of Bozeman | 20 E. Olive St. | Bozeman, MT 59715
P: 406.582.2922
www.bozeman.net
From: Lance Lehigh <llehigh@BOZEMAN.NET>
Sent: Thursday, September 21, 2023 11:27 AM
To: Cody.Croskey <cody.croskey@tdhengineering.com>
Cc: Mikaela Schultz <mschultz@BOZEMAN.NET>; Tyler Steinway <tsteinway@intrinsikarchitecture.com>; Henri Foch
<hfoch@intrinsikarchitecture.com> (hfoch@intrinsikarchitecture.com) <hfoch@intrinsikarchitecture.com>; Jenny
Connelley <jconnelley@BOZEMAN.NET>
Subject: RE: [EXTERNAL]23243 Cooper Block SP Fire Line CCON
Concurrent construcAon is not required for this. Please follow the standard infrastructure review process and we will
need a detailed traffic control plan for main street.
Please try and complete the construcAon on main street ASAP as we will not allow for long-duraAon street closures
given the traffic load on Main.
2
Lance
City of Bozeman MT
Lance Lehigh, PE, CFM | Engineer III
From: Cody J. Croskey <Cody.Croskey@tdhengineering.com>
Sent: Thursday, September 21, 2023 9:35 AM
To: Lance Lehigh <llehigh@BOZEMAN.NET>
Cc: Mikaela Schultz <mschultz@BOZEMAN.NET>; Tyler Steinway <tsteinway@intrinsikarchitecture.com>; Henri Foch
<hfoch@intrinsikarchitecture.com> (hfoch@intrinsikarchitecture.com) <hfoch@intrinsikarchitecture.com>
Subject: [EXTERNAL]23243 Cooper Block SP Fire Line CCON
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Good morning Lance,
Mikaela suggested we get in touch with you regarding a new fire line in Main Street for the 23243 Cooper Block SP
project (previously the downtown anAques store). Do new fire lines typically require concurrent construcAon if no public
water main improvements are involved? I believe fire lines are considered private uAliAes from the valve at the main to
the building (BMC 40.02.760 and 40.02.790.A).
We understand the fire line sAll requires separate engineering review, pre-con, street cut/MDT encroachment permits,
and cerAficaAon/as-builts. However we weren’t sure if the other CCON requirements would apply (i.e., Irrevocable Offer
of DedicaAon) or how a fire line could be required to be installed and accepted prior to building permits being issued?
Here’s a snip of the uAlity plan for refence. Please let us know if you think this needs to follow the concurrent
construcAon process or just the fire service line standard.
3
Thanks!
Cody Croskey, P.E. l Civil Engineer
TD&H Engineering
234 E. Babcock Street, Suite 3 l Bozeman, MT 59715
p: 406.586.0277 l c: 406.580.0685 l d: 406.602.4091
www.tdhengineering.com