HomeMy WebLinkAbout001 - NARRATIVECOOPER BLOCK MIXED USE BUILDING
CCOA/SITE PLAN APPLICATION – RC1
SEPTEMBER 2023
TABLE OF CONTENTS
1. Commercial Certificate of Appropriateness Application, Site Plan Forms & Checklists
2. Project Team
3. Narrative
a. General site information
b. Site considerations
c. Parkland
d. Building design
e. Landscaping
f. Site Lighting
g. Traffic
h. Water rights
i. Departures
j. CCOA Checklist Items
k. DEM Checklist Items
4. Appendices
Appendix A – Vicinity Map
Appendix B – Existing zoning
Appendix C – Existing Plat
Appendix D – Existing Site Photos & Historical Images
Appendix E – Property Record Form 2016
Appendix F – SID 565 Space data
Appendix G – Waiver of TIS Request Letter
Appendix H – Water, Sewer and Stormwater Design Report
Appendix I – Stormwater Maintenance Plan
Appendix J – CILWR Determination Request
1. Site Plan Application Information, Forms & Checklists
The Site Plan form has been included per City requirements, and the applicant will submit the
required fee once the application has been deemed adequate for review. Please see the
estimated site plan fee amount below:
Component Fee Quantity Total
Base $3,069 $3,069
Dwelling Units $125 per unit 4 $500
Commercial Area $400 Per 1,000 SF 3,701 $1,480.04
Total $5,049.44
2. Project Team
OWNER / APPLICANT RWH REALTY LLC
(Attn: Randy Scully)
randy@scullywestproperties.com
5073 Patterson Road
Bozeman, Montana 59718
p. 914.450.8803
PROJECT CONSULTANTS
ARCHITECT/PLANNER Intrinsik Architecture
(Attn. Tyler Steinway)
Tsteinway@intrinsikarchitecture.com
106 East Babcock, Suite 1A
Bozeman, Montana 59715
p. 406.582.8988
CIVIL ENGINEER TD&H Engineering
(Attn: Kyle Scarr)
Kyle.scarr@tdhengineering.com
234 East Babcock Street, Suite 3
Bozeman, Montana 59715
p. 406.586.0277
3. Site Plan Narrative
A. General site information
This Site Plan Application proposes to re-envision a historic building on Main Street by
preserving and rehabilitating the existing two-story brick façade and constructing a new three-
story building with partial basement. Currently vacant, the ground floor was most recently home
to an antique shop and the second-floor level contains one residential apartment. A small brick
shed occupies the rear of the lot adjacent to the alley. The proposed program for the new
building will be comprised of a retail space and common areas on the ground floor, office space
and one residential apartment on the second floor and three residential apartments on the third
floor. The Cooper Block building is listed as contributing to the Main Street Historic District and
as such, the front façade is proposed to be maintained in its current form to the greatest extent
possible and rehabilitated with a new ground level storefront, new windows on the second floor,
and a reconstructed brick parapet.
Originally constructed in 1872, the Cooper Block building was much larger than its current form.
It contained 11 narrow arched-top windows on the second-floor level and a matching number of
large arched windows/doors on the ground floor. Over time the building was modified and
modernized replacing the large arched openings on the ground floor level with more transparent
storefront designs more common to buildings constructed in the early 1900s. At some point the
building was divided into three separate properties which shared the continuous front façade.
These storefronts could be easily distinguished by the number of windows on the second story.
The eastern portion had four windows (Subject Site 122 East Main), the middle portion had
three windows (118 East Main) and the western portion had four windows (112 East Main). The
portion of the building at 112 East Main was demolished in 1972 to allow for the construction of
the First National Bank. Additionally, the portion at 118 East Main was altered in approximately
2002 with an extensive remodel and a large modern addition at the rear of the building. While
the historic masonry façade of the eastern portion of the building remains mostly intact, the
structure behind it and the Main Street storefront and parapet have been modified.
The proposed scope of work includes rehabilitating the historic Main Street façade and
demolishing the existing structure behind it. The new construction includes three stories infilled
on the narrow lot. The first floor will remain retail, the second floor will include space for an office
and a residential unit, and the third floor will be set back from Main Street and accommodate
three residential units.
B. Site considerations
1. Setbacks & Utilities
Setbacks
This building will front along Main Street and will take advantage of the Storefront Block frontage
which puts the fact of the building at the back of the 12’ sidewalk. This building is located in the
B-3 core and will have 0’ setbacks off the sides of the building. Additionally on the rear the
building will be setback approximately 23’ from the property line. This building complies with all
of the B-3 and block frontage setbacks.
Infrastructure
New water and sewer services will be constructed off the Main Street main lines to service this
building. It is understood that proper permits will be required from MDT for any work in Main
Street ROW. The current thinking is to bore from the basement of the building out into Main
Street to create the connections.
2. Block Frontage
The project is located on Main Street. The vision for this project is to maintain the active
streetscape and as such will utilize the Storefront Block Frontage. The proposal is to rehabilitate
the existing brick façade and setback the upper level addition to minimize the visual impact to
maintain the historic downtown aesthetic.
3. Accessible provision
This development will be designed in compliance with the IBC, including its accessible
requirements; as well as ANSI 117.1 standards for accessible design. Specifically pertaining to
this site plan, the site design provides five (5) accessible parking spaces across the whole site.
All resident building entries, the refuse areas, and landscaped open space, are connected via
an accessible pathway system which is in compliance with the requirements for an accessible
route.
4. Parking
Given the small downtown nature of this lot parking for this building will be provided in the form
of the existing SID 565 Spaces. In 1976 this project paid for 10.9 SID spaces which are still in
use today. The redevelopment of this site stays within the paid for spaces and does not require
any additional spaces. Please see the Parking Calculations included below and Appendix F for
more information on the SID 565 Spaces.
Parking Calculations Table
Level Program Square
Footage
3,000 SF
Exempt
(B-3)
Square
Footage
After
Reduction
Number
of
Residenti
al Units
Parking
Factor
Required
Number
of
Spaces
Blanket
Reductions
Required
Parking
after
reduction
Basement Mechanical
& Tennant
Storage
2,624 0 0 0 N/A N/A N/A N/A
Basement Retail
Office
290 0 290 0 250 1.16 20% 0.7
Ground Retail Commercial 2,402 2,402 0 0 300 0 40% 0
Level 2 Office 1,603 598 1,005 0 250 4 20% 3
Level 2 Residential 1,251 0 0 1 1 1 0 1
Level 3 Residential 2,440 0 0 3 1 3 0 3
TOTAL 9,825 3,000 4 7
Other Reductions
Within 800’ of Transit Stop – 10% 7
Within 800’ of Structured Parking – 15% 6
TOTAL REQUIRED 6
TOTAL PROVIDED (in SID Spaces) 10.9
5. Bike Parking
The required parking for the site is 6 spaces which then requires 0.6 bike parking spaces (10%
of total parking). The minimum number of bike parking spaces is 2. There is an existing bike
rack on the sidewalk directly in front of the building which provides the required 2 parking
spaces.
6. Trash Enclosure
Refuse and recycling containers will be located in the rear of the site adjacent to the alley
located behind a fence. It is important to note that while the garbage tots are located behind a
fence, the fence is not required to meet any UDC design standards for service area because it
is located on an alley (38.520.070.B.3.). This screening element is proposed to reduce the
visual impact of the trash area. Please refer to Sheets SP100 & PS201 for location and access.
7. Open Space
The open space for this project is proposed to be provided within the building. This project
proposes four residential units that are a mix of two studio units and two two-bedroom units. In
total this project is required to provide 500 SF of residential open space. This will be
accomplished through private balcony spaces and a common roof court area. Please see the
table below for the open space calculations and the plan set for the proposed open space
locations.
OPEN SPACE CALCULATIONS
Program Number of
Units
Open Space
Factor Required Open Space
Studio 2 100 200 SF
1 Bedrooms 2 100 200 SF
TOTAL REQUIRED 400 SF
Provided Open Space
Private Balcony Open Space 200 SF (377 SF TOTAL PROVIDED)
Common Roof Court Open Space 200 SF (300 SF TOTAL PROVIDED)
TOTAL PROVIDED 400 SF (677 SF TOTAL PROVIDED)
9. Construction management
To provide a safe working environment for adjacent properties, the project will utilize temporary
construction fencing around the project extents which generally follows the perimeter of the
property. A 40-cy dumpster will be located near the site in an easily accessible and clearly
defined area to provide easy disposal of construction waste. The dumpsters will typically be
placed near the alley to allow for easy pick up. Construction staging areas will be Likely be in
the adjacent parking lot owned by the property owner on East Babcock. See C2.2 Construction
Management Plan for more information.
C. Parkland
This application proposes to pay CIL of Parkland rather than dedicate any due to it being
located in the commercial core of Bozeman. CIL of Parkland is also supported by Resolution
4784. It states, “CIL will always be accepted for development within the B-3 District.”
Additionally, Resolution 4784 indicates areas less than 5,300 sf are more favorable for CIL.
Please see the calculations below for the required CIL amount.
D. Building design
The Cooper Block Building at 122 E. Main St. was originally constructed in 1872. While the
historic masonry façade remains intact, the structure behind it and the Main St. storefront has
been modified. The proposed scope of work includes rehabilitating the historic Main St. façade
and demolishing the existing structure behind it. The new construction includes three stories
infilled on the narrow lot. The first floor will remain retail, the second floor will include space for
an office and a residential unit, and the third floor will be set back from Main St. and
accommodate only residential spaces. There are a variety of outdoor areas incorporated into
the design including private balconies and a carved-out courtyard on the third floor. The building
will be constructed with a face brick – informed by the abundance of historic masonry buildings
on Main St.
F. Site lighting
There are minimal accent lights proposed on the rear of the building as well as the top story of
the front elevation. Please see plan set sheet ES1.1 – ES1.4 for more information on the
proposed locations, photometrics and details.
G. Traffic
23243 Cooper Block SP Park and Recreation Requirements
Total site area
(ac) 0.09
(s) school or park
sites (ac) Total excluded (ac) 0.02
(D) Net
residential
density 57
(c) commercial
lot area (ac)
(a) ROW &
easements (ac)
(N) Net residential lot
area (ac) 0.07 Zoning District Other
(i) industrial lot
area (ac)
(d) Open
space/Park (ac) 0.02 (du) Number of units 4
(M) Max
density by zone 12
Required land
dedication Required cash-in-lieu
Adjustments to Parkland
Requirements Approved Parkland Dedication
Net residential
land area (ac) 0.07
Net residential
land area (ac) 0.07
Parkland dedication
required (ac) 0.02
Land
dedication (ac) 0.00
Dwellings/acre
(du) 8 Dwelling/acre (du) 4
Land already provided
(ac) 0.00 Cash-in-lieu ($) $1,132.56
Acre/du of land 0.03 Acre/du of land 0.03
Land dedication
proposed (ac) 0
Additional in-
lieu ($) $2,265.12
Land
dedication (ac) 0.02
Equivalent land
area (ac) 0.01
Land equivalent required
(ac) 0.02 Total CILP/IILP $3,397.68
land appraisal
value ($/sf) $2.60
Land appraisal value
($/sf) $2.60
Cash-in-lieu ($) $1,132.56 In-lieu fee equivalent ($) $2,265.12
A memo requesting a waiver to provide a TIS has been provided with this application (Appendix
G). Included in that request is a trip generation report. That report shows that the net weekday
trips ends at the site are expected to increase by 167 average daily trips while the net peak hour
trips are expected to increase by 7 and 9 trips ends during the AM and PM peak hours,
respectively. It is our request given the limited net increase in trips and built out nature of the
existing transportation network that a waiver to providing a traffic impact study be granted.
H. Water rights
The City of Bozeman Engineering Department (Griffin Neilson) has been contacted to determine
what cash-in-lieu of water rights are required for the site. Upon final acceptance by the City of
Bozeman Engineering Department, the fee will be paid by the owner prior to site plan approval.
Please see Appendix J documenting the ongoing conversation with Engineering.
I. Departures
There are no departures included in this application.
J. CCOA Checklist Items
If demolition is proposed, provide a complete submittal with checklist items in form DEM.
Applicant Response: The current proposal is to demolish everything behind the front
façade of the building and renovate the existing storefront. The goal is to
preserve/renovate the front facade to do minor repairs and bring it up to current codes.
Everything behind the front façade will be new construction.
Date of construction of structure if known.
Applicant Response: The original structure was built in 1872. Originally, the Cooper
Block building consisted of 11 bays of arch windows but 4 of those bays on the west end
were removed in 1972 when the first national bank expanded to the east. Additionally,
slight alterations were made to the middle three bays (Bozeman Optical) in order to give
the appearance of a slightly different building above this business.
Property record form, both original and updated.
Applicant Response: Please see the property record form attached as Appendix E &E.2.
Project narrative providing a thorough description of what is being proposed including a list of all
alterations/changes proposed on the property.
Applicant Response: Please see Site Plan Sheet SP200-201 and Section 3 above for our
project narrative outlining the proposed changes.
Historical information such as pictures, plans, authenticated verbal records and similar research
documentation that may be relevant to the proposed changes to the property.
Applicant Response: Please see Appendix E& E.2 for Historic Property Records.
Appendix E contains a set of historic photos for reference. We have also included
reference as built conditions on sheet SP200.
One current picture of each elevation of each structure planned to be altered that will clearly
express the nature and extend of the changes planned. All pictures should include elevation
direction and relevant information on the proposed changes.
Applicant Response: The drawing set contains detailed elevations for each face of the
building. Additionally, please see Appendix D for site photos that depict each elevation.
Include a separate site plan displaying existing conditions such as lot boundaries, dimensions,
setbacks, existing easements, access points, vehicular and pedestrian circulation, buildings,
natural features, and topography.
Applicant Response: Please see Plan Set Sheet C2.1 for an existing site plan and sheets
SP100 for our proposed Site Plan.
Site plan depending on project complexity with north narrow, property dimensions, location of
buildings, parking, driveways, fencing, landscaping, setbacks, utilities, access, pedestrian
facilities, and location of changes proposed.
Applicant Response: Please see Plan Set Sheet C2.1 for an existing site plan and sheets
SP100 for our proposed Site Plan.
Front, rear and side elevations of all buildings, structures, fences and walls with height
dimensions and roof pitches if new construction or changes to elevations are proposed. Show
existing and proposed changes.
Applicant Response: We have included as-built and proposed elevations in the drawing
set, please see sheets SP300-303. Proposed changes are indicated on the drawings.
Building elevations shall include proposed exterior building materials, windows and doors
including a color and building material palette for all proposed features keyed to the building
elevations.
Applicant Response: Please see sheets SP300-303 for the building elevations and sheet
SP310 for the proposed materials. Additionally, Please see the Architectural Plan Set.
One exhibit or illustration shall include all the internal and external elements of a structure to be
removed or altered by a project. All elements to be removed or altered, and to what extent, shall
be clearly identified and shall include those elements to be removed and reinstalled.
Applicant Response: Please see the included drawing set this information.
For any non-conforming structure, an analysis of demolition to determine whether the threshold
for loss of protected nonconforming status per Section 38.280.040.B BMC has been met or
surpassed.
Applicant Response: At this time there are no known non-conformities, and the proposed
building will comply with the Unified Development Code.
For minor screen, storefront or window/door changes or replacements, and other minor
changes: pictures, specifications and other information that will clearly express the proposed
changes or alterations to the property.
Applicant Response: Please see the finish selections on SP310. Additionally, lighting
plan set sheet ES1.4 for cutsheet information.
Cutsheets or brochure pages for proposed windows, doors, exterior lighting or other detailed
alterations if building elevations are not detailed enough to depict features accurately.
Applicant Response: Please see the finish selections on SP310. Additionally, lighting
plan set sheet ES1.4 for cutsheet information.
Floor plans showing floor layout including square footage and proposed use for each room and
area within the building clearly showing areas to be changed or added to. Suggested scale of
1/4” = 1’-0”.
Applicant Response: Floor plans have been included in the architectural plan set.
Additionally, please see the As-Built drawing sheets for existing floor plans. Detailed
plans will follow for Building Permit Applications.
Parking plan and calculation for all uses, if proposed changes to the property require review of
parking requirements.
Applicant Response: Given the small downtown nature of this lot parking for this
building will be provided in the form of the existing SID 565 Spaces. In 1976 this project
paid for 10.9 SID spaces which are still in use today. The redevelopment of this site stays
within the paid for spaces and does not require any additional spaces. Please see the
Parking Calculations included above.
A schedule for the proposed changes to the property if to be phased or if applicable.
Applicant Response: The Applicant is not going to phase the improvements proposed in
this application. Any additional modifications will be submitted and approved through a
MOD Application, and subsequent Building Permit Applications where required.
K. Demolition Checklist
1. Project narrative providing a thorough description of what is being proposed including a list of
all alterations proposed to buildings, structures and site layouts on the property.
Application Response: Please see Appendix E & E.2 for Historic Property Records.
Appendix E contains a set of historic photos for reference. We have also included
reference as built conditions on sheet SP200. The proposal is to demolish everything
behind the front façade and do minor rehabilitation to the front façade but largely leave it
in its current form.
2. Historical information, such as pictures, plans, authenticated verbal records and similar
research documentation which describe the property’s historic significance that may be relevant
to the proposed changes to the property. A current Montana Property Record Form may be used
to document the existing conditions on the site and determine the property’s historic
significance.
Application Response: Please see Appendix E & E.2 for Historic Property Records.
Appendix E contains a set of historic photos for reference. We have also included
reference as built conditions on sheet SP200.
3. One current picture of each elevation of each structure planned to be altered that will clearly
express the nature and extent of the changes planned. All pictures should include elevation
direction and relevant information on the proposed changes.
Applicant Response: Please See Appendix E for reference pictures of the building.
4. Site plan showing), parking, driveways, fencing, landscaping, setbacks.
a. Property dimensions
b. Location of building(s) and changes proposed
c. Setbacks
d. Pedestrian and vehicular circulation
e. Location of utilities
Application Response: Please see plan set sheet C2.1 and SP200-201 for this
information.
5. One exhibit or illustration shall include all the internal and external elements of a structure to
be removed or altered by a project. All elements to be removed or altered, and to what extent,
shall be clearly identified and shall include those elements to be removed and reinstalled.
Application Response: Please see plan set sheet C2.1 and SP200-201 for this
information.
6. For any non-conforming structure, an analysis of demolition to determine whether the
threshold for loss of protected non-conforming status per Section 38.280.040 BMC has been
met or surpassed.
Application Response: At this time there are no known non-conformities and the
proposed building will comply with the Unified Development Code.
7. If the property is classified as historic, whether by listing on the National Register of Historic
Places, identification as “eligible” or “contributing,” identification as a Landmark or in a local
district, definitive evidence shall be provided in support of demolishing the structure under
Section 38.340.090.C and Section 38.340.100 including:
a. The structure or site has no viable economic or useful life remaining, based on evidence
supplied by the applicant. This may include a structural analysis and cost comparison
evaluating the cost to repair and/ or rehabilitate versus the cost of demolition and
redevelopment using the International Existing Buildings Code.
b. The structure or site is a threat to public health or safety, and that no reasonable repairs or
alterations will remove such threat; any costs associated with the removal of health or safety
threats must exceed the value of the structure.
Application Response: The only historically significant portion of the building is the front
façade. This portion of the building is proposed to be rehabbed and will remain largely
intact. The structure is listed as contributing to the historic district although the original
building has been significantly altered. The western 4 bays of windows were removed in
1972 to allow for the construction of the First National Bank. Additionally, modifications
to the middle portion of the building (middle three bays) were done in 2003.