Loading...
HomeMy WebLinkAboutExterior Lighting SpecsTHRULINE PARTNERS DESIGN TO BUILD BSB OAC MEETING ATTENDEES:David Tolliver and Kat Belendiuk 2023 August 7 Jesse Brown,Josh Aarestad –Hyalite Custom Building Suzanne McGee,Marit Lueth –Thruline Partners Attendees met at the Thruline Partners Office at 4 PM.Meeting intent was to review HCB agenda items and update from site.TLP Agenda:kitchen layout options. ACTION ITEMS: ●TLP: ○Submit structural details to city ○Contact surveyor for plat and utility maps,alert to curb stop ○Investigate with city the potential of utilizing both water lines ○Confirm lower level egress window sill heights 44”max. ○Provide window R.O.framing Thursday 8/10 ○Provide site plan to K&D for negotiating purchase of sliver of adjacent lot ○Follow up with Geotech Engineer re:foundation waterproofing approach and sump pump ○Send K&D WOH bedroom light alternatives ●HCB: ○Review trusses and roof framing once exposed,attn:above dining and kitchen ○Begin working w/Xypex waterproofing rep.Derek ○Salvage concrete slabs and stone fountain pieces ○Look into sump pump performance and drainage solutions SCHEDULE ●TLP,HCB w/Structural engineer 10 AM,8/10 @ BSB. ●Next OAC meeting 4 PM,8/14 @ BSB or TLP ●HCB to complete demo this week (8.7 -8.11) ●Plan to begin window RO Thursday 8/10 MEETING NOTES: BASEMENT BEAM ●Demo revealed compromised joists and awkward,jogged beam condition at media room/rec. room ceiling beams. ●K&D approved moving forward with recessing new beam solution in floor pack. ●Team will review on site with structural engineer 8/10. THRULINE PARTNERS ||212 S WALLACE AVE STE 301 BOZEMAN MT 59715 ||(406)282-4411 thrulinepartners.com 1 Per Table 38.570.040-2. Entrance requires 2.5 - 5 foot candles Product Lumens / Feet squared above pavement = Foot candles 800 lm / (6 ft) sq = 22.22 foot candles (2) total fixtures exceed requirements LITTLE SPANISH SCHOOL