Little Spanish Preschool - 130 Flanders Mill Rd
Sewer, Water, Storm Report for Site Plan Application
Introduction
This summary report outlines the impact of sewer, water, and stormwater by the proposed Little
Spanish Preschool Site Plan at 130 Flanders Mill Rd. The site is located in R3 zoning, and the
existing building will have dual usage: upstairs to remain residential plus a group home daycare,
and the lower level to be converted into a commercial daycare facility. Although the upper and
lower level daycares have different classifications, they are treated the same for sewer and water
calculations.
Sewer
Proposed is a 4” deep sanitary sewer service line that will flow from the building into the
existing 18” sanitary sewer main in Flanders Mill. Based on the calculations shown below in
Table 1, the approximate flow rate (gpd) of the site is 1,458 gpd, with a peak hour flow of 3,234
gpd.
Table 1: Sewer CalculaƟons
Residential*
R3 Zoning 2.11
persons/dwelling
89
gallons/capita/day
2.11 persons/dwelling x 89
gallons/capita/day = 188 gpd
Daycare**
Children 25 gpd/unit 46 children x 25 gpd/child = 1,150 gpd
Employees 15 gpd/unit 8 employees x 15 gpd/employee = 120 gpd
Total:1,458 gpd
Peak Flow: 3,234 gpd
*The data used for this estimate is based on the average flow rate of 2.11 persons/dwelling and 89
gallons/capita/day.
**The data for the daycare portion of the site is taken from Table 3.1-1 MDEQ Circular 4 for Daycares.
The peaking factor is calculated as:
𝑷𝒆𝒂𝒌𝒊𝒏𝒈 𝒇𝒂𝒄𝒕𝒐𝒓=𝟏𝟖+𝑷𝟎.𝟓
𝟒+𝑷𝟎.𝟓=𝟏𝟖+𝟓𝟔𝟎.𝟓
𝟒+𝟓𝟔𝟎.𝟓=𝟐.𝟐𝟐
Peak Flow = 2.22 x 1,458 gpd = 3,234 gpd
In order to tie into the City sewer system, the on-site wastewater system must be abandoned,
which includes cutting and capping the drainfield line and either crushing, filling, or removing
the septic tank. The tank will likely be completely removed so the new water service line can be
installed closer to the house. Currently a grinder pump sends the lower level plumbing sewage to
the upper level, where it then flows out of the building into the existing septic system and
drainfield. This pump has failed numerous times and so it is the Client’s wish to excavate and
2
remove the sump and pump, which will allow for gravity feed of the lower level into the main
line that then drains to the City sewer main.
Water
The water service line is a proposed 2” Type K copper service that will connect to the water main
in Sunstone Street. This service will be installed around the building to the south where it will
connect to the existing water infrastructure. The existing well connection to the building shall be
removed and only used for irrigation.
The water service line and meter are proposed to be 2” based on the City of Bozeman’s
commercial and residential water service calculation worksheets (included as Appendix). The
approximate length of the water service. Similar to the sewer calculations, water usage is
separated between the residential portion of the building and the daycares. Although the upper
and lower portion daycares have separate classifications (group home daycare and commercial
daycare), their water usage will be lumped together and calculated using the flow rates used for
sewer from Table 3.1-1 MDEQ Circular 4.
Table 2: Water CalculaƟons
Residential*
Residence 2.11
persons/dwelling
170 gpd 2.11 persons/dwelling x 170 gpd = 359
gpd
Daycare**
Children 25 gpd/unit 46 children x 25 gpd/child = 1,150 gpd
Employees 15 gpd/unit 8 employees x 15 gpd/employee = 120 gpd
Total: 1,629 gpd
Maximum (2.3:1): 3,747 gpd; Maximum (3:1): 4,887 gpd
*The data used for this estimate is based on the average flow rate of 2.11 persons/dwelling and 170 gpd.
**The data for the daycare portion of the site is taken from Table 3.1-1 MDEQ Circular 4 for Daycares.
Stormwater
Currently this site has minimal impervious areas that include only the building and the driveway.
Much of the existing driveway will remain as is, with small portions of expansion to allow for
more parking and improved grading for ADA compliance. This project increases impervious area
by 980 sf. Pre- and post- flows were calculated for the 10-yr, 2-hr storm using the MDEQ’s
Simplified Stormwater Plan.
The site is currently graded to send runoff from a portion of the building’s roof and driveway into
an infiltration/retention basin between the driveway and Flanders Mill Rd. As much of the
existing driveway will remain and portions of it will be expanded and re-graded, the majority of
runoff will still flow towards the location of the existing retention facility. This facility is to be
expanded to allow more runoff capture. Although this existing facility is within utility easements,
there is sufficient space between existing utilities to allow for the expansion of the retention
basin. The basin area will be approximately 296 sf, graded inwards at a 4:1, with a depth of
approximately 0.75 foot, for an approximate volume of 124 cf. The total impervious area that is
3
directed towards the pond is 3,927 sf for a flow of 117 cf (based on the 10-yr, 2-hr storm per the
City of Bozeman Standards and Specifications for residential sites). Therefore, this pond can
completely capture runoff for the 10-yr, 2-hr storm.
The remainder of runoff from the impervious roof and new pathways are directed towards the
large grass yard that surrounds the building, which will capture and infiltrate the majority of the
runoff. The majority of the rain that lands on grassed landscape area surrounding the house,
which has a C-value of 0.92, will be retained and infiltrated on site.
With the expanded pond and grassed landscaping to remain, this site will retain at least half of
runoff originating from on site.
Appendix:
x MDEQ Simplified Stormwater Plan for calculating pre- and post- flows
x CoB Residential Water Service Calculation Worksheet
x CoB Commercial Water Service Calculation Worksheet
Sudivision Name
EQ#
County 0.9
Location 130 Flanders Mill 0.8
Lot/Area No.0.1
Max. Slope on Lot %OK 0.2
Impervious Surfaces % OK Q=C*i*A
Will Alter Off-site Pass-Through?STOP, Sumbit a DEQ-8 Plan
10-year, 2-hour, i 0.4 inches/hr
Total Area/Lot Size acres = 47371 ft2
Paved/House Area 0.14 acres 6,287 ft2 V=188.61 ft3
Gravel Area 0.00 acres - ft2 V=0 ft3
Lawn/Landscaping 0.94 acres 41,084 ft2 V=136.95 ft3
Unimproved Area 0 acres 0 ft2 V=0 ft3
Total 1.09 acres 47371 ft2 VTotal=325.56 ft3
Paved/House Area 0.17 acres 7,370 ft2 V=221.1 ft3
Gravel Area 0.00 acres ft2 V=0 ft3
Lawn/Landscaping 0.92 acres 40,001 ft2 V=133.34 ft3
Unimproved Area 0.00 acres 0 ft2 V=0 ft3
Total 1.09 acres 47371 ft2 VTotal=354.44 ft3
ΔV=28.88 ft3
= input field
10-year, 2-hour i
(volume)
Appendix F: Simplified Storm Drainage Plan
10-year, 2-hour i
(volume)
Rational Method Co-Efficients (C)
Paved/hard surfaces
Gravel surfaces
Lawn/landscaping
Unimproved areas
Pre-Development Characteristics
Post-Development Characteristics
Increase in Runoff Volume (Minimum Retention Pond Size)
Little Spanish Preschool
Residential (2018 IRC) for Alteration and Additions
City of Bozeman Water Service Calculation Worksheet
Project Address: ___________________________________ Property Owner: ________________________________
General Contractor: _______________________________________________________________________________
Permit Number: _______________ Proposed Water Meter Size: ______________
UPC Table 610.3 Standard Design Water Supply Fixture Units
Appliances and Fixtures Units # of EXISTING Fixtures NEW Fixtures Total
Bathtub or combo tub/shower (1/2” fill valve) 4.0 X ________ +/- ________ = ________
Bath Tub (3/4” fill valve) 10.0 X ________ +/- ________ = ________
Shower (per head) 2.0 X ________ +/- ________ = ________
Clothes washer 4.0 X ________ +/- ________ = ________
Dishwasher 1.5 X ________ +/- ________ = ________
Hose Bibb 2.5 X ________ +/- ________ = ________
Additional Hose Bibb (each) 1.0 X _______ +/- ________ = ________
Lavatory Sink 1.0 X ________ +/- ________ = ________
Kitchen Sink 1.5 X ________ +/- ________ = ________
Laundry Sink 1.5 X ________ +/- ________ = ________
Water closet [toilet] (1.6 GPF) 2.5 X ________ +/- ________ = ________
Bidet 1.0 X ________ +/- ________ = ________
Urinal (flushometer valve) Table Values* ________ +/- ________ = ________
Total Number of Fixture Units ________
Fixture Unit Tables for Determining Water Pipe & Meter Size Pressure Range – 46 - 60 PSI
Circle the length in feet to the farthest fixture & applicable service, meter & branch sizes below based on the total number of fixture
units detailed above.
Maximum Allowable Length in feet
Meter & Supply & 60’ 80’ 100’ 150’ 200’
Service Branches
¾” ¾” 20 19 17 14 11
¾” 1” 39 36 33 28 23
1” 1” 39 39 36 30 25
¾” 1¼” 39 39 39 39 39
1” 1¼” 78 76 67 52 44
1½” 1¼” 78 78 78 66 52
1” 1½”/2” 85 85 85 85 85
1½” 1½” 151 151 151 128 105
2” 1½” 151 151 151 150 117
1½” 2” 370 340 318 272 240
2” 2” 370 370 370 368 318
If count is over 370 fixtures, water demand does not meet table 6.10.4 and must be engineered by a registered Montana
mechanical engineers design, signed and stamped 04.29.20
130 Flanders Mill Rd, Bozeman, MT 59715 Little Spanish Preschool - Vivianna Helvik
n/a 0
n/a 0
1 0
1 0
1 0
1 0
1 0
2 0
1 0
1 0
2 0
0 0
0 0
0
0
4
10
2
4
1.5
2
1.5
1.5
5
0
0
31.5
2.5
;
;
¾” 20 19 17 14 11
¾” 39 36 33 28 23
1”
1”
39 39 36 30 25
¾” 1¼” 39 39 39 39 39
1” 78 76 67 52 44
1½”
1¼”
78 78 78 66 52
1” 1½”/2” 85 85 85 85 85
1½” 151 151 151 128 105
2” 151 151 151 150 117
1½” 370 340 318 272 240
2”
1½”
370 370 370 368 318
1”
¾”
2”
2”
1½”
1¼”
UPC Table 610.3 Standard Design Water Supply Fixture Units
Fixture Units # of Fixtures Total
4.0 X ________ = ________
10.0 X ________ = ________
2.0 X ________ = ________
4.0 X ________ = ________
1.5 X ________ = ________
2.5 X ________ = ________
1.0 X ________ = ________
0.5 X ________ = ________
3.0 X ________ = ________
1.0 X ________ = ________
1.5 X ________ = ________
1.5 X ________ = ________
Appliances and Fixtures
Bathtub/Combination Tub/Shower
Soaker Tub
Shower (per head)
Clothes washer
Dishwasher
Hose Bibb
Additional Hose Bibb (each)
Drinking Fountain
Service / Mop Basin
Lavatory Sink
Kitchen Sink
Laundry Sink
Water closet (1.6 GPF) 2.5 X ________ = ________
Water closet (1.6 GPF – Flushometer tank) X ________ = ________
= ________ Water closet (flushometer valve)
Urinal (flushometer valve) = ________
Table Values ________
Table Values ________
Total Number of Fixture Units ________
)LUVWLGHQWLI\WKHOHQJWKLQIHHWWRWKHIDUWKHVWIL[WXUHDQGDSSOLFDEOHVHUYLFH.7KHQFURVVUHIHUHQFHWKHQXPEHURI
IL[WXUHVEDVHGRQWKH7RWDO1XPEHURI)L[WXUH8QLWVDERYHWRGHWHUPLQHWKHDSSURSULDWH0HWHU 6HUYLFHDQG
6XSSO\ %UDQFKVL]H.
UPC Table 610.4 Maximum Allowable Length in feet - 46-60 PSI
Meter & Supply & 150’ 200’
Service Branches
If count is over 370 fixtures, water demand does not meet table 610.4 submitted by a registered Montana
mechanical engineers design, signed and stamped.
0DUFK22
Commercial (20 8P&)
City of Bozeman Water Service Calculation Worksheet
Project Address: ___________________________________ Pr operty Owne r: ______________________________
General Contractor: _______________________________________________________________________________
Permit Number: _______________ Proposed Water Meter Size: _______________
$VDVXEVWLWXWHIRUWKLVIRUP\RXFDQXWLOL]H$SSHQGL[0LQ8QLIRUP3OXPELQJ&RGH.7KHFDOFXODWRUUHVXOWVDVZHOODVDOORI
WKHIL[WXUHVWKDWZLOOEHXVHG RQWKLVSURMH FWZLOO QHHGWREHVXEPLWWHGLQOLHXRIWKLVIRUP.
6HF . .
6HF. .
10’ 0’ 0’
$SSHQGL[0UHTXLUHVWKHSURSHUW\WREHLGHQWLILHGDVDZDWHUFRQVHUYDWLRQ%XLOGLQJ.