Loading...
HomeMy WebLinkAbout3 C2.0 Grading PlanUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEUG-TELEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASWV W PPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPW SWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWRSWROHPOHPOHPCO CO SUNSTONE ST FLANDERS MILL RDW W CO EXISTINGBUILDING EXISTING RETAINING WALL1.3' TALL OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO4775' 4774'4773'4772'4775'4774' 4 7 7 2 ' 47 7 3 ' 4772' 4772'4773'4774' 4775'4775'4 7 7 3 '4774'TVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVCONNECT TO EG 4775.80 FG 4773.57 CONNECT TO EG 4775.71 FG 4773.70 FG 4775.77 FG 4775.71 CONNECT TO EG 4772.41 FG 4772.43 CONNECT TO EG 4772.89 FG 4774.30 FG 4774.90 FG 4775.25 CONNECT TO EG 4775.80 FG 4772.00 FG 4772.50 FG 4771.48 FG 4771.53 FG 4772.34 SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWR SWRSWRSWRSWRSWRSWRSWRSWRSWRSWRWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW2.7% (ext'g ) 8.2% (ext'g) 5.7 % ( e x t ' g ) 7.2 % ( e x t ' g ) 1.1 % ( e x t ' g ) 2.2 % ( e x t ' g )2% (new)7% ( n e w ) CONNECT TO EG 4774.72 5.2% (new) 5.3% (new) 2.7% (new) TOP OF POND 4771.34 CONNECT TO EG 4772.00 477 3 '4771'47 7 4 '4775'47 7 4 ' 477 5 ' CONNECT SW TO EG 4771.65 20' UTIL. EASEMENT 30.00' STREET AND UTILITYEASEMENTPER COS 2360 20' UTILITY AND ELECTRIC POWER LINE EASEMENT PER DOC #2051456 CONNECT TO EG 4771.54 CONNECT TO EG 4771.14 CONNECT SW TO EG 4771.09 TOP OF POND 4771.29 BOTTOM OF POND 4769.25 TOP OF POND 4771.00 CONNECT TO EG 4774.04 4.8 % ( n e w ) 5' R5' RFG 4774.02 FG 4774.91 FG 4774.91 FG 4773.51 FG 4773.90 FG 4775.22 BIKE PARKING 10' UTIL. EASEMENT 5' SETBACK 0 10 20 30 SCALE 1"=10' BASIS OF BEARING Bobcat LDP Coordinate System ELEVATION DATUM: NAVD 88 SHEET DATE PROJECT c ALPINE 2022 DRAWN BY REVIEWED BY RE V I S I O N S RE V DA T E DE S C R I P T I O N BY 714 Stoneridge DriveSuite 3Bozeman, MT 59718586.5599 OfficeREMOVE AND DISPOSE OF EXT'G ASPHALT AND RESEED SAWCUT EXT'G ASPHALT AND TACK COAT SAWCUT EXT'G ASPHALT AND TACK COAT CUT RETAINING WALL, TIE INTO EXT'GSIDEWALK WITH STEPS TOP OF RETAINING WALL ELEV. 4773.82 TIE FG TO EG AT4:1 SLOPE (TYP) NEW MUDROOM (SEE ARCH SHEETS) EXT'G FENCE TO REMAIN REMOVE AND DISPOSE OF EXT'G ASPHALT AND RESEED PROPERTY LINE INSTALL ADA RAMP FROM EXT'G ASPHALT TO NEW LL ENTRANCE. WIDTH: 3 FT DESIGN SLOPE: 4.61%, MAX 5% DESIGN CROSS SLOPE: 2%INSTALL 60" MIN. LANDING EGEG FGFG SAWCUT EXT'G CURB AND GUTTER, WIDEN DRIVEWAY TO 24'. CONTRACTOR TO OBTAIN ENCROACHMENT PERMIT PRIOR TOCONSTRUCTION LITTLE SPANISH PRESCHOOL130 FLANDERS MILLBOZEMAN, MTGRADING PLANNOT FOR CONSTRUCTION ASPHALT TO BE REMOVED PROPOSED NEW ASPHALT INSTALL 5' BLVD AND 10'MIXED USE PATHINSTALL 5' BLVD AND 10'MIXED USE PATH 537-01 09/08/23 JLS MB C2.0 EXT'G DRIVEWAY EDGE TO REMAIN PROPOSED NEW MIXED USE PATH AND ADA RAMP EXT'G RETENTION BASIN TO BE EXPANDED. TOP OF POND TO MATCH EXT'G GRADE, 1.25 FT DEEP SLOPED AT A 4:1. VOLUME: 124 CF. EXT'G UG UTILITIESEXT'G UG UTILITIES OVERHEAD POWER LINE EXT'G UG TV PROPOSED SEWER OLD ENTRANCE TO BE REMOVED PROPOSED WATER SVC 1 8/ 2 4 / 2 3 RE V I S I O N S F O R S I T E P L A N A P P . JL S