Loading...
HomeMy WebLinkAbout027 A5.06 Building Colors and Material4 N 7 6 1 2 35LEVEL 1 - T.O FLOOR SLAB WINDOW HEAD LEVEL 2 - TOP OF PLATE LEVEL 2 - T.O. SHEATING WINDOW HEAD LEVEL 3 - T.O. SHEATING LEVEL 3 - TOP OF PLATE WINDOW HEAD ROOF PLATE ROOF BASE T.O. HIGH PARAPET 10' - 1"10' - 1"9' - 1"4' - 6"8' - 0"8' - 1 1/2"8' - 1 1/2"LEVEL 1 AMENITIES LEVEL 2-3 UNIT B2 TYPE B HEFGLEVEL 1-3 UNIT B2 ALT 1 T.O LOW PARAPET A.1 A.2 E.1 E.2 LEVEL 1 - T.O FLOOR SLAB WINDOW HEAD LEVEL 2 - TOP OF PLATE LEVEL 2 - T.O. SHEATING WINDOW HEAD LEVEL 3 - T.O. SHEATING LEVEL 3 - TOP OF PLATE WINDOW HEAD ROOF PLATE ROOF BASE T.O. HIGH PARAPET 9' - 1"10' - 1"10' - 1"4' - 6"8' - 0"9' - 1 1/2"8' - 1 1/2"LEVEL 1 UNIT A1 TYPE A LEVEL 2-3 UNIT A1 TYPE B LEVEL 1-3 UNIT A1 TYPE B LEVEL 2-3 UNIT C1 TYPE B HG LEVEL 1-3 UNIT A1-TYPE B T.O LOW PARAPET LEVEL 1 UNIT C1 TYPE A LEVEL 1 - T.O FLOOR SLAB WINDOW HEAD LEVEL 2 - TOP OF PLATE LEVEL 2 - T.O. SHEATING WINDOW HEAD LEVEL 3 - T.O. SHEATING LEVEL 3 - TOP OF PLATE WINDOW HEAD ROOF PLATE ROOF BASE T.O. HIGH PARAPET 10' - 1"10' - 1"9' - 1"4' - 6"8' - 0"8' - 1 1/2"8' - 1 1/2"6 87 STAIR #2 LEVEL 1-3 UNIT B1 ALT T.O LOW PARAPET 6.1 7.1 MATERIALS FIBER CEMENT SIDING -PAINT FINISH HORIZONTAL SIDING -PAINT FINISH 1 HORIZONTAL SIDING -PAINT FINISH 2 BOARD & BATTEN -WHITE BOARD & BATTEN -BLACK STONE VENEER KEYPLAN BUILDING 1 BUILDING 2 LEVEL 1 - T.O FLOOR SLAB WINDOW HEAD LEVEL 2 - TOP OF PLATE LEVEL 2 - T.O. SHEATING WINDOW HEAD LEVEL 3 - T.O. SHEATING LEVEL 3 - TOP OF PLATE WINDOW HEAD ROOF PLATE ROOF BASE T.O. HIGH PARAPET T.O LOW PARAPET 34' - 3"11' - 1"10' - 1"10' - 1"9' - 1"9' - 1"9' - 1"8' - 0"8' - 1 1/2"8' - 1 1/2"ARCHITECTS, L.P.5339 ALPHA ROAD · SUITE 300 · DALLAS · TX 75240P: (972) 701.9636 · F: (972) 701.9639HUMPHREYS PARTNERS&DALLAS · CHARLOTTE · CHICAGO · DENVER · NEW ORLEANS · NEW YORK NEWPORT BEACH · ORLANDO · SCOTTSDALE · CHENNAI · HANOILONDON · MONTEVIDEO · MEXICO CITY · TORONTOwww.humphreys.comThe architectural works depicted herein are the sole property of Humphreys & Partners Architects, L.P. and may not be constructed or used without its express written permission. No permission to modify or reproduce any of the architectural works, including without limitation the construction of any building, is expressed or should be implied from delivery of preliminary drawings or unsealed construction drawings. Permission to construct the building depicted in sealed construction drawings is expressly conditioned on the full and timely payment of all fees otherwise due Humphreys & Partners Architects, L.P. and, in the absence of any written agreement to the contrary, is limited to a one-time use on the site indicated on these plans. © by Humphreys & Partners Architects, L.P. All Rights Reserved Designed by: SHEET CONTENTS SHEET NO. Drawn by: Architect of Record: Issue for Pricing / Bidding: Issue for Permit Application: Issue for Construction: Date Plotted: A5.06 BRIDGER LAND GROUPBLOCK 15 APARTMENTSAuthor #22380 ML 02/03/2023 02/03/2023 100% DESIGN DEVELOPMENTVince Chupka 2023 BOZEMAN, MTBUILDING 2 - COLOR ELEVATIONS Revisions # DATE COMMENTS 1/8" = 1'-0"7 COLOR - WEST ELEVATION BLDG 2 1/8" = 1'-0"6 COLOR - WEST ELEVATION AT PARKING LOT BLDG 2 1/8" = 1'-0"4 COLOR - SOUTH ELEVATION AT PARKING LOT BLDG 2 1/8" = 1'-0"5 COLOR - COURTYARD ELEVATION 02/27/2023 CD PROGRESS02/27/2023