Loading...
HomeMy WebLinkAbout011 C6.2 Civil Details 336.05' 41.51' 16.58'14.58' PROJECT NO: DATE: ENGINEER: REVISIONS DATENO.DESC. SHEET OF 9 22021 August 31, 2023 ELCBLOCK 15 AT BLACKWOOD GROVESBOZEMAN, MONTANABLOCK 15 CIVIL SITE PLANTAOMNNA RN GEO S EF SI NA LROP EINECOTE ETHAN L No. 60593PE ELICNES D8/31/2023 C6.2 CONSTRUCTION DETAILSRETENTION CHAMBER #4 DETAILS2SCALE: NTS 9 B A ISOLATOR ROW PLUS (SEE DETAIL) PLACE MINIMUM 12.50' OF ADSPLUS125 WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS BED LIMITS RETENTION CHAMBER #3 DETAILS1SCALE: NTS SC-160LP CHAMBER CROSS SECTION3SCALE: NTS ISOLATOR ROW PLUS (SEE DETAIL) PLACE MINIMUM 12.50' OF ADSPLUS125 WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS BED LIMITS CONCEPTUAL ELEVATIONS: MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED):11.50 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC):3.17 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC):2.67 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT):2.67 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT):2.67 TOP OF STONE:2.00 TOP OF SC-160LP CHAMBER:1.50 8" ISOLATOR ROW PLUS INVERT:0.58 6" x 6" BOTTOM MANIFOLD INVERT:0.56 BOTTOM OF SC-160LP CHAMBER:0.50 BOTTOM OF STONE:0.00 PROPOSED LAYOUT 35 STORMTECH SC-160LP CHAMBERS 14 STORMTECH SC-160LP END CAPS 6 STONE ABOVE (in) 6 STONE BELOW (in) 30 STONE VOID 581 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) (COVER STONE INCLUDED) (BASE STONE INCLUDED) 688 SYSTEM AREA (SF) 116.2 SYSTEM PERIMETER (ft) *INVERT ABOVE BASE OF CHAMBER MAX FLOWINVERT*DESCRIPTIONITEM ON LAYOUTPART TYPE 0.66"6" x 6" BOTTOM MANIFOLD, MOLDED FITTINGSAMANIFOLD 1.3 CFS IN(DESIGN BY ENGINEER / PROVIDED BY OTHERS)BCONCRETE STRUCTURE W/WEIR B A MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 14" (355 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONE AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. ACCEPTABLE FILL MATERIALS: STORMTECH SC-160LP CHAMBER SYSTEMS NOTES: 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 1.5” · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 400 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. D C B A *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 20" (510 mm). 6" N12 8" N12 SC-160StormTech 6" N12 8" N12 SC-160StormTech 6" N12 8" N12 SC-160StormTech 6" N12 8" N12 SC-160StormTech 6" N1 8" N12 SC-160StormTech PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) SUBGRADE SOILS (SEE NOTE 3) PERIMETER STONE (SEE NOTE 4) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) SC-160LP END CAP NO SPACING REQUIRED BETWEEN CHAMBERS 12" (300 mm) 14" (350 mm) MIN* 10' (3.0 m) MAX 6" (150 mm) MIN 12" (300 mm) MIN 25" (635 mm) 12" (300 mm) TYP DEPTH OF BASE STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS CONCEPTUAL ELEVATIONS: MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED):11.50 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC):3.17 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC):2.67 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT):2.67 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT):2.67 TOP OF STONE:2.00 TOP OF SC-160LP CHAMBER:1.50 8" x 8" BOTTOM MANIFOLD INVERT:0.58 8" ISOLATOR ROW PLUS INVERT:0.58 BOTTOM OF SC-160LP CHAMBER:0.50 BOTTOM OF STONE:0.00 PROPOSED LAYOUT 106 STORMTECH SC-160LP CHAMBERS 44 STORMTECH SC-160LP END CAPS 6 STONE ABOVE (in) 6 STONE BELOW (in) 30 STONE VOID 1598 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) (COVER STONE INCLUDED) (BASE STONE INCLUDED) 1816 SYSTEM AREA (SF) 178.9 SYSTEM PERIMETER (ft) *INVERT ABOVE BASE OF CHAMBER MAX FLOWINVERT*DESCRIPTIONITEM ON LAYOUTPART TYPE 0.96"8" x 8" BOTTOM MANIFOLD, MOLDED FITTINGSAMANIFOLD 2.2 CFS IN(DESIGN BY ENGINEER / PROVIDED BY OTHERS)BCONCRETE STRUCTURE W/WEIR 36.05' 41.60' 45.83' 47.83' SC-160LP ISOLATOR ROW PLUS DETAIL4SCALE: NTS CATCH BASIN OR MANHOLE SC-160LP CHAMBERSTORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES 8" (200 mm) HDPE ACCESS PIPE REQUIRED USE 8" OPEN END CAP PART #: SC160IEPP08 SC-160LP END CAP OPTIONAL INSPECTION PORT ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) INSPECTION & MAINTENANCE STEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENT A.INSPECTION PORTS (IF PRESENT) A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B.ALL ISOLATOR PLUS ROWS B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C.VACUUM STRUCTURE SUMP AS REQUIRED STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. PART #STUB A SC160EPP 6" (150 mm)0.66" (16 mm) 8" (200 mm)0.80" (20 mm) SC160EPP08 8" (200 mm)0.96" (24 mm) ALL STUBS ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. NOTE: ALL DIMENSIONS ARE NOMINAL NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)25.0" X 12.0" X 85.4" (635 mm X 305 mm X 2169 mm) CHAMBER STORAGE 6.85 CUBIC FEET (0.19 m³) MINIMUM INSTALLED STORAGE*16.0 CUBIC FEET (0.45 m³) WEIGHT 24.0 lbs.(10.9 kg) *ASSUMES 6" (152 mm) ABOVE, 6" (152 mm) BELOW, AND STONE BETWEEN CHAMBERS WITH 40% STONE POROSITY. BUILD ROW IN THIS DIRECTION START END SC-160LP TECHNICAL SPECIFICATION NTS SC-160StormTech 6" N12 8" N12 SC-160StormTech OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) 25.0" (635 mm) 12.0" (305 mm) 90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH 4.4" (112 mm) 11.7" (297 mm) 18.6" (472 mm) SC-160LP TECHNICAL DETAILS5SCALE: NTS