Loading...
HomeMy WebLinkAbout008 Traffic Impact Study Waiver1 matt@bridgerlandgroup.com From:Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Sent:Wednesday, March 1, 2023 12:11 PM To:matt@bridgerlandgroup.com Subject:RE: [SENDER UNVERIFIED]TIS Waiver Request - Block 15 Apartments, Blackwood Groves Phase 2 Attachments:Untitled attachment 00048.txt; Untitled attachment 00051.htm Hi Matt, Please see below. BMC 38.220.060.A - TIS Waiver Authority: A Traffic Impact Study (TIS) is not required for Block 15 Apartments given the proposed unit counts are within the counts for the given phase identified in the Blackwood Groves Subdivision TIS. Please provide this email with the application. Thank you, City of Bozeman MT Transportation & Engineering Alicia Paz-Solis, Engineer I DL 406 582 2976 From: matt@bridgerlandgroup.com <matt@bridgerlandgroup.com> Sent: Tuesday, February 28, 2023 7:37 AM To: Alicia Paz-Solis <apazsolis@BOZEMAN.NET> Subject: [SENDER UNVERIFIED]TIS Waiver Request - Block 15 Apartments, Blackwood Groves Phase 2 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Alicia, Sorry I have another TIS waiver request for you. This one is for 82 apartment dwelling units located in Block 15, Blackwood Groves, Phase 2 (SP #23065). Attached is the draft architectural site plan for this project. The site plan checklist requires a waiver from City Engineering for the site plan TIS. The overall TIS for Blackwood Groves included all 82 units proposed within this Block (Phase 2 includes 222 dwelling units). The TIS Addendum approved with the preliminary plat application is attached here for reference – Table 1 includes the 222 total units proposed in Phase 2. Currently we are at 157 total dwelling units proposed in Phase 2 which leaves a surplus of 65 dwelling units remaining from the TIS for Phase 2. Can you please provide a TIS waiver for this site plan application as these units were all accounted for in the approved overall TIS for Blackwood Groves? Please let me know if you have any questions or need any additional information. Best, MATT HAUSAUER, P.E. | Bridger Land Group 2 406.599.9124 | 115 W. Kagy Blvd, Suite L, Bozeman, MT 59715 ________________________________ bridgerlandgroup.com