Loading...
HomeMy WebLinkAboutFire Station No. 2 Attachment BCity of Bozeman, MT Project Information Deck && Elevating the spirit of Bozeman's vibrant community, our quest is to find an iconic public sculpture for Fire Station No. 2 that transcends convention. This artwork should weave a modern, innovative narrative that artfully intertwines the distinct essences of the Bozeman Fire Department, Montana State University (on whose campus the fire station resides), and the Museum of the Rockies (which sits across the street from the station). Drawing inspiration from these sites, the sculpture will reflect the evolving spirit of this diverse city. Guided by the principles of storytelling, we seek an artwork that beckons engagement, offering both vehicular travelers and pedestrians an intriguing experience. With a focus on local Montana talent, while remaining open to fresh perspectives from afar, our goal is to introduce a piece that sparks curiosity and celebrates Bozeman's rich history. Through its uniqueness, playfulness, and captivating aesthetics, this sculpture will not only enrich the city's public art collection but also encapsulate the evolving vibrancy of Bozeman's character, inviting all to partake in its ever-evolving tale. Storytelling Iconic and Innovative Representative of Location (FD, MSU, Museum) Intriguing Modern Fun and Playful Unique SCULPTURE LOCATION CURRENTLY HAS A 5’ X 5’ CONCRETE PAD AND TWO FLOOD LIGHTS, BUT THIS CAN CHANGE DEPENDING ON SELECTED ARTIST’S RECOMMENDATION 31’H TALLEST POLE: 31.5’H 16.5’H F F F F F F F TV TV TV CO E E S S S D E EEIIII I T T4935 4932 4931 4935493449334936 493749324 9 3 34934 49334936 KB PROPOSED FIRE STATION 2 STAFF ENTRY PUBLIC ENTRY WEST KAGY BOULEVARD EXIST HUFFMAN BUILDING EXIST MOLECULAR BEAM BUILDINGAPPROX. 67'-0"APPROX. 50'-0"STAFF ENTRY STAFF CONC PATIO STAFF ENTRYSTAFF CONC PATIO FENCE AND LANDSCAPE SCREENING CONC EXIT APRON CONC ENTRY APRON EXIST FIRE HYDRANT ELECT PEDESTAL -TYP 12 + 1 HC PARKING SPACESBIKE RACK (3)FLAGPOLES - (2)25-'0" HIGH, (1) 30'-0" HIGH - MIDDLE LOCATION SOUTH 7TH AVENUERELOCATE EXIST PARKING SHED TO MSU IMPOUND LOT - PROVIDE POWER CONNECTION RELOCATE EXIST COMM SERVICE exist ladder truck -47'-1"5'-0" SNOWMELT NWE POWER -TBDNWE GAS -TBDWATERFIRE WATERSAN SEWERCOMMSAND/OIL SEPARATOR RELOCATE EXIST COMM PEDESTAL - CENTURYLINK DRIVE AISLE STREET VISION TRIANGLE FFL = 4935.??' = 100'-0" RELOCATE COMM PEDESTAL -CENTURYLINK REVISE EXIST MEDIAN EXISTING TRASH AND RECYCLING SERVICE (SHARED BFD SERVICE WITH MSU) REVISE EXISTING PARKING ISLAND - RELOCATE SITE LIGHTING PRELIM LEASE LINE - APPROX 44,744SF (1.027 ACRES) FD APPRATUS RETURN SNOW STORAGE - APPROX 2,000 SFEV CHARGING STATION ELECT SITE LIGHT DRYSTACK BOULDER WALL/BENCH - TYP PRINCIPAL ARTERIALCOLLECTOR IRRIGATION WATER MSU NON-POTABLE SERVICE SNOW STORAGE -TYP - APPROX 750SF RELOCATE EXIST. MSU PARKING SHED - VERIFY LOCATION WITH MSU PD ASPHALT PAVING WITH CONC CURB AND GUTTER DRIVE AISLE STREET VISION TRIANGLE - LOCAL STREET (40'-0") OPEN SPACE PLAZA *315' MINIMUM SETBACK REQUIRED FOR PARTIAL ACCESS +/- 259'60' - 0" *315' MINIMUM SEPARATION +/- 91'26' - 11" PARTIAL ACCESS EGRESS ONLY - 3 DRIVE LANES ALTERNATIVE FD APPRATUS RETURN EXISTING FENCE TO REMAIN EXISTING SITE LIGHT TO REMAIN -TYP 7' - 0" 5' - 0" EXISTING MEDIAN FD TRAINING FIRE HYDRANT TRAFFIC SIGN - 'DO NOT BLOCK INTERSECTION' R10-7 TRAFFIC SIGN -'FIRE STATION' W11-8 SD1.1 1 2 SD1.1 TRAFFIC SIGN - 'AUTHORIZED VEHICLES ONLY' R5-11 5'-0" SNOWMELT GENERATOR - RE: ELECT UG PROPANE TANKS - RE: PLUMB LINE OF PROPERTY RESERVE -10'-0" FROM PROPOSED KAGY RECONSTRUCTION FOR PRIVATE UTILITIES SD1.1 3 SD1.1 3 SD1.1 3 UG RETENTION - RE: CIVIL COPYRIGHT 2022PRELIMINARY DRAWINGSNOT FOR CONSTRUCTION6/27/2022 1:55:37 PMSD1.0 DD JUNE 27, 2022 2105CITY OF BOZEMANFIRE STATION 2575 WEST KAGY BLVD, BOZEMAN, MONTANA 59715SITE PLAN1" = 20'-0"SD1.0 1 SITE PLAN NORTH ISSUE DATE DESCRIP. GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG4934493349324931493249334934 4933 FINISH FLOORELEVATION = 4935.55FINISH FLOORELEVATION 4935.54BPBPBPBPBPBPBPNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGFFFTVTV4W6W6W6W6W6W6WWSWSWSWSWSWSWSSSSBP BP BP BP NGNGNGNGNGSSSSSSCOCOCOGTREESSHRUBSSYMBOLBOTANICAL NAMESIZETYPESPACING QUANTITYCOMMON NAMEPLANT SCHEDULETILIA MONGOLICA 'HARVEST GOLD'HARVEST GOLD LINDEN2.5" CALB & B PER PLAN 4PERENNIALS & GRASSES*** DROUGHT TOLERANT SPECIESɫ FIRE WISE SPECIESMATUREHEIGHT30' - 40'MATURESPREAD30' - 40'PICEA PUNGENSCOLORADO SPRUCE10' B & B PER PLAN 2 40' - 50' 30' - 50'RIBES ALPINUM 'GREENMOUND'***ɫDWARF ALPINE CURRANT5 GAL POTPER PLAN 32 3' - 5' 3' - 5'AGUJA REPTANS 'BRONZE BEAUTY'ɫBRONZE BEAUTY BUGLEWEED1 GAL POTPER PLAN 400 8" 15"FESTUCA GLAUCA 'ELIJAH BLUE'***ɫELIJAH BLUE BLUE FESCUE 1 GAL POTPER PLAN 211 12" 12"GERANIUM SANGUINEUM 'MAX FREI'***ɫMAX FREI GERANIUM1 GAL POTPER PLAN 36 12" 12"OTHERFESCUE SODSOD13,200 SFFLATWILLOW LANDSCAPE BOULDER2'WX4'LX3'HPER PLAN 32NEPETA RACEMOSA 'WALKER'S LOW'***ɫWALKER'S LOW CATMINT1 GAL POTPER PLAN 52 2' 3'SEDUM X 'AUTUMN JOY'***ɫAUTUMN JOY SEDUM1 GAL POTPER PLAN 94 18" 24"STACHYS LANATA ' HELEN VON STEIN' '***ɫHELEN VON STEIN LAMBS EARS1 GAL POTPER PLAN 40 8" 18"SHREDDED CEDAR MULCH4,200 SFBROWN RIVER DREDGE ROCK MULCHAVAILABLE FROM SCENIC CITY3,150 SFNATURAL STEEL EDGING520 LFLANDSCAPE INSTALL NOTESGENERAL1. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING WORK.CALL 811.2. PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT. LANDSCAPE ARCHITECT TO BENOTIFIED 48 HOURS IN ADVANCE.3. PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BE NOTIFIED 48 HOURS IN ADVANCE.4. THE LOCATION OF ALL FLAGSTONE, STEPS, AND PATIO AREAS SHALL BE COORDINATED ON SITE WITH THE LANDSCAPEARCHITECT, WHEN APPLICABLE.5. ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.5.1. ALL DECIDUOUS TREES AND SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO BE FENCED FOR MIN. 2 YEARS.5.2. ALL TREES TO BE STAKED FOR MIN. 2 YEARS.6. VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.7. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. ALL REQUESTSSHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 OR TROY@DESIGN5LA.COM.8. LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINED INTERVALS TO DISCUSSPROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.9. ALL EDGING SHALL BE 316" X 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEEL FOR CURVED RUNS (OR ASOTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN A MINIMUM OF 18" DEEP.10. ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARE TO BE RECLAIMEDAND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREAS IN FIELD. CONTRACTOR ISRESPONSIBLE FOR THE COST OF RESTORING ANY DISTURBANCE OUTSIDE OF THE AGREED UPON LIMIT OF WORK BOUNDARYINDICATED ON THE PLANS.SITE SOIL PREP11. ALL BACKFILLED AND DISTURBED AREAS TO BE RAKED SMOOTH. ALL ROCKS GREATER THAN 3" DIAMETER AND ALLCONSTRUCTION DEBRIS TO BE PICKED UP AND REMOVED FROM SITE BEFORE SOIL AMENDMENTS ARE ADDED.12. SEED AREAS(WHEN APPLICABLE)- LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIOR TO ADDING SOIL.- SEEDED AREA AMENDED TOPSOIL: MIX 1" COMPOST WITH MIN. 3" NEW TOPSOIL (COMBINED SETTLED DEPTH OF 4").HYDROSEED WITH *FLEXTERRA TACKIFIER*. ADD EROSION CONTROL MAT TO ALL AREAS WITH SLOPES STEEPER THAN 3:1 PERMANUFACTURER'S SPECIFICATION13. SOD AREAS(WHEN APPLICABLE) - LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIOR TO ADDING SOIL.- SOD AREA AMENDED SOIL: MIX 1" COMPOST WITH MIN. 5" NEW TOPSOIL (COMBINED SETTLED DEPTH OF 6"). TOPSOIL SHALL BEDRUM ROLLED OR TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY PRIOR TO LAYING SOD. RAKE SMOOTH TO MATCHFINAL GRADING PLAN.14. ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOM TO REMOVE GLAZING.15. ALL PLANTING BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOST WITH MIN. 17" NEW TOPSOIL (COMBINED SETTLEDDEPTH OF 18"). RAKE SMOOTH TO MATCH FINAL GRADING PLAN.IRRIGATION16. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. MAIN LINE,LATERAL LINE, AND SPRINKLERS NOT BURIED AT TIME OF PROJECT COMPLETION WILL NOT BE ACCEPTED.17. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES.SHEET INDEXL1.0 - LANDSCAPE SITE PLANL3.0 -LANDSCAPE PLAN - NORTHL3.1 -LANDSCAPE PLAN - SOUTHL5.0 - LANDSCAPE DETAILSL5.1 - LANDSCAPE DETAILSL6.0 - IRRIGATION PLAN2010040N1L1.01" = 20'-0"Landscape Site PlanSTONEWALL/CRASHBARRIERFLAGPOLECONCRETE STAFF DINING PATIOSCREEN FENCECONCRETE STAFFEXERCISE PATIOBIKE PARKINGCONCRETEENTRY PLAZACOPYRIGHT 2022PRELIMINARY DRAWINGS NOT FOR CONSTRUCTION 6/20/2022 3:56:41 PMDDJUNE 27, 20222105CITY OF BOZEMAN FIRE STATION 2 575 WEST KAGY BLVD, BOZEMAN, MONTANA 59715 ISSUEDATE DESCRIP.L1.0LANDSCAPE PLAN CONCRETEDRIVEWAY,SEE CIVILASPHALTPARKING LOT,SEE CIVILCONCRETEDRIVEWAY,SEE CIVILEX, ASPHALTPARKING LOTPROJECT LIMIT OF DISTURBANCEKAGY BOULEVARD30' FIREWISE SETBACK FIRST FLOOR100' -0" SECOND FLOOR112' -0" 2345 1.B810 PARAPET 02126' -0" HIGH ROOF BRG123' -0" 697 PARAPET 03130' -0" MP-1 MP-1 MP-1 CMU-1 CF MC CF CF CMU-1CMU-1CMU-1CMU-1CMU-1 1 A3.3 2 A3.2 2 A3.3 1 A3.4 2 A3.4 1.A AW.2 120A128F 128E 128D AW.2 118SF.1 AW.2 ADJACENT MSU HUFFMAN BUILDING LOW ROOF BRG112' -0" PARAPET 01116' -0" MC MC MC MP-1 FIRST FLOOR 100' -0" SECOND FLOOR112' -0" BCG PARAPET 02 126' -0" HIGH ROOF BRG 123' -0" E B.1 A PARAPET 03 130' -0" B.8 MP-1 CMU-1 CMU-2CMU-2 CMU-2 CF MC CMU-1 1 A3.1 2 A3.1 1 A3.2 2 A3.0 1 A3.0 D A.9 AW.1AW.1AW.1AW.1AW.1AW.2 AW.2 100AAW.1116ACW.2SF.3 LOW ROOF BRG 112' -0" PARAPET 01 116' -0" MC MP-1 CMU-1 4x4x16 CMU, COLOR 1 EXTERIOR MATERIAL LEGEND CMU-2 4x4x16 CMU, COLOR 2 MP-1 PRE-FINISHED METAL WALL PANEL, COLOR 1 MP-2 PRE-FINISHED METAL WALL PANEL, COLOR 2 MC PRE-FINISHED METAL COPING SYSTEM CF STEEL CANOPY FASCIA -PAINT COPYRIGHT 2022PRELIMINARY DRAWINGSNOT FOR CONSTRUCTION6/27/2022 2:08:34 PMA2.0 DD JUNE 27, 2022 2105CITY OF BOZEMANFIRE STATION 2575 WEST KAGY BLVD, BOZEMAN, MONTANA 59715EXTERIOR ELEVATIONS1/8" = 1'-0"A2.0 1 NORTH ELEVATION 1/8" = 1'-0"A2.0 2 EAST ELEVATION ISSUE DATE DESCRIP. FIRST FLOOR100' -0" SECOND FLOOR 112' -0" 2 3 4 51.B 8 10 PARAPET 02126' -0" HIGH ROOF BRG123' -0" 6 97 PARAPET 03130' -0" 6.8 CMU-1CMU-1MC CMU-1CMU-1CMU-1CMU-1CMU-1CMU-1 MC CMU-2CF CMU-1 'SOLARWALL' METAL WALL PANEL 'SOLARWALL' METAL WALL PANEL 1 A3.3 2 A3.2 2 A3.3 1 A3.4 2 A3.4 1.A 9.2 128A 128B 128C SF.6 SF.6SF.6 CW.4 CW.1 LOW ROOF BRG112' -0" PARAPET 01116' -0" AW.3 CMU-2 FIRST FLOOR100' -0" SECOND FLOOR112' -0" B C G PARAPET 02126' -0" HIGH ROOF BRG123' -0" B.1A PARAPET 03130' -0" B.2 B.8 CMU-1 CMU-1 MP-1 MP-1 CMU-1 CMU-1 MP-1CF MC 1 A3.1 2 A3.1 1 A3.2 2 A3.0 1 A3.0 D AW.2 137AAW.2AW.2 136C LOW ROOF BRG 112' -0" PARAPET 01116' -0" MC MC SF.2 CMU-1 4x4x16 CMU, COLOR 1 EXTERIOR MATERIAL LEGEND CMU-2 4x4x16 CMU, COLOR 2 MP-1 PRE-FINISHED METAL WALL PANEL, COLOR 1 MP-2 PRE-FINISHED METAL WALL PANEL, COLOR 2 MC PRE-FINISHED METAL COPING SYSTEM CF STEEL CANOPY FASCIA -PAINT COPYRIGHT 2022PRELIMINARY DRAWINGSNOT FOR CONSTRUCTION6/27/2022 2:08:43 PMA2.1 DD JUNE 27, 2022 2105CITY OF BOZEMANFIRE STATION 2575 WEST KAGY BLVD, BOZEMAN, MONTANA 59715EXTERIOR ELEVATIONS1/8" = 1'-0"A2.1 1 SOUTH ELEVATION 1/8" = 1'-0"A2.1 2 WEST ELEVATION SOUTH ELEVATIOSN TRANSPARENCY CALCULATION (WEST KAGY BLVD) OTHER BLOCK FRONTAGE STANDARD -AT LEAST 10% OF THE ENTIRE FACADE ENTIRE FACADE = 3,300 SF GLAZING = 990 SF TRANSPARACY = 30% > 10% MIN. MIN. GLAZING HEIGHT = 0" ABOVE GROUND FLOOR MAX GLAZING HEIGHT = 19'-6" ABOVE GROUND FLOOR ISSUE DATE DESCRIP. CMU-1 "KANTA PRODUCTS" GROUND FACE - BLACK (PRIMARY EXTERIOR MASONRY) CMU-2 "KANTA PRODUCTS" GROUND FACE - CASTLE WHITE (ACCENT EXTERIOR MASONTY AT ENTRY) MP-1 - "PAC-CLAD" PRECISION SERIES HWP - WEATHERED ZINC (ELEVATED METAL WALL PANEL/SIDING) MSU BOBCAT BLUE - FOURFOLD DOOR AND ACCENT PAINT SP-1 "PAC-CLAD" FLUSH/REVEAL SOFFIT PANELS (UNDERSIDE OF ROOF OVERHANG) COPYRIGHT 2022PRELIMINARY DRAWINGSNOT FOR CONSTRUCTION6/27/2022 2:09:52 PMA2.3 DD JUNE 27, 2022 2105CITY OF BOZEMANFIRE STATION 2575 WEST KAGY BLVD, BOZEMAN, MONTANA 59715EXTERIOR PERSPECTIVESA2.3 1 SOUTHEAST AERIAL PERSPECTIVE A2.3 2 SOUTHEAST PERSPECTIVE A2.3 3 SOUTHWEST PERSPECTIVE 1/8" = 1'-0" EXTERIOR MATERIAL PALETTE ISSUE DATE DESCRIP. THANK YOUTHANK YOU