Loading...
HomeMy WebLinkAbout009 A201 Pad D Building ElevationsCOLLABORATIVE DESIGN 1"=20'-0" GC PAD 'D' WEST ELEVATION 10 APRIL 23 SOUTH ELEVATION STOREFRONT BLOCK FRONTAGE 20'-0"26'-4"10'-0" 2'-6" 68% TRANSPERENCY 68% TOTAL EIFS AREA 7% EIFS STONE ALUM METAL PANELS TILE BASE WOOD-LOOK METAL SIDING STONE ALUM METAL PANELS EAST ELEVATION TUBE FRAME TRELLIS ALUM METAL PANELSALUM METAL PANELS EIFS ALUM METAL PANELS EIFS ALUM METAL PANELS TILE BASE