Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
028-CMP-CONST MANAGE PLAN
4 W4 WSSSSSSUWWWW ////////////////////////////////////////// /// /// /// /// /// /// /// /// /// /// /// /// /// ////// /// /// /// /// /// /// /// /// //////////////////////////////////// /// /// ////// /// /// /// /// /// /// /// /// /// /// /// /// ////// /// /// T TTTTTTTT T T T T T TT TT TTT T T TT G GGGGGGGG G G G G G GG GGG GGGG GG GGGE EEEEEEEE E E E E E EEEEE EEEEEEESSSSSSSSSS WWWWWWWWW W W W W W W SSSSSSSS SS SS SS SS SS SS SS WSWSWSWSWSWSSD SD SD SD SD SD SD SD SD SD SDSDSD11"X17": 1"= 80 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )20404040HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2023VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2036\001\ACAD\SHEETS\CONST-MANAGEMENT-PLAN.dwg Plot Date: 1/31/2023 2:04 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN01/27/2023RECONSTRUCTION MANAGEMENT PLANTBD CATALYST STREETWARBLER CONDOS2036.001CMPCATALYST STREETCATAMOUNT STREETWARBLER WAYBUILDING 1BUILDING 2EQUIPMENT/MATERIAL STAGING AREACONSTRUCTION ACCESSEXISTING HYDRANTLEGEND:CONSTRUCTION ACCESS ROUTECOBBLE CONSTRUCTION ACCESSEQUIPMENT/MATERIAL STAGING AREA.CONSTRUCTION MANAGEMENT NOTES:1.ALL TRASH IS TO BE REMOVED FROM THE SITE DAILY2.WORKER TOILETS TO BE STAKED DOWN IN DESIGNATED STAGINGAREA.3.CONCRETE WASHOUTS TO BE KEPT IN STAGING AREA.4.COBBLE RUNOFF PAD AT CONSTRUCTION ENTRANCE TO BE REMOVEDFOR INSTALLATION OF CONCRETE AND ASPHALT APPROACH. ONCEPAVED, COBBLE ACCESS MAY BE REMOVED PERMANENTLY.5.ANY DAMAGE TO EXISTING ASPHALT, CURB, SIDEWALK CONCRETE, OREXISTING GROUND DISTURBANCES OUTSIDE THE SITE SHALL BEREPAIRED AT THE CONTRACTOR'S EXPENSE.CONSTRUCTION FENCECONSTRUCTION FENCETO DAVIS LANE,THEN NORTH TOVALLEY CENTERNORTH TO VALLEYCENTERNORTH 27TH AVE