Workflow:PLNAPP-1963 - Planning Template Small - 11/10/2022 3:08:35 PM
1 of 1 Find |NextACDBFG100%J K
Plan Review - Review Comments Report
Project Name: 22365 Warbler Condos INF
Workflow Started: 11/10/2022 3:08:35 PM
Report Generated: 01/02/2023 07:04 AM
REVIEW COMMENTS
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION
10 CD Technician
Sam Sagstetter
11/22/22 4:19 PM
Checklist Item
Missing owner signature on Development Review Application - Please have
the owner sign the application and resubmit the signed version. A digital
signature or a physical signature will suffice. Thank you.
Reviewer Response: Sam Sagstetter - 11/2
My mistake, I see that now.
----------------------------------------------
Responsed by: Jeremy May - 11/22/22 5:0
The owner signature is included at the end
Planning Application. We included the full
addition to the signature page as a result
scan quality.
----------------------------------------------
Reviewer Response: Sam Sagstetter - 11/2
11 CD Technician
Sam Sagstetter
11/22/22 4:19 PM
Checklist Item
Missing schematic landscape plan - . It does not need to be certified by
certified landscaper. Identified species and irrigation not required. Show
general location of street trees, screening, landscape separation, and parking
lot landscaping, as applicable to the project.
Reviewer Response: Sam Sagstetter - 11/2
AM
I spoke with your planner and they gave t
combining the landscape and civil plan be
an informal review. Other application type
separate documents for those.
----------------------------------------------
Responsed by: Jeremy May - 11/22/22 5:0
Trees and bushes as required are shown o
----------------------------------------------
Reviewer Response: Sam Sagstetter - 11/2
Please include a landscape plan of the pro
12 1 Solid Waste
Russell Ward
11/29/22 6:38 AM
Changemark
SLD Waste
1. if the plan is for each individual unit to have it's own residential trash tote
then each tenant would be responsible for getting tote to street for
collection. refuse trucks will not enter onto property because they would
then need to back out onto the street to exit.
003-C.2-SITE PLAN.pdf
13 1 Building Division
Ben Abbey
12/5/22 2:23 PM
Changemark
BLDG - Codes
The city of Bozeman and the State of Montana adopted the new ICC 2021
Building Codes Spring of 2022. The state adopted June 10th. City adoption
August 1st, 2022.
001-I.1-COVER.pdf
14 1 Addressing
J Connelley
12/7/22 1:23 PM
Comment
We will probably need to re-address the buildings on this lot as the access is
from Catalyst St and not Warbler Way.
15 1 Parks Department
Matthew Lee
12/12/22 10:10 AM
Comment
Resolution 4784 - Cash-in-Lieu of Parkland is acceptable for this project as it
is subsequent development. Current CILP value is $2.30/SF but is only an
estimate. CILP value is finalized at time of SP adequacy. Provide Parkland
Tracking Table showing parkland calculations and CILP Conversion and
provide a narrative addressing the criteria of Resolution 4784 with
application documents. Parkland was provided in Phase 3 at 6 du/acre; the
balance owed is 6 du/acre for compliance with 38.420.020.
16 1 Engineering
Suzanne Ryan
12/12/22 2:31 PM
Changemark
ENG Sidewalk Chase
DSSP IV. C.5. The use of sidewalk chases is not allowed.
003-C.2-SITE PLAN.pdf
17 1 Water and Sewer
Division
Nick Pericich
12/12/22 2:36 PM
Changemark
W/S Tree proximity to water
In the public right of way or easement, trees need to be 10' from water and
sanitary sewer services.
004-C.3-CIVIL PLAN.pdf
18 1 Engineering
Suzanne Ryan
12/12/22 2:38 PM
Comment
A stormwater drainage plan was likely approved for the existing site, please
submit a copy of the approved report. The applicant must show how the site
fits within the previously approved design report and the increased runoff
must comply with all applicable current drainage design standards. Below I
have summarized the findings from a recent stormwater report which
1/2/23, 7:04 AM Report Viewer
https://bozeman-mt-us.avolvecloud.com/ProjectDox/ReportViewer.aspx?ReportPath=%2FReport%2FPlan Review - Review Comments&DataSourceN…2/3
analyzed the existing regional ponds. In a 2020 report by Confluence
Consulting named Cattail Creek Community Association - Cattail Creek
Stormwater Detention Ponds #1-3 and #5-7 60% Design information
regarding existing ponds in the subdivision will be important to consider for
the development of this site. As depicted in the development proposal,
stormwater flow from the Urban Villas lot will flow Northward and westward
to two existing detention facilities, DP.J00.00017 and DP.J00.00016, which
are labeled in the Confluence report as Basins #6 and #7. The Confluence
report states that these ponds (given regional groundwater elevations and
other factors) are not currently functioning as designed, and do not meet
COB requirements. They are not currently detaining design flows and should
not be used for additional stormwater detention, unless they are modified as
such. The applicant must show how the previously approved flows fit within
the regional pond design and the increase in impervious area from the new
buildings cannot drain to the Cattail Creek HOA ponds unless they are
modified.
19 1 Engineering
Suzanne Ryan
12/12/22 2:40 PM
Library Comment
The applicant must provide and file with the County Clerk and Recorder's
office executed Waivers of Right to Protest Creation of Special Improvement
Districts (SIDs) on City standard form for the following: a.Street
improvements to N. 27th Avenue between Valley Center and Cattail St
including lighting, signalization, paving, curb/gutter, sidewalk, and storm
drainage. b.Street improvements to Cattail St between Fen Way and N 27th
Avenue including lighting, signalization, paving, curb/gutter, sidewalk, and
storm drainage. c.Street improvements to Catamount St between Davis Lane
to Valley Center including lighting, signalization, paving, curb/gutter,
sidewalk, and storm drainage. d. Street improvements to Davis Lane
between Cattail St to Westlake Rd including lighting, signalization, paving,
curb/gutter, sidewalk, and storm drainage. e.Intersection improvements at
North Cattail St and N 27th Ave including lighting,
signalization/channelization, paving, curb/gutter, sidewalk, and storm
drainage. f. Intersection improvements at South Cattail St and N 27th Ave
including lighting, signalization/channelization, paving, curb/gutter,
sidewalk, and storm drainage. g.Intersection improvements at Catamount St
and N. 27th Ave including lighting, signalization/channelization, paving,
curb/gutter, sidewalk, and storm drainage. h. Intersection improvements at
Catamount St and Davis Lane including lighting,
signalization/channelization, paving, curb/gutter, sidewalk, and storm
drainage. i. Intersection improvements at N 27th Ave and Valley Center Rd
including lighting, signalization/channelization, paving, curb/gutter,
sidewalk, and storm drainage. j. . Intersection improvements at Cattail St and
Davis Lane including lighting, signalization/channelization, paving,
curb/gutter, sidewalk, and storm drainage The SID template has been
uploaded to the City Documents folder.
20 1 Engineering
Suzanne Ryan
12/12/22 2:40 PM
Library Comment
DSSP Fire Service Line Standard - Plans, specifications, and submittals for all
fire service lines and water service lines greater than 4 inches in diameter
must be submitted to the City Engineering Department through PDOX
Infrastructure review.
21 1 Engineering
Suzanne Ryan
12/12/22 2:40 PM
Library Comment
BMC 38.410.130 - Water Rights - The applicant must contact Griffin Nielsen
with the City Engineering Department to obtain a determination of cash-in-
lieu of water rights (CILWR). CILWR must be paid prior to site plan approval.
22 1 Engineering
Suzanne Ryan
12/12/22 2:40 PM
Library Comment
BMC 38.410.060 - Easements: All Easements indicated below must be
provided on city standard easements templates. Drafts must be prepared for
review and approval by the city with site plan submittal. Signed hard copies
of the easements must be submitted to the city prior to site plan approval.
The applicant may contact the review engineer to receive standard
templates. (the City Standard Easement Templates are attached with this
transmittal.)
23 1 Engineering
Suzanne Ryan
12/12/22 2:41 PM
Comment
DSSP Section II A. 4. - The applicant must include a storm drainage plan with
post-construction storm water management controls that are designed to
infiltrate, evapotranspire, and/or capture for reuse the post-construction
runoff generated from the first 0.5 inches of rainfall from a 24-hour storm
preceded by 48 hours of no measurable precipitation.
24 1 Engineering
Suzanne Ryan
12/12/22 2:41 PM
Comment
DSSP Section II C. - The applicant must provide on-site detention with
release rates limited to predevelopment runoff rates. Retention ponds must
be sized based on a 10-year, 2-hour storm intensity.
25 1 Engineering
Suzanne Ryan
12/12/22 2:42 PM
Comment
Montana Post Construction Storm Water BMP Design Manual - The
proposed project is located in an area that is known to have seasonally high
groundwater. The applicant must demonstrate that seasonal high
groundwater will not impact the function or maintenance of the proposed
facilities. Industry guidance recommends a three-foot minimum separation
from the bottom of the proposed facility to the underlying groundwater
table. The applicant must provide local seasonal high groundwater
elevations to support the proposed design.
26 1 Fire Department
Scott Mueller
12/14/22 10:15 AM
Comment
As proposed, the buildings will require a fire riser room with exterior
access/door. This will require a sidewalk from public way to riser room door.
Also the FDC, fire department connection and horn/strobe will be required
to be placed visible from building front and have sidewalk underneath. This
removes issues with being hidden by landscaping.
1/2/23, 7:04 AM Report Viewer
https://bozeman-mt-us.avolvecloud.com/ProjectDox/ReportViewer.aspx?ReportPath=%2FReport%2FPlan Review - Review Comments&DataSourceN…3/3
27 1 Water Rights
Griffin Nielson
12/14/22 12:03 PM
Comment
BMC 38.410.130. Water Adequacy - The development will need to satisfy the
water adequacy code requirement prior to future site plan approval. A cash-
in-lieu of water rights fee determination will be completed during the site
plan review process, however, if there are any questions or if a preliminary
review is desired please contact Griffin Nielsen with the Engineering/Utility
Department directly. Email: gnielsen@bozeman.net Phone: 406 582-2279.
28 1 EngineeringSuzanne Ryan12/15/22 3:58 PM
CommentThe TIS is waived based on the trip generation numbers provided.
29 1 EngineeringSuzanne Ryan12/15/22 4:02 PM
ChangemarkENG Water Sewer CalcsThank you for supplying the water and sewer calculations. A water and sewer design report was most likely prepared for the original subdivision. Please submit that report along with these calculations with the site plan.
002-water -sewer usage.pdf
30 1 Planning
Susana Montana
12/19/22 11:43 AM
Changemark
striping of on site parking
You are proposing 3 parking spaces per residential unit consisting of one in
a garage and two in the driveway. You do not need to strip the parking in
the driveway. Note that per Table 38.540.050-1, only 2 parking spaces are
required for each of these 4 bedroom units. Please review the requirements
for "stacking" parking in the driveway behind the garage per 38.540.010.A.4.
The landscaped strip between the units' driveways appear to meet the
separation requirements of subsection 4.
001-Cover Letter_INF.pdf
31 1 PlanningSusana Montana12/19/22 11:48 AM
Changemarktype of buildingIt appears that you are proposing two rowhouse buildings each subject to the design standards of 38.360.250. What would be the purpose of developing this as Apartments, Limited?
001-Cover Letter_INF.pdf
32 1 Planning
Susana Montana
12/19/22 11:50 AM
Changemark
ADA parking
Each lot where parking is provided for residents or guests shall be
accessible. Our Building Department will give you the accessibility
requirements for row house developments.
001-Cover Letter_INF.pdf
33 1 Planning
Susana Montana
12/19/22 11:52 AM
Changemark
solid waste collection
Please contact the Bozeman solid waste division for this information.
001-Cover Letter_INF.pdf
34 1 PlanningSusana Montana12/19/22 11:56 AM
Changemarkprivate trailsPrivate trails within the Site must be maintained by the property owner or property owners' association. Maintenance includes snow removal. Will this trail have a public access easement on it? Please contact Engineering to find out if a gravel surface is permissible.
001-Cover Letter_INF.pdf
35 1 Planning
Susana Montana
12/19/22 11:59 AM
Changemark
4 bedroom units
The bedroom/den in the "mail level" cannot be converted to an Accessory
Dwelling Unit. Only one ADU is permitted per lot, perTable 38.360.040.
009-UNIT PLANS.pdf
36 1 Planning
Susana Montana
12/19/22 12:01 PM
Changemark
site plan application
Please provide a landscape plan with the site plan application which shows
the landscaping, sidewalks, open space areas, parking, bicycle parking and
Landscape Block Frontage setbacks and plantings.
001-I.1-COVER.pdf
37 1 PlanningSusana Montana12/19/22 12:03 PM
Changemark# bedroomsPlease show that these are 4 bedroom dwelling units with 2 parking spaces per unit required. Show on street parking locations and dimensions. Check with Fire Department regarding fire engine turnaround space.
003-C.2-SITE PLAN.pdf
38 1 Northwestern
Energy
Matt Tilstra
12/29/22 9:18 AM
Changemark
NWE
If meters are to be screened, there needs to be a 4ft clear zone in front of
them.
004-C.3-CIVIL PLAN.pdf