HomeMy WebLinkAbout003_Informal Review Comments 0102231/2/23, 7:04 AM Report Viewer https://bozeman-mt-us.avolvecloud.com/ProjectDox/ReportViewer.aspx?ReportPath=%2FReport%2FPlan Review - Review Comments&DataSourceN…1/3 Workflow:PLNAPP-1963 - Planning Template Small - 11/10/2022 3:08:35 PM 1 of 1 Find |NextACDBFG100%J K Plan Review - Review Comments Report Project Name: 22365 Warbler Condos INF Workflow Started: 11/10/2022 3:08:35 PM Report Generated: 01/02/2023 07:04 AM REVIEW COMMENTS REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION 10 CD Technician Sam Sagstetter 11/22/22 4:19 PM Checklist Item Missing owner signature on Development Review Application - Please have the owner sign the application and resubmit the signed version. A digital signature or a physical signature will suffice. Thank you. Reviewer Response: Sam Sagstetter - 11/2 My mistake, I see that now. ---------------------------------------------- Responsed by: Jeremy May - 11/22/22 5:0 The owner signature is included at the end Planning Application. We included the full addition to the signature page as a result scan quality. ---------------------------------------------- Reviewer Response: Sam Sagstetter - 11/2 11 CD Technician Sam Sagstetter 11/22/22 4:19 PM Checklist Item Missing schematic landscape plan - . It does not need to be certified by certified landscaper. Identified species and irrigation not required. Show general location of street trees, screening, landscape separation, and parking lot landscaping, as applicable to the project. Reviewer Response: Sam Sagstetter - 11/2 AM I spoke with your planner and they gave t combining the landscape and civil plan be an informal review. Other application type separate documents for those. ---------------------------------------------- Responsed by: Jeremy May - 11/22/22 5:0 Trees and bushes as required are shown o ---------------------------------------------- Reviewer Response: Sam Sagstetter - 11/2 Please include a landscape plan of the pro 12 1 Solid Waste Russell Ward 11/29/22 6:38 AM Changemark SLD Waste 1. if the plan is for each individual unit to have it's own residential trash tote then each tenant would be responsible for getting tote to street for collection. refuse trucks will not enter onto property because they would then need to back out onto the street to exit. 003-C.2-SITE PLAN.pdf 13 1 Building Division Ben Abbey 12/5/22 2:23 PM Changemark BLDG - Codes The city of Bozeman and the State of Montana adopted the new ICC 2021 Building Codes Spring of 2022. The state adopted June 10th. City adoption August 1st, 2022. 001-I.1-COVER.pdf 14 1 Addressing J Connelley 12/7/22 1:23 PM Comment We will probably need to re-address the buildings on this lot as the access is from Catalyst St and not Warbler Way. 15 1 Parks Department Matthew Lee 12/12/22 10:10 AM Comment Resolution 4784 - Cash-in-Lieu of Parkland is acceptable for this project as it is subsequent development. Current CILP value is $2.30/SF but is only an estimate. CILP value is finalized at time of SP adequacy. Provide Parkland Tracking Table showing parkland calculations and CILP Conversion and provide a narrative addressing the criteria of Resolution 4784 with application documents. Parkland was provided in Phase 3 at 6 du/acre; the balance owed is 6 du/acre for compliance with 38.420.020. 16 1 Engineering Suzanne Ryan 12/12/22 2:31 PM Changemark ENG Sidewalk Chase DSSP IV. C.5. The use of sidewalk chases is not allowed. 003-C.2-SITE PLAN.pdf 17 1 Water and Sewer Division Nick Pericich 12/12/22 2:36 PM Changemark W/S Tree proximity to water In the public right of way or easement, trees need to be 10' from water and sanitary sewer services. 004-C.3-CIVIL PLAN.pdf 18 1 Engineering Suzanne Ryan 12/12/22 2:38 PM Comment A stormwater drainage plan was likely approved for the existing site, please submit a copy of the approved report. The applicant must show how the site fits within the previously approved design report and the increased runoff must comply with all applicable current drainage design standards. Below I have summarized the findings from a recent stormwater report which 1/2/23, 7:04 AM Report Viewer https://bozeman-mt-us.avolvecloud.com/ProjectDox/ReportViewer.aspx?ReportPath=%2FReport%2FPlan Review - Review Comments&DataSourceN…2/3 analyzed the existing regional ponds. In a 2020 report by Confluence Consulting named Cattail Creek Community Association - Cattail Creek Stormwater Detention Ponds #1-3 and #5-7 60% Design information regarding existing ponds in the subdivision will be important to consider for the development of this site. As depicted in the development proposal, stormwater flow from the Urban Villas lot will flow Northward and westward to two existing detention facilities, DP.J00.00017 and DP.J00.00016, which are labeled in the Confluence report as Basins #6 and #7. The Confluence report states that these ponds (given regional groundwater elevations and other factors) are not currently functioning as designed, and do not meet COB requirements. They are not currently detaining design flows and should not be used for additional stormwater detention, unless they are modified as such. The applicant must show how the previously approved flows fit within the regional pond design and the increase in impervious area from the new buildings cannot drain to the Cattail Creek HOA ponds unless they are modified. 19 1 Engineering Suzanne Ryan 12/12/22 2:40 PM Library Comment The applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SIDs) on City standard form for the following: a.Street improvements to N. 27th Avenue between Valley Center and Cattail St including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. b.Street improvements to Cattail St between Fen Way and N 27th Avenue including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. c.Street improvements to Catamount St between Davis Lane to Valley Center including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. d. Street improvements to Davis Lane between Cattail St to Westlake Rd including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. e.Intersection improvements at North Cattail St and N 27th Ave including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. f. Intersection improvements at South Cattail St and N 27th Ave including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. g.Intersection improvements at Catamount St and N. 27th Ave including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. h. Intersection improvements at Catamount St and Davis Lane including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. i. Intersection improvements at N 27th Ave and Valley Center Rd including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. j. . Intersection improvements at Cattail St and Davis Lane including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage The SID template has been uploaded to the City Documents folder. 20 1 Engineering Suzanne Ryan 12/12/22 2:40 PM Library Comment DSSP Fire Service Line Standard - Plans, specifications, and submittals for all fire service lines and water service lines greater than 4 inches in diameter must be submitted to the City Engineering Department through PDOX Infrastructure review. 21 1 Engineering Suzanne Ryan 12/12/22 2:40 PM Library Comment BMC 38.410.130 - Water Rights - The applicant must contact Griffin Nielsen with the City Engineering Department to obtain a determination of cash-in- lieu of water rights (CILWR). CILWR must be paid prior to site plan approval. 22 1 Engineering Suzanne Ryan 12/12/22 2:40 PM Library Comment BMC 38.410.060 - Easements: All Easements indicated below must be provided on city standard easements templates. Drafts must be prepared for review and approval by the city with site plan submittal. Signed hard copies of the easements must be submitted to the city prior to site plan approval. The applicant may contact the review engineer to receive standard templates. (the City Standard Easement Templates are attached with this transmittal.) 23 1 Engineering Suzanne Ryan 12/12/22 2:41 PM Comment DSSP Section II A. 4. - The applicant must include a storm drainage plan with post-construction storm water management controls that are designed to infiltrate, evapotranspire, and/or capture for reuse the post-construction runoff generated from the first 0.5 inches of rainfall from a 24-hour storm preceded by 48 hours of no measurable precipitation. 24 1 Engineering Suzanne Ryan 12/12/22 2:41 PM Comment DSSP Section II C. - The applicant must provide on-site detention with release rates limited to predevelopment runoff rates. Retention ponds must be sized based on a 10-year, 2-hour storm intensity. 25 1 Engineering Suzanne Ryan 12/12/22 2:42 PM Comment Montana Post Construction Storm Water BMP Design Manual - The proposed project is located in an area that is known to have seasonally high groundwater. The applicant must demonstrate that seasonal high groundwater will not impact the function or maintenance of the proposed facilities. Industry guidance recommends a three-foot minimum separation from the bottom of the proposed facility to the underlying groundwater table. The applicant must provide local seasonal high groundwater elevations to support the proposed design. 26 1 Fire Department Scott Mueller 12/14/22 10:15 AM Comment As proposed, the buildings will require a fire riser room with exterior access/door. This will require a sidewalk from public way to riser room door. Also the FDC, fire department connection and horn/strobe will be required to be placed visible from building front and have sidewalk underneath. This removes issues with being hidden by landscaping. 1/2/23, 7:04 AM Report Viewer https://bozeman-mt-us.avolvecloud.com/ProjectDox/ReportViewer.aspx?ReportPath=%2FReport%2FPlan Review - Review Comments&DataSourceN…3/3 27 1 Water Rights Griffin Nielson 12/14/22 12:03 PM Comment BMC 38.410.130. Water Adequacy - The development will need to satisfy the water adequacy code requirement prior to future site plan approval. A cash- in-lieu of water rights fee determination will be completed during the site plan review process, however, if there are any questions or if a preliminary review is desired please contact Griffin Nielsen with the Engineering/Utility Department directly. Email: gnielsen@bozeman.net Phone: 406 582-2279. 28 1 EngineeringSuzanne Ryan12/15/22 3:58 PM CommentThe TIS is waived based on the trip generation numbers provided. 29 1 EngineeringSuzanne Ryan12/15/22 4:02 PM ChangemarkENG Water Sewer CalcsThank you for supplying the water and sewer calculations. A water and sewer design report was most likely prepared for the original subdivision. Please submit that report along with these calculations with the site plan. 002-water -sewer usage.pdf 30 1 Planning Susana Montana 12/19/22 11:43 AM Changemark striping of on site parking You are proposing 3 parking spaces per residential unit consisting of one in a garage and two in the driveway. You do not need to strip the parking in the driveway. Note that per Table 38.540.050-1, only 2 parking spaces are required for each of these 4 bedroom units. Please review the requirements for "stacking" parking in the driveway behind the garage per 38.540.010.A.4. The landscaped strip between the units' driveways appear to meet the separation requirements of subsection 4. 001-Cover Letter_INF.pdf 31 1 PlanningSusana Montana12/19/22 11:48 AM Changemarktype of buildingIt appears that you are proposing two rowhouse buildings each subject to the design standards of 38.360.250. What would be the purpose of developing this as Apartments, Limited? 001-Cover Letter_INF.pdf 32 1 Planning Susana Montana 12/19/22 11:50 AM Changemark ADA parking Each lot where parking is provided for residents or guests shall be accessible. Our Building Department will give you the accessibility requirements for row house developments. 001-Cover Letter_INF.pdf 33 1 Planning Susana Montana 12/19/22 11:52 AM Changemark solid waste collection Please contact the Bozeman solid waste division for this information. 001-Cover Letter_INF.pdf 34 1 PlanningSusana Montana12/19/22 11:56 AM Changemarkprivate trailsPrivate trails within the Site must be maintained by the property owner or property owners' association. Maintenance includes snow removal. Will this trail have a public access easement on it? Please contact Engineering to find out if a gravel surface is permissible. 001-Cover Letter_INF.pdf 35 1 Planning Susana Montana 12/19/22 11:59 AM Changemark 4 bedroom units The bedroom/den in the "mail level" cannot be converted to an Accessory Dwelling Unit. Only one ADU is permitted per lot, perTable 38.360.040. 009-UNIT PLANS.pdf 36 1 Planning Susana Montana 12/19/22 12:01 PM Changemark site plan application Please provide a landscape plan with the site plan application which shows the landscaping, sidewalks, open space areas, parking, bicycle parking and Landscape Block Frontage setbacks and plantings. 001-I.1-COVER.pdf 37 1 PlanningSusana Montana12/19/22 12:03 PM Changemark# bedroomsPlease show that these are 4 bedroom dwelling units with 2 parking spaces per unit required. Show on street parking locations and dimensions. Check with Fire Department regarding fire engine turnaround space. 003-C.2-SITE PLAN.pdf 38 1 Northwestern Energy Matt Tilstra 12/29/22 9:18 AM Changemark NWE If meters are to be screened, there needs to be a 4ft clear zone in front of them. 004-C.3-CIVIL PLAN.pdf