Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
019 - A3-21 - EXTERIOR COURT ELEVATION
LEVEL 1 0' -0" LEVEL 1 T.O.P. 12' -1" T.O. ROOF 24' -3" 01B01B 0513 02 8/30/2023 12:07:49 PM A3.21EXTERIOR COURT ELEVATION BOZEMAN, MT South Range Crossing 1/4" = 1'-0"COVERED PATIO EAST ELEVATION 1 Keynote Legend Key Value Keynote Text 01B ROOF MATERIAL: 'BERRIDGE METALS ' STANDING SEAM METAL ROOFING OR APPROVED EQUAL 02 EXTERIOR WALL: "1-COAT" INTEGRAL EXTERIOR STUCCO SYSTEM BY 'OMEGA DIAMOND WALL' ICC-ES REPORT ESR-1194 OR APPROVED EQ. OVER MINIMUM GRADE 'D' BLDG. PAPER. INSTALL PER MANUF INSTRUCTIONS 05 EXTERIOR WALL: ADHERED MASONRY VENEER OVER PLASTER BASE OVER 2 LAYERS GRADE 'D' MIN. BUILDING PAPER. INSTALL PER MANUF. INSTRUCTIONS. ICC -ES REPORT ESR 2380 OR EQ. VERIFY W/ COLOR SCHEME 13 FASCIA: 2X6 R.S. WOOD BARGE AND FASCIA BOARD PRE-PRIMED Architecture + Planning 3660 Blake Street Suite 500 Denver, CO 80205 ktgy.com 303.825.6400 PROVIDENCE DEVELOPMENT 529 E. MAIN STREET BOZEMAN, MT 59715