Loading...
HomeMy WebLinkAbout008 Appendix G - Concurrent Construction LetterCity of Bozeman Development Review Committee Re: South Range Crossing Subdivision Concurrent Construction Request Please accept this letter and enclosed application as a request for concurrent construction of on-site infrastructure, off-site infrastructure and building improvements for the South Range Crossing Phase Please 1, Block 5, Lot 1 Clubhouse as outlined in the “South Range Crossing Major Subdivision Phasing Plan.” SRX LLC will begin construction of the Subdivision infrastructure as soon as practical after engineering approvals have been obtained, but infrastructure is unlikely to be complete prior to Final Plat. It is anticipated that a portion of the Subdivision infrastructure will be financially guaranteed prior to Final Plat through an Improvements Agreement to allow for the building permit to be released. Concurrent Construction allows for the construction of internal buildings (subject to a site plan) while the Phase 1 improvement and the onsite improvements are being completed. This request is supported by the following standard construction per UDC 38.270.030.C.1.a for site development. The Phase 1, Block 5, Lot 1 Clubhouse site plan meets the provisions outlined within the UDC in sections 38.270.030.C.1.a., as the water and sewer services will be pulled off the main lines that are located within a publicly dedicated ROW. The site will be able to be serviced by two fire hydrants located on Brookdale Drive, with one of them being directly across the street from the project site. Additionally, there will be access to the north and west side along Brookdale Drive and Canter Avenue. Please let us know if there are any additional conditions required to enable concurrent construction. Sincerely, Parker Lange Development Manager SRX LLC