HomeMy WebLinkAbout008 Appendix G - Concurrent Construction LetterCity of Bozeman
Development Review Committee
Re: South Range Crossing Subdivision
Concurrent Construction Request
Please accept this letter and enclosed application as a request for concurrent construction of
on-site infrastructure, off-site infrastructure and building improvements for the South Range
Crossing Phase Please 1, Block 5, Lot 1 Clubhouse as outlined in the “South Range Crossing
Major Subdivision Phasing Plan.” SRX LLC will begin construction of the Subdivision
infrastructure as soon as practical after engineering approvals have been obtained, but
infrastructure is unlikely to be complete prior to Final Plat. It is anticipated that a portion of the
Subdivision infrastructure will be financially guaranteed prior to Final Plat through an
Improvements Agreement to allow for the building permit to be released.
Concurrent Construction allows for the construction of internal buildings (subject to a site plan)
while the Phase 1 improvement and the onsite improvements are being completed. This
request is supported by the following standard construction per UDC 38.270.030.C.1.a for site
development.
The Phase 1, Block 5, Lot 1 Clubhouse site plan meets the provisions outlined within the UDC in
sections 38.270.030.C.1.a., as the water and sewer services will be pulled off the main lines that
are located within a publicly dedicated ROW.
The site will be able to be serviced by two fire hydrants located on Brookdale Drive, with one of
them being directly across the street from the project site. Additionally, there will be access to
the north and west side along Brookdale Drive and Canter Avenue.
Please let us know if there are any additional conditions required to enable concurrent
construction.
Sincerely,
Parker Lange
Development Manager
SRX LLC