Loading...
HomeMy WebLinkAboutThe Ugly Onion Mixed Use - Response to Prescreen Comment Jake Weldon | Project Manager / Designer ASPEKT Architecture LLC 214 E. Mendenhall Street Suite 201 Bozeman, MT 59715 719.330.9496 June 1st, 2023 City of Bozeman Planning Dept. RE: Plan Review Prescreen Plan Review Comment: Please provide water rights information. If cash-in-lieu is proposed a cash-in-lieu of water rights calculation and payment amount certified by the City’s Engineering Division. Response: Per the City of Bozeman concept review, there was a comment provided regarding the water rights information. The fee was to be determined during the site plan review. See comment #9 from the concept review below. BMC 38.410.130. – Water Adequacy: The development will need to satisfy the water adequacy code requirement prior to a future site plan approval. If sufficient water rights can’t be provided to offsets the development's annual demand then a cash-in-lieu of water rights (CILWR) payment will be required. The City assesses the CILWR fee at a rate of $6,000 per acre-foot. The fee determination will take place during the site plan review, however if there are any questions or if a preliminary review is desired please contact Griffin Nielsen with the Engineering/Utilities Department directly at gnielsen@bozeman.net or (406) 582-2279. Please feel free to contact me at any time if you have any questions. Sincerely, Jake Weldon | Project Manager / Designer