Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
009_PHASE PLAN
6 WSD SD E E E G G G 8 W 8 W WSWS6 WWSWS6 WWS WSSS SSEEEEEGGGGGSD SDSD75.62' 285.79'92.15'69.85'140.00'342.68'332.14'SS SS SS SS SS SSFDC FDCFDCEEEGGG16 W16 W16 W16 W16 W16 W16 W16 W8 SS8 SS8 SS8 SS8 SS8 SS8 SSEEEEEEEEEE11"X17": 1"= 60 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )15303030HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2023VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\1204\003\ACAD\SHEETS\PHASE PLAN.dwg Plot Date: 7/13/2023 7:55 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN7/13/234/12/23JRMPHASE PLANBUSINESS PARKNELSON MEADOWS1204.003PH-1PRINCE LANE10' FRONT SETBACK3' SIDE SETB A C K 3' SIDE SETBACK 3' REAR SETBACKEXISTING HYDRANTEXISTING POWER TRANSFORMERPROPOSED 5' CONCRETE SIDEWALKPROPOSED STORM WATER PONDSPROPOSED STORM WATER PONDLOADINGRAMPLOADING RAMP BUILDING 1BUILDING 2BUILDING 3PROPOSED TRASH ENCLOSUREPROPOSED 5' CONCRETE SIDEWALKPROPOSED 7' SIDEWALKPROPOSED 7' SIDEWALK PROPOSED 5' CONCRETE SIDEWALK28.0028.00CATTAIL CREE K V IS ION TR IANGL E STORMWATER TRACT 2NELSON MEADOWS0.68 ACRESCOMMON OPEN SPACE 1LOT 5 , BLOCK 3NELSON MEADOWS2.56 ACRESEXISTING REGIONALSTORM POND9' WIDE OVERHEADDOOR, TYP.9' WIDE OVERHEADDOOR, TYP.ACCESSIBLE PARKINGSPACE, TYP.PROPOSED ASPHALT PARKING LOTEXISTING POWER & GAS8" PVC SEWER MAIN16" D.I.P. WATER MAINWATERCOUR S E S E T B A C KEXISTING 20' P.U.E.EXISTING 10' P.U.E.EXISTING 10' P.U.E.9' WIDE OVERHEADDOOR, TYP.EXISTING STREET LIGHT, TYP.EXISTING STREET LIGHTPROPOSED POWER & GAS SERVICESPROPOSED 8" D.I.P. WATER MAIN EXTENSIONPROPOSED HYDRANTPROPOSED 6"D.I.P. FIRESERVICE AND 1"DOMESTICWATER SERVICEPROPOSED 6"D.I.P. FIRESERVICE AND 1"DOMESTICWATER SERVICEPROPOSED 1"DOMESTICWATER SERVICEPROPOSED 30' WATER & SEWER EASEMENTPROPOSED RAILINGALONG LOADING RAMPPROPOSED 6" D.I.P.FIRE SERVICEPROPOSED 4" PVCSEWER SERVICEPROPOSED 4" PVCSEWER SERVICEPROPOSED 4" PVCSEWER SERVICEHANDICAP SIGNSHANDICAPSIGN (PH 3)ABANDON EXISTING WATER & FIRE SERVICEBLOCK FRONTAGE: "OTHER"PROPOSED JOINTUTILITY TRENCHPHASE 1PHASE 2PHASE 3PHASE 1:INSTALLATION OF WATER MAIN AND SERVICES, FIRE SERVICES AND SEWER SERVICES TO ALL BUILDINGS.INSTALLATION OF POWER, GAS, AND COMMUNICATIONS MAINS FOR BUILDING 1. INSTALLATION OF TRASHENCLOSURE, STORM PONDS AND PIPING, EXCEPT PIPE FOR BUILDING 2 & INLETS FOR BLDG 1 & 2 TRUCK DOCK,ALL PARKING LOT ASPHALT AND CURB. ACCESS ONTO PRINCE LANE, STRIPING FOR PHASE 1 PARKING LOTSPACES, BIKE RACK ADJACENT TO BUILDING 3 STRIPING OF HANDICAP SPACES & SIGN INSTALLATION IN FRONTOF BUILDING 3, CROSSWALKS, AND SIDEWALK ADJACENT TO BUILDING 3. PHASE 1 WILL ALSO INCLUDECONSTRUCTION OF BUILDING 3 INCLUDING ALL LANDSCAPING WITHIN THE PHASE 1 BOUNDARY.PHASE 2:CONSTRUCTION OF BUILDING 1, INCLUDING ADJACENT SIDEWALK & BIKE RACK. LANDSCAPING WITHIN PHASE 2BOUNDARY. STORM PIPE FOR BUILDING 1 AND TRUCK DOCK INLETS, STORM SWALE FOR BUILDING 1 & ARMOREDCHANNEL INTO REGIONAL POND, DRY UTILITIES FOR BUILDING 1.PHASE 3:CONSTRUCTION OF BUILDING 2, INCLUDING ADJACENT SIDEWALK. INSTALLATION OF DRY UTILITIES TO BUILDING2 AND STORM PIPE FOR ROOF DRAINS. COMPLETION OF LANDSCAPING SHOWN IN PHASE 3. STRIPING OFHANDICAP SPACE & SIGN INSTALLATION IN FRONT BUILDING 2PARKING CALCS BY PHASEPHASE 1:BUILDING 3 (11,946 SF)4,300 SF OFFICE, 5,646 MANUFACTURING, 2,000 SF WAREHOUSE = 22 REQUIRED STALLS - 1 REQUIRED ADA STALLPHASE 2:BUILDING 1 (11,966 SF)4,300 SF OFFICE, 5,666 MANUFACTURING, 2,000 SF WAREHOUSE = 22 REQUIRED STALLS - 2 REQUIRED ADA STALLSPHASE 3:BUILDING 2 (12,186 SF)4,300 SF OFFICE, 5,886 MANUFACTURING, 2,000 SF WAREHOUSE = 22 REQUIRED STALLS - 3 REQUIRED ADA STALLSPHASE 1 PARKING PHASE 1 PARKINGPHASE 2 PARKINGPHASE 2 PARKING PHASE 2 PARKING PHASE 3 PARKING PHASE 3 PARKINGPHASE 2 PARKINGPHASE 3 PARKINGPROPOSED BIO-RETENTION STORM WATER PONDS