Loading...
HomeMy WebLinkAbout003-C-2_CIVIL SITE PLAN6 W6 W6 WSD SD SD SD SD SDE E E E E E E GG G G G G G G G 8 W 8 W 8 W 8 W 8 W 8 W WSWSWSWSWS6 W6 W6 WWSWSWSWSWS6 W 6 W6 W6 WWS WSWSWSWSWSSS SS SS SS SSSSSSEEEEEEEEEEEEEEGGGGGGGGGGGGGSD SD SD SDSDSDSDSD75.62' 285.79'92.15'69.85'140.00'342.68'332.14'SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSFDCFDCFDCSD SD SD SD SD SD SD SDEEEEEEEEE EEEEGGGGGGGGGGGGG16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W16 W8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SS8 SSEEEEEEEEEEEEEEEEEEEEEEEEEEEEESDSDEEESSSSWSWSWSGGGTTT11"X17": 1"= 60 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )15303030HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2023VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\1204\003\ACAD\SHEETS\SHEETS-CIVIL.dwg Plot Date: 7/13/2023 9:23 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:190 NORTHSTAR LANE, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN7/13/2304/28/23JRMCIVIL SITE PLANBUSINESS PARKNELSON MEADOWS1204.003C-2PRINCE LANE10' FRONT SETBACK3' SIDE SET B A C K 3' SIDE SETBACK 3' REAR SETBACKEXISTING HYDRANTEXISTING POWER TRANSFORMERPROPOSED 5' CONCRETE SIDEWALKPROPOSED STORM WATER PONDSPROPOSED STORM WATER PONDLOADINGRAMPLOADING RAMP BUILDING 1BUILDING 2BUILDING 3PROPOSED TRASHENCLOSUREPROPOSED 5' CONCRETE SIDEWALKPROPOSED 7' SIDEWALKPROPOSED 7' SIDEWALK PROPOSED 5' CONCRETE SIDEWALK28.0028.00CATTAIL CR E E K VIS ION TR IANG LE STORMWATER TRACT 2NELSON MEADOWS0.68 ACRESCOMMON OPEN SPACE 1LOT 5, BLOCK 3NELSON MEADOWS2.56 ACRESEXISTING REGIONALSTORM POND9' WIDE OVERHEADDOOR, TYP.9' WIDE OVERHEADDOOR, TYP.PROPOSED RAILING ALONGLOADING RAMPPROPOSED & EXISTING TRAFFIC FLOWLEGEND:9.00 TYP.20.0026.00PROPOSED ASPHALT PARKING LOTEXISTING POWER & GAS8" PVC SEWER MAIN16" D.I.P. WATER MAINWATERCO U R S E S E T B A C KEXISTING 20' P.U.E.EXISTING 10' P.U.E.EXISTING 10' P.U.E.EXISTING STREET LIGHT, TYP.EXISTING STREET LIGHTPROPOSED POWER & GAS METERPROPOSED HYDRANTPROPOSED 30' WATER & SEWER EASEMENTUNDERGROUND ELECTRICSEWER PIPEWATER SERVICE LINEEASEMENT OR SETBACK AS LABELEDUNDERGROUND GAS LINEUNDERGROUND COMMUNICATION LINEEXISTING CONTOURS 1.0' INTERVAL4" IRRIGATION CONDUITPROPOSED SIDEWALKEXISTING CURB FLOWLINEPROPOSED RAILINGALONG LOADING RAMPFIRE RISER/MECH. ROOMFIRE RISER/MECH. ROOMFIRE RISER/MECH. ROOMHANDICAP SIGNSHANDICAPPARKING SIGNBLOCK FRONTAGE: "OTHER"PROPOSED JOINT UTILITYTRENCHEXISTING 10' P.U.E.LOADINGRAMPPROPOSED BIKE RACK, TYP2' RETAININGWALLSNOW STORAGEBIO-RETENTIONPONDS INISLANDSEXISTING TRAILCONSTRUCTION TRAFFIC TO UTILIZEPROPOSED APPROACH LOCATION TOREDUCE CURB DAMAGE ON PRINCE LANECONSTRUCTION NOTES:1. ALL ISLANDS ARE 8' WIDE MINIMUM.2. PARKING SPACES ARE 9' MIN. WIDTH.3. DRIVE AISLES ARE 24' MIN. WIDTH.4. CURB RADII ARE TO BE 3' UNLESS OTHERWISE NOTED.5. ALL INFRASTRUCTURE SHALL BE INSTALLED IN ACCORDANCE WITH THELATEST EDITION OF THE MONTANA PUBLIC WORKS, THE CITY OF BOZEMANMODIFICATIONS TO MPWSS 6TH EDITION, AND CITY OF BOZEMAN DESIGNSTANDARDS AND SPECIFICATIONS POLICY DATED MARCH 2004 ANDSUBSEQUENT ADDENDA.6. THE CONTRACTOR SHALL CONTACT ONE CALL @ 1-800-424-5555 FORONSITE UTILITY LOCATION. ALL UTILITIES SHALL BE MARKED BEFOREDIGGING. UTILITIES SHOWN ARE FOR PLANNING PURPOSES ONLY.7. THE CONTRACTOR SHALL NOTIFY THE BOZEMAN WATER & SEWERDEPARTMENT A MINIMUM OF 24 HOURS PRIOR TO BEGINNING ANY WORK.8. CONSTRUCTED SIDEWALKS SHALL MEET ALL SPECIFICATIONS ANDREQUIREMENTS OF THE CITY OF BOZEMAN SIDEWALK POLICY.9. CONSTRUCTION TRAFFIC WILL LEAVE THE SITE THROUGH THE PROPOSEDACCESSES AND THEN TRAVEL ON NORTH 27TH AVENUE TO VALLEY CENTERROAD.10. ALL SIDEWALKS TO BE 4" THICK M-4000 CONCRETE UNLESS OTHERWISENOTED.11. ALL 6" CONCRETE TO BE REINFORCED W/ #4 REBAR, 18" O.C.12. PROPOSED POWER AND GAS SERVICE LINES ARE CONCEPTUAL, FINALLAYOUT WILL BE COORDINATED WITH NORTHWESTERN ENERGY.CONSTRUCTION MANAGEMENT NOTES:1. SEE CONSTRUCTION MANAGEMENT SHEETS FOR DETAILEDDESCRIPTION OF CONSTRUCTION MANAGEMENT ACTIVITIES.2. CONSTRUCTION TRAFFIC WILL LEAVE THE SITE THROUGHTHE PROPOSED ACCESSES AND THEN TRAVEL EAST ONPRICE LANE TO NELSON ROAD, THEN SOUTH TO FRONTAGEROAD.SITE PLAN NOTES:BIKE PARKING - 4 PARKING SPACES PROVIDED, EACH NEAR AN ENTRANCETO THE PROPOSED BUILDINGS FOR A TOTAL OF 8 BIKE PARKING SPACES.PARKING:66 PROPOSED OFFSTREET PARKING INCLUDING 1 COMPACT & 4 ADA SPACESHISTORIC:NO HISTORIC, CULTURAL, OR ARCHAEOLOGICAL RESOURCES EXIST ON ORNEAR THE SITE.PUBLIC FACILITIES:A PEDESTRIAN CROSSING EXISTS ON PRINCE LANE WHICH CONNECTS 6'GRAVEL TRAILS TO THE NORTH AND SOUTH. THESE TRAILS LOOP THROUGHTHE NELSON MEADOWS SUBDIVISION. CATTAIL CREEK IS ADJACENT TO THEPROPERTY AND IS CONTAINED WITHIN A COMMON OPEN SPACE.OPEN SPACE & PARK:NO OPEN SPACE OR PARK REQUIRED FOR INDUSTRIAL USES.39.0020.009.00 TYP.18.0018.0018.00INSTALL COMPACTPARKING SIGN8.50'9' WIDE OVERHEADDOOR, TYP.PROPOSED BIKERACK, TYPPROPOSED BIKERACK, TYPPROPOSED BIKERACK, TYPEXISTINGCLUSTERMAILBOXHATCHED FORNO PARKINGHATCHED FOR NOPARKING6" CONCRETE APPROACH &SIDEWALK IN FRONT OFOVERHEAD DOORS6" CONCRETECROSSWALK99.0081.0081.0063.00CPOSSIBLE ENTRY SIGNTYPICALEXTERIOR LIGHT,SEE SHEET ES1.04' CONCRETEVALLEY GUTTERPOWER & GASMETERSTHICKENED EDGESIDEWALKINSTALL CONCRETEAPPROACH PERDETAIL, SHEET C-6MOVE PLANTED TREEMOVE PLANTED WILLOWTYPICALEXTERIOR LIGHT,SEE SHEET ES1.0ZONE 1 / 2 LINEWATERCOURSE SETBACK LINEZONE 1 ZONE 2 NEW TRANSFORMERNEW TRANSFORMERCONNECT SIDEWALKTO MAIL PAD