Nelson Meadows – Construction Management Plan
The applicant plans to construct the buildings in three phases as shown on the PH-1 sheet. Phase 1 will contain the
majority of the site work; site grading, parking lot construction, storm pond construction, as well as construction of
Building #3 and the landscaping and sidewalks associated with building 3. Phases 2 & 3will mostly include the
construction of buildings and adjacent sidewalks & landscaping. During each step of the construction, the garbage and
materials will be managed. Below is a description of the Construction Management Plan broken down into the three
phases.
PHASE 1
1. Site grading
During site grading, the excess materials (topsoil & fill) will be hauled offsite and disposed of. Garbage will be
minimal in this portion of the construction and will be hauled offsite daily by the contractor. Minimal topsoil
will be stockpiled onsite in the future building 2 pad and placed immediately following parking lot and building
completion.
2. Infrastructure Installation
During the installation of the underground water and sewer services, as well as during the installation of the
underground power and phone, the minimal garbage will be hauled offsite daily. The pipe and wire will be
stored at an offsite yard until the time of installation when it will be hauled to the site and stored until it is
installed. Staging areas are shown on the attached construction management exhibit.
3. Parking Lot & Building Pad Construction
The excess fill materials will be hauled offsite during the site grading phase of construction so minimal material
is anticipated to leave the site during the parking lot construction. The gravels and asphalt will be trucked in on
an as-needed basis. Any waste asphalt will be trucked back to the pit after paving has been completed by the
paving contractor. Concrete trucks will be washed out into a designated washout pit.
4. Building Construction
During the construction of building 3, a 20-30 cubic yard dumpster will be onsite as shown on the attached
exhibit to manage the waste generated by the building construction. A portable toilet will be onsite during all
phases of construction. The building materials will be stored in the staging area during construction. Concrete
trucks will be washed out into a designated washout pit
5. General Management
During this phase of construction, the access will utilize a construction entrance with a cobble runout pad until
the parking lot is paved. As shown on the phasing plan, all parking lots will be paved in Phase 1 to allow for an all-weather staging/construction area.
The proposed hydrant in the center of the project will be utilized for any firefighting needs following its
installation. Other hydrants are nearby along Prince Lane. The construction access shall remain open to allow
access for the EMS services.
PHASE 2
1. Site grading
No site grading is planned in Phase 2.
190 Northstar Lane, Bozeman, MT 59718 (406) 581-5730 www.headwatersmt.net Page 2 of 2
2. Infrastructure Installation
No infrastructure installation will occur in Phase 2.
3. Building Pad Construction
The excess fill materials will be hauled offsite during the site grading phase of construction, so minimal
material is anticipated to leave the site during the building pad construction. The gravel will be trucked in on
an as-needed basis.
4. Building Construction
During the construction of building 1, a 20-30 cubic yard dumpster will be onsite as shown on the attached
exhibit to manage the waste generated by construction of the building. A portable toilet will be onsite during
all phases of construction. The building materials will be stored in the staging area during construction.
Concrete trucks will be washed out into a designated washout pit
5. General Management
The construction dumpster and the sanitary facilities will be located away from any occupied buildings in an
attempt to minimize disturbance. The parking in front of the existing building will remain unaffected to parking
for existing tenants.
The existing hydrant in the center of the project will be utilized for any firefighting needs. Other hydrants are
nearby along Prince Street. The construction access shall remain open to allow access for the EMS services.
PHASE 3
1. Site grading No site grading is planned in Phase 3.
2. Infrastructure Installation
During the installation of the underground storm pipe, the minimal garbage will be hauled offsite daily. The
pipe will be stored at an offsite yard until the time of installation when it will be hauled to the site and stored
until it is installed. Staging areas are shown on the attached construction management exhibit.
3. Building Pad Construction
The excess fill materials will be hauled offsite during the site grading phase of construction, so minimal
material is anticipated to leave the site during the building pad construction. The gravel will be trucked in on
an as-needed basis.
4. Building Construction
During the construction of building 2, a 20-30 cubic yard dumpster will be onsite as shown on the attached
exhibit to manage the waste generated by the building construction. A portable toilet will be onsite during all
phases of construction. The building materials will be stored in the staging area during construction. Concrete
trucks will be washed out into a designated washout pit
5. General Management
The construction dumpster and the sanitary facilities will be located away from any occupied buildings in an
attempt to minimize disturbance. The parking in front of the existing buildings will remain unaffected to
parking for existing tenants.
The existing hydrant in the center of the project will be utilized for any firefighting needs. Other hydrants are
nearby along Prince Street. The construction access shall remain open to allow access for the EMS services.
H:\1204\003\DOCS\SITEPLAN\construction management plan.doc
6 WSDSD
EEEGGG8 W8 WWS WS6 WWS WS
6 WWS WS
SSEEEEEGGGGGSDSDSD75.62'285.79'92.15'
69.8
5
'
140.00'342.68'332.14'SSSSSSFDCFDCFDC
EG
16 W 16 W 16 W 16 W 16 W8 SS 8 SS 8 SS 8 SS
E E E E E E E
N
GRAPHIC SCALE
1 inch = ft.
0
( IN FEET )
30
60
60
DRAWN BY:
DATE:
Plot Date: 4/11/2023 2:17 PM
H:\1204\003\ACAD\SHEETS\CONST MANAGE.dwg
REVISION DATE:
190 NORTHSTAR LANE, BOZEMAN, MT 59718
HEADWATERSMT.NET 406-581-5730
PROJECT #:
LOCATION:
NELSON MEADOWS
CONSTRUCT MANAGEMENT
PHASE 1
JRM
04/2023
1204.003
BOZEMAN
NOTES:
SPOIL PILES TO BE REMOVED FOLLOWING PHASE 1 PARKING LOT
CONSTRUCTION.
TOPSOIL PILE WILL ONLY CONTAIN TOPSOIL NEEDED FOR FINAL
LANDSCAPING OF BUILDINGS.
PHASE 1
CONSTRUCTION FENCE OR SILT FENCE
TOPSOIL
PILE
PHASE 1
STAGING
AREATOILET
ROLLOFF DUMPSTER
UTILIZE FOR
CONSTRUCTION
ACCESS
ACTIVE HYDRANT
ACTIVE HYDRANT IN
MIDDLE OF PHASE 1
PHASE 1
STAGING
AREA
PRINCE LANE
BUILDING 1
BUILDING 2
BUILDING 3
6 WSDSD
EEEGGG8 W8 WWS WS6 WWS WS
6 WWS WS
SSEEEEEGGGGGSDSDSD75.62'285.79'92.15'
69.8
5
'
140.00'342.68'332.14'SSSSSSFDCFDCFDC
EG
16 W 16 W 16 W 16 W 16 W8 SS 8 SS 8 SS 8 SS
E E E E E E E
N
GRAPHIC SCALE
1 inch = ft.
0
( IN FEET )
30
60
60
DRAWN BY:
DATE:
Plot Date: 4/11/2023 2:17 PM
H:\1204\003\ACAD\SHEETS\CONST MANAGE.dwg
REVISION DATE:
190 NORTHSTAR LANE, BOZEMAN, MT 59718
HEADWATERSMT.NET 406-581-5730
PROJECT #:
LOCATION:
NELSON MEADOWS
CONSTRUCT MANAGEMENT
PHASE 2
JRM
04/2023
1204.003
BOZEMAN
NOTES:
TOPSOIL PILE WILL ONLY CONTAIN TOPSOIL NEEDED FOR FINAL
LANDSCAPING OF BUILDINGS.
PHASE 2
CONSTRUCTION FENCE OR SILT FENCE
TOPSOIL
PILE
TOILET
ROLLOFF DUMPSTER
UTILIZE FOR
CONSTRUCTION
ACCESS
ACTIVE HYDRANT
ACTIVE HYDRANT
PHASE 2
STAGING
AREA
PRINCE LANE
BUILDING 1
BUILDING 2
BUILDING 3
6 WSDSD
EEEGGG8 W8 WWS WS6 WWS WS
6 WWS WS
SSEEEEEGGGGGSDSDSD75.62'285.79'92.15'
69.8
5
'
140.00'342.68'332.14'SSSSSSFDCFDCFDC
EG
16 W 16 W 16 W 16 W 16 W8 SS 8 SS 8 SS 8 SS
E E E E E E E
N
GRAPHIC SCALE
1 inch = ft.
0
( IN FEET )
30
60
60
DRAWN BY:
DATE:
Plot Date: 4/11/2023 2:17 PM
H:\1204\003\ACAD\SHEETS\CONST MANAGE.dwg
REVISION DATE:
190 NORTHSTAR LANE, BOZEMAN, MT 59718
HEADWATERSMT.NET 406-581-5730
PROJECT #:
LOCATION:
NELSON MEADOWS
CONSTRUCT MANAGEMENT
PHASE 3
JRM
04/2023
1204.003
BOZEMAN
PHASE 3
CONSTRUCTION FENCE OR SILT FENCE
TOILET
ROLLOFF DUMPSTER
UTILIZE FOR
CONSTRUCTION
ACCESS
ACTIVE HYDRANT
ACTIVE HYDRANT
PHASE 3
STAGING AREA
PRINCE LANE
BUILDING 1
BUILDING 2
BUILDING 3