STORM DRAINAGE PLAN
Cattail Duplexes, Application 20285
Synergy Engineering and Konsulting, Inc
3731 Equestrian Lane, STE 102, Bozeman, MT 59718/ 406-624-6137 /marlene@seakmt.com
Date: REV April 22,2022
Prepared for: City of Bozeman
Cattail Creek Subdivision Phase 2, Block 12, Lot 4A &4B
Cattail Duplexes
APPLICATION 20285 April 22, 2022
1
Table of Contents
1. GENERAL LOCATION AND DESCRIPTION ............................................................................................... 2
A. LOCATION ............................................................................................................................................. 2
B. DESCRIPTION ..................................................................................................................................... 3
2. DRAINAGE DESIGN ................................................................................................................................ 4
A. RUNOFF COEFFICIENTS ..................................................................................................................... 4
B. TIME OF CONCENTRATION (Tc) ........................................................................................................ 4
C. STORM INTENSITY ............................................................................................................................. 4
D. ESTIMATION OF PEAK RUNOFF RATE ............................................................................................... 4
E. RUNOFF VOLUME ............................................................................................................................. 5
F. DRAINAGE FACILITIES ........................................................................................................................ 5
3. FACILITY MAINTENANCE PLAN.............................................................................................................. 6
A. OWNERSHIP OF FACILITY .................................................................................................................. 6
2. SCHEULE FOR MAINTENANCE ........................................................................................................... 6
3. RESPONSIBLE PARTY ......................................................................................................................... 6
4. CERTIFICATION ...................................................................................................................................... 7
Cattail Duplexes
APPLICATION 20285 April 22, 2022
2
1. GENERAL LOCATION AND DESCRIPTION
This Storm Drainage Plan is prepared for the 11-unit duplex project proposed within the Cattail
Creek Subdivision Phase 2, Block 12, Lot 4A &4B. Total acreage is 0.708 acres. The project
includes paved access and driveways, 11 duplex units and landscaped areas.
A. LOCATION
The Cattail Duplexes are located on lots 4A and 4B on 0.708 acres in Bozeman, MT. The closest
intersection to the site is Catron St and Davis Lane. The site is bordered on the north and south
by existing residential on the east by Fen Way and on the west by Davis Lane. The site is
currently undeveloped.
1. Owner/Developer: Dixon and Company Inc.
2. R-3 Zoning
3. Township 1S, Range 5E, NW ¼ Section 35
4. Access provided by Fen Way
Figure 1: Cattail Duplexes Location Map
Cattail Duplexes
APPLICATION 20285 April 22, 2022
3
B. DESCRIPTION
In-situ Conditions: The site is mostly covered by short herbaceous grasses.
The drainage generally flows in a north northwesterly direction in the project vicinity (Slage
Contours, Gallatin County GIS). The site is located between two Slage contours with ground
elevations of 4650 and 4700. The perpendicular distance between the two contours Is 4224.
The interpolated ground elevation at the site is 4672.
Groundwater elevation: The site is located between two Hackett groundwater elevations 4680
and 4640 (Gallatin County GIS). The perpendicular distance between the two contours is 3326
feet. The interpolated depth of groundwater at the site is 4664. Depth to groundwater is
estimated to be six feet below the ground surface.
Proposed Conditions:
• Asphalt access and driveways 0.40 acres
• 11-unit duplexes 0.158 acres
• landscape areas 0.15 acres
Figure 2: Cattail Duplexes Proposed Conditions
Cattail Duplexes
APPLICATION 20285 April 22, 2022
4
2. DRAINAGE DESIGN
Drainage design is based on the requirements in the City of Bozeman Design Standards and
Specifications Policy March 2004 (DSSP). DSSP requires that retention ponds be sized based on a
10-year, 2-hour storm intensity. Auto Desk Storm and Sanitary Analysis (SSA) program was utilized
to model rational and modified rational methods.
A. RUNOFF COEFFICIENTS
1. Table I-1
a. Pre-Development: Open Land = 0.20
b. Developed: Dense Residential = 0.50
B. TIME OF CONCENTRATION (Tc)
1. Peak runoff occurs when the duration of the storm equals the time of concentration.
2. Tc = 1.87(1.1-CCf) D1/2
S1/3
a. C = Runoff Coefficient
b. Cf = Frequency Adjustment Factor
c. D = Length of Basin
d. S = slope of Basin %
3. Pre-Development Tc
a. C = 0.20
b. Cf = 1.00
c. D = 273 feet
d. S = 1.52%
e. Tc = 1.87 (1.1-(.2x1))x(2731/2)/(1.521/3) = 24.19 minutes
4. Development Tc
a. C = 0.50
b. CF = 1.00
c. D = 101 feet
d. S = 1.1%
e. Tc = 1.87(1.1-(.5x1))x(1011/2)/(1.11/3) = 10.92 minutes
C. STORM INTENSITY
1. Duration is assumed to be equal to the time of concentration
2. Figure I-2
a. Pre-Development: 1.14 in/hr
b. Developed: 1.9 in/hr
D. ESTIMATION OF PEAK RUNOFF RATE
1. Rational Formula: Q = CIA
a. Q = Peak runoff rate (cfs)
b. C = Runoff coefficient
c. i = average rainfall intensity (in/hr)
d. A = Drainage Area (acres)
2. Pre-Development Runoff
a. C = 0.20
Cattail Duplexes
APPLICATION 20285 April 22, 2022
5
b. i = 1.14 in/hr
c. A = 0.708
d. Q = 0.2 x 1.14 in/hr x 0.708 acres = 0.161 cfs
3. Developed
a. C = 0.50
b. I = 1.9 in/hr
c. A = 0.708 acres
d. Q = 0.50 x 1.9 in/hr x 0.708 acres = 0.6726 cfs
E. RUNOFF VOLUME
1. The modified rational method approach shall be used to compute runoff volume for storm
durations equal to or greater than the time of concentration.
2. Maximum runoff rates for durations greater than the time of concentration are less than the
peak runoff rate.
3. Maximum Runoff Rates (SSA outputs)
a. Pre-Development = 0.05 cfs
b. Developed = 0.13 cfs
4. Total runoff volume is computed by multiplying the duration of the storm by the runoff rate.
5. Pre-development
a. Runoff rate = 0.05 cfs
b. Storm duration = 2 hours
c. Modified method 1.14
d. (0.05 cu.ft./s) x (3600 s /hour) x 2 hours = 360 cu.ft
6. Developed
a. Runoff rate = 0.13 cfs
b. Storm duration = 2 hours
c. (0.13 cu.ft/s) x (3600 s/hour) x 2 hours = 936 cu.ft.
F. DRAINAGE FACILITIES
1. The pre developed site slopes from the southwest to the northeast. A retention basin is
proposed along the north boundary of the project site as shown in figure 3 below. Post
development runoff from two thirds of the developed area will flow into the retention pond and
one third will leave the site. One third of the developed flow is equal to 312 cu.ft. This is less
than the pre development flows leaving the site meeting minimum retention requirements.
2. The proposed drainage facility conforms to the historical drainage pattern of the site without
contributing additional runoff to the property to the north. The basin shall be 12 feet wide by
130 feet in length. Side slopes shall be 4:1. Depth of basin shall be 1.5 feet. Basin shall be grass
lined. Basin shall form a U shape in the landscape area around the fire truck turn around. Basin
capacity calculated by average end area is 1070 cf.
Cattail Duplexes
APPLICATION 20285 April 22, 2022
6
Figure 3: Cattail Duplexes Topographic map.
3. FACILITY MAINTENANCE PLAN
A. OWNERSHIP OF FACILITY
1. Cattail duplexes HOA.
2. SCHEULE FOR MAINTENANCE
1. The retention area should be regularly inspected for signs of erosion, seepage, and structural
damage. Sediment should be removed and the basin restored to its original dimensions when
the sediment has accumulated to one-half the design depth of the basin or 50% of the design
capacity. Andy signs of erosion and/or structural damage to the detention basin noted during
an inspection should be repaired immediately. Basin should be inspected once every 14
calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater.
3. RESPONSIBLE PARTY
1. Cattail duplexes HOA.
Cattail Duplexes
APPLICATION 20285 April 22, 2022
7
4. CERTIFICATION
This report and drainage plan for the Cattail duplexes was prepared by me (or under my direct
supervision) in accordance with the provisions of the City of Bozeman “Design Standards and
Specifications Policy”.
Signature:
State of Montana No. 20459 04-22-2022
Attachments
Table I-2
Rational Method SSA reports
Modified Rational Method SSA reports
t"rj ......... G)
~
>-I I Iv
~ z t"rj ;p.
r-< r-< z @
w 163 -" ......... >-J
>-<
I
t:l
C ~ >-J ......... ~ z
i >-J tT1 (/.)
6
5 n::
::)
0 I
n:: w
(L 4 -•·
(/) w
I u z
_J _J
<{
LL z
RAINFALL INTENSITY -DURATION CURVES
BOZEMAN,MONTANA
RAINFALL POWER CURVE
I I I I I-
,,,,,,. I 00 YEAR
FREQ UREN CY X=HR
Y=IN/HR
2YEAR
5 YEAR
10 YEAR
25 YEAR
50 YEAR
100 YEAR
Y=0.36X--60
Y=o.s2x-·64
Y=0.64X--65
Y=o.nx--64
Y=0.92X-·66
Y= 1.0 I x--67
.~---~---~---f 1---1----~--~---l
-,-t--,.,....,_~........_--+ I I l----~---1----1··----I 1----1
~ i--,... 0:: 1 ·---1 I l
I r
~~ I I
i I 1
I -1 I . l 0 -J~-1--1---
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
DURATION IN MINUTES
Project Description
Cattail Duplexes_Rational.SPF
Project Options
CFS
Elevation
Rational
User-Defined
Kinematic Wave
YES
NO
Number of Elements
Qty
1
2
1
0
0
0
0
1
0
0
0
0
0
0
0
0
0
Rainfall Details
10 year(s)
Land Uses ............................................................................
Return Period........................................................................
Pipes ............................................................................
Pumps ..........................................................................
Orifices .........................................................................
Weirs ............................................................................
Outlets ..........................................................................
Pollutants ..............................................................................
Outfalls .........................................................................
Flow Diversions ...........................................................
Inlets ............................................................................
Storage Nodes .............................................................
Links......................................................................................
Channels ......................................................................
Enable Overflow Ponding at Nodes ......................................
Skip Steady State Analysis Time Periods ............................
Rain Gages ...........................................................................
Subbasins..............................................................................
Nodes....................................................................................
Junctions ......................................................................
File Name .............................................................................
Flow Units .............................................................................
Elevation Type ......................................................................
Hydrology Method .................................................................
Time of Concentration (TOC) Method ..................................
Link Routing Method .............................................................
Subbasin Summary
SN Subbasin Area Weighted Total Total Total Peak Time of
ID Runoff Rainfall Runoff Runoff Runoff Concentration
Coefficient Volume
(ac)(in)(in)(ac-in)(cfs)(days hh:mm:ss)
1 Developed 0.71 0.5000 0.34 0.17 0.12 0.65 0 00:10:55
2 EG 0.71 0.2000 0.46 0.09 0.06 0.16 0 00:24:11
Subbasin Hydrology
Subbasin : Developed
Input Data
Area (ac) .......................................................0.71
Weighted Runoff Coefficient ........................0.5000
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
-0.71 -0.50
Composite Area & Weighted Runoff Coeff.0.71 0.50
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.34
Total Runoff (in) ............................................0.17
Peak Runoff (cfs) .........................................0.65
Rainfall Intensity ...........................................1.833
Weighted Runoff Coefficient ........................0.5000
Time of Concentration (days hh:mm:ss) ......0 00:10:55
Subbasin : Developed
Subbasin : EG
Input Data
Area (ac) .......................................................0.71
Weighted Runoff Coefficient ........................0.2000
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
-0.71 -0.20
Composite Area & Weighted Runoff Coeff.0.71 0.20
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.46
Total Runoff (in) ............................................0.09
Peak Runoff (cfs) .........................................0.16
Rainfall Intensity ...........................................1.134
Weighted Runoff Coefficient ........................0.2000
Time of Concentration (days hh:mm:ss) ......0 00:24:11
Subbasin : EG
Project Description
Cattail Duplexes.SPF
Project Options
CFS
Elevation
Modified Rational
User-Defined
Kinematic Wave
YES
NO
Number of Elements
Qty
1
2
1
0
0
0
0
1
0
0
0
0
0
0
0
0
0
Rainfall Details
10 year(s)
Land Uses ............................................................................
Return Period........................................................................
Pipes ............................................................................
Pumps ..........................................................................
Orifices .........................................................................
Weirs ............................................................................
Outlets ..........................................................................
Pollutants ..............................................................................
Outfalls .........................................................................
Flow Diversions ...........................................................
Inlets ............................................................................
Storage Nodes .............................................................
Links......................................................................................
Channels ......................................................................
Enable Overflow Ponding at Nodes ......................................
Skip Steady State Analysis Time Periods ............................
Rain Gages ...........................................................................
Subbasins..............................................................................
Nodes....................................................................................
Junctions ......................................................................
File Name .............................................................................
Flow Units .............................................................................
Elevation Type ......................................................................
Hydrology Method .................................................................
Time of Concentration (TOC) Method ..................................
Link Routing Method .............................................................
Subbasin Summary
SN Subbasin Area Weighted Total Total Total Peak Time of
ID Runoff Rainfall Runoff Runoff Runoff Concentration
Coefficient Volume
(ac)(in)(in)(ac-in)(cfs)(days hh:mm:ss)
1 Developed 0.71 0.5000 0.72 0.36 0.25 0.13 0 00:10:55
2 EG 0.71 0.2000 0.72 0.14 0.10 0.05 0 00:24:11
Subbasin Hydrology
Subbasin : Developed
Input Data
Area (ac) .......................................................0.71
Weighted Runoff Coefficient ........................0.5000
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
-0.71 -0.50
Composite Area & Weighted Runoff Coeff.0.71 0.50
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.72
Total Runoff (in) ............................................0.36
Peak Runoff (cfs) .........................................0.13
Rainfall Intensity ...........................................0.360
Weighted Runoff Coefficient ........................0.5000
Time of Concentration (days hh:mm:ss) ......0 00:10:55
Subbasin : Developed
Subbasin : EG
Input Data
Area (ac) .......................................................0.71
Weighted Runoff Coefficient ........................0.2000
Runoff Coefficient
Area Soil Runoff
Soil/Surface Description (acres)Group Coeff.
-0.71 -0.20
Composite Area & Weighted Runoff Coeff.0.71 0.20
Subbasin Runoff Results
Total Rainfall (in) ..........................................0.72
Total Runoff (in) ............................................0.14
Peak Runoff (cfs) .........................................0.05
Rainfall Intensity ...........................................0.360
Weighted Runoff Coefficient ........................0.2000
Time of Concentration (days hh:mm:ss) ......0 00:24:11
Subbasin : EG