Loading...
HomeMy WebLinkAbout123.6 G1.20 TRANSPARENCY ELEVATIONSLEVEL 1 0" LEVEL 4 33'-3" LEVEL 2 11'-9" LEVEL 3 22'-6" 1 2 3 4 5 6 ROOF 42'-3" 7 8 9 10 GRADE -6" PARAPET 48'-3" GABLE PEAK 52'-10 1/2" TOTAL SURFACE: 10,402 SF TRANSPARENCY SURFACE: 1,845 SF TRANSPARENCY PERCENTAGE: 17.7% WEATHER PROTECTION LEVEL 1 0" LEVEL 4 33'-3" A LEVEL 2 11'-9" LEVEL 3 22'-6" BCD ROOF 42'-3" E GRADE -6" PARAPET 48'-3" GABLE PEAK 52'-10 1/2" TOTAL SURFACE: 5934 SF TRANSPARENCY SURFACE: 890 SF TRANSPARENCY PERCENTAGE: 15% WEATHER PROTECTION LEVEL 1 0" LEVEL 4 33'-3" A LEVEL 2 11'-9" LEVEL 3 22'-6" B C D ROOF 42'-3" E GRADE -6" PARAPET 48'-3" GABLE PEAK 52'-10 1/2" TOTAL SURFACE: 5,984 SF TRANSPARENCY SURFACE: 972 SF TRANSPARENCY PERCENTAGE: 16.2% LEVEL 1 0" LEVEL 4 33'-3" LEVEL 2 11'-9" LEVEL 3 22'-6" 123456 ROOF 42'-3" 78910 GRADE -6" PARAPET 48'-3" GABLE PEAK 52'-10 1/2" TOTAL SURFACE: 10,402 SF TRANSPARENCY SURFACE: 1,771 SF TRANSPARENCY PERCENTAGE: 17% WEATHER PROTECTION LEVEL 1 0" LEVEL 4 33'-3" A LEVEL 2 11'-9" LEVEL 3 22'-6" B ROOF 42'-3" E GRADE -6" PARAPET 48'-3" 12'-0" 15'-0" 15'-0" 12'-0" SHEET NO.: TITLE: COPYRIGHT 2023 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT/ENGINEER SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: OWNER LOGO: CONSULTANT LOGO/CONTACT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: SMA PROJECT NUMBER:Plot Date:NOT FOR CONSTRUCTION AHJ APPROVAL: HELENA P: 406-442-4933 BOZEMAN P: 406-219-2216 www.sma.design 7/20/2023 10:35:24 AMG1.20 22-015 2023-07-17 TRANSPARENCY ELEVATIONS Author Checker TRUMAN FLATS @ CANYON GATE 22-015 980 STORY MILL RD BOZEMAN, MT 59715 CANYON GATE INVESTORS LLC SITE PLAN NO.DATE REVISION DESCRIPTION 1/16" = 1'-0"G1.20 1 BUILDING ELEVATION - EAST SF 1/16" = 1'-0"G1.20 4 BUILDING ELEVATION - NORTH SF 1/16" = 1'-0"G1.20 3 BUILDING ELEVATION - SOUTH SF 1/16" = 1'-0"G1.20 2 BUILDING ELEVATION - WEST SF 1/16" = 1'-0"G1.20 5 BUILDING ELEVATION - NORTH INTERNAL SF