1 1 Solid Waste
Russell Ward
12/27/22 12:03 PM
Changemark
SLD Waste
1. need a detailed plan for refuse enclosure. 2. refuse enclosure will need to be
covered.
105 - Architectural Site Plan.pdf See Architectural Site Plan Info Only
2 1 Parks Department
Matthew Lee
1/9/23 1:28 PM
Comment
BMC 38.420.020 - Parkland tracking table needs to show parkland owed at this
phase of development. Include the values of parkland given at subdivision being
used to satisfy this development's parkland requirement and the resulting
remaining balance.
See Canyon Gate Subdivision Application 22264 Info Only
3 1 Building Division
Ben Abbey
1/11/23 10:20 AM
Changemark
BLDG - Construction Documents
Construction documents shall be submitted in the orientation that they are
proposed on the approved site plans.
105 - Architectural Site Plan.pdf Acknowledged Info Only
4 1 Building Division
Ben Abbey
1/11/23 10:20 AM
Changemark
BLDG - Adopted Building Codes
2021 International Building Code (IBC) ICC A117.1-2017 Standard for Accessible
and Usable Buildings and Facilities
105 - Architectural Site Plan.pdf Acknowledged Info Only
5 1 Planning
Susana Montana
1/13/23 1:18 PM
Changemark
on-street parking
1. please be sure that the on-street parking spaces on the "corners" do not
impede upon sight visibility standards. 2. Please mark the dimensions of the on-
street parking spaces per the standards of 38.540.050.A.1.a (1).
103 - Master Site Plan Highlighting
Truman Flats.pdf
Complies Info Only
6 1 Planning
Susana Montana
1/13/23 1:18 PM
Changemark
access for emergency service vehicles and trash trucks
Please check with FIRE and Solid Waste to be sure the radii for the drive aisles
allow unimpeded access for large trucks.
103 - Master Site Plan Highlighting
Truman Flats.pdf
Complies Info Only
7 1 Planning
Susana Montana
1/13/23 1:24 PM
Changemark
usable open space
Please fill in the blank of this cell per the requirements of 38.520.060.B
113 - Open Space Map.pdf See A0.11 Info Only
8 1 Planning
Susana Montana
1/13/23 1:24 PM
Changemark
usable open space
Indicate the number of studio, one and two or more bedroom units and the
open space requirements for each.
113 - Open Space Map.pdf See A0.11 Info Only
9 1 Planning
Susana Montana
1/13/23 1:24 PM
Changemark
fences for common open spaces
How does this common open space area meet the standards of 38.520.060.B.1.b?
113 - Open Space Map.pdf See Landscape Drawings Info Only
Plan Review - Review Comments Report
Project Name: 22398 Truman Flats CONR
Workflow Started: 12/21/2022 11:15:01 AM
Report Generated: 04/17/2023 10:46 AM
REVIEW COMMENTS
report from ProjectDox
by Avolve Software
Plan Review - Review Comments Report
Project Name: 22398 Truman Flats CONR
Workflow Started: 12/21/2022 11:15:01 AM
Report Generated: 04/17/2023 10:46 AM
10 1 Planning
Susana Montana
1/13/23 1:46 PM
Changemark
Block frontage designations
Please provide a map/site plan exhibit showing the block frontage designations
for each of the streets within the Site. Please provide elevations with annotations
as to how the building facades that face the street meet he block frontage
standards. Please be cognizant of the Special Residential Block Frontage
requirements for ground floor dwelling units. Provide a detail drawing as to what
option you are using to meet these privacy and safety standards for all dwelling
units that abut a pedestrian walkway.
107 - Front Elevation.pdf See Architectural Drawings Info Only
11 1 Planning
Susana Montana
1/13/23 1:46 PM
Changemark
block frontage requirements
Please provide details for facades that abut streets regarding the block frontage
requirements of buildings entrances that face the street which must have direct
and visible entrances to the street, weather protection, unit addresses, facade
transparencies, sidewalks to the public ROW sidewalk, and landscaping per the
examples shown in Table 38.510.030.C.
107 - Front Elevation.pdf See Architectural Drawings Info Only
12 1 Planning
Susana Montana
1/13/23 1:46 PM
Changemark
opaque balconies
For facades that lie within 15' of a property line abutting a residentially-zoned
property, the balcony must be at least 50% opaque per 38.520.030.B.
107 - Front Elevation.pdf Not Applicable Info Only
13 1 Planning
Susana Montana
1/13/23 1:46 PM
Changemark
maximum building length/width
Please label the length of the building on each lot, being cognizant of the
restrictions of 38.530.040.E. Please describe in detail how the design meets the
articulation standards of subsection D.
107 - Front Elevation.pdf Complies Info Only
14 1 Planning
Susana Montana
1/13/23 1:46 PM
Changemark
block frontage designations
Per 38.510.020.B, all block frontages within residential zones are subject to
landscaped block frontage provisions of 38.510.030.C. Please provide a map or
site plan which labels the block frontage designations of all streets abutting this
107 - Front Elevation.pdf See Architectural Site Plan
All block frontage complies with Landscape Block Frontage
Info Only
15 1 Planning
Susana Montana
1/13/23 1:59 PM
Changemark
site plan submittal requirements
Please note that the site plan submittal must include the information noted in
38.220.080. Please provide a dimensioned site plan and landscape plan. If
building facades include electrical panels, the landscape plan shall provide details
of screening per 38.520.070. The landscape plan shall show details of the
common open space areas meeting the standards of 38.520.060.B. Please provide
details of how each ground floor dwelling unit is provided the
separation/safety/privacy elements of 38.510.030.J.
105 - Architectural Site Plan.pdf The electrical panels and meters are located within the
building with access from the exterior.
Info Only
report from ProjectDox
by Avolve Software
Plan Review - Review Comments Report
Project Name: 22398 Truman Flats CONR
Workflow Started: 12/21/2022 11:15:01 AM
Report Generated: 04/17/2023 10:46 AM
16 1 Planning
Susana Montana
1/13/23 2:01 PM
Changemark
Annexation agreement housing requirements
Please attach the recorded Annexation Agreement to the site plan application
with a narrative as to how the required affordable housing would be provided
within this Site and how it would be managed over time.
003 - Project Narrative.pdf See Narrative
See Annexation Agreement
Info Only
17 1 Water Rights
Griffin Nielson
1/19/23 2:12 PM
Comment
BMC 38.410.130. Water Adequacy: The development will need to satisfy the
water adequacy code requirement prior to a future site plan approval. If sufficient
water rights cant be provided to offsets the development's annual demand then
a cash-in-lieu of water rights (CILWR) payment will be required. The City assesses
the CILWR fee at a rate of $6,000 per acre-foot. The fee determination will take
place during the site plan review, however if there are any questions or if a
preliminary review is desired please contact Griffin Nielsen with the
Engineering/Utilities Department directly at gnielsen@bozeman.net or (406) 582-
2279. The City encourages the use of groundwater wells to supply irrigation
demands, which in turn will reduce the CILWR fee. Applicants must obtain a pre-
determination from the DNRC demonstrating that a groundwater well may be
permitted under Montanas exempt appropriation or provide the water right
documentation if existing prior to finalization of the CILWR fee determination.
Finally, the City would like to make the owner aware of an available CILWR rebate
of approximately 20% for residential units if high-efficiency fixtures (toilets,
washers, and shower heads) meeting the City Water Conservation Division
standards are installed. The rebate would be released at occupancy and requires
an agreement defining the terms and amount rebate be finalized and executed
prior to final plan approval. If the owner is interested or has any questions please
reach out to Griffin Nielsen. A template agreement has been uploaded to the
Acknowledged Info Only
18 1 Northwestern Energy
Matt Tilstra
1/25/23 5:01 PM
Changemark
NWE - Meter Room
Meter room shall not have doors that can restrict access.
104 - Civil Site Plan.pdf Complies Info Only
19 1 Northwestern Energy
Matt Tilstra
1/25/23 5:04 PM
Changemark
NWE
NWE has limited electrical capacity in this area that will require further
101 - Existing Conditions Preliminary Plat
2.pdf
Acknowledged Info Only
report from ProjectDox
by Avolve Software
Plan Review - Review Comments Report
Project Name: 22398 Truman Flats CONR
Workflow Started: 12/21/2022 11:15:01 AM
Report Generated: 04/17/2023 10:46 AM
20 1 Fire Department
Scott Mueller
1/27/23 8:50 AM
Comment
Both buildings will require fire alarm and fire sprinkler systems with fire
standpipes. Along with the requirement for standpipes, a fire hydrant shall be
within 100 feet of the system FDC (fire department connection). Taking an
assumption with proposed layout and orientation, ideally the fire riser rooms are
the rooms on North end of buildings adjacent to the stairs. These rooms would
be acceptable as proposed with the sidewalk leading to and underneath the
FDC/horn strobe. Site layout is acceptable BUT would highly suggest removing
mid-parking lot spaces creating a full loop through parking area. Concern is fire
apparatus turning radii. 28 feet radii should be maintained. Suggest buildings be
addressed with a Maiden Spirit naming function.
Acknowledged Info Only
21 1 Engineering
Mikaela Schultz
1/30/23 2:22 PM
Library Comment
DSSP Section II A. 4. - The applicant must include a storm drainage plan with
post-construction storm water management controls that are designed to
infiltrate, evapotranspire, and/or capture for reuse the post-construction runoff
generated from the first 0.5 inches of rainfall from a 24-hour storm preceded by
48 hours of no measurable precipitation.
Acknowledged Info Only
22 1 Engineering
Mikaela Schultz
1/30/23 2:22 PM
Library Comment
DSSP Section II C. - The applicant must provide on-site detention with release
rates limited to predevelopment runoff rates. Retention ponds must be sized
based on a 10-year, 2-hour storm intensity.
Acknowledged Info Only
23 1 Engineering
Mikaela Schultz
1/30/23 2:22 PM
Library Comment
Montana Post Construction Storm Water BMP Design Manual - The proposed
project is located in an area that is known to have seasonally high groundwater.
The applicant must demonstrate that seasonal high groundwater will not impact
the function or maintenance of the proposed facilities. Industry guidance
recommends a three-foot minimum separation from the bottom of the
proposed facility to the underlying groundwater table. The applicant must
provide local seasonal high groundwater elevations to support the proposed
See Engineering Report and Civil Plans Info Only
24 1 Engineering
Mikaela Schultz
1/30/23 2:26 PM
Library Comment
BMC 38.220.080 A. 2.g. - The applicant must submit a peak hour trip generation
value to the City for the development.
See Subdivision Application 22264 Info Only
25 1 Engineering
Mikaela Schultz
1/30/23 2:29 PM
Comment
BMC 38.540.020(M) - Stall aisle and driveway design - Snow removal storage
areas must be sufficient to store snow accumulation on site. Areas must be
indicated on the site plan prior to approval.
Acknowledged Info Only
report from ProjectDox
by Avolve Software
Plan Review - Review Comments Report
Project Name: 22398 Truman Flats CONR
Workflow Started: 12/21/2022 11:15:01 AM
Report Generated: 04/17/2023 10:46 AM
26 1 Engineering
Mikaela Schultz
1/30/23 2:33 PM
Library Comment
DSSP Section V.A. - A water design report must be prepared by a professional
engineer for the proposed project. The water distribution system must be
designed to meet the maximum day demand plus fire flow and the peak hour
See Engineering Report Info Only
27 1 Engineering
Mikaela Schultz
1/30/23 2:34 PM
Comment
DSSP Section V. B. - Sanitary Sewer System Design Criteria: The applicant must
provide an estimate of the peak-hour sanitary sewer demand certified by a
professional engineer for the proposed project prior to site plan approval.
See Engineering Report Info Only
28 1 Engineering
Mikaela Schultz
1/30/23 2:41 PM
Library Comment
BMC 38.270.030.B - Completion time for subdivisions: All improvements must be
installed prior to the issuance of a building permit for any lot within a
subdivision, except when concurrent construction is an identified purpose of the
initial project review and approved pursuant to the criteria established in
subsection D of this section. The subdivider must meet the requirements of
either subsection (1) or (2) for completion of infrastructure improvements. The
option must be specified in the preliminary plat submittal.
See CCOFF - Concurrent Construction Checklist Info Only