Loading...
HomeMy WebLinkAbout017_TIS_Report_Block4TRAFFIC IMPACT STUDY for SOUTH UNIVERSITY DISTRICT PHASE 3 - BLOCK 4 Bozeman, Montana Prepared for STAHLY ENGINEERING Prepared by MARVIN & ASSOCIATES 1300 North Transtech Way Billings, MT 59102 October 6, 2022 P.T.O.E. # 259 TRAFFIC IMPACT STUDY for SOUTH UNIVERSITY DISTRICT PHASE 3 - BLOCK 4 Bozeman, Montana Prepared for STAHLY ENGINEERING Prepared by MARVIN & ASSOCIATES 1300 North Transtech Way Billings, MT 59102 October 6, 2022 P.T.O.E. # 259 i TABLE OF CONTENTS PAGE INTRODUCTION 1 PROPOSED SITE DEVELOPMENT 1 EXISTING CONDITIONS 3 Streets & Intersections 3 Existing Traffic Volumes 4 Speeds 4 Existing Capacity 6 DEVELOPMENT TRAFFIC PROJECTIONS 7 Trip Generation 7 Trip Distribution 8 Traffic Assignment 10 TRAFFIC IMPACTS 14 Existing Plus Development Traffic Volumes 14 Capacity 16 Safety 17 Future Conditions Plus Site Traffic 17 Future External Street Capacity 19 Future Block 1-4 Access Traffic Projections 20 Future Block 1-4 Access Capacity 21 CONCLUSIONS & RECCOMMENDATIONS 22 APPENDIX A – TRAFFIC COUNTS & PROJECTIONS APPENDIX B – CAPACITY CALCULATIONS APPENDIX C – TURN LANRAFFIC ASSIGNMENT MODELS ii LIST OF TABLES PAGE Table 1. Existing Capacity Calculation Summary 6 Table 2. SUD Phase 3 – Block 4 Trip Generation Summary 7 Table 3. Existing Plus Blocks 1-3 Traffic Capacity Analysis Summary 16 Table 4 Future Year 2037 External Intersections Capacity Analysis Summary 19 Table 5. Future Year 2037 Site Access Intersections Capacity Calculation Summary 22 LIST OF FIGURES PAGE Figure 1. SUD Phase 3 Block 4 Development Site & Study Intersections 2 Figure 2. Year 2022 Existing Traffic Volumes 5 Figure 3. Block 4 Site Generated Trip Distribution Percentages 9 Figure 4. SUD Phase 3 Block 4 Traffic Assignment 11 Figure 5. SUD Phase 3 Block 4 Traffic Access Assignment 12 Figure 6. SUD Phase 3 Block 1 - 4 Traffic Access Assignment 13 Figure 7 Existing Plus SUD Phase 3 Blocks 1-4 Development Site Traffic 15 Figure 8. Future Traffic Projections at External Intersections 18 Figure 9. Future Traffic Projections at SUD Accesses Pertinent to Block 4 Development 21 . South University District Phase3 Block 4 Traffic Impact Study MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 1 INTRODUCTION The following narratives serve as a summary report of operational impacts that could be associated with the proposed Block 4 development of the South University District Subdivision, herein referenced as the SUD Phase 3 Block 4 development. The report, figures, and appendix encompass all intersections that could potentially be impacted by the development, including all intersections between arterial and collector streets within a 0.5-mile radius of the development. PROPOSED SITE DEVELOPMENT The proposed development property is located: south of Student Drive, with the southern boundary fronting on the future extension of Arnold Street; the eastern boundary is located along the S. 11th Avenue; and the western boundary fronts along an extension of S 14th Avenue, as shown in Figure 1. The Stucky Road Extension, State Street, and S 17th Avenue are all currently under construction. Block 4 of SUD Phase 3 consists of 11.89 acres that will provide apartment buildings similar to the SUD Phase 2 development north of Student Drive. The apartments are being designed to accommodate 654 Montana State University students. Three additional developments within Phase 3 are shown in Figure 1. The Block 2 and 3 TIS reports were recently submitted while the Block 1 TIS reports is currently being prepared for the proposed developments being proposed within SUD Phase 3. Access to the proposed development will include Arnold Street, Student Drive, South 11th Avenue, and South 14th Avenue. Student Drive and South 11th Avenue currently exist, while the extensions of South 14th Avenue and Arnold Street will be constructed in conjunction with Blocks 3 & 4 construction. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 2 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 3 EXISTING CONDITIONS Streets & Intersections Potentially impacted intersections located within 0.5-miles of the proposed development site are: Kagy Boulevard intersections with S. 11th and S. 19th Avenue; S. 19th Avenue intersections with Lincoln Street, Stucky Road, Arnold Street, and Graf Street; and the Graf Street Intersection with S 3rd Avenue. Kagy Boulevard is currently a two-lane street with left-turn lanes at its intersection with S 11th Avenue and bike lanes east of S 14th Avenue. There are three approach lanes on Kagy Boulevard at its intersection with S. 19th Avenue. Kagy Boulevard extends from the termini point just west of S. 19th Avenue, past the MSU campus, to rural areas east of Bozeman. Montana Department of Transportation (MDT) has had an ongoing design process that developed preferred alternatives. The project was in flux for a few years and was rescoped in late 2021. The most current news of the project is a halt in the process with no indication of when design and construction will be completed. Based on potential traffic growth it could be assumed that a future street section with 5 lanes of traffic would be needed. The configuration of intersection controls from S 19th Avenue to S 3rd Avenue will not be known until project design concepts have been secured. South 11th Avenue extends from a point south of Graf Street, thru the MSU campus, to an intersection with Main Street. It currently operates with one lane for each direction of travel and includes bikes lanes on either side north of Arnold Street. At its intersection with Kagy Boulevard it accommodates separate left- turn lanes on all four legs of the intersection. South 19th Avenue extends from a point south of Kagy Boulevard across the entire Bozeman urban area to an interchange with Interstate 90. The Kagy Boulevard & S 19th Avenue intersection has multiple approach lanes and is controlled by a traffic signal. S 19th Avenue has 2 traffic lanes in each direction MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 4 and there are opposing left-turn bays within the raised median at the Lincoln Street intersection. Lincoln Street intersects S 19th Avenue approximately 1,300’ north of Kagy Boulevard. The Lincoln Street approaches are controlled by stop signs. Raised median channelization does not allow left-turn or thru-movements movements from Lincoln Street onto or across S 19th Avenue. Existing Traffic Volumes Previous studies in the study area collected 24-hour traffic data on South 19th Avenue, north of Kagy Boulevard and on Kagy Boulevard, east of S 19th Avenue. Peak AM and PM traffic counts were taken with Mio-vision cameras in April 2022. Traffic volume summaries for external intersections can be found in Appendix A of this report. The results of the nine intersection counts are illustrated in Figure 2. Also shown in Figure 2, are the Average Weekday Traffic (AWT) volumes which were calculated using the hourly variation factors. Appendix A also in includes summaries of a models used to balance traffic volumes and adjust the counts to average annual traffic conditions. In comparing these counts to previous studies completed in the area, it was discovered that there was a 1.5% annual average increase in traffic growth on S 19th Avenue and Kagy Boulevard. It should be noted that the peak AM hour traffic on S 19th Avenue occurs between 7:30 and 8:30 AM at most of the intersections while the peak PM hour traffic varies within a period between 4:30 and 6:00 PM. Speeds Speed data was previously recorded on both Kagy Boulevard and on S 19th Avenue. Statistical analysis of the speed data indicated that the 85th % speed on S 19th Avenue was approximately 44 mph while the 85th % speed on Kagy Boulevard was approximately 39 mph. The speed samples on both streets are within a reasonable range of the posted speed limits. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 5 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 6 Existing Capacity Capacity calculations were completed for the study intersections based on existing lane geometry and traffic volume counts. Table 1 provides a summary of the calculation results, and the calculations can be found in Appendix B of this report. Delay, Level-of-service (LOS), and vehicle queue projections are used as Measures of Effectiveness (MOE) within Table 1. All intersections, approaches and movements currently operate at LOS “C” or better except for the westbound through/right lane on Kagy Boulevard, which operates at LOS “D” with 36.0 seconds delay per vehicle during the peak PM hour. Intersection Int/App Delay LOS Max Q Int/App Delay LOS Max Q WB- Worst 13.0 B 1 WB- Worst 19.8 C 4 Overall 23.9 C 11 Overall 20.8 C 11 NB- Worst 30.5 C 9 NB- Worst 30.3 C 8 Overall 21.0 C 13 Overall 22.2 C 10 EB- Worst 30.6 C 9 EB- Worst 26.0 C 8 Overall 18.6 B 6 Overall 18.2 B 6 WB- Worst 22.5 C 5 WB- Worst 22.3 C 5 Overall 20.2 C 10 Overall 24.8 C 16 NB- Worst 29.3 C 9 WB- Worst 34.5 C 16 EB- Worst 14.9 C 1 EB- Worst 13.7 B 1 Overall 5.5 A 2 Overall 3.6 A 1 NB- Worst 6.2 A 2 SB- Worst 3.9 A 1 Overall 9.3 A 4 Overall 4.5 A 1 WB- Worst 12.5 B 4 EB- Worst 4.8 A 1 Overall 6.5 A 3 Overall 5.3 A 2 NB- Worst 7.0 A 3 EB- Worst 5.4 A 1 S 11th Avenue & Graf Street S 3rd Avenue & Graf Street Table 1. Existing Capacity Calculation Summary S 19th Avenue & Lincoln Street PEAK PM HOUR S 19th Avenue & Kagy Boulevard S 19th Avenue & Stucky Road S 19th Avenue & Graf Street S 11th Avenue & Kagy Boulevard S 11th Avenue & Stucky Road PEAK AM HOUR S 11th Avenue & Arnold Atreet MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 7 DEVELOPMENT TRAFFIC PROJECTIONS Trip Generation The planned development of SUD Phase 3 , Block 4 includes apartment buildings with 654 student beds. The TIS for SUD Phase 2 student apartments was completed in 2016 when there were no ITE Trip Generation Rates available. Therefore, a trip generation study was completed for student apartments north of the development was completed to develop appropriate rates. Subsequent to the Phase 2 TIS study two new ITE Trip Generation Reports were published that incorporated student housing. The latest ITE Trip Generation Report, 11th Edition contains Land Use Code 225 “Off-Campus Student Apartments”. In comparing the 2016 SUD Phase 2 study to the 11th Edition ITE rates, it was determined that the rates were within a few percentage points of being the same. Therefore, the ITE rates were used to estimate trip generation. Table 2 summarizes trip generation projections for the proposed 654 student bed development. The development would generate approximately 2,281 trips on the average weekday (AWT). There would be 78 trips during the peak AM hour period with 28 trips entering and 50 exiting the site. During the peak PM hour period, there would be 157 trips with 79 entering and 78 exiting the site. Table 2. SUD Phase 3 - Block 4 Trip Generation Summary No. of Rate Total Total Total Development Area Units Units Rate Trips Rate Trips Enter Exit Rate Trips Enter Exit Code 225 - Off-Campus Students Apts - Low-Rise 654 Beds 1 2281 2 78 28 50 3 157 79 78 Total Trip Ends =2281 78 28 50 157 79 78 Pedestrian/Bike Trips =20%456 20%16 6 10 20%31 16 15 Net Vehicular Trips =1825 62 22 40 126 63 63 1 - Ln(T) = 0.75Ln(X)+2.87 2 - T = 0.12(X) (36% enter)3 - T = 0.24(X) (50% enter) Peak AM Hour Peak PM HourITE Trip Generation Report - 11th Edition Average Weekday MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 8 Not all these trips would represent new traffic on the street system. Some trips would be attributed to bike and pedestrian modes. The 2016 SUD Phase 2 study indicated that approximately 30% of the trips were made by pedestrians and 10% were made by bicycles. Since the Block 4 property in SUD Phase 3 development is slightly farther away from campus it was assumed that alternate modes would be less or approximately 20% of total trip ends. The net vehicular trips would be 1,825 average weekday trips with 62 vehicular trips in the AM hour and 126 in the PM hour, as indicated in Table 2 Trip Distribution There are various methods available for determining the directional distribution of trips to and from site developments. For developments within a large, urbanized area, the task is best accomplished through the creation of a computerized transportation model of the urban street system, which includes the proposed development changes. When the creation of a model is not feasible, realistic estimates can be made by determining the distribution of existing traffic volumes on the surrounding street system. The existing distribution can then be applied to newly generated trips, with adjustments made based upon the likely trip origins and destinations associated with the development land use or uses. For the SUD Phase 3, Block 4 property development, a basic area of influence model was used. With potential for trip origins and destinations to be made throughout the Bozeman urban area. Polygon areas were plotted on aerial photos of the Bozeman urban area. The polygon boundaries were defined by direction of access on the entire street system for both existing and future conditions. Approximate population and commercial densities were estimated within each of the polygon areas. The percentage densities of each polygon were calculated based on the entire study area and applied to street links accessing the site. A Gravity Equation using the inverse square of the travel time to the center of each polygon was applied to the densities and the relative percentage attraction was calculated. Figure 3 presents the resulting percentage trip distribution on the study street system. The overall distribution shown in Figure 3 accounts for the MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 9 fact that trips associated with students and the location of the university would heavily skew directional distribution to and from the campus The overall percentage distribution in Figure 3 is used to route traffic within the traffic assignment models. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 10 Traffic Assignment Site traffic assignments were completed using the trip generation projections in Table 3 and the trip distribution percentages discussed in the preceding section. The traffic assignment models (see Appendix C) assumed that the completion of construction for Phase 3 developments would be in-place when the development is completed. That assumption would include: the Stucky Road extension from S 19th Avenue to S 11th Avenue; S 17th Avenue from Arnold Street to Kagy Boulevard; State Street from S 19th Avenue to S 17th Avenue; and Arnold Street from S 11th Avenue to S 19th Avenue. Figure 4 presents the AWT and peak hour site traffic assignments on the external street system. Most of the site traffic would be concentrated on S 11th Avenue north of Arnold Street. Site traffic would be split between S 19th Avenue north of Stucky Road 620 AWT and S 11th Avenue north of Kagy Boulevard with 658 AWT. Site traffic assignment for SUD Phase 3, Block 4 access intersections were calculated and are summarize in Figure 5. Figure 5 details eight intersections that surround the development site. The highest volume access would be the site access at S 11th Avenue and Student Drive with 36 vehicles exiting and 38 vehicles entering the site during the peak PM hour period. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 11 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 12 Since the SUD Phase 3 development is currently constructing the public streets that will provide access to the Block 4, Block 2, and the Block 1 development, it can be assumed that these blocks will be developed in the same time frame. A previous study for Block 1 (aka Block 5) was completed in 2016 with a TIS update submitted in 2018 and Blocks 2 and 3 TIS were completed and submitted in September 2020. Since 2018, the S 11th Avenue connection between Graf Street and Stucky Road was opened along with an extension to Arnold Street. Because of the new street links, it was determined that a revised traffic assignment model was necessary to determine traffic volumes at the intersection accesses shared with Block 1. Appendix C contains the new Block 1, Block 2, MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 13 Block 3, and Block 4 traffic assignment models. Figure 6 summarizes the combination of Blocks 1 through 4 traffic assignments at eleven site accesses. Figure 6 indicates that the Stucky Road access east of S 19th Avenue would be the highest volume access with 251 vehicles entering and exiting during the peak PM hour period. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 14 TRAFFIC IMPACTS Existing Plus Development Traffic Volumes Figure 7 illustrates the combination of existing am and pm design hour traffic volumes and development generated traffic at each of the key study intersections for full development of SUD Phase 3, Blocks 1 through 4. Also shown in Figure 7 are the resultant AWT volumes on the study street links. When these AWT volumes are compared to Figure 2 existing volumes, the highest increases (approximately 10%) would occur on S 19th Avenue, north and south of Kagy Boulevard. It should be noted that, normally traffic impacts on streets that are less than 10% are not considered to be significant because daily traffic variations on any street routinely exceed 10%. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 15 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 16 Capacity Capacity calculations (see Appendix B) indicate that all approaches and all movements at the external intersections would be the same as existing LOS at all intersections. There would be slight variations in delay, v/c ratios, and queue lengths with no appreciable impact on overall operations at the existing intersections. Table 3 presents a summary of the MOE’s for each external intersection. All the intersections external to the site would operate at LOS “C” or better for existing plus site traffic conditions. The S 11th Avenue NB approach to Kagy Boulevard would have the greatest delay of the four site accesses with 35.9 seconds per vehicle in the am hour (LOS “D”) and 22.8 LOS “C”) in the pm hour. Intersection Int/App Delay LOS Max Q Int/App Delay LOS Max Q WB- Worst 13.0 B 1 WB- Worst 19.8 C 4 Overall 24.6 C 11 Overall 20.6 C 12 NB- Worst 31.0 C 9 NB- Worst 30.9 C 7 Overall 24.0 C 10 Overall 24.9 C 12 EB- Worst 30.3 C 8 WB- Worst 26.9 C 3 Overall 18.8 B 6 Overall 18.6 B 6 WB- Worst 22.7 C 5 WB- Worst 22.5 C 5 Overall 21.6 C 11 Overall 23.7 C 15 NB- Worst 35.9 D 11 WB- Worst 31.2 C 15 EB- Worst 23.1 C 3 EB- Worst 26.1 C 4 Overall 5.6 A 2 Overall 3.8 A 1 NB- Worst 6.4 A 2 SB- Worst 4.0 A 1 Overall 9.9 A 5 Overall 4.7 A 1 WB- Worst 13.6 B 5 EB- Worst 5.0 A 1 Overall 6.7 A 3 Overall 5.6 A 2 NB- Worst 7.2 A 3 EB- Worst 5.8 A 2 S 11th Avenue & Graf Street S 3rd Avenue & Graf Street S 19th Avenue & Stucky Road S 19th Avenue & Graf Street S 11th Avenue & Kagy Boulevard S 11th Avenue & Stucky Road S 11th Avenue & Arnold Atreet Table 3. Existing Plus Blocks 1 - 4 Traffic Capacity Calculation Summary PEAK AM HOUR PEAK PM HOUR S 19th Avenue & Lincoln Street S 19th Avenue & Kagy Boulevard Typically, two-lane streets in an urban environment can carry between 6,000 and 9,000 vehicles per day and still operate at LOS “C”. Three lane streets can carry up to 18,000 vehicles while 5 lane streets max-out at approximately 30,000. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 17 Thus, S 11th Avenue and Stucky Road, west of S19th Avenue would still be within its ideal operating range, while Kagy Boulevard is and will be well above its ideal operating range. Safety All the site accesses would have adequate sight distance according to AASHTO geometric guidelines. Warrants for left-turn and right-turn auxiliary lanes were investigated in the previous Block 1 TIS and it was determined that none of the site accesses would be close to the minimum volumes associated with a right- turn lane. Future Conditions Plus Site Traffic The City of Bozeman’s Municipal Code (BMC) requires that all traffic impact studies analyze all arterial and collector street intersections within a 0.5-mile distance from the site development. The BMC indicates that all intersections must operate at an overall LOS “C” or better in the future, which is defined as 15 years beyond the development year. For this development, several previous studies have been completed to develop design data for the new street construction with the study area. In addition, traffic assignment models were developed for SUD Phase 3 Blocks 1, 2, 3, and 4 as a part of this study (see Appendix C). It was determined that the studies did not necessarily correlate, when combined. For traffic projections within the future development east of S 19th Avenue, west of S 11th Avenue, north of Kagy Boulevard, and south to and including Blackwood Grove Subdivision were included group and traffic assigned to the existing and proposed street system contained therein. Traffic volumes on S 19th and Avenue and on Kagy Boulevard were increased by a factor of 1.35 (1.5% annual growth for 15 years). In some cases, developments within the study are a part of the growth factor and some traffic balancing was required to determine a reasonable estimate of future traffic volumes at the key study intersections. Figure 8 illustrates the resulting traffic projections on the external intersections. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 18 MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 19 Future External Street Capacity Table 4 presents a summary of the MOE’s for each intersection in the year 2037. In calculating the future capacity, it was assumed that all the future street improvements and extensions would be constructed as currently planned. As previously mentioned, the intersection improvements on Kagy Boulevard are not known at the present time and it can only be assumed that the design of future improvements will include all future development traffic that could impact future operations. Intersection Int/App Delay LOS Max Q Int/App Delay LOS Max Q WB- Worst 13.5 B 1 WB- Worst 29.3 D 7 NA Overall 33.7 C 11 Overall 32.8 C 16 WB- Worst 44.6 D 4 WB- Worst 41.8 D 6 EB- Worst 15.1 C 1 EB- Worst 16.0 C 1 Overall 28.7 C 9 Overall 21.1 C 9 NB- Worst 33.4 C 9 NB- Worst 22.3 C 5 NA EB- Worst 37.2 E 5 EB- Worst 42.5 E 6 Overall 6.2 A 3 Overall 4.1 A 1 NB- Worst 7.3 A 3 SB- Worst 4.4 A 1 Overall 11.7 B 6 Overall 5.4 A 6 WB- Worst 17.3 C 6 EB- Worst 5.8 A 2 Overall 7.6 A 3 Overall 5.5 A 2 NB- Worst 8.2 A 3 EB- Worst 5.7 A 2 Table 4. Future Year 2037 External Intersections Capacity Calculation Summary PEAK AM HOUR PEAK PM HOUR S 19th Avenue & Lincoln Street S 19th Avenue & Kagy Boulevard S 11th Avenue & Graf Street S 3rd Avenue & Graf Street S 19th Avenue & Arnold Street S 19th Avenue & Stucky Road S 19th Avenue & Graf Street S 11th Avenue & Kagy Boulevard S 11th Avenue & Stucky Road S 11th Avenue & Arnold Atreet Table 4 indicates that all intersections would operate at an overall LOS “C” or better in the year 2037. However, individual approach lanes at three intersections would operate at a LOS below “C.” The westbound approach from MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 20 Lincoln Lane onto S 19th Avenue would operate at LOS “D” in the peak PM hour period with a maximum queue of 7 vehicles. There are no HCM methods to calculate the overall LOS of two-way stop-controlled intersections. However, the Lincoln Stret approach is only 10% of the traffic entering the intersection in the peak PM hour so the overall delay of the intersection would be much less than the LOS “D” criteria. Both the eastbound and westbound approaches at the intersection of S 19th Avenue and Stucky Road would operate at LOS “D” during the peak AM and PM hours of operation. Since the eastbound approach left turn lane can only accommodate 6 vehicles and future projections indicate that the maximum queue length would be as high as 16 vehicles, the eastbound approach could be considered a concern for future operations. At the intersection of Stucky Road and S 11th Avenue the eastbound approach would operate at LOS “E” during the AM and PM peak hour periods in the year 2037. Improvements to that intersection would be required. However, lane additions or any significant physical changes would be difficult to achieve considering that current roadside development structures would be significant impediments to expansion of the intersection area. In this case, a traffic signal would be a practical solution to excessive delay. It would also accommodate significant pedestrian traffic at this intersection. Future Block 1 - 4 Access Traffic Projections Figure 9 illustrates future year 2037 traffic projections at the site access intersections specifically impacted by the Block 4 development. The volumes include thru-traffic on S 19th Avenue. S 17th Avenue and Stucky Road based on the overall traffic projections for all SUD Phase 3 developments and future year external street projections. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 21 Future Block 1 - 4 Access Capacity Table 5 presents the results of capacity calculations for the site access intersections based on the Figure 9 traffic projections. Intersections labeled “2” and “5” in Table 5 were not analyzed because exceedingly small traffic projections, which indicates that capacity at those intersections would not be of significant concern. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 22 All site access intersections would operate at LOS “B” or better given projected future traffic volumes. All accesses would operate with maximum queues of one vehicle in the access approach. Access into and out of the Block 2 and 3 accesses on Stucky Road, east of S 19th Avenue, would not be blocked by westbound vehicle queues (6 in PM Hour) at the S 19th Avenue and Stucky Road intersection since the left turn lane could accommodate 9 vehicles in storage. Intersection Int/App Delay LOS Max Q Int/App Delay LOS Max Q NB- Worst 10.9 B 1 SB- Worst 12.5 B 1 Overall 3.7 A 1 Overall 4.0 A 1 EB- Worst 3.8 A 1 EB- Worst 4.3 A 1 Overall 3.7 A 1 Overall 4.0 A 1 EB- Worst 3.8 A 1 EB- Worst 4.2 A 1 EB- Worst 20.4 C 1 EB- Worst 13.6 B 1 SB- Worst 9.7 A 0 SB- Worst 12.5 B 1 SB- Worst 9.8 A 0 SB- Worst 10.3 B 1 SB- Worst 9.9 A 0 SB- Worst 11.0 B 1 Arnold Street & West Blk 4 Access Arnold Street & West Blk 4 Access Table 5. Future Year 2037 Site Access Intersections Capacity Calculation Summary S 14th Avenue & Stucky Road S 11th Avenue & Student Drive S 17th Avenue & Arnold Street PEAK AM HOUR PEAK PM HOUR Stucky Road & Block 2 and 3 Access S 17th Avenue & Stucky Road CONCLUSIONS & RECOMMENDATIONS Development of the SUD Phase 3 Block 4 property would not cause additional impacts to the safety and efficiency of any of the area streets or intersections. However, Block 4 development would contribute a small portion to future traffic generated by development of the remaining SUD Phase 3 properties and other developments planned within the area south of Stucky Road. MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 SUD Phase 3 Block 4 Traffic Impact Study Page 23 Future traffic (year 2037) on area streets is projected to impact some intersections as developments are constructed and external area traffic demand increases. Future improvements to Kagy Boulevard are currently in limbo but will eventually be required at as a key element in the future areawide transportation system. The intersection of S 19th Avenue & Stucky Road will require future modifications due to continued traffic growth on Stucky Road west of S 19th Avenue. That section of road is currently at the maximum LOS limits for a two-lane roadway. Future traffic projections indicate that the minimum street section would need be a three-lane facility with added lanes at its intersection with S 19th Avenue. The future construction of S 27th Avenue from Graf Street to Kagy Boulevard could also reduce traffic demands on Stucky Road. Future improvements would also be required on S 19th Avenue to add an additional southbound lane on the western half of the roadway section between Stucky Road and Arnold Street. The intersection of Stucky Road and S 11th Avenue would have capacity issues as developments continue in the future. Because of geometric constraints additional lanes or a roundabout would not be possible. The most practical mitigation would be installation of a basic two-phase signal, which would allow efficient intersection operations while providing protected pedestrian crossing to accommodate the higher pedestrian travel demands expected at that intersection. APPENDIX A Traffic Counts & Projections Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 1 197 76 15 0 0 15 171 1100 477 7:45 AM 2 240 68 18 0 0 12 231 0100 572 8:00 AM 6 238 50 22 0 0 6 280 4210 609 8:15 AM 4 182 38 20 0 0 3 233 1000 481 8:30 AM 1 164 52 19 0 0 7 171 1100 416 8:45 AM 4 225 66 16 0 0 4 186 1100 503 9:00 AM 2 202 87 17 0 0 7 170 1200 488 9:15 AM 1 153 50 33 0 0 2 172 0300 414 Peak AM = 13 857 232 75 0 0 36 915 6410 2139 PHF = 0.88 4:00 PM 0 230 54 93 0 0 6 202 2100 588 4:15 PM 2 206 43 85 0 0 2 229 0300 570 4:30 PM 0 242 33 91 0 0 5 226 0300 600 4:45 PM 2 227 46 56 0 0 5 242 0300 581 5:00 PM 2 249 43 67 0 0 6 216 0400 587 5:15 PM 1 253 45 58 0 0 3 271 0400 635 5:30 PM 0 268 68 71 0 0 11 177 0200 597 5:45 PM 2 222 69 72 0 0 10 214 1100 591 Peak PM = 5 992 225 268 0 0 30 878 1 11 0 0 2410 PHF = 0.95 Southbound Westbound Northbound Eastbound S 19th Avenue West Lincoln Street S 19th Avenue West Lincoln Street Site Code Project SUD Prpoerties Study Name 19th Avenue and West Lincoln Street Start Date 04/05/2022 Start Time 7:30 AM Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 6 54 122 64 2 27 79 117 7345 490 7:45 AM 9 97 125 66 4 34 82 166 17 0 6 9 615 8:00 AM 13 105 92 85 5 34 48 200 6127 598 8:15 AM 7 70 105 75 5 52 68 142 4206 536 8:30 AM 7 68 75 77 4 28 50 86 8336 415 8:45 AM 9 84 109 64 4 39 46 98 8 2 6 13 482 9:00 AM 5 72 110 70 2 27 53 86 5 4 2 10 446 9:15 AM 5 62 82 79 8 21 34 76 3118 380 Peak AM = 35 326 444 290 16 147 277 625 34 6 12 27 2239 PHF = 0.91 4:00 PM 2 128 91 112 2 49 27 105 2 0 1 14 533 4:15 PM 4 107 80 131 4 55 26 84 2 4 4 10 511 4:30 PM 4 135 91 129 5 52 40 98 1 6 8 11 580 4:45 PM 2 120 82 115 2 61 48 104 2 3 6 23 568 5:00 PM 2 137 92 125 1 55 54 82 1 8 8 17 582 5:15 PM 0 140 93 124 4 72 62 113 2696 631 5:30 PM 6 155 91 86 2 53 61 98 1736 569 5:45 PM 2 119 94 99 3 44 46 97 2255 518 Peak PM = 8 532 358 493 12 240 204 397 6 23 31 57 2361 PHF = 0.94 Southbound Westbound Northbound Eastbound S 19th Avenue W Kagy Blvd S 19th Avenue W Kagy Blvd Site Code Project SUD Properties Study Name 19th Avenue and Kagy Blvd Start Date 04/05/2022 Start Time 7:30 AM Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 47 35 114 27 21 99 343 7:45 AM 54 74 149 32 24 118 451 8:00 AM 54 86 179 47 36 80 482 8:15 AM 63 70 149 37 13 72 404 8:30 AM 36 61 81 17 21 70 286 8:45 AM 66 61 92 16 19 66 320 9:00 AM 53 47 97 14 7 65 283 9:15 AM 33 56 67 16 6 46 224 Peak AM = 218 265 591 143 94 369 1680 PHF = 0.87 4:00 PM 73 97 71 17 15 68 341 4:15 PM 59 108 79 23 22 41 332 4:30 PM 93 105 77 21 21 68 385 4:45 PM 74 112 92 21 21 76 396 5:00 PM 82 121 71 20 21 71 386 5:15 PM 94 128 107 23 13 79 444 5:30 PM 91 125 65 16 12 91 400 5:45 PM 66 111 85 15 20 64 361 Peak PM = 341 486 335 80 67 317 1626 PHF = 0.92 Southbound Westbound Northbound Eastbound S 19th Avenue n/a S 19th Avenue Stucky Road Site Code Project SUD Properties Study Name 19th Avenue and Stucky Road Start Date 04/05/2022 Start Time 7:30 AM Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 5 17 30 31 1 3 7 91 1 1 7 26 220 7:45 AM 3 42 53 52 3 3 21 109 1 2 11 17 317 8:00 AM 6 44 67 87 7 4 21 131 5 1 20 17 410 8:15 AM 7 46 23 70 8 7 6 85 0 0 13 9 274 8:30 AM 10 41 27 27 5 3 9 65 5 1 6 17 216 8:45 AM 16 40 20 21 2 3 2 68 1 1 9 17 200 9:00 AM 3 33 16 24 3 5 7 67 2 0 5 14 179 9:15 AM 5 37 18 24 6 3 5 51 0 1 2 11 163 Peak AM = 21 149 173 240 19 17 55 416 7 4 51 69 1221 PHF = 0.74 4:00 PM 13 65 36 29 10 3 1 41 3 3 8 18 230 4:15 PM 20 76 27 42 10 11 4 46 0 0 6 16 258 4:30 PM 12 79 41 29 9 13 2 57 1 2 4 13 262 4:45 PM 19 69 40 30 7 4 4 75 1 2 5 13 269 5:00 PM 16 79 50 25 11 21 3 47 2 3 11 15 283 5:15 PM 28 85 28 39 21 13 6 73 2 3 6 14 318 5:30 PM 17 82 31 21 10 12 6 56 4199258 5:45 PM 13 77 33 19 6 6 5 69 0 2 3 10 243 Peak PM = 75 312 159 123 48 51 15 252 6 10 26 55 1132 PHF = 0.89 Study Name 19th Avenue and Graf Street Start Date 04/05/2022 Start Time 7:30 AM Site Code Project SUD Properties Southbound Westbound Northbound Eastbound S 19th Avenue Graf Street S 19th Avenue Graf Street Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 3 14 11 23 84 1 20 32 15 13 161 4 381 7:45 AM 5 18 17 18 87 2 29 41 13 21 170 12 433 8:00 AM 10 25 16 25 96 3 18 66 31 14 102 11 417 8:15 AM 5 24 20 17 92 1 18 50 22 21 127 8 405 8:30 AM 6 15 16 21 92 9 13 29 15 10 106 14 346 8:45 AM 8 17 23 15 84 6 12 25 17 19 119 20 365 9:00 AM 8 20 17 22 78 5 23 54 13 18 125 21 404 9:15 AM 8 16 25 35 91 8 17 22 13 8 84 18 345 Peak AM = 23 81 64 83 359 7 85 189 81 69 560 35 1636 PHF = 0.94 4:00 PM 17 45 28 36 115 16 22 31 20 15 109 14 468 4:15 PM 19 41 39 28 126 16 16 37 30 20 99 7 478 4:30 PM 23 51 41 29 125 13 11 28 24 16 107 17 485 4:45 PM 18 34 41 31 118 8 19 26 26 22 118 15 476 5:00 PM 23 56 40 31 119 11 10 38 31 25 124 15 523 5:15 PM 28 46 41 38 131 16 14 41 21 20 128 19 543 5:30 PM 26 52 47 29 88 12 10 42 19 19 102 16 462 5:45 PM 20 39 46 34 100 17 20 41 21 16 115 18 487 Peak AM = 92 187 163 129 493 48 54 133 102 83 477 66 2027 PHF = 0.93 Southbound Westbound Northbound Eastbound S 11th Avenue W Kagy Blvd S 11th Avenue W Kagy Blvd Site Code Project SUD Properties Study Name S 11th Ave and Kagy Blvd Start Date 04/05/2022 Start Time 7:30 AM Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 4 21 41 0 0 19 85 7:45 AM 2 30 61 0 0 16 109 8:00 AM 1 36 101 1 1 9 149 8:15 AM 2 32 82 2 0 5 123 8:30 AM 7 20 39 0 2 12 80 8:45 AM 4 25 36 0 0 9 74 9:00 AM 6 28 51 3 0 28 116 9:15 AM 4 21 27 0 0 8 60 Peak AM = 9 119 285 3 1 49 466 PHF = 0.78 4:00 PM 14 48 35 0 0 17 114 4:15 PM 18 48 45 2 1 9 123 4:30 PM 16 58 23 0 2 13 112 4:45 PM 10 43 34 0 2 14 103 5:00 PM 21 67 48 0 2 11 149 5:15 PM 12 50 40 0 0 17 119 5:30 PM 13 53 42 2 0 10 120 5:45 PM 10 51 39 3 1 21 125 Peak PM = 56 221 169 5 3 59 513 PHF = 0.86 Study Name 11th Avenue and Stucky Road Start Date 04/05/2022 Start Time 7:30 AM Site Code Project SUG Developmemts Southbound Westbound Northbound Eastbound S 11th Avenue n/a S 11th Avenue Stucky Road Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 8 6 3 1 6 18 42 7:45 AM 7 7 6 3 12 38 73 8:00 AM 21 8 22 14 42 72 179 8:15 AM 20 4 16 7 9 65 121 8:30 AM 11 1 3 2 1 26 44 8:45 AM 5 3 5 1 1 15 30 9:00 AM 11 3 7 2 0 30 53 9:15 AM 11 3 2 0 2 10 28 Peak AM = 59 20 47 26 64 201 417 PHF = 0.58 4:00 PM 25 5 4 4 3 14 55 4:15 PM 22 3 9 3 2 14 53 4:30 PM 28 6 2 7 3 10 56 4:45 PM 26 8 4 0 5 11 54 5:00 PM 45 7 4 9 3 6 74 5:15 PM 37 8 3 1 4 24 77 5:30 PM 26 7 6 1 4 21 65 5:45 PM 22 8 3 0 1 15 49 Peak PM = 134 30 17 11 16 62 270 PHF = 0.88 Southbound Westbound Northbound Eastbound S 11th Avenue Arnold Street S 11th Avenue n/a Site Code Project SUD Properties Study Name S 11th Street and Arnold Street Start Date 04/05/2022 Start Time 7:30 AM Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 2159240049112114100 7:45 AM 3 1 6 22 40 0 4 11 15 24 34 19 179 8:00 AM 13 14 11 42 57 2 10 46 47 44 42 29 357 8:15 AM 8 9 11 28 36 1 2 21 21 8 19 17 181 8:30 AM 815820215762713103 8:45 AM 2135191438313769 9:00 AM 54392301783141592 9:15 AM 3174160127418568 AM Peak = 32 25 33 100 153 5 17 83 90 82 122 78 820 PHF = 0.57 4:00 PM 13 6 10 5 19 3 0 6 14 12 27 5 120 4:15 PM 15 4 5 4 36 42787274123 4:30 PM 24 2 8 3 29 201214239117 4:45 PM 10 8 10 7 24 232613308123 5:00 PM 30 10 13 4 24 21269444149 5:15 PM 15 13 12 14 42 3 1 4 14 14 25 9 166 5:30 PM 10 5 13 8 25 202691915114 5:45 PM 768717305811264102 PM Peak = 79 33 43 28 119 9 5 9 28 50 122 30 555 PHF = 0.84 Southbound Westbound Northbound Eastbound S 11th Avenue W Graf Street S 11th Avenue W Graf Street Site Code Project SUD Developments Study Name 11th Avenue and Graf Street Start Date 04/05/2022 Start Time 7:30 AM Total Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Entering 7:30 AM 17 13 20 14 16 11 91 7:45 AM 20 29 27 43 19 24 162 8:00 AM 26 75 58 84 49 19 311 8:15 AM 16 30 56 38 18 17 175 8:30 AM 14 10 16 13 10 22 85 8:45 AM 13 8 16 8 4 15 64 9:00 AM 21 3 14 12 7 13 70 9:15 AM 16 5 24 2 16 10 73 Peak AM = 79 147 161 179 102 71 739 PHF = 0.59 4:00 PM 17 12 21 11 22 14 97 4:15 PM 20 19 15 21 13 21 109 4:30 PM 20 13 13 13 12 20 91 4:45 PM 22 17 18 13 23 21 114 5:00 PM 19 25 10 8 30 22 114 5:15 PM 38 27 35 29 11 29 169 5:30 PM 25 14 11 10 14 19 93 5:45 PM 23 12 7 6 14 15 77 Peak PM = 104 83 74 60 78 91 490 PHF = 0.72 Southbound Westbound Northbound Eastbound n/a W Graf Street S 3rd Avenue W Graf Street Site Code Project SUD Properties Study Name Graf St and 3rd Ave Start Date 04/05/2022 Start Time 7:30 AM 2022 AM HOUR TRAFFIC COUNTS 2092 NORTH 1102 990 13 857 232 19 0 75 75 24 1 344 5 4 269 6 915 36 861 957 1818 1747 475 805 942 168 270 307 35 326 444 23 81 64 85 27 290 453 463 35 83 449 130 12 16 1186 1127 560 359 1158 45 6 147 733 664 69 7 709 34 625 277 81 189 85 479 936 157 270 355 1415 512 1443 462 483 960 128 334 218 265 9 119 361 369 0 12 49 0 824 0 62 0 463 94 0 50 1 0 143 591 3 285 359 734 120 288 1093 408 0 327 0 0 79 248 59 20 0004773 0 0 0 157 0002684 201 64 0 0 85 265 0 350 1068 351 0 343 725 90 261 0 0 21 149 173 32 25 33 47 69 240 276 275 78 100 258 258 226 171 51 19 555 557 122 153 430 431 71 79 458 124 4 17 279 282 82 5 172 173 102 147 232 7 416 55 90 83 17 179 161 170 478 112 190 249 340 648 302 589 S 19th Avenue S 3rd Avenue STUCKY ROADSTUCKY ROAD GRAF STREET GRAF STREET GRAF SREET WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD ARNOLD STREET S 11th Avenue 2022 PM HOUR TRAFFIC COUNTS 2368 NORTH 1222 1146 5 992 225 6 0 268 268 17 0 523 11 11 255 1 878 30 1003 909 1912 1925 770 978 947 442 320 328 88 532 358 92 187 163 106 57 493 745 687 66 129 670 217 31 12 1338 1313 477 493 1364 111 23 240 593 626 83 48 694 6 397 204 102 133 54 795 607 318 320 289 1402 607 1479 505 827 652 277 228 341 486 56 221 421 317 0 61 59 0 805 0 123 0 384 67 0 62 3 0 80 335 5 169 553 415 224 174 968 398 0 243 0 0 164 79 134 30 0001728 00074 0001146 62 16 0 0 145 78 0 223 976 222 0 546 430 155 67 0 0 75 312 159 79 33 43 129 55 123 222 226 30 28 156 164 187 220 26 48 422 428 122 119 326 333 91 104 352 91 10 51 200 202 50 9 170 169 78 83 165 6 252 15 28 9 5 60 74 373 273 92 42 161 134 646 134 295 S 19th Avenue GRAF STREET GRAF STREET GRAF SREET S 11th Avenue S 3rd Avenue STUCKY ROAD STUCKY ROAD ARNOLD STREET WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD 2022 AM HOUR TRAFFIC COUNTS BALANCED 2092 NORTH 1102 990 13 857 232 19 0 75 75 24 1 344 5 4 269 6 915 36 861 957 1818 1760 475 809 951 168 270 307 35 330 444 23 81 64 86 27 290 453 463 35 83 449 131 12 16 1190 1127 560 359 1158 45 6 147 737 664 69 7 709 35 634 281 81 189 85 483 950 157 270 355 1433 512 00 1433 462 483 950 128 334 218 265 9 119 359 369 0 12 49 0 818 0 62 0 459 90 0 50 1 0 141 581 3 285 355 722 120 288 1077 408 00 0 327 0 0 82 245 62 20 0004774 0 0 0 157 0002783 198 63 0 0 89 261 0 350 00 1077 350 0 355 722 89 261 0 0 22 155 178 31 25 33 48 68 236 272 0 272 78 100 257 ‐1 258 226 171 51 19 557 557 124 152 431 431 71 79 458 123 4 17 285 0 285 83 5 174 1 173 102 147 232 7 418 56 89 83 17 179 161 176 481 113 189 249 340 657 302 589 S 19th Avenue S 3rd Avenue STUCKY ROADSTUCKY ROAD GRAF STREET GRAF STREET GRAF SREET ARNOLD STREET WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD S 11th Avenue 2022 PM HOUR TRAFFIC COUNTS BALANCED 2368 NORTH 1222 1146 5 992 225 6 0 268 268 17 0 523 11 11 255 1 878 30 1003 909 1912 1959 770 994 965 442 320 328 88 548 358 92 187 163 106 57 493 755 687 66 129 670 217 31 12 1356 1313 477 493 1364 111 23 250 601 626 83 48 694 6 415 212 102 133 54 821 633 318 320 289 1454 607 00 1454 505 821 633 277 228 337 484 56 221 419 305 0 61 59 0 793 0 123 0 374 69 0 62 3 0 82 328 5 169 553 410 224 174 963 398 0 246 0 0 169 77 139 30 0001729 00073 0001244 60 14 0 0 151 74 0 225 00 00 963 225 0 553 410 151 74 0 0 76 316 161 76 33 42 132 51 119 220 0 220 32 31 157 0 157 183 220 27 50 424 424 122 117 326 326 91 100 348 88 10 51 204 0 204 50 9 169 0 169 78 83 165 6 240 16 27 11 5 57 74 377 262 92 43 161 131 639 135 292 S 19th Avenue GRAF STREET GRAF STREET GRAF SREET S 11th Avenue S 3rd Avenue WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD STUCKY ROAD STUCKY ROAD ARNOLD STREET 2022 AM HOUR TRAFFIC COUNTS FACTORED TO AWT 2259 Factor = 1.08 NORTH 1190 1069 14 926 251 21 0 81 81 26 1 372 5 4 291 6 988 39 930 1034 1963 1901 513 874 1027 181 292 332 38 356 480 25 87 69 93 29 313 489 500 38 90 485 141 13 17 1285 1217 605 388 1251 49 6 159 796 717 75 8 766 38 685 303 87 204 92 522 1026 170 292 383 1548 553 00 1548 499 522 1026 138 361 235 286 10 129 388 399 0 13 53 0 883 0 67 0 496 97 0 54 1 0 152 627 3 308 383 780 130 311 1163 441 00 0 353 0 0 89 265 67 22 0005180 0 0 0 170 0002990 214 68 0 0 96 282 0 378 00 1163 378 0 383 780 96 282 0 0 24 167 192 33 27 36 52 73 255 294 0 294 84 108 278 ‐1 279 244 185 55 21 602 602 134 164 465 465 77 85 495 133 4 18 308 0 308 90 5 188 1 187 110 159 251 8 451 60 96 90 18 193 174 190 519 122 204 269 367 710 326 636 S 19th Avenue WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD STUCKY ROAD STUCKY ROAD ARNOLD STREET S 11th Avenue S 3rd Avenue GRAF STREET GRAF STREET GRAF SREET 2022 PM HOUR TRAFFIC COUNTS FACTORED TO AWT 2557 Factor = 1.08 NORTH 1320 1238 5 1071 243 PM to AWT Factor 6 0 289 289 187.3 18 0 565 5761 12 12 275 1 948 32 Graf, Stucky, S 3rd = 1083 982 2065 2116 832 1074 1042 477 346 354 95 592 387 99 202 176 114 62 532 815 742 71 139 724 2742 234 33 13 1464 18452 1418 515 532 1473 18561 120 25 270 649 676 90 52 750 6 448 229 110 144 58 887 684 343 346 312 1570 656 1570 545 887 684 299 246 364 523 60 239 453 329 0 66 64 0 8564 856 0 1355 133 0 404 75 0 67 3 0 89 354 5 183 597 443 242 188 1040 430 0 266 0 0 183 83 150 32 0001831 00079788 0001348 65 15 0 0 163 80 0 243 1040 243 0 597 443 163 80 0 0 82 341 174 82 36 45 143 55 129 238 238 35 33 170 170 198 2376 238 29 54 458 4579 458 132 126 352 3521 352 98 108 376 3758 95 11 55 220 220 54 10 183 183 84 90 178 6 259 17 29 12 5 62 80 407 283 99 46 174 141 690 146 315 3154S 19th Avenue S 3rd Avenue 6687 4384 2479 18373 12168 12168 8074 29922 WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD S 19th = Kagy = S 11th = 11.7 12.6 10.2 10.0 24754 8482 STUCKY ROAD STUCKY ROAD ARNOLD STREET 1487S 11th Avenue GRAF STREET GRAF STREET GRAF SREET 2023 AM Traffic with Stucky Extension & S 17th  2259 Factor = 1.08 NORTH 1190 1069 14 926 251 21 0 81 81 26 1 372 5 4 291 6 988 39 930 1034 1963 1901 513 874 977 181 292 332 38 356 470 25 87 69 93 29 263 489 500 38 90 485 141 13 17 1285 1217 605 388 1251 49 6 139 796 717 65 8 766 38 685 243 20 240 92 522 1026 170 292 383 1548 553 00 1548 499 522 1034 138 361 215 286 10 28 129 388 339 68 0 13 85 0 883 60 25 0 67 0 496 97 10 0 54 10 0 152 627 25 75 338 383 780 130 311 1163 441 00 0 353 0 0 89 265 67 22 0005180 0 0 0 170 0002990 214 68 0 0 96 282 0 378 00 1163 378 0 383 780 96 282 0 0 24 167 192 33 27 36 52 73 255 294 0 294 84 108 278 ‐1 279 244 185 55 21 602 602 134 164 465 465 77 85 495 133 4 18 308 0 308 90 5 188 1 187 110 159 251 8 451 60 96 90 18 193 174 190 519 122 204 269 367 710 326 636 S 19th Avenue S 11th Avenue S 3rd Avenue GRAF STREET GRAF STREET GRAF SREET STUCKY ROAD STUCKY ROAD ARNOLD STREET WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD 2023 PM Traffic with Stucky Extension & S 17th  2557 NORTH 1320 1238 5 1071 243 6 0 289 289 187 18 0 565 5761 12 12 275 1 948 32 1083 982 2065 2116 832 1074 1042 477 346 354 95 642 337 99 202 176 114 62 532 815 742 71 139 724 2742 234 33 13 1464 18452 1418 515 532 1473 18561 120 25 255 649 676 90 52 750 6 448 157 60 144 58 887 684 343 346 312 1570 656 1570 545 887 684 299 246 364 523 50 60 230 453 229 41 0 66 86 0 8564 856 50 21 0 1355 133 0 404 75 15 0 67 3 0 89 354 22 39 139 597 443 242 188 1040 24% 430 1040 266 597 443 183 83 597 140 32 0001831 00079788 0001348 443 65 15 597 443 163 80 1040 243 1040 243 0 597 443 163 80 0 0 82 341 174 70 36 45 143 55 129 238 238 35 33 170 170 198 2376 238 29 54 458 4579 458 132 126 352 3521 352 98 108 376 3758 95 11 45 220 220 54 10 183 183 84 90 178 6 259 17 29 12 5 62 80 407 283 99 46 174 141 690 146 315 3154 S 19th Avenue S 3rd Avenue 29922 WEST LINCOLN 24754 8482 KAGY BOLEVARD KAGY BOULEVARD 18373 6687 STUCKY ROAD STUCKY ROAD 12168 4384 GRAF SREET 8074 1487 S 11th Avenue ARNOLD STREET 12168 2479 GRAF STREET GRAF STREET 2037 AM HOUR TRAFFIC PROJECTIONS 3108 Factor = NORTH 1629 1478 19 1272 339 27 0 109 109 34 2 0 503 7 5 0 393 8 1369 53 1277 1430 2707 2542 747 1188 1354 252 450 494 51 487 649 34 126 93 128 39 355 566 585 49 122 666 194 19 KAGY BOULEVARD 23 1562 1540 819 524 1719 66 8 188 996 956 88 20 1053 54 960 328 27 324 140 683 1342 234 450 491 2025 725 2141 656 698 1443 204 452 290 386 22 54 150 0 544 471 111 192 163 131 0 0 1238 92 49 342 321 0 0 0 694 131 32 150 158 27 0 0 205 861 36 109 321 0 549 1103 177 431 1652 608 1687 468 611 1076 191 277 32 473 34 34 92 41 46 77 108 119 132 20 22 101 146 6 4 179 188 28 47 231 100 17 7 60 55 7 32 130 9 891 20 51 250 61 496 921 131 362 1417 493 1601 536 0 532 1069 140 396 0 0 32 238 262 45 36 59 0 0 0 67 101 350 402 401 113 157 390 385 0 0 332 248 74 28 819 819 184 227 657 649 108 117 675 181 5 24 417 419 122 7 267 265 157 215 343 7 618 81 130 126 24 267 0 235 267 706 165 279 371 502 974 444 873 S 19th Avenue 1.35 WEST LINCOLN STUCKY ROAD ARNOLD STREET KAGY BOULEVARD STUCKY ROAD ARNOLD STREET S 11th Avenue S 3rd Avenue GRAF STREET GRAF STREET GRAF STREET 2037 PM HOUR TRAFFIC PROJECTIONS 3561 Factor = NORTH 1840 1721 7 1505 328 PM to AWT Factor 8 0 390 390 247.86 24 0 0 761 7766 16 16 0 371 1 1331 43 Graf, Stucky, S 3rd = 1521 1376 2897 2970 1164 1509 1461 667 490 497 128 884 497 134 296 238 158 84 718 1022 960 115 188 1003 3743.4 320 47 KAGY BOULEVARD 18 1778 22402 1906 710 KAGY BOULEVARD 718 2037 25668 162 31 286 756 946 122 97 1034 12 659 212 108 194 86 1202 883 514 490 389 2084 903 2167 832 1260 907 441 390 433 707 119 131 311 0 612 309 65 194 204 203 0 0 11192 1119 97 58 460 4365 428 0 0 0 508 101 72 266 224 22 0 0 120 533 50 73 188 0 880 703 332 261 1584 593 1511 350 858 653 225 125 79 664 115 20 132 47 93 54 73 111 96 27 19 61 1615 162 4 4 278 2781 190 47 35 162 1620 69 11 34 167 95 20 7 101 9 527 49 41 95 7 709 585 159 142 1294 301 1330 352 0 721 609 220 132 0 0 119 352 250 95 51 74 0 0 0 200 82 162 302 304 47 59 243 255 0 0 275 3361.5 336 39 GRAF STREET 73 614 6143 617 193 GRAF STREET 170 517 5171 527 140 GRAF STREET 154 524 5238 136 15 68 312 313 73 14 274 271 131 122 248 8 365 23 39 26 7 101 0 108 435 396 138 72 252 209 830 209 462 4617 S 19th Avenue 41667 33896 S 11th Avenue S 3rd Avenue STUCKY ROAD STUCKY ROAD ARNOLD STREET ARNOLD STREET 1.35 WEST LINCOLN S 19th =11.7 Kagy =12.6 S 11th =10.2 10.0 24387 18528 15134 9714 11870 9212 6045 3071 2134 APPENDIX B-1 Existing Capacity Calculations HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19th & Lincoln Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 4/29/2022 East/West Street Lincoln Street Analysis Year 2022 North/South Street S 19th Avenue Time Analyzed AM Hour Existing Peak Hour Factor 0.88 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blockss 2,3,& 4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 2 0 0 1 2 0 Configuration R R L T TR L T TR Volume (veh/h)4 81 0 6 988 39 0 251 926 14 Percent Heavy Vehicles (%)0 0 0 0 0 0 Proportion Time Blocked 0.500 0.500 0.500 0.500 Percent Grade (%)0 0 Right Turn Channelized Yes Yes Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.9 6.9 4.1 4.1 Critical Headway (sec)6.90 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.3 3.3 2.2 2.2 Follow-Up Headway (sec)3.30 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)5 92 7 285 Capacity, c (veh/h)538 543 814 818 v/c Ratio 0.01 0.17 0.01 0.35 95% Queue Length, Q₉₅ (veh)0.0 0.6 0.0 1.6 Control Delay (s/veh)11.8 13.0 9.5 11.7 Level of Service (LOS)B B A B Approach Delay (s/veh)11.8 13.0 0.1 2.5 Approach LOS B B A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 5/5/2022 2:20:23 PM19th & Lincoln AM Exist.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19th & Lincoln Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 4/29/2022 East/West Street Lincoln Street Analysis Year 2022 North/South Street S 19th Avenue Time Analyzed PM Hour Existing Peak Hour Factor 0.95 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blockss 2,3,& 4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 2 0 0 1 2 0 Configuration R R L T TR L T TR Volume (veh/h)12 289 0 1 948 32 0 243 1071 5 Percent Heavy Vehicles (%)0 0 0 0 0 0 Proportion Time Blocked 0.500 0.500 0.500 0.500 Percent Grade (%)0 0 Right Turn Channelized Yes Yes Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.9 6.9 4.1 4.1 Critical Headway (sec)6.90 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.3 3.3 2.2 2.2 Follow-Up Headway (sec)3.30 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)13 304 1 256 Capacity, c (veh/h)538 543 814 818 v/c Ratio 0.02 0.56 0.00 0.31 95% Queue Length, Q₉₅ (veh)0.1 3.4 0.0 1.3 Control Delay (s/veh)11.9 19.8 9.4 11.4 Level of Service (LOS)B C A B Approach Delay (s/veh)11.9 19.8 0.0 2.1 Approach LOS B C A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 5/5/2022 2:21:32 PM19th & Lincoln PM Exist.xtw HCM Analysis Summary Existing ConditionsR MarvinAM Hour Analysis Duration: 15 mins.Kagy Blvd/S 19th Ave5/18/2022Case: S 19th & Kagy AM Exist Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 3 1 4 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 T 12.0 T 12.0 T 12.0 R 12.0 R 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 T 3 R 3 L 3 T 3 R 3 L 3 TR 3 29 0.94 0 13 0.94 0 6 0.94 0 159 0.94 0 17 0.94 0 313 0.94 0 38 0.94 0 685 0.94 0 303 0.94 0 480 0.94 0 356 0.94 0 35 0.94 0 0 0 0 0 --- --- 140 5 0 0 --- --- 120 1 0 0 --- --- 5 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP R L L R LTR LTP LTP 0 18.0 3.5 1.5 6.0 4.0 0.0 15.0 4.0 2.0 23.0 4.0 2.0 Actuated 83.0 Sec 17.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 306 0.022 0.217 L 0.101 26.1 C 25.9 C T 412 0.007 0.217 T 0.034 25.7 C R 350 0.004 0.217 R 0.017 25.6 C WB * L 308 0.119 0.217 L 0.549 30.1 C 18.9 B T 412 0.009 0.217 T 0.044 25.7 C R 951 0.114 0.590 R 0.193 7.9 A NB Lper 269 0.000 0.277 30.5 C Lpro 130 0.022 0.072 L 0.100 18.5 B * T 1000 0.202 0.277 T 0.729 31.8 C R 447 0.121 0.277 R 0.436 27.7 C SB Lper 109 0.000 0.349 18.9 B * Lpro 544 0.283 0.301 L 0.783 25.6 C TR 1891 0.115 0.530 TR 0.217 10.6 B Intersection: Delay = 23.9sec/veh Int. LOS=C Xc= 0.76 * Critical Lane Group (v/s)Crit= 0.60SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing ConditionsR MarvinAM Hour Kagy Blvd/S 19th Ave5/18/2022Case: S 19th & Kagy AM Exist App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 1 / 1 6.2 0.0 T 0 / 1 13.4 0.0 R 0 / 0 0.0 0.0 All 8.8 0.0 WB L 3 / 4 6.2 0.0 T 0 / 1 25.2 0.0 R 3 / 5 15.1 0.0 All 14.9 0.0 NB L 1 / 3 13.1 0.0 T 6 / 9 11.4 0.0 R 3 / 6 12.4 0.0 All 11.6 0.0 SB L 7 / 11 7.5 0.0 TR 3 / 4 19.6 0.0 All 13.3 0.0 Intersect. 12.7 SIG/Cinema v3.08 Marvin & Associates Page 2 29 13 6 159 17 313 38 685 303 480 356 35 1 17 24 1 17 24 2 6 04 2 6 04 2 6 04 3 15 24 3 15 24 4 23 24 4 23 24 HCM Analysis Summary Existing ConditionsR MarvinPM Hour Analysis Duration: 15 mins.Kagy Blvd/S 19th Ave5/18/2022Case: S 19th & Kagy PM Exist Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 3 1 4 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 T 12.0 T 12.0 T 12.0 R 12.0 R 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 T 3 R 3 L 3 T 3 R 3 L 3 TR 3 62 0.94 0 33 0.94 0 25 0.94 0 270 0.94 0 13 0.94 0 532 0.94 0 6 0.94 0 448 0.94 0 229 0.94 0 387 0.94 0 592 0.94 0 95 0.94 0 15 0 0 0 --- --- 240 5 0 0 --- --- 120 1 0 0 --- --- 25 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP R L L R LTR LTP LTP 0 25.0 3.5 1.5 6.0 4.0 0.0 15.0 4.0 2.0 23.0 4.0 2.0 Actuated 90.0 Sec 17.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 393 0.047 0.278 L 0.168 24.7 C 24.4 C T 528 0.018 0.278 T 0.066 23.9 C R 449 0.007 0.278 R 0.024 23.6 C WB * L 388 0.206 0.278 L 0.740 36.0 D 21.5 C T 528 0.007 0.278 T 0.027 23.7 C R 1002 0.193 0.622 R 0.310 8.0 A NB Lper 186 0.000 0.256 30.3 C Lpro 120 0.003 0.067 L 0.020 20.9 C * T 923 0.132 0.256 T 0.517 30.8 C R 412 0.072 0.256 R 0.282 28.6 C SB Lper 183 0.000 0.322 15.0 B * Lpro 501 0.228 0.278 L 0.602 14.4 B TR 1736 0.198 0.489 TR 0.406 15.4 B Intersection: Delay = 20.8sec/veh Int. LOS=C Xc= 0.70 * Critical Lane Group (v/s)Crit= 0.57SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing ConditionsR MarvinPM Hour Kagy Blvd/S 19th Ave5/18/2022Case: S 19th & Kagy PM Exist App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 2 / 2 6.7 0.0 T 1 / 2 16.9 0.0 R 0 / 1 15.2 0.0 All 11.6 0.0 WB L 5 / 8 6.2 0.0 T 0 / 0 26.1 0.0 R 4 / 5 15.9 0.0 All 14.7 0.0 NB L 0 / 1 11.7 0.0 T 5 / 8 11.1 0.0 R 2 / 4 14.4 0.0 All 11.5 0.0 SB L 5 / 11 8.3 0.0 TR 5 / 7 16.4 0.0 All 13.8 0.0 Intersect. 13.3 SIG/Cinema v3.08 Marvin & Associates Page 2 62 33 25 270 13 532 6 448 229 387 592 95 1 24 24 1 24 24 2 6 04 2 6 04 2 6 04 3 15 24 3 15 24 4 23 24 4 23 24 HCM Analysis Summary Existing ConditionsR MarvinPeak AM Hour Analysis Duration: 15 mins.Stucky Road/S 19th Avenue6/8/2022Case: STUCKY & 19TH AM EXIST Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 0 0 1 2 1 2 1 L 12.0 L 12.0 T 12.0 R 12.0 T 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 R 3 L 3 T 3 T 3 R 3 399 0.92 2 0 0.90 2 97 0.92 2 0 0.90 2 0 0.90 2 0 0.90 2 152 0.92 2 627 0.92 5 0 0.90 2 0 0.90 2 286 0.92 5 235 0.92 2 45 0 0 0 --- --- 0 0 0 0 --- --- 0 5 0 0 --- --- 105 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L P LT LT TP 0 28.0 3.5 1.5 8.0 4.0 0.0 36.0 4.0 2.0 Actuated 87.0 Sec 11.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * L 570 0.245 0.322 L 0.761 31.9 C 30.6 C R 509 0.036 0.322 R 0.112 20.8 C NB Lper 383 0.003 0.483 16.4 B Lpro 163 0.092 0.092 L 0.302 10.9 B * T 999 0.377 0.552 T 0.683 17.8 B SB T 749 0.172 0.414 T 0.415 19.7 B 18.9 B R 651 0.090 0.414 R 0.217 17.2 B Intersection: Delay = 21.0sec/veh Int. LOS=C Xc= 0.71 * Critical Lane Group (v/s)Crit= 0.62SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing ConditionsR MarvinPeak AM Hour Stucky Road/S 19th Avenue6/8/2022Case: STUCKY & 19TH AM EXIST App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 8 / 9 6.5 0.0 R 1 / 2 23.8 0.0 All 11.1 0.0 NB L 2 / 4 12.6 0.0 T 9 / 13 13.4 0.0 All 13.3 0.0 SB T 5 / 6 14.5 0.0 R 1 / 2 21.5 0.0 All 15.7 0.0 Intersect. 13.2 SIG/Cinema v3.08 Marvin & Associates Page 2 399 97 152 627 286 235 1 27 24 2 8 04 3 36 24 3 36 24 HCM Analysis Summary Existing ConditionsR MarvinPeak PM Hour Analysis Duration: 15 mins.Stucky Road/S 19th Avenue6/8/2022Case: STUCKY & 19TH PM EXIST Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 0 0 1 2 1 2 1 L 12.0 L 12.0 T 12.0 R 12.0 T 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 R 3 L 3 T 3 T 3 R 3 329 0.92 2 0 0.90 2 75 0.92 2 0 0.90 2 0 0.90 2 0 0.90 2 89 0.92 2 354 0.92 5 0 0.90 2 0 0.90 2 523 0.92 5 364 0.92 2 30 0 0 0 --- --- 0 0 0 0 --- --- 0 5 0 0 --- --- 125 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L P LT LT TP 0 28.0 3.5 1.5 8.0 4.0 0.0 36.0 4.0 2.0 Actuated 87.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * L 570 0.202 0.322 L 0.628 26.7 C 26.0 C R 509 0.031 0.322 R 0.096 20.7 C NB Lper 179 0.000 0.483 12.6 B * Lpro 163 0.055 0.092 L 0.284 14.0 B T 999 0.213 0.552 T 0.385 12.2 B SB * T 749 0.314 0.414 T 0.758 28.9 C 26.0 C R 651 0.165 0.414 R 0.399 19.7 B Intersection: Delay = 22.2sec/veh Int. LOS=C Xc= 0.69 * Critical Lane Group (v/s)Crit= 0.57SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing ConditionsR MarvinPeak PM Hour Stucky Road/S 19th Avenue6/8/2022Case: STUCKY & 19TH PM EXIST App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 6 / 8 6.7 0.0 R 1 / 2 22.2 0.0 All 11.0 0.0 NB L 1 / 2 12.5 0.0 T 5 / 6 15.9 0.0 All 15.5 0.0 SB T 8 / 10 13.7 0.0 R 1 / 2 20.2 0.0 All 14.8 0.0 Intersect. 13.8 SIG/Cinema v3.08 Marvin & Associates Page 2 329 75 89 354 523 364 1 27 24 2 8 04 3 36 24 3 36 24 HCM Analysis Summary Existing ConditionsR MarvinPeak AM Hour Analysis Duration: 15 mins.Graf Street/S 19th Avenue6/8/2022Case: Graf & 19th AM Exist Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 73 0.75 2 55 0.75 2 4 0.75 2 18 0.75 2 21 0.75 2 255 0.75 2 8 0.75 2 451 0.75 5 60 0.75 2 192 0.75 2 167 0.75 5 24 0.75 2 0 5 0 0 --- --- 115 0 0 0 --- --- 20 5 0 0 --- --- 5 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 18.0 3.5 1.5 13.0 4.0 0.0 24.0 4.0 2.0 Actuated 70.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 265 0.094 0.257 L 0.366 21.6 C 21.0 C TR 474 0.042 0.257 TR 0.165 20.2 C WB L 337 0.018 0.257 L 0.071 19.7 B 22.5 C * TR 417 0.133 0.257 TR 0.516 22.8 C NB Lper 420 0.000 0.429 20.4 C Lpro 329 0.006 0.186 L 0.015 5.4 A * TR 1164 0.193 0.343 TR 0.562 20.7 C SB Lper 205 0.000 0.429 13.5 B * Lpro 329 0.145 0.186 L 0.479 10.4 B TR 1161 0.073 0.343 TR 0.214 16.7 B Intersection: Delay = 18.6sec/veh Int. LOS=B Xc= 0.60 * Critical Lane Group (v/s)Crit= 0.47SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing ConditionsR MarvinPeak AM Hour Graf Street/S 19th Avenue6/8/2022Case: Graf & 19th AM Exist App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 2 / 2 7.9 0.0 TR 1 / 2 16.2 0.0 All 12.1 0.0 WB L 0 / 1 15.4 0.0 TR 2 / 5 20.0 0.0 All 19.9 0.0 NB L 0 / 2 13.4 0.0 TR 4 / 6 13.3 0.0 All 13.3 0.0 SB L 2 / 4 13.2 0.0 TR 2 / 3 15.7 0.0 All 14.8 0.0 Intersect. 14.6 SIG/Cinema v3.08 Marvin & Associates Page 2 73 55 4 18 21 255 8 451 60 192 167 24 1 17 24 1 17 24 2 13 04 2 13 04 3 24 24 3 24 24 HCM Analysis Summary Existing ConditionsR MarvinPeak PM Hour Analysis Duration: 15 mins.Graf Street/S 19th Avenue6/8/2022Case: Graf & 19th PM Exist Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 55 0.74 2 29 0.74 2 11 0.74 2 55 0.74 2 54 0.74 2 129 0.74 2 6 0.74 2 259 0.74 5 17 0.74 2 174 0.74 2 341 0.74 5 82 0.74 2 5 5 0 0 --- --- 62 0 0 0 --- --- 10 5 0 0 --- --- 25 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 18.0 3.5 1.5 15.0 4.0 0.0 24.0 4.0 2.0 Actuated 72.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 297 0.062 0.250 L 0.249 21.8 C 21.4 C TR 453 0.026 0.250 TR 0.104 20.8 C WB L 336 0.055 0.250 L 0.220 21.6 C 22.3 C * TR 427 0.096 0.250 TR 0.384 22.6 C NB Lper 246 0.000 0.417 18.3 B Lpro 369 0.005 0.208 L 0.013 5.7 A TR 1142 0.105 0.333 TR 0.314 18.6 B SB Lper 338 0.000 0.417 16.5 B * Lpro 369 0.133 0.208 L 0.332 7.4 A * TR 1132 0.158 0.333 TR 0.475 20.4 C Intersection: Delay = 18.2sec/veh Int. LOS=B Xc= 0.49 * Critical Lane Group (v/s)Crit= 0.39SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing ConditionsR MarvinPeak PM Hour Graf Street/S 19th Avenue6/8/2022Case: Graf & 19th PM Exist App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 1 / 2 7.1 0.0 TR 1 / 2 18.1 0.0 All 12.0 0.0 WB L 1 / 2 9.9 0.0 TR 3 / 5 16.5 0.0 All 15.4 0.0 NB L 0 / 0 0.0 0.0 TR 3 / 4 13.3 0.0 All 13.3 0.0 SB L 2 / 4 16.5 0.0 TR 3 / 6 14.5 0.0 All 14.9 0.0 Intersect. 14.3 SIG/Cinema v3.08 Marvin & Associates Page 2 55 29 11 55 54 129 6 259 17 174 341 82 1 17 24 1 17 24 2 15 04 2 15 04 3 24 24 3 24 24 HCM Analysis Summary 2022 ExistingR MarvinPeaK AM Analysis Duration: 15 mins.Kagy Boulevard/S 11th Avenue6/8/2022Case: KAGY & 11TH AM EXIST Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 2 1 2 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 38 0.91 0 605 0.91 1 75 0.91 0 8 0.91 0 388 0.91 1 90 0.91 0 87 0.91 0 204 0.91 0 92 0.91 0 69 0.91 0 87 0.91 0 25 0.91 0 10 8 0 0 --- --- 30 0 0 0 --- --- 25 100 0 0 --- --- 5 1 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP LTP LTP LTP 0 14.0 4.0 0.0 32.0 3.5 1.5 20.0 3.5 1.5 Actuated 80.0 Sec 10.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 218 0.000 0.463 11.8 B Lpro 316 0.023 0.175 L 0.079 7.8 A * TR 1158 0.397 0.625 TR 0.636 12.0 B WB L 267 0.013 0.400 L 0.034 14.8 B 24.2 C TR 737 0.267 0.400 TR 0.668 24.4 C NB L 323 0.074 0.250 L 0.297 24.5 C 29.3 C * TR 435 0.171 0.250 TR 0.685 30.8 C SB L 160 0.119 0.250 L 0.475 26.3 C 25.0 C TR 462 0.064 0.250 TR 0.255 24.1 C Intersection: Delay = 20.2sec/veh Int. LOS=C Xc= 0.65 * Critical Lane Group (v/s)Crit= 0.57SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results 2022 ExistingR MarvinPeaK AM Kagy Boulevard/S 11th Avenue6/8/2022Case: KAGY & 11TH AM EXIST App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 0 / 1 16.5 0.0 TR 7 / 10 16.0 0.0 All 16.0 0.0 WB L 0 / 1 15.7 0.0 TR 7 / 9 11.5 0.0 All 11.5 0.0 NB L 1 / 5 6.6 0.0 TR 6 / 9 8.7 0.0 All 8.3 0.0 SB L 2 / 5 2.2 0.0 TR 2 / 3 12.9 0.0 All 7.1 0.0 Intersect. 11.1 SIG/Cinema v3.08 Marvin & Associates Page 2 38 605 75 8 388 90 87 204 92 69 87 25 1 14 04 2 31 24 2 31 24 3 19 24 3 19 24 HCM Analysis Summary 2022 ExistingR MarvinPeaK PM Analysis Duration: 15 mins.Kagy Boulevard/S 11th Avenue6/8/2022Case: KAGY & 11TH PM EXIST Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 2 1 2 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 71 0.94 0 515 0.94 1 90 0.94 0 52 0.94 0 532 0.94 1 139 0.94 0 110 0.94 0 144 0.94 0 58 0.94 0 176 0.94 0 202 0.94 0 99 0.94 0 20 8 0 0 --- --- 30 0 0 0 --- --- 25 100 0 0 --- --- 15 1 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP LTP LTP LTP 0 10.0 4.0 0.0 34.0 3.5 1.5 23.0 3.5 1.5 Actuated 81.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 98 0.000 0.481 12.5 B * Lpro 223 0.042 0.123 L 0.237 14.0 B TR 1094 0.337 0.593 TR 0.569 12.3 B WB L 307 0.075 0.420 L 0.179 16.0 B 34.5 C * TR 769 0.372 0.420 TR 0.887 36.0 D NB L 218 0.152 0.284 L 0.537 25.9 C 24.3 C TR 507 0.105 0.284 TR 0.371 23.4 C SB * L 277 0.192 0.284 L 0.675 30.9 C 28.0 C TR 516 0.167 0.284 TR 0.589 26.1 C Intersection: Delay = 24.8sec/veh Int. LOS=C Xc= 0.73 * Critical Lane Group (v/s)Crit= 0.61SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results 2022 ExistingR MarvinPeaK PM Kagy Boulevard/S 11th Avenue6/8/2022Case: KAGY & 11TH PM EXIST App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 2 / 5 8.0 0.0 TR 6 / 9 16.0 0.0 All 14.8 0.0 WB L 1 / 2 10.6 0.0 TR 14 / 16 7.3 0.0 All 7.4 0.0 NB L 3 / 9 3.1 0.0 TR 2 / 4 14.4 0.0 All 8.4 0.0 SB L 3 / 5 5.1 0.0 TR 6 / 9 10.9 0.0 All 9.1 0.0 Intersect. 9.4 SIG/Cinema v3.08 Marvin & Associates Page 2 71 515 90 52 532 139 110 144 58 176 202 99 1 10 04 2 33 24 2 33 24 3 22 24 3 22 24 HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Stucky Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 5/9/2022 East/West Street Stucky Road Analysis Year 2022 North/South Street S 11th Avenue Time Analyzed AM Hour Existing Peak Hour Factor 0.78 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0 Configuration LR LT TR Volume (veh/h)53 1 3 308 129 10 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.2 4.1 Critical Headway (sec)6.40 6.20 4.10 Base Follow-Up Headway (sec)3.5 3.3 2.2 Follow-Up Headway (sec)3.50 3.30 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)69 4 Capacity, c (veh/h)433 1360 v/c Ratio 0.16 0.00 95% Queue Length, Q₉₅ (veh)0.6 0.0 Control Delay (s/veh)14.9 7.7 0.0 Level of Service (LOS)B A A Approach Delay (s/veh)14.9 0.1 Approach LOS B A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 2022 Generated: 5/9/2022 3:11:57 PMS 11th & Stucky AM Exist.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Stucky Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 5/9/2022 East/West Street Stucky Road Analysis Year 2022 North/South Street S 11th Avenue Time Analyzed PM Hour Existing Peak Hour Factor 0.86 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0 Configuration LR LT TR Volume (veh/h)64 3 5 183 239 60 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.2 4.1 Critical Headway (sec)6.40 6.20 4.10 Base Follow-Up Headway (sec)3.5 3.3 2.2 Follow-Up Headway (sec)3.50 3.30 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)78 6 Capacity, c (veh/h)490 1201 v/c Ratio 0.16 0.00 95% Queue Length, Q₉₅ (veh)0.6 0.0 Control Delay (s/veh)13.7 8.0 0.0 Level of Service (LOS)B A A Approach Delay (s/veh)13.7 0.3 Approach LOS B A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 2022 Generated: 5/9/2022 3:14:34 PMS 11th & Stucky PM Exist.xtw HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Arnold Agency or Co.Marvin & Associates E/W Street Name Arnold Street Date Performed 5/5/2022 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed AM Hour Existing Peak Hour Factor 0.57 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LR TR LT Volume (V), veh/h 0 29 51 0 214 68 0 22 67 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 51 89 0 375 119 0 39 118 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 140 494 157 Entry Volume, veh/h 140 494 157 Circulating Flow (vc), pc/h 208 375 39 51 Exiting Flow (vex), pc/h 158 0 464 169 Capacity (cpce), pc/h 941 1326 1310 Capacity (c), veh/h 941 1326 1310 v/c Ratio (x)0.15 0.37 0.12 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.2 6.2 3.7 Lane LOS A A A 95% Queue, veh 0.5 1.8 0.4 Approach Delay, s/veh 5.2 6.2 3.7 Approach LOS A A A Intersection Delay, s/veh | LOS 5.5 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Arnold Agency or Co.Marvin & Associates E/W Street Name Arnold Street Date Performed 5/5/2022 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed PM Hour Existing Peak Hour Factor 0.88 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 0 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LR TR LT Volume (V), veh/h 0 13 18 0 65 15 0 32 150 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 15 20 0 74 17 0 36 170 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 35 91 206 Entry Volume, veh/h 35 91 206 Circulating Flow (vc), pc/h 221 74 36 15 Exiting Flow (vex), pc/h 53 0 94 185 Capacity (cpce), pc/h 1280 1330 1359 Capacity (c), veh/h 1280 1330 1359 v/c Ratio (x)0.03 0.07 0.15 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 3.0 3.2 3.9 Lane LOS A A A 95% Queue, veh 0.1 0.2 0.5 Approach Delay, s/veh 3.0 3.2 3.9 Approach LOS A A A Intersection Delay, s/veh | LOS 3.6 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 5/5/2022 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed AM Hour Existing Peak Hour Factor 0.57 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 84 134 90 0 5 164 108 0 96 90 18 0 36 27 33 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 147 235 158 0 9 288 189 0 168 158 32 0 63 47 58 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 540 486 358 168 Entry Volume, veh/h 540 486 358 168 Circulating Flow (vc), pc/h 119 473 445 465 Exiting Flow (vex), pc/h 330 514 494 214 Capacity (cpce), pc/h 1222 852 877 859 Capacity (c), veh/h 1222 852 877 859 v/c Ratio (x)0.44 0.57 0.41 0.20 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 7.5 12.5 9.0 6.2 Lane LOS A B A A 95% Queue, veh 2.3 3.7 2.0 0.7 Approach Delay, s/veh 7.5 12.5 9.0 6.2 Approach LOS A B A A Intersection Delay, s/veh | LOS 9.3 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 5/5/2022 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed PM Hour Existing Peak Hour Factor 0.84 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 35 132 54 0 10 125 33 0 29 12 5 0 45 36 82 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 42 157 64 0 12 149 39 0 35 14 6 0 54 43 98 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 263 200 55 195 Entry Volume, veh/h 263 200 55 195 Circulating Flow (vc), pc/h 109 91 253 196 Exiting Flow (vex), pc/h 217 282 95 119 Capacity (cpce), pc/h 1235 1258 1066 1130 Capacity (c), veh/h 1235 1258 1066 1130 v/c Ratio (x)0.21 0.16 0.05 0.17 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 4.8 4.2 3.8 4.7 Lane LOS A A A A 95% Queue, veh 0.8 0.6 0.2 0.6 Approach Delay, s/veh 4.8 4.2 3.8 4.7 Approach LOS A A A A Intersection Delay, s/veh | LOS 4.5 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 3rd & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 5/5/2022 N/S Street Name S 3rd Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed AM Hour Existing Peak Hour Factor 0.72 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 Lane Assignment TR LT LR Volume (V), veh/h 0 77 110 0 159 85 0 193 174 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 107 153 0 221 118 0 268 242 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 260 339 510 Entry Volume, veh/h 260 339 510 Circulating Flow (vc), pc/h 221 268 107 607 Exiting Flow (vex), pc/h 349 386 0 374 Capacity (cpce), pc/h 1101 1050 1237 Capacity (c), veh/h 1101 1050 1237 v/c Ratio (x)0.24 0.32 0.41 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.5 6.7 7.0 Lane LOS A A A 95% Queue, veh 0.9 1.4 2.1 Approach Delay, s/veh 5.5 6.7 7.0 Approach LOS A A A Intersection Delay, s/veh | LOS 6.5 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 3rd & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 5/5/2022 N/S Street Name S 3rd Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed PM Hour Existing Peak Hour Factor 0.59 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 Lane Assignment TR LT LR Volume (V), veh/h 0 98 84 0 90 108 0 62 80 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 166 142 0 153 183 0 105 136 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 308 336 241 Entry Volume, veh/h 308 336 241 Circulating Flow (vc), pc/h 153 105 166 441 Exiting Flow (vex), pc/h 302 288 0 295 Capacity (cpce), pc/h 1181 1240 1165 Capacity (c), veh/h 1181 1240 1165 v/c Ratio (x)0.26 0.27 0.21 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.4 5.3 4.9 Lane LOS A A A 95% Queue, veh 1.0 1.1 0.8 Approach Delay, s/veh 5.4 5.3 4.9 Approach LOS A A A Intersection Delay, s/veh | LOS 5.3 A APPENDIX B – 2 Existing Plus Site Capacity Calculations HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19th & Lincoln Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 10/2/22 East/West Street Lincoln Street Analysis Year 2022 North/South Street S 19th Avenue Time Analyzed AM Exist Plus Ph 1-4 Peak Hour Factor 0.88 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks 1-4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 2 0 0 1 2 0 Configuration R R L T TR L T TR Volume (veh/h)4 81 0 6 1051 42 0 251 956 14 Percent Heavy Vehicles (%)0 0 0 0 0 0 Proportion Time Blocked 0.500 0.500 0.500 0.500 Percent Grade (%)0 0 Right Turn Channelized Yes Yes Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.9 6.9 4.1 4.1 Critical Headway (sec)6.90 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.3 3.3 2.2 2.2 Follow-Up Headway (sec)3.30 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)5 92 7 285 Capacity, c (veh/h)538 543 814 818 v/c Ratio 0.01 0.17 0.01 0.35 95% Queue Length, Q₉₅ (veh)0.0 0.6 0.0 1.6 Control Delay (s/veh)11.8 13.0 9.5 11.7 Level of Service (LOS)B B A B Approach Delay (s/veh)11.8 13.0 0.1 2.4 Approach LOS B B A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 1:19:35 PM19th & Lincoln AM Exist Plus.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19th & Lincoln Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 10/2/22 East/West Street Lincoln Street Analysis Year 2022 North/South Street S 19th Avenue Time Analyzed PM Exist Plus Ph 1-4 Peak Hour Factor 0.95 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks 1-4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 2 0 0 1 2 0 Configuration R R L T TR L T TR Volume (veh/h)12 289 0 1 1021 34 0 243 1160 5 Percent Heavy Vehicles (%)0 0 0 0 0 0 Proportion Time Blocked 0.500 0.500 0.500 0.500 Percent Grade (%)0 0 Right Turn Channelized Yes Yes Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.9 6.9 4.1 4.1 Critical Headway (sec)6.90 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.3 3.3 2.2 2.2 Follow-Up Headway (sec)3.30 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)13 304 1 256 Capacity, c (veh/h)538 543 814 818 v/c Ratio 0.02 0.56 0.00 0.31 95% Queue Length, Q₉₅ (veh)0.1 3.4 0.0 1.3 Control Delay (s/veh)11.9 19.8 9.4 11.4 Level of Service (LOS)B C A B Approach Delay (s/veh)11.9 19.8 0.0 2.0 Approach LOS B C A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 1:21:29 PM19th & Lincoln PM Exist Plus.xtw HCM Analysis Summary Existing Plus Phase 1&2R MarvinAM Hour Analysis Duration: 15 mins.Kagy Blvd/S 19th Ave8/24/22Case: S 19TH & KAGY AM EXIST PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 3 1 4 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 T 12.0 T 12.0 T 12.0 R 12.0 R 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 T 3 R 3 L 3 T 3 R 3 L 3 TR 3 29 0.94 0 14 0.94 0 6 0.94 0 139 0.94 0 17 0.94 0 263 0.94 0 40 0.94 0 711 0.94 0 243 0.94 0 481 0.94 0 361 0.94 0 38 0.94 0 0 0 0 0 --- --- 140 5 0 0 --- --- 120 1 0 0 --- --- 5 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP R L L R LTR LTP LTP 0 18.0 3.5 1.5 6.0 4.0 0.0 15.0 4.0 2.0 23.0 4.0 2.0 Actuated 83.0 Sec 17.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 306 0.022 0.217 L 0.101 26.1 C 25.9 C T 412 0.008 0.217 T 0.036 25.7 C R 350 0.004 0.217 R 0.017 25.6 C WB * L 308 0.104 0.217 L 0.481 28.8 C 19.3 B T 412 0.009 0.217 T 0.044 25.7 C R 951 0.081 0.590 R 0.138 7.6 A NB Lper 266 0.000 0.277 31.0 C Lpro 130 0.024 0.072 L 0.109 18.5 B * T 1000 0.209 0.277 T 0.756 32.8 C R 447 0.081 0.277 R 0.293 25.3 C SB Lper 100 0.000 0.349 19.9 B * Lpro 544 0.284 0.301 L 0.795 27.4 C TR 1889 0.118 0.530 TR 0.222 10.7 B Intersection: Delay = 24.6sec/veh Int. LOS=C Xc= 0.75 * Critical Lane Group (v/s)Crit= 0.60SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing Plus Phase 1&2R MarvinAM Hour Kagy Blvd/S 19th Ave8/24/22Case: S 19TH & KAGY AM EXIST PLUS App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 1 / 1 7.4 0.0 T 0 / 1 18.0 0.0 R 0 / 0 0.0 0.0 All 10.9 0.0 WB L 3 / 4 6.7 0.0 T 0 / 1 25.3 0.0 R 3 / 4 15.1 0.0 All 15.3 0.0 NB L 1 / 2 14.1 0.0 T 6 / 9 10.9 0.0 R 2 / 5 13.5 0.0 All 11.3 0.0 SB L 7 / 11 7.8 0.0 TR 2 / 4 20.7 0.0 All 14.0 0.0 Intersect. 12.8 SIG/Cinema v3.08 Marvin & Associates Page 2 29 14 6 139 17 263 40 711 243 481 361 38 1 17 24 1 17 24 2 6 04 2 6 04 2 6 04 3 15 24 3 15 24 4 23 24 4 23 24 HCM Analysis Summary Existing Plus Phase 1&2R MarvinPM Hour Analysis Duration: 15 mins.Kagy Blvd/S 19th Ave5/18/2022Case: S 19th & Kagy PM Exist Plus Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 3 1 3 1 4 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 T 12.0 T 12.0 T 12.0 T 12.0 R 12.0 R 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 T 3 R 3 L 3 T 3 R 3 L 3 T 3 R 3 L 3 TR 3 62 0.94 0 35 0.94 0 26 0.94 0 255 0.94 0 13 0.94 0 532 0.94 0 6 0.94 0 486 0.94 0 157 0.94 0 368 0.94 0 655 0.94 0 95 0.94 0 15 0 0 0 --- --- 240 5 0 0 --- --- 100 1 0 0 --- --- 25 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP R L L R LTR LTP LTP 0 25.0 3.5 1.5 6.0 4.0 0.0 15.0 4.0 2.0 23.0 4.0 2.0 Actuated 90.0 Sec 17.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 393 0.047 0.278 L 0.168 24.7 C 24.3 C T 528 0.019 0.278 T 0.070 24.0 C R 449 0.007 0.278 R 0.027 23.7 C WB * L 387 0.195 0.278 L 0.700 33.8 C 20.1 C T 528 0.007 0.278 T 0.027 23.7 C R 1002 0.193 0.622 R 0.310 8.0 A NB Lper 174 0.000 0.256 30.9 C Lpro 120 0.003 0.067 L 0.020 20.9 C * T 923 0.143 0.256 T 0.560 31.6 C R 412 0.038 0.256 R 0.148 26.7 C SB Lper 166 0.000 0.322 15.3 B * Lpro 501 0.217 0.278 L 0.586 14.4 B TR 1738 0.217 0.489 TR 0.444 15.8 B Intersection: Delay = 20.6sec/veh Int. LOS=C Xc= 0.68 * Critical Lane Group (v/s)Crit= 0.55SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing Plus Phase 1&2R MarvinPM Hour Kagy Blvd/S 19th Ave5/18/2022Case: S 19th & Kagy PM Exist Plus App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 2 / 3 5.8 0.0 T 1 / 1 16.0 0.0 R 0 / 1 15.5 0.0 All 10.4 0.0 WB L 5 / 8 5.9 0.0 T 0 / 1 24.7 0.0 R 3 / 5 17.1 0.0 All 14.5 0.0 NB L 0 / 1 6.4 0.0 T 5 / 7 10.9 0.0 R 1 / 2 17.6 0.0 All 11.5 0.0 SB L 5 / 12 8.7 0.0 TR 5 / 8 16.0 0.0 All 13.9 0.0 Intersect. 13.2 SIG/Cinema v3.08 Marvin & Associates Page 2 62 35 26 255 13 532 6 486 157 368 655 95 1 24 24 1 24 24 2 6 04 2 6 04 2 6 04 3 15 24 3 15 24 4 23 24 4 23 24 HCM Analysis Summary Existing Existing Plus Phase 1&2R MarvinPeak AM Hour Analysis Duration: 15 mins.Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH AM EXIST PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 339 0.92 2 68 0.90 2 97 0.92 2 82 0.90 2 36 0.90 2 24 0.90 2 152 0.92 2 638 0.92 5 27 0.90 2 16 0.90 2 286 0.92 5 215 0.92 2 45 0 0 0 --- --- 5 0 0 0 --- --- 5 5 0 0 --- --- 105 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP L L LTP LTP 0 10.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 40.0 4.0 2.0 Actuated 100.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 338 0.158 0.280 30.3 C * Lpro 177 0.100 0.100 L 0.715 29.6 C TR 401 0.076 0.230 TR 0.332 32.3 C WB Lper 274 0.000 0.280 24.6 C Lpro 177 0.051 0.100 L 0.202 20.5 C TR 406 0.035 0.230 TR 0.150 30.8 C NB Lper 356 0.030 0.460 22.4 C * Lpro 142 0.080 0.080 L 0.331 14.4 B * TR 1368 0.210 0.400 TR 0.524 24.2 C SB Lper 213 0.000 0.460 20.0 B Lpro 142 0.010 0.080 L 0.051 12.3 B T 724 0.172 0.400 T 0.430 23.6 C R 851 0.076 0.540 R 0.141 11.8 B Intersection: Delay = 24.0sec/veh Int. LOS=C Xc= 0.64 * Critical Lane Group (v/s)Crit= 0.55SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing Existing Plus Phase 1&2R MarvinPeak AM Hour Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH AM EXIST PLUS App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 7 / 8 9.4 0.0 TR 3 / 5 11.8 0.0 All 10.1 0.0 WB L 2 / 3 11.3 0.0 TR 1 / 2 11.4 0.0 All 11.3 0.0 NB L 3 / 5 8.0 0.0 TR 6 / 9 12.6 0.0 All 11.8 0.0 SB L 0 / 1 12.0 0.0 T 5 / 10 13.7 0.0 R 1 / 2 21.5 0.0 All 15.0 0.0 Intersect. 11.9 SIG/Cinema v3.08 Marvin & Associates Page 2 339 68 97 82 36 24 152 638 27 16 286 215 1 10 04 1 10 04 1 10 04 2 22 24 2 22 24 3 8 04 3 8 04 4 40 24 4 40 24 HCM Analysis Summary Existing Existing Plus Phase 1&2R MarvinPeak PM Hour Analysis Duration: 15 mins.Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH PM EXIST PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 R 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 T 3 R 3 229 0.92 2 72 0.90 2 75 0.92 2 48 0.90 2 42 0.90 2 53 0.90 2 89 0.92 2 375 0.92 5 28 0.90 2 68 0.90 2 523 0.92 5 364 0.92 2 20 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only L L R LTP LTP L L LTP LTP 0 10.0 4.0 0.0 23.0 3.5 1.5 8.0 4.0 0.0 40.0 4.0 2.0 Actuated 100.0 Sec 19.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 317 0.064 0.280 26.3 C * Lpro 177 0.100 0.100 L 0.504 22.8 C * TR 401 0.080 0.230 TR 0.349 32.4 C WB Lper 267 0.000 0.280 26.9 C Lpro 177 0.030 0.100 L 0.119 20.1 C TR 400 0.048 0.230 TR 0.210 31.2 C NB Lper 154 0.000 0.460 20.7 C * Lpro 142 0.055 0.080 L 0.328 18.5 B TR 1362 0.127 0.400 TR 0.319 21.2 C SB Lper 346 0.000 0.460 26.5 C Lpro 142 0.043 0.080 L 0.156 12.1 B * T 724 0.314 0.400 T 0.785 34.6 C R 851 0.175 0.540 R 0.324 13.8 B Intersection: Delay = 24.9sec/veh Int. LOS=C Xc= 0.68 * Critical Lane Group (v/s)Crit= 0.55SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing Existing Plus Phase 1&2R MarvinPeak PM Hour Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH PM EXIST PLUS App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 5 / 6 10.6 0.0 TR 3 / 4 10.1 0.0 All 10.4 0.0 WB L 1 / 1 12.8 0.0 TR 2 / 3 11.8 0.0 All 12.0 0.0 NB L 2 / 4 6.7 0.0 TR 4 / 6 12.9 0.0 All 11.7 0.0 SB L 2 / 4 8.8 0.0 T 9 / 12 12.6 0.0 R 2 / 3 18.6 0.0 All 13.1 0.0 Intersect. 12.1 SIG/Cinema v3.08 Marvin & Associates Page 2 229 72 75 48 42 53 89 375 28 68 523 364 1 10 04 1 10 04 1 10 04 2 22 24 2 22 24 3 8 04 3 8 04 4 40 24 4 40 24 HCM Analysis Summary Existing Pls Phase 1&2R MarvinPeak AM Hour Analysis Duration: 15 mins.Graf Street/S 19th Avenue8/24/22Case: Graf & 19th AM Exist Plus Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 75 0.75 2 55 0.75 2 4 0.75 2 18 0.75 2 21 0.75 2 259 0.75 2 8 0.75 2 458 0.75 5 60 0.75 2 194 0.75 2 176 0.75 5 26 0.75 2 0 5 0 0 --- --- 115 0 0 0 --- --- 20 5 0 0 --- --- 5 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 18.0 3.5 1.5 13.0 4.0 0.0 24.0 4.0 2.0 Actuated 70.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 260 0.099 0.257 L 0.385 21.8 C 21.1 C TR 474 0.042 0.257 TR 0.165 20.2 C WB L 337 0.018 0.257 L 0.071 19.7 B 22.7 C * TR 416 0.136 0.257 TR 0.529 23.0 C NB Lper 411 0.000 0.429 20.6 C Lpro 329 0.006 0.186 L 0.015 5.4 A * TR 1164 0.196 0.343 TR 0.570 20.8 C SB Lper 201 0.000 0.429 13.8 B * Lpro 329 0.146 0.186 L 0.489 10.6 B TR 1160 0.078 0.343 TR 0.227 16.8 B Intersection: Delay = 18.8sec/veh Int. LOS=B Xc= 0.61 * Critical Lane Group (v/s)Crit= 0.48SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing Pls Phase 1&2R MarvinPeak AM Hour Graf Street/S 19th Avenue8/24/22Case: Graf & 19th AM Exist Plus App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 2 / 3 8.9 0.0 TR 1 / 2 16.1 0.0 All 12.6 0.0 WB L 0 / 1 9.7 0.0 TR 2 / 5 19.7 0.0 All 19.3 0.0 NB L 0 / 2 15.4 0.0 TR 4 / 6 13.4 0.0 All 13.4 0.0 SB L 2 / 6 14.2 0.0 TR 2 / 3 15.1 0.0 All 14.8 0.0 Intersect. 14.7 SIG/Cinema v3.08 Marvin & Associates Page 2 75 55 4 18 21 259 8 458 60 194 176 26 1 17 24 1 17 24 2 13 04 2 13 04 3 24 24 3 24 24 HCM Analysis Summary Existing Plus Phase 1&2R MarvinPeak PM Hour Analysis Duration: 15 mins.Graf Street/S 19th Avenue8/24/22Case: Graf & 19th PM Exist Plus Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 61 0.74 2 29 0.74 2 11 0.74 2 55 0.74 2 54 0.74 2 140 0.74 2 6 0.74 2 280 0.74 5 17 0.74 2 185 0.74 2 361 0.74 5 88 0.74 2 5 5 0 0 --- --- 62 0 0 0 --- --- 10 5 0 0 --- --- 25 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 18.0 3.5 1.5 15.0 4.0 0.0 24.0 4.0 2.0 Actuated 72.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 285 0.072 0.250 L 0.288 22.0 C 21.6 C TR 453 0.026 0.250 TR 0.104 20.8 C WB L 336 0.055 0.250 L 0.220 21.6 C 22.5 C * TR 425 0.105 0.250 TR 0.419 22.9 C NB Lper 230 0.000 0.417 18.6 B Lpro 369 0.005 0.208 L 0.013 5.8 A TR 1142 0.113 0.333 TR 0.339 18.8 B SB Lper 323 0.000 0.417 16.9 B * Lpro 369 0.141 0.208 L 0.361 7.7 A * TR 1131 0.169 0.333 TR 0.507 20.9 C Intersection: Delay = 18.6sec/veh Int. LOS=B Xc= 0.52 * Critical Lane Group (v/s)Crit= 0.41SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Existing Plus Phase 1&2R MarvinPeak PM Hour Graf Street/S 19th Avenue8/24/22Case: Graf & 19th PM Exist Plus App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 1 / 2 7.6 0.0 TR 1 / 2 16.5 0.0 All 11.8 0.0 WB L 1 / 2 7.6 0.0 TR 3 / 5 16.5 0.0 All 14.8 0.0 NB L 0 / 1 14.4 0.0 TR 3 / 4 12.5 0.0 All 12.5 0.0 SB L 2 / 5 16.2 0.0 TR 4 / 6 13.3 0.0 All 13.8 0.0 Intersect. 13.5 SIG/Cinema v3.08 Marvin & Associates Page 2 61 29 11 55 54 140 6 280 17 185 361 88 1 17 24 1 17 24 2 15 04 2 15 04 3 24 24 3 24 24 HCM Analysis Summary 2022 Existing PLus Phase 1&2R MarvinPeaK AM Analysis Duration: 15 mins.Kagy Boulevard/S 11th Avenue8/24/22Case: KAGY & 11TH AM EXIST PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 2 1 2 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 36 0.91 0 607 0.91 1 65 0.91 0 15 0.91 0 388 0.91 1 90 0.91 0 20 0.91 0 240 0.91 0 104 0.91 0 69 0.91 0 93 0.91 0 25 0.91 0 10 8 0 0 --- --- 30 0 0 0 --- --- 30 100 0 0 --- --- 5 1 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP LTP LTP LTP 0 14.0 4.0 0.0 32.0 3.5 1.5 20.0 3.5 1.5 Actuated 80.0 Sec 10.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 218 0.000 0.463 11.6 B Lpro 316 0.022 0.175 L 0.075 7.8 A * TR 1161 0.391 0.625 TR 0.626 11.8 B WB L 274 0.023 0.400 L 0.058 15.2 B 24.1 C TR 737 0.267 0.400 TR 0.668 24.4 C NB L 321 0.017 0.250 L 0.069 22.9 C 35.9 D * TR 437 0.197 0.250 TR 0.789 36.7 D SB L 128 0.148 0.250 L 0.594 31.5 C 27.0 C TR 462 0.067 0.250 TR 0.268 24.2 C Intersection: Delay = 21.6sec/veh Int. LOS=C Xc= 0.67 * Critical Lane Group (v/s)Crit= 0.59SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results 2022 Existing PLus Phase 1&2R MarvinPeaK AM Kagy Boulevard/S 11th Avenue8/24/22Case: KAGY & 11TH AM EXIST PLUS App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 1 / 1 13.6 0.0 TR 7 / 11 16.8 0.0 All 16.6 0.0 WB L 0 / 1 11.9 0.0 TR 7 / 8 11.5 0.0 All 11.5 0.0 NB L 1 / 2 6.6 0.0 TR 8 / 11 7.4 0.0 All 7.4 0.0 SB L 5 / 7 0.8 0.0 TR 2 / 3 13.3 0.0 All 4.0 0.0 Intersect. 9.7 SIG/Cinema v3.08 Marvin & Associates Page 2 36 607 65 15 388 90 20 240 104 69 93 25 1 14 04 2 31 24 2 31 24 3 19 24 3 19 24 HCM Analysis Summary 2022 Existing Plus Phase 1&2R MarvinPeaK PM Analysis Duration: 15 mins.Kagy Boulevard/S 11th Avenue8/24/22Case: KAGY & 11TH PM EXIST PLUS Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 2 1 2 1 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 85 0.94 0 526 0.94 1 90 0.94 0 72 0.94 0 532 0.94 1 139 0.94 0 60 0.94 0 144 0.94 0 64 0.94 0 176 0.94 0 219 0.94 0 99 0.94 0 20 8 0 0 --- --- 30 0 0 0 --- --- 25 100 0 0 --- --- 15 1 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP LTP LTP LTP 0 8.0 4.0 0.0 36.0 3.5 1.5 25.0 3.5 1.5 Actuated 83.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 115 0.000 0.494 13.9 B * Lpro 174 0.050 0.096 L 0.311 15.7 B TR 1068 0.343 0.578 TR 0.594 13.7 B WB L 281 0.119 0.434 L 0.274 17.5 B 31.2 C * TR 795 0.372 0.434 TR 0.858 32.8 C NB L 225 0.086 0.301 L 0.284 22.4 C 22.8 C TR 535 0.109 0.301 TR 0.363 22.9 C SB * L 294 0.192 0.301 L 0.636 28.5 C 26.8 C TR 548 0.177 0.301 TR 0.588 25.7 C Intersection: Delay = 23.7sec/veh Int. LOS=C Xc= 0.74 * Critical Lane Group (v/s)Crit= 0.61SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results 2022 Existing Plus Phase 1&2R MarvinPeaK PM Kagy Boulevard/S 11th Avenue8/24/22Case: KAGY & 11TH PM EXIST PLUS App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 3 / 5 6.7 0.0 TR 7 / 9 16.0 0.0 All 14.2 0.0 WB L 1 / 2 10.5 0.0 TR 12 / 15 8.8 0.0 All 8.9 0.0 NB L 1 / 3 5.9 0.0 TR 3 / 4 12.8 0.0 All 11.0 0.0 SB L 3 / 6 5.8 0.0 TR 6 / 7 12.0 0.0 All 10.1 0.0 Intersect. 10.7 SIG/Cinema v3.08 Marvin & Associates Page 2 85 526 90 72 532 139 60 144 64 176 219 99 1 8 04 2 35 24 2 35 24 3 24 24 3 24 24 HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Stucky Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 10/2/22 East/West Street Stucky Road Analysis Year 2022 North/South Street S 11th Avenue Time Analyzed AM Exist Plus Ph 1-4 Peak Hour Factor 0.78 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks 1-4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0 Configuration LR LT TR Volume (veh/h)109 28 84 238 123 44 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.2 4.1 Critical Headway (sec)6.40 6.20 4.10 Base Follow-Up Headway (sec)3.5 3.3 2.2 Follow-Up Headway (sec)3.50 3.30 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)176 108 Capacity, c (veh/h)371 1320 v/c Ratio 0.47 0.08 95% Queue Length, Q₉₅ (veh)2.4 0.3 Control Delay (s/veh)23.1 8.0 0.8 Level of Service (LOS)C A A Approach Delay (s/veh)23.1 2.7 Approach LOS C A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 2022 Generated: 10/3/2022 1:23:51 PMS 11th & Stucky AM Exist Plus.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Stucky Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 10/2/22 East/West Street Stucky Road Analysis Year 2022 North/South Street S 11th Avenue Time Analyzed PM Exist Plus Ph 1-4 Peak Hour Factor 0.86 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks 1-4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0 Configuration LR LT TR Volume (veh/h)157 21 63 174 265 109 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.2 4.1 Critical Headway (sec)6.40 6.20 4.10 Base Follow-Up Headway (sec)3.5 3.3 2.2 Follow-Up Headway (sec)3.50 3.30 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)207 73 Capacity, c (veh/h)372 1115 v/c Ratio 0.56 0.07 95% Queue Length, Q₉₅ (veh)3.2 0.2 Control Delay (s/veh)26.1 8.5 0.6 Level of Service (LOS)D A A Approach Delay (s/veh)26.1 2.7 Approach LOS D A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 2022 Generated: 10/3/2022 1:25:47 PMS 11th & Stucky PM Exist Plus.xtw HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Arnold Agency or Co.Marvin & Associates E/W Street Name Arnold Street Date Performed 10/2/22 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed AM Exist Plus 1-4 Peak Hour Factor 0.57 Project Description SUD Blocks 1-4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 6 1 1 0 29 1 51 0 1 220 68 0 22 85 1 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 11 2 2 0 51 2 89 0 2 386 119 0 39 149 2 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 15 142 507 190 Entry Volume, veh/h 15 142 507 190 Circulating Flow (vc), pc/h 239 399 52 55 Exiting Flow (vex), pc/h 160 6 486 202 Capacity (cpce), pc/h 1081 919 1309 1305 Capacity (c), veh/h 1081 919 1309 1305 v/c Ratio (x)0.01 0.15 0.39 0.15 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 3.4 5.4 6.4 4.0 Lane LOS A A A A 95% Queue, veh 0.0 0.5 1.9 0.5 Approach Delay, s/veh 3.4 5.4 6.4 4.0 Approach LOS A A A A Intersection Delay, s/veh | LOS 5.6 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Arnold Agency or Co.Marvin & Associates E/W Street Name Arnold Street Date Performed 10/2/22 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed PM Exist Plus 1-4 Peak Hour Factor 0.88 Project Description SUD Blocks 1-4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 10 1 1 0 13 1 22 0 1 85 15 0 34 157 10 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 11 1 1 0 15 1 25 0 1 97 17 0 39 178 11 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 13 41 115 228 Entry Volume, veh/h 13 41 115 228 Circulating Flow (vc), pc/h 232 109 51 17 Exiting Flow (vex), pc/h 57 13 133 194 Capacity (cpce), pc/h 1089 1235 1310 1356 Capacity (c), veh/h 1089 1235 1310 1356 v/c Ratio (x)0.01 0.03 0.09 0.17 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 3.4 3.2 3.5 4.0 Lane LOS A A A A 95% Queue, veh 0.0 0.1 0.3 0.6 Approach Delay, s/veh 3.4 3.2 3.5 4.0 Approach LOS A A A A Intersection Delay, s/veh | LOS 3.8 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 10/2/22 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed AM Exist Plus 1-4 Peak Hour Factor 0.57 Project Description SUD Blocks 1-4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 84 136 90 0 5 168 119 0 96 94 18 0 52 27 33 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 147 239 158 0 9 295 209 0 168 165 32 0 91 47 58 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 544 513 365 196 Entry Volume, veh/h 544 513 365 196 Circulating Flow (vc), pc/h 147 480 477 472 Exiting Flow (vex), pc/h 362 521 521 214 Capacity (cpce), pc/h 1188 846 848 853 Capacity (c), veh/h 1188 846 848 853 v/c Ratio (x)0.46 0.61 0.43 0.23 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 7.9 13.6 9.6 6.6 Lane LOS A B A A 95% Queue, veh 2.5 4.2 2.2 0.9 Approach Delay, s/veh 7.9 13.6 9.6 6.6 Approach LOS A B A A Intersection Delay, s/veh | LOS 9.9 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 10/2/22 N/S Street Name S 11th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed PM Exist Plus 1-4 Peak Hour Factor 0.84 Project Description SUD Blocks 1-4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 35 143 54 0 10 126 52 0 29 20 5 0 61 38 70 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 42 170 64 0 12 150 62 0 35 24 6 0 73 45 83 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 276 224 65 201 Entry Volume, veh/h 276 224 65 201 Circulating Flow (vc), pc/h 130 101 285 197 Exiting Flow (vex), pc/h 249 268 128 121 Capacity (cpce), pc/h 1209 1245 1032 1129 Capacity (c), veh/h 1209 1245 1032 1129 v/c Ratio (x)0.23 0.18 0.06 0.18 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.0 4.4 4.0 4.8 Lane LOS A A A A 95% Queue, veh 0.9 0.7 0.2 0.6 Approach Delay, s/veh 5.0 4.4 4.0 4.8 Approach LOS A A A A Intersection Delay, s/veh | LOS 4.7 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 3rd & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 10/2/22 N/S Street Name S 3rd Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed AM Exist Plus 1-4 Peak Hour Factor 0.72 Project Description SUD Blocks 1-4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 Lane Assignment TR LT LR Volume (V), veh/h 0 83 120 0 159 88 0 199 174 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 115 167 0 221 122 0 276 242 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 282 343 518 Entry Volume, veh/h 282 343 518 Circulating Flow (vc), pc/h 221 276 115 619 Exiting Flow (vex), pc/h 357 398 0 388 Capacity (cpce), pc/h 1101 1041 1227 Capacity (c), veh/h 1101 1041 1227 v/c Ratio (x)0.26 0.33 0.42 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.7 6.8 7.2 Lane LOS A A A 95% Queue, veh 1.0 1.4 2.1 Approach Delay, s/veh 5.7 6.8 7.2 Approach LOS A A A Intersection Delay, s/veh | LOS 6.7 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 3rd & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 10/2/22 N/S Street Name S 3rd Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed PM Exist Plus 1-4 Peak Hour Factor 0.59 Project Description SUD Blocks 1-4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 Lane Assignment TR LT LR Volume (V), veh/h 0 106 100 0 90 118 0 78 80 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 180 169 0 153 200 0 132 136 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 349 353 268 Entry Volume, veh/h 349 353 268 Circulating Flow (vc), pc/h 153 132 180 485 Exiting Flow (vex), pc/h 316 332 0 322 Capacity (cpce), pc/h 1181 1206 1149 Capacity (c), veh/h 1181 1206 1149 v/c Ratio (x)0.30 0.29 0.23 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.8 5.7 5.3 Lane LOS A A A 95% Queue, veh 1.2 1.2 0.9 Approach Delay, s/veh 5.8 5.7 5.3 Approach LOS A A A Intersection Delay, s/veh | LOS 5.6 A APPENDIX B-3 Future External Intersections Capacity Calculations HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19th & Lincoln Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 8/24/22 East/West Street Lincoln Street Analysis Year 2037 North/South Street S 19th Avenue Time Analyzed AM Future3Traffic Peak Hour Factor 0.90 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blockss 2,3,& 4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 2 0 0 1 2 0 Configuration R R L T TR L T TR Volume (veh/h)7 109 0 8 1369 53 0 339 1272 19 Percent Heavy Vehicles (%)0 0 0 0 0 0 Proportion Time Blocked 0.500 0.500 0.500 0.500 Percent Grade (%)0 0 Right Turn Channelized Yes Yes Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.9 6.9 4.1 4.1 Critical Headway (sec)6.90 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.3 3.3 2.2 2.2 Follow-Up Headway (sec)3.30 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)8 121 9 377 Capacity, c (veh/h)538 543 814 716 v/c Ratio 0.01 0.22 0.01 0.53 95% Queue Length, Q₉₅ (veh)0.0 0.8 0.0 3.1 Control Delay (s/veh)11.8 13.5 9.5 15.5 Level of Service (LOS)B B A C Approach Delay (s/veh)11.8 13.5 0.1 3.2 Approach LOS B B A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 8/30/2022 12:51:28 AM19th & Lincoln AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19th & Lincoln Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 8/24/22 East/West Street Lincoln Street Analysis Year 2037 North/South Street S 19th Avenue Time Analyzed PM Future Traffic Peak Hour Factor 0.95 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blockss 2,3,& 4 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 1 0 0 1 0 1 2 0 0 1 2 0 Configuration R R L T TR L T TR Volume (veh/h)16 390 0 1 1331 43 0 328 1505 7 Percent Heavy Vehicles (%)0 0 0 0 0 0 Proportion Time Blocked 0.500 0.500 0.500 0.500 Percent Grade (%)0 0 Right Turn Channelized Yes Yes Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.9 6.9 4.1 4.1 Critical Headway (sec)6.90 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.3 3.3 2.2 2.2 Follow-Up Headway (sec)3.30 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)17 411 1 345 Capacity, c (veh/h)538 543 693 818 v/c Ratio 0.03 0.76 0.00 0.42 95% Queue Length, Q₉₅ (veh)0.1 6.6 0.0 2.1 Control Delay (s/veh)11.9 29.3 10.2 12.6 Level of Service (LOS)B D B B Approach Delay (s/veh)11.9 29.3 0.0 2.2 Approach LOS B D A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 8/30/2022 12:57:00 AM19th & Lincoln PM Future.xtw HCM Analysis Summary Future TrafficR MarvinPeak AM Hour Analysis Duration: 15 mins.Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH AM FUTURE Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 471 0.92 1 92 0.90 1 131 0.92 1 32 0.90 1 49 0.90 1 111 0.90 1 205 0.92 1 861 0.92 5 36 0.90 1 22 0.90 1 386 0.92 5 290 0.92 1 45 0 0 0 --- --- 25 0 0 0 --- --- 5 5 0 0 --- --- 110 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTR LTP LTP L L LTP LTP 0 24.0 4.0 0.0 15.0 3.5 1.5 8.0 4.0 0.0 39.0 4.0 2.0 Actuated 105.0 Sec 14.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB * Lper 140 0.141 0.190 40.9 D * Lpro 408 0.228 0.229 L 0.934 48.6 D TR 715 0.112 0.410 TR 0.273 20.7 C WB L 171 0.030 0.143 L 0.211 40.0 D 44.6 D TR 243 0.088 0.143 TR 0.617 45.8 D NB Lper 228 0.163 0.429 31.5 C * Lpro 136 0.076 0.076 L 0.613 23.6 C * TR 1270 0.284 0.371 TR 0.764 33.4 C SB Lper 100 0.000 0.429 26.5 C Lpro 136 0.013 0.076 L 0.102 17.3 B TR 1237 0.185 0.371 TR 0.498 26.9 C Intersection: Delay = 33.7sec/veh Int. LOS=C Xc= 0.84 * Critical Lane Group (v/s)Crit= 0.73SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future TrafficR MarvinPeak AM Hour Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH AM FUTURE App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 10 / 11 10.3 0.0 TR 3 / 6 14.4 0.0 All 11.3 0.0 WB L 1 / 1 11.9 0.0 TR 3 / 4 11.3 0.0 All 11.3 0.0 NB L 4 / 6 5.7 0.0 TR 9 / 11 10.5 0.0 All 9.7 0.0 SB L 0 / 1 8.2 0.0 TR 6 / 9 11.2 0.0 All 11.1 0.0 Intersect. 10.5 SIG/Cinema v3.08 Marvin & Associates Page 2 471 92 131 32 49 111 205 861 36 22 386 290 1 24 04 2 14 24 2 14 24 3 8 04 3 8 04 4 39 24 4 39 24 HCM Analysis Summary Future TrafficR MarvinPeak PM Hour Analysis Duration: 15 mins.Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH PM FUTURE Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 309 0.92 1 97 0.90 1 101 0.92 1 72 0.90 1 58 0.90 1 65 0.90 1 120 0.92 1 533 0.92 5 50 0.90 1 119 0.90 1 707 0.92 5 433 0.92 1 45 0 0 0 --- --- 20 0 0 0 --- --- 5 5 0 0 --- --- 120 5 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTR LTP LTP L L LTP LTP 0 24.0 4.0 0.0 15.0 3.5 1.5 8.0 4.0 0.0 39.0 4.0 2.0 Actuated 105.0 Sec 19.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB Lper 170 0.000 0.190 22.1 C * Lpro 408 0.188 0.229 L 0.581 23.0 C TR 729 0.095 0.410 TR 0.232 20.3 C WB * L 175 0.065 0.143 L 0.457 42.0 D 41.8 D TR 251 0.065 0.143 TR 0.454 41.7 D NB Lper 72 0.000 0.429 28.0 C Lpro 136 0.073 0.076 L 0.625 33.4 C TR 1261 0.185 0.371 TR 0.499 26.9 C SB Lper 223 0.000 0.429 38.7 D * Lpro 136 0.074 0.076 L 0.368 18.1 B * TR 1239 0.332 0.371 TR 0.894 41.2 D Intersection: Delay = 32.8sec/veh Int. LOS=C Xc= 0.81 * Critical Lane Group (v/s)Crit= 0.66SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future TrafficR MarvinPeak PM Hour Stucky Road/S 19th Avenue8/24/22Case: STUCKY & 19TH PM FUTURE App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 7 / 9 11.3 0.0 TR 5 / 6 10.2 0.0 All 10.9 0.0 WB L 2 / 3 8.0 0.0 TR 3 / 6 9.3 0.0 All 8.9 0.0 NB L 3 / 6 5.3 0.0 TR 6 / 8 11.1 0.0 All 10.0 0.0 SB L 4 / 8 5.8 0.0 TR 11 / 16 9.8 0.0 All 9.4 0.0 Intersect. 9.8 SIG/Cinema v3.08 Marvin & Associates Page 2 309 97 101 72 58 65 120 533 50 119 707 433 1 24 04 2 14 24 2 14 24 3 8 04 3 8 04 4 39 24 4 39 24 HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19t & Arnold AM Future Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 8/30/2022 East/West Street Arnold Street Analysis Year 2037 North/South Street S 19th Avenue Time Analyzed Peak AM Future Traffic Peak Hour Factor 0.92 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 1 1 0 1 2 0 0 1 2 0 Configuration LTR LT R L T TR L T TR Volume (veh/h)77 6 17 7 4 108 0 9 891 20 0 34 473 32 Percent Heavy Vehicles (%)0 0 0 0 0 0 0 0 0 0 Proportion Time Blocked 0.400 0.400 0.300 0.400 0.400 0.300 0.300 0.350 Percent Grade (%)0 0 Right Turn Channelized No Median Type | Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 Critical Headway (sec)7.50 6.50 6.90 7.50 6.50 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 Follow-Up Headway (sec)3.50 4.00 3.30 3.50 4.00 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)109 12 117 10 37 Capacity, c (veh/h)463 326 764 1145 1064 v/c Ratio 0.23 0.04 0.15 0.01 0.03 95% Queue Length, Q₉₅ (veh)0.9 0.1 0.5 0.0 0.1 Control Delay (s/veh)15.1 16.5 10.6 8.2 8.5 Level of Service (LOS)C C B A A Approach Delay (s/veh)15.1 11.1 0.1 0.5 Approach LOS C B A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 8/30/2022 12:36:33 PM19th & Arnold AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 19t & Arnold AM Future Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 8/30/2022 East/West Street Arnold Street Analysis Year 2037 North/South Street S 19th Avenue Time Analyzed Peak PM Future Traffic Peak Hour Factor 0.92 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 1 1 0 1 2 0 0 1 2 0 Configuration LTR LT R L T TR L T TR Volume (veh/h)54 4 11 34 4 73 0 9 527 49 0 115 664 79 Percent Heavy Vehicles (%)0 0 0 0 0 0 0 0 0 0 Proportion Time Blocked 0.400 0.400 0.300 0.400 0.400 0.300 0.350 0.300 Percent Grade (%)0 0 Right Turn Channelized No Median Type | Storage Left Only 1 Critical and Follow-up Headways Base Critical Headway (sec)7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 Critical Headway (sec)7.50 6.50 6.90 7.50 6.50 6.90 4.10 4.10 Base Follow-Up Headway (sec)3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 Follow-Up Headway (sec)3.50 4.00 3.30 3.50 4.00 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)75 41 79 10 125 Capacity, c (veh/h)402 412 764 1064 1145 v/c Ratio 0.19 0.10 0.10 0.01 0.11 95% Queue Length, Q₉₅ (veh)0.7 0.3 0.3 0.0 0.4 Control Delay (s/veh)16.0 14.7 10.3 8.4 8.5 Level of Service (LOS)C B B A A Approach Delay (s/veh)16.0 11.8 0.1 1.1 Approach LOS C B A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 8/30/2022 12:42:44 PM19th & Arnold PM Future.xtw HCM Analysis Summary Future TrafficR MarvinPeak AM Hour Analysis Duration: 15 mins.Graf Street/S 19th Avenue8/24/22Case: GRAF & 19TH AM FUTURE Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 101 0.75 2 74 0.75 2 5 0.75 2 24 0.75 2 28 0.75 2 350 0.75 2 11 0.75 2 618 0.75 5 81 0.75 2 262 0.75 2 238 0.75 5 35 0.75 2 0 5 0 0 --- --- 140 0 0 0 --- --- 20 5 0 0 --- --- 5 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 23.0 3.5 1.5 15.0 4.0 0.0 24.0 4.0 2.0 Actuated 77.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 226 0.178 0.299 L 0.597 26.1 C 23.5 C TR 551 0.057 0.299 TR 0.192 20.2 C WB L 381 0.025 0.299 L 0.084 19.5 B 25.5 C * TR 483 0.196 0.299 TR 0.656 26.1 C NB Lper 310 0.000 0.390 33.4 C Lpro 345 0.008 0.195 L 0.023 7.0 A * TR 1057 0.267 0.312 TR 0.856 33.8 C SB Lper 97 0.016 0.390 25.9 C * Lpro 345 0.195 0.195 L 0.790 30.6 C TR 1054 0.106 0.312 TR 0.339 21.3 C Intersection: Delay = 28.7sec/veh Int. LOS=C Xc= 0.82 * Critical Lane Group (v/s)Crit= 0.66SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future TrafficR MarvinPeak AM Hour Graf Street/S 19th Avenue8/24/22Case: GRAF & 19TH AM FUTURE App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 3 / 4 8.6 0.0 TR 2 / 4 14.7 0.0 All 12.0 0.0 WB L 1 / 2 8.5 0.0 TR 4 / 5 18.7 0.0 All 18.0 0.0 NB L 0 / 2 15.0 0.0 TR 7 / 9 10.9 0.0 All 10.9 0.0 SB L 4 / 7 10.4 0.0 TR 3 / 5 13.1 0.0 All 12.1 0.0 Intersect. 12.5 SIG/Cinema v3.08 Marvin & Associates Page 2 101 74 5 24 28 350 11 618 81 262 238 35 1 22 24 1 22 24 2 15 04 2 15 04 3 24 24 3 24 24 HCM Analysis Summary Future TrafficR MarvinPeak PM Hour Analysis Duration: 15 mins.Graf Street/S 19th Avenue8/24/22Case: GRAF & 19TH PM FUTURE Area Type: Non CBD Lanes Geometry: Movements Serviced by Lane and Lane Widths (feet) Approach Outbound Lane 1 Lane 2 Lane 3 Lane 4 Lane 5 Lane 6 EB WB NB SB 2 1 2 1 3 2 3 2 L 12.0 L 12.0 L 12.0 L 12.0 TR 12.0 TR 12.0 T 12.0 T 12.0 TR 12.0 TR 12.0 East West North South LTRLTRLTRLTRData Movement Volume (vph) PHF % Heavy Vehicles Lane Groups Arrival Type RTOR Vol (vph) Peds/Hour % Grade Buses/Hour Parkers/Hour (Left|Right) L 3 TR 3 L 3 TR 3 L 3 TR 3 L 3 TR 3 82 0.75 2 39 0.75 2 15 0.75 2 68 0.75 2 73 0.75 2 162 0.75 2 9 0.75 2 365 0.75 5 23 0.75 2 250 0.75 2 352 0.75 5 119 0.75 2 0 5 0 0 --- --- 90 0 0 0 --- --- 20 5 0 0 --- --- 20 0 0 0 --- --- Signal Settings: Operational Analysis Cycle Length: Lost Time Per Cycle: Phase: EB WB NB SB Green Yellow All Red 12345678Ped Only LTP LTP L L LTP LTP 0 23.0 3.5 1.5 15.0 4.0 0.0 24.0 4.0 2.0 Actuated 77.0 Sec 15.0 Sec Capacity Analysis Results Approach: App Group Lane Cap(vph)v/sRatio g/CRatio LaneGroup v/cRatio Delay(sec/veh) LOS Delay(sec/veh) LOSEB L 331 0.098 0.299 L 0.329 21.2 C 20.6 C TR 533 0.040 0.299 TR 0.135 19.8 B WB L 393 0.069 0.299 L 0.232 20.5 C 21.2 C * TR 515 0.112 0.299 TR 0.375 21.5 C NB Lper 192 0.000 0.390 22.3 C Lpro 345 0.007 0.195 L 0.022 7.6 A TR 1070 0.143 0.312 TR 0.459 22.7 C SB Lper 241 0.000 0.390 20.4 C * Lpro 345 0.188 0.195 L 0.568 13.0 B * TR 1046 0.179 0.312 TR 0.575 24.5 C Intersection: Delay = 21.1sec/veh Int. LOS=C Xc= 0.60 * Critical Lane Group (v/s)Crit= 0.48SIG/Cinema v3.08 Marvin & Associates Page 1 NETSIM Summary Results Future TrafficR MarvinPeak PM Hour Graf Street/S 19th Avenue8/24/22Case: GRAF & 19TH PM FUTURE App Group Lane (veh)Avg/MaxPer LaneQueues (mph)SpeedAverage Period)(% of PeakWorst LaneSpillback in EB L 2 / 3 7.2 0.0 TR 1 / 2 16.2 0.0 All 11.4 0.0 WB L 1 / 2 9.4 0.0 TR 3 / 5 18.5 0.0 All 17.0 0.0 NB L 0 / 0 26.7 0.0 TR 4 / 5 11.4 0.0 All 11.5 0.0 SB L 4 / 6 11.3 0.0 TR 5 / 9 12.2 0.0 All 12.0 0.0 Intersect. 12.5 SIG/Cinema v3.08 Marvin & Associates Page 2 82 39 15 68 73 162 9 365 23 250 352 119 1 22 24 1 22 24 2 15 04 2 15 04 3 24 24 3 24 24 HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Stucky Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 8/24/22 East/West Street Stucky Road Analysis Year 2037 North/South Street S 11th Avenue Time Analyzed AM Future Traffic Peak Hour Factor 0.85 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0 Configuration LR LT TR Volume (veh/h)131 27 109 321 150 54 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.2 4.1 Critical Headway (sec)6.40 6.20 4.10 Base Follow-Up Headway (sec)3.5 3.3 2.2 Follow-Up Headway (sec)3.50 3.30 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)186 128 Capacity, c (veh/h)290 1291 v/c Ratio 0.64 0.10 95% Queue Length, Q₉₅ (veh)4.1 0.3 Control Delay (s/veh)37.2 8.1 1.0 Level of Service (LOS)E A A Approach Delay (s/veh)37.2 2.8 Approach LOS E A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 2022 Generated: 8/30/2022 1:02:00 AMS 11th & Stucky AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Stucky Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 8/24/22 East/West Street Stucky Road Analysis Year 2037 North/South Street S 11th Avenue Time Analyzed PM Future traffic Peak Hour Factor 0.90 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Blocks Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0 Configuration LR LT TR Volume (veh/h)203 22 73 188 311 131 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.2 4.1 Critical Headway (sec)6.40 6.20 4.10 Base Follow-Up Headway (sec)3.5 3.3 2.2 Follow-Up Headway (sec)3.50 3.30 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)250 81 Capacity, c (veh/h)332 1063 v/c Ratio 0.75 0.08 95% Queue Length, Q₉₅ (veh)5.8 0.2 Control Delay (s/veh)42.5 8.7 0.7 Level of Service (LOS)E A A Approach Delay (s/veh)42.5 3.0 Approach LOS E A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 2022 Generated: 8/30/2022 1:04:40 AMS 11th & Stucky PM Future.xtw HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Arnold Agency or Co.Marvin & Associates E/W Street Name Arnold Street Date Performed 8/24/22 N/S Street Name S 11th Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed AM Future Peak Hour Factor 0.70 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 20 28 7 0 32 47 22 0 51 250 61 0 41 92 24 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 29 40 10 0 46 67 31 0 73 357 87 0 59 131 34 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 79 144 517 224 Entry Volume, veh/h 79 144 517 224 Circulating Flow (vc), pc/h 236 459 128 186 Exiting Flow (vex), pc/h 186 174 417 187 Capacity (cpce), pc/h 1085 864 1211 1142 Capacity (c), veh/h 1085 864 1211 1142 v/c Ratio (x)0.07 0.17 0.43 0.20 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 3.9 5.8 7.3 4.9 Lane LOS A A A A 95% Queue, veh 0.2 0.6 2.2 0.7 Approach Delay, s/veh 3.9 5.8 7.3 4.9 Approach LOS A A A A Intersection Delay, s/veh | LOS 6.2 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Arnold Agency or Co.Marvin & Associates E/W Street Name Arnold Street Date Performed 8/24/22 N/S Street Name S 11th Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed PM Future Peak Hour Factor 0.90 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 27 47 20 0 7 35 19 0 41 95 7 0 47 132 20 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 30 52 22 0 8 39 21 0 46 106 8 0 52 147 22 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 104 68 160 221 Entry Volume, veh/h 104 68 160 221 Circulating Flow (vc), pc/h 207 182 134 93 Exiting Flow (vex), pc/h 112 107 157 177 Capacity (cpce), pc/h 1117 1146 1204 1255 Capacity (c), veh/h 1117 1146 1204 1255 v/c Ratio (x)0.09 0.06 0.13 0.18 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 4.0 3.6 4.1 4.4 Lane LOS A A A A 95% Queue, veh 0.3 0.2 0.5 0.6 Approach Delay, s/veh 4.0 3.6 4.1 4.4 Approach LOS A A A A Intersection Delay, s/veh | LOS 4.1 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 8/24/22 N/S Street Name S 11th Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed AM Future Peak Hour Factor 0.70 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 113 184 122 0 7 227 157 0 130 126 24 0 59 36 45 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 161 263 174 0 10 324 224 0 186 180 34 0 84 51 64 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 598 558 400 199 Entry Volume, veh/h 598 558 400 199 Circulating Flow (vc), pc/h 145 527 508 520 Exiting Flow (vex), pc/h 381 574 565 235 Capacity (cpce), pc/h 1190 806 822 812 Capacity (c), veh/h 1190 806 822 812 v/c Ratio (x)0.50 0.69 0.49 0.25 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 8.5 17.3 10.9 7.1 Lane LOS A C B A 95% Queue, veh 2.9 5.7 2.7 1.0 Approach Delay, s/veh 8.5 17.3 10.9 7.1 Approach LOS A C B A Intersection Delay, s/veh | LOS 11.7 B HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 11th & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 8/24/22 N/S Street Name S 11th Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed PM Future Peak Hour Factor 0.90 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 47 193 73 0 14 170 59 0 39 26 7 0 74 51 95 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 52 214 81 0 16 189 66 0 43 29 8 0 82 57 106 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 347 271 80 245 Entry Volume, veh/h 347 271 80 245 Circulating Flow (vc), pc/h 155 124 348 248 Exiting Flow (vex), pc/h 304 338 147 154 Capacity (cpce), pc/h 1178 1216 968 1072 Capacity (c), veh/h 1178 1216 968 1072 v/c Ratio (x)0.29 0.22 0.08 0.23 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.8 4.9 4.5 5.5 Lane LOS A A A A 95% Queue, veh 1.2 0.9 0.3 0.9 Approach Delay, s/veh 5.8 4.9 4.5 5.5 Approach LOS A A A A Intersection Delay, s/veh | LOS 5.4 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 3rd & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 8/24/22 N/S Street Name S 3rd Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed AM Future Peak Hour Factor 0.85 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 Lane Assignment TR LT LR Volume (V), veh/h 0 108 157 0 215 117 0 267 235 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 127 185 0 253 138 0 314 276 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 312 391 590 Entry Volume, veh/h 312 391 590 Circulating Flow (vc), pc/h 253 314 127 705 Exiting Flow (vex), pc/h 403 452 0 438 Capacity (cpce), pc/h 1066 1002 1212 Capacity (c), veh/h 1066 1002 1212 v/c Ratio (x)0.29 0.39 0.49 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 6.2 7.8 8.2 Lane LOS A A A 95% Queue, veh 1.2 1.9 2.7 Approach Delay, s/veh 6.2 7.8 8.2 Approach LOS A A A Intersection Delay, s/veh | LOS 7.6 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection S 3rd & Graf Agency or Co.Marvin & Associates E/W Street Name Graf Street Date Performed 8/24/22 N/S Street Name S 3rd Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed PM Future Peak Hour Factor 0.80 Project Description SUD Blocks 2,3, & 4 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 0 0 Lane Assignment TR LT LR Volume (V), veh/h 0 140 131 0 122 154 0 101 108 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 175 164 0 152 192 0 126 135 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 Pedestrians Crossing, p/h 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 339 344 261 Entry Volume, veh/h 339 344 261 Circulating Flow (vc), pc/h 152 126 175 470 Exiting Flow (vex), pc/h 310 318 0 316 Capacity (cpce), pc/h 1182 1214 1154 Capacity (c), veh/h 1182 1214 1154 v/c Ratio (x)0.29 0.28 0.23 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 5.7 5.6 5.2 Lane LOS A A A 95% Queue, veh 1.2 1.2 0.9 Approach Delay, s/veh 5.7 5.6 5.2 Approach LOS A A A Intersection Delay, s/veh | LOS 5.5 A APPENDIX B-4 Site Access Capacity Calculations HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection Stucky & Block 2&3 Access Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 10/2/22 East/West Street Stucky Road Analysis Year 2037 North/South Street Block 2&3 Access Time Analyzed AM Future Traffic Peak Hour Factor 0.92 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)10 140 8 6 137 5 26 5 20 13 2 29 Percent Heavy Vehicles (%)0 0 0 0 0 0 0 0 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.10 4.10 7.10 6.50 6.20 7.10 6.50 6.20 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.20 2.20 3.50 4.00 3.30 3.50 4.00 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)11 7 55 48 Capacity, c (veh/h)1438 1430 666 752 v/c Ratio 0.01 0.00 0.08 0.06 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.3 0.2 Control Delay (s/veh)7.5 0.1 0.1 7.5 0.0 0.0 10.9 10.1 Level of Service (LOS)A A A A A A B B Approach Delay (s/veh)0.5 0.3 10.9 10.1 Approach LOS A A B B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:01:31 PMStucky & Mid Block Access AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection Stucky & Block 2&3 Access Agency/Co.Marvin Associates Jurisdiction City of Bozeman Date Performed 10/2/22 East/West Street Stucky Road Analysis Year 2037 North/South Street Block 2&3 Access Time Analyzed PM Future Traffic Peak Hour Factor 0.92 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)30 209 27 21 170 15 11 3 12 17 5 14 Percent Heavy Vehicles (%)0 0 0 0 0 0 0 0 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.10 4.10 7.10 6.50 6.20 7.10 6.50 6.20 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.20 2.20 3.50 4.00 3.30 3.50 4.00 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)33 23 28 39 Capacity, c (veh/h)1383 1320 532 520 v/c Ratio 0.02 0.02 0.05 0.08 95% Queue Length, Q₉₅ (veh)0.1 0.1 0.2 0.2 Control Delay (s/veh)7.7 0.2 0.2 7.8 0.2 0.2 12.1 12.5 Level of Service (LOS)A A A A A A B B Approach Delay (s/veh)1.1 0.9 12.1 12.5 Approach LOS A A B B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:04:28 PMStucky & Mid Block Access PM Future.xtw HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection Stucky & S 17th Agency or Co.Marvin Associates E/W Street Name Stucky Road Date Performed 10/2/22 N/S Street Name S 17th Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed AM Future Traffic Peak Hour Factor 0.92 Project Description SUD Phase 3 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 3 173 1 0 1 139 14 0 1 8 1 0 8 3 11 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 3 188 1 0 1 151 15 0 1 9 1 0 9 3 12 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 192 167 11 24 Entry Volume, veh/h 192 167 11 24 Circulating Flow (vc), pc/h 13 13 200 153 Exiting Flow (vex), pc/h 198 164 27 5 Capacity (cpce), pc/h 1362 1362 1125 1181 Capacity (c), veh/h 1362 1362 1125 1181 v/c Ratio (x)0.14 0.12 0.01 0.02 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 3.8 3.6 3.3 3.2 Lane LOS A A A A 95% Queue, veh 0.5 0.4 0.0 0.1 Approach Delay, s/veh 3.8 3.6 3.3 3.2 Approach LOS A A A A Intersection Delay, s/veh | LOS 3.7 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection Stucky & S 17th Agency or Co.Marvin Associates E/W Street Name Stucky Road Date Performed 10/2/22 N/S Street Name S 17th Avenue Analysis Year 2037 Analysis Time Period, hrs 0.25 Time Analyzed PM Future Traffic Peak Hour Factor 0.92 Project Description SUD Phase 3 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 2 236 1 0 1 152 38 0 1 5 1 0 12 8 54 Percent Heavy Vehicles, %0 0 0 3 0 3 0 0 3 3 3 3 0 0 3 0 Flow Rate (vPCE), pc/h 0 2 257 1 0 1 165 41 0 1 6 1 0 13 9 59 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 260 207 8 81 Entry Volume, veh/h 260 207 8 81 Circulating Flow (vc), pc/h 23 9 272 167 Exiting Flow (vex), pc/h 271 225 49 11 Capacity (cpce), pc/h 1348 1367 1046 1164 Capacity (c), veh/h 1348 1367 1015 1160 v/c Ratio (x)0.19 0.15 0.01 0.07 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 4.3 3.9 3.6 3.7 Lane LOS A A A A 95% Queue, veh 0.7 0.5 0.0 0.2 Approach Delay, s/veh 4.3 3.9 3.6 3.7 Approach LOS A A A A Intersection Delay, s/veh | LOS 4.0 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection Stucky & S 14th Agency or Co.Marvin & Associates E/W Street Name Stucky Road Date Performed 10/3/2022 N/S Street Name S14th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed Peak AM Future Peak Hour Factor 0.92 Project Description SUD Phase 3 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 1 175 6 0 1 140 1 0 11 1 1 0 1 1 1 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 1 190 7 0 1 152 1 0 12 1 1 0 1 1 1 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 198 154 14 3 Entry Volume, veh/h 198 154 14 3 Circulating Flow (vc), pc/h 3 14 192 165 Exiting Flow (vex), pc/h 192 165 3 9 Capacity (cpce), pc/h 1376 1360 1135 1166 Capacity (c), veh/h 1376 1360 1135 1166 v/c Ratio (x)0.14 0.11 0.01 0.00 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 3.8 3.5 3.3 3.1 Lane LOS A A A A 95% Queue, veh 0.5 0.4 0.0 0.0 Approach Delay, s/veh 3.8 3.5 3.3 3.1 Approach LOS A A A A Intersection Delay, s/veh | LOS 3.7 A HCS Roundabouts Report General Information Site Information Analyst R Marvin Intersection Stucky & S 14th Agency or Co.Marvin & Associates E/W Street Name Stucky Road Date Performed 10/3/2022 N/S Street Name S14th Avenue Analysis Year 2022 Analysis Time Period, hrs 0.25 Time Analyzed Peak PM Future Peak Hour Factor 0.92 Project Description SUD Phase 3 Jurisdiction City of Bozeman Volume Adjustments and Site Characteristics Approach EB WB NB SB Movement U L T R U L T R U L T R U L T R Number of Lanes (N)0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 0 Lane Assignment LTR LTR LTR LTR Volume (V), veh/h 0 1 230 18 0 1 172 1 0 18 1 1 0 1 1 1 Percent Heavy Vehicles, %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Flow Rate (vPCE), pc/h 0 1 250 20 0 1 187 1 0 20 1 1 0 1 1 1 Right-Turn Bypass None None None None Conflicting Lanes 1 1 1 1 Pedestrians Crossing, p/h 0 0 0 0 Proportion of CAVs 0 Critical and Follow-Up Headway Adjustment Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Critical Headway, s 4.9763 4.9763 4.9763 4.9763 Follow-Up Headway, s 2.6087 2.6087 2.6087 2.6087 Flow Computations, Capacity and v/c Ratios Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Entry Flow (ve), pc/h 271 189 22 3 Entry Volume, veh/h 271 189 22 3 Circulating Flow (vc), pc/h 3 22 252 208 Exiting Flow (vex), pc/h 252 208 3 22 Capacity (cpce), pc/h 1376 1349 1067 1116 Capacity (c), veh/h 1376 1349 1067 1116 v/c Ratio (x)0.20 0.14 0.02 0.00 Delay and Level of Service Approach EB WB NB SB Lane Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass Lane Control Delay (d), s/veh 4.2 3.8 3.5 3.2 Lane LOS A A A A 95% Queue, veh 0.7 0.5 0.1 0.0 Approach Delay, s/veh 4.2 3.8 3.5 3.2 Approach LOS A A A A Intersection Delay, s/veh | LOS 4.0 A HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Student Dr Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 10/3/2022 East/West Street Student Drive Analysis Year 2022 North/South Street S 11th Avenue Time Analyzed AM Future Conditions Peak Hour Factor 0.60 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 1 0 0 0 1 0 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)16 1 1 5 1 40 1 289 3 15 142 9 Percent Heavy Vehicles (%)0 0 0 0 0 0 0 0 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 Critical Headway (sec)7.10 6.50 6.20 7.10 6.50 6.20 4.10 4.10 Base Follow-Up Headway (sec)3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 Follow-Up Headway (sec)3.50 4.00 3.30 3.50 4.00 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)30 77 2 25 Capacity, c (veh/h)264 488 1325 1087 v/c Ratio 0.11 0.16 0.00 0.02 95% Queue Length, Q₉₅ (veh)0.4 0.6 0.0 0.1 Control Delay (s/veh)20.4 13.7 7.7 0.0 0.0 8.4 0.2 0.2 Level of Service (LOS)C B A A A A A A Approach Delay (s/veh)20.4 13.7 0.0 1.0 Approach LOS C B A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:21:27 PM11th & Student AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 11th & Student Dr Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 10/3/2022 East/West Street Student Drive Analysis Year 2022 North/South Street S 11th Avenue Time Analyzed PM Future Conditions Peak Hour Factor 0.88 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 1 0 0 1 0 0 0 1 0 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)25 1 1 4 1 23 1 132 8 51 194 25 Percent Heavy Vehicles (%)0 0 0 0 0 0 0 0 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 Critical Headway (sec)7.10 6.50 6.20 7.10 6.50 6.20 4.10 4.10 Base Follow-Up Headway (sec)3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 Follow-Up Headway (sec)3.50 4.00 3.30 3.50 4.00 3.30 2.20 2.20 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)31 32 1 58 Capacity, c (veh/h)448 759 1329 1433 v/c Ratio 0.07 0.04 0.00 0.04 95% Queue Length, Q₉₅ (veh)0.2 0.1 0.0 0.1 Control Delay (s/veh)13.6 10.0 7.7 0.0 0.0 7.6 0.4 0.4 Level of Service (LOS)B A A A A A A A Approach Delay (s/veh)13.6 10.0 0.1 1.7 Approach LOS B A A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:18:30 PM11th & Student PmM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 17th & Arnold Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 10/3/2022 East/West Street Arnold Street Analysis Year 2022 North/South Street S 17th Avenue Time Analyzed Peak AM Future Peak Hour Factor 0.60 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0 Configuration LT TR LR Volume (veh/h)3 59 115 1 1 1 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.10 6.40 6.20 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.20 3.50 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)5 3 Capacity, c (veh/h)1392 765 v/c Ratio 0.00 0.00 95% Queue Length, Q₉₅ (veh)0.0 0.0 Control Delay (s/veh)7.6 0.0 9.7 Level of Service (LOS)A A A Approach Delay (s/veh)0.4 9.7 Approach LOS A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:33:33 PMS 17th & Arnold AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection S 17th & Arnold Agency/Co.Marvin & Associates Jurisdiction City of Bozeman Date Performed 10/3/2022 East/West Street Arnold Street Analysis Year 2022 North/South Street S 17th Avenue Time Analyzed Peak PM Future Peak Hour Factor 0.60 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0 Configuration LT TR LR Volume (veh/h)2 164 109 1 1 3 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.10 6.40 6.20 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.20 3.50 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)3 7 Capacity, c (veh/h)1404 761 v/c Ratio 0.00 0.01 95% Queue Length, Q₉₅ (veh)0.0 0.0 Control Delay (s/veh)7.6 0.0 9.8 Level of Service (LOS)A A A Approach Delay (s/veh)0.1 9.8 Approach LOS A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:27:12 PMS 17th & Arnold AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection Arnold & S West Access Agency/Co.Marvin & Associates Jurisdiction Cit of Bozeman Date Performed 10/3/2022 East/West Street Arnold Street Analysis Year 2022 North/South Street West Access Block 4 Time Analyzed Peak AM Future Peak Hour Factor 0.60 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0 Configuration LT TR LR Volume (veh/h)2 59 115 2 3 3 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.10 6.40 6.20 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.20 3.50 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)3 10 Capacity, c (veh/h)1390 766 v/c Ratio 0.00 0.01 95% Queue Length, Q₉₅ (veh)0.0 0.0 Control Delay (s/veh)7.6 0.0 9.8 Level of Service (LOS)A A A Approach Delay (s/veh)0.3 9.8 Approach LOS A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:39:19 PMArnold & West Access AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection Arnold & S West Access Agency/Co.Marvin & Associates Jurisdiction Cit of Bozeman Date Performed 10/3/2022 East/West Street Arnold Street Analysis Year 2022 North/South Street West Access Block 4 Time Analyzed Peak PM Future Peak Hour Factor 0.60 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0 Configuration LT TR LR Volume (veh/h)5 164 109 3 4 5 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.10 6.40 6.20 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.20 3.50 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)8 15 Capacity, c (veh/h)1400 688 v/c Ratio 0.01 0.02 95% Queue Length, Q₉₅ (veh)0.0 0.1 Control Delay (s/veh)7.6 0.1 10.3 Level of Service (LOS)A A B Approach Delay (s/veh)0.3 10.3 Approach LOS A B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:41:07 PMArnold & West Access PM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection Arnold & East Access Agency/Co.Marvin & Associates Jurisdiction Cit of Bozeman Date Performed 10/3/2022 East/West Street Arnold Street Analysis Year 2022 North/South Street East Access Block 4 Time Analyzed Peak AM Future Peak Hour Factor 0.60 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0 Configuration LT TR LR Volume (veh/h)1 59 115 3 4 2 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.10 6.40 6.20 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.20 3.50 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)2 10 Capacity, c (veh/h)1388 743 v/c Ratio 0.00 0.01 95% Queue Length, Q₉₅ (veh)0.0 0.0 Control Delay (s/veh)7.6 0.0 9.9 Level of Service (LOS)A A A Approach Delay (s/veh)0.1 9.9 Approach LOS A A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:43:48 PMArnold & East Access AM Future.xtw HCS Two-Way Stop-Control Report General Information Site Information Analyst R Marvin Intersection Arnold & East Access Agency/Co.Marvin & Associates Jurisdiction Cit of Bozeman Date Performed 10/3/2022 East/West Street Arnold Street Analysis Year 2022 North/South Street East Access Block 4 Time Analyzed Peak PM Future Peak Hour Factor 0.60 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description SUD Phase 3 Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0 Configuration LT TR LR Volume (veh/h)3 164 109 5 7 3 Percent Heavy Vehicles (%)0 0 0 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 7.1 6.2 Critical Headway (sec)4.10 6.40 6.20 Base Follow-Up Headway (sec)2.2 3.5 3.3 Follow-Up Headway (sec)2.20 3.50 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)5 17 Capacity, c (veh/h)1396 620 v/c Ratio 0.00 0.03 95% Queue Length, Q₉₅ (veh)0.0 0.1 Control Delay (s/veh)7.6 0.0 11.0 Level of Service (LOS)A A B Approach Delay (s/veh)0.2 11.0 Approach LOS A B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 2022 Generated: 10/3/2022 2:45:19 PMArnold & East Access PM Future.xtw APPENDIX C Traffic Assignment Models 2022 AM HOUR BLOCK 1 COMMERCIAL TRAFFIC ASSIGNMENT25% 15 NORTH 10 6 10 00Number Of Trips: Enter Exit 0%00 1272 1272 00 6 38 23 10 6 16 10 15 25%10% 15 25%10%6 10% 10 6 442 10 4 000 02 410% 2%1 1 10 10 ‐8252610% 2%1101018220%54210% 06 27%9 0 0 6 1809 840 2%6 25%27 20%8 ‐3 Passerby=48% 0 ‐3 0 55 27% 25 20 ‐820 Passerby=52% 011 11 30% 11 45%23 20%8 011 1211 8 0 01028 31010111120%11 0 15%96 31615%10 12 8%12 0 67630%02220 11 0 3 711 0 0 2 3 18 0 5 30%8% 18 5 711 23 7 10 00 011 00 00 22% 00 01 11 2 711 12 18 4 30%6% 18 60 711 25 0 0 132 01 12 44 4265 2 5%3610%10%62 41014%91 224% 22 24321 6 24 36 02 2 4 9 36 15%2% 10% S 19th Avenue S 17th Avenue S 11th Avenue S 3rd Avenue GRAF STREET GRAF SREET ARNOLD STREET Egress Peak AM =Ingress KAGY BOULEVARD KAGY BOULEVARD STUCKY ROAD STATE STREET STUCKY ROAD STUCKY ROAD WEST LINCOLN KAGY BOLEVARD AWT = Passerby= GRAF STREET 2022 PM HOUR BLOCK 1 COMMERCIAL TRAFFIC ASSIGNMENT 25% 55 NORTH 26 29 26 00Number Of Trips: Enter Exit 0%00 1272 1272 00 29 105 114 26 29 45 49 55 25%10% 55 25%10%22 10% 26 29 11 11 11 26 11 200 011 1110% 2%4 2 28 28 ‐20 25 23 11 22 10% 2%22828492520%23 11 11 10% 229 27%45 0 0 31 49 0 45 21 11 0 2%31 25%93 20%21 2 Passerby=45% 02 0 27 27 27% 73 46 ‐25 46 Passerby=55% 021 21 20% 21 45%90 20%21 021 6029 210 051921 17 51 51 29 29 20%29 0 15%33 16 17 67 15%51 39 8%39 0 16 34 16 30%09990 21 0 8 34 21 0 0 9 8 55 0 18 30%8% 0 18 00 98 0 72 00 022 15%00 0015%22 72% 00030%25 00 6 00 76 0 13 30%6% 66 22 0 34 32 913 0 0 61711 27 6 5 11 11 11 6 17 15 4 5%11 22 10%10%22 11 11 35 14%31 5 4 9 4% 511 11 18 16 11 5 16 611 17 16 2 6 11 11 33 922 15%2% 10%S 19th Avenue S 17th Avenue S 11th Avenue S 3rd Avenue Ingress Egress STUCKY ROAD GRAF STREET GRAF STREET GRAF SREET KAGY BOULEVARD Peak PM =Passerby= STUCKY ROAD STUCKY ROAD STUCKY ROAD ARNOLD STREET STATE STREET WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD AWT = 2022 AM HOUR BLOCK 2 TRAFFIC ASSIGNMENT 32% 27 NORTH 6 20 6 00Number Of Trips: Enter Exit 0%03 519 519 00 34% 20 3 19 64 623 29 4% 32% 27 8%12%7 8% 620 225 52 2 100 053 2%222551518% 00 2 22 5 8%5312 120 8%512 5 22 205 6212 27 20%7 8%12%17 26%18% 34 529 5 12 12 19% 14 2 11% 17 2 519 24 11% 18%10%18% 4%21 16%9 6%12%17 614 6 3 612 666 8142912%5 3 8 8 12 0 12%10 2 8 40 21%19 13 5 28 31%0 2 7 11 13 20 20 8 0 2 2 72 00 82 9011 11%13% 9 11 72 82 7 8 00 000 00 002% 00 00 2 2 72 82 9 10 11%11% 9 90 72 72 00 16 7 10 00 0222 1 2%200%099%73 134% 00 07633 2 01 62 00 31 7 04 9%2% 5% S 19th Avenue S 17th Avenue S 11th Avenue S 3rd Avenue GRAF STREET GRAF SREET ARNOLD STREET Egress Peak AM =Ingress KAGY BOULEVARD KAGY BOULEVARD STUCKY ROAD STATE STREET STUCKY ROAD STUCKY ROAD WEST LINCOLN KAGY BOLEVARD AWT = GRAF STREET 2022 PM HOUR BLOCK 2 TRAFFIC ASSIGNMENT 32% 27 NORTH 17 10 17 00Number Of Trips: Enter Exit 0%01 519 519 00 14% 10 1 54 31 17 11 28 4% 32% 27 8%12%9 8% 17 10 66 2 13 4 6 100 0210 2%244 22 1518% 11 4 44 2 8%2106 110 8%26 14 11 4 0 2 16 6 6 25 20%7 8%12%22 26%18% 28 14 14 14 66 19% 12 6 11% 86 14 14 28 11% 18% 10% 18% 4%25 16%12 6%12%22 18 7 3 9 16 6 18 316 471412%15 9 23 23 6 0 12%10 6 4 45 21%21 7 15 33 31%0 6 3 31 7 10 10 4 0 6 7 36 0 0 4 7 9 011 11%13% 9 11 36 47 3 4 00 011 00 012% 00 00 6 6 36 46 9 10 11%11% 9 90 36 36 00 13 3 11 00 0555 2 2%200%089%81 234% 10 03321 5 13 35 01 23 8 14 9%2% 5%S 19th Avenue S 17th Avenue Ingress Egress STUCKY ROAD GRAF STREET GRAF STREET GRAF SREET KAGY BOULEVARD Peak PM = S 11th Avenue S 3rd Avenue WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD STUCKY ROAD STUCKY ROAD ARNOLD STREET STATE STREET AWT = 2022 AM HOUR BLOCK 2 & 1 TRAFFIC ASSIGNMENT 42 NORTH 16 26 0160 00 00 00 03 00 03 0263 16 29 44 42 14 16 26 667 0511 060 20 00 00 0 07 07 31 01212‐807102021 1 0 012 1219 0 7 100 714 2260 0015 0012 5 28 19 0 15 13 6 12 33 34 25 31 526 050 17 17 039 022 0822 530 35 32 32 25 6 25 1914 1312 006 1008 1300 11 0 14 39 15 0 14 19 19 12 0 0 19 8 11 56 29 13 5 40 40 0 0 0 8 0 14 17 13 0 0 22 22 10 0 0 0112 000 600 14 13 0 0 10 6 27 0 16 27 16 14 13 10 6 0140 0100 00 00 00 11 00 00 00 02 00 00 00 01 0130 040 14 13 10 4 27 14 27 16 0 14 13 97 00 292 008 22 44 40 48 70 02 50 06 62 419163 26 20 02 20 011 96 03 070 030 500 97 03 65 17 310 S 19th Avenue S 17th Avenue S 11th Avenue S 3rd Avenue STATE STREET STUCKY ROAD STUCKY ROAD WEST LINCOLN KAGY BOLEVARD KAGY BOULEVARD KAGY BOULEVARD GRAF STREET GRAF SREET ARNOLD  STREET ARNOLD  STREET STUCKY ROAD GRAF STREET 2022 PM HOUR BLOCK 2 & 1 TRAFFIC ASSIGNMENT 82 NORTH 44 38 0440 00 00 00 01 00 01 0381 44 40 83 82 31 44 38 17 17 14 01331 0170 30 00 00 0 014 020 62 03333‐20 0 27 25 11 0 37 3 1 0 33 33 53 0 27 25 0 20 17 3380 0047 006 14 41 53 0 47 37 17 6 55 100 43 30 14 16 0140 33 33 085 052 0 ‐17 52 14 35 49 46 102 43 18 28 64 38 37 6 0 0 18 51 0 12 37 0 0 21 0 7 65 66 0 38 53 53 6 0 0 43 22 21 112 72 7 15 71 71 0 0 0 22 0 38 47 7 0 0 19 19 13 0 0 0216 000 1500 38 27 0 0 13 15 65 0 29 75 29 38 37 13 15 0380 0112 00 00 00 33 00 00 22 08 00 00 20 05 0370 0120 38 37 11 12 75 23 75 31 0 38 37 13 19 0 0 62011 0210 6 6 11 11 11 0 11 22 20 0 0 6 13 0 0 22 22 11 11 43 38 6 6 12 60 011 11 0 0 22 19 13 0 6 0210 070 1300 20 21 2 7 13 13 41 10 26 S 19th Avenue S 17th Avenue S 11th Avenue S 3rd Avenue GRAF STREET GRAF STREET GRAF SREET KAGY BOULEVARDKAGY BOLEVARD KAGY BOULEVARD STUCKY ROAD STUCKY ROAD ARNOLD STREET ARNOLD STREET STATE STREET STUCKY ROAD WEST LINCOLN 2022 AM HOUR BLOCK 3 TRAFFIC ASSIGNMENT32% 32 NORTH 8 25 8 00Number Of Trips: Enter Exit 0%03 776 776 00 34% 25 3 21 69 828 35 4% 36% 34 8%12%8 8% 925 33 6 82 3 100 064 2%222 661618% 00 2 22 6 8%6412 125 8%612 8 26 20 6 6312 34 7 8%12%19 18% 34 826 8 00 0 0 26 0 826 34 38%10%18% 34 7 6%16 826 2 6 4 12 26 0 2 4 8192828%7 0 7 7 12 0 12%11 3 8 36 40%31%28 21 7 28 31%0 30828%21 21 21 9 0 70 6 3 27 2 6 9 3 9712 10%4% 8% 97 27 2 6 02 11 071010%13 0 0144 0 0335%30 01 3 31 1 3 54 5%4%13% 5412 31 1 3 9 3 30 1 9 00413 0000 056%40002% 0 413 00 0 11 2 82 0 0 9 2 10 0 11 11%11% 10 10 0 82 82 00 16 8 10 00 0222 1 2%200%099%83 144% 00 08633 2 01 62 00 31 8 05 9%2% 5% S 19th Avenue S 17th Avenue S 11th Avenue S 3rd Avenue GRAF STREET AWT = LOCAL STREET ARNOLD STREET ARNOLD STREET Egress Peak AM =Ingress KAGY BOULEVARD KAGY BOULEVARD STUCKY ROAD STATE STREET STUCKY ROAD STUCKY ROAD WEST LINCOLN KAGY BOLEVARD GRAF STREET GRAF SREET LOCAL STREET ARNOLD STREET 2022 PM HOUR BLOCK 3 TRAFFIC ASSIGNMENT 32% 41 NORTH 26 15 26 00Number Of Trips: Enter Exit 0%02 776 776 00 24% 15 2 71 42 26 17 42 4% 36% 46 8%12%12 8% 31 15 99 3 26 6 9 100 0313 2%266 33 2018% 11 6 66 3 8%3138 115 8%38 27 16 6 0 3 21 9 8 43 9 8%12%29 18% 43 27 16 27 00 0 0 16 0 27 16 43 38%10%18% 43 9 6%20 27 16 6 3 13 8 720 0 6 13 5121728%22 0 22 22 8 0 12%14 9 5 45 40%31%35 13 22 35 31%0 902828%13 13 13 5 0 40 3 9 74 6 3 5 9 11 915 10%4% 8% 11 9 74 6 3 07 3 3 04610%32 0 0175 0 02115%20 04 2 24 3 2 65 5%4%13% 6515 24 3 2 5 9 20 3 5 00332 00 11 076%50012% 0 342 00 0 44 8 58 0 0 5 8 12 0 13 11%11% 12 12 0 58 58 00 14 5 11 00 0666 3 2%200%0119%10 2 3 5 4% 10 05422 6 14 46 01 24 10 16 9%2% 5%S 19th Avenue S 17th Avenue S 11th Avenue S 3rd Avenue KAGY BOLEVARD KAGY BOULEVARD AWT = Ingress Egress STUCKY ROAD KAGY BOULEVARD Peak AM = LOCAL STREET STUCKY ROAD STUCKY ROAD LOCAL STREET STATE STREET WEST LINCOLN GRAF STREET GRAF STREET GRAF SREET ARNOLD STREET ARNOLD STREET ARNOLD STREET 2022 AM HOUR BLOCK 4 TRAFFIC ASSIGNMENT34%36%NORTH2222100%81482214708111142%10122%10 102%2%11118%010000 471411477 14 00012 22 2221 03534%56%210035714000 0122225122101111 1111 00 04%2121728%17 611 1728%1700%0166666000411 2224 00 6 11 12226 0 17 3510%28% 56%000116940111140% N9160017250061% S16 0006004701110%1% 16%6S 17th Avenue0112400472400450016% N460083% 10%N .25x.36=10%13%333 1100%013SN332% S7101001100112023%3%2S 14th Avenue2111111000011 000%00023%000110120 011%1100 11 02003%0%10S 19th AvenueS 11th Avenue12%S 3rd AvenueExit91222 40AWT =Peak AM =912Number Of Trips: EnterGRAF STREETKAGY BOLEVARDKAGY BOLEVARDARNOLD STREETSTUCKY ROADSTUCKY ROADKAGY BOLEVARDSTUCKY ROADSTUDENT DRGRAF SREETSTUCKY ROADGRAF STREETSTUDENT DRARNOLD STREETARNOLD STREET 2022 PM HOUR BLOCK 4 TRAFFIC ASSIGNMENT34%36%NORTH4445100%23 2123 45 2321 1231111112%31142%31 112%2%323###13111 1 11 11211231121 21 0 0 035 45 3543 07134%56%43007121 210 00 035 35615353151818 1818 00 04%5333528%35 1818 3528%3500%03181818181800 0618 356 6 0 0 18 18 35 3513 0 35 7110%28% 56%000221825 100181840% N26 2500355200181% S26 101100 011 1102110%1% 16%13S 17th Avenue022660 011 11610 10680016% N11 1000163% 10%13%888 2300%028SN882% S11 102112200234043%3%4S 14th Avenue4222222000022 000%00043%000221241 111%2200 21 14013%0%11S 19th AvenueS 11th Avenue32%S 3rd AvenueGRAF STREETGRAF STREETGRAF SREETSTUCKY ROADSTUCKY ROADSTUCKY ROADSTUCKY ROADARNOLD STREETPeak PM = 63 63KAGY BOLEVARDKAGY BOLEVARDNumber Of Trips: Enter ExitAWT =912 912KAGY BOLEVARDSTUDENT DRSTUDENT DRARNOLD STREETARNOLD STREET