HomeMy WebLinkAbout016_StormwaterEngineersReportBlock4Engineering Report
Stormwater Design
South University District Phase 3 –
Block 4
Site Plan Submittal
Updated May 2023
Submitted to:
City of Bozeman Engineering Department
20 East Olive
Bozeman, MT 59715
Prepared by:
Stahly Engineering and Associates
851 Bridger Drive, Suite 1
Bozeman, MT 59715
(406) 522-9526
Stormwater Plan 1 5/12/2023
Engineering Report
Table of Contents
General Information and Design Criteria
Existing Site Conditions
Storm Drainage Plan Description
Estimation of Runoff
Sub Drainage Areas
Inlet Capacity
Retention Facilities
Outfall Structure Weir Sizing
Conveyance Capacity
Curb and Gutter
Facilities Maintenance
Figures and Tables
Figure 1. Vicinity Map
Figure 2. Stormwater Plan
Table 3. Curb and Gutter Conveyance Calculations
Table 4. UPDATED - Runoff & Capacity Calc’s for SUD PHASE 2 (attached)
Table 6. Runoff & Capacity Calc’s for SUD Block 4 – On-site (attached)
Table 7. Runoff & Capacity Calc’s for SUD Block 4 – Off-site (attached)
Appendix
South University District Phase 2 Stormwater Engineering Report (attached)
Stormwater Plan 2 5/12/2023
General Information and Design Criteria
The intent of this report is to provide an updated to the SUD Phase 2 Subdivision
infrastructure stormwater engineering report dated June 2017 and included as
attachment to this report. This report will demonstrate conformance to the
previously-designed, and partially-constructed stormwater infrastructure.
The proposed South University District (SUD) Phase 3 Block 4 Development is located
southwest of the intersection of South 11th Avenue and Student Drive. This
development will consist of 243 residential units with 655 bedrooms on an 11.89-acre
lot.
Six different building types consisting of 20 unique unit configurations within the
buildings is proposed with this development. The intent of this project is to create a
variety of building types to create a diverse neighborhood in a growing part of town
adjacent to the Montana State University Campus.
Stormwater mitigation is achieved by using a compact, efficient stormwater
management design utilizing Low Impact Design (LID) methodology to mitigate the
impacts of stormwater runoff. The LID stormwater mitigation has been designed in
accordance with City of Bozeman Design Standards and Specifications Policy for
retention/infiltration facilities. Survivability of LID systems through conventional
development is difficult. Erosion control Best Management Practices (BMP’s) will be
utilized during construction to reduce the impacts of construction site runoff, until the
LID systems are constructed.
Plans are provided showing proposed grading, drainage flow paths, and stormwater
retention/infiltration details and locations.
The developer’s contact information is:
Capstone Collegiate Communities
Davis Maxwell
431 Office Park Drive
Birmingham, AL 35223
Water supply and wastewater treatment will be provided by the City of Bozeman’s
municipal systems. The system owner’s contact information is:
City of Bozeman Public Service Department
PO Box 1230
Bozeman, MT 59771-1230
The location of the South University District Phase 3, Block 4 Development is shown on
the Vicinity Map in Figure 1.
Stormwater Plan 3 5/12/2023
Figure 1. Vicinity Map, Bozeman, Montana
Existing Site Conditions
SUD Phase 3 Block 4 is a block parcel created by the South University District Phase 3
Major Subdivision. The SUD Block 4 development site was previously used
agriculturally prior to its subdivision development. The existing ground slopes north at
grades between 1-3%. Existing offsite drainage is minimal, if present it would flow north
and west to the existing storm drainage system located along Student Drive. The
stormwater management facilities for the Block 4 Development were constructed during
the SUD Phase 2 infrastructure project and are located in City Park 1, northwest of the
Block 4 site.
A geotechnical evaluation was conducted and is provided in a separate appendix of this
submittal. This site is typical of Bozeman with fine-grained soils overlying sandy silty
clay to depths of approximately 7.5 to 11 feet at which point soils transition into native
gravel deposits. Geotechnical borings have determined the depth to gravel ranges from
7.5 to 11 feet below existing grade.
Groundwater monitoring was conducted in 2019 and 2022 during the high groundwater
season for the SUD Phase 3 subdivision development. Groundwater monitoring found
groundwater depths ranged from 7.0’ to 10.0’ below existing grade in the areas of the
site proposed for development. The site is not located within a 100-year floodplain.
Stormwater Plan 4 5/12/2023
Storm Drainage Plan Description
The storm drainage plan for the SUD Phase 3 Block 4 site development consists of
conveying stormwater runoff to an existing retention basin located in City Park 1
northwest of the intersection of Stucky Rd. and South 14th Ave. This pond has been
constructed as a part of the Phase 2 subdivisions “Common Subdivision Improvements
(CSIs)” and a 15” outfall flows to Mandeville Creek. The overall storm drainage plan for
Block 4 is depicted on attached Figure 2. This plan shows proposed drainage basin
areas, flow paths, and retention/infiltration system locations. In general, grades will be
sloped away from buildings towards interior drive aisles. The sub-drainage areas
typically drain north via curb and gutter that conveys runoff to inlets and storm drains
connected to the existing retention/infiltration system located within the park. The site
will be divided into 4 primary sub-drainage areas as shown on attached Figure 2 and
described below.
Sub Drainage Area Description
The 4 primary sub-drainage areas of the Block 4 development ultimately convey runoff
to an existing 30” storm pipe located within South 14th Ave at the northwest corner of
the site. Sub-drainage area 30D is located on the western half of the site and extends
along Arnold Street to the south and drains north to the existing 24” storm drain stub on
the south side of Student Drive. Sub-area 31D is located internal to the Block 4 site and
drains north to the existing 24” storm drain stub on the southeast intersection corner of
Student Drive and South 13th Avenue. Sub-area 32D is located internal to the Block 4
site and drains northerly to the existing 24” storm drain stub on the southeast
intersection corner of Student Drive and South 12th Avenue. Sub-area 33D is located on
the eastern edge of the site and drains overland easterly and then northerly to the
existing storm inlet at the intersection of South 11th Ave and Student Drive.
Estimation of Runoff
Runoff estimates were obtained for each sub-drainage area using City of Bozeman
standards. The off-site stormwater facilities have been sized to fully capture the 10-year,
2-hour storm event. The Bozeman IDF (Intensity, Duration, and Frequency) curves
show a rainfall intensity of 0.41 in/hour for the 10-year, 2-hour storm, totaling a 0.82-
inch storm event. The detailed on-site and off-site basin runoff calculations are
displayed in the Updated Table 4, Table 6, and Table 7 in the Appendix of this report.
Inlet Capacity
The curb inlets on the roadways in the development were analyzed to ensure they have
capacity to accept flows conveyed to them without reaching a point 0.15 feet from the
top of the curb. The COB-approved Neenah Foundry R-3067-L inlet structure has a
capacity of 5.98 cfs at 0.35 feet of head (0.15 below top of curb). This capacity will
convey the necessary flows.
Stormwater Plan 5 5/12/2023
Retention Facilities
The exiting retention basin located in City Park 1 was designed to account for the
stormwater runoff from SUD Block 4, as detailed in the updated Table 3 and Table 5 in
the “South University District Phase 2 Stormwater Engineering Report” attached in the
appendix of this report. The proposed Block 4 development conforms with the planned
drainage areas outlined in the SUD Phase 2 Stormwater Engineering Report and is
described within this report and the attached Figure 2.
Conveyance Pipe Capacity
Conveyance pipes were sized by adding the 25-year peak runoff rates of contributing
basins without routing or attenuation. The pipe size calculations are displayed in the
updated Table 4, Table 6, and Table 7 in the attached Appendix.
Curb and Gutter
Curb and gutter are used on the site to convey runoff into the underground storm pipe
network. To ensure the standard curb design will provide adequate conveyance
capacity for peak flows, curb and gutter with the greatest flows and least amount of
redundant or secondary storm conveyance options was identified and analyzed for
conveyance capacity. The critical curb required to convey the maximum flow was
identified as the approximately 503’ length of curb running from south to north along S.
14th Ave, serving a catchment area of approximately 34,568 sf. This catchment area
produces a peak flow of 1.82 cfs for the 25-year design storm. At the minimum slope of
0.5%, the curb on site has a conveyance capacity of 5.03 cfs.
Table 3 – Curb and Gutter Conveyance Calculations
Curb and Gutter Capacity Calcs
Max Curb Conveyance Req'd (ft^3/sec) 1.82
Right-side Slope X:1 0.06
Left-side Slope X:1 33.00
Channel Bottom Width (ft) 0
Flow Depth (ft) 0.350
Flow Area (ft^2) 2.025
Wetted Perimeter (ft) 11.906
Width 0.044
Hydraulic Radius (ft) 0.170
Manning's Roughness 0.013
Slope (ft/ft) 0.005
Average Velocity (ft/sec) 2.49
Flow (ft^3/sec) 5.03
Stormwater Plan 6 5/12/2023
Storm Water Maintenance Plan
The proposed storm drainage facilities will be privately operated and maintained by the
Property Owners Association (POA). The POA Covenants should include the following
stormwater maintenance provisions:
(a) General Information.
The South University District Phase 2 utilizes conventional stormwater collection
to mitigate storm water impacts. The stormwater facilities consist of curb and
gutter, curb inlets, sumped manholes, onsite and offsite conveyance piping,
underground retention chambers, and an existing offsite detention basin located
in the city park. The system is designed to accommodate all storm water from the
Property.
The storm water conveyance facilities located on the property are privately
owned and maintained. It is the property owner association's responsibility to
maintain the storm water facilities located on the property. The storm water
facilities are designed to operate without excessive maintenance. However, like
all infrastructure, periodic maintenance will prevent costly repair and
replacement. The maintenance plan set forth in this Section has been prepared
in accordance with City of Bozeman guidelines. Over time, recommended
maintenance guidelines may evolve. Please contact the City of Bozeman
Stormwater Division if any questions arise.
(b) Storm Water Facilities Maintenance Schedule.
(i) Site Housekeeping. Site housekeeping is to be conducted
continuously as needed. The main cause of storm water facility damage is
poor site housekeeping. Sediment tracked onto pavement can be washed
into storm water inlets/ conveyance piping and damage these facilities.
Trash can clog pipes and inlet structures causing property damage. Site
housekeeping consists of the following:
• Keep sidewalk and pavement areas clean.
• Pick up trash.
• Restore damaged landscaping in order to prevent sediment runoff.
(ii) System Monitoring: System monitoring is to be conducted quarterly,
except in winter. The storm water facilities shall be inspected quarterly to
quickly identify small issues before expensive damage can occur. In
addition to regular monitoring, the best time to inspect the performance of
storm water facilities is during runoff events. System monitoring consists
of the following:
• Observe system during runoff. Look for ponding outside of
stormwater inlets. This can indicate a clogged inlet or pipe.
Stormwater Plan 7 5/12/2023
• Inspect inlets, manholes and pipes.
(iii) Inlet, Manhole, and Piping Quarterly Maintenance: All stormwater
inlets and manholes have a sump to capture sediment. If this sediment is
not periodically removed it can wash downstream and clog infiltration
facilities. The sump is typically visible from the surface through the inlet
grate. Inlet, manhole, and piping maintenance consists of the following:
• Remove visible sediment from sump.
• Inspect pipe inlets and outlets for sediment in pipe and remove if
present.
(iv) Inlet, Manhole, and Piping Long-term Maintenance. This
maintenance is to be conducted long-term if and when necessary. If
regular housekeeping and maintenance is not performed adequately,
sediment and debris can accumulate in the stormwater conveyance
piping, and pipes may become clogged. Long-term inlet, manhole, and
piping maintenance consist of the following:
• Hiring a contractor to clean pipes and remove all sediment
encountered from manhole sumps, inlet sumps and/or piping.
(v) Retention Pond Long-term Maintenance. This maintenance is to be
conducted on an annual basis at a minimum. If regular housekeeping and
maintenance is not adequately performed, sediment and debris will
accumulate in the underground stormwater retention basins and could
negatively affect the stormwater percolation rate. Retention pond
maintenance consist of the following:
• Remove the underground chamber’s inspection port covers.
• Record the depth from the rim of the inspection port to the
chamber’s floor. If the measurement changes by 0.1’ between any
reading, or sediment accumulates to a depth of 0.1’ above the
bottom of the chamber,
• Hire a contractor to flush and clean out the stormwater storage
chambers.
UPDATED Table 4: Phase 2 Inlet Basin and Pipe Capacity Calculations
Inlet Drainage Basin 5.4.23
Inlet Basin 1 D 2 D 3 D 4 D 5 D 6 D 7 D 8 D 9 D 10 D 11 D 12 D 13 D 14 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24 D 25 D 26 D 27 D 28 D 29 D 30 D 31 D 32 D 33 D 2B 3B 4B
Land Use REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU
Drainage Area (acres) 0.63 0.43 1.28 0.49 0.47 1.36 0.48 0.43 0.96 0.40 0.43 1.21 0.82 0.94 0.44 1.24 0.42 0.37 0.43 0.46 1.11 1.04 0.40 0.53 1.87 1.55 0.41 0.44 5.77 2.08 4.96 1.46 0.33 0.46 0.32
Slope (%) 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 2.1 2.1 2.1
Runoff Coefficients 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
Frequency Adjustment Factor, Cf 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Basin Length (ft) 325 249 784 681 300 297 320 320 249 319 316 323 279 274 331 274 335 335 354 354 360 240 327 295 762 358 300 301 500 500 500 500 287 425 275
Time of Concentration (min) 12.2 10.7 18.9 17.7 11.7 11.7 12.1 12.1 10.7 12.1 12.0 12.2 11.3 11.2 12.3 11.2 12.4 12.4 12.7 12.7 12.8 10.5 12.2 11.6 18.7 12.8 11.7 11.7 15.1 15.1 15.1 15.1 10.9 13.2 10.7
Peak Flow Calculations
Design Storm 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr
Intensity at Tc (Figure I-2 pg. 29) (in/hr) 2.16 2.36 1.63 1.71 2.22 2.23 2.17 2.17 2.36 2.18 2.18 2.17 2.27 2.28 2.15 2.28 2.14 2.14 2.10 2.10 2.09 2.38 2.16 2.23 1.65 2.10 2.22 2.22 1.88 1.88 1.88 1.88 2.33 2.05 2.36
Peak Runoff Rate at Tc (Q = CIA) (cfs)0.82 0.61 1.25 0.50 0.63 1.82 0.63 0.56 1.36 0.52 0.56 1.57 1.12 1.29 0.57 1.70 0.54 0.47 0.54 0.58 1.39 1.49 0.52 0.71 1.85 1.95 0.55 0.59 6.52 2.35 5.61 1.65 0.47 0.56 0.45
Note: Due to site grading changes, Basin 15 D has been omitted
Detention Basin B - Pipe Network Capacity
Pipe Number 1 D 2 D 3 D 4 D 5 D 6 D 7 D 8 D 9 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24D 25D 26D
Pipe Size (in) 30.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 30.00 15.00 24.00 24.00 24.00 18.00 24.00 15.00 24.00 24.00 15.00 15.00 15.00 15.00 15.00
Manning's "n" (PVC) 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
Area (ft2)4.91 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 4.91 1.23 3.14 3.14 3.14 1.77 3.14 1.23 3.14 3.14 1.23 1.23 1.23 1.23 1.23
Wetted Perimeter (ft) 7.85 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 7.85 3.93 6.28 6.28 6.28 4.71 6.28 3.93 6.28 6.28 3.93 3.93 3.93 3.93 3.93
Hydraulic Radius (ft) 0.63 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.63 0.31 0.50 0.50 0.50 0.38 0.50 0.31 0.50 0.50 0.31 0.31 0.31 0.31 0.31
Slope (ft/ft) 0.0219 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0079 0.0050 0.0050 0.0050 0.0045 0.0050 0.0045 0.0050 0.0045 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050
Full Flow Capacity (cfs) 60.86 4.58 4.58 4.58 4.58 4.58 4.58 4.58 4.58 4.58 4.58 36.55 4.58 16.04 16.04 15.22 7.45 15.22 4.58 15.22 16.04 4.58 4.58 4.58 4.58 4.58
Velocity (ft/sec) 12.40 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 7.45 3.73 5.11 5.11 4.84 4.21 4.84 3.73 4.84 5.11 3.73 3.73 3.73 3.73 3.73
Contributing Inlet Basin 16D 4D NONE NONE 6D 14D NONE 21D 20D NONE 17D NONE 18D 19D 30D NONE 31D 25D 24D NONE 31D & 32D 29D 28D 6%30D NONE 33D
Contributing Pipes 12D NONE 4D 5D NONE NONE 6D 9D NONE 11D NONE 14D NONE 13D 24D 17D NONE 19D NONE 22D NONE 23D NONE NONE 26D NONE
7D 15D 16D 18D 20D 21D 25D
10D
Actual Pipe Flow (cfs)25.80 0.50 1.82 1.82 1.82 1.29 1.29 1.12 0.54 1.70 1.70 22.25 0.54 15.33 6.91 14.32 2.35 11.97 0.52 10.74 7.96 2.78 0.55 0.39 1.65 1.65
% Capacity 42% 11% 40% 40% 40% 28% 28% 25% 12% 37% 37% 61% 12% 96% 43% 94% 32% 79% 11% 71% 50% 61% 12% 9% 36% 36%
Table 6 - Block 4 ONSITE
Inlet Drainage Basin WEST - DB 30D CENTER - DRAINAGE BASIN 31D EAST - DRAINAGE BASIN 32D
Inlet Basin (SDI)40 41 42 17 43 46 47 48 50 51 21 52 53 55 56 58 59 60 61 62 63 64 65
Land Use REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU
Drainage Area (SF) 40408 42267 22319 10694 10272 2870 15038 14191 25386 11875 1461 20953 14743 38183 14331 13226 15222 4909 12183 17732 16328 10333 23115
Drainage Area (acres) 0.93 0.97 0.51 0.25 0.24 0.07 0.35 0.33 0.58 0.27 0.03 0.48 0.34 0.88 0.33 0.30 0.35 0.11 0.28 0.41 0.37 0.24 0.53
Runoff Coefficients 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
Time of Concentration (min) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Peak Flow Calculations
Design Storm 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr
Intensity at Tc (Figure I-2 pg. 29) (in/hr) 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83
Peak Runoff Rate at Tc (Q = CIA) (cfs)2.13 2.23 1.18 0.56 0.54 0.15 0.79 0.75 1.34 0.63 0.08 1.10 0.78 2.01 0.76 0.70 0.80 0.26 0.64 0.93 0.86 0.54 1.22
Pipe Network Capacity WEST - DB 30D CENTER - DRAINAGE BASIN 31D EAST - DRAINAGE BASIN 32D
Pipe Number 40D 41D 42D 17D 43D 44D 46D 47D 48D 49D 50D 51D 21D 21bD 52D 53D 54D 55D 56D 57D 58D 59D 60D 61D 62D 63D 64D 65D
Pipe Size (in) 18.00 15.00 15.00 24.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 24.00 21.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 18.00 18.00 15.00 15.00 15.00 15.00
Manning's "n" (PVC) 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
Area (ft2)1.77 1.23 1.23 3.14 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 3.14 2.41 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.77 1.77 1.23 1.23 1.23 1.23
Wetted Perimeter (ft) 4.71 3.93 3.93 6.28 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 6.28 5.50 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 4.71 4.71 3.93 3.93 3.93 3.93
Hydraulic Radius (ft) 0.38 0.31 0.31 0.50 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.50 0.44 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.38 0.38 0.31 0.31 0.31 0.31
Slope (ft/ft) 0.0150 0.0150 0.0150 0.0200 0.0050 0.0110 0.0110 0.0150 0.0100 0.0150 0.0100 0.0100 0.0100 0.0050 0.0050 0.0050 0.0200 0.0050 0.0180 0.0100 0.0080 0.0080 0.0100 0.0100 0.0070 0.0050 0.0050 0.0050
Full Flow Capacity (cfs) 12.90 7.93 7.93 32.08 4.58 6.79 6.79 7.93 6.48 7.93 6.48 6.48 22.68 11.23 4.58 4.58 9.16 4.58 8.69 6.48 5.79 5.79 10.53 10.53 5.42 4.58 4.58 4.58
Velocity (ft/sec) 7.30 6.46 6.46 10.21 3.73 5.54 5.54 6.46 5.28 6.46 5.28 5.28 7.22 4.67 3.73 3.73 7.46 3.73 7.08 5.28 4.72 4.72 5.96 5.96 4.42 3.73 3.73 3.73
Contributing Inlet Basin 40 41 42 17 43 NONE 46 47 48 NONE 50 51 21 NONE 52 53 NONE 55 56 NONE 58 59 60 61 62 63 64 65
Contributing Pipes 41D 42D NONE 43D NONE 46D 47D 48D NONE 50D NONE NONE 52D 60D NONE 55D NONE 57D 58D NONE NONE 61D 62D 63D 64D 65D NONE
44D 49D 51D 21bD 54D 56D 53D 59D
Actual Pipe Flow (cfs) 5.53 3.40 1.18 4.76 0.54 3.66 3.66 3.50 0.75 1.96 1.34 0.63 10.68 9.50 1.10 0.78 5.04 2.01 3.03 1.50 0.70 0.80 4.46 4.20 3.56 2.62 1.76 1.22
% Capacity 43% 43% 15% 15% 12% 54% 54% 44% 12% 25% 21% 10% 47% 85% 24% 17% 55% 44% 35% 23% 12% 14% 42% 40% 66% 57% 38% 27%
Table 7 - Block 4 OFFSITE
Inlet Drainage Basin
Inlet Basin (SDI)28 29 32 33 34 35 36 37 24 15
Land Use REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU
Drainage Area (SF) 16467 32398 11583 6720 15284 25878 11430 18928 1505 7301
Drainage Area (acres) 0.38 0.74 0.27 0.15 0.35 0.59 0.26 0.43 0.03 0.17
Runoff Coefficients 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
Time of Concentration (min) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Peak Flow Calculations
Design Storm 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr
Intensity at Tc (Figure I-2 pg. 29) (in/hr) 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83 3.83
Peak Runoff Rate at Tc (Q = CIA) (cfs)0.87 1.71 0.61 0.35 0.81 1.36 0.60 1.00 0.08 0.38
Pipe Network Capacity
Pipe Number 27D 28D 29D 30D 31D 32D 33D 34D 35D
Pipe Size (in) 24.00 15.00 15.00 18.00 15.00 15.00 15.00 15.00 15.00
Manning's "n" (PVC) 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
Area (ft2)3.14 1.23 1.23 1.77 1.23 1.23 1.23 1.23 1.23
Wetted Perimeter (ft) 6.28 3.93 3.93 4.71 3.93 3.93 3.93 3.93 3.93
Hydraulic Radius (ft) 0.50 0.31 0.31 0.38 0.31 0.31 0.31 0.31 0.31
Slope (ft/ft) 0.0100 0.0050 0.0100 0.0150 0.0187 0.0050 0.0050 0.0050 0.0050
Full Flow Capacity (cfs) 22.68 4.58 6.48 12.90 8.86 4.58 4.58 4.58 4.58
Velocity (ft/sec) 7.22 3.73 5.28 7.30 7.22 3.73 3.73 3.73 3.73
Contributing Inlet Basin NONE 28 29 NONE NONE 32 33 34, 36 35,37
Contributing Pipes 28D NONE NONE 31D 32D 33D 34D 35D NONE
29D 40D
30D
Actual Pipe Flow (cfs) 11.24 0.87 1.71 8.67 3.13 3.13 2.52 2.17 1.36
% Capacity 50% 19% 26% 67% 35% 68% 55% 47% 30%
Off-site Flow
SOUTH 11TH AVESOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVESTUCKY RD
SOUTH 14TH AVEARNOLD ST SOUTH 14TH AVESOUTH 13TH AVESOUTH 12TH AVEEXISTINGTRAILS (TYP)SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDLOT 2 "PHASE 1"6.41 ACRESPLAT J-518CITY PARK 14.41 ACRESPLAT J-605 LOT 1 "PHASE 1"9.82 ACRESPLAT J-518
LOT 1 "PHASE 2"
16.05 ACRES
PLAT J-605
CITY PARK 2
9.64 ACRES
PLAT J-605
LOT 1, BLOCK 4
"PHASE 3"
11.89 ACRES
PLAT J-695 SDBASIN
40
BASIN
41 BASIN
42 BASIN
48
BASIN
47
BASIN
50 BASIN
51
BASIN
58
BASIN
59
BASIN
55
BASIN
17
BASIN
43
BASIN
46
BASIN
53
BASIN
56
BASIN
52
BASIN
21 BASIN
60
BASIN
61
BASIN
63
BASIN
62 BASIN
65
BASIN
64
PIPE 27D
PIPE 28D
PIPE 29D
PIPE 30D
PIPE 31D
PIPE 32D PIPE 33D PIPE 34D PIPE 34D
PIPE 35D
PIPE 40D
PIPE 41D
PIPE 42D
PIPE 17D
PIPE 43D
PIPE 44D
PIPE 46D
PIPE 47DPIPE 48D
PIPE 49D
PIPE 51D
PIPE 50D
PIPE 21D
PIPE 52D
PIPE 21bDPIPE 55D
PIPE 54D
PIPE 60D
PIPE 61D
PIPE 56D
PIPE 57D
PIPE 58D
PIPE 59D
PIPE 62D
PIPE 63D
PIPE 64D
PIPE 65D
DRAINAGE
BASIN 30D
PHASE 3
4.98 ac 5.77 ac
DRAINAGE BASIN 31D
PHASE 3
4.55 ac 2.08ac DRAINAGE BASIN 32DPHASE 32.06 ac 4.96acDRAINAGE BASIN 33DPHASE 3 / 11TH AVE2.58 ac 1.46 acBASIN
24
BASIN
29
BASIN
15
BASIN
28
BASIN
33
BASIN
35
BASIN
34
BASIN
37
BASIN
36
EX PIPE 24D
EX PIPE 15D
ALLISON
SUBDIVISION, PH 4A
BLOCK 1, LOT 2
8.39 ACRES
ALLISON
SUBDIVISION, PH 4A
BLOCK 1, LOT 3A
14.42 ACRES ALLISONBASIN 19D
0.20 ac 0.37 acDETENTIONBASIN PHASES2 AND 3PHASE 1B PHASE 1BASIN 1D0.63 ac BASIN 2D0.43 ac BASIN 3D1.28 ac
BASIN 4D 0.49 acBASIN 5D0.47 acBASIN 6D1.36 ac BASIN 7D0.48 acBASIN 8D0.43 acBASIN 9D0.96 ac BASIN 10D0.40 acBASIN 11D0.43 acBASIN 12D1.21 ac BASIN 13D0.82 ac
BASIN 14D
0.94 ac
BASIN 16D0.44 acBASIN 17D
1.24 ac
BASIN 18D
0.42 ac BASIN 20D0.43 acBASIN 21D0.46 acBASIN 22D
1.11 ac BASIN 26D
1.87 ac
BASIN 27D
1.55 ac
BASIN 23D
1.04 ac
BASIN 24D
0.40 ac
BASIN 28D
0.41 ac
BASIN 2B 0.33 ac BASIN 3B 0.46 acBASIN 4B0.32 acDETENTIONBASIN PHASES2 AND 3PHASE 1B PHASE 1
BASIN 25D
0.20 ac 0.53ac
BASIN 29D
0.20 ac 0.44 ac
MAIL LOADINGZONE
PIPE 53D
BASIN
32 >>SDSDSDSDSD
SD SD SDHCHC
HC HC
HC HC
HC HC
HC HCHC
HCHCHCHCHCHCSDSDSDSDSDSDSDSDSDSDSDSD SD SD
SD SD
SDSDSD
SDSDSDSD SDSDSD SDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSD SD SDSDSDSD SD SD SD SD SD SD SDSDSDSD SDSDSDSDSDSDSDHCHC HCHCSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSDSDSDSDSDSDSD SD SD
SDSDSDSDSDSDSDSDSD SD SDSDSDSDSD SDSDSDSDSDSDSDSDSD SD SD SDSD
SD SD
SD
SD SD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD
SDSDSDSDSDSDSD
STORM WATER
Figure 2STORMDRAINAGEFIGURE1 3/23/2022 COB CONCEPT SUBMITTAL ZWL CDP
2 10/17/2022 COB SITE PLAN SUBMITTAL ZWL CDP PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESTHE FLATS AT
BOZEMAN
CAPSTONE COLLEGIATE
COMMUNITIES LLC
OFF-SITE STORM FACILITIES
PH. 3 STORM FACILITIES
PH. 3 SITE STORM FACILITIES
PH. 3 SUBD. STORM FACILITIES
Storm Water Plan
South University District Phase 2
June, 2017
Submitted to:
City of Bozeman Engineering Department
20 East Olive
Bozeman, MT 59715
Prepared by:
Stahly Engineering and Associates
851Bridger Drive, Suite 1
Bozeman, MT 59715
(406) 522-9526
Storm Water Plan 1 6/27/2017
Storm Water Plan
Contents
General Information
Existing Conditions and General Design Criteria
Storm Drainage Plan Description
Estimation of Runoff Pre-development Runoff – Phase 2 & 3 Post-development Runoff – Phase 2 & 3
Storage/Treatment Facilities
Outfall Structure Weir Sizing
Curb and Gutter Capacity Inlet Capacity Facilities Maintenance
Figures and Tables
Figure 1. Inlet Basin Exhibit Figure 2. Inlet Basin Exhibit
Table 1. Runoff Calculations – Phase 2 & 3
Table 2. Outfall Structure Sizing Table 3. Curb and Gutter Capacity Calculations Table 4. Phase 2 Inlet Basin and Pipe Capacity Calculations
Table 5. Phase 2 and 3 Detention Basin Calculations
Storm Water Plan 2 6/27/2017
General Information
The South University District (SUD) Phase 2 is a subsequent minor subdivision
of Lot 3, SUD Subdivision Phase 1. The subsequent division will provide right of
way dedications for South 14th Avenue, South 11th Avenue, and an additional street on the south side (currently un-named). This subdivision will create a 16.05-acre lot for subsequent site development.
Phase 2 is located within the City of Bozeman, south of Campus Boulevard and
between South 11th and South 14th Avenues. Phase 2 is located south of Phase 1 (completed) and Phase 1B (in progress). Site development on the Phase 2 lot is anticipated to be an 887-bed student housing project. SUD Phase 3 is a future
development planned south of Phase 2. SUD Phase 3 will utilize storm water
infrastructure installed in Phase 2 and its area is included in this analysis.
Storm drainage improvements for SUD Phase 2 utilize infrastructure in Campus Blvd. and the Phase 1 Park. The storm water detention basin serving Phase 2
and 3 was constructed with the Phase 1 Park improvements. A storm water
trunk line was installed in Campus Boulevard for Phase 2 and 3.
This report also includes a preliminary analysis of Phase 2 on-site storm water mains. The analysis of on-site mains will be re-evaluated and updated with the
final site design.
The developer’s contact information is: Capstone Collegiate Communities, LLC.
431 Office Park Drive
Birmingham, AL 35223
Existing Conditions and General Design Criteria
As stated previously the detention basin and trunk line in Campus Blvd. serving
Phase 2 and Phase 3 was constructed in Phase 1. The existing storm water
detention basin is located in the Phase 1 Park and outfalls to Mandeville Creek. The Phase 1 Park is located between Phase 2 and Mandeville creek to the west. The existing condition at the site is undeveloped agricultural land. The site
generally slopes to the north at 1-2%.
In accordance with the City of Bozeman Design Standards and Specifications Policy (COB Standards) an engineering analysis has been conducted for SUD
Phase 2 and 3 property to limit post-development runoff to pre-development
rates. Storm runoff originating on the site will be detained on-site and released at
rates less than the pre-development rates. Furthermore, the detention basin will
reduce storm water velocity and allow solids, silt, oils, grease, and other pollutants to settle from the runoff before the flows leave the site.
Storm Water Plan 3 6/27/2017
Inlets and storm sewers are sized to pass the 25-year event without overtopping
roadways. Should a larger event overtop the roadways grading will divert storm
water away from structures.
Storm Drainage Plan Description
The overall storm drainage plan for SUD Phase 2 is depicted on Figure 1 and 2
at the end of this report. Figure 1 shows the Phase 2 improvements, and Figure
2 shows the inclusion of Phase 3 areas. The storm drainage system builds on improvements completed in Phase 1 in the Park and Campus Blvd. Overall drainage direction on the proposed development is indicated by arrows showing
the proposed drainage patterns and inlet locations. The existing detention pond
previously constructed during Phase 1 will not need to be altered to
accommodate Phase 2 or 3. Phase 2 storm water mains will connect to the trunk line in Campus Blvd. A storm drain will be extended in South 14th Avenue and along the south boundary of Phase 2 to serve future development in Phase 3.
Estimation of Runoff
Runoff estimates are provided for Phase 2 (21.4 acres) and Phase 3 (14.2 acres), with Phase 3 located to the south of Phase 2. Phase 3 estimates are
included in this report because the storm water runoff from this offsite area will
pass through Phase 2 storm water infrastructure.
The rational method was used to estimate peak flow rates and volumes from storm runoff. Standard assumptions in using the rational method include that
rainfall is uniformly distributed over a watershed for the duration of a storm event,
the peak runoff rate occurs when the storm duration equals the time of
concentration, and the runoff coefficient for a watershed is constant for similar land use. Time of concentration was determined from the slope of the basin, rational runoff coefficient and flow length (COB Standards – Equation II.E.6).
Pre-development Runoff – Phase 2 and 3
A runoff coefficient of 0.20 for open land was selected for pre-development conditions. An average overland slope of 1.1% over a basin length of 1,200 feet
provides a time of concentration of 56.5 minutes. The Bozeman IDF curves
show a rainfall intensity for the 10-year design storm event of 0.67 in/hr.
Applying this over the 35.6 acre site produces a runoff flow rate of 4.74 cfs at the downstream end of the basin.
Post-development Runoff – Phase 2 and 3
Post-construction runoff was calculated using a runoff coefficient of 0.60 (commercial neighborhood) to account for future site development in accordance
Storm Water Plan 4 6/27/2017
with the master plan. The increased impervious area and proposed site grading reduces the time of concentration to 14.7 minutes. The Bozeman IDP curves
show a 10-year storm intensity of 1.59 in/hr. The rational method provides a 10-
year peak runoff rate of 34.07 cfs. The same analysis for a 25-year event
provides a peak runoff rate of 44.43 cfs.
Table 1: Runoff Calculations – Phase 2 and 3
Time of Concentration
Calculations Preconstruction Postconstruction
Storm Sewer
Flow
Land Use Open Land REMU REMU
Drainage Area (acres) 35.6 35.6 35.6
Slope (%) 1.1 1.8 1.8
Runoff Coefficients 0.2 0.6 0.6
Frequency Adjustment Factor, Cf 1 1 1.1
Basin Length (ft) 1200 367 367
Time of Concentration (min) 56.5 14.7 13.0
Peak Flow Calculations
Design Storm 10-Year 10-Year 25-Year
Intensity at Tc (Figure I-2 pg. 29) (in/hr) 0.67 1.59 2.08
Peak Runoff Rate at Tc (Q = CIA) (cfs) 4.74 34.07 44.43
In addition to the overall storm runoff calculations for Phase 2 and 3, the 25-year
storm runoff flow rate for each storm drainage inlet basin has been determined
based on the drainage plan shown on Figure 1. These calculations are provided in Table 4 at the end of this report.
Storage/Treatment Facilities
Simple pond routing using the modified rational method is provided for Phase 2 and Phase 3 in Table 5 at the end of the report. This spreadsheet shows a
required storage of 32,151 cubic feet of runoff for the 10-year event for Phase 2
and 3. The required storage is provided by a detention basin that was
constructed during Phase 1. The detention basin constructed in Phase 1 has a
bottom area of 23,105 square feet and 4:1 side slopes. The bottom elevation is 4931.5 and the surface overflow to the west is provided at an elevation of 4933.0.
This 1.5’ maximum depth provides a total volume of approximately 36,500 cubic
feet. The detention basin is located at the northwest (down-gradient) end of the
site and is vegetated with grass.
Storm Water Plan 5 6/27/2017
Outfall Structure Weir Sizing
The detention basin outflow for both Phase 2 and 3 developments is restricted by
a typical control structure as depicted in COB Standards Figure A-2. Using the
weir calculation equation given in Section II.D.2 of the COB Standards, the slot width of the outlet structure was determined (See Table 2). The combined slot width for Phase 2 and 3 discharge structure is 9 inches. This slot width limits the
discharge from the structure to pre-developed rates at the maximum depth of 1.5
feet. Since this detention pond was constructed during Phase 1, this outfall
structure has already been constructed and meets the requirements of Phase 2 and 3.
Table 2 Outfall Structure Weir Sizing
Phase 2-3
Pre-developed Runoff (cfs) 4.47
Weir Coefficient "C" 3.33
Head (ft) 1.5
Slot Width (in) 9
In the occurrence of an event greater than the 10-year event the ponds are sized
for, the overflow of the ponds directs flow to the west to Mandeville Creek. Curb and Gutter Capacity
Storm runoff will be collected in street and parking lot curb and gutters. The
hydraulic capacity of the curb and gutter was analyzed to determine if the curb would be overtopped in a 25-year event. The maximum 25-year event for any of the curb inlet basins produces approximately 1.95 cfs of runoff. The capacity of
the curb at the lowest designed slope of 0.6% is 5.51 cfs at a depth of .15 feet
below the top of the curb. Therefore, curb capacities in the development are
adequate to carry the 25-year event.
Table 3 Curb and Gutter Capacity Calcs
Right-side slope X:1 0.05
Left-side slope X:1 33.00
Channel bottom width (ft) 0
Flow Depth (ft) 0.350
Flow Area (ft^2) 2.024
Wetted Perimeter (ft) 11.906
Width 0.035
Hydraulic Radius (ft) 0.170
Manning's Roughness 0.013
Slope (ft/ft) 0.006
Average Velocity (ft/sec) 2.72
Flow (ft^3/sec) 5.51
Storm Water Plan 6 6/27/2017
Inlet Capacity
The curb inlets on the roadways in the development were analyzed to ensure
they have capacity to accept flows conveyed to them without reaching a point 0.15 feet from the top of the curb. The COB approved Neenah Foundry R-3067-L inlet structure has a capacity of 5.98 cfs at 0.35 feet of head (0.15 below top of
curb). This capacity will convey the necessary flows.
Facilities Maintenance The proposed storm drainage facilities will be operated and maintained by the
property owner. The owner is responsible for quarterly maintenance of all storm
water facilities. The maintenance includes, but is not limited to, visual inspection
and removal of sediment from curbs, inlets, detention basins, and outlet structures as well as any necessary repairs to the facilities.
Table 5
Phase 2 and Phase 3 Detention Basin Calculations
Time of Concentration Calculations Preconstruction Postconstruction Storm Sewer Flow
Land Use Open Land REMU REMU
Drainage Area (acres)35.6 35.6 35.6Slope (%)1.1 1.8 1.8
Runoff Coefficients 0.2 0.6 0.6Frequency Adjustment Factor, Cf 1 1 1.1
Basin Length (ft)1200 367 367 Basin length based on typical inlet areaTime of Concentration (min)56.5 14.7 13.0
Peak Flow Calculations
Design Storm 10-Year 10-Year 25-YearIntensity at Tc (Figure I-2 pg. 29) (in/hr)0.67 1.59 2.08
Peak Runoff Rate at Tc (Q = CIA) (cfs)4.74 34.07 44.43
(max release rate)
Required Storage Volume MAX VOL.
32151.02
Storm Duration Intensity Future Runoff Rate Runoff Volume Release Volume Required Storage(minutes)(in/hr)(Q = CIA) (cfs)(cf)(cf)(cf)
2 5.84 124.71 14965.50 568.75 14396.7543.72 79.48 19074.44 1137.49 17936.94
6 2.86 61.06 21982.84 1706.24 20276.5982.37 50.65 24311.53 2274.99 22036.54
10 2.05 43.81 26286.38 2843.74 23442.64121.82 38.91 28018.46 3412.48 24605.97
14 1.65 35.20 29571.65 3981.23 25590.42161.51 32.28 30986.52 4549.98 26436.54
18 1.40 29.90 32290.60 5118.73 27171.88201.31 27.92 33503.59 5687.47 27816.11241.16 24.80 35711.22 6824.97 28886.25
26 1.10 23.54 36725.82 7393.72 29332.10281.05 22.44 37690.86 7962.46 29728.40
30 1.00 21.45 38612.08 8531.21 30080.87320.96 20.57 39494.20 9099.96 30394.24
34 0.93 19.78 40341.16 9668.70 30672.46360.89 19.05 41156.33 10237.45 30918.88380.86 18.40 41942.57 10806.20 31136.37
40 0.83 17.79 42702.35 11374.95 31327.40420.81 17.24 43437.82 11943.69 31494.13
44 0.78 16.72 44150.87 12512.44 31638.42460.76 16.25 44843.14 13081.19 31761.95
48 0.74 15.80 45516.12 13649.94 31866.18500.72 15.39 46171.11 14218.68 31952.42
52 0.70 15.00 46809.28 14787.43 32021.85540.69 14.64 47431.69 15356.18 32075.51560.67 14.30 48039.29 15924.92 32114.37
58 0.65 13.97 48632.95 16493.67 32139.27600.64 13.67 49213.44 17062.42 32151.02 Required Storage
62 0.63 13.38 49781.49 17631.17 32150.32640.61 13.11 50337.75 18199.91 32137.83
66 0.60 12.85 50882.82 18768.66 32114.16680.59 12.60 51417.26 19337.41 32079.85
70 0.58 12.37 51941.57 19906.16 32035.42720.57 12.14 52456.24 20474.90 31981.34740.56 11.93 52961.70 21043.65 31918.05
76 0.55 11.72 53458.35 21612.40 31845.95780.54 11.53 53946.58 22181.15 31765.43
80 0.53 11.34 54426.73 22749.89 31676.84820.52 11.16 54899.15 23318.64 31580.51
84 0.51 10.98 55364.14 23887.39 31476.75860.51 10.82 55821.98 24456.13 31365.85880.50 10.66 56272.95 25024.88 31248.07
90 0.49 10.50 56717.32 25593.63 31123.69
92 0.48 10.35 57155.30 26162.38 30992.93
94 0.48 10.21 57587.14 26731.12 30856.02960.47 10.07 58013.05 27299.87 30713.18
98 0.47 9.94 58433.23 27868.62 30564.611000.46 9.81 58847.88 28437.37 30410.511020.45 9.68 59257.16 29006.11 30251.05
104 0.45 9.56 59661.26 29574.86 30086.401060.44 9.44 60060.35 30143.61 29916.74
108 0.44 9.33 60454.56 30712.36 29742.211100.43 9.22 60844.07 31281.10 29562.96
112 0.43 9.11 61228.99 31849.85 29379.141140.42 9.01 61609.47 32418.60 29190.87
116 0.42 8.91 61985.64 32987.34 28998.291180.41 8.81 62357.61 33556.09 28801.521200.41 8.71 62725.51 34124.84 28600.67
Notes
Table 4: Phase 2 Inlet Basin and Pipe Capacity CalculationsInlet Drainage BasinInlet Basin 1 D 2 D 3 D 4 D 5 D 6 D 7 D 8 D 9 D 10 D 11 D 12 D 13 D 14 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24 D 25 D 26 D 27 D 28 D 29 D 30 D 31 D 32 D33 D2B 3B 4BLand UseREMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMU REMUREMUREMU REMU REMUDrainage Area (acres)0.63 0.43 1.28 0.49 0.47 1.36 0.48 0.43 0.96 0.40 0.43 1.21 0.82 0.94 0.44 1.24 0.42 0.20 0.43 0.46 1.11 1.04 0.40 0.20 1.87 1.55 0.41 0.20 4.98 4.552.06 2.580.33 0.46 0.32Slope (%)1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.801.802.1 2.1 2.1Runoff Coefficients0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.60.60.6 0.6 0.6Frequency Adjustment Factor, Cf1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.11.11.1 1.1 1.1Basin Length (ft)325 249 784 681 300 297 320 320 249 319 316 323 279 274 331 274 335 335 354 354 360 240 327 295 762 358 300 301 375 375 375375287 425 275Time of Concentration (min)12.2 10.7 18.9 17.7 11.7 11.7 12.1 12.1 10.7 12.1 12.0 12.2 11.3 11.2 12.3 11.2 12.4 12.4 12.7 12.7 12.8 10.5 12.2 11.6 18.7 12.8 11.7 11.7 13.1 13.1 13.113.110.9 13.2 10.7Peak Flow CalculationsDesign Storm 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr25yr25yr 25yr 25yrIntensity at Tc (Figure I-2 pg. 29) (in/hr) 2.16 2.36 1.63 1.71 2.22 2.23 2.17 2.17 2.36 2.18 2.18 2.17 2.27 2.28 2.15 2.28 2.14 2.14 2.10 2.10 2.09 2.38 2.16 2.23 1.65 2.10 2.22 2.22 2.07 2.07 2.072.072.33 2.05 2.36Peak Runoff Rate at Tc (Q = CIA) (cfs)0.82 0.61 1.25 0.50 0.63 1.82 0.63 0.56 1.36 0.52 0.56 1.57 1.12 1.29 0.57 1.70 0.54 0.26 0.54 0.58 1.39 1.49 0.52 0.27 1.85 1.95 0.55 0.27 6.17 5.64 2.553.200.47 0.56 0.45Note: Due to site grading changes, Basin 15 D has been omittedDetention Basin B - Pipe Network CapacityPipe Number1 D 2 D 3 D 4 D 5 D 6 D 7 D 8 D 9 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24D25D 26DPipe Size (in)30.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 30.00 15.00 24.00 24.00 24.00 18.00 24.00 15.00 24.00 24.00 15.00 15.00 15.0015.00 15.00Manning's "n" (PVC)0.013 0.013 0.013 0.013 0.013 0.013 0.0130.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.0130.013 0.013Area (ft2)4.91 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 4.91 1.23 3.14 3.14 3.14 1.77 3.14 1.23 3.14 3.14 1.23 1.23 1.231.23 1.23Wetted Perimeter (ft)7.85 3.93 3.93 3.93 3.93 3.93 3.93 3.933.93 3.93 3.93 7.85 3.93 6.28 6.28 6.28 4.71 6.28 3.93 6.28 6.28 3.93 3.93 3.933.93 3.93Hydraulic Radius (ft)0.63 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.63 0.31 0.50 0.50 0.50 0.38 0.50 0.31 0.50 0.50 0.31 0.31 0.310.31 0.31Slope (ft/ft)0.0219 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0079 0.0050 0.0050 0.0050 0.0045 0.0050 0.0045 0.0050 0.0045 0.0050 0.0050 0.0050 0.00500.0050 0.0050Full Flow Capacity (cfs)60.86 4.58 4.58 4.58 4.58 4.58 4.58 4.58 4.58 4.58 4.58 36.55 4.58 16.04 16.04 15.22 7.45 15.22 4.58 15.22 16.04 4.58 4.58 4.584.58 4.58Velocity (ft/sec)12.40 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 3.73 7.45 3.73 5.11 5.11 4.84 4.21 4.84 3.73 4.84 5.11 3.73 3.73 3.733.73 3.73Contributing Inlet Basin16D 4D NONE NONE 6D 14D NONE 21D 20D NONE 17D NONE 18D 19D94%30DNONE 31D 25D 24D NONE 31D and 32D 29D 28D6%30DNONE 33DContributing Pipes12D NONE 4D 5D NONE NONE 6D 9D NONE 11D NONE 14D NONE 13D 24D 17D NONE 19D NONE 22D NONE 23D NONE NONE26D NONE7D15D16D18D20D21D25D10DActual Pipe Flow (cfs)23.51 0.50 1.82 1.82 1.82 1.29 1.29 1.12 0.54 1.70 1.70 19.96 0.54 13.79 6.17 12.99 0.00 12.99 0.52 12.20 8.19 4.01 0.55 0.373.20 3.20% Capacity39% 11% 40% 40% 40% 28% 28% 25% 12% 37% 37% 55% 12% 86% 38% 85% 0% 85% 11% 80% 51% 88% 12% 8%70% 70%Detention Basin B - Pipe Network CapacityPipe Number1 B 2 B 3 B 10 B 11 B 12 B 13 B 1E 4 B 5 B 6 B 7 B 8 B 9 B 1F 2F 3F 4F 5F 6F 7F 8F 9F 10F 11F 12FPipe Size (in)36.00 36.00 30.00 12.00 12.00 30.00 24.00 15.00 30.00 12.00 30.00 24.00 15.00 12.00 24.00 15.00 24.00 15.00 15.00 15.00 18.00 15.00 15.00 15.00 15.00 15.00Manning's "n" (PVC)0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013Area (ft2)7.07 7.07 4.91 0.79 0.79 4.91 3.14 1.23 4.91 0.79 4.91 3.14 1.23 0.79 3.14 1.23 3.14 1.23 1.23 1.23 1.77 1.23 1.23 1.23 1.23 1.23Wetted Perimeter (ft)9.42 9.42 7.85 3.14 3.14 7.85 6.28 3.93 7.85 3.14 7.85 6.28 3.93 3.14 6.28 3.93 6.28 3.93 3.93 3.93 4.71 3.93 3.93 3.93 3.93 3.93Hydraulic Radius (ft)0.75 0.75 0.63 0.25 0.25 0.63 0.50 0.31 0.63 0.25 0.63 0.50 0.31 0.25 0.50 0.31 0.50 0.31 0.31 0.31 0.38 0.31 0.31 0.31 0.31 0.31Slope (ft/ft)0.0060 0.0060 0.0045 0.0100 0.0100 0.0230 0.0100 0.0050 0.0045 0.0050 0.0045 0.0100 0.0045 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050 0.0050Full Flow Capacity (cfs)51.80 51.80 27.59 3.57 3.57 62.37 22.68 4.58 27.59 2.53 27.59 22.68 4.35 2.53 16.04 4.58 16.04 4.58 4.58 4.58 7.45 4.58 4.58 4.58 4.58 4.58Velocity (ft/sec)7.33 7.33 5.62 4.55 4.55 12.71 7.22 3.73 5.62 3.22 5.62 7.22 3.54 3.22 5.11 3.73 5.11 3.73 3.73 3.73 4.21 3.73 3.73 3.73 3.73 3.73Contributing Inlet BasinNONE NONE NONE 4B 1D 5D 8D 7D 2D 2B NONE NONE 3D 3B 11D 10D NONE 9D 12D 13D 26D 22D NONE 23D NONE 27DContributing Pipes2B 3B 13B NONE NONE 2D 1E NONE 5B NONE 7B 1F 9B NONE 3F NONE 4F NONE 6F NONE 8F NONE 10F NONE 12F NONE10B 4B3D 8D6B8B2F5F9F11F11B1D7F12BActual Pipe Flow (cfs)44.74 44.74 17.01 0.45 0.82 26.46 2.31 0.63 14.70 0.47 13.63 11.81 1.82 0.56 11.81 0.52 10.73 1.36 2.69 1.12 6.68 1.39 3.44 1.49 1.95 1.95% Capacity86% 86% 62% 13% 23% 42% 10% 14% 53% 18% 49% 52% 42% 22% 74% 11% 67% 30% 59% 24% 90% 30% 75% 32% 43% 43%