HomeMy WebLinkAbout122-A200-MF Building 1-ELEVATIONSTOP OF SLAB
0' -0"
2ND LEVEL
10' -6 3/4"
3RD LEVEL
21' -1 1/2"
TOP OF PLATE
40' -8 1/4"
4TH LEVEL
31' -8 1/4"
CORRUGATED METAL SIDING
METAL ROOF
PREFINISHED METAL GUTTER
AND DOWNSPOUT SYSTEM
PREFINISHED METAL FASCIA
PREFINISHED WINDOW WITH
INSULATED LOW-E GLAZING
PREFABRICATED METAL BALCONY
PREFINISHED ALUMINUM CANOPY
WITH BRACKETS BY CANOPY SUPPLIER
PREFINISHED WINDOW WITH
INSULATED LOW-E GLAZING
PAINTED FIBER CEMENT PANEL
SIDING
PAINTED FIBER CEMENT TRIM
PREFINISHED ENTRY DOOR WITH
INSULATED LOW-E GLAZING
CORRUGATED METAL SIDING
METAL ROOF
PREFINISHED METAL GUTTER
AND DOWNSPOUT SYSTEM
PREFINISHED METAL FASCIA
PAINTED FIBER CEMENT BOARD
AND BATTEN SIDING
PREFINISHED ALUMINUM CANOPY
PREFABRICATED METAL BALCONY
WITH TENSION ROD
PAINTED FIBER CEMENT
VERTICAL SIDING
PREFINISHED METAL COPING
TOP OF SLAB
0' -0"
2ND LEVEL
10' -6 3/4"
3RD LEVEL
21' -1 1/2"
TOP OF PLATE
40' -8 1/4"
4TH LEVEL
31' -8 1/4"
CORRUGATED METAL SIDING
METAL ROOF
PREFINISHED METAL GUTTER
AND DOWNSPOUT SYSTEM
PREFINISHED METAL FASCIA
PREFINISHED WINDOW WITH
INSULATED LOW-E GLAZING
PREFABRICATED METAL BALCONY
PREFINISHED ALUMINUM CANOPY WITH
BRACKETS BY CANOPY SUPPLIER
PREFINISHED WINDOW WITH
INSULATED LOW-E GLAZING
PAINTED FIBER CEMENT TRIM
CORRUGATED METAL SIDING
METAL ROOF
PREFINISHED METAL GUTTER
AND DOWNSPOUT SYSTEM
PREFINISHED METAL FASCIA
PAINTED FIBER CEMENT BOARD
AND BATTEN SIDING
PREFABRICATED METAL BALCONY
WITH TENSION ROD
METAL GARAGE DOOR PREFINISHED ENTRY DOOR WITH
INSULATED LOW-E GLAZING
PREFINISHED ALUMINUM CANOPY
ROOF EQUIPMENT SCREEN.
SEE ROOF PLAN.
PREFINISHED ALUMINUM CANOPY
TOP OF SLAB
0' -0"
2ND LEVEL
10' -6 3/4"
3RD LEVEL
21' -1 1/2"
TOP OF PLATE
40' -8 1/4"
4TH LEVEL
31' -8 1/4"
PREFABRICATED METAL BALCONY
WITH TENSION ROD
PAINTED FIBER CEMENT BOARD
AND BATTEN SIDING
METAL ROOF
PREFINISHED METAL GUTTER
AND DOWNSPOUT SYSTEM
PREFINISHED METAL FASCIA
PREFINISHED WINDOW WITH
INSULATED LOW-E GLAZING
CORRUGATED METAL SIDING
METAL ROOF
PAINTED FIBER CEMENT TRIM
PREFINISHED ENTRY DOOR WITH
INSULATED LOW-E GLAZING
PREFINISHED ALUMINUM CANOPY WITH
BRACKETS BY CANOPY SUPPLIER
TOP OF SLAB
0' -0"
2ND LEVEL
10' -6 3/4"
3RD LEVEL
21' -1 1/2"
TOP OF PLATE
40' -8 1/4"
4TH LEVEL
31' -8 1/4"
PAINTED FIBER CEMENT BOARD
AND BATTEN SIDING
METAL ROOF
PREFINISHED METAL GUTTER
AND DOWNSPOUT SYSTEM
PREFINISHED METAL FASCIA
PREFINISHED WINDOW WITH
INSULATED LOW-E GLAZING
CORRUGATED METAL SIDING
METAL ROOF
PAINTED FIBER CEMENT TRIM
PREFINISHED ENTRY DOOR WITH
INSULATED LOW-E GLAZING
PREFABRICATED METAL BALCONY
WITH TENSION ROD
PREFINISHED ALUMINUM CANOPY
WITH BRACKETS BY CANOPY SUPPLIER
DISTRIBUTION LOG NEQUETTE PROJECT NUMBER:THIS DRAWING IS THE PROPERTY OF NEQUETTE ARCHITECTS, INC. NO PERMISSIONS ARE GRANTED TO REUSE, REPRODUCE, OR ALTER, UNLESS GRANTED IN WRITING FOR A SPECIFIC PURPOSE BY NEQ.BOZEMAN, MONTANA01-A200FLATS AT BOZEMAN21120MULTIFAMILY 1
3/32" = 1'-0"01-A200
1 NORTH ELEVATION
3/32" = 1'-0"01-A200
2 SOUTH ELEVATION
3/32" = 1'-0"01-A200
3 EAST ELEVATION
3/32" = 1'-0"01-A200
4 WEST ELEVATION
AREA OF TOTAL FACADE: 11553 sf
AREA OF TRANSPARENCY: 1908 sf
PERCENTAGE OF TRANSPARENCY: 17%
MINIMUM HEIGHT FROM GRADE: 1'-6"
MAXIMUM HEIGHT FROM GRADE: 39'-2"
TRANSPARENCY:
AREA OF TOTAL FACADE: 2856 sf
AREA OF TRANSPARENCY: 380 sf
PERCENTAGE OF TRANSPARENCY: 13% **
MINIMUM HEIGHT FROM GRADE: 0'-8"
MAXIMUM HEIGHT FROM GRADE: 39'-0"
TRANSPARENCY:
445 sf 15%
AREA OF TOTAL FACADE: 2856 sf
AREA OF TRANSPARENCY: 380 sf
PERCENTAGE OF TRANSPARENCY: 13% **
MINIMUM HEIGHT FROM GRADE: 0'-8"
MAXIMUM HEIGHT FROM GRADE: 39'-0"
TRANSPARENCY:
445 sf 15%