Loading...
HomeMy WebLinkAbout007 - A1-1 - LANDSCAPE PLANSAVIN JUNIPER (JUNIPERUS SABINA )2 GAL. POT18"3' FT.KARL FOERSTER FEATHER REED GRASS (CALAMAGROSTIS ACUTIFLORA 'KARL FOERSTER'(ROSA RUGOSA 'HANSA' )2 GAL. POT3'-5' FT.HONEYLOCUST -LARGE CANOPY(GLEDITSIA TRIACANTHOS VAR. INERMIS) LANDSCAPING LEGENDCOMMON NAME(SCIENTIFIC NAME)SYMBOLPLANTING SIZEMATURE HGT.#1.5-2" CALIPER50 FT.FLOWERING CRABAPPLE -ORNAMENTAL TREE(MALEUS FLORIBUNDA 'SNOWWHITE' FRUITLESS)1" CALIPER2 GAL POT20' FT.DROUGHT TOLERANTYESNO YES YES YES 42/46 TOTAL=(91%) DROUGHT TOLERATE ACCORDING TO COB 2022428434TOTAL 46LANDSCAPE ROCK 2"SOD5' CONCRETE SIDEWALK3'X 3' CONCRETE PAVERSSWEDISH ASPEN (8' W X 40' H)(POPULUS TREMULA 'ERECTA')1.5" CALIPER8' TALL BARERROOT40' FT.2NO 1. IRRIGATION PROVIDED WITH AUTOMATIC DRIP SYSTEM @ PLANTINGS2. TREES NOT PLANTED IN SHRUB OR PLANTING BEDS SHALL HAVE A 18" DIAMETER ORGANIC MULCH RINGS AROUND BASE AND REQUIRE MINIMUM 1 GALLON OF WATER/WEEK3. NO SOD USED4. NO TREE SHALL BE PLANTED WITHIN 10' OF WATER OR SEWER LINES.5. STANDARD TREE PROTECTION MEASURES, INCLUDING 4' HIGH ORANGE BARRIER FENCING INSTALLED AT TREE'S DRIP LINE.6. ALL SHRUB PLANTING WILL BE ROCKED WITH 2-4" OF 2" LANDSCAPE ROCK INSTALLED OVER WEED FABRIC7. TREES TO BE DRIP IRRIGATED AT 5 GAL. PER TREE 3 TIMES/WEEK. TOTAL WEEKLY WATER REQUIREMENT IS 90 GAL/WEEK8. ALL SHRUBS TO BE DRIP IRRIGATED WITH 2 GAL. PER SHRUB 3 TIMES/WEEK. TOTAL WEEKLY WATER REQUIREMENT IS 234 GAL/WEEKGALLONS PER WEEK9. ALL LANDSCAPE BEDS ARE TO BE EDGED WITH STEEL LANDSCAPE EDGING UNLESS BORDERED BY HARDSCAPE (CONCRETE, ASPHALT).10. ALL PLANTINGS NEXT TO BUILDING SHALL SLOPE AWAY FROM BLDG MIN 2%11. WATER SOURCE IS BUILDING (NO INDEPENDENT WELL)12. IRRIGATION CONTROLLER TO HAVE RAIN DETECTION MONITOR.LANDSCAPING NOTES:OPEN SPACE LANDSCAPING :CALC:874/5907.4=0.148390/5907.4=0.0660.066+0.148X100=15.4%LOT 03LOT AREA:15493.5 SQ FTOPEN SPACE AREA:901 SQ FT38.520.060.D.1.b-PAVED WALKING SURFACES OR UNIT PAVING1.e-24" SEATING, 16" DP, PER 60 SF1.f-LANDSCAPING FOR VISUAL INTERESTMECH SCREENING LANDSCAPING :C.2-SIDES AND REAR OF SERVICE ENCLOSURES MUST BE SCREENED WITH LANDSCAPING AT LEAST 5' WD IN LOCATIONS VISIBLE FROM STREET, PARKING LOTS, AND PATHWAYS900/60=15 X 24"=360"/12=30' LF /5' LF=6 BENCHESLOT 03 BLK 16NGALLOWAY ST (90' ROW)PROPERTY LINE 163' 0"N00 DEG 18' 03"WCABALLO AVE (90' ROW)(E) PARKING LOTPROPERTY LINE 163' 0"N00 DEG 18' 03"WPROPERTY LINE 94.50'N89DEG 41' 57"EPROPERTY LINE 94.50'N89DEG 41' 57"E(E) PARKING SPACES(E) 4" WATER(E) 4" SEWERALLEY (30' ROW)RESIDENTIAL 6 (N) PARKINGFSD LINERESIDENTIAL MAIL BOXES IN LOBBY TYPBUILDING 02BUILDING 011' - 0"15' - 0"15' - 0"1' - 0"(E) PARKING SPACES5' REAR SETBACK9"CONTROL CORNERFTG WITHIN PROPERTY LINE26' - 1 5/16"(N) 4" SEWER SERVICE(N) 1.5" WATER SERVICESEE CIVIL DWGS FOR INFO ON SERVICES EXISTING AND NEW. TYP(E) PARKING SPACES(E) PARKING SPACESCL54' - 0"5' - 0"76CL5' - 0"7' - 0"5' - 0"0"6CONCRETE PAVERS TYP @ OPEN SPACE5' - 0"27' - 0"1' - 2"ELEC/DATA/GASELEC/DATAELEC/DATAGASG A SSNOW STORAGESNOW STORAGESNOW STORAGESNOW STORAGECL15' - 0"12' - 6"CL12' - 0"4' - 0"MAINTAIN 48" CLEARANCE IN FRONT OF ALL METERS TYP4 FEET4 FEETTERRA FIRMA CAST IRON TREE GRATE-TF8-2011DRAWN BY:PROJECT #:REVDESCDATEPHASEPRE SDDDCDDATE1234A1-106.22.23LANDSCAPE PLANBAXTER LOT 33720 GALLOWAY STBOZEMAN, MT 59718SITE PLAN---Author--------1/8" = 1'-0"A1-11LANDSCAPE PLAN1/2" = 1'-0"A1-12TREE GRATE