HomeMy WebLinkAbout22_May Fly Townhomes_Traffic Impact Letter 2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781 Professional Consulting Engineers and Land Surveyors Equal Opportunity Employer | www.hyaliteeng.com July 25, 2022 City of Bozeman Engineering Alfred M. Stiff Professional Building PO Box 1230 Attn: Karl Johnson RE: May Fly Townhomes Traffic Impact Letter Bozeman, Gallatin County, Montana Dear Karl: The purpose of this letter is to present an analysis of one of the access points into the May Fly Townhomes development off of Laurel Parkway. The intersection is located approximately 110 feet south of the intersection of Laurel Parkway and May Fly Street. City of Bozeman standards require that this access be 150 feet away from this intersection; however, the analysis provided with this letter we will show that the intersection will function safely as it is currently designed. As a part of a larger study (Urban + Farm Major Subdivision), traffic data was collected to analyze the traffic system as a whole in the surrounding area. The intersection of Laurel Parkway and the access road into the May Fly Townhomes will be internal to the Urban + Farm Commercial Subdivision and this letter will present only the data necessary to show the serviceability of this intersection. A trip generation estimate was performed for this development and is enclosed in Appendix A. The trip generation analysis was performed using generation rates found in the Trip Generation; 10th Edition published by the Institute of Transportation Engineers (ITE) for estimating average vehicle trip ends based on Land Use Code 220 – Multifamily Housing (Low-Rise). The May Fly Townhomes development is projected to generated 454 average weekday trips as well as 29 weekday AM and 35 weekday PM peak hour trips. Enclosed with this traffic letter in Appendix B is a set of figures to display the traffic data and results of the analysis performed at the intersection of Laurel Parkway and the access road to the development. Below is a list of the figures enclosed: Figure 1: Site Location Figure 2: Subdivision Layout Figure 3: Existing Transportation System Figure 4: Trip Distribution Figure 5: Traffic Assignment Figure 6: Estimated 2024 Background Traffic Figure 7: Estimated 2024 Total Traffic Figure 8: Traffic Operations Summary for 2024 Total Traffic The capacity and level of service analyses for the May Fly Townhomes are provided in Appendix C. The level of service for the intersection was analyzed at the volumes anticipated at the development horizon of 2024. Below is a table displaying the results of the performed analyses: Traffic Operations Summary for 2024 Total Traffic Intersection Time Period Movement LOS Laurel Parkway & Access Road AM WB A Laurel Parkway & Access Road PM WB A The intersection of Laurel Parkway and the access road will be designed as a right-in-right out only with stop-control for westbound traffic. The raised median on Laurel Parkway will remain to restrict left turn movements for both southbound and westbound traffic. The volume of traffic at this intersection is anticipated to be very low and the level of service will achieve an A for both AM and PM time periods. With low speeds in the area, bike lanes, and sidewalks already provided, the intersection as currently designed will operate well within acceptable levels and minimal delays will be experienced by all modes of transportation. Let me know if you have any questions regarding this traffic letter, or if anything else needs to be provided or clarified. Please give me a call or send an email to bmegaard@hyaliteeng.com with any questions. Sincerely, Brett Megaard, P.E. Project Manager Enclosed: Appendix A: TRIP GENERATION ESTIMATE Appendix B: TRAFFIC FIGURES Appendix C: CAPACITY & LEVEL OF SERVICE ANALYSES M A Y F L Y T O W N H O M E S T R A F F I C I M P A C T L E T T E R J U L Y 2 0 2 2 A P P E N D I X APPENDIX A TRIP GENERATION ESTIMATE ITE Quantity In Out Total In Out Total In Out LUC Land Use 23%77%63%37%50%50% 220 Multifamily Housing (Low-Rise)62 7 22 29 22 13 35 227 227 454 Rate:Rate:Rate: TOTALS:62 7 22 29 22 13 35 227 227 454 May Fly Townhomes Traffic Impact Letter Trip Generation Estimate - Multifamily Housing (Low-Rise) Weekday Morning Peak Hour Weekday Evening Peak Hour Daily Trips 0.46 / UNIT 0.56 / UNIT 7.32 / UNIT M A Y F L Y T O W N H O M E S T R A F F I C I M P A C T L E T T E R J U L Y 2 0 2 2 A P P E N D I X APPENDIX B TRAFFIC FIGURES M:\203430\Traffic Impact Study\Mayfly Figures.dwgSITE LOCATION FIGURE 1 JOB NUMBER : SHEET : SCALE :1" = 1000' 1 OF 101000'2000' DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 PROJECT LOCATION COTTONWOOD ROADJULY 2022 203430 MAY FLY TOWNHOMES HUFFINE LANE FALLON STREET BABCOCK STREET GOOCH HILL ROADLAUREL PKWYELDORADO AVEMAY FLY STREET M:\203430\Traffic Impact Study\Mayfly Figures.dwgSUBDIVISION LAYOUT FIGURE 2 JOB NUMBER : SHEET : SCALE :NTS 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 203430 JULY 2022MAY FLY TOWNHOMES STUDY INTERSECTION M:\203430\Traffic Impact Study\Mayfly Figures.dwgEXISTING TRANSPORTATION SYSTEM FIGURE 3 JOB NUMBER : SHEET : SCALE : 1 OF 10250'500' DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND STOP SIGN TRAFFIC LANE CONFIGURATION TRAFFIC SIGNAL CONTROLLED INTERSECTION 1" = 250' 203430 PROJECT LOCATION FALLON STREETLAUREL PKWYMAY FLY STREETBULL FROG DRIVEPOND LILY DRIVEJULY 2022MAY FLY TOWNHOMES M:\203430\Traffic Impact Study\Mayfly Figures.dwgTRIP DISTRIBUTION FIGURE 4 JOB NUMBER : SHEET : SCALE : 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND TRIP DISTRIBUTION PERCENTAGEXX% 75% 203430 PROJECT LOCATION FALLON STREETLAUREL PKWYMAY FLY STREETBULL FROG DRIVEPOND LILY DRIVE10%15%15% 15% 10% JULY 2022MAY FLY TOWNHOMES 5% 0 250'500' 1" = 250' M:\203430\Traffic Impact Study\Mayfly Figures.dwgTRAFFIC ASSIGNMENT FIGURE 5 JOB NUMBER : SHEET : SCALE : 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND WEEKDAY AM PEAK HOUR WEEKDAY PM PEAK HOUR(XX) XX XXX TURNING MOVEMENTS ESTIMATED AVG WEEKDAY TRAFFIC 203430 PROJECT LOCATION FALLON STREETLAUREL PKWYMAY FLY STREETBULL FROG DRIVEPOND LILY DRIVE501 (1) 1 (3) 3 (2)(2) 1 0 250'500' 1" = 250' JULY 2022MAY FLY TOWNHOMES M:\203430\Traffic Impact Study\Mayfly Figures.dwgESTIMATED 2024 BACKGROUND TRAFFIC FIGURE 6 JOB NUMBER : SHEET : SCALE : 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 XXX TURNING MOVEMENTS ESTIMATED AVG WEEKDAY TRAFFIC LEGEND WEEKDAY AM PEAK HOUR WEEKDAY PM PEAK HOUR(XX) XX 203430 0 250'500' 1" = 250' PROJECT LOCATION FALLON STREETLAUREL PKWYMAY FLY STREETBULL FROG DRIVEPOND LILY DRIVE1206 (5) (5) 6 JULY 2022MAY FLY TOWNHOMES M:\203430\Traffic Impact Study\Mayfly Figures.dwgESTIMATED 2024 TOTAL TRAFFIC FIGURE 7 JOB NUMBER : SHEET : SCALE : 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND WEEKDAY AM PEAK HOUR WEEKDAY PM PEAK HOUR(XX) XX XXX TURNING MOVEMENTS ESTIMATED AVG WEEKDAY TRAFFIC 203430 0 250'500' 1" = 250' JULY 2022MAY FLY TOWNHOMES PROJECT LOCATION FALLON STREETLAUREL PKWYMAY FLY STREETBULL FROG DRIVEPOND LILY DRIVE1707 (6) 1 (3) 3 (2)(7) 7 M:\203430\Traffic Impact Study\Mayfly Figures.dwgTRAFFIC OPERATIONS SUMMARY FOR 2024 TOTAL TRAFFIC FIGURE 8 JOB NUMBER : SHEET : SCALE : 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND WEEKDAY AM PEAK HOUR APPROACH LOS WEEKDAY PM PEAK HOUR APPROACH LOS A A 203430 0 250'500' 1" = 250' JULY 2022MAY FLY TOWNHOMES A A PROJECT LOCATION FALLON STREETLAUREL PKWYMAY FLY STREETBULL FROG DRIVEPOND LILY DRIVE M A Y F L Y T O W N H O M E S T R A F F I C I M P A C T L E T T E R J U L Y 2 0 2 2 A P P E N D I X APPENDIX C CACACITY & LEVEL OF SERVICE ANALYSES HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection Laurel Pkwy & Access Rd Agency/Co.Jurisdiction Date Performed 7/18/2022 East/West Street Access Rd Analysis Year 2024 North/South Street Laurel Pkwy Time Analyzed Total AM Peak Hour Factor 0.87 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description May Fly Townhomes Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 0 0 0 1 0 0 1 0 0 0 1 0 Configuration R TR T Volume (veh/h)3 7 1 7 Percent Heavy Vehicles (%)3 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized No Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.2 Critical Headway (sec)6.23 Base Follow-Up Headway (sec)3.3 Follow-Up Headway (sec)3.33 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)3 Capacity, c (veh/h)1070 v/c Ratio 0.00 95% Queue Length, Q₉₅ (veh)0.0 Control Delay (s/veh)8.4 Level of Service (LOS)A Approach Delay (s/veh)8.4 Approach LOS A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 7.9 Generated: 7/18/2022 1:17:27 PMAccess Tot AM.xtw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection Laurel Pkwy & Access Rd Agency/Co.Jurisdiction Date Performed 7/18/2022 East/West Street Access Rd Analysis Year 2024 North/South Street Laurel Pkwy Time Analyzed Total PM Peak Hour Factor 0.83 Intersection Orientation North-South Analysis Time Period (hrs)0.25 Project Description May Fly Townhomes Lanes Major Street: North-South Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6 Number of Lanes 0 0 0 0 0 1 0 0 1 0 0 0 1 0 Configuration R TR T Volume (veh/h)2 6 3 7 Percent Heavy Vehicles (%)3 Proportion Time Blocked Percent Grade (%)0 Right Turn Channelized No Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)6.2 Critical Headway (sec)6.23 Base Follow-Up Headway (sec)3.3 Follow-Up Headway (sec)3.33 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)2 Capacity, c (veh/h)1070 v/c Ratio 0.00 95% Queue Length, Q₉₅ (veh)0.0 Control Delay (s/veh)8.4 Level of Service (LOS)A Approach Delay (s/veh)8.4 Approach LOS A Copyright © 2022 University of Florida. All Rights Reserved.HCS™TWSC Version 7.9 Generated: 7/18/2022 1:24:21 PMAccess Tot PM.xtw