Loading...
HomeMy WebLinkAbout15_CorrosionAvgCalcs&Table5 < 500 ohm-cm 30 500 - 1000 ohm-cm 25 > 1000 - 1500 ohm-cm 22 > 1500 - 2000 ohm-cm 19 > 2000 - 3000 ohm-cm 10 > 3000 - 5000 ohm-cm 5 > 5000 ohm-cm 0 > 100 ppm = positive 8 50 - 100 ppm = trace 3 < 50 ppm = negative 0 > 15% = Wet 5 5 - 15% = Moist 2.5 < 5% = Dry 0 Pipe below the water 5 table at any time pH 0 - 4 4 pH > 4 - 6 1 pH 6 - 8, with sulfides and low or negative redox 4 pH > 6 0 positive ( 1 ppm)4 trace ( > 0 and < 1 ppm) 1.5 negative ( 0 ppm) 0 = negative 2 = positive 0 - 100 mv 1 = positive > 100 mv 0 Connected to noble metals 2 (e.g. copper) - yes Connected to noble metals 0 (e.g. copper) - no TOTAL POSSIBLE POINTS Cinders, Mine Waste, Peat Bog, Landfill, Fly Ash, Coal RESISTIVITY CHLORIDES MOISTURE CONTENT GROUND WATER INFLUENCE pH SULFIDE IONS REDOX POTENTIAL BI-METALLIC CONSIDERATIONS Known Corrosive Environments POINTS 30 8 5 5 4 4 2 2 60 21 * Soils with Known Corrosive Environments shall be assigned 21 points or the total of points for Likelihood Factors, whichever is greater. Likelihood Score Sheet TABLE 2 – > – > MAXIMUM POSSIBLE POINTS LIKELIHOOD FACTOR AVG. CALCS 19 (1740 OHM) 3 (50 PPM) 5 (19.4%) 5 (YES) 0 (7.58) 1.5 (ASSUMED) 0 (287.75 mV) 2 (YES) 35.5/60 6 DIPRA and Corrpro again listened to the needs of utility operators and recognized the differences between long, large diameter, straight-run transmission mains and the more complicated networks of distribution pipelines that bring water to our neighborhoods and businesses. The result provides a more practical solution for pipeline networks that comprise the distribution systems within a utility’s service area. The use of V-Bio® enhanced polyethylene encasement in conjunction with metallized zinc provides water operators with an effective alternative to controlling corrosion in distribution systems. 3” to 24” 0 30” to 36” 8 42” to 48” 12 54” to 64” 22 Routine (Fair to good access, minimal traffic/other utility 0 consideration, etc.) Moderate (Typical business/ residential areas, some right 8 of way limitations, etc.) Difficult (Subaqueous crossings, downtown metropolitan business areas, 20 multiple utilities congestion, swamps, etc.) 0 to 10 feet depth 0 > 10 to 20 feet depth 3 > 20 feet depth 5 Alternate supply available - no 3 Alternate supply available - yes 0 TOTAL POSSIBLE POINTS PIPE SERVICE LOCATION: Construction-Repair Considerations DEPTH OF COVER CONSIDERATIONS ALTERNATE WATER SUPPLY POINTS 22 20 5 3 50 Consequence Score Sheet TABLE 3 The revised DDM® recognizes the practical differences in corrosion control needs between transmission mains and distribution systems. MAXIMUM POSSIBLE POINTS CONSEQUENCE FACTOR AVG. CALCS 0 (8") 8 0 (6.5') 0 (YES) 8/50