Loading...
HomeMy WebLinkAbout01_CoB-Notification Letter-signedBOZEMANMT Community Development DEVELOPMENT REVIEW APPLICATION Remember to obtain owner signature on this form prior to uploading with the rest of your submittal PROJECT INFORMATION Project Name:Mayfly Townhomes Project Type(s):Subdivision - Preliminary Plat PP Street Address:4 parcels surrounded by S Laurel Parkway, May Fly St, Pond Lilly Dr & Fallon St Legal Description: Lots 1-4, Block 11 of Norton East Ranch Phase 4 Subdivision, S 09, T 2S, R 5E, Plat J-668 Description of Project: Townhome/Duplexes development Current Zoning:R-4 Residential High Density District Existing Use:Undeveloped Proposed Use:Residential Gross Lot Area:238639 Number of Buildings:27 Type and Number of Dwellings:62 Building Size (SF):130000 Non-Residential Building Size (SF):0 Building Height (ft): Affordable Housing (Y/N):No Departure/Deviation Request (Y/N):No Zoning Verification Expedited (Y/N):No PROPERTY OWNER Company Name:Fallon First, LLC Name:Tom Berkley Full Address:PO Box 160250, Big Sky, MT 59716 Email:tom@theoutlawpartners.com Phone:(508) 728-1088 APPLICANT Company Name:Hyalite Engineers, PLLC Name:Brett Megaard Full Address:2304 N 7th Ave, Suite L , Bozeman, Montana 59715 Email:bmegaard@hyaliteeng.com Phone:(406) 587-2781 Mike Magrans mikemagrans@theoutlawpartners.com (646)483-6729 DocuSign Envelope ID: 49F6D738-F519-4FAA-8948-2C526AB0D3AF REPRESENTATIVE Company Name:Hyalite Engineers, PLLC Name:Brett Megaard Full Address:2304 N 7th Ave, Suite L , Bozeman, Montana 59715 Email:bmegaard@hyaliteeng.com Phone:(406) 587-2781 CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal. This application PDF must also be signed by the property owner(s) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance - I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance. Property Owner Signature: Printed Name:Tom Berkley CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozemn, MT 59715 planning@bozeman.net www.bozeman.net/planning Mike Magrans DocuSign Envelope ID: 49F6D738-F519-4FAA-8948-2C526AB0D3AF