HomeMy WebLinkAbout029.01 Appendix CC.1 - Wetland Review Comment ResponsesMarch 24, 2023
Lynn Hyde, Development Review Planner
City of Bozeman
20 East Olive Ave
Bozeman, MT 59771
RE: Aaker Subdivision Aquatic Resource Response to Second Review (#22311)
Ms. Hyde,
In his March 20, 2023 letter to the City of Bozeman, the wetland reviewer, Dr. William
Kleindl, PWS, correctly noted that an analysis of impacts to wetland hydroperiod was
not included, nor was a monitoring plan with performance criteria included. He also had
some concerns regarding the placement of fill for the stormwater retention pond outfalls.
The following discussion is intended to address these concerns.
Assessment of Potential Changes in Wetland Hydroperiod
Wetlands on-site are associated with surface waters, some of which occur within natural
drainages that have been degraded over the years from agricultural practices, and
others that are wholly or partially supported artificially by irrigation water. The Aaker
project proposes to enhance the hydroperiod of the naturally formed wetland, W-01, and
adversely impact the hydroperiod of the artificial wetlands found in the central irrigation
ditch, Ditch-02/W-02. This will occur by diverting water westward at the south end of
Ditch-02 through a pipe and swale to the W-01. Please refer to the attached Figure WL
1.4. Perennial stream flows and flood flows are diverted from Ditch-02 to W-01, thereby
increasing the hydroperiod of that drainage and providing additional hydrologic support
to the floristically diverse, higher functioning wetland found there.
Conversely, wetland W-02 which occurs on either side of the irrigation ditch (Ditch-02),
and consists primarily of a narrow band of reed canarygrass, would receive less water.
This wetland is currently artificially supported by irrigation water. The future frequency
and duration of flows along the ditch are unknown at this time and will be determined by
the needs for water by the sole downstream water right holder, the State of Montana at
the Montana State Department of Livestock facility located at 1911 West Lincoln Street.
It is more likely than not that the vegetation comprising W-02 will be able to persist
indefinitely along Ditch-02 under the new hydroperiod.
In my opinion, the enhancement of the hydroperiod of W-01 outweighs the change to
the hydroperiod to W-02 and that an overall increase in wetland function will result from
this modification.
Confluence Consulting Inc.
Aaker Subdivision Aquatic Resource Response
2
Temporary impacts to hydroperiod may be necessary at other impact locations during
construction, but no other permanent impacts to hydroperiod are anticipated.
Construction dewatering will be conducted in a manner that minimizes the impacts to
hydroperiod to areas outside of the impact zones, as well as minimizes turbidity of the
water returned to the wetlands or streams.
Monitoring Plan
As discussed in the application, all permanently impacted areas will be mitigated at the
Upper Missouri Mitigation Bank, and all temporarily disturbed areas will be restored to
original elevations and configuration and revegetated with salvaged sod and topsoil,
and a native wetland seed mix. It is important to note that the temporary disturbances
proposed at these locations will result primarily from vehicular access during
construction of the transportation and park infrastructure (e.g., Kagy Boulevard, the
pedestrian bridges). As such, the disturbances are anticipated to be topical and not
fundamentally change the soils, hydrology, or functioning of these sites. For this reason
the proposed monitoring should focus on the success or failure of the revegetation
efforts. Please note that this monitoring plan has been added to the Parks Plan per the
reviewer’s request.
Monitoring of the temporarily disturbed wetland areas will be conducted as follows:
Monitoring will be initiated in late June or July the first new growing season
following the impacts.
Monitoring will occur for two years, or until the success criteria has been
achieved.
Year 1
Two photo points will be established at each impact location, for a total of 16
photo points.
Visual estimates of percent cover at each temporarily impact site will be made by
a wetland scientist.
Notes on the wetland hydrology observed during the site visit will be completed.
A brief technical memorandum will be prepared to document the findings,
determine whether or not the sites meet the performance criteria, and provide
recommendations if they are not.
Year 2
Repeat photos will be taken from each of the 14 photopoints established in Year
1.
Visual estimates of percent cover at each temporarily impact site will be made by
a wetland scientist.
Notes on the wetland hydrology observed during the site visit will be completed.
Individual wetland sample points will be completed at each temporarily impacted
site (9 sample points).
Confluence Consulting Inc.
Aaker Subdivision Aquatic Resource Response
3
A brief technical memorandum will be prepared to document the findings,
determine whether or not the sites meet the performance criteria, and provide
recommendations if they are not.
Performance Criteria
Each temporarily impacted site will be deemed to be successful if it achieves the
following performance criteria:
1. The site is determined to be a wetland using current guidance from the U.S.
Army Corps of Engineers; and
2. The site is dominated by ≥50% native hydrophytic vegetation.
3. The site contains less than 5% state listed noxious weeds.
Stormwater Retention Pond Outfalls
The Stormwater Design Report - Appendix U has been updated to reflect the current
design. The stormwater retention basins are designed to fully retain storm-runoff from a
city prescribed design storm event (i.e., 10 yr, 2 hr, storm). Overflow discharges will be
infrequent and occur only during large storm events. None of the retention basin
overflow “outfalls” disturb wetlands. The following is excerpted from page 5 of the
updated Stormwater Design Report, and I’ve attached the latest stormwater figure to the
end of this letter.
To accommodate discharge from storm events larger than the design event all
retention systems have overflow provisions sized to meet the 25-year peak flow
event. The retention basins will contain a significant amount of runoff even from
large events, dramatically reducing the actual overflow flow rate and occurrence.
To reduce impacts to the adjacent wetland and stream the retention basins in the
City Park have a broad rip-rap overflow that allows overflows to disperse into the
wetlands adjacent to the stream. The bio-retention basins all include an overflow
structure at the downgradient side that conveys the overflow out of the street.
The west bioretention overflow (Basin 3) discharges just outside of the wetlands.
The east bio-retention overflow (Basin 5) discharges directly to the stream
crossing culvert beneath the roadway. Overflows are anticipated to rarely occur,
but even so all the basin overflows are situated to minimize impacts to the
adjacent wetlands and stream.
Confluence Consulting Inc.
Aaker Subdivision Aquatic Resource Response
4
Please let me know if you or Dr. Kleindl have any further questions or require additional
information.
Regards,
Richard McEldowney, PWS
Sr. Wetland Scientist
Enclosures
Cc: File, Connor Brown, Cordell Pool
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEPROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESWEST UNIVERSITY LLC
BOZEMAN, MONTANAWL 1.4ENLARGEDIMPACT AREAWEST DRAINAGERETURNAAKER PHASE 1 SUBDIVISION
W W W W W
WWWWWWWWWWWWWWWWWWWWWWWWWWWWW
W
W
WWWWWWWWWW W
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SSSSSSSSSSSS
SS
SS
SSSSSSSSSSSSSSSSSSUGEUGEUGEUGEUGEUGEUGEUGEUGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
WWWWWWWWWWWWWWWWWGASGASGASGASGASGASSS SS SS SS SS SS SS SS SS SS
SS SS SS SS SS SS UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGCUGCUGCUGCUGCUGCUGCUGCUGCUGCUGC UGCUGCUGCUGEUGEUGEUGEUGEUGEUGE
UGEBB B B BBB8'8'8'
1 5-13-22 PHASE 1 PRE-APP CDP ZWL
2 10/11/2022 PRELIMINARY PRICING CDP ZWL
3 10/26/2022 PRELIMINARY PLAT CDP ZWL
4 2/2/2023 PRELIM PLAT RC1 CDP ZWL
5 3/23/2023 PRELIM PLAT RC2 CDP ZWL PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESAAKER PHASE 1 SUBDIVISION
LOCATED IN THE SE 14 OFSECTION 14, T2S, R5EWEST UNIVERSITY, LLCBOZEMAN, MONTANAC5.0PH1 DRAINAGEAND GRADINGPLANNOTES:1.SUBDIVISION STORMWATER RETENTION INCLUDES PHASE 1STREETS.2.ALL LOTS TO HAVE ON-SITE RETENTION.