Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
012 AP3.01A Building Elevations Building A
T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" 2 2 T.O. SLAB -MAIN LEVEL 100' -0" T.O. SLAB -MAIN LEVEL 100' -0" T.O. GYPCRETE -2ND LEVEL 110' -9 3/8" T.O. GYPCRETE -2ND LEVEL 110' -9 3/8" T.O. ROOF 155' -6 7/16" T.O. ROOF 155' -6 7/16" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -3RD LEVEL 130' -7 7/8" T.O. PLATE -3RD LEVEL 130' -7 7/8" T.O. PLATE -2ND LEVEL 119' -10 1/2" T.O. PLATE -2ND LEVEL 119' -10 1/2" 8 8 T.O. PARAPET 143' -11 1/4"T.O. PARAPET 143' -11 1/4" 9 9 7 7 4 4 5 5 6 6 3 3 T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. GYPCRETE -4TH LEVEL 132' -4 1/8"T.O. GYPCRETE -4TH LEVEL 132' -4 1/8" 10 10 1 1 EX-01 EX-04 EX-01 EX-06 EX-06 EX-01 EX-01 EX-06 EX-04 EX-04 EX-04 EX-04 EX-04 EX-04 EX-04 EX-04 7" 12" 7" 12" 1 EX-04 EX-09 EX-04 EX-10EX-10 EX-05 2 T.O. PLATE -4TH LEVEL 141' -5 1/4" T.O. PLATE -4TH LEVEL 141' -5 1/4" EX-05 EX-05 7" 12" 7" 12" 7" 12" 7" 12" 7" 12" 7" 12"3" / 12"3 T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -2ND LEVEL 110' -7 7/8" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" T.O. SUBFLOOR -3RD LEVEL 121' -5 1/4" 2 2 T.O. SLAB -MAIN LEVEL 100' -0" T.O. SLAB -MAIN LEVEL 100' -0" T.O. GYPCRETE -2ND LEVEL 110' -9 3/8"T.O. GYPCRETE -2ND LEVEL 110' -9 3/8" T.O. ROOF 155' -6 7/16" T.O. ROOF 155' -6 7/16" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. GYPCRETE -3RD LEVEL 121' -6 3/4" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -MAIN LEVEL 109' -1 1/8" T.O. PLATE -3RD LEVEL 130' -7 7/8" T.O. PLATE -3RD LEVEL 130' -7 7/8" T.O. PLATE -2ND LEVEL 119' -10 1/2" T.O. PLATE -2ND LEVEL 119' -10 1/2" 8 8 T.O. PARAPET 143' -11 1/4" T.O. PARAPET 143' -11 1/4" 9 9 7 7 4 4 5 5 6 6 3 3 T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. SUBFLOOR -4TH LEVEL 132' -2 5/8" T.O. GYPCRETE -4TH LEVEL 132' -4 1/8" T.O. GYPCRETE -4TH LEVEL 132' -4 1/8" 10 10 1 1 7" 12" 7" 12" 7" 12" 7" 12" 7" 12" 7" 12" EX-01 EX-08 EX-03 EX-01 EX-03 EX-04 EX-04 EX-04 EX-04 EX-01 EX-04 EX-04 EX-04 EX-04 EX-01 EX-04 EX-06 EX-06 EX-06 EX-01 EX-09 EX-04 EX-05 T.O. PLATE -4TH LEVEL 141' -5 1/4" T.O. PLATE -4TH LEVEL 141' -5 1/4" EX-04 EX-04 EX-04 EX-043" / 12"7" 12" 7" 12" 4 SHEET PROJECT NUMBER 81211 Gallatin Rd. Suite E Bozeman, Montana 59718 406.587.9968 studiohdesigninc.comPRINTED ON:PROJECT #:FILE PATH:PROJECT NAME:DRAWN BY:CHECKED BY:THESE DRAWINGS ARE THE ORIGINAL UNPUBLISHED WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED OR USED WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT.REVISIONS ISSUED ISSUE DATE:2/24/2023 3:07:42 PMC:\Users\SHD8\Documents\201808-09_Nexus_PH II Apartments_r2022_sclaytonYP63S.rvtAP3.01A 201808-09 BUILDING ELEVATIONSNEXUS POINT PH II -36 PLEXAP3.01A201808-09NEXUS POINT PH II -36 PLEXAuthorChecker02/24/202302/24/2023 SITE PLAN SUBMITTALBOZEMAN, MONTANABLDG. TYPE A1/8" = 1'-0"AP3.01A 1 FRONT ELEVATION 1/8" = 1'-0"AP3.01A 2 STREET ELEVATION TRANSPARENCY CALCULATIONS ELEVATION % TRANSPARENT FRONT STREET SIDE 1 SIDE 2 25.1% 27.0% 16.4% 16.9% FACADE AREA GLAZING AREA 7,196SF 8,208 SF 3,820 SF 3,795 SF 1,808 SF 2,218 SF 625 SF 641 SF EXTERIOR FINISH SCHEDULE MARK DESCRIPTION MANUFACTURER MODEL SERIES DIMENSIONS FINISH COLOR COMMENTS EX-01 CEMENTITIOUS LAP SIDING JAMES HARDIE HARDIE PLANK LAP SIDING SELECT CEDARMILL 8 1/4" WIDTH; 7" EXPOSURE FACTORY PAINT LIGHT MIST EX-02 STANDING SEAM, 12" O.C. BRIDGER STEEL TRU-SNAP W/ STRIATIONS 12" X 1 1/2" x 22 G.A. FACTORY PAINT TETON EX-03 CHANNEL RUSTIC CEDAR - HORIZONTAL PER CONTRACTOR - - 1X6 STOCK; 1/2" REVEAL FIELD PANT "MOUNTAIN ASH" SW 3540 EX-04 VERTICAL CORRUGATED METAL SIDING BRIDGER STEEL 7/8" CORRUGATED - 37" x 7/8" x 24 G.A. FACTORY PAINT MATTE BLACK EX-05 VERTICAL CORRUGATED METAL SIDING BRIDGER STEEL 7/8" CORRUGATED - 37" x 7/8" x 24 G.A. FACTORY PAINT OLD ZINC GRAY EX-06 SHIPLAP PANEL BRIDGER STEEL SHIPLAP PANEL - 9" COVERAGE W/ 1/2" REVEAL FACTORY PAINT OLD ZINC GRAY EX-07 ASPHALT SHINGLES MALARKEY - HIGHLANDER NEX, AR - - MIDNIGHT BLACK EX-08 STRUCTURAL STEEL FRAMING PER CONTRACTOR - - - FIELD PAINT "IRON ORE" SW7069 STRUCTURAL STEEL EX-09 4x4 METAL WIRE MESH PER CONTRACTOR - - - FIELD PAINT "IRON ORE" SW7069 EX-10 FASCIA PER CONTRACTOR - - - FIELD PAINT "IRON ORE" SW7069 FASCIA SHEET NOTES 1 EXTERIOR WALL SCONCE "CASCADE 1830SK", TYP. 2 ELECTRICAL METER LOCATION, TYP. 3 ARCHITECTURAL SCREEN 4 WATER AND FIRE RISER ROOM, SEE PLANS